Loading...
HomeSearchMy WebLinkAbout; ; 1966 Joint Powers Sewage Facilities AUDIT REPORT; 1966-06-30; ; 1967 Vista-Carlsbad-Buena Joint Sewerage System AUDIT REPORT; 1967-06-30; ; 1968 Vista-Carlsbad-Buena Joint Sewerage System FINANCIAL STATEMENTS; 1968-06-30; ; 1969 Joint Powers Sewerage System AUDIT REPORT; 1969-06-30; ; 1970 Joint Powers Sewerage System AUDIT REPORT; 1970-06-30; ; 1971 Joint Powers Sewerage System AUDIT REPORT; 1971-06-30; ; 1972 Joint Powers Sewerage System AUDIT REPORT; 1972-06-30; ; 1973 Joint Powers Sewerage System AUDIT REPORT; 1973-06-30; ; 1974 Joint Powers Sewerage System AUDIT REPORT; 1974-06-30; ; 1975 Joint Powers Sewerage System AUDIT REPORT; 1975-06-30; ; 1976 Joint Powers Sewerage System AUDIT REPORT; 1976-06-30; ; 1977 Joint Powers Sewerage System AUDIT REPORT; 1977-06-30; ; 1978 Joint Powers Sewerage System AUDIT REPORT; 1978-06-30; ; 1985 - URBAN WATER MANAGEMENT PLAN FOR THE COSTA REAL MUNICIPAL WATER DISTRICT; 1985-01-01; ; 1990 - URBAN WATER MANAGEMENT PLAN FOR CARLSBAD MUNICIPAL WATER DISTRICT; 1990-12-04; ; 1997 - URBAN WATER MANAGEMENT PLAN FOR CARLSBAD MUNICIPAL WATER DISTRICT; 1997-04-01; ; 2000 - URBAN WATER MANAGEMENT PLAN FOR CARLSBAD WATER MUNICIPAL DISTRICT; 2000-01-01; ; 2010 URBAN WATER MANAGEMENT PLAN; 2011-05-06; ; 2019 Asset Management Master Plan Carlsbad Municipal Water District and the City of Carlsbad; 2019-06-17; ; 2019 Potable Water Master Plan Carlsbad Municipal Water District; 2019-06-17; ; 2019 Recycled Water Master Plan Carlsbad Municipal Water District; 2019-07-15; ; 2019 Sewer Master Plan City of Carlsbad; 2019-06-17; ; 2021 Potable and Recycled Water Rate Study; 2021-10-01; ; 2021 Wastewater Rate Study; 2021-10-01; ; COSTA REAL MUNICIPAL WATER DISTRICT - MASTER PLAN FOR PUBLIC WATER SYSTEM; 1985-02-01; ; Design of Squires Dam and Appurtenant Structures for Carlsbad Municipal Water District; 1961-02-16; ; Encina Water Pollution Control Facility Joint Advisory Committee ENCINA PLANT EXPANSION FINAL DESIGN REPORT; 1973-09-18; ; ENGINEERING REPORT TO THE CARLSBAD MUNICIPAL WATER DISTRICT; 1995-06-01; ; Environmental Impact Report, Improvement, Enlargement of the Buena Vista and Agua Hedionda Pumping Stations; 1974-10-11; ; Geotechnical Parameters Carlsbad Boulevard Overhead Bridge 573-134 Seismic Retrofit; 2001-03-05; ; OVERVIEW FOR PUBLIC NON-POTABLE WATER SOURCES AND MASTER PLAN FOR PUBLIC NON-POTABLE WATER SYSTEM; 1982-09-01; ; PRELIMINARY GEOTECHNICAL INVESTIGATION; TWO PROPOSED WATER STORAGE TANKS SOUTH OF PALOMAR AIRPORT ROAD BETWEEN I-5 AND EL CAMINO REAL; 1990-10-02; ; SEWER GIS SUBMITTAL; 2003-02-01; 2015 Urban Water Management Plan Final Carlsbad Municipal Water District; 2015 Urban Water Management Plan; 2016-06-30; Beech Avenue Sewer Geotechnical; Beech Avenue Sewer Geotechnical; 2008-10-21; Buena Interceptor Sewer and Vallecitos Interceptor Sewer; ASSESSMENT REPORT; 2004-02-14; Carlsbad Municipal Golf Course Toxicity Testing; Toxicity Testing for Municipal Golf Course Water Quality; 2006-07-05; Carlsbad Municipal Water District; Addendum to Design of Squires Dam and Appurtenant Structures for Carlsbad Municipal Water District; 1961-10-01; Carlsbad Research Center-Reflex II on Lot 64, 1825 Aston Av; GEOTECHNICAL INVESTIGATION AND FOUNDATION RECOMMENDATIONS; 1998-06-30; Encina Basin Water Reclamation Program; Phase II Project - State Water Resources Control Board Fourth Annual Report; 2012-02-16; Municipal Golf Course Toxicity Testing Water Qual; Toxicity Testing Municipal Golf Course Water Qual; 2007-07-20; Municipal Golf Course Water Quality Monitoring; Water Quality Monitoring Plan Municipal Golf Course; 2004-11-18; Palomar Solid Waste Transfer Station; County of San Diego Environmental Impact Report-Draft; 1977-07-29; Poinsettia Park Sewer Geotechnical Investigation; Poinsettia Park Sewer Geotechnical Investigation; 1995-12-14; Right of Way 869 Square Foot Parcel Licensed Drainage Facility Appraisal Report; LICENSED DRAINAGE FACILITY; 2014-01-31; Terramar Sewer Assessment District; Soils Report; 1964-12-24; Tri-Agencies Water Transmission Pipeline Draft EIR; Tri-Agencies Water Transmission Pipeline Draft EIR; 1975-02-01; Vista/Carlsbad Interceptor Sewer/Oak Storm Dr; Vista/Carlsbad Interceptor Sewer/Oak Storm Dr; 1982-08-311077; Park Drive Sewer Line Trench Backfill Compaction; Park Drive Sewer Line Trench Backfill Compaction; 1980-10-273182 | 3528; Vista/Carlsbad Interceptor Sewer/ S CV Storm Drain; Vista/Carlsbad Inter Sewer/ S CV Storm Drain Pt 1; 1998-01-303182 | 3528; Vista/Carlsbad Interceptor Sewer/ S CV Storm Drain; Vista/Carlsbad Inter Sewer/ S CV Storm Drain Pt 2; 1998-01-3031821A; VISTA/ CARLSBAD INTERCEPTOR SEWER; SUBMITTALS;31821A; VISTA/ CARLSBAD INTERCEPTOR SEWER; TEST RESULTS;3184; CANNON ROAD WEST; SEWER MAIN CONSTRUCTION; 1985-11-063303; Agua Hedionda Sewage Pump Station; Agua Hedionda Sewer Pump Station Soils Condition; 1991-04-193338; Agua Hedionda & Calavera Creek Dredging; Calavera Lake Water Chemistry, Diversity, Structure, Toxin;3417; LA COSTA DOWNS; SEWER LOG REPORTS; 1996-03-013537; Vista/Carlsbad Interceptor Sewer; Agua Hedionda Sewer Access Road; 1998-07-143537; Vista/Carlsbad Interceptor Sewer; North Agua Hedionda Interceptor Access Road Shoreline; 2003-07-233537; Vista/Carlsbad Interceptor Sewer; North Agua Hedionda Interceptor Microtunneling Access Shafts; 2007-07-093537; Vista/Carlsbad Interceptor Sewer; North Agua Hedionda Interceptor West Archaeological; 2009-04-153537; Vista/Carlsbad Interceptor Sewer; North Agua Hedionda Interceptor; 2003-07-243674; Sewer Study Poinsettia Lane - Dejong Property; Sewer Study Poinsettia Lane - Dejong Property; 1999-03-253873; Home Plant Lift Station Sewer Pipeline Replacement; Geotechnical Evaluation; 2008-03-053873; Home Plant Lift Station Sewer Pipeline Replacement; Home Plant Lift Station Sewer Pipeline Replacement; 2008-03-053873; Sewer Pipeline Replacement,2359 Carlsbad Blvd.; Sewer Pipeline Replacement,2359 Carlsbad Blvd.; 2009-03-05480530-01; Home Plant Sewer Pump Station Storage Res.; Home Plant Sewer Pump Station Storage Res.; 1980-08-065035; LA COSTA WATER MAIN REPLACEMENT; GEOTECHNICAL EVALUATION; 2017-01-275208; RECYCLED WATER PHASE III PIPELINE EXPANSION SEGMENTS 1A AND 7; GEOTECHNICAL EVALUATION; 2014-11-255208-A; RECYCLED WATER PHASE III PIPELINE EXPANSION SEGMENT 9; GEOTECHNICAL EVALUATION; 2016-06-145501-2; BUENA INTERCEPTOR SEWER BIOLOGICAL ODOR CONTROL; SUBMITTALS; 2018-03-135503-11; PIPELINE CIPP REHABILITATION PHASE I; SEWER INSPECTION REPORTS; 2017-06-075512; Beech Avenue Sewer Project; Beech Avenue Sewer Project; 2008-12-305515; HDD SEWER EXTENSION; SUBMITTALS (2013);5515; VANCOUVER STREET HDD SEWER EXT.; SUBMITTALS; 2013-12-105515; VANCOUVER STREET HDD SEWER EXTENSION; SUBMITTALS;6024-1; ; Geotechnical Evaluation La Costa Avenue Slope Failure; 2008-02-256604-1; ; Geotechnical Evaluation Romeria Street Drainage Improvement; 2008-06-279001-1; SEA CLIFF SEWER ACCESS HOLE REPLACEMENTS; LAB REPORT; 2006-05-08CMWD 85-401; North Batiquitos Force Sewer Main Geotech; North Batiquitos Force Sewer Main Geotech; 1996-02-14CMWD 85-401; North Batiquitos Force Sewer Main Geotech; North Batiquitos Force Sewer Main Geotechnical; 1996-02-14CMWD 85-401; North Batiquitos Force Sewer Main Geotech; North Batiquitos Sewage Force Main Geotech; 1997-02-14CP 3828; Agua Hedionda Trunk Sewer Main; Agua Hedionda Trunk Sewer Main Reach SAHT 1E; 2000-10-23CT 05-13; LA COSTA RIDGE NEIGH 2.6; COMPACTION TEST RESULTS FOR SEWER & WATER LINE TRENCH BACKFILL; 2009-12-07CT 06-25; ROBERTSON RANCH EAST VILLAGE PA 21; SEWER REPORTS;CT 74-21; Carlsbad Oaks Business Center Lot 22; UPDATED GEOTECHNICAL INVESTIGATION - Proposed Concrete Tilt-Up Structure Lot 22; 1998-02-11CT 81-46; AIRPORT BUSINESS CENTER CT 81-46 Unit 1, Lot Nos, 7, 8, 11 and 15; GEOTECHNICAL INVESTIGATION; 1996-05-08CT 83-36; Terraces at Sunny Creek; WATER SYSTEM ANALYSIS FOR THE SUNNY CREEK PROJECT CT 83-36; 1991-02-14CT 84-32; Cobblestone Sea Village Units 1&2; SEWER STUDY; 1996-03-06CT 84-32; Cobblestone Sea Village; WATER DISTRIBUTION SYSTEM ANALYSIS; 1996-03-06CT 85-24; Carlsbad Research Center Offsite Sewer; Soils Report; 1988-04-29CT 85-35C; Murphy Sewer Storm Drain; Soils Report; 1989-09-25CT 97-13; EL FUERTE SEWER LIFT STATION; TECHINICAL SPECIFICATIONS; 2006-02-10CT 99-04; VILLAGES OF LA COSTA OAKS AND RIDGE; LABORATORY TEST RESULTS FOR SEWER ACCESS ROAD; 2007-07-18CUP 11-06; FAIRFIELD INN CARLSBAD; SEWER SURVEY; 2013-12-02CUP 98-03; CHEVRON 93320 970 TAMARACK AVE; GEOTECHNICAL INVESTIGATION; 1998-01-09EIA 99-09; Encina Basin Water Reclamation Program Phase II; 3RD ANNUAL PROGRESS REPORT - STATE WATER RESOURCES CONTROL BOARD WATER RECYCLING FUNDING PROGRAM LOANS 3903-030, 110 AND 120; 2011-01-01EIA 99-09; Encina Basin Water Reclamation Program Phase II; 4TH ANNUAL PROGRESS REPORT - STATE WATER RESOURCES CONTROL BOARD WATER RECYCLING CONSTRUCTION PROGRAM AGREEMENT 02-737-550-0; 2012-01-01EIA 99-09; Encina Basin Water Reclamation Program; 5TH ANNUAL PROGRESS REPORT - STATE WATER RESOURCES CONTROL BOARD WATER RECYCLING CONSTRUCTION PROGRAM AGREEMENT 02-737-550-0; 2013-01-01EIR 83-05; Alanda; Environmental Impact Report- Draft; 1983-08-15MS 11-02; SOHAEI MINOR SUBDIVISION; SEWER SURVEY; 2015-11-02PD 411; RANCHO CARRILLO; SEWER STUDY FOR RANCHO CARRILLO OFF-SITE SEWER CMWD 86-502; 1997-01-14PD 431; LA TERRAZA; SEWER FLOW CALCULATIONS; 1994-11-07PD 479; Carlsbad Research Center Lots 47 and 48; UPDATED GEOTECHNICAL INVESTIGATION - Proposed Concrete Tilt-Up Structure; 1996-09-26PD 484; CALLAWAY GOLF FACILITY; GEOTECHNICAL INVESTIGATION PROPOSED GOLF BALL FACILITY LOT 39 AND 40 CARLSBAD RESEARCH CENTER RUTHERFORD ROAD; 1997-10-10PD 499; Carlsbad Research Center Unit 5, Lot 106; LIMITED GEOTECHNICAL ANALYSIS FOUNDATION RECOMMENDATIONS; 1997-11-25PD 514; Carlsbad Research Center, Lot 66; PRELIMINARY GEOTECHNICAL EVALUATION; 1996-11-11PD 518; Carlsbad Research Center Lot 98; PRELIMINARY GEOTECHNICAL EVALUATION; 1998-08-03PDP 01G; ENCINA WASTEWATER POLLUTION CONTROL FACILITY; SOIL COMPACTION TESTS- ACID WASTE & SEWER PIPELINES;PIP 89-14; Carlsbad Oaks Lot 25 Business Park; REPORT OF GEOTECHNICAL INVESTIGATION; 1996-10-24PIP 97-05; Carlsbad Oaks Business Center Lot 18; UPDATED GEOTECHNICAL INVESTIGATION; 1996-12-23PIP 98-06; Carlsbad Oaks East - Lots 32,33 & 34; GEOTECHNICAL INVESTIGATION CMWD 98-213; 1997-11-19PS 205; Church of the Nazarene; FOUNDATION SOILS INVESTIGATION; 1974-01-29SDP 09-05; PALOMAR COMMONS; CONSIDERATIONS FOR EXISTING SEWER MAINS DURING GRADING; 2012-06-01SDP 97-10; Optimal Integrated Solutions; UPDATED GEOTECHNICAL INVESTIGATION; 1997-06-25SUP 88-02; CRMWD Operations Center; Soils Investigation; 1988-10-27