HomeMy WebLinkAbout2820 LOKER AVE E; ; CBC2022-0185; PermitBuilding Permit Finaled
(cityof
Carlsbad
Commercial Permit
Print Date: 10/28/2024
Job Address: 2820 LOKER AVE E, CARLSBAD, CA 92010-6608
Permit No:
Status:
CBC2022-0185
Closed -Finaled
Permit Type: BLDG-Commercial Work Class: Tenant Improvement
Parcel #: 2090831500 Track#: Applied: 06/01/2022
Valuation: $4,128,299.92 Lot#: Issued: 11/16/2022
Occupancy Group: B/F-1/S-1 Project#: DEV2022-0135 Finaled Close Out: 10/28/2024
#of Dwelling Units:
Bedrooms:
Bathrooms:
Occupant Load: 400
Code Edition: 2019
Sprinkled: Yes
Project Title: ABSORPTION SYSTEMS
Plan#:
Construction Type:I11-B
Orig. Plan Check#:
Plan Check#:
Final Inspection: 11/15/2023
INSPECTOR: Cheung, Nathaniel
Kersch, Tim
Salcedo, Felix
Renfro, Chris
Ontiveros, Linda
de Roggenbuke, Dirk
Alvarado, Tony
Description: ABSORPTION SYSTEMS: COM-Tl (63,786 SF) PHASE II-SHELL TO OFFICE/WAREHOUSE MEZZANINE, LAB, EXTERIOR WORK,
GENERATOR ENCLOSURE AND DOCK SCREENING
Applicant: Property Owner:
WARE MALCOMB ARCHITECTS
NATHAN DEAN
TECHBILT INCOME PROPERTIES INC
PO BOX 80036
3911 SORRENTO VALLEY BLVD, # STE 120
SAN DIEGO, CA 92121-1456
(858) 638-7277
FEE
BUILDING INSPECTION FEE
BUILDING INSPECTION FEE
BUILDING PLAN CHECK
SAN DIEGO, CA 92138-0036
(619) 223-1663
BUILDING PLAN REVIEW-MINOR PROJECTS (LOE)
BUI LDING PLAN REVIEW -MINOR PROJECTS (PLN)
CERTIFICATE OF OCCUPANCY
COMM/IND Tl -STRUCTURAL
FIRE F Occupancies Tl
FIRE Haz Mat Storage Chem Class 26-100 Chems
PUBLIC FACILITIES FEES -inside CFO
SB1473 -GREEN BUILDING STATE STANDARDS FEE
SEWER CONNECTION FEE (General Capacity al l areas)
STRONG M OTION -COMMERCIAL (SMIP)
SWQMP INSPECTION (subsequent acre >than .5 acres)
TRAFFIC IMPACT Commercial-Industrial w/in CFO
Total Fees: $178,629.64 Total Payments To Date:
Building Division
$178,629.64
CoApplicant:
THE WHITING TURNER CONTRACTING CO
3911 SORRENTO VALLEY BLVD, # STE 100
SAN DIEGO, CA 92121-1457
(858) 792-0600
Balance Due:
AMOUNT
$516.00
$516.00
$3,089.74
$194.00
$98.00
$16.00
$5,215.30
$691.00
$1,204.00
$75,135.06
$166.00
$22,693.62
$1,155.92
$1,083.00
$66,856.00
$0.00
Page 1 of 2
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
Building Permit Finaled
Commercial Permit
Print Date: 10/28/2024 Permit No:
C cityof
Carlsbad
CBC2022-0185
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
Building Division Page 2 of 2
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
C cityof
Carlsbad
COMMERCIAL
BUILDING PERMIT
APPLICATION
B-2
Plan Check
Est. Value
PC Deposit
Date
Job Address 2820 LOKER AVE. EAST CARLSBAD, CA. 92010
Tenant Name#: ABSORPTION SYSTEMS
Suite: APN: 209 -083 -15 -----
Lot#: 24 & 25 Year Built: 2017 -----------
Year Built:._2_01_7 __ Occupancy: B/F-1Is-1 Construction Type:_11_1-B __ Fire sprinklers(:)YESO NO A/c:eYES0No
BRIEF DESCRIPTION OF WORK: F'HASE 2: FULL-BUILDING, FIRST GENERATION TENANT IMPROVEMENT WITI<IN AN EXISTING COLO-SHELL WAREHOUSE BUILDING tW1TH MEZZANINE FOR OFFICE SPACE)
IMPROVEMENT$ INCLUDE LAB & VIVARIUM SPACE, OFFICE AND AMENITY SPACES EXTERIOR MECHANICAL YARD. EXTERIOR GENERATOR ENCLOSURE AND DOCK SCREENING.
D Addition/New: _____________ New SF and Use,, ___________ New SF and Use
_______ SF Deck, SF Patio Cover, SF Other (Specify) ___ _
liJTenant Improvement: _____ SF, Existing Use: ________ Proposed Use: _______ _
_ 63_. _186 ____ SF, Existing Use: B1F-11s-, Proposed Use: _8_1F-_11_s-_, ____ _
D Other: ______ R-=-=E=-C~E.+-/\~/EP-+-'Ot------------
PRIMARY APPLICANT
Name: NATHAN DEAN
Address: 3911 SORRENTO VALLEY BLVD, #120
'fj•• 01 202Z
ARLSBAD
BUILDING DIVIS/Orv
PROP£RTY OWNER
Name: TECHBILT INCOME PROPERTIES, INC.
Address: P.O. Box 80036
City: SAN DIEGO State: CA Zip:,_9_21_2_1 ___ City: SAN DIEGO State: __ c_A __ Zip: 92120
Phone: 858.638.7222 Phone: 619.223.1663
Email: NDEAN@WAREMALCOMB.COM Email: RAUL@TECHBILT.COM
DESIGN PROFESSIONAL
Name: NATHAN DEAN
Address: 3911 SORRENTO VALLEY BLVD, #120
City: SAN DIEGO
Phone: 858.638.7222
State:_c_A __ Zip: 921 21
Email: NDEAN@WAREMALCOMB.COM
Architect State License: _c_3_31_8_5 _________ _
CONTRACTOR OF RECORD
Business Name: WHITING-TURNER CONTRACTING COMPANY
Address: 3911 SORRENTO VALLEY BLVD, #100
City: SAN DIEGO State: CA Zip:._9_2_,2_, _____ _
Phone: ssa.792.0600
Email: NICK.DEKOVIC@WHITING-TURNER.COM
CSLB License#: 311107 Class:_A_&_B ______ _
Carlsbad Business License# (Required):_B_Lo_s_1_2_37_2_5o ____ _
APPLICANT CERT/FICA TION: I certify that I have read the application and state that the above information is correct and that the
information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building
construction.
NAME (PRINT):N __ at_h_an_D_ea_n ______ _ ("\~ 5/23/2022 SIGN:-~---+'~"""-"---"'=-------------' DATE:-------
1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719 Email: 8uildlng@carlsbadca.gov
REV. 04/22
THIS PAGE REQUIRED AT PERMIT ISSUANCE PLAN CHECK NUMBER: ______ _
1
A BUILDING PERMIT CAN BE ISSUED TO EITHER A STATE LICENSED CONTRACTOR OR A PROPERTY OWNER. IF THE PERSON
SIGNING THIS FORM IS AN AGENT FOR EITHER ENTITY AN AUTHORIZATION FORM OR LETTER IS REQUIRED PRIOR TO
PERMIT ISSUANCE.
(OPTION A): LICENSED CONTRACTOR DECLARATION:
I herebyaf firm under penal tyof perjurythat I am I icensed underprovisions of Chapter 9 ( commencing with Section 7000) of Division 3
of the Business and Professions Code, and my license is inf ul I force and effect. I also affirm under penalty of perjury one of the
following declarations (CHOOSE ONE):
D I have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the
work which this permit is issued. PolicyNo. _________________________________________ _
-OR-
IBJ I have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
My workers' compensation insurance carrier and policy number are: lnsuranceCompany Name: TRAVELERS IDEMNITY COMPANY (THE)
Policy No. VTC2KUB6P95227721 Expiration Date: --'0_8_/0_1_/2_0;_2_2 ___________ _
-OR-
O Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become
subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage ls unlawful and shall subject an employer to
criminal penalties and civil fines up to $100,000.00, In addition the to the cost of compensation, damages as provided for in Section 3706 of the Labor Code,
Interest and attorney's fees.
CONSTRUCTION LENDING AGENCY, IF ANY:
I hereby affirm that there is a construction lending agency for the performance of the work this permit Is issued (Sec. 3097 (i) Civil Code).
Lender's Name: ______________________ Lender'sAddress: _____________________ _
CONTRACTOR CERT1F/CA TION: The applicant certifies that all documents and plans clearly and accurately show all existing and proposed buildings, structures, access roads, and
utilities/utility easements. All proposed modifications and/or additions ore clearly labeled on the site pion. Any potent/oily existing detail within these plans inconsistent with the site plan are not
approved for construction and may be required to be altered or removed. The city's approval of the application is based on the premise thot the submitted documents and plans show the correct
dimensions of; the property, buildings, structures and their setbacks from property lines and from one another; access roads/easements, and utilities. The existing and proposed use of eoch building
as stated is true and correct; oil easements and other encumbrances to development hove been accurately shown and labeled as well as all on-site grading/site preparation. All improvements
existing on the property were completed in accordance with all regulations in existence at the time of their construction, unless oJ!J!'!dl!~gJ!,d.
Nick Dekovic £~~$::-.:.-NAME (PRINT): Niick Dekovic SIGNATURE: =--~,,u~•= DATE; __ s1_23_12_2 ___ _
Note: If the person signing above is an authorized agent for the contractor provide a letter of authorization on contractor letterhead.
(OPTION B): OWNER-BUILDER DECLARATION:
I hereby affirm that I am exempt from Contractor's License Law for the following reason:
0 I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec.
7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such
work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold
within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
-OR-
O I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's License Law).
-OR-O I am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason:
AND,
D FORM B-61 "Owner Builder Acknowledgement and Verification Form-is required for any permit issued to a property owner.
By my signature below I acknowledge that, except for my personal residence in which I must have resided for at least one year prior to completion of the
improvements covered by this permit, I cannot legally sell a structure that I have built as an owner-builder if it has not been constructed in its entirety by licensed
contractors./ understand that a copy of the applicable law, Section 7044of the Business and Professions Code, is available upon request when this application is
submitted or at the following Website: http: I I www. legi nfo. ca.gov I cal aw. html.
OWNER CERTIFICATION: The applicant certifies that all documents and plans clearly and accurately show all existing and proposed buildings, structures, access roads, and utilities/utility
easements. All proposed modifications and/or additions are clearly labeled on the site pion. Any potentially existing detail within these plans inconsistent with the site pion ore not approved for
construction and may be required to be altered or removed. The city's approval of the opplirotion is based on the premise that the submitted documents and plans show the correct dimensions of;
the property, buildings, structures and their setbacks from property lines and from one another; access roods/easements, and utilities. The existing and proposed use of each bullding as stated is true
and correct; all easements and other encumbrances to development hove been occurotely shown and labeled as well as all on-site grading/site preparation. All improvements existing on the property
were completed In accordance with all regulations In existence at the time of their construction, unless otherwise noted.
NAME (PRINT): SIGN: __________ DATE: ______ _
Note: If the person signing above Is an authorized agent for the property owner Include form B-62 signed by property owner.
1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719 Email: Building@carlsbadca.gov
2 REV. 04/22
Building Permit Inspection History Finaled
{cityof
Carlsbad
PERMIT INSPECTION HISTORY for (CBC2022-0185)
Permit Type: BLOG-Commercial Application Date: 06/01/2022 Owner: TECHBIL T INCOME PROPERTIES INC
Work Class: Tenant Improvement Issue Date: 11/16/2022 Subdivision: PARCEL MAP NO 15692
Status: Closed -Finaled Expiration Date: 04/16/2024 Address: 2820 LOKER AVE E
IVR Number: 40990 CARLSBAD, CA 92010-6608
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
11/23/2022 11/23/2022 BLDG-11 197278-2022 Passed Tim Kersch Complete
Foundation/Ftg/Piers
(Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-14 197279-2022 Passed Tim Kersch Complete
Frame/Steel/Bolting/We
lding (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
12/01/2022 12/01/2022 BLDG-14 197762-2022
Frame/Steel/Bolting/We
Partial Pass Tim Kersch Reinspection Incomplete
lding (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Insulation Yes
12/07/2022 12/07/2022 BLDG-44 198185-2022 Partial Pass Tim Kersch Reinspection Incomplete
Rough/Ducts/Dampers
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
12/13/2022 12/13/2022 BLDG-14 198669-2022 Partial Pass Tim Kersch Re inspection Incomplete
Frame/Steel/Bolting/We
lding (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Insulation Yes
12/15/2022 12/15/2022 BLDG-84 Rough 198879-2022 Failed Tim Kersch Reinspection Incomplete
Combo(14,24,34,44)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
BLDG-14 No
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout No
BLDG-34 Rough Electrical No
BLDG-44 No
Rough-Ducts-Dampers
12/16/2022 12/16/2022 BLDG-24 Rough/Topout 199010-2022 Passed Tim Kersch Complete
Monday, October 28, 2024 Page 1 of 15
PERMIT INSPECTION HISTORY for (CBC2022-0185)
Permit Type: BLDG-Commercial Application Date: 06/01/2022 Owner: TECHBIL T INCOME PROPERTIES INC
Work Class: Tenant Improvement Issue Date: 11/16/2022 Subdivision: PARCEL MAP NO 15692
Status: Closed -Finaled Expiration Date: 04/16/2024 Address: 2820 LOKER AVE E
IVR Number: 40990 CARLSBAD, CA 92010-6608
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Re inspection Inspection
Date Start Date Status
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
12/20/2022 12/20/2022 BLDG-17 Interior 199237-2022 Partial Pass Tim Kersch Reinspection Incomplete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
12/28/2022 12/28/2022 BLDG-34 Rough 199724-2022 Partial Pass Tim Kersch Re inspection Incomplete
Electrical
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
01/05/2023 01/05/2023 BLDG-44 200141-2023 Partial Pass Tim Kersch Reinspection Incomplete
Rough/Ducts/Dampers
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
01/10/2023 01/10/2023 BLDG-14 200394-2023 Partial Pass Tim Kersch Re inspection Incomplete
Frame/Steel/Bolting/We
lding (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Insulation Yes
01/13/2023 01/13/2023 BLDG-44 200699-2023 Partial Pass Tim Kersch Reinspection Incomplete
Rough/Ducts/Dampers
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
01/24/2023 01/24/2023 BLDG-14 201510-2023 Partial Pass Tim Kersch Reinspection Incomplete
Frame/Steel/Bolting/We
lding (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Insulation Yes
BLDG-15 Roof/ReRoof 201323-2023 Partial Pass Tim Kersch Reinspect ion Incomplete
(Patio)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-17 Interior 201509-2023 Partial Pass Tim Kersch Reinspect ion Incomplete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
Monday, October 28, 2024 Page 2 of 15
PERMIT INSPECTION HISTORY for (CBC2022-0185)
Permit Type: BLDG-Commercial Application Date: 06/01/2022 Owner: TECHBIL T INCOME PROPERTIES INC
Work Class: Tenant Improvement Issue Date: 11/16/2022 Subdivision: PARCEL MAP NO 15692
Status: Closed -Finaled Expiration Date: 04/16/2024 Address: 2820 LOKER AVE E
IVR Number: 40990 CARLSBAD, CA 92010-6608
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Re inspection Inspection
Date Start Date Status
02/08/2023 02/08/2023 BLDG-24 Rough/Topout 202641-2023 Partial Pass Tim Kersch Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
NOTES Created By TEXT Created Date
Seta Levanduski ETHAN 858-264-7738 02/07/2023
02/10/2023 02/10/2023 BLDG-34 Rough 202965-2023 Partial Pass Tim Kersch Reinspect ion Incomplete
Electrical
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
NOTES Created By TEXT Created Date
Angie Teanio 858-264-7738 Ethan 02/09/2023
02/15/2023 02/15/2023 BLDG-24 Rough/Topout 203365-2023 Partial Pass Tim Kersch Re inspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
NOTES Created By TEXT Created Date
Seta Levanduski ETHAN 858-264-7738 02/07/2023
Angie Teanio 858-264-7738 Ethan 02/14/2023
02/22/2023 02/22/2023 BLDG-85 T-Bar, Ceiling 203935-2023 Partial Pass Tim Kersch Re inspection Incomplete
Grids, Overhead
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-14 Yes
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44 Yes
Rough-Ducts-Dampers
NOTES Created By TEXT Created Date
Angie Teanio 858-264-9567 Tom 02/21/2023
02/27/2023 02/27/2023 BLDG-24 Rough/Topout 204223-2023 Partial Pass Tim Kersch Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
Monday, October 28, 2024 Page 3 of 15
PERMIT INSPECTION HISTORY for (CBC2022-0185)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Application Date: 06/01/2022 Owner: TECHBIL T INCOME PROPERTIES INC
Issue Date: 11/16/2022 Subdivision: PARCEL MAP NO 15692
Status: Closed -Finaled Expiration Date: 04/16/2024 Address: 2820 LOKER AVE E
CARLSBAD, CA 92010-6608 IVR Number: 40990
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
NOTES Created By TEXT Created Date
Seta Levanduski ETHAN 858-264-7738 02/07/2023
Angie Teanio 858-264-7738 Ethan 02/14/2023
Angie Teanio 858-264-7738 Ethan 02/24/2023
02/28/2023 02/28/2023 BLDG-16 Insulation 204291-2023 Passed Tim Kersch Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
03/01/2023 03/01/2023 BLDG-24 Rough/Topout 204393-2023 Partial Pass Tim Kersch Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
NOTES Created By TEXT Created Date
Seta Levanduski ETHAN 858-264-7738 02/07/2023
Angie Teanio 858-264-7738 Ethan 02/14/2023
Angie Teanio 858-264-7738 Ethan 02/24/2023
Angie Teanio 858-264-7738 Ethan 02/28/2023
03/03/2023 03/03/2023 BLDG-24 Rough/Topout 204648-2023 Partial Pass Chris Renfro Re inspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Partial pass rooftop out. See highlighted Yes
sections on plans for areas. Inspected.
NOTES Created By TEXT Created Date
Seta Levanduski ETHAN 858-264-7738 02/07/2023
Angie Teanio 858-264-7738 Ethan 02/14/2023
Angie Teanio 858-264-7738 Ethan 02/24/2023
Angie Teanio 858-264-7738 Ethan 02/28/2023
Angie Teanio 858-264-7738 Ethan 03/02/2023
03/07/2023 03/07/2023 BLDG-24 Rough/Topout 204800-2023 Partial Pass Tim Kersch Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Partial pass rooftop out. See highlighted Yes
sections on plans for areas. Inspected.
Monday, October 28, 2024 Page 4 of 15
PERMIT INSPECTION HISTORY for (CBC2022-0185)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Application Date: 06/01/2022 Owner: TECHBIL T INCOME PROPERTIES INC
Issue Date: 11/16/2022 Subdivision: PARCEL MAP NO 15692
Status: Closed -Finaled Expiration Date: 04/16/2024
IVR Number: 40990
Address: 2820 LOKER AVE E
CARLSBAD, CA 92010-6608
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date
03/09/2023 03/09/2023
Status
NOTES Created By TEXT
Seta Levanduski ETHAN 858-264-7738
Angie Teanio 858-264-7738 Ethan
Angie Teanio 858-264-7738 Ethan
Angie Teanio 858-264-7738 Ethan
Angie Teanio 858-264-7738 Ethan
Angie Teanio 858-264-7738 Ethan
BLDG-13 Shear 20511 2-2023 Partial Pass Tim Kersch
Panels/HD (ok to wrap)
Checklist Item COMMENTS
BLDG-Building Deficiency
NOTES Created By
Angie Teanio
TEXT
858-264-7738 Ethan // Shear Board
03/10/2023 03/10/2023 BLDG-24 Rough/Topout 205235-2023 Partial Pass Tim Kersch
Checklist Item
BLDG-Building Deficiency
NOTES Created By
Seta Levanduski
Angie Teanio
Angie Teanio
Angie Teanio
Angie Teanio
Angie Teanio
COMMENTS
Partial pass rooftop out. See highlighted
sections on plans for areas. Inspected.
TEXT
ETHAN 858-264-7738
858-264-7738 Ethan
858-264-7738 Ethan
858-264-7738 Ethan
858-264-7738 Ethan
858-264-7738 Ethan
03/14/2023 03/14/2023 BLDG-24 RoughfTopout 205397-2023 Partial Pass Tim Kersch
Checklist Item
BLDG-Building Deficiency
Monday, October 28, 2024
COMMENTS
Partial pass rooftop out. See highlighted
sections on plans for areas. Inspected.
Created Date
02/07/2023
02/14/2023
02/24/2023
02/28/2023
03/02/2023
03/06/2023
Reinspection Incomplete
Passed
Yes
Created Date
03/08/2023
Reinspect ion Incomplete
Passed
Yes
Created Date
02/07/2023
02/14/2023
02/24/2023
02/28/2023
03/02/2023
03/06/2023
Re inspection Incomplete
Passed
Yes
Page 5 of 15
PERMIT INSPECTION HISTORY for (CBC2022-0185)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Application Date: 06/01/2022 Owner: TECH BIL T INCOME PROPERTIES INC
Issue Date: 11/16/2022 Subdivision: PARCEL MAP NO 15692
Status: Closed -Finaled Expiration Date: 04/16/2024
40990
Address: 2820 LOKER AVE E
CARLSBAD, CA 92010-6608
IVR Number:
Scheduled
Date
Actual Inspection Type
Start Date
Inspection No. Inspection Primary Inspector
NOTES Created By
Seta Levanduski
Angie Teanio
Angie Teanio
Angie Teanio
Angie Teanio
Angie Teanio
Angie Teanio
Status
TEXT
ETHAN 858-264-7738
858-264-7738 Ethan
858-264-7738 Ethan
858-264-7738 Ethan
858-264-7738 Ethan
858-264-7738 Ethan
858-264-7738 Ethan
03/20/2023 03/20/2023 BLDG-84 Rough 205801-2023 Partial Pass Tim Kersch
Combo(14,24,34,44)
Checklist Item
BLDG-Building Deficiency
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
COMMENTS
03/24/2023 03/24/2023 BLDG-14 206232-2023
Frame/Steel/Bolting/We
lding (Decks)
Checklist Item COMMENTS
Insulation
TEXT
Passed Tim Kersch
BLDG-Building Deficiency
NOTES Created By
Angie Teanio Ethan 858-264-7738
Monday, October 28, 2024
BLDG-85 T-Bar, Ceiling 206091-2023
Grids, Overhead
Checklist Item
BLDG-Building Deficiency
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
COMMENTS
Partial Pass Tim Kersch
Reinspection Inspection
Created Date
02/07/2023
02/1 4/2023
02/24/2023
02/28/2023
03/02/2023
03/06/2023
03/13/2023
Reinspection Incomplete
Passed
No
Yes
Yes
Yes
Yes
Passed
Yes
Created Date
03/23/2023
Complete
Reinspection Incomplete
Passed
Yes
Yes
Yes
Yes
Yes
Page 6 of 15
PERMIT INSPECTION HISTORY for (CBC2022-0185)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Application Date: 06/01/2022 Owner: TECH BIL T INCOME PROPERTIES INC
Issue Date: 11/16/2022 Subdivision: PARCEL MAP NO 15692
Status:
Scheduled
Date
04/04/2023
04/07/2023
Closed -Finaled Expiration Date: 04/16/2024
IVR Number: 40990
Address: 2820 LOKER AVE E
CARLSBAD, CA 92010-6608
Actual Inspection Type
Start Date
Inspection No. Inspection Primary lnsp.ector
NOTES Created By
Angie Teanio
Angie Teanio
Status
TEXT
858-264-9567 Tom
Ethan 858-264-7738
04/04/2023 BLDG-14 206968-2023 Passed Tim Kersch
Frame/Steel/Bolting/We
lding (Decks)
Checklist Item
BLDG-Building Deficiency
NOTES Created By
Angie Teanio
COMMENTS
TEXT
Ethan 858-264-7738
04/07/2023 BLDG-85 T-Bar, Ceiling 207348-2023 Partial Pass Tony Alvarado
Grids, Overhead
Checklist Item
BLDG-Building Deficiency
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
COMMENTS
April 7, 2023:
1. T-bar grid seismic restraints, for above T
bar, electrical plumbing, mechanical HVAC.
Pending:
2. All Full height, demising-fire rated wails,
requiring stenciling "Permanent
Identification Labeling" ("fire rated wall no
penetrations") labeling throughout (typical).
a) Informed contractor superintendent
representative Ethan.
b) The rest of Construction tenant
improvement, scope of work per plan -
OK.
April 7, 2023:
1. T-bar grid seismic restraints, for above T
bar, electrical plumbing, mechanical HVAC.
Pending:
2. Ail Full height, demising-fire rated walls,
requiring stenciling "Permanent
Identification Labeling" ("fire rated wail no
penetrations") labeling throughout (typical).
a) Informed contractor superintendent
representative Ethan.
b) The rest of Construction tenant
improvement, scope of work per plan -
OK.
Reinspection Inspection
Created Date
02/21/2023
03/22/2023
Passed
Yes
Created Date
04/03/2023
Complete
Reinspection Incomplete
Passed
Yes
Yes
Yes
Yes
Yes
Monday, October 28, 2024 Page 7 of 15
PERMIT INSPECTION HISTORY for (CBC2022-0185)
Permit Type: BLDG-Commercial Application Date: 06/01/2022 Owner: TECHBIL T INCOME PROPERTIES INC
Work Class: Tenant Improvement Issue Date: 11/16/2022 Subdivision: PARCEL MAP NO 15692
Status: Closed -Finaled Expiration Date: 04/16/2024 Address: 2820 LOKER AVE E
IVR Number: 40990 CARLSBAD, CA 92010-6608
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
NOTES Created By TEXT Created Date
Angie Teanio 858-264-9567 Tom 02/21/2023
Angie Teanio Ethan 858-264-7738 03/22/2023
Angie Teanio 858-264-7738 Ethan 04/06/2023
04/11/2023 04/11/2023 BLDG-34 Rough 207662-2023 Partial Pass Tim Kersch Reinspection Incomplete
Electrical
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
NOTES Created By TEXT Created Date
Angie Teanio 858-264-7738 Ethan 02/09/2023
Angie Teanio 858-264-7738 Ethan 04/10/2023
04/25/2023 04/25/2023 BLDG-17 Interior 208958-2023 Passed Tim Kersch Complete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
NOTES Created By TEXT Created Date
Angie Teanio 858-264-7738 Ethan 04/24/2023
05/31/2023 05/31/2023 BLDG-85 T-Bar, Ceiling 212556-2023 Passed Tim Kersch Complete
Grids, Overhead
Monday, October 28, 2024 Page 8 of 15
PERMIT INSPECTION HISTORY for (CBC2022-0185)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Application Date: 06/01/2022 Owner: TECHBIL T INCOME PROPERTIES INC
Status:
Scheduled
Date
06/05/2023
06/06/2023
Issue Date: 11/16/2022 Subdivision: PARCEL MAP NO 15692
Closed -Finaled Expiration Date: 04/16/2024
IVR Number: 40990
Address: 2820 LOKER AVE E
CARLSBAD, CA 92010-6608
Actual Inspection Type
Start Date
Inspection No. Inspection Primary Inspector Reinspection Inspection
Checklist Item
BLDG-Building Deficiency
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
NOTES Created By
Angie Teanio
Angie Teanio
Angie Teanio
Angie Teanio
Status
COMMENTS
April 7, 2023:
1. T-bar grid seismic restraints, for above T
bar, electrical plumbing, mechanical HVAC.
Pending:
2. All Full height, demising-fire rated walls,
requiring stenciling "Permanent
Identification Labeling" ("fire rated wall no
penetrations") labeling throughout (typical).
a) Informed contractor superintendent
representative Ethan.
b) The rest of Construction tenant
improvement, scope of work per plan -
OK.
April 7, 2023:
1. T-bar grid seismic restraints, for above T
bar, electrical plumbing, mechanical HVAC.
Pending:
2. All Full height, demising-fire rated walls,
requiring stenciling "Permanent
Identification Labeling" ("fire rated wall no
penetrations") labeling throughout (typical).
a) Informed contractor superintendent
representative Ethan.
b) The rest of Construction tenant
improvement, scope of work per plan -
OK.
TEXT
858-264-9567 Tom
Ethan 858-264-7738
858-264-7738 Ethan
858-264-7738 Ethan
06/05/2023 BLDG-33 Service
Change/Upgrade
213183-2023 Passed Dirk de Roggenbuke
Checklist Item COMMENTS
BLDG-Building Deficiency SDGE electric room. Disconnect/ reconnect
06/06/2023 BLDG-18 Exterior
Lath/Drywall
213229-2023 Passed Tim Kersch
Checklist Item COMMENTS
BLDG-Building Deficiency
Passed
Yes
Yes
Yes
Yes
Yes
Created Date
02/21/2023
03/22/2023
04/06/2023
05/30/2023
Passed
Yes
Passed
Yes
Complete
Complete
Monday, October 28, 2024 Page 9 of 15
PERMIT INSPECTION HISTORY for (CBC2022-0185)
Permit Type: BLDG-Commercial Application Date: 06/01/2022 Owner: TECHBIL T INCOME PROPERTIES INC
Work Class: Tenant Improvement Issue Date: 11/16/2022 Subdivision: PARCEL MAP NO 15692
Status: Closed -Finaled Expiration Date: 04/16/2024 Address: 2820 LOKER AVE E
IVR Number: 40990 CARLSBAD, CA 92010-6608
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
NOTES Created By TEXT Created Date
Angie Teanio 858-264-7738 Ethan 06/05/2023
06/08/2023 06/08/2023 BLDG-18 Exterior 213611-2023 Passed Tim Kersch Complete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
NOTES Created By TEXT Created Date
Angie Teanio 858-264-7738 Ethan 06/07/2023
06/19/2023 06/19/2023 BLDG-85 T-Bar, Ceiling 214566-2023 Passed Tim Kersch Complete
Grids, Overhead
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-14 Yes
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44 Yes
Rough-Ducts-Dampers
NOTES Created By TEXT Created Date
Angie Teanio 858-264-7738 Ethan 06/16/2023
06/29/2023 06/29/2023 BLDG-22 Sewer/Water 215873-2023 Partial Pass Tim Kersch Reinspection Incomplete
Service
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
NOTES Created By TEXT Created Date
Angie Teanio 858-264-7738 Ethan 06/28/2023
06/30/2023 06/30/2023 BLDG-22 Sewer/Water 216103-2023 Partial Pass Tim Kersch Re inspection Incomplete
Service
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
NOTES Created By TEXT Created Date
Angie Teanio 858-264-7738 Ethan 06/28/2023
Angie Teanio 858-264-7738 Ethan 06/29/2023
07/10/2023 07/10/2023 BLDG-84 Rough 216548-2023 Partial Pass Tim Kersch Reinspection Incomplete
Combo(14,24,34,44)
Monday, October 28, 2024 Page 10 of 15
PERMIT INSPECTION HISTORY for (CBC2022-0185)
Permit Type: BLDG-Commercial Application Date: 06/01/2022 Owner: TECH BIL T INCOME PROPERTIES INC
Work Class: Tenant Improvement Issue Date: 11/16/2022 Subdivision: PARCEL MAP NO 15692
Status: Closed -Finaled Expiration Date: 04/16/2024 Address: 2820 LOKER AVE E
IVR Number: 40990 CARLSBAD, CA 92010-6608
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Re inspection Inspection
Date Start Date Status
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
BLDG-14 Yes
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44 Yes
Rough-Ducts-Dampers
07/11/2023 07/11/2023 BLDG-22 Sewer/Water 216965-2023 Partial Pass Tim Kersch Reinspection Incomplete
Service
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
NOTES Created By TEXT Created Date
Angie Teanio 858-264-7738 Ethan 06/28/2023
Angie Teanio 858-264-7738 Ethan 06/29/2023
07/12/2023 07/12/2023 BLDG-22 Sewer/Water 217144-2023 Partial Pass Tim Kersch Reinspection Incomplete
Service
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
07/18/2023 07/18/2023 BLDG-22 Sewer/Water 217759-2023 Partial Pass Tim Kersch Reinspection Incomplete
Service
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
NOTES Created By TEXT Created Date
Angie Teanio ethan 858-264-7738 07/17/2023
07/20/2023 07/20/2023 BLDG-23 218047-2023 Passed Tim Kersch Complete
Gas/Test/Repairs
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
07/26/2023 07/26/2023 BLDG-34 Rough 218731-2023 Partial Pass Tim Kersch Re inspection Incomplete
Electrical
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
NOTES Created By TEXT Created Date
Angie Teanio 858-264-7738 Ethan 02/09/2023
Angie Teanio 858-264-7738 Ethan 04/10/2023
Monday, October 28, 2024 Page 11 of 15
PERMIT INSPECTION HISTORY for (CBC2022-0185)
Permit Type: BLDG-Commercial Application Date: 06/01/2022 Owner: TECH BIL T INCOME PROPERTIES INC
Work Class: Tenant Improvement Issue Date: 11/16/2022 Subdivision: PARCEL MAP NO 15692
Status: Closed -Finaled Expiration Date: 04/16/2024 Address: 2820 LOKER AVE E
IVR Number: 40990 CARLSBAD, CA 92010-6608
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
07/28/2023 07/28/2023 BLDG-34 Rough 218953-2023 Partial Pass Tim Kersch Reinspection Incomplete
Electrical
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
NOTES Created By TEXT Created Date
Angie Teanio 858-264-7738 Ethan 02/09/2023
Angie Teanio 858-264-7738 Ethan 04/10/2023
07/31/2023 07/31 /2023 BLDG-34 Rough 219063-2023 Partial Pass Tim Kersch Re inspection Incomplete
Electrical
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
NOTES Created By TEXT Created Date
Angie Teanio 858-264-7738 Ethan 02/09/2023
Angie Teanio 858-264-7738 Ethan 04/10/2023
08/01/2023 08/01/2023 BLDG-34 Rough 219283-2023 Partial Pass Tim Kersch Re inspection Incomplete
Electrical
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
NOTES Created By TEXT Created Date
Angie Teanio 858-264-7738 Ethan 02/09/2023
Angie Teanio 858-264-7738 Ethan 04/10/2023
08/03/2023 08/03/2023 BLDG-34 Rough 219491-2023 Partial Pass Tim Kersch Reinspection Incomplete
Electrical
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
NOTES Created By TEXT Created Date
Angie Teanio 858-264-7738 Ethan 02/09/2023
Angie Teanio 858-264-7738 Ethan 04/10/2023
08/11/2023 08/11/2023 BLDG-21 220294-2023 Partial Pass Tim Kersch Reinspect ion Incomplete
Underground/Underflo
or Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-38 Signs 220295-2023 Passed Tim Kersch Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
Monday, October 28, 2024 Page 12 of 15
PERMIT INSPECTION HISTORY for (CBC2022-0185)
Permit Type: BLDG-Commercial Application Date: 06/01/2022 Owner: TECHBIL T INCOME PROPERTIES INC
Work Class: Tenant Improvement Issue Date: 11/16/2022 Subdivision: PARCEL MAP NO 15692
Status: Closed -Finaled Expiration Date: 04/16/2024 Address: 2820 LOKER AVE E
IVR Number: 40990 CARLSBAD, CA 92010-6608
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
08/16/2023 08/1 6/2023 BLDG-24 Rough/Topout 220724-2023 Partial Pass Tim Kersch Re inspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Partial pass rooftop out. See highlighted Yes
sections on plans for areas. Inspected.
NOTES Created By TEXT Created Date
Seta Levanduski ETHAN 858-264-7738 02/07/2023
Angie Teanio 858-264-7738 Ethan 02/14/2023
Angie Teanio 858-264-7738 Ethan 02/24/2023
Angie Teanio 858-264-7738 Ethan 02/28/2023
Angie Teanio 858-264-7738 Ethan 03/02/2023
Angie Teanio 858-264-7738 Ethan 03/06/2023
Angie Teanio 858-264-7738 Ethan 03/13/2023
08/23/2023 08/23/2023 BLDG-24 Rough/Topout 221632-2023 Partial Pass Tim Kersch Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Partial pass rooftop out. See highlighted Yes
sections on plans for areas. Inspected.
NOTES Created By TEXT Created Date
Seta Levanduski ETHAN 858-264-7738 02/07/2023
Angie Teanio 858-264-7738 Ethan 02/14/2023
Angie Teanio 858-264-7738 Ethan 02/24/2023
Angie Teanio 858-264-7738 Ethan 02/28/2023
Angie Teanio 858-264-7738 Ethan 03/02/2023
Angie Teanio 858-264-7738 Ethan 03/06/2023
Angie Teanio 858-264-7738 Ethan 03/13/2023
08/28/2023 08/28/2023 BLDG-34 Rough 222095-2023 Partial Pass Tim Kersch Reinspectlon Incomplete
Electrical
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
NOTES Created By TEXT Created Date
Angie Teanio 858-264-7738 Ethan 02/09/2023
Angie Teanio 858-264-7738 Ethan 04/10/2023
08/29/2023 08/29/2023 BLDG-34 Rough 222320-2023 Passed Tim Kersch Complete
Electrical
Monday, October 28, 2024 Page 13 of 15
PERMIT INSPECTION HISTORY for (CBC2022-0185)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Application Date: 06/01/2022 Owner: TECHBIL T INCOME PROPERTIES INC
Issue Date: 11/16/2022 Subdivision: PARCEL MAP NO 15692
Status: Closed -Finaled Expiration Date: 04/16/2024
IVR Number: 40990
Address: 2820 LOKER AVE E
CARLSBAD, CA 92010-6608
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector
Date Start Date Status
Checklist Item COMMENTS
TEXT
BLDG-Building Deficiency
NOTES Created By
Angie Teanio 858-264-7738 Ethan
Angie Teanio 858-264-7738 Ethan
09/12/2023 09/12/2023 BLDG-84 Rough 223674-2023
Combo(14,24,34,44)
Checklist Item
BLDG-Building Deficiency
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
COMMENTS
10/19/2023 10/19/2023 BLDG-34 Rough 227635-2023
Electrical
Checklist Item COMMENTS
BLDG-Building Deficiency
11/15/2023 11/15/2023 BLDG-Final Inspection 230512-2023
Checklist Item
BLDG-Building Deficiency
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
COMMENTS
11/21/2023 11/21/2023 BLDG-71 Set Ups
Checklist Item
231175-2023
COMMENTS
BLDG-Building Deficiency
12/06/2023 12/06/2023 BLDG-LOE Final
Checklist Item
185731-2022
COMMENTS
Passed
Passed
Passed
Cancelled
Passed
Tim Kersch
Tim Kersch
Tim Kersch
Tim Kersch
Linda Ontiveros
BLDG-LOE Final PROJECT SUBJECT TO THE TDM
ORDINANCE; DO NOT FINAL PERMIT PRI
TO SITE INSPECTION AND TDM PLAN
APPROVAL.
10/02/2024 10/02/2024 BLDG-SW-Inspection 262910-2024 Passed Tim Kersch
Monday, October 28, 2024
Reinspection Inspection
Passed
Yes
Created Date
02/09/2023
04/10/2023
Passed
Yes
Yes
Yes
Yes
Yes
Passed
Yes
Passed
Yes
Yes
Yes
Yes
Yes
Complete
Complete
Complete
Reinspection Incomplete
Passed
No
Complete
Passed
No
Complete
Page 14 of 15
PERMIT INSPECTION HISTORY for (CBC2022-0185)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Application Date: 06/01/2022 Owner: TECHBIL T INCOME PROPERTIES INC
Issue Date: 11/16/2022 Subdivision: PARCEL MAP NO 15692
Status: Closed -Finaled Expiration Date: 04/16/2024
IVR Number: 40990
Address: 2820 LOKER AVE E
CARLSBAD, CA 92010-6608
Scheduled
Date
Actual Inspection Type
Start Date
Inspection No. Inspection Primary Inspector Reinspection Inspection
10/17/2024
Checklist Item
Are erosion control BMPs
functioning properly?
Are perimeter control BMPs
maintained?
Is the entrance stabilized to
prevent tracking?
Have sediments been tracked
on to the street?
Has trash/debris accumulated
throughout the site?
Are portable restrooms
properly positioned?
Do portable restrooms have
secondary containment?
COMMENTS
10/17/2024 BLDG-Fire Final
Checklist Item
264225-2024
COMMENTS
FIRE-Building Final
Monday, October 28, 2024
Status
Passed
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Passed Felix Salcedo Complete
Passed
Yes
Page 15 of 15
C Cityof
Carlsbad
SPECIAL INSPECTION
AGREEMENT
B-45
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
In accordance with Chapter 17 of the California Building Code the following must be completed when work being performed
requires special inspection, structural observation and construction material testing.
P . UP ·t csc2022-0185 p . tAdd 2820 LOKER AVE. EAsr RFc1=1v,....0 roJec erm1 : ___________ roJec ress: _________________ ___,c __ .... ~
A. THIS SECTION MUST BE COMPLETED BY THE PROPERTY OWNER/AUTHORIZED AGENT. Please check if ~~J ai 8~43uilder
D. (If you checked as owner-builder you must also complete Section B of this agreement.) CIT nr C L
Nathan A. Dean f3UtL[ '''Gr 08AD
Name: (Please print,__________________________________ ;'\J
(First) (M I ) (last)
Mailing Address: 3911 Sorrento Valley Blvd, Suite 120, San Deigo, Ca 92121
Email· ndean@waremalcomb.com Phone: 858.500.4618
I am: □Property Owner □Property Owner's Agent of Record ilArchitect of Record □Engineer of Record
S fc l.f . R . . N b C33185 E . . D 1/31/2023 tate o a I ornIa egIstratIon um e[:_____________ xpIratIon ate:
AGREEMENT: I, the undersigned, declare under penalty of perjury under the laws of the State of California, that I have read,
understand, acknowledge and promise to comply with the City of Carlsbad requirements for special inspections, structural
observations, construction materials testing and off-site fabrication of building components, as prescribed in the statement of
special inspections noted on the approved plans and, as required by the California Building Code.
Digitally signed by Date·. 7/11/2022 Signature-I Nathan A. Dean ~ Da e:'2U2T.O . ------------
14:28:38-0T00'
B. CONTRACTOR'S STATEMENT OF RESPONSIBILITY (07 CBC, Ch 17, Section 1706). This section must be completed by the
contractor I builder/ owner-builder.
Contractor's Company Name: The Whiting-Turner Contracting Company Please check if you are Owner-Builder o
Nicholas E Dekovic Name: (Please print) ___________________________________ _
(Forst) (M I ) (last)
Mailing Address: 3911 Sorrento Valley Blvd., Suite 100, San Diego, CA 92121
Email: nick.dekovic@whiting-turner.com ______ Phone: 925-719-7359
State of California Contractor's License Number: 3111 o7 Expiration Date: _7_1_3_1_12_3 ____ _
• I acknowledge and, am aware, of special requirements contained in the statement of special inspections noted on
the approved plans;
• I acknowledge that control will be exercised to obtain conformance with the construction documents approved by the
building official;
• I will have in-place procedures for exercising control within our (the contractor's} organization, for the method and
frequency of reporting and the distribution of the reports; and
• I certify that I will have a qualified person within our (the contractor's) organization to exercise such control.
• I will provide a final report I letter in compliance with CBC Section 1704.1.2 prior to requesting final
inspection.
o.-ar...--..NC6-0.-
Signature· Nick Dekovi;;:::c,,E",;,;,;;.;.:..._....;.;'-:-...,-,..,,~~-,,,,co..,,:''--____________ Date: 7112122
o.. 112201121s1tn.orw
8-45 Page 1 of 1 Rev. 03/20
I ' ..
WISEMAN +ROHY
STRUCTURAL ENGINEERS
SUPPLEMENTAL STRUCTURAL
CALCULATIONS
9915 Mira Mesa Blvd.
TEL. (858) 536-5166
FOR
ABSORPTION SYSTEMS
PHASE 2 DELTA 4
2820 LOKER AVE. EAST
CARLSBAD, CA 92010
MARCH ]TH, 2023
W+R Job #22-005
Suite 200
WRENGINEERS.COM
San Diego, CA 92131
Nn BY __ _ DATE
.. ~A. L l . / \. 2
(!J /7(/t:1
'\__;
Wl$EMAN· .t ROHY
-STRUOURAL ENGINEERS
SHEET NO. ___ OF ___ _
JOB NO. l 2 -oo ~
,, ,,. I
0 VE /f.. / 20 0 C.., IV
1·ff( 1181 #---,/✓6 fa ~AS.r€#'£4f/;; -::: 173/F/J-sredE/l. ~~-•••
b, a< /3't INfj?E C. t
CITY ...
WISEMAN+ROHY
STRUCTURAL ENGINEERS
SUPPLEMENTAL STRUCTURAL
CALCULATIONS
9915 Mira Mesa Blvd.
TEL. (858) 536-5166
FOR
• ABSORPTION SYSTEMS
PHASE 2 DELTA 3
2820 LOKER AVE. EAST
CA_RLSBAD, CA 92010
DECEMBER 8th, 2022
W+R Job #22-005
Sulte200
WRENGINEERS.1
CBC2022-0185
2820 LOKER AVE E
ABSORPTION SYSTEMS: COM-Tl (63,786 SF) PHASE
II-SHELL TO OFFICE/WAREHOUSE MEZZANINE, LAB,
EXTERIOR WORK, GENERATOR ENCLOSURE AND DOCK
DEV2022-0135 2090831500
2/14/2023
CBC2022-0185
. :_ iWISEMAN + .jROHY •
.. . . .\· .St:.R!Jq~~MJf!i!NE~,~ .... _ .. -· ,. . _ -· ........... !.
·.·.:;, ·:.~"M· .:·f:oATE-· .. ·:·:j_i/2; .. PROJECT._·_· .... A"""':·.~ ..... :5-· o~a--Fp ...... r ..... 10-·K\=· _·$, .... Y'--'s ...... ::r .... ·&l~">~··_ ... _Prl ·sHEETNO. : .: ••• OF .. _.,.; __
""""'-'""-="""""""""'"·· ........ --;-+=• .. ""'"·•=-"=-· .. =--.. ......,_..""'"""..___....._......._ .......... ....,.: ............. ~-------'-"""""'.........a""""""~=L=·'"'"-"JOI.NO,.:· .. i~~ 00 5 . -·
.i ...
.. : ·-.. .. ·~--· ·J i i . i -..... -: .. . -.. -.... --.... ~= , A s \ . 3. .
!· ..... .
' ... . '. -......... ,_, ___ , ....... ····-·-·:-·· ,._, ... -···---.... --. : r .
. ...... 1 . ---.. . ·-.-...... _ .......
• .J ............ ,.,_, ...... '": . ..... : .................. -···· ! _ .. r . • ' j • ~ _-!~:·
····-··· .. -~o -=-=-.s :
I 'I ... :
......... i
. , .......
.. · ui_· 4!o -... 2· z.:· -r·.. ..j
..... :·_ .. :::::::~:.:::· ... -· ... ·:-· .. • _ ..... ·;~ ...... _ .... _ ......... _. ___ ,, ..... ; ...... __ :~~~~~lf:t .. ~::~.):J.· ~'i ~:-: .·.:-::.:: ·:4:·::·.··~r..·i)/~;·;.,c 9i:•f ................ (::··· ........... -• .
........ .. . r .1 -.. _ ,, --·· ... ... . . .. .. . ·! ... -... . ............ v,~ ...... 5, .. ·--·I. A.·C..'> ....... ..
• • ·l .. • • .. ... --_,: :----· • ; . • . --· .. -: ::~ ,:~· • : ::.:-...... -:··• ...... i::.;. ·:-z· '.·,~ ... _: .. _ ........ -···
+-.... _;zr .. ';.'f1c.it )( , .. e,. .. ~.,.-.:fs .. ":'!. ~r:21r ,:-..... -·· ....... ~~~·-· p .. :-• . ......... :; • • • • • • ..... i~·.·~i:i:.i.:Gq:: .. :/ .... _ .. _ ... _ ........ ~ ·-...... -................. i • ··-·
f -•• ·-· -·" •• ---.. --·· ....... ··-·· ..................... !· ......... .... . . ... . . .. ·!·· ··········-.. ..... . .. . • . . . . . ... .. .•. . -. -•• • • • ••• -• • ...... • l
...... ........ -•-··••!,.·-·--· ! i···-···•-·--······· --······-•-·-. ····-·-----·-··-·---· ··•·.·· •.. ·----.... ·-·-··---.. --•. , .. --.• -·-··-------·-------,--·•·-...... ---·-·-······. -·-·-... -...... -..... ··•·• .. j .......... : .......... ··-·-· -~--·· ··-, · -· · ,1 -i --. .... ...... .. -. . j ....... ..
.......
I I
• ··\
J.. .. . I -. ·~r.: -~~!;~( .. ~-·:~2.t; ,c l' :. b .. _::: '7 ~.~ ---~ -...... -.. <·T:. ,..,_,. .......
... -j.. I '
... !... • .. •• .... .. .. .. -· • ( ••. i:iei>1~~--; ... , .. ~ .. ;,,,. .7_ .. o"'..: ... .
... .... ···-· • . e-< -; ~ol:-{:'::-·c r=., ..... .) -............. .
i ·-.......... .
. j
I
.: .~~·:.CS?~ :-sup~~,.~ .. 2 .;,; .. ·b·;;;:·d .... --Fort::~·:·~~ct • ··_----· ... ;. __ :::-· .. _ ....... : .. :.+ .. :·· ........ :: ::·1
? .. I . .. • ·-··· • •• r
•• • • : -· _,,. ·-· . _... . ... : .. • : :· •
1
~·:,.; ·;i. t. ~ .. ~i: '.C.:~ .~ :\.~-:;:,-.-:~:·::~·.,;, ·~:•·i, ;·.-. ;::;:~.· . .-.-~: .. ;; ··:✓-Q~ •. :,_.: :_: ·-· .. :::: ....... -.• : ;.· . -.. + ......... -.... -. :1 -
.. .. .. ........... ... . . __ [. __ ... _,. • .. _ ....... G;.-G) ...... ~v·p(>olJi:::·:.:::~~a.. -.. Jp.' ~,~,,~-:_:: .s,::1~A~4 .. ::: .... : .. -... : ............. :: ........ : ... ·.-·" '._ ... '..:·:· ............. • ..... _ ... •.1
......... -•--------·-·•-·---------------···-·-----!-··--·····-------• -
.·~ :::::· ::·: :··~ .... : ....... : ..... ··:·:-::::'.: ... . .. ::,::··:·:.: :.::::·: :~.'.: r."'5~q -s .. ~ .. ; ~: .. ::;:.:~: .. ·.::~e:o.·#.~·.::/:~:.~.::.::·:. • .. !. • • •• '. ..... -...
_ ............................ ·.·.·.--........ · ! ...... ,......... ........ -.. ' ... .. . .. .. .. ... -. ,·-. -.. . .. -' ..
.................. .. ... i. .......... ·-.. ·---~ .(;) ... ftif'\-.. -; ........ -. . -· .... _ .... _,,.:_ ..... _ ....... _ ...... .
. .. • I .• , { .............. '
! .
-----1--··-· .. ----···--.. -~ ............. ·-·-·-·-···-........................ -·· .. .. j ...................... -......... -................ ..
.. ,·::o .. ~/~~ ~ :~L:~. ~ • ·"l:;0-9 • ::i'> ·vs~ .. ·it·:·.· ... :. _........ • • ·_ • .. _ .... J .. --..... • -·
i
........ ,_ .................................. : .... , ....... ·-·
...... 1 .. -........
I .. ..... !'
. ! ....... _, ..... _. -. _.,_._ ---·--····-·-·----·--·--·-· .. --,·-........ ,-----··--·· .............. ___ ....... --·-.. ---l ... . . . .... --···-·•-·""' : --·-----·-·· .. -··---··· ____ , . ., .... -----.. ·--.. -·-····
............. ",.,_ I
. '·-------·· ···-• -.... -··· ----------·--··-·· ... ······-···
............................... !
................... i .. ····i ...
! .. . .... i
! . .. ..... ·-·-...
...............................
-......... _._ ........ _ ..... -·--·-·----;..---; ........... -·--•--·----,--' ...... _ .... _ .. ,. ___ ,._ .... •·· .-.. --·-· ..
; ..
. ........ -I
i ... !
......... ·•· ··--·· . ' .......... j······ ... '.
.. -r--· ·-· ·--...... ··-·-... -· ---· ... . ............ _._,. ... ·---·-· ....... ·····-·---·-............ . i
WISEMAN+ROHY
STRUCTURAL ENGINEERS
EQUIPMENT SEISMIC ANCHORAGE
(2018 IBC / 2019 CBC/ ASCE 7-16)
Verslon3.0
, Gf~lon Phase 2
l 12/912022 09:09:45
NCHORAGE PER ASCE 7-1613.3.1
Oo= 1.0
SosA-0.74
..Ii,= ,.o
z= 35
h= 35
Equipment Weight=
Curb Weight=
Total Weight.,
Top of Curb to COG"
ft (equip ht) Curb Height =
ft (roof ht) Total Ht to COG c
Horizontal Component (LRFD)
1750
0
1750
51.33
0
51.33
lb
lb
lb (Wp)
In
In
rn(HT)
Fpx = 0.4 (~) (Ip)(SDs)(W,,) ( 1 + 2Ji) =
F,,.M1N = 0.3 (Sos) (Ip) (Wp) =
F,,. MAX= 1.6 (Sos) (Ip) (Wp) =
1.124 Wp
0.225 Wp
1.198 Wp
Fpx""
Vertical Component (LRFD)
Anchorage Calculations:
Strength Level Forces:
1.124 WP =
0.150 WP =
Critical Angle =
1966.1 lb
262.2 lb
0.1498 Wp
36 degrees
Fpx * HT= 100921 lb-in
MR= (0.9-Fpz) •WP• Lx = 32668 lb-In (at critical angle)
MNe,= (MOT· MR) = 68253 lb-In (at critical angle)
Tu= 1361
Vu= 492
NOTES:
lb Tension/ Anchor (worst case anchor)
lb Shear I Anchor (all equal)
Length (long side)(@ anchors)=
Width (short side)(@ anchors)=
#Anchors on long side (10 max)=
# Anchors on short side (8 max) =
(not counting comers at short sides)
Total Anchor Points =
Anchor Layout
ASD Level Forces:
0.788 WP =
0.105 Wp =
1376.3 lb
183.5 lb
42
31
2
0
4
Critical Angle = 36 degrees
Mor Fp,c *HT= 70645 lb-in
in
In
(42 In oc)
(31 in oc)
MR= (0.6-FpJ • Wp • lx "' 21561 lb-in (at critical angle)
M,~ M,) • 49084 lb-lo {,t oritioal eogle)
T O = 979 lb enslon I Anchor (worst case anchor)
V so= 344 lb • hear I Anchor (all equal)
-This spreadsheet checks all angles (O deg -90 deg) for each bolt arrangement Forces given are for the worst-case angle.
-Angles are measured up from the horizontal line In the diagram above through the center of the unit (0 deg"' right, 90 deg= up).
-Attachment to concrete or masonry shall use Omega unless governed by a ductile shear or tensile failure.
-If equipment is mounted on vibration Isolators with the clearance from equipment to frame> 0.25 inch use 2Fp (double Sds).
-Lx Is the distance to the farthest anchor measured perpendicularly from the angled line of rotation.
Y:\Projects\22\22-005 AbsorptlonSystemsTl\2 • Calculatlons\2 -Spreadsheets\Mech Anchorage\Mech Anchorage -PHl D4 PH2 D3\2019 CBC -Mechanlcal
Anchorage(EF-1.3)
••• :.WISEMAN.+: :ROHY
.. STRUCTURAL.ENGINEERS. . . ........... ..
( :DATE. 11,h .PROJECT ••• :·Ae~gp·r-1~-. ~'/s·r0"Js rti'·:SHIET'NO ...•••• • or·_· __
• •••• •• • • ' • ..J.08 NO': . ?. '2. ~ 0.45. .
i
t·····
"fA.~L.. .... 1 .......... , ...
.. . ... ·• ·-·. ·-. ·--···-···-.. ··-:· .
~~·.-:~:-..-.:·:.· .. •• ......... A~~-;;:·~;:.-:~~ :~::·~: ·::. ii t ·i.,., \ .~~~;{•;.:~~:::·;~~}~-~-1·~~~~ ·.:::~ .. ~:~-;-·:·: .( .... ·=:::::::::·:::::~:T.~:.--.·:: ... ·: .. -----·
.............. .. .. ·.c~~~in:..~................. =:~:!'_;'···''.;· ........ -1........... t'.'.I~, -.......... y...... . ..... -: ... . .......... .. ........ ·-·:·:::· .. ·.:::.·.:_ ... '. ...... ~.~pf::;--~ "' .. ,. ·"'.>6'.5~/.,;,_ ·.:; , ,.,,, _.. ........ l • ••••••••••• .... f····
I ' \
. L. . r·--. .. , ......
'. • ' • -•• . . i. ..... -. ·--·-··· .... . :'®.: ::::: ::: .. : ... f.~.~~~~:c.~:::~:: .• s~c ,.1 • .r~·oJ.-... ~ ··,z·: ~.. . .... t .• ..... ;--~11 •~-: ~·~•·.~:;·:-;a·. 'j);i;~: ::-··-·· ;. • . .; :::···· : ......... ,
. .. i ........ ·-• . :-.. ·-·. -· ·-• -• -· •.. . • .. -•. .. -... ·-·-····. :
;, .............. .
.. ·-·. ·-·-·. ; _____ .. . . . .. T. ·-ryi:: e,o:t·\-i :··.i~:. J'_\f;.4.j .. A.i-Y:c.~ro.«.M..·~... r··:·:·::...... . i
' ... I ' ·.·.:I ::: .. : :: =· :. .• I
........................... ;-.. ::.~:.:.~:~:::: :::~:.: ... ·+ .. ·· ..... :: ~:: .. : .. ::. ,:::::·:J~~,i;~·.:c :· : c": ~f-,· • ·: :~:~7-9.~:.f.a. ~ ... ;. ~~ ~:~·:£·:·::~~~-~:~:~:6:~.~~?-.: ·~ ~::.:_ · .. ::: :~:··· .:
.... ......... ..... ... ! .. .
.... ·-··········. ·······-·· .. ·:··--"···.
... ... . .. -· .... ·-··-...... ··-.. l .....
' ...... -·-........ ' . '.. .... .. .. . . . ·i
.. .......... , ....... I ..
••• • : • ~ -~·~ ... ::a~ •• ·;;J }P..~u: ..... .
• • • ····•. ··-·-···-· ... -··--·----••..••• -t·. .. . ...... ·---•--··-·-·---. ---··· •••. .......... 1 ......... I ........
I • ...... ····~· •• l
l •• ·•····-·--·-····· •
. -..l····-············ -~---···---···--. ·-··---·-.....
• ' I .. J ....
. ........ l
. . --.... l
.. ... .. ....... .. ................................... f ........ ..
! .....
I •• ·•· ...•
. ... .. .. 1·•·•···.
........... ·--·---· ·-·-········--··--·-·--.. •---··-··-·-•-;-•---··-···
I
I .... ·----·-i--·
!
! .
. ·····-············--···-; •·••··· . . . . . . ...... ······-··-··-···---··---· -·········•··• ....... .. .. -·----······· ..
.. I.
......... , .. ···-·---------
1··--
......... -·-··•• .....
.. . .......... -·-····--···---------·-.. •····
WISEMAN-t-ROHY
STRUCTURAL ENGINEERS
EQUIPMENT SEISMIC ANCHORAGE
(2018 IBC/ 2019 CBC/ ASCE7-16)
Version 3.0
rption i,e 2
/
___..-12/9/2022 09:09:45
EQUIPMENT ANCHORAGE PER ASCE 7-1613.3.1
ap = 2.5 Equipment Weight= 700 lb
Rp::; 6.0 Curb Weight= 0 lb
Oo= 1.0 Total Weight= 700 lb (Wp)
Sos= 0.749
I = p 1.0 Top of Curb to COG = 45.33333 in
z= 35 ft (equip ht) Curb Height= 0 In
h = 35 ft (roof ht) Total Ht to COG = 45,33333 in (HT)
Horizontal Component (LRFD)
Fpx = 0.4 (~) Uv)(Sos)(Wv) (1 + 2i) =
FpxMIN = 0.3 (Sos} (Ip} (Wp} =
F px MAX = 1.6 (Sos} (Ip) 01-/ p} =
Vertical Component (LRFD)
Anchorage Calculations:
Strength Level Forces:
0.375 Wp =
0.150 WP =
Critical Angle =
262.2 lb
104.9 lb
0.1498 WP
0 degrees
0.375 Wp
0.225 Wp
1.198 Wp
MR= (0.9-FpJ •WP• L~ = 7352 lb-in (at critical angle)
(Mor MR) = 4532 lb-in (at critical angle)
B1 lb Tension/ Anchor (worst case anchor)
66 lb Shear/ Anchor (all equal)
NOTES:
Length (long side)(@ anchors)=
Width (short side)(@ anchors)=
# Anchors on long side {10 max) =
# Anchors on short side (8 max) =
{not counting corners at short sides)
Total Anchor Points =
Anchor Layout
ASD Level Forces:
0.262 WP =
0.105 Wp =
183.5 lb
73.4 lb
40
28
2
0
4
Critical Angle = 0 degrees
Mor Fpx *HT= 8319 lb-In
In
In
(40 In oc)
(28 In oc)
~Mor-MR~::: 3467 lb-In (atcritlcai angle)
62 lb Ten/ion / Anchor (worst case anchor)
46 lb year/ Anchor (ell equal)
/ L.c.•..,..J
-This spreadsheet checks all angles (0 deg -90 deg) for each bolt arrangement Forces given are for the worst-case angle.
-Angles are measured up from the horizontal line In the diagram above through the center of the unit (0 deg = right, 90 deg = up}.
-Attachment to concrete or masonry shall use Omega unless governed by a ductile shear or tensile failure.
-If equipment is mounted on vibration Isolators with the clearance from equipment to frame> 0.25 Inch use 2Fp (double Sds).
-Lx is the distance to the farthest anchor measured perpendicularly from the angled line of rotation.
Y:\ProJects\22\22-005 AbsorptionSystemsTl\2 -Calculatlons\2 -Spreadsheets\Mech Anchorage\Mech Anchorage -PHl D4 PH2 D3\2019 CBC-Mechanical
Anchorage(CU)
WISEMAN+ROHY
STRUCTURAL ENGINEERS
EQUIPMENT SEISMIC ANCHORAGE
(2018 IBC / 2019 CBC/ ASCE 7-16)
Version 3.0
EQUIPMENT ANCHORAGE PERASCE 7-1613.3.1
ap = 2.5 Equipment Weight = 215 lb
Rp-= 6.0 Curb Weight= 0 lb
Do= 1.0 Total Weight= 215 lb (Wp)
Sos= 0.749
Ip= 1.0 Top of Curb to COG = 45.33333 In
z= 35 ft (equip ht) CUrb Height = 0 In
h= 35 ft (roof ht) Total Htto COG= 45.33333 In (HT)
Horizontal Component (LRFD)
Fpx= 0.4 (Z)(lp)(Sps)(w,,)(1+2~ =
FpxMIN = 0.3 (Sos) (Ip) (Wp)=
FpxW.X = 1.6 (Soo)(lp) (Wp) =
0.375 Wp
Vertical Component {LRFD)
0.1498 WP
Anchorage Calculations:
Strength Level Forces:
0.375 Wp = 80.5 lb
0.150 WP = 32.2 lb
0.375 Wp
0.225 Wp
1.198 Wp
Length (long side)(@ anchors)=
Width (short side)(@ anchors)=
# Anchors on long side (10 max) =
# Anchors on short side (8 max) =
(not counting comers at short sides)
Total Anchor Points =
ASD Level Forces:
0.262 WP =
~.105 WP =
56.4 lb
22.5 lb
24
13
2
0
4
Critical Angle = 0 degrees Critical Angle = 0 degrees
Mor= Fpx*HT= 3650 lb-In Mor= Fpx *HT= 2555 lb-in
09:09:45
In
In
(24 In oc)
(13 In oc)
MR= (0.6-F9z) *WP• L. = 692 lb-in (at_critlcal angle)
MNer (Mor -MR) = 2602 lb-in (at critical angle) MNer (Mor-MR) = 1863 lb-ln (at critical angle)
T ASD ~ lb Tension/ Anchor (worst case anchor)
V ASD t _/ lb Shear/ Anchor (all equal)
Tu= 100 lb Tension / Anchor (worst case anchor)
Vu= 20 lb Shear/ Anchor (all equal)
--
NOTES:
-This spreadsheet checks all angles (0 deg -90 deg) for each bolt arrangement. Forces given are for the worst-case angle.
-Angles are measured up from the horizontal line In the diagram above through the center of the unit (0 deg= right, 90 deg= up).
-Attachment to concrete or masonry shall use Omega unless governed by a ductile shear or tensile failure.
-If equipment Is mounted on vibration isolators with the clearance from equipment to frame> 0.25 inch use 2Fp (double Sds).
-Lx ts the distance to the farthest anchor measured perpendicularly from the angled line of rotation.
V:\ProJects\22\22-005 AbsorptlonSystemsTl\2-Calculatlons\2 -Spreadsheets\Mech Anchorage\Mech Anchorage -PHl D4 PH2 D3\2019 CBC-Mechanical
Anchorage(SSCU 1.06)
(
.. (
i
--···---··-·"'-···-·· ..... -•--· -----· ··+·· .. --,-· ..
•WISEMAN+ iROHY
.. $Ul:ll.Q'~MU"G,INJ~~-
av ~· • ~ tt : :oATE. ,r.> /2 , ~ROJEa --=-"" .... &-:«....,: .. :P ... • · -l'P"""!'-'-'"""t,a..., ...... -_s=: -'-"'~=1...__..E,M, __ !)__ •• .SHEET No .. ..----oF _·· -'---
.......................... __ • ·""'l.:=--=--=-=--=··· -...,-=;...· .......... =-------------r------'-"'""" ................. ---~----· -•• JOB NO. : .·.22 ·....:·ro-s
I . -r
................... :•-····--·
... i
---:----···
i--·-···
I,, .. _• I
. l. l-ti ED \J.C..,. .) ;
·····1"•"•-·-·
i .j ...
i ....... . • 'j" .. .
~ .• -_ ... ' .. -...... •,:c.. ••.• .. ·····-;,;,;··;;;,·-··-····; ... _.·,'."-... ·.··-.··· \f ···-· •• •••• ' .... ~ .1.9 .. ,-~ "" ~.... .._, ... ~ • "! ....... ::-.3'.!\ 1"' ""· \... ...... )
I
...... r ......... r
····-1 ---•-•
···--··-·--·-··· .. I
..• ····••· i---·-··+
... i
--... -----· ............ .
. I.
!·
···--·l--!
!
! i i .
·····i-·····
! .,
---. ··------········--... J .. --.. -·--•·•---··-----···· . , ... ! ------........ ~
: -. . ........ f .. , ..
····-[ .•
. I
~-". --· ·-··
.L
... 1
.. ,
WISEMAN+ROHY
STRUCTURAL ENGINEERS
EQUIPMENT SEISMIC ANCHORAGE
(2018 IBC / 2019 CBC I ASCE 7-16)
Version 3.0
PROJECT: Absorptlon Phase 2
LOCATION: SSCU 1.01
JOB NO: 22-005 12/912022 09:09:45
EQUIPMENT ANCHORAGE PER ASCE 7-1613.3.1
ap = 2.5 Equipment Weight= 440 lb
Rp:: 6.0 Curb Weight= 0 lb
Clo= 1.0 Total Weight= 440 lb (Wp)
Sos= 0.749
Ip= 1.0 Top of Curb to COG = 28.66667 in
z= 35 ft (equip ht) Curb Height = 0 ln
h= 35 ft (roof ht) Total Ht to COG= 28.66667 In (HT)
Horizontal Component (LRFD)
Fpx == 0.4 (::) (/p)(SDs)(Wr,) ( 1 _+ zi) =
Fpx=
Fpx MIN= 0.3 (Sos) (Ip) 01/p) =
F px MAX = 1.6 (Sos) (lp)(W p) =
0.375 WP
0.375 Wp
0.225 Wp
1.198 Wp
Vertical Component (LRFD)
0.1498 Wp
Anchorage Calculations:
Strength Level Forces:
Mor=
0.375 WP =
0.150 WP =
Critical Angle =
164.8 lb
65.9 lb
0 degrees
Fpx *HT= 4724 lb-in
MR= (0.9-Fpz) .. WP• Lx = 5281 lb-in (at critical angle)
NOTES:
0 lb-In (at critical angle)
lb Tension/ Anchor (worst case anchor)
lb Shear/ Anchor (all equal)
Length (long side)(@ anchors) =
Width (short side)(@ anchors)=
# Anchors on long side ( 1 0 max) =
# Anchors on short side (8 max) =
(not counting comers at short sides)
Total Anchor Points =
ASD Level Forces:
0.262 Wp =
0.105 WP =
115.3 lb
46.1 lb
44
32
2
0
4
Critical Angle = 0 degrees
Mor= F px • HT = 3307 lb-In
in
In
(44 in oc)
(32 In oc)
MR= (0.6-Fp,),. Wp * L, = 3486 lb-In (at critical angle)
0 lb-in (at critical angle)
=ylb nslon / Anchor (wont case anchor)
= 29 lb ar / Anchor (all equal)
....
-This spreadsheet checks all angles (0 deg -90 deg) tor each bolt arrangement Forces given are for the worst-case angle:
-Angles are measured up from the horizontal line in the diagram above through the center of the unit (0 deg= right, 90 deg:: up).
-Attachment to concrete or masonry shall use Omega unless governed by a ductile shear or tensile failure.
-If equipment Is mounted on vibration isolators with the clearance from equipment to frame > 0.25 Inch use 2Fp (double Sds).
-Lx is the distance to the farthest anchor measured perpendicularly from the angled llne of rotation.
Y:\Projects\22\22-005 AbsorptlonSystemsTl\2-Calculatlons\2 -Spreadsheets\Mech Anchorage\Mech Anchorage -PHl D4 PH2 D3\2019 CBC -Mechanical
Anchorage(SSCU 1.01 gov over Sscul.04)
Job Name/Location: Tag#:
Date: For: OCil File ~ Resubmit
PO No.: l!;il Approval [iii] Other ___ _
Architect: GC:
Engr: Mech:
Rep:
(Company) (Project Manager)
ARNU243M2A4
Multi vi,,, High Static Ducted
21\,200 Btu/h lndoo1 Unit
Performance:
Total Cooling Capacity (Btu/h)
Heating Capacity (Btu/h)
Max Power lnput1 {W)
L/M/H Power Input at Factory Default (W)
24,200
27,300
430
34/43/67
Rated capacity Is certified under AHRI Standard 1230. Ratings are subject to change
without notice. current certified ratings are available at www.ahrldlrectory.org,
Electrical:
Power Supply (V/Hz/(/J)
Rated Amps (A)
208-230/60/1
2.3
Piping:
Refrigerant:
Liquid Line (in, OD)
Vapor Line {in, OD)
Condensate:
Condensate Pump Draln2 (In, ID)
Gravity Drain Plugged (in, OD)
Controls Features:
•Auto changeover
(Heat Recovery only)
•Auto operation
•Auto restart
•Dual thermistor
control
•Wi-Fi compatible
Optional Accessories:
•Dual setpoint control
•Multiple aux heater
applications
• Filter life display
•External on/off control
•Auto fan
• Leak detection
fill Wireless Remote Controller' -PQWRHQOFDB
@J Premium Controller -PREMTAOOO
!fill MultiSITE CRCl Controller -PREMTBVCO
~ MultiSITE CRC1+ Controller -PREMTBVCl
ID] Simple Controller -PREMTCOOU
~ Wi-Fi Module -PWFMDD200
3/8 Flare
5/8 Flare
1 Plaln
1 (3/4 MPT)
•Weekly schedule
• Fan speed control
•Group control
•Hot start
•Self diagnostics
•Timer (on/off)
•Child lock
~ Simple Dry Contact (1 contact, 24 VAC external power) -PDRYCBlOO
Ifill Dry Contact for Economizer -PDRYCB400
[§) Dry Contact for Third Party Thermostat -PDRYCB320
Ifill Aux Heater Kit -PRARHl
1MJ Remote Temperature Button Sensor -ZRTBSOl
~ High Efficiency Filter Box -ZFBXM201A
.LG
Life's Good
Entering Mixed Air:
Cooling Max4 ("F WB)
Heating Min ("F DB)
Unit Data:
Refrigerant Type
Refrigerant Control
Sound Power" dB(A) (H/M/L, @0.24 ESP)
Filter Type
MERV
Filter Quantity
76
59
R410A
EEV
54/53/53
Washable
N/A
2
Filter Dlmensions6 (In) 9-11/16 x 23-15/16 x 3/16
Net Unit Weight (lbs) Shipping Weight (lbs) 82.9
Fan:
Type
1 ( 95.5 )
Sirocco
2 Fan Quantity
Motor/Drive
Motor Quantity
Brushless Digitally Controlled/Direct
1
Standard Mode Airflow Rate H/M/L (CFM) 640 / 520 / 435
Standard Mode External Static Pressure (ESP)7 (in wg) 0.20
High Mode Airflow Rate H/M/L (CFM) 673 / 512 / 425
High Mode External Static Pressure (ESP)7 (in wg)
Airflow Range (CFM)
Minimum ESP {in wg)8
Maximum ESP (in wg)"
Notes:
1 Maximum power Input ls r.1ited at maxlmum setting value.
0.24
135 -1,431
0.16
0.71
2 Maximum lift Is 17 In from bottom of unit. Check wive not Included lfleld supplledl,
3 Requires an \.G wall controller because ducted urilts do not have lnfr-.rad recelvtr,
4 See Engineering Manoal fcrsen,lble and latent copaclties.
5 Sound Powtr level Is m .. sun,d uslna rated conditions, •/\d tuted tn a
reverbereUon room J>C!r lSO 3741 :ibndards.
6 Actu.i filter silos may vary.
l Atfoctory fan spud setting.
8 Maximum static proswro may rosult In reduced >lrf/ow ICFMj,
9 All Communlatlon coble betw"n Master outdoor units to Indoor units/ heat
recovery units to be IS AWG, 2-<:<>nductor, twisted, stranded, shielded. Ensu,e
the communication coblo shlold Is proporly 1ro.anded to the Mastor outdoor
unit chassis only. Do notsrourKf tl\e outdoor unit to Indoor units/ hoat
recovery units communlutlon cable at any other point. Wiring must comply
with all appllable local and national codes. n Power wt ring c.ibla size ""'st comp Iv with the applicable local and nation•! code.
1t This unit comes wllti a dry ottro1en dlar..,.
12 All capacities are net with a comblnatlon n,tlo betwe.., 95-IOSlr,, n Must follow Installation lnstsudlons In 1he applkable LG lnst>llaijon monuat.
<ffi· C US
Forcontinu.ll prOOJct development, LG reserves the right
to change specifications without noUce.
LG fJectronks U.SA. Inc., Ef'81ewood ~11trs, ~J. All rights reserved. "LCi life's Good" Is a registered trademark of LG corp. /www.lghwc.com SB_Mull,V_Hlgl\Sioil<Ouoted,,}IRNU243M2M_2020_10_1~1o4516 Pai,, I of 2
Job N·ame/Location:
ARNU243M2A4
Multi V''1 High Static Ducted
2·1,200 Blu/h Indoor Unit
J ...
If· -::_---.lmll·--_L .,
□
If □ . □ ~
□
z s> -N w ... u, "' ....,
"ll Gl t:'. ~ ~ I ~ ~ ;:l, 81 .0 I 'O !:, s· 5' i z a. .. ~-~-"!! . Q ~ ~ 'i .. a :, C' "' a a. .. :, n i :,: :, 0 :, ~ 5 :, 2.
~-G. 3 ,.
:, g " :, ~-
C!. g
~ ,.
:,:
2. ,.
[
'O
' ' ' ' ' ' '
C!. 0 ::,
.LG
Life's Good
~:
.... 1,::tr• .. .,
l!..-...!!
l lfi i
:fl
\: ': ~ ·,-
co "'
~ ('\ 0
f [ i!!:
i;l i
~ I '
~
't) 8. ii
For continual product developm~nt, LG reserves the right to change specifications without notice.
LG Electronlcs U.SA, lf\C,, Englewood Cliffs, NJ. AH rights rMcrvacl .,LG Life's Good111 Is a reg_lstered tndemaric of LG Corp. /www.l&hvac.com
Tag#:
Date:
PO No.:
'2 ::, rt'
5'
~
SB.../,4uluV.)11ohS1olk:OuC18cLARNU2◄3M2A4_2020_1tJ..12-..104515 P•&• 2 of 2
'f'RANIJ'
.JOO 1'4amu: AOSOtPUOn .:,yswrn, 1 u I on ::,pm
Pro1iored For:
Unil Tug: IOT -lnooer
auanli\y: 1
S~-F C-1.0 \ --
6 -25 Ton Unitary Split Systems lndoor
'Re_fr}gerant lllformation
2022/05117 20:31 :49
95:00F
67.57 F
66.64F
121.~4MBh
17.00. F.
15.09F
68.56 MBh . 7(6_6 MBh. ;
'. 1~.0QA·
iifo'i..
o.sooin H20
0.665 in fi20
748rpm
U33bhp
' ....
168 PerFoot
338ft/mln
56.64 F •••
93.55MBh
28.38 MBh
117,76 MBh
89.37 MBh
·:Q_.0·9,;:::·.-:.: .
· .. ·:o.oo•f.. :· ,.-,-.
: .· -·~
. i
J
Page 1 of 5
TRJWIT
SUPPLY
OPEN
CONTROL WIRING
CONTROL BOX
ACCESS PAN El
DRAIN CONNECTION
FOR HORIZONTAL
(SEE NOTE 2,3,5)
22 7/lf' I
13/16"1
rt= S4 1n6• 36 716"
LL 1
2022/05117 20:31 :49
JOO rcomo: I\USorpuoo ::,y5,1ero • 1 u I on :,p.it
Pmpared For:
Unit Tag: 10T • Indoor
Quantity: 1
25112"
241/16"
NOTES:
1 PANEL DEPTH 112" (TYPAll PANELS).
2. REMOVA81.E DRAIN PAN AND ATTACHED DRAIN CONNECTION MAY BE IIISTAI.LED ON ENO
OF UNIT IN EITHER THE VERTICAL OR HORIZONTALCONFIGUR/ITION, PlASTIC DRAtl PIIN
ACCESS PLATE ON THE END OF UNIT OPPOSITE DRAIN CONNECTION MUST BE REMOVED TO
SLIDE DRAIN PAN OUT Of UNIT FOR CLEANING.ACCESS PLATE MUST BE RE-INSTALLED AFTER
SLIDING DRAIN PAN BACK INTO UNIT.
3. IF PERIODIC DRAIN PAN CLEANING IS REOUIREO,ALLOWROOM FOR PARTIAL REMOVAL OF
DRAIN PAN CONNECTION AT END OF UNIT.
4. t• FEMALE SCH ED. 40 PVC PIPE ORA.ti CONNECflON VERTICAL CONFIGURATION.
5. 1" FEMALE SCH ED. 40 PVC PIPE DRAIN CONNECTION HORIZONTAL CONFIGURATION.
16' SIDE RETURN 16 7/&" BOTTOM RETURN
111
1,wj
2314" -----50"
11!16" I
23/4"-l i-----56" ----"'1
3 112"
vi 1/6-
COPPER LIQUID LINE
FIELD CONNECTION
COPPER SUCTION ltlE
FIELD CONNECTION
161W 10 11116' 19" 13
TO" I l 1
20"
! 20 11116" 10 314" 16 I/◄" 13 3/◄"
I ! 1
15/16j
SIJE
f
(◄) -HOLE FOR HORIZONTAL
SUSPENSION
RETURN
SUPPLY VERTICAL -
RETURN HORIZONTAL/
RETURN VERTICAL
10 TON AIR HANDLER (DUALCIRCUID
DIMENSIONAL DR/1\MNG
Pogo 2 015
15/0"
3 ll/8"
ENOTES
2,3.4
(4) KNOCKOUT FOR
UORIZONTAL
SUSPENSK>N
SUPPLY HORIZONTAL -
RETURN VERTICAL/
RETURN MORIZONT/\L
\j \\J {\tz_\ ~-·-1 lf' J.r~
tLx
SSFC 1.04 I
""N5 IN6
FCU 2.09 I
-N3 fN4
~1
SSFC 1.01 I
IN2
Envelope Only Solution
W+R SK-1
NM Absorption Systems Ph 2 Dec 9, 2022 at 9:24 AM
22-005 Mech Support Vivarium Plan.ad
-·· ... ---. ··--------
-"··~
ELx
1000S200-68 I
"'NS 1N6
4-i3
800S162-54
IN4
"%1 1000S200-68 I
IN2
Envelope Only Solution
W+R SK-2
NM Absorption Systems Ph 2 Dec 9, 2022 at 9:24 AM
22-005 Mech Support Vivarium Plan.r2d
--------·-----•---·------·--·-·-----------------
~
-201blft-~lllJlllililllllN6
-20Jbl~~N4
-20lb/ft llillililllll.ll.lllillllill N2
Loads: BLC 1, DL
W+R SK-3
NM Absorption Systems Ph 2 Dec 9, 2022 at 9:25 AM
22-005 Mech Support Vivarium Plan.r2d
··-·-··--···--·-··· __ .......... _ -··-·----------·----------------
t:1.x
-601bllt pmmru.uumurmrnmllillllllilllJl~ 'N6 -illl1W
~
-601b~N2
1
•N4
Loads: BLC 2, LL
W+R SK-4
NM Absorption Systems Ph 2 Dec 9, 2022 at 9:25 AM
22-005 Mech Support Vrvarlum Plan.r2d
---------------·-·· -------·-····· -• -·-· .. -------------------------
Eix I
-861b
l I "'N5 1N6
-100Ib
l I
""N3 1N4
-216lb
I
~1 ' I
iN2
Loads: BLC 3, MECH
W+R SK-5
NM Absorption Systems F.'h 2 Dec 9, 2022 at 9:25 AM
22-005 Mech Support Vivarium Plan.r2d
Beam: SSFC 1.04
Shape: 1000S200-68
Material: A653 SS Gr50/1
Length: 20 ft
I Joint: N5
J Joint: N6 A------------lb
LC 1: DL+LL (24"oc)
Code Check: 0.733 (bending)
Report Based On 100 Sections
fa ------------ksi
18.965 at 9.899 ft
fc ksi
ft ksi
-18.965 at 9.899 ft
AISI S100-16: ASD Code Check
843 at Oft
-843 at 20 ft
M k-ft
-4.425 at 9.899 ft
-0.841 at 10.101 ft
Max Bending Check 0.733 Max Shear Check 0.252 Max Defl Ratio U285
Location 10.101 ft Location 20 ft
Equation F3.1-1
Gov.0 Equation F2/F3
Location 10.101 ft
Span 1
R (16.2.1) Not Used Out Plane In Plane
Fy 50 ksi Lb 20ft 20 ft A eff. (Fy) 0.562 in"2 Pn/o 1132.881 lb KUr 362.599 65.727 A eff. (Fn) 1.05 in"2 Tn/o 31437.126 lb lyeff. 0.46 ln"4 Mn/o 6.041 k-ft L Comp Flange Oft Syeff. (L) 1.078 ln"3 Vn/Q 3344.713 lb Sy eff. (R) 0.292 in"3 Cb 1.154 lzeff. 12.991 in"4
Sz eff. (T) 2.421 ln"3
Sz eff. (B) 2.803 ln"3
Beam: FCU 2.09
Shape: 800S162-54
Material: A653 SS Gr50/1
Length: 17 ft
I Joint: N3
J Joint: N4
LC 1: DL+LL (24"oc)
Code Check: 0.374 (bending)
Report Based On 100 Sections
fa-----------ksi
9.559 at 8.414 ft
fc ksi
ft ksi
-9.559 at 8.414 ft
A/SI S100-16: ASD Code Check
A-----------lb
220 at Oft
V ~ lb ~
-220 at 17 ft
M k-ft
-1.143 at 8.414 ft
-0.363 at 8.414 ft
Max Bending Check 0.374 Max Shear Check 0.105 Max Detl Ratio U562 Location 8.586 ft Location 17 ft Location 8.414ft Equation F3.1-1 Span 1 Gov.0 Equation F2/F3
R (16.2.1} Not Used Out Plane In Plane
Fy 50 ksl Lb 17 ft 17 ft A eff. (Fy) 0.356 in"2 Pn/n 664.696 lb KUr 378.138 69.697 A eff. (Fn) 0.67 ln"2 Tn/n 20059.88 lb lyeff. 0.194 JnA4 Mn/n 3.067 k-ft L Comp Flange Oft Sy eff. (L) 0.558 inA3 Vn/n 2090.842 lb Sy eff. (R) 0,152 jnA3
Cb 1.199 lz eff. 5.296 jnA4
Sz eff. (T} 1.229 ln"3
Sz eff. (8) 1.434 fnl\3
Beam: SSFC 1.01
Shape: 1000S200-68
Material: A653 SS Gr33
Length: 7 ft
I Joint: N1
J Joint: N2
LC 1: DL+LL (24"oc)
Code Check: 0.204 (bending)
Report Based On 100 Sections
fa ------------ksl
3.703 at 3.465 ft
fc ksl
ft ksl
-3.703 at 3.465 ft
A/SI S100-16: ASD Code Check
A ------------lb
388 at oft
~
V C=====:J lb
-388 at 7 ft
M k-ft
-0.864 at 3.465 ft
D~ln
-0.019 at 3.465 ft
Max Bending Check 0.204 Max Shear Check 0.116 Max Deft Ratio U4468 Location 3.535ft Location 7 ft Location 3.535ft Equation F3.1-1 Span 1 Gov.0 Equation F2/F3
R (16.2.1) Not Used Out Plane In Plane
Fy 33 ksi Lb 7 ft 7 ft A eff. (Fy) Q.625 inA2
Pn/n 6220.847 lb KL/r 126.91 23.004 A eff. (Fn) 0.729 inA2
Tn/n 20748.503 lb lyeff .. 0.46jnA4
Mn/o 4.293 k-ft L Comp Flange Oft Sy eff. (L) 1.078 1nA3 Vn/n 3344.713 lb Syeff. (R) 0.292 lnA3
Cb 1.21 lz eff. 13.524 in"4
Sz eff. (T) 2,607 inAJ
Sz eff. (B) 2.81 in"3
..... (
\
. :WISEMAN +.;ROHY •
..... ' .~lR~c;TY.~UN.§1NEH$ ...
··sv -~·.,: ·!oATE. 1?. Is ••••••• SHEETNO; ___ • ·oF· _· __ _
rev ......... , ..... ,.
........... ,.
... _j
··!· , ..... ,. . f 12.(>(V\. : .. ·~~~-~J....~td:~.:
····1·········
I •• •• r·· t· • ·---·
..... :.(.\?OC ••••• ~~···-
. j
...... ,.
···1----··· ·····-'I"
e,~~(£ :
j . . ... :.~. • .. ;. '•
-~· .. ····
... --·r··
.. . T. ·-
.JOUN() .. i-z·:::..6c~
I
• •. ·1 ··-·-•···
i .... !
.!. ..
/ ! •-•• •-• •-•. ,,. __ .. . ... t •-••-• --• ,_ .. ,,,_ ... _ ..... !
·:: ~.:~·~·r i~~~i:~.t. :.;;::~r~~~:~=~1~a~~:~~~:\r-; .~.~:~~1--· :: :.i··: :; .. •
.... ... .... ...... ;....... i
...... i ............... .
••• 1 •·:
i
.......... l. ..... .
.!
. . .. ~ ..
r· ·: I
....... I. I
I . i ..... .!.
l .....
.. ) ......... .
.j.
~----·-· ······-·--1··--· . ··-•·•. ------·-··· ..... • .. ,._., ________ ·--... ·•
. ......... ·-·······•····· f , .. ___ ..
... -J:·.
I .... ·+
·····}·· ----~-------~-~---~-·--_··_-_-_-_-_-_-_-_-_-_~. I . J.
··-; .. ·-·" • I
• ! i ' .
..~ .....
. .... ·--·-; ···---
"i
J. ;
.... : : i ···l-... ··· .-. ·1 ·· ,.. · ... 1 -1-. i
....... ·······1· ............. · ... t
....... ,... r --.. ·-····-··t---.................................. · ... ·-r· :··•
···········+· •..• ······+ ••• . ;
.j.
!
i ..... ~ ....
... 1
••'•••••••rn-••
.. -·· ... ·-t-·-··-·-
j .
~.::.t:·
' I .·r ..
i I
... ·--' .... ·-··· ........ _ ...... .
-----+--··············-··-· ..
. ··:·~·t ~----· ............... ,_ ...... .
I
i ··i···"· ... 1. ...
.. j
' l
.......................... ,_ ...................... --...
1
.... :.. ....... [
...i. ..
I ..... l.
... ... :
.,_, __ , _, ... ~~::~ .. :~ ·-· -~-.i.
···--·· • 1 .. -··---· ............ ·--·--·
I
-t---··-· ...
.. i I .... ·-· -........... .
! -· •..
i ......... .l ..
I = ii S ;, •-----------------------HIIII PROFIS Engineering 3,0.81
WWW.hati..eom
~ -.:
PhonalFax:-
Deslgn;
F8Slanlng point
Spociftefa commonls:
1 Jnputdata
Metaldeeic
Metal dcclttypo:
Anchor lnslallatioo:
Anchor typo and dla-..-:
l!emnumt>ar.
-... •-depth:
Malarial:
Eviwallon SetYlea-
luucd I Valid:
Wl&enmn + Rol,y SM/duraJ EnglneOl'I Page:
9915 Mira Mosa SIYd 8(e 200, 13"1 Diego, CA 92131 Spedllor.
(8S8) '536-61 II& I E-Moll:
W.elaldod<•oct31, 2IJ2Z !la:
41/21'/Deek
W1
In lhe lowerfiuta of ccn~lod metal decl<
Kwlk Bolt"TZ2 •CS 112 (11/2)h._1
22'10254 KB-122 1/2x3 314
h....,_ c 1.600 In .. ~ = 2.000 In.
ca,l,c,nSleel
ESR-42S6
1:l/17/202111211/2023
1
Nclant.'.<Whortar
10/31/2022
E!ffli ■I ii I (t
DI
Prcol: lleslin Method ACI 318-14 I Moch In <Ona.., over molal dock lnstalallon --Pro!l'.e:
Bue matmial:
lnstalJallon:
Goomouy l)n.J & Laad~ (lb. In.lb]
c:rad<ed ccna-ole, i!OOD. r.; • 3,000 pol; h • 3.000 In.
hammer drillKI ~ tm.Uatfon condJtion: D,y
' (9
_..Gtli_f'Ullb.llUINdadadb'~•---.~-b~ PRORl~(c.)10Cl-202:t .. N1,,,RA4MSct.aHlllll•----T..........,_d._AG,,W.,..,
--------~
i = i I S ·iiO _____________________ _
HIit! PROAS Engineering 3.0.81
W'ill'W.hlttl.com
~ Address:
Pbonolf'a>c: Doalgn: Faslenlr1l point
1.10oolgnroowla
-..,+ RohySINconl EnglllMl'S
9915 Mn Mesa SIYd Ste 200. 6aJl Diego, CA 92131
(858) !136-61661
Metal ded< • oct 31, 2ll22
Page:
Speciler.
E-Ma;j:
DalB:
ene ~ Fo,-Obl/MomentllnJbJ
Combination 1 N • 100:V11:•100;V1 •0;
M,,•O:M,•O:M,,•O;
2 Load case/Resulting anc;hor forc;es
AndlorlUdlons[ll>J
Tension Ina: (+T..-.. -cam-on)
AAalt1t Tenslonfon,e Shearfor<e Slleerl'l>teex Sllear-1'
100 100 100
max.""""""".,,,,.,._.... · l",J max.caietol8----[psi]
nisu111ng tanslon llln:e In (xly)-(0.000/0,000~ 0 !Jb]
mui,ng ~fnra, In li</Y)'(D.OOMl.000~ 0 [!)]
3 Tension load
LoadN..(lb] C.padly ♦ N, [II>)
SIMS1rong111' NIA
..._.SVWngttl" 100
Concno, BINJcout Fallunl"° NIA
• hlghestlceded anchor .._ group (enchoro ln18nslon)
3.1l'ulloutSlrenglll
N~
1,651
(f.'./3000)"
1.000
..
0.500
_.._
1.000
lrlp.a:dllaM1--na1bll~lcir---lillllta ........... ftiir....,. PAORl~(■)ZIID-ZIIZ2ta!M. ........ ~*IH,.,....,_~••Al1..._.
1'¥A
1,073
NIA
0.550
2
NalonMoWhollw
10131/2022
SolsmJc Max. Ul!l.-,!!:J
no io-
U-n P•" N..,+ N,, Stalus
NIA NIA
10 OK
NIA NIA
♦ ~ ~
1,073 100
2
--------· ..... __________ ----···--•··· ----·------·-.
•=liS-u HUii PROF!$ Engineerlng-3-.0-.8_1 __________________ _
WWWJIUll&ocn
Company:
Address:
Phone I Fox:
DOlign:
Falrilgpcint
Wloeman + Rohy StNClural Enii>eers Pago:
9915 Mlra Mesa Blvd Ste 200, San Diogo, CA92131 Spocl(,er. (858) 538-S166 I E-Maik
Metal deck-Oct 31, 2022 Oola:
4Shearload
l..oll.d v. llbl Capacity♦ v.[U>J
S..olStronsith• 100 1,154
steell'ailure('Mlhleverannr NIA NIA
Pryout ,._-NIA
Con<IO!O ~ foil.l"' In dlrtcllon -NIA
•hlghostlOadodatdlor -.nci,«group(191ovan!llllcl1cl$)
4.1 St"' Strangtb
v_,__111>1
1,791 0.650
♦ V.,.__Obl
1,1"4
5 Combln•d tension and shear loads
P,.
0.093
Jws:P!,+15,;,<=1
6Wamfngs
,.,
o.oas 513-
v~
100
IJ1lilzallon~ 4
NIA
NIA
-OK
U1UIDl!on II,• v..,+ v.
9
NIA
NIA
NIA
3
Nolan Mc:Whcrter
1ar.11121l22
Sta11Js
OK
NIA
NIA
NIA
• The llllcl\ardftlg:n methcclaln PROFISEnglneerlng require rlgidandlor~wourrenln,g,4"11orm (AS 52111:2021, ETAC 001/AnMxC, EOTA TR029 et<.). Thlsmeam,load rHSl!iblJ1!onon t119and!otc CIUU> --ofiho __ .,. not--iho
onct,ar plola Is asaumed ID be oufflclerrtJy sliff. In order net ID be de.'amod whenaul,jocad 101he deolgtl loadlng. PROFIS En;in-1og c:,olcu-
lhe mlniaun required ondlor plate 1hldulen with CBFEM lo flml Ole lln>s5 o1Uleanellor pls1a -oniho ..umpllonoo,q,lalntd above. The
proof~1herislld enchor plceaaeumptloo 1' Yalld Is notc.arrfed outbyPAOFIS~ q,<Jldatuod-mustbe-ror agrecnentwlh lho tO<i>llng oondltlons end for p1au$1b1111yf
• Co!d!lonAappies who<e lho po!ontlal ooncrer,, fallune ...-.,.. c:ro&Hd by ,upplo,-gy nolnlor<:emantpnll)Oll!aned lo Ce lhe potonllal
""1<fflefailuoe prilmlnl01ho llro<turalrneml>er. Concffllon 11---~-lo nctpn,,lded, orwhan,p<dcut or pryoutlltrengCh ;...,,,._ •
• Rt!ertolho rnarMaC!uret'& producl llte<aw"'for"-'lng an<1'i,.,ta11at1an-.:t1ans.
• Foraddilonal lnforma!lon aboutACI 318 ~lh dealgn prowdcr,a, p(ooM go ID htlprJ-.us.hlli.axnlPROF1SAncborOesiGuld81
• Hi~~ aodl<n shal ba ..... nod In-"'"' Iha Hlll Monufactur .... Printed l/lstllllalion -(IWPn~ -ACI 318-1~. $edlon 17.8.1.
Fastening meets the design criteria!
~--.... l!Nl.b.o.dradt:ir~..,-~~---~ ~~(c)20Q:3.2022:._AG,FWi&e&Sc,wan..-lJ•...-,.:l~flHliAG..~
-----··
i = I I S -I • ----------------------Hllti PROFIS Engineering 3.0.81
www.hlltl.eom
C....-,y:
M<nso:
Phanoll'lu::
Design:
FUIOn!ng point
7 lnatallatlon data
Pro!'le:-
Holedlamolerlnl!W-:---.. ~~-
W1soman + RahySlrucunl-Engl...,.
W15 Mltll Mesa EIIVd Sit 200, sen Diego. CA ffl31
(858) 536-61861
---Oct31,2!122
llrili'1g method: Hammer drtled
Cloaning: Ma!Nlll doaning of lhodrillod hole ao:onling ID ln&INdlonsfwllSO is
r,,q<nd.
Pago,
~ 6,1,W;
4
NolanMcWhorler
Dal8: 10/31/2022
Ancllor\ypeanddin-,K'a,1<BotTZ2-CS112(1112)
hncm1
Item nunbor. 2210264 Kll-'IZ2 112X3 314
_....__602n.J>
Holed-In lhll-matorfal: 0.500 In.
.-depth In.,__ .-.lal:2.250in.
--ollho-.-ial:2.5001n.
HW K8-T22 oiud oncllorwith 2 In-~ 112 (1112) mom1, Carbon steel, lnsta-per ESR-4200
7.1 ___ _
M_ini
•&.lablellomyHammor
• Pn,perty-drll bit
Caordf,_. Anchor In.
Anchor X ~
0.000 0.000
~~
a-..!!!.
•Manualbio,f-outpomp
... :,,,. e.:r.
~---~...,.,.~..,_....., ..... ..._....._w.,,~
PROFIS~(eJ2DOWmZKll~FWMll.,_tedlla ....... T--.-rlHIIM..,_,
Selling
• TOf<1ueoonln)IJedconlesslmpacttool
•TD!qu.wrendl
• Hanmer
__ ,.,_ ... ---------------------------------------------
•=iiS-0 HIit! PROFIS Englneertng_3_.0_.8_1 ___________________ _
www.hlll1.com
~
.AddNN:
Pllonal Fac: Oell;n:
Fallanirvpoint
-· RohySrruelunlEngi_,. 11915 Mn 1'1.-Blw ste200.Son Diego, CAll2131
~)!3U1as1 ---Oc131,2DZ2
8 Remarks; Your Cooperation Duties
Pogo;
Spodtlor.
E-Md: Dato:
5 --10131/lOZZ
• /Vr/-d-ond<lolaCC11tamod In the-coneem lOlll!ylle UMolHIIII productaanelan,l>IMdon lho pr1nCiploo, ,. __
NCUrlyraguladonsln-....-Hilh--Ol>d~.~and-,,t,fy-•lc..thetmustbe~
ccmi:t".od 1n1, t,ylho us«. PJ figino ccnlalMd -In are -iv-, and """9fore _..,..,.,_.,.ID be condudad priorm ialng
lhe,._.Hlllprodua. The-,Jlool.,._....todoutby.,_.otll>o---~onlle-youputln.
~. you bearlhe l0lo mponolblRlyfDrtno ebeence ot emn, the c:omplelllnma ond the --.,. ot !he da!a ID be put In by you.
-..,youbNr,cg~forhNngll>o.....:llollheOO:cullllon-andclaarldby111-,.~-_.,lo
a:mpl!anc."'111 IIIJl)liule nonns and ponnb, prlllrto ~ 1-foryouupeci(cfal::mty. n..-.-oni, u en cf ID lrDtlntnorms
'"1d pennils-1111)'9.,.,.._ • lo tho oboente al omn. the.,.,_ Ind tho rellrVance o/the ,_ orsullab~fDr• ~
appilcal!on.
• Yoo lllllSl talca II nacusiryand -stops ID -o, lmll cllmaG• -by Iha ScltwaN. In pallamr, you nat -tart,e
regular b&dG4) d programs and da1a Ind, II' appac:,bla. earry out INl UpdMN at.,_ sottware on.rad: t,v f-111 on• l"IIQUtat bUls.. l'you do not l»a
lho AlnoUpdlle lundion o/ lhe -you ...i onolft that you are using lho a,rro,,t and ""11 up-«><fata vwaion o/ the _.. In Udl
.... /ffcanylngCUI-UJ)dllaSYI& the HIii W-. ~Wiil ncl bellabllfotccmequencas, aldl .. lll retr,wyoflosto,dlmagecl da1o
orprogrwn,.~l,om•~-o/dutyb)',ou.
.... .ca .... ____ ._..._ .. __.., .................. ~
Pfa=IIEn_,.....(c)ZICIS,Z':DHaNl.f\AM.._.tCll■•----TJlliltMtt.,tWAII.-...
·-· ----·--··--·-·-
-· ....
ESR-4266 I Most Widely Accepted and Trusted
Lower flute installation
. .
hn,ln,d,:ck k. • • ·· • : -~ ... -. . .
• #,.. • ~# -r---.w,---,..
Max. 3" ~ € -.... ;,
Min.
4-1/2" Min.
l"
Min. 12" typ.
Page 12 of 15
Min. 20-gauge steel deck
FIGURE 5A-KB-TZ2 IN THE SOFFIT OF CONCRETE FILLED PROFILE STEEL DECK ASSEMBLIES -W DECK
Lower flute installation
' t.' .;.,.,;,:..,-..
hmhulec.k .... •.. , . , "" •
~> • ... . ,..
l ~ -~....,,,,---.. • <
Max 3" ' , • • -'i
Min.
3-7/8" :j I ,. Min.
l"
Min. 12" typ.
Upper flute
installation
1-----,,--,-----,-, -+-,.-,+----1 ..• ·••.•;-. .·
. ;
• ,-~,~ .El~ . ::g "1
Min. 20-gauge steel deck
FIGURE 5B-KB·TZ2 IN THE SOFFIT OF CONCRETE FILLED PROFILE STEEL DECK ASSEMBLIES -W DECK
Lower flute installation
t•Min. 6" ~P-•
.• ,._...,_ 1· .. J,.
J::ltl,-,... -.·t/:., .• ..,. . ~
Upper flute installation
__j_
..,.. •,
FIGURE 5C-KB-TZ2 IN THE SOFFIT OF CONCRETE FILLED PROFILE STEEL DECK ASSEMBLIES -B DECK
ESR-4266 I Most Widely Accepted and Trusted Page 11 of 15
TABLE 8--HILTI KB-TZ2 CARBON STEEL ANCHORS TENSION AND SHEAR DESIGN DATA FOR INSTALLATION IN THE SOFFIT OF
3000 PSI, LIGHTWEIGHT CONCRETE-FILLED PROFILE STEEL DECK ASSEMBLIES1A 3
D,ialgn parameter Symbof Unlti
Ario!M)r Diameter
1/4 318 1/2 5/8 3/4
Effective min, embedment 1 ti., In. 1-1/2 1-1/2 2 2-1/2 1-112 2 2-1/2 3-1/4 2-3/4 4 3-1/4 3-314
Minimum hole depth ho In, 2 2 2-3/4 3-114 2-1/4 2-3/4 3-1/4 4-1/4 3-3/4 4-314 4-1/4 4-3/4
l,oads According to Figure SA
Minimum concrete hmin.-In. 2-1/2 2-1/2 2-1/2 2-1/2 2-1/2 3-1/4 thickness over un=r flute •
Pullout strength,
uncracked concrete•·• NM-lb 1,725 1,855 2,625 2,995 1,85~ 2,750 3,745 4,715 4,415 5,815 3,600 4,795
Pullout strength,
cracked concrete •·• Np,-.., lb 515 1,625 2,295 2,405 \_1,651?.., 2,135 3,275 3,340 3,930 4,395 3,325 3,730
PL4lul strength,
selsmlc'·7 Np,,._ lb 616 1,625 2,295 2,405 1,650 2,135 3,275 3,340 3,930 4,396 3,325 3,730
Staal strength in shear• v..,.,,, lb 1,630 1,355 2,120 2,120 1,790 2,260 3,285 4,235 3,815 4,650 4,085 7,865
Steel strength In shear,
•0 lsmlc7 v ... -.. lb 1,630 1,355 2,12D 2,120 1,790 2,260 3,285 4,235 3,816 4,650 4,086 7,865
: . Loads ~Ing to Flgu~ 5B
Minimum concrete fl,..,,dt<k In. 2-1/2 2-1/2 2-112 2-112 2-1/2 3-1/4 thickness over unn<>r flute •
PIAloul strenglh,
uncracked concretes.• NMld<.unct lb 1,726 1,856 2,625 2,995 1,856 2,750 3.745 4,715 4,415 5,815 3.800 4,795
P!Mout strength,
~racked concrete M Np,,,_ lb 616 1,625 2,295 2,405 1,650 2,135 3,275 3,340 3,930 4,395 3,325 3,730
Pt6>ut streng1h,
-ismlc57 Np.de<t.t11 lb 616 1,625 2,295 2,406 1,650 2,135 3,275 3,340 3,930 4,395 3,325 3,730
Steel strength In shear 8 v ........ lb 1,630 1,355 2,620 2,120 1,780 2,260 3,285 4,235 3,815 4,650 4,085 7,865
Steel strength In shear,
<=lsmlo7 v ... ~ lb 1,630 1,355 2,12D 2,120 1,790 2,260 3,285 4,235 3,816 4,650 4,085 7,865
Loads According to Figure 5C
Minimum concrete hn,zn,11eck in. 2-114 2-114 NIA 2-1/4 NIA 3-114 3-114 NIA NIA NIA thickness over un=r flute•
Pullout strength,
ur1eracked concrete•·• Np.nd{,c.,or lb 1,380 990 2,485 N/A 1,815 1,900 NIA 2,665 2,960 NIA N/A NIA
Pullout strength,
cracked concrete •·• Np.-.,, lb 410 670 2,130 N/A 1,480 1,480 NIA 1,680 2,635 NIA N/A N/A
Pullout strength,
seismlc5•7 Np.doct.lRI lb 410 670 2,130 N/A 1,480 1,480 NIA 1,890 2,635 NIA NIA NIA
Steel strength In shear• v .. ..,.. lb 1,125 2,370 2,505 NIA 2,680 3,175 NIA 3,455 4,085 NIA NIA NIA
Steel strength In shear,
selsmlc7 v..,.ot.,q lb 1,125 2,370 2,505 NIA 2,680 3,175 NIA 3,465 4,085 NIA NIA NIA
1 lnstalietlons must comply with Section 4,1.9 and Section 4.3 and Figure 5A, Figure 5B end Flg11re 6C of this report. .
2 Toe values for ¢1,,N In tension can be found In Table 4 of Ihle report. The values for ;..,vln shear can be round In Table 6 of this report,
3 Evaluation of concrete breakout capacity In aocordance with ACI 318-14 17.4.2, 17.5.2 and 17.5.3 or ACI 318-11 D.6.2, D.6.2, end D.6.3, as applicable, Is not
required for anchors Installed In the deck sofflt.
4 Minimum concrete thlcl<nesa n1fere to concrete thickness above upper flute. See Figures 5A lo 5C.
5 Characteristic pullOut resistance for conccete compressive strengths greeter than 3,000 psi (20,7 MPs) may be Increased by multiplying the value in the table by
(f'c/ 3000r for psi or (f 'cl 20.7)0 for MPa. • Toe values listed must be used in accordance with Section 4.1.4 of this report.
'Toe values listed must be used In accordance with Sections 4,1.4 and 4.1,8 of this report.
8 Toe values listed must bo used In accorclance with Section 4.1.5 of this report.
. (
..... ~--•·•···
···!. '
·::T ::
···-·-·!.-........ .. ;
.......... -· .. ··!
. i
·········! ...... i"'
.t:
..... !
__ j
...... i .....
·' I
. ... ~---
·-···-.............. ...
:WISEMAN + ROHY .
' STRUCTURAUN~INEERS.. • •• : . . '' ........... -·····---·--·-··---i-:"'•···"-··-· .. ·· ·-··· ···-· ----··-·--· ••• . I
A&¼w-no~ :. ; si~ft:M·~: ·\Y.,2 SHEET tto._: oF: __ _
' <!.. JOB.NO. :.2.2:-.00,s_:
. -i---·····
·····.·i ..
...• j ..
....... ) -----. ···--· ·---
. , ..
··i • --··-·· i !
i
i • -• T
... !
.. ,
''i'
.,
i
• ··1 ·
..... -!-
...... .i .
I ., •
-,1. .......•
! •
1 ...
.. .. ·(
..... ..i ....
. .. :
! ... ;
I .I
!
... ·--j
--·--I
! ··-··· .. ·· .... ·-··.... ···--!
'
. i
I . ;
.......... ····-·--·------·-·---·~-. ,.,_.
Q.x
NM
-
9 ~Iops~
Lr-::-20'7 Sr
\ 2 c> c.. -r-,(f'
o;-1.:.~ fLH'S
~ '>iL"t\.L\o~\
22-005
;-.. ··· ·•-!-.
! '
; i ' ' ! i I I . i T ' , • •i -·· .... -•····· ...... -l---__;---l·· ' : ·-··· t'. ··-······t··--·-·L--..;..-
1 i ! ; ' j I ; : I I ; :
i : ! l l I ' '1 I i ! ' •
···• ···-· -i -.... ·--i-..... ----~-...... -.. -. j ____ --···--;.. . ··•--. l .... ~ ---~-t _j ____ ... ,.N--•·-·· ___ ,;._., _______ ---·-·
I . 1' I I' 1· ' ; i I I J I 1
I I ( i I i i ' I : :
: . ··•··--i----·----~----··-·· l ··-··--···I· ... 1 ..... ; . -------1---t----+--·····-·-·l------·-··••f----·-··i.---·J_ ______ L.,_
I : : ' I • i ! I i ; : l I i ! I : I I ' I ! I . ; i i i I ! I I : ;
! •• r ..... : . ···-T·· -r--·-··1----··:---···-···-T·· I ,·--·---1
L. ........... L ... _ ... l---·-j ··-·--··J, ........ _ !__ __ ... _J . -.-...! I l '
I I ; ! I I ' I I • I i i j ' I . ; i I • I I • I
! 181S4.1 Alatfo Su arts i ! 1 ' ___ . _ __l __
11 , ii . {N12 :
' I I ' I
L-·--·-·-·-·····j-I '····-· .. ··11· __ ... I {
I ' , I I I I ' ; : I I i I I : 2x4 Si i ht , --·--J ....... ~--i -· ·--···-· __ J_ ......... 11 .. .I
I 7 I NB l I I i
; , i ·· -· 1L···-1--~-/ j I i I i : -1
! ' • I , 1 i I 1 • , : 4-:ls 1 4x4 S!<'f1ight ! IN .... 6. __ . i· .. ·····-+-1 ' j I l I I I I : I I • •
; ' ! ; I ; I I I I ' ! . : . i i I I I
i··-··········~---· t····-··-.. ··:··--·-;··--· ·t--·-·t--·····-· ··---· I 1 I -·-~-··-1 ! :-·--·· '.--
•x• Eb o hi _J _ I i --~ --~---~-···' . -~ 9 , i , : N10 I 1' • I • :
: ! I I : I I I l ; ' I I • : ' I
--• -1 r---1 -t -1 . I I ·-···' · --t---.1.--
• I I I ' I ! I I I •·--.. _. · t ····-----i---·· -· ···· • ··• •• I ·-··•-·-· ·--i,,., _____ • 1
-
.. ·-·· .. J ____ L.... I ..... J_ I I I i
SK-1
Absorption systems Ph2 Dec 9, 2022 at 9:16 AM
Roof Supports Ph2 (w. OF lf2. & STD).r2d
lix f·-······ I Cl =-7--,-----: -·r ··-· , : 1 • ----"T"--.--i -1-1-J ___ ! _ ! I· -t-·t . I . I I -I···· I • ; .. . t : ! I ••••••• 1' •••• • ••• • I I I
1
..... .,. ...... -1... ; 1 I r-t--1--, ' ' ., _, ' ' I ' I i ! ' ,-' '' ·(-.. --1 ' ,, ' I I I I I -L~ ! i· --+~~-1-:--_ J_I • , ---l
I -··y······· •••••• 1 · ' ' '' : I i I ! I 1 --1········---··+ I
f 11 i ' 4X4 : I I I I I
1_._L .. j I I IN12-··-•-···--
·-··········--·t----r--L---I
7 .• I ~ i I N8 ·-·'1···--7·· ' I
t---------L , I ~ :1 I I I •••••• l--' I I I •••••••
I 5 ! 4X4 ; I I • I : ' ' ' I I [ '. i ' IN6 I ·"-· [ ,··--·--,--·-t-··-·-L·-! I I -.I ---11---•••• I I
I : ' ···-+--I ! : I ! ; -i-""' I '"' i , i ! 4j(4 j I I --:i--+-•
c..,_______J !
I -t--t--·· I 11 !
I I ····-I ;
i ____ l _ ,-·-····-···+--+i---j!--;· l
I I
I . I I
·-·· ···•·I•-·-·---I ! I
I ;
I !
..........._.....,..' ... i ...
I I • I
I I ! I ! m I . I
I I ! .• i.. I I
I i I -I -y···'
I -, 7 I ! l
1 I ·--+----·l-··--+-
1 I I I I I I : ! i
: l L ·--.l.--+-----t---t--.----,-
-~-I ~ .. ,. I ' t .. j.
! LU
····-···+-i··· I I
1
·-1
1 I 1 1
I -·· I I
; 9 ! , ! : I -"T IN10
I i ,, I : I I
I ' I I ,---r r --r : -l --I --r .
t·i_J~-r-_J-. -r-1 I : : : : : • 1
SK-2
NM Absorption systems Ph2 Dec 9, 2022 at 9:16 AM
22-005 Roof Supports Ph2 (w. DF #2 & STD}.r2d
fu_x
NM
22-005
I I I 7 ! 1 ; l I • ! I : I i I --,-___ j__ I I +-i I I I ;
:-----····+· ----+------1---: l I 1 : i : i i •• ~ i ! 1 : ! ·------····-·--1 ; 1 i : •
! ! : : I I I I ! : ' ! ,-
r--·-·--1 --···-T····-····!-··--·--··-··-··-··;········1' ............ '._. I: ! I I ! : · 1 I . • I • ~ ! ; I I j' ! -· --r----· a
!· ·· 1 · --·! · ·I· · .... --·-·-·I·----_ 1 l i • ! i l I ! i ,· -·······--·+-----· ··--··-····· -·--· ' I i-l·-1-J-H l •1
1
1
._; __
1
. £)F STO I I J ! ;
"iN~, 11 I I I I N12 ···-·---i I 1· ! j •
--J.----···I·· ·····--·r1 ----' , i ! i ---j--T . ; . I I ' i I :
I ; DF kro I I I I I I -·t-·
jf'l7 I I + NS I •••••• : 1 j I ' · 1 I -----• '. • '
r --+--1-------r--! I • i , ! i
"¼-i1
1 5 I □+□ I! IN6 --1-+--I -i ! I I I I I • '
! .. ---·---I i : I ! : I I • : ·t · · -·· · · ··1-···· ·-·-·;----+·--····· ! . ·--: : I I . : I I I • ·----i I I I ; . I I I I --,
I : l DF,#2 : i i I • : i
! I I ,-----y----i-
1 I i I I I
! : l ..
I ' ! i i ! ' ~ ~ .. ~ ____l
L-_ j_______ : I • I -;
! I: 1---·-·r·---· -------1-· -. .. . .. . . ---·-i' --··-·-' : :
I · 1----· -f····-· --I I ! I i i , • ···-··--I I
l
. I I I I I • 1 -I ' I I · I r-·
-··--·····-·-·-·-_L _____ .l._: .. --i : -.. i ·---·_J I I j__
SK -3
Absorption systems Ph2 Dec 9, 2022 at 9: 16 AM
Roof Supports Ph2 (w. OF #2 & STD).r2d
-------------------------------------·· ·-···---··· --•-·•·-·· ·----· ·--·--··---·--------------------------
h.x :--! -.... i .. --i -----1----~---1--+---• ,
,---------•--... L . : • I ' 1 I ' I , -...... 1 -----1-----! : i , ! ., . --j ! I I 1 ! I ,: I --L---1
; ! • ' · • ~-••-•·•+-• I I ' i ' i ' : i I ------, • I : I ! , __ ' I ' ' ' ' I I -------~---' ' i r ·-:"--T--l · +---+-!---' ----, i ! ; ! ' i . -l. .. ; t' ! ; i I r I I ---i -----J._ ___ _
~8 i l. --. . . J-'--------··t ·~~--+-1----' I ! ! i ---
; ... ~lbr . • _,. b , , I ' ~---· .. -+-·--· -• i .i ·--·····7 · ---·1·----· ,1-··-1---+ ' -1
! h-4:: j
'jN11 i : j j . i__ ' I --
i ! ~ I 1N12 , i : ! I ' I
-201b i--·--t-··· --· ------1--+---+-·-· I ·-----I i I ' I i ! ' l :--+-,
I : ! i N8 -··----,,,1---t-_J~----·-I ! I 1
1---.... __ , ____ ·J·-, i i , , _ .. __ .. -n· ! , , ------~-. . , I • • , I .-
; I -401 _ I ! ----·-r-· ---,[-------1--+--1---1___ i ! I I I , I ··--·· t --t---1-; 'iJ5 , t : I , 1 I , ••••• ,.
: · i l :Ne 1 ,-----! Ii __ I , ! ! ~
'-~ , • 1 : I I 1 • --' .L
1
:
-30lblc'mJ-11111·,~+· ---t ·· l -!-.. -t --! llil I tij' I i I I J·™.k~nniJnnnmnTT~1 ,
1
--.. I I i 9 . ~J,.W,,,W,J,~ 1 ' I I ...... ..
;:•i=~--1· 1! : ~ ! ,• i i I ~N10 ··-----------+ •
i :---j . . -+-----I _L I • I ; 1 [ i I I • ---··(·· ·---t---J.____
( .. -.. ·-·+---i ! 1 I I j
t ______ .1. -----_j~_-.. -~~-~~J-_--1-___ r I 1 1 1 1 1 1 1 1
1
Loads: BLC 1, DL
SK-4
NM Absorption systems Ph2 Dec 9, 2022 at 9:17 AM
22-005 Roof Supports Ph2 (w. DF #2 & STD).r2d
ELx -' --~------~-~ -· .. L_ I I ' • • ·+·•··-•·•·-·'· i! I I ' I ! •-••-••• -• --l-• _ _L. ,1 j . . I ; 1· I I ·-' I • ---,------,--1 I I ! • ,..... I I
. . .......... j > i i i ' I i I '
I : l,····· .... ··j·-··---t-··· ···,~··········{.. .. I I i I • -~ ....... \. ! ; ! . ; ,· ! i ! : .... 1 ..... I . i. .... I I l . I I I ••••••• ·--~····
j I ' : • • • • -·-i-···· .... ·-· 1-··-·' ··--·•-·-1-··-I I I • i ' i ' ' I ' • I ' ----••• -' I ' •
j ···-··· ; ... ··-· !··-··-. 1
1
: i , -, , 1
1
'. ·-•• ~. ; i • :·· · · --. . .. ·1·· -········, 1 i LI , , , . . . . . ' ' ' •
I
' ' I I ! ' . i -------' ' i
' ! ---..l-·-·····r: -. I J . I ' i -; ·--J-••• I ; I I ' ----I i I ' I : : I I • I I I I ! : I j 11 I ' • ... ..;. ; I I I I 1N12 ; I > I I
'-·-·-1 ! I I I I I
i i -40!bn(_ -r· -1 .. t -----1---; . i I j ,-··-·-1·-'
~vmwnunimm~mnu -· . j!.. ..... j I i -,-···t··--··-··t ··--i-
: ! · I · !N8 , +---·--'---+---+-I j I j i I '
! , -80! ' ' ' -~ I I --,-1 • ! ' ........ ·· I
1
1 --·---···t'···· ··-···1 I 1' I l i • -t--····:·-, . ·1· -I I ' i •
~__L_~• _J_ I I I I . . --f-----l.·-! "'.'NO . -I I I I I I ---,·-··
i N6 : ,---1---' 1 1
1
! 1
, ___ _;__ ___ i i ; i ! ' • i ' i __ J_ ___ f : !
-60lbM~ ----,------'--' I I ' I ' • I .----~~~~;,-~~ 1---, ! ---L _; ; i , 9 ~ , ! I , , ·-----'-
I ' ; i . . I i I I I i i -· ; i j ! ! i 1'
1
~ft"o·-·r--r--1······-..l----+··-·-i i : r --, ... . , I . , . ' I -•· •• --· • ; i ; ....... I .. ·-··-·· --r······· . ! ........ ·····-t-7 ,• i rl, -·-·-1-, : , I , ···---+--_J I -, ' ' ' I I • ' ---·· • --' ' i ' ,------, --·· ----i-----f--1 ! I I • -----;---+------1 ; ! I I ·-··.) --:-·-· -I I ! : I ;
: : ! I ! I l • ' !
,....... ' . ' ' -' ' ! --·---'-··· .. ·-· .. l __ . _ ___:_ l 1' I : ; • ·--·· -· · ... .. I ' ! . I I ! i ; . I
Loads: BLC 2, RLL
SK-5
NM Absorption systems Ph2 Dec 9, 2022 at 9:17 AM
22-005 Roof Supports Ph2 (w. OF 1r2. & STD).r2d
"T
ELx l
i ; • : .. __ 1=:1=:t:i ---i-( -i· ···t i i I f T ~---'-_
: , ; i -! -·----r-··•··-····L .•..... -•-, I , I 1 ! 1
1
'-------~ ----· -!. ·-· ... J .. .!. : : ; i I ; -+--: • ' ' .. , ......... ·· t·· . . . i I I I '
. : _: ____ 1 : T-r--;-+-r 1
: • --·---
. . ! , I I ---1----+ I
I
I i : i •
~3~~br·r-! --+· __ I -53db : i : I 7 ----· ·1··-·· ·-··--ri ---i-----~··---L 1
l i i ,--·· -··-;··1-··~----+ . , ; ; , i I ' --, '
: y i I i i ! : I I --··-+··· ' I i I : I 1N11 : I '. ! y 1' I I I I -; ---···: ••
i j j i ! _N12 ·I ; • ! , • ' i --.. L -l-i ! ' --, I ! ••• --\-
i ' ' ' , • I 1'
' I I i I : I I ' f-.j7 1 , I I _ _L_ , I ' I I i I ! ! jN8 ! ~----I -I i I ' ,_ -·. . . .. I I I . I ' -·--t·· •• L • '
j ; ·
1
r--·-··l--·r~-··· ··-···-··--·-1 l·-·----1lf--+· _ 1· i "!Ns : : I i ; I ·,--·-·--·1···-+-__.__
I ! I I ,N6 ···-·1········ ··---·--r------!---L-t I i ! ' I I I I . • ---i.--· • ,_ .... , , , 1 • , I , 1----r--l-' --1--! --·-:····: --:-: _J __ ' ' i I I l ••• l •• J
• I · I I · I • • • ; ; I ; i ' I ! • l···-·-..._ _ _J__. 4Jg ! i . I ! I I i ···+··-~
' ' , ' ' J I : ' ' : ! ; ! i · i ; IN10-···--...! • •• • -+ j ~ ! i ,
[ ---i ! -+-+--i -+ -: -_', ··--1
1 .L _:_ -I~ -~ --! -•• i
; ---··-· ··:····-· ----j-·· ___ J... . '. -· . I ! I I i i i -r--.L, • ··-. ·-t-
i
! ! l i l -·-1--··-··11········-·' j i ii I I ; I , I ; • I --·· -__,__ i l ' ' ' ' ' ' ' ••• ' ' ---'-·--·-· '--···-··l-. ! ' i I I I ,· I +···-----·.l.·-
·-····-' --_I I ! • ·----~-.L. , I ' I 1 --I I t : --~-L ,._.___i_
Loads: BLC 3, EL
SK-6
NM Absorption systems Ph2 Dec 9, 2022 at 9:17 AM
22-005 Roof Supports Ph2 (w. DF #2 & STD).r2d
la.x ~ .. -· --···t···· ·-·-~ I ·-+----···J.-··· i ! I i +···· ! I I . I I . l ; I ; I I ' • • : i i I I i i I • ; i I l
• ·-·t-·-··-··-·r··-· • +-··· · ·l· · ··-···· ·~·· -··-· l i l ! ·····!·-···--~ ! : ····:-• •• •• ···~ --!
; I l I ! I ' I i ; ! • I ' I ··!-. . -). . ..• +·· ·--+-· .. --t·--.... ~ ... ··-+· . '. -~--·-j---·· -+· ··-+··--··-!-··· . ! i ! I I I I I I I ; : ; . . I , , 1 ,
-·•·. ..,. . .. : .. L--L-·--·-1--· -~·-· .. J ..... -1' I -····L-.... L_ I I
• • • I I ' I I ' I • 1 , i i i ! '1 i 1 ·1' I : i I 1 : '1 l I : . I ' 1 j • I . 1 • • I I 1---···-t·······-· I·· ···-·+··-•-•i••·-··-_J __ + ...... ··-······•·· , , -· ······-··.---+----'.
: l i i I i I I . i i ,· ,, i ; I : I : I I i j •
iJ11 : i : I IN12 -1···-·······f---1---+----I-----T,1
·~·-i '. I I '·
; I I ! I I Qj' t-·----1--·-·1-··--· -··-·· · · · ·1····-·-i-~ • '. -• ' . I I I ~.-~ •
~7 : : i N8 :---+ I -· !--++I
! !-1751 • .. ·····-j I .. ;.......... ! . -. ---! ! --·~ I --· ·j .
! • ·~ I I I I i I ' ; i ; • I '
. I I I···---~ ; ·-••--l-----+·--· I I -· I +-•I•
1 5 ! ,N6 : , I ! ! • 1 t i ! i i I i ; i j : ; l I ! .
I.-····-+··... I· ·-··-'---1,--·· <···-··-·:---··-·-'-·-. i I ··--I ••• 1 ·--··-··~-1 I 9011..1 l 901 ' • I . ' ; I ' i l I : -D ; ! l -I I I ' I i I : ! i • I I I I ! I : • l i l : : I • i I I • , ' -······--L··--'-····l---'---+·-····· ••• :
I 9 : ; : i , ! N10 ~· ,: • ' I ' . ! ! I ' I : I ! I •
l j i ; I i i I I ! ! i (. ···-···-~ .. ., ·-......... -·-· ., ··········i--··-·c ...... ..I.-··-+------··· --·--r·--·'-····· -•l-•--..---•4"
I : I I i ,· I I I I I I 1· I ' I . I • I
' I . ! I ; I i
~·-·-....... L ······---'.·-·-•--l• ··--·!·_:-···· •·· -· •• ·--r··----'--l---+--rr·· i I I I '. ! • , , -r I ; I : · I 1 l I '. I •
i ···--L. .. ___ J··-·-··-· L ...... 1-. ___ ...... -·•·.L-... J_._.1..-_.___ I ••• I I . I i --··L
i i
1· -··-··· • -·· ••
r . --~i.
!
Loads: BLC 4, IHU
SK-7
NM Absorption systems Ph2 Dec 9, 2022 at 9:18 AM
22-005 Roof Supports Ph2 (w. OF #2 & STD).r2d
Beam: 4x4 (E) skylight
Shape: 4X4
Material: DF#2
Length: 8 ft
I Joint: N9
J Joint N10
Envelope
Code Check: 0.919 (LC 3)
Report Based On 10 Sections
A------------lb
1.536 at 4.283 ft
f(y) ksl
-1.536 at 4.283 ft
fa ------------ksl
AWC NDS~18: ASD Code Check
461 .91 at Oft
Vy~~lb
-461.91 at 8 ft
M lb-ft
-914.636 at 4.04 ft
o-, ,---, ,-, '-,, In
-0.534 at 3.556 ft
Max Bending Check 0.919 (LC ~x Shear Check 0.251
Location 4.04 ft Location 8 ft
(LC 3) Max Defl Ratio U177
Location 3.96 ft
Equation 3.9•3
CD 1.25 RB 5.237
Cr 1 Cfu 1
Fe'
Ft'
Fb'
Fv' E'
lksn
0.588
1.078
1.688
0.225
1600
Cm
1
1
1
1
1
Ct
1
1
1
1
1
CL 1
CP 0.303
CF
1.15
1.5
1.5
Span 1
Out
Lb 8 ft
le/d 27.429
Sway No
Le-Bending Top
Le-Bending Bot
8 ft
8 ft
In
8 ft
27.429
No
\
Beam: 4x4 Skylfght
Shape: 4X4
Material: DF STD
Length: 4 ft
I Joint: N5
J Joint: N6
Envelope
Code Check: 0.710 (LC 1)
Report Based On 10 Sections
A
0.45 at 2.222 ft
f(y)
-0.45 at 2.222 ft
fa
lb
ksl
ksl
AWC NDSN18: ASD Code Check
153.455 at Oft
Vy I ~ I lb
-153.455 at 4 ft
M lb-ft
-268.104 at 2.222 ft
D
' ' ' " ' ' ' In
-0.039 at 2.222 ft
Max Bending Check 0.710 (LC 11,jax Shear Check 0.086 (LC 1)
Location 2.02 ft Location 4 ft
Max Defl Ratio U1206
Location 2.02 ft
Equ~on 19~
CD 0.9 RB 3.703
Cr 1 Cfu 1
Fe'
Ft'
Fb'
Fv'
E'
(ksi)
1.066
0.338
0.518
0.162
1400
Cm
1
1
1
1
1
CL 1
CP 0.846
Ct CF
1 1
1 1
1 1
1
1
Span 1
Lb
le/d
Sway
Out
4ft
13.714
No
Le-Bending Top 4 ft
Le-Bending Bot 4 ft
In
4 ft
13.714
No
Beam: 2x4 Skylight
Shape: 2X4
Material: OF STD
Length: 4 ft
I Joint: N7
J Joint: NB
Envelope
Code Check: 0.671 (LC 3)
Report Based On 10 Sections
A------------lb
0.474 at 2.182 ft
f(y) ksl
-0.474 at 2.182 ft
fa ------------ksl
AWC NDS-18: ASD Code Check
122.552 at O ft
Vy~lb
-122.552 at 4 ft
M lb-ft
-121.039 at 2.182 fl
D-,' ,-, •, ,-, ' In
-0.046 at 1.778 ft
Max Bending Check 0.671 (LC &)ax Shear Check 0.156 (LC 3) Max Defl Ratio L/1020
Location 1.98 ft Location 2.02 ft Location 4 ft
Equ~on 1~3
CD 1.25 RB 8.641
Cr 1 Cfu 1
Fe'
Ft'
Fb'
Fv'
E'
lksl)
0.388
0.469
0.715
0.225
1400
Cm
1
1
1
1
1
Ct
1
1
1
1
1
CL 0.995
GP 0.222
CF
1
1
1
Span 1
Lb
le/d
Sway
Out
4ft
32
No
Le-Bending Top 4 ft
Le-Bending Bot 4 ft
In
4ft
13.714
No
Beam: 181S4.1 Platform Supports
Shape: 4X4
Material: OF STD
Length: 5 ft
I Joint: N11
J Joint: N12
Envelope
Code Check: 1.000 (LC 4)
Report Based On 10 Sections
A------------lb
0.92 at 2.222 ft
f(y) ksi
-0.92 at 2.222 ft
fa ------------ksl
AWC NDS-18: ASD Code Check
. 725.444 at 0 ft
Vy[\ \Jib
-725.444 at 5 ft
M lb-ft
-547.69 at 2.222 ft
D-, ,-, ,-, '-,, In
-0.161 at 2. 778 ft
Max Bending Check 1.000 (LC '13x Shear Check 0.308 (LC 4) Max Defl Ratio L/367
Location 2.525 ft Location 5 ft
Equation 3.9-3
CD 1.6 RB 4.14
Cr 1 Cfu 1
Fe'
Ft'
Fb'
Fv'
E'
(ksD
1.173
0.6
0.92
0.288
1400
Cm
1
1
1
1
1
CL 1
GP 0.524
Ct CF
1 1
1 1
1 1
1
1
Location 2.475 ft
Span 1
Lb
le/d
Sway
Out
5ft
17.143
No
Le-Bending Top
Le-Bending Bot
5 ft
5ft
In
5 ft
17.143
No
ABSORPTION
SYSTEMS®
A Pharmaron Compe \°"('(
TECHNICAL REPORT
CHEMICAL CLASSIFICATION PACKET HAZARDOUS
MATERIALS SUMMARY
For
Absorption Systems California, LLC.
2820 Loker Ave East
Carlsbad, CA 92010
December 14, 2022
CBC2022-0185
2820 LOKER AVE E
ABSORPTION SYSTEMS: COM-Tl (63,786 SF) PHASE
II-SHELL TO OFFICE/WAREHOUSE MEZZANINE, LAB.
EXTERIOR WORK, GENERATOR ENCLOSURE AND DOCK
DEV2022-0135 2090831500
2/14/2023
CBC2022-0185
Absorption Systems California, LLC. -2820 Loker Ave East, Carlsbad, CA 92010
Technical Report/ Chemical Classification Packet
Table of Contents
December 14, 2022
Page 2
1.0 OSl's CAS2Class Database used to produce Technical Reports ............................. 3
1.1 Report Preparation Process ...................................................................................... 3
1.2 Company Information ................................................................................................ 3
1.3 Report Submission to the Orange County Fire Authority ........................................... 4
1.4 Executive Summary .................................................................................................. 4
2.0 Building/Facility Information ...................................................................................... 4
3.0 Attachment Information ............................................................................................. 4
4.0 Hazard Classification Process ................................................................................... 5
5.0 Table 1 (Chemical Classification) .............................................................................. 6
5.1 Table 1.1 (Chemical Classification Summary) ......................................................... 10
5.2 Table 1.2 (Chemical Classification Summary Totals) .............................................. 15
6.0 Operational Controls ............................................................................................... 16
6.1 Automatic Fire Extinguishing System for Buildings ................................................. 16
6.2 Fire Alarm System ................................................................................................... 16
6.3 Security ................................................................................................................... 16
6.4 Portable Fire Extinguishers ..................................................................................... 16
6.5 Sources of Ignition .................................................................................................. 17
6.6 Markings and Identification Signs ............................................................................ 17
6.7 Separation of Incompatible Materials ...................................................................... 17
6.8 Empty Containers .................................................................................................... 17
6.9 Approved Flammable Liquid and Hazardous Materials Storage Cabinets .............. 18
6.10 Corrosive Materials .............................................................................................. 18
6.11 Organic Peroxides ............................................................................................... 18
6.1 2 Oxidizing Materials ............................................................................................... 18
6.13 Highly Toxic & Toxic Materials ............................................................................. 18
6.14 Water Reactive Solids and Liquids ...................................................................... 18
6.15 Lab Fume Hoods, Building Exhaust & Ventilation, and Materials Exhausted ...... 19
6.1 6 Spill Control, Drainage, Secondary Containment ................................................. 22
6.1 7 Explosion Control ................................................................................................. 22
6.18 Limit Controls ....................................................................................................... 22
6.19 Pressure Controls ................................................................................................ 22
6.20 Treatment Systems .............................................................................................. 22
6.21 Protection from Vehicles ...................................................................................... 22
6.22 Employee Training and Response Procedures .................................................... 22
7.0 Hazardous Materials Summary ............................................................................... 23
Attachment 1 (Facility Vicinity Map & Site Location) ....................................................... 25
Attachment 1.1 (Floor Plan, First Floor) .......................................................................... 26
Attachment 1.2 (Floor Plan, Second Floor) ..................................................................... 27
I •
Absorption Systems California, LLC. -2820 Loker Ave East, Carlsbad, CA 92010
Technical Report / Chemical Classification Packet
1.0 OSl's CAS2Class Database used to produce Technical Reports
December 14, 2022
Page 3
Occupational Services, Inc. ("OSI") owns a custom-designed Microsoft Access database that
has been continually improved and updated to reflect the current California Fire Code. Over
225,000 chemicals are currently recognized and classified by their Chemical Abstract Service
Number (CAS No.) in OSI' s database, called "CAS2Class." The foundation of OSl's Technical
Report is the Physical Hazard Summary and Health Hazard Summary reports produced by
CAS2Class.
1.1 Report Preparation Process
Before presenting a Technical Report to a Code Official, OSI collects the tenant's "proposed"
chemical inventory and imports the inventory into CAS2Class. OSI then makes a proper
hazard determination for every unclassified chemical. OSI uses trained and degreed HazMat
professionals to determine the hazard categories, which are based on the chemical's Safety
Data Sheet (SOS), the manufacturer's product literature, and textbooks, along with the
concentration, physical state, chemical properties and health hazards of that chemical. OSI
also refers to NIOSH, OSHA, EPA and DOT hazard classifications. OSI uses all of these
physical and chemical references to properly classify the chemicals according to the
categories listed in Appendix E of the 2019 California Fire Code (CFC). When 100% of the
tenant's chemical inventory is properly classified, OSI generates two tables: Physical Hazard
Summary and Health Hazard Summary.
OSI then compares the tenant's summaries to the Maximum Allowable Quantity (MAQ) per
Control Area of Hazardous Materials Posing a Physical Hazard listed in Table 5003.1.1 (1) &
5003.1.1 (3) of the 2019 CFC and the Maximum Allowable Quantity per Control Area of
Hazardous Materials Posing a Health Hazard in Table 5003.1.1(2) & 5003.1 .1 (4) of the 2019
California Fire Code (CFC). If the entire inventory does not exceed the MAQs, OSI advises
the architect to design and construct one control area. If the MAQs are exceeded, OSI advises
the architect to design more control areas until the inventory does not exceed MAQs. Many
hours of technical expertise are spent designing the quantity and one-hour boundaries of the
control areas. OSI and the architect use this CAS2Class report at the beginning of the design
process and the information is used to form the basis of the building design.
1.2 Company Information
Absorption Systems delivers a comprehensive range of non-clinical research services for all
biomedical products with the highest data quality and integrity, focused on timely
communication and exemplary customer service, to better predict human outcomes.
Absorption Systems California, LLC. -2820 Loker Ave East, Carlsbad, CA 92010
Technical Report/ Chemical Classification Packet
1.3 Report Submission to the Carlsbad Fire Department
December 14, 2022
Page 4
OSI and Absorption Systems understand the Carlsbad Fire Department will review this
Hazardous Materials Opinion and Technical Report and that the Building Official will request
Carlsbad Fire Department's approval on this Hazardous Material Opinion and Technical
Report. Absorption Systems will file the San Diego Regional Hazardous Materials
Questionnaire DEH HM-9171 with the San Diego County Department of Environmental Health.
The Hazardous Material Questionnaire will have the County Health stamp provided in the
'RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY'. The Business Plan will
be processed by the Client with the County Health Department while construction occurs and
will be completed prior to the Certificate of Occupancy is obtained and provided to the Fire
Official. A completed copy of the Hazardous Materials Business Plan and this Technical
Opinion Report will be submitted to the Carlsbad Fire Department:
City of Carlsbad Fire Department
Fire Prevention Division
1635 Faraday Avenue
Carlsbad, CA 92008-7314
www.firemail@carlsbadca.gov
P: (760) 602-4665
1.4 Executive Summary
Absorption Systems is submitting this Technical Report as part of the permit process for a
tenant improvement involving the addition of vivarium/lab space and office space at 2820
Loker Ave East, Carlsbad, CA 92010. Absorption Systems will occupy the entire 63,900
square foot building. This Technical Report was prepared by Todd Hansen, a Fire Code
Specialist with OSI.
2.0 Building/Facility Information
The two story industrial building located at 2820 Loker Ave East, Carlsbad, CA 92010, is a
fuUy sprinklered building. The building has a total square footage of 63,900 ft2 and is one
control area.
3.0 Attachment Information
Attachment 1: Facility Vicinity Map and Site Location for Absorption Systems located at 2820
Loker Ave East, Carlsbad, CA 9201 O
Attachment 1.1: Floor Plan
Absorption Systems California, LLC. -2820 Loker Ave East, Carlsbad, CA 92010
Technical Report/ Chemical Classification Packet
4.0 Hazard Classification Process
December 14, 2022
Page 5
Table 1 (Chemical Classification Form) of this Technical Report is a list all Absorption
Systems', facility Hazardous Materials at 2820 Loker Ave East, Carlsbad, CA 92010. The
inventory is sorted by Common Name and Chemical Name. Included in Table 1 (Chemical
Classification Form) is the Chemical Percent Composition, Chemical Abstract Service Number
(CAS#), Chemical Form, Quantity Stored , Quantity In-Use (Open and/or Closed), Location of
Storage & Use, assigned Hazard Classes and justification from Safety Data Sheets (SOS).
Each Hazardous Material listed in Table 1 (Chemical Classification Form) hazardous
classification was verified from the chemical manufacturers Safety Data Sheets (SOS), OSl's
Chemical Classification Database, 2019 CFC, and/or the Orange County Fire Authority
(OCFA) Top 100 List. Many of the inventory items have more than one hazard class. For
example, lsopropanol listed in Table 1 has two hazard classes, Flammable Class 1-8 (FL-IB)
(chemical liquid has a flash point below 73 degrees Fahrenheit and boiling point of above 100
degrees Fahrenheit), and Organic Peroxide Class IV (Formulation that burn in the same
manner as ordinary combustibles and pose a minimal reactivity hazard).
Absorption Systems California, LLC. -2820 Loker Ave East, Carlsbad, CA 92010
Technical Re_l)_ort I Chemical Classification Packet
5.0 Table 1 (Chemical Classification)
July 11, 2022
Pa_g_e 6
Table 1 (Chemical Classification Form), list Common Name, Chemical Name, Chemical Composition, CAS#, Form, Quantity Stored Quantity,
Quantity In-Use (Open and/or Closed), (Storage & Use), Hazard Classification, and Justification of every chemical in Absorption Systems' facility
inventory located at 2820 Loker Ave East, Carlsbad, CA 92010. The entire facility only has Qne fire control are"a.
1,2-Propanediol II 1,2-Propanediol II 99% 11 57-55-6 II L II 0.132 Gal II closed I 0.1453 Gal j CL-11I8, SENS, OHH, IRR II Laboratory II SOS
0.0018 Gal,
1-Methyl-2-pyrrolidinone 111-Methyl-2-pyrrolidinone 1199% 11 872-50-4 ! L II 0.018 Gal I closed 0.0195 Gal CL-IIIA, OHH, IRR I Laboratory II SOS
2-Hydroxypropyl-~-2-Hyd roxypropyl-~-
199% 11128446-35-5 ~ s II 0.220 Lbs I 0.022 Lbs,
cyclodextrin cyclodextrin closed ! 0.2425 Lbs j lRR II Laboratory II SOS
II
104 Lbs,
Acetaminophen II Acetaminophen I 99% !1103-90-2 11 s 0.004 Lbs J closed 0.0044 Lbs SENS, OHH, IRR I Laboratory II SOS
199% 1164-19-7 ~ L II
0.0528 Gal, I Laborato~l SOS Acetic Acid 0.528 Gal closed 0.5808 Gal CL-II, COR
! Acetone II Acetone 1199% 11 67-64-1 II L II 1.05 Gal I closed 1.1550 Gal FL-I8, OHH, IRR Laboratory [ sos
Ii Acetonitrile . ]I Acetonitrile II~ 1175-05-8 IIL7I 2.602 Gal
I 0.2602 Gal,
2.8622 Gal FL-I8 Laboratory [ sos closed
~ L II
0.0125 Gal,
[ sos Alcohol, 99% ~ Alcohol, 99% II 99% 11 64-17-5 0.125 Gal J closed 0.1374 Gal FL-I8, OHH, IRR Laboratory
111344-28-1 1s· 11 0.176 Lbs I 0.0176 Lbs,
[ sos Aluminum Oxide II Aluminum Oxide 1199% closed 0.1940 Lbs IRR Laboratory l~ll 0007664-41-7 I L II 0.0264Gal,
Ammonia Solution II Ammonia Solution 0.264 Gal closed I 0.2906 Gal I COR, OHH Ii Laboratory II SOS
II 12125-02-9 I s I
0.0055 Lbs,
Ammonium Chloride I Ammonium Chloride 1199% 0.055 Lbs closed 0.0606 Lbs OHH, IRR I Laboratory II SOS
Ammonium Hydroxide Ammonium Hydroxide
199% 111336-21-6 I L I 0.0264Gal,
solution solution 0.264 Gal closed I 0.2906 Gal I COR, OHH, TOX Ii Laboratory II SOS
h II 0.0001 Gal,
Benzakonium Chloride ~ Benzakonium Chloride II 99% II 63449-41-2 0.001 Gal II closed 0.0015 Gal COR I Laboratory ll SOS
11 9048-46-8 II s I 0.022 Lbs,
[ sos lovine Serum Albumin II Bovine Serum Albumin II 99% 0.220 Lbs closed 0.2425 Lbs IRR Laboratory
1110043-52-4 I s I
0.022 Lbs,
Laboratory [ SOS Calcium Chloride I Calcium Chloride II 99% 0.220 Lbs closed 0.2425 Lbs OHH, IRR
Absorption Systems California, LLC. -2820 Loker Ave East, Carlsbad, CA 92010
Technical Re1>_ort / Chemical Classification Packet
Carbon Dioxide II 99% 11 124-38-9 II G I[
Carboxymethylcellulose
1199% 119004-32-4 I s I sodium salt 2.205 Lbs closed
□ 0.0793 Gal,
Chloroform anhydrous ~ Chloroform anhydrous 11 99% ~L67-66-3 0.793 Gal closed
Citrate Buffer I Citrate Buffer II 99% 11 007722-84-1 L II 0.066 Gal closed
I Dimethyl Sulfoxide 1~167-68-5 CII 0.0732 Gal,
Dimethyl Sulfoxide 0.732 Gal closed
Dry Ice 1199% 11 0000124-38-9 s II 200 Lbs 20 Lbs, closed
Dulbecco's Modified Dulbecco's Modified Eagle ~I DI 0.0132 Gal,
Eagle Medium Medium 99% 004310-00-0 0.132 Gal closed
II Dulbecco's PBS 1199% 117778-77--0 11~11
0.0264Gal,
Dulbecco's PBS 0.264 Gal closed
II
0.0055 Lbs,
II EDTA Powder 1199% 11 60--00-4 11 s 0.055 Lbs II closed
II Ethyl Acetate ,~, 141-78-6 ~ L II 0.088 Gal I
0.0088 Gal,
Ethyl Acetate closed
~ Ethyl Alcohol 11-:7164-17-5 11~11 4.254 Gal I 0.4254 Gal,
Ethyl Alcohol closed
II
0.0002 Lbs,
Evans Blue ~ Evans Blue II 99% II 314-13-6 II s 0.002 Lbs II closed
0.0264 Gal,
Formaldehyde Solution I Formaldehyde Solution 11 99% 11 oso-00-0 ll L II 0.264 Gal II closed
ICII 1.585 Gal I
0.1585 Gal,
Formic Acid I Formic Acid II 99% 11 64-18-6 closed
1~11 0.026 Gal I 0.0026 Gal,
Glucose Solution I Glucose Solution II 99% 11 so-99-7 closed
0.0423 Gal,
Glutaraldehyde II Glutaraldehyde 1199% 11111-30-8 JI L II 0.423 Gal II closed
11 7647-01-0 11=] 0.528 Gal I 0.0528 Gal,
Hydrochloric Acid II Hydrochloric Acid II 99% closed
1167-63-0 11 ~11 0.661 Gal I 0.0661 Gal,
lsopropyl Alcohol II lsopropyl Alcohol II 99% closed
11 50-21-5 101 0.264Gal I
0.0264Gal,
Lactic Acid II Lactic Acid II 99% closed
2.425 Lbs OHH, IRR
0.8723 Gal OHH, IRR, TOX
0.0726 Gal OX-I, IRR
0.8052 Gal CL-IIIA, SENS, IRR
II 220 Lbs ~ INERT GAS, IRR
II 0.1453 Gal II IRR
II 0.2906 Gal 11 IRR
II 0.0606 Lbs II I~
l_Q.Q~68 Gal II FL-IB, IRR
II 4.6794 Gal 11 FL-IB, OHH, IRR
II 0.0024 Lbs ~ OHH
II 0.2904 Gal I CL-IIIA
II 1.7435 Gal II CL-II, COR
II 0.0291 Gal 11 IRR
II 0.4653 Gal II COR, OHH, TOX
II 0.5808 Gal 11 COR, OHH, TOX
II 0.7266 Gal 11 FL-IB, OHH, IRR, OP-IV
II 0.2906 Gal II IRR
July 11, 2022
Pa_g_e 7
I Laboratory ll SDS
[ sos Laboratory
II Laboratory [ sos
II Ir
II Laboratory II SDS
II Laboratory II SOS
II Laboratory II SOS
II Laboratory II SOS
II Laboratory II SOS
II Laboratory II SOS
II Laboratory II SOS
II Laboratory II SOS
II Laboratory II SDS
II Laboratc,ry II SOS
IL Laboratory II SOS
IL Laboratory II SOS
Absorption Systems California, LLC. -2820 Loker Ave East, Carlsbad, CA 92010
Technical Re_e_ort / Chemical Classification Packet
Liquid nitrogen II liquid nitrogen II 99% 11 0007727_37_9 II L II 122 Gal II closed
II Methanol 1199% II 67-56-1 II L II
0.2024
Methanol 2.024 Gal I closed
0.0772 Lbs,
Methyl cellulose II Methyl cellulose 1199% 11 9004-67-5 11 s II 0. 772 Lbs I closed I Methyl tert-butyl Ether 11~11634-04-4 11~1
0.0634Gal,
Methyl tert-butyl Ether 0.634Gal closed
~1127-19-5 11:=11 0.026 Gal I 0.0026 Gal,
N,N-Dimethylacetamide N,N-Dimethylacetamide closed
~168-12-2 11:=11 0.066 Gal I 0.0066 Gal,
N,N-Dimethylformamide N,N-Dimethylformamide closed
Neutral Buffered
~lo50-00-o II_ :=11 10.568 Gal I 1.0568 Gal,
Formalin Neutral Buffered Formalin closed
II 134.2 Gal II CYRO INERT, LIQUEFIED
II 2.2264 Gal II FL-1B, OHH, IRR
II 0.8492 Lbs II IRR
II 0.6975 Gal II FL-1B, OHH, IRR
II 0.0291 Gal II CL-IIIA
II 0.0727 Gal II CL-II, OHH, IRR
II 11.624 Gal II CL-IIIA
July 11, 2022
Pa.9.e 8
II Laboratory
II Laboratory
II Laboratory II SOS
II Laboratory II SOS
11 Laboratory II SOS
II Laboratory II SOS
Oxygen II Oxygen ]199% 11 7782-44-7 II G 0 Cf 2980 Cf, closed II 2980 Cf II OXIDIZER GAS, GASEOUS II Laboratory II SOS
0.1323 Lbs,
Paraformaldehyde II Paraformaldehyde 1199% 11 30525-89-4 s 1.323 Lbs closed I 1.4553 Lbs II FS, SENS, OHH, IRR II Laboratory II SOS
Paraformaldehyde II Paraformaldehyde l~I 00030525-89-4 □ 0.0528 Gal, I 0.5808 Gal II CL-IIIA, OHH, IRR II Laboratory II SOS solution solution 0.528 Gal closed
Phosphate buffer ~ Phosphate buffer 1199% 117758-11-4 L II lGal 0.1 Gal, closed II 1.1 Gal II 1RR II Laboratory II SOS
Phosphate buffered II Phosphate buffered saline 1~17778-77-0 CII .
0.0449 Gal,
saline 0.449 Gal closed II 0.4939 Gal 11 IRR 11 Laboratory II SOS I Phosphoric acid 1~17664-38-2 II~ 0.0264 Gal,
Phosphoric acid 0.264 Gal closed II 0.2906 Gal 11 COR, OHH II Laboratory II SOS
1 Poly(ethylene glycol) Jl-71119481-71-9 11:7
0.0026Gal,
Poly(ethylene glycol) 0.026 Gal closed II 0.0291 Gal II IRR II Laboratory II SOS
0.1102 Lbs,
Potassium Bicarbonate II Potassium Bicarbonate 1199% 11 298-14-6 11 s II 1.102 Lbs II closed II 1.2125 Lbs 11 IRR II Laboratory II SOS
Potassium Chloride Potassium Chloride
199% 117447-40-7 11:71
I 0.0264 Gal,
Solution Solution 0.264 Gal • closed II 0.2906 Gal I IRR II Laboratory II SOS
0.022 Lbs,
Resorcinol II Resorcinol II 99% II 108-46-3 II s II 0.220 Lbs II closed II 0.2425 Lbs II TOX, IRR II Laboratory II SOS
0.022 Lbs,
Sodium Acetate 1199% 11127-09-3 II s II 0.220 Lbs II closed II 0.2425 Lbs 11 IRR II Laboratory II SOS
Sodium Sodium
1-71017642-00-0 1171
I 0.2205 Lbs,
carboxymethylcellulose carboxymethylcellulose 2.205 lbs closed II 2.4251 Lbs II OHH, IRR II Laboratory II SOS
Absorption Systems California, LLC. -2820 Loker Ave East, Carlsbad, CA 92010
Technical Ree_ort / Chemical Classification Packet
Sodium Chloride II 99% II 7647-14-S II s II 1.102 Lbs closed
Sodium Citrate Dihvdrate II Sodium Citrate Dihydrate II 99% 11 6132-04-3 LIi 2.205 Lbs closed
;01
0.001
Sodium Fluoride 99% II 99% 11 7681-49-4 0.002 Lbs closed
Sodium Hydroxide
Sodium Hydroxide solution ~I 0001310-73-2 11~1
0.0555 Gal,
solution 0.555 Gal closed
Sodium Phosphate
Sodium Phosphate Dibasic ~17558-79-4 11~1
0.011 Lbs,
Di basic 0.110 Lbs closed
Sodium Phosphate Sodium Phosphate " "
Monobasic Monobasic II 99% 11 7558-80-7 II s II 0.220 Lbs II closed
0.0002 Lbs,
Sodium Tetraborate 99% II Sodium Tetraborate 99% 1199% 111330-43-4 11 s II 0.002 Lbs II closed
Sodium Tetraborate Sodium Tetraborate
~11303-96-4 lls~I 0.002 Lbs I
0.0002 Lbs,
Decahydrate Decahydrate closed
Succinic Acid Succinic Acid (butanedioic r:--II 110-15-6 lls~I 0.004 Lbs I 0.0004 Lbs,
(butanedioic acid) acid) closed
f~I 0.264 Gal I
0.0264 Gal,
Tetrahydrofuran II Tetrahydrofuran II 99% 11109-99-9 closed
Trifluoroacetic Acid Trifluoroacetic Acid
~176-05-1 IIL~I 0.001 Gal I
0.0001 Gal,
:ent plus Reagent plus closed
Trisodium Citrate Trisodium Citrate r:--116132-04-3 lls71 1.102 Lbs I
0.1102 Lbs,
Di hydrate Di hydrate closed
II
0.0026 Gal,
Triton X-100 Triton X-100 99% 9002-93-1 L 0.026 Gal closed
,, Flammable Liquid Waste, Flammable Liquid 99% 010542-00-0 DI 55 Gal 5.5 Gal, closed I Waste, Formalin Waste, Formalin 99% 50-00-0 L II 55 Gal 5.5 Gal, closed
II Diesel I 9~_% 1 68476-34-6 n1 Diesel No. 2 0 918 Gal, Closed
II 1.2125 Lbs II IRR
II 2.4251 Lbs 11 IRR
11 0.0024 Lbs II IRR, TOX
II 0.6105 Gal II COR, OHH
Ii 0.1213 Lbs II IRR
II 0.2425 Lbs Ii IRR ..
II 0.0024 Lbs II OHH, IRR
I 0.0024 Lbs II OHH, IRR
I 0.0044 Lbs II IRR
II 0.2906 Gal II FL-1B, OP-Ill, UR-I
I 0.0015 Gal II COR, OHH
II 1.2125 Lbs 11 IRR
0.0291 Gal CL-111B, IRR
60.5 Gal FL-1B
60.5 Gal CL-II, COR, TOX
0 CL-IIIA
July 11, 2022
Pa_g_e 9
II J.Cl~oratory
II Laboratory II SDS
II Laboratory II SDS
II Laboratory II SDS
II Laboratory II SDS
II Laboratory II SDS
11 Laboratory II SDS
II Laboratory I[ SDS
I Laboratory [ SDS
II Laboratory II SDS
II Laboratory II SDS
II Laboratory II SDS
Laboratory 11 SDS
Laboratory JI SDS
Laboratory II SDS
Exterior
Mechanical II SDS
Absorption Systems California, LLC. -2820 Loker Ave East, Carlsbad, CA 92010
Technical Report/ Chemical Classification Package
5.1 Table 1.1 (Chemical Classification Summary)
December 14, 2022
Page 10
Table 1.1 (Chemical Classification Summary -Regulated Hazard Classes), summarizes all Chemical
Hazard Classifications by Chemical Name, Amount Stored, Open System Use (O.S. Use), Closed
System Use (C.S. Use), Location of Storage, and Location of Use of Regulated Hazardous Materials
within Absorption Systems' facility located at 2820 Loker Ave East, Carlsbad, CA 92010.
Acetic Acid 0 0.0528 0.5808 Gallons Laboratory J Laboratory
Formic Acid 1.585 0 0.1585 1.7435 Gallons Laboratory Laboratory
N,N-Dimethylformamide 0.066 0 0.0066 0.0727 Gallons Laboratory Laboratory
te, Formalin 0 5.5 60.5 J Gallons IJ Laboratory II Laboratory
Total 0 5.71 Gallons Laboratory Laboratory
Dimethyl Sulfoxide
I
I 0.732 Laboratory
Formaldehyde Solution E2fil 0 0.0264 0.2904 Gallons Laboratory Laboratory
N,N-Dimethylacetamide 0 0.0026 0.0286 Gallons Laboratory Laboratory 6
Neutral Buffered Formalin I 10.568 ll 0 1.0568 11.6248 Gallons Laboratory Laboratory
Paraformaldehyde solution I o.52811 0 0.0528 0.5808 Gallons Laboratory Laboratory
Total I 12.13611 0 1.2136 13.3496 Gallons Laboratory Laboratory
Triton X-100 0.026 0.0286 Gallons Laboratory Laborato
Total 0.158 0.0158 0.1738 Gallons Laboratory Laboratory
I
Absorption Systems California, LLC. -2820 Loker Ave East, Carlsbad, CA 92010
Technical Report / Chemical Classification Package
Ammonia Solution 0.264
Ammonium Hydroxide solution 0.264 0 0.0264
nzalkonium Chloride 0. 0 0.0001 I
Formic Acid 1.585 0 0.1585 1.7435 Gallons
Glutaraldehyde 0.423 0 0.0423 0.4653 Gallons
Hydrochloric Acid 0.528 0 0.0528 0.5808 Gallons
Phosphoric acid 0.264 0 0.0264 0.2904 Gallons
Sodium Hydroxide solution ~ 0 0.0555
Trifluoroacetic Acid Reagent plus .0001 1
Waste, Formalin I 55 I 5.5 60.
Total 59.413
2.602 0 2 2.8622 Gallons
Alcohol, 99% 0.125 0 0.0125 0.1375 Gallons
Ethyl Acetate 0.088 0 0.0088 0.0968 Gallons
Ethyl Alcohol 4.254 0 0.4254 4.6794 Gallons
lsopropyl Alcohol 0.661 0 0.0661 0.7271 Gallons
Methanol 2.024 0 0.2024 2.2264 Gallons
Methyl tert-butyl Ether 0.634 0 0.0 0.6974 Gallons
Tetrahydrofuran 0.264 0 0.2904 Gallons
Waste, Flammable Liquid I 55 1 0 60.5 Gallons
Total ~ 66.702 ~ al 6.6 73.3722 Gallo
December 14, 2022
Page 11
Laboratory
Laboratory
I Laboratory Laborato
I Laboratory Laboratory
Laboratory Laboratory
Laboratory Laboratory
Laboratory Laboratory
Laboratory Laboratory
Laboratory
Laboratory Laboratory
Laboratory
Laboratory
Labo
Laboratory Laboratory
Laboratory Laboratory
Laboratory Laboratory
Laboratory Laboratory
Laboratory Laboratory
Laboratory Laboratory
Laboratory Laboratory
Laboratory
Absorption Systems California, LLC. -2820 Loker Ave East, Carlsbad, CA 92010
Technical Report/ Chemical Classification Package
Total 0.264 .2904 Gallons
December 14, 2022
Page 12
Laboratory Laboratory
Absorption Systems California, LLC. -2820 Loker Ave East, Carlsbad, CA 92010
Technical Reoort / Chemical Classification Package
Dimeth I Sulfoxide 0.732 0 0.8052 Gallons
Total 0.864 0 0. 0.9504 Gallons
Paraformaldehyde 0 0.1323 1.4553 Lbs
Total 1.327 0 1.4597 Lbs
Glutaraldehyde 0.423 0 0.0423 0.4653 Gallons
Hydrochloric Acid 0.528 0 0.0528 0.5808 Gallons
Waste, Formalin 55 60.5 Gallons
Total S7.008 62.7088 Gallons
December 14, 2022
Page 13
Laboratory
Laboratory Laboratory
Laboratory
ratory
Laboratory Laboratory
Laboratory Laboratory
Laboratory Laboratory
Laboratory La
Absorption Systems California, LLC. -2820 Loker Ave East, Carlsbad, CA 92010
Technical Report/ Chemical Classification Package
Sodium Fluoride 0.002 0
Total I 0.222 II ol
Diesel 0 918 0 GAS
Total 0 0 918 0 Lbs
December 14, 2022
Page 14
Laboratory
Laboratory
Exterior Exterior
Exterior Exterior
Absorption Systems California, LLC. -2820 Loker Ave East, Carlsbad, CA 92010
Technical Report/ Chemical Classification Package
December 14, 2022
Page 15
5.2 Table 1.2 (Chemical Classification Summary Totals)
Table 1.2 (Chemical Classification Summary Totals-Regulated Hazard Classes), shows a list of all
Chemical Hazard Classification totals of Interior Storage, Exterior Storage, Open System Use and Closed
System Use for Absorption Systems, facility Regulated Hazardous Materials located at 2820 Loker Ave
East, Carlsbad, CA 92010
TABLE 1.2 TABLE 1.2 TABLE 1.2
COMBUSTIBLE LIQUID CLASS II COMBUSTIBLE LIQUID CLASS IIIA COMBUSTIBLE LIQUID CLASS IIIB
Interior StoraQe 57.179 Gallons Interior Storaae 12.136 Gallons Interior Storaae 0.158 Gallons
Exterior Storaae 0 Gallons Exterior Storaae 918 Gallons Exterior Storage 0 Gallons
Ooen System Use 0 Gallons Ooen System Use 0 Gallons Ooen Svstem Use O Gallons
Closed Svstem Use 5.7179 Gallons Closed Svstem Use 1.2136 Gallons Closed System Use 0.0158 Gallons
Total: 62.897 Gallons Total: 931.3496 Gallons Total: 0.1738 Gallons
TABLE 1.2 TABLE 1.2 TABLE 1.2
CORROSIVE LIQUID CRYOGENIC INERT. LIQUEFIED FLAMMABLE LIQUID CLASS 1-B
Interior StoraQe 59.413 Gallons Interior Storaoe 0 Gallons Interior StoraQe 66. 702 Gallons
Exterior Storaae 0 Gallons Exterior Storaae 0 Gallons Exterior StoraQe 0 Gallons
Ooen System Use 0 Gallons Open System Use 0 Gallons Open System Use 0 Gallons
Closed System Use 5.9413 Gallons Closed System Use 122 Gallons Closed System Use 6.6702 Gallons
Total: 65.354 Gallons Total: 122 Gallons Total: 73.3722 Gallons
TABLE 1.2
FLAMMABLE SOLID
TABLE 1.2
COMPRESSED INERT GAS I TABLE 1.2
INERT GAS SOLID
Interior Storaae 1.323 Lbs Interior Storaae 2500 Cft3 Interior Storaae 200 Lbs
Exterior Storaae 0 Lbs Exterior Storaae 0 Cft3 Exterior StoraQe 0 Lbs
Ooen System Use 0 Lbs Open System Use 0 Cft3 Open System Use 0 Lbs
Closed Svstem Use 0.1323 Lbs Closed System Use 250 Cft3 Closed System Use 20 Lbs
Total: 1.4553 Lbs Total: 2750 Cft3 Total: 220 Lbs
TABLE 1.2 TABLE 1.2 TABLE 1.2
OXIDIZER CLASS 1 LIQUID COMPRESSED OXIDIZER GAS ORGANIC PEROXIDE I LIQUID
Interior Storaae 0.066 Gallons Interior Storaae 0 Cft3 Interior Storage 0.264 Gallons
Exterior StoraQe 0 Gallons Exterior Storaae 0 Cft3 Exterior Storage 0 Gallons
Ooen System Use 0 Gallons Open System Use 0 Cft3 Ooen System Use 0 Gallons
Closed Svstem Use 0.0066 Gallons Closed System Use 2980 Cft3 Closed System Use 0.0264 Gallons
Total: 0.0726 Gallons Total: 2980 Cft3 Total: 0.2904 Gallons
I
Absorption Systems California, LLC. -2820 Loker Ave East, Carlsbad, CA 92010
Technical Report / Chemical Classification Package
TABLE 1.2 TABLE 1.2
ORGANIC PEROXIDE IV LIQUID UNSTABLE REACTIVE CLASS 1 LIQUID
Interior Storaae 0.661 Gallons Interior Storage 0.264 Gallons
Exterior StoraQe 0 Gallons Exterior StoraQe O Gallons
Open Svstem Use 0 Gallons Ooen Svstem Use 0 Gallons
Closed Svstem Use 0.0661 Gallons Closed System Use 0.0264 Gallons
Total: 0.7271 Gallons Total: 0.2904 Gallons
TABLE 1.2
SENSITIZER SOLID I TABLE 1.2 I TOXIC LIQUID
Interior Storaae 1.327 Lbs Interior Storage 57.008 Gallons
Exterior StoraQe 0 Lbs Exterior StoraQe O Gallons
Open Svstem Use 0 Lbs Open Svstem Use 0 Gallons
Closed Svstem Use 0.1327 Lbs Closed System Use 5.7008 Gallons
Total: 1.4597 Lbs Total: 62.7088 Gallons
6.0 Operational Controls
I
December 14, 2022
Page 16
TABLE 1.2
SENSITIZER LIQUID
Interior Storage 0.864 Gallons
Exterior Storage 0 Gallons
Ooen Svstem Use 0 Gallons
Closed System Use 0.086 Gallons
Total: 0.9504 Gallons
TABLE 1.2
TOXIC SOLID
Interior Storage 0.222 Lbs
Exterior Storage 0 Lbs
Open System Use 0 Lbs
Closed System Use 0.0222 Lbs
Total: 0.2442 Lbs
The following controls will be installed at 2820 Loker Ave East, Carlsbad, CA 92010.
6.1 Automatic Fire Extinguishing System for Buildings
[2019 CFC 903.2, NFPA 13)
The building is fully equipped with an existing, approved, automatic wet fire extinguishing system.
The Fire Sprinkler System meets current specification for B occupancy in accordance with the
CFC Chapter 9 and 2019 NFPA 13.
6.2 Fire Alarm System
[2019 CFC, 907]
A system or portion of a combination system consisting of components and circuits arranged to
monitor and annunciate the status of fire alarm or supervisory signal-initiating devices and to
initiate appropriate response to those signals. Building is equipped with a fire detection and fire
alarm system in accordance 2019 CFC Section 907.
6.3 Security
[NFPA 730 & NFPA 731)
The building/facility will be equipped with lock(s) and key access cards to prevent unauthorized
entry. The security measures in place at 2820 Loker Ave East, Carlsbad, CA 92010 are within
compliance of the Code.
6.4 Portable Fire Extinguishers
[2019 CFC 906 & CCR Title 19, Division I, Section 568)
The facility will be equipped with portable dry chemical fire extinguishers minimum rating (2A 10
BC). There will be an appropriate amount of approved fire extinguishers with minimum rating
(2A10 BC) provided within 75 feet minimum travel distance for each within the Absorption
I
Absorption Systems California, LLC. -2820 Loker Ave East, Carlsbad, CA 92010
Technical Report/ Chemical Classification Package
December 14, 2022
Page 17
Systems' facility located at 2820 Loker Ave East, Carlsbad, CA 92010. The appropriate amount
and type fire extinguishers will be located throughout the facility.
6.5 Sources of Ignition
[2019 CFC 305, 310, 3205.3]
Clearance between ignition sources, such as luminaries, heaters, flame producing devices and
combustible materials, shall be maintained in an approved manner. Smoking shall be prohibited
within the facility Hazardous Materials storage area. Approved "No Smoking" signs will be
conspicuously posted in accordance with the 2019 CFC Section 310.
6.6 Markings and Identification Signs
[2019 CFC 5003.5, 5703.5, 2007 OCFA Hazardous Materials Identification Guideline G-05]
Facility Rooms, Buildings, Outside Areas, Aboveground Tanks, and Vats of hazardous materials
identification signs shall state in plain language the hazard class(es) presented by the materials
stored or used. All lettering shall be in capital letters on a contrasting background (e.g. white on
red, white on black). Signs shall be of durable construction and suitable for the environment in
which they are posted. Letters shall be not less than three inches in height when a single hazard
class is present. When two hazard classes are present the letters may be reduced to not less
than two inches in height. If three or more hazards are present, letters shall be a minimum of one
inch in height. Lettering height adjustments allow sign dimensions to be of a size that can be
placed on doors, buildings, and tanks and still be visible to emergency response personnel. The
material state (solid/liquid/gas) is also required to be included on the sign for each hazard class
identified. When tanks or vats are heated, this information shall also be specified on the tank
(e.g., HEATED TANK). When multiple hazards exist, the sign must contain all applicable
hazards. Exception: When multiple hazards are present and they are of the same general
class (e.g., Water Reactive 1 and Water Reactive 3, Organic Peroxide Ill and Organic
Peroxide II, etc.), only the greatest hazard within each class is required to be listed on the
sign. The marking and Identification Signs will be in accordance with the 2019 CFC Sections
5003.5, 5703.5 and the OCFA Hazardous Materials Identification Guideline G-05.
6.7 Separation of Incompatible Materials
[2019 CFC 5003.9.8]
Incompatible materials will be separated from each other in storage in (FM) approved self-
closing storage cabinets, or in separate (UL) listed or (DOT) approved waste collection
containers. To ensure compliance, one or more of the following methods will separate
incompatible materials:
• Storage in separate approved self-closing storage cabinets as follows:
• Flammable/Combustible liquids (Class I, II, and Ill-A) will be stored in
approved flammable liquids cabinets,
• Acids will be stored in acid cabinets,
• Bases will be stored in base cabinets.
• Trained personnel will further distinguish between incompatible materials (i.e. acids and
bases; oxidizers and flammables; acids and flammables) and store them in an appropriate
manner with adequate distance to avoid incompatible reactions.
• Incompatible gases will be separated by a distance of more than twenty feet
• Incompatibles will be separated using noncombustible partitions/barrier greater than 18"
high.
Employees will receive chemical safety instruction on the separation of incompatible materials.
6.8 Empty Containers
[2019 CFC 5003.2.5]
The storage of empty containers and containers previously used for the storage of flammable or
combustible liquids, unless free from explosive vapors, will be stored as required for filled tanks
Absorption Systems California, LLC. -2820 Loker Ave East, Carlsbad, CA 92010
Technical Report/ Chemical Classification Package
December 14, 2022
Page 18
and containers. Tank and containers, when emptied will have the covers or plugs immediately
replaced in openings.
6.9 Approved Flammable Liquid and Hazardous Materials Storage Cabinets
[2019 CFC 5003.B. 7.2, 5704.3.2]
Flammable and combustible liquids will be stored in approved flammable liquid storage cabinets.
Doors will be well fitted, self-closing, and equipped with a latch. Cabinets shall be clearly
identified in an approved manner with red letters on contrasting background to read:
HAZARDOUS-KEEP FIRE AWAY.
6.10 Corrosive Materials
[2019 CFC 5403.1]
The storage and use of corrosive materials in amounts not exceeding the maximum
Allowable quantity per control area indicated in the 2013 CFC Section 5003.1 shall be in
Accordance with the 2019 CFC Sections 5001, 5003, and 5401. Absorption Systems, will store
and use Corrosive materials in quantities below maximum allowable quantities indicated in the
2019 CFC Table 5003.1.1 (2). Corrosive materials will be stored, used and handled in accordance
With the 2019 CFC Sections 5001 , 5003, and 5401 .
6.11 Organic Peroxides
[2019 CFC 6201]
The storage and use of organic peroxides in amounts not exceeding the maximum
Allowable quantity per control area indicated in the 2019 CFC Section 5003.1 shall be in
accordance with the 2019 CFC Sections 5001, 5003, 6201 and 6203. Absorption Systems, will
store and use organic peroxides in quantities below maximum allowable quantities indicated in the
2019 CFC Table 5003.1.1 (1 ). Organic Peroxides will be stored, used and handled in accordance
with the 2019 CFC Sections 5001 , 5003, 6201 and 603.
6.12 Oxidizing Materials
[2019 CFC 6303]
The storage and use of oxidizing materials in amounts not exceeding the maximum
Allowable quantity per control area indicated in the 2019 CFC Section 5003.1 shall be in
accordance with the 2019 CFC Sections 5001, 5003, 6301 and 6303. Absorption Systems will
store and use oxidizing materials in quantities below maximum allowable quantities indicated in
the 2019 CFC Table 5003.1.1 (1 ). Oxidizing materials will be stored, used and handled in
accordance with the 2019 CFC Sections 5001, 5003, 6301 and 6303.
6.13 Highly Toxic & Toxic Materials
[2019 CFC 6303]
The indoor storage or use of toxic solids or liquids in amounts not exceeding the
Maximum Allowable quantity per control area indicated in the 2019 CFC Table
5003.1.1 (2) shall be in accordance with the 2019 CFC Section 5001, 5003 and 6001.
Absorption Systems will store and use highly toxic and toxic solids and liquids in quantities below
Maximum allowable quantities indicated in the 2019 CFC Table 5003.1.1 (2). Highly Toxic
and Toxic materials will be stored, used and handled in accordance with the 2019 CFC Section
5001 , 5003 and 6001.
6.14 Water Reactive Solids and Liquids
[2019 CFC 6703]
The storage and use of water-reactive solids and liquids in amounts not exceeding the
Maximum Allowable Quantity per control area indicated in the 2019 CFC Section 5003.1
shall be in accordance with the 2019 CFC Sections 5001 , 5003, 6701 and 6703.
Absorption Systems will store and use water-reactive materials in quantities below Maximum
allowable quantities indicated in the 2019 CFC Table 5003.1.1 (1 ). Water Reactive Materials will
be stored, used and handled in accordance with the 2019 CFC Sections 5001 , 5003, 6701 and
Absorption Systems California, LLC. -2820 Loker Ave East, Carlsbad, CA 92010
Technical Report/ Chemical Classification Package
6703.
December 14, 2022
Page 19
6.15 Lab Fume Hoods, Building Exhaust & Ventilation, and Materials Exhausted
[2019 CMC Chapter 5]
a. Fume Hood Exhaust System Specifications.
• Fume Hood Exhaust Duct System shall be designed in accordance with the 2019 California
Mechanical Code.
• Fume Hood Exhaust System does not convey flammable dusts.
• Fume Hood Exhaust Ducting shall be independent and completely separate from Environmental
Air Ducts and shall not extend into or through plenums.
b. Flammable Gases and Vapors in the Exhaust Systems.
Flammable vapor or fumes is the concentration of flammable constituents in air that exceeds
twenty-five percent (25%) of its Lower Explosive Limit (LEL). The Fume Hood Exhaust and
Ventilation System at Absorption Systems will comply with the 2019 California Mechanical Code
and the California Energy Commission Standards. Scientists will be trained not to exhaust
incompatibles into the ventilation systems. Bench scale laboratory reactions will be performed in
the fume hoods at Absorption Systems and will be in compliance with the Code of Federal
Regulations Volume 29 Part 1910.1450. The storage and use of flammable and combustible
liquids and gases in hoods and exhaust ducts will be limited to the smallest amounts needed each
day. Concentrations of gases and vapors will be diluted to less than 25% of the Lower Explosive
Limit (LEL) for each compound. Therefore, no automatic fire protection systems will be required
in the fume hoods or exhaust ducts.
c. Corrosive Materials
Corrosives will be used in the chemical fume hoods. Corrosives will be neutralized in the
chemical experiments and the corrosives will not be exhausted untreated directly into the
fume hoods at concentrations that could attack the ducting or accumulate and drip. The
corrosives are used in milliliters quantities for pH adjustment and not at original strength nor
heated and exhausted untreated where they could attack the ducting.
d. Heating
The materials being exhausted will not be heated above standard room temperature.
Mechanical exhaust will be provided where Class I, II, or Ill liquids are used (in any amount) in
Group B, or portions thereof. Under normal operating conditions explosive vapor-air mixtures will
not develop in the exhaust system at Absorption Systems. The exhaust ventilation will be
sufficient to maintain non-flammable and non-explosive vapor concentrations throughout the
entire exhaust duct system. Absorption Systems' activities will not require elevated temperatures,
therefore separate and distinct exhaust systems are not required.
e. Calculations to determine necessary CFM required to maintain levels 25% LEL for Class I,
II, Ill-A Flammable liquids
Hoods and Building Exhaust Systems and Types of Material Exhausted
Calculations to Determine Required CFM to Maintain Levels
<25% LEL for Flammable Liquids
The following report contains ca lculations for the volume of air in cubic feet per minute (CFM) required to
dilute flammable liquid vapors to 25% or below their Lower Explosive Limit. These calculations represent
Absorption Systems California, LLC. -2820 Loker Ave East, Carlsbad, CA 92010
Technical Report / Chemical Classification Package
December 14, 2022
Page 20
a spill scenario in which a one-gallon container of flammable liquid was to shatter in a fume hood,
releasing the entire contents. The calculations are based on the release being vaporized consistently for
a one-hour period.
Acetone 58.08 0.791 2 2
Acetonitrile 41.05 0.783 4.4 1.42
Ethanol 46.07 0.79 3.3 1.59
Ethyl Acetate 88.11 0.902 2.2 3
lsopropyl Alcohol 60.1 0.785 2.5 2.1
Methanol 32 0.8 6 1.1
Methyl tert-butyl Ether 88.15 0.74 1.6 3
Tetra hyd rofu ran 72 0.89 1.8 2.5
Calculating the Required CFM
The following calculations were made to determine the minimum ventilation required to assure that the
aforementioned flammable liquids are maintained below 25% of the Lower Explosive Limit. Requirements
were based on the cubic feet of air required per gallon of evaporation. The calculation used was taken
from 2011 NFPA 86 "Ovens and Furnaces" Method for Determining Solvent Safety Ventilation Rates
Section 11 .6.8.4.
CFM to maintain <25% LEL =
l ~)(SpGr)(IOO-LEL) I .
l_o.075 VD LEL 160mm
Where:
4.0 = Safety Factor to Account for 25% LEL
8.33 = Weight of 1 gallon of water
0.075 = Weight of dry air in 29.9 in. Hg
SpGr: Specific gravity
VD = Vapor Density
LEL = Lower Explosion Limit
Table 2 is a worst-case scenario in which the CFM calculated was to account for a gallon of flammable
liquid being released in a fume hood over a one hour period.
Absorption Systems California, LLC. -2820 Loker Ave East, Carlsbad, CA 92010
Technical Report/ Chemical Classification Package
December 14, 2022
Page 21
Table 2 • Minimum Required Ventilation in CFM to maintain concentrations of Flammable Liquids below
25% Lower Explosive Limit (LEL) during a one-gallon spill situation released over a one-hour period
Acetone 8610 143
Acetonitrile 5323 89
Ethanol 6468 108
Ethyl Acetate 5938 99
lsopropyl Alcohol 6477 108
Methanol 5062 84
Methyl tert-butyl Ether 6740 112
Tetrahydrofuran 8628 144
The worst case scenario spill for the flammable liquids stored in a fume hood at Absorption Systems'
facility is a one gallon release of Tetrahydrofuran. To ensure that such a spill be maintained at 25% the
lower explosive limit, fume hoods must provide an airflow of a minimum of 144 cubic feet fresh air, per
minute. All of Absorption Systems' fume hoods will exhaust more than 144 CFM. Since the
exhaust volumes will be greater than 144 CFM, the duct work is classified as Class 1 or Class 5
Ducts.
Table 3 below indicates proposed materials to be used within Absorption Systems' fume hoods located at
2820 Loker Ave East, Carlsbad, CA 92010.
Acetone Class 1-8 Compatible
Acetonitrile Class 1-8 Compatible
Ethanol Class 1-8 Compatible
Ethyl Acetate Class 1-B Compatible
lsopropyl Alcohol Class 1-B Compatible
Methanol Class 1-8 Compatible
Methyl tert-butyl Ether Class 1-8 Compatible
Tetrahydrofuran Class 1-8 Compatible
Proposed Hazardous Materials listed above in Table 3 are used in different experiments and/or
processes within all Absorption Systems' fume hoods and designated areas located at 2820 Loker Ave
East, Carlsbad, CA 92010.
Absorption Systems California, LLC. -2820 Loker Ave East, Carlsbad, CA 92010
Technical Report / Chemical Classification Package
6.16 Spill Control, Drainage, Secondary Containment
[2019 CFC 5004.2.1, 5004.2.2, & 5004.2.2.1]
December 14, 2022
Page 22
Carts and trucks transporting liquids shall be capable of containing a spill from the largest single
container transported.
Absorption Systems will never store vessels containing hazardous materials greater than
55 gallons inside facility building.
The vessels exceeding 1.1 gallon capacity in the designated bulking and/or dispensing
areas used for flammable liquids will be equipped with secondary containment.
6.17 Explosion Control
[2019 CFC 5005.2.1.2]
Explosion control shall be provided in accordance with the 2019 CFC Section 5004.6 when
explosive environment can occur because of the characteristics or nature of the hazardous
materials dispensed or used, or as a result of the dispensing or use process. Flammables,
oxidizers, unstable reactive compounds, and water-reactive compounds will be stored in approved
explosion proof or flammable liquid cabinets. The explosion controls will be in compliance with
the 2019 CFC Sections 911 , 5004.6 and 5005.2.1 .2.
6.18 Limit Controls
[2019 CFC 5005.1.4]
Temperature Controls will be maintained in the event of a power failure. Temperature controls will
be in compliance with the Code.
6.19 Pressure Controls
[2019 CFC 5004.8.2]
Stationary tanks and equipment containing hazardous materials that can generate pressure
exceeding design limits because of exposure fires or internal reaction shall have some form of
construction or other approved means that will relieve excessive internal pressure. The means of
pressure relief shall vent to an approved location. The pressure controls for cryogenic liquid tanks
will be in compliance with the California Fire Code and all Federal, State and Local regulations.
6.20 Treatment Systems
[TITLE 22 CCR CH-12 ARTICLE-1 {66262.10]
Absorption Systems will properly manage any hazardous waste generated in accordance with
Federal State and Local regulations.
6.21 Protection from Vehicles
[2019 CFC 312]
Absorption Systems stores all hazardous materials within the building located 2820 Loker Ave
East, Carlsbad, CA 92010. All vehicle impact protection needed will be in compliance with the
2019 CFC 312.
6.22 Employee Training and Response Procedures
(2019 CFC 4062013 CFC 407, and Title 8 CCR §5194]
Employees in the occupancies listed in the 2019 CFC Section 404.2 shall be trained in the fire
emergency procedures described in their fire evacuation and fire safety plans. Employees shall
be familiar with fire alarm and evacuation signals and their assigned duties in the event of an
alarm or emergency. Employees' assigned fire-fighting duties shall be trained to know the
locations and proper use of portable fire extinguishers or other manual fire-fighting equipment and
the protective clothing or equipment required for its safe and proper use. The supplied training
will be in compliance with 2019 CFC Section 406.
Absorption Systems California, LLC. -2820 Loker Ave East, Carlsbad, CA 92010
Technical Report/ Chemical Classification Package
December 14, 2022
Page 23
Persons responsible for the operational of areas in which hazardous materials are stored, bulked,
dispensed, handled, or used shall be trained initially and annually on the chemical hazards of the
materials and the appropriate spill mitigation procedures. The supplied training will be in
compliance with 2019 CFC 406, 2019 CFC 407, and Cal/OSHA Title 8 CCR §5194.
Absorption Systems will provide employees with Cal/OSHA compliant Hazard Communication
safety training and will continue to provide refresher courses every year. The following
information is taught to each hazmat employee in the facility:
In the event of a FIRE: First, notify local fire department by dialing 911 from a landline when
possible, versus a mobile phone. Next, if possible, have an employee trained on the proper use
of a fire extinguisher extinguish the fire with an ABC fire extinguisher. If the fire cannot be
extinguished safely with one extinguisher, evacuate all personnel from the building.
SMALL SPILL: Use the emergency spill kits compatible with the spilled materials. Refer to
Material Safety Data Sheets/Safety Data Sheets (MSDS/SDS) for protective clothing and clean up
guidelines. Waste products will be handled and disposed of as hazardous waste.
LARGE SPILL: Secure the area and warn others away. Call the Fire Department if the spill
represents a health hazard or materials are released outside of the building. Arrangements will
be made with a licensed disposal firm for assistance with cleanup and disposal of any hazardous
wastes.
7.0 Hazardous Materials Summary
Absorption Systems, located at 2820 Loker Ave East, Carlsbad, CA 92010 will store, transport on site,
use and handle Hazardous Materials in accordance with the 2019 California Fire Code, 2019 California
Building Code and all federal, state, local regulations and the OCFA Chemical Classification Packet
Guideline G-06.
I certify that all information contained herein, including the attachments, is true and correct to the best of
my knowledge. I have authority to act on behalf of Absorption Systems relative to matters involved in this
Technical Report.
Absorption Systems California, LLC. -2820 Loker Ave East, Carlsbad, CA 92010
Technical Report / Chemical Classification Package
Approved:
;tp~
Todd Hansen
Fire Safety Specialist
Occupational Services, Inc.
6397 Nancy Ridge Drive
San Diego, CA 92121
Reviewed and Approved:
V. Chad Hansen, MS, MBA, CIH, CSP, CPE
President
Occupational Services, Inc.
6397 Nancy Ridge Drive
San Diego, CA 92121
Reviewed and Approved:
December 14, 2022
Page 24
As a Representative of Absorption Systems, I certify that I have reviewed and approve all of the
information contained herein, including the attachments of this Technical Opinion Report. I act on behalf
of Absorption Systems, relative to matters involved in this Technical Opinion Report. By my signature,
Absorption Systems agrees to meet the fire code regulations required and specified in this report.
Absorption Systems California, LLC. Representative (Sign Name and Date)
Absorption Systems' Representative (Print Name)
Absorption Systems California, LLC. -2820 Loker Ave East, Carlsbad, CA 92010
Technical Report / Chemical Classification Package
Attachment 1 (Facility Vicinity Map & Site Location)
December 14, 2022
Pa.9.e 25
Facility Vicinity Map and Site Location for Absorption Systems, Located at 2820 Loker Ave East, Carlsbad, CA 92010
l I • ,,
' '
f ., --. •· ~ . ' . I • 4 f ,j
Absoiplio11 fyftems
t. -4 I •• ~ f 1 • • 2$20 Lpker A:ve'East1
Carlsbad. C~ 9'l04 O ,
f 4 ,_ f C
;: f ,,
Absorption Systems California, LLC. -2820 Loker Ave East, Carlsbad, CA 92010
Technical Report / Chemical Classification Package
Attachment 1.1 (Floor Plan, First Floor)
____ j _________ j ____ _ . . -----!.------~--' I
,:r
' I
' I I
I I
I -----+-----~,a
I ----i--------
1 I ----~---------
1 I I I
I I I I /§J
----4----------+------=r--~"-t--=-----J I I I -----~-----------~------1--
December 14, 2022
Page 26
•
Absorption Systems California, LLC. -2820 Loker Ave East, Carlsbad, CA 92010
Technical Report / Chemical Classification Package
Attachment 1.2 (Floor Plan, Second Floor)
_, ___ ..... __ ..,...,_ .. __ ... ____ _. _____ ..., ... ___ ~-----~-----~-
I I
' I
I
I
I
I
' I ' I I I I __ L ________ _. ___________ L __________ __L __________ __L ___________ , _____ J _
' I I I
i i .
I
' I I
I I
I
I • • -+-------------------l------------l------------!-----------! , r'c:::s l
I I
I I I
-------l------------l-----------..J-----------..J------------l----1 I I I I
I I
I
I
I
1 ----1 1li11II 111iii11li 1111 11 _.J -----+----------'-f--------
' -+------
' I
i ! ~!:J T'!;r j-~m,., ;:tI ! ,
--L---------L-----EF :~0 ~g~---L-----------L-----J
December 14, 2022
Pa.9.e 27
Business Name
Hazardous Materials Questionnaire
County of San Diego, Department of Environmental Health and Quality
PO Box 129261, San Diego, CA 921 12-9261
(858) 505-6700 (800) 253-9933 www.sdcdehq.org
Absorption Systems California, LLC Business Contact
Matt Lyulkin
Project Address
2820 Loker East AVE
Applicant
Scott Zuppan
City
Carlsbad
Applicant E-Mail
scott.zuppan@am.jll.com
State
CA
Record ID#: Not in System
Plan Check#: DEH2022-HHMBP-011927
Balance Due: $87.00
Telephone#
Zip Code
92010
Applicant Telephone #
Plan File#
APN#
209-083-15-00
The following questions represent the facility's activities, NOT the specific project description.
PART I: FIRE DEPARTMENT· HAZARDOUS METERtALS DIVISION· OCCUPANCY CLASSIFICATION:(Not required for projects within the City of San Diego.)
Indicate by selecting the item, whether your business will use, process, or store any of the following hazardous materials. If any of the items are selected, Applicant must
contact the Fire Protection Agency with jurisdiction prior to plan submittal.
Occupancy Rating: B Facility's Square Footage (including proposed project): 63900
□ Explosive or Blasting Agents □ Organic Peroxides □ Water Reactives □ Corrosives
□ Compressed Gases □ Oxidizers □ Cryogenics □ Other Health Hazards
□ Flammable/Combustible Liquids □ Pyrophorics □ Highly Toxic or Toxic Materials □ None of These
□ Flammable Solids □ Unstable Reactives □ Radioactives
PART JI· SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEALTH • HAZARDOUS MATERIALS DIVISION !HMP)jf the answer to any of the questions is
yes, applicant must contact the County of San Diego Hazardous Materials Division, in person at 5500 Overland Ave., Suite 110, San Diego, CA 92123, or by phone at(858)
505-6700 prior to issuance of a building permit. FEES ARE REQUIRED.
Project Completion Date: 4/1/2023
1.
2.
3.
4.
5.
6.
7.
8.
YES NO
□ 00
□ 00
□ 00
□
□
□
□
□
Is your business listed on the reverse side of this form? (check all that apply).
Will your business dispose of Hazardous Substances or Medical Waste in any amount?
Will your business store or handle Hazardous Substances in quantities equal to or greater than
55 gallons, 500 pounds. or 200 cubic feet?
Will your business handle carcinogens or reproductive toxins in any quantity?
Will your business use an existing, or install an underground storage tank?
Will your business store or handle Regulated Substances (CalARP)?
Will your business use or install a Hazardous Waste Tank System (Title 22, Article 10)?
Will your business store petroleum in tanks or containers at your facility with a total storage capacity
equal to or greater than 1,320 gallons? (California's Aboveground Petroleum Storage Act).
□
□
□
CalARP Exempt
CalARP Required
CalARP Complete
Review Date:
PART Ill: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT !APCDl: If the answer to Question #1 is 'Yes' and the answer to Question #2 is 'No', the applicant
must contact the APCD prior to the issuance of a building or demolition permit. If any answer to Questions #3, #4, or #5 is 'Yes', the applicant must contact the APCD prior to
the issuance of a building or demolition permit. If the answer to Question #3 or #4 is 'Yes', the applicant may need to submit an asbestos notification form to the APCD at
least 10 working days prior to commencing demolition or renovation (some residential projects may be exempt from the notification requirements). Contact the APCD at
10124 Old Grove Road, San Diego, CA 92131 or telephone (858) 586-2600 for more information.
1.
2.
3.
4.
YES NO
00 □
00 □
□ 00
□ 00
Will any existing building materials be disturbed as part of this project? (If the answer is 'Yes', an asbestos survey may be required.)
Has a survey been performed to determine the presence of asbestos containing materials?
Will the project involve handling or disturbance of any asbestos containing materials?
Will the project involve the removal of any load supporting structural member?
5.
6.
□
□
00
□
Will the subject facility or construction activities include operations or equipment that emit or are capable of emitting an air contaminant? (See the APCD
factsheet at http://www.sdapcd.org/info/facts/permits.pdf
(ANSWER ONLY IF QUESTION 5 IS 'YES') Will the subject facility be located within 1,000 feet of the outer boundary of a school (K through 12)? Search
the California School Directory at http://www.cde.ca.gov/re/sd/ for public and private schools or contact the appropriate school district.
Briefly describe business activities: Briefly describe proposed project:
Phase I Construction Project Phase I Construction Project plumbing and mezzanine improvements
I declare under penalty of perjury that to the best of my knowledge and belief, the responses made herein are true and correct. IBI; Fees Acknowledged: fBI
Scott Zuppan
Name of Owner or Authorized Agent
FIRE DEPARTMENT OCCUPANCY CLASSIFICATION:
BY:
EXEMPT OR NO FURTHER INFORMATION
REQUIRED
COUNTY-HMO* APCD
~,i or ~lo o'-v ~
u REVIEWl:.D "'o
M. Martinez
SlG~ATU~c
7/1 1/2022
FOR OFFICIAL USE ONLY
RELEASED FOR BUILDING PERMIT BUT NOT FOR
OCCUPANCY
COUNTY-HMO APCD
6/29/2022
Oate
DATE: __________ _
RELEASED FOR OCCUPANCY
COUNTY-HMO APCD
"A stamp in this box only exempts businesses from completing or updating a Hazardous Materials Business Plan. Other permitting requirements may still apply.
DEHQ_HMD_HMBP _Questionnaire v 2.0 (8/2021)
Printed on: 7/11/2022@ 3:41 PM
ENCINA WASTEWATER AUTHORITY
INDUSTRIAL WASTEWATER DISCHARGE PERMIT
SCREENING SURVEY
6200 Avenida Encinas, Carlsbad, CA 92011
Phone: 760-438-3941 Fax: 760-476-9852
SourceControl@encinajpa.com
Date: 10/21 /2022 NEO
Business Name: Absorption Systems California, LLC R 'i:. CE.,\
--2-82_0_L_o-ke_r_A-ve-,-C-a-rls-b-ad-CA-92_0_1_0 ___ ~•\l~tt
Street Address: ~v-. 58~o
Email Address: cynthia.cuellar@pharmaron.com .-rv Or C~f\l. \S\O~ ·---------------"T'\\' \NG o\\J
PLEASE CHECK HERE IF YOUR BUSINESS IS EXEMPT: (ON REVERSE SIDE CHE($~0F BUSINESS) □
Check all below that are present at your facility:
o Acid Cleaning
o Assembly
o Automotive Repair
o Battery Manufacturing
o Biofuel Manufacturing
« Biotech Laboratory
o Bulk Chemical Storage
o CarWash
o Chemical Manufacturing
o Chemical Purification
o Denta I Offices
• Dental Schools
• Dental Clinics
o Dry Cleaning
o Electrical Component
Manufacturing
o Fertilizer Manufacturing
o Film/X-ray Processing
o Food Processing
o Glass Manufacturing
o Industrial laundry
o Ink Manufacturing
o Laboratory
o Machining/Milling
o Membrane manufacturing
(i.e. water filter membranes)
o Metal Casting/Forming
o Metal Fabrication
o Metal Finishing
• Electroplating
• Electroless Plating
• Anodizing
• Coating (i.e. phosphating)
• Chemical Etching/Milling
• Printed Circuit Board
Manufacturing
o Metal Powders Forming
o Nutritional Supplement/Vitamin
Manufacturing
o Painting/Finishing
o Paint Manufacturing
o Personal Care Products
Manufacturin~
o Pesticide Man~ng/ Packaging
o Pharmaceutica~acturing
(including prec~
o Porcelain Enamb
o Power Generati n
o Print Shop
<X Research and Development
o Rubber Manufacturing
o Semiconductor Manufacturing
o Soap/Detergent Manufacturing
o Waste Treatment/Storage
New Business? Yes D No~ SIC Code(s) if known: _87_3_4 ___ _ Date operation began/will begin:. ___ 7"'""/_2_3 __ _
Tenant Improvement? Yes~ NoO If yes, briefly describe improvement: ______________ ~--
Approx 64,000 sf overall broken into 14k of Office and S0k of Lab / Research space.
Description of operations generating wastewater (discharged to sewer, hauled or evaporated): __ _
Biotechnological Research and Development -preclinical in vivo services done in a vivarium with large and
small animals.
Estimated volume of industrial wastewater to be discharged (gal/ day): __ 1_30_o_G_a_l/_d_a_y ___________ _
list hazardous wastes generated (type/volume): Formalin liquid Waste ~20 gal/month
Have you applied for a Wastewater Discharge Permit from the Encina Wastewater Authority? Yes D Date: ____ No I&]
Page 1 of 2
ENCINA WASTEWATER AUTHORITY
INDUSTRIAL WASTEWATER DISCHARGE PERMIT
SCREENING SURVEY
6200 Avenida Encinas, Carlsbad, CA 92011
Phone: 760-438-3941 Fax: 760-476-9852
SourceControl@encinajpa.com
The commercial enterprises listed below are a partial listing of businesses that are exempt from industrial wastewater
discharge permitting under normal operating conditions. They are exempt because (a) they discharge no process wastewater
(i.e., they only discharge sanitary wastewater with no pollutants exceeding any local limits), and (b) they have no potential to
negatively impact the EWPCF or other waste\/..tater treatment plants in the ESS. Any questions regarding exemptions
should be referred to EWA Source Control staff.
o Automobile Detailers o Hotels/Motels (no laundry)
o Barber/Beauty Shops o Laundromats
o Business/Sales Offices o Libraries
o Cleaning Services o Medical Offices (no x-ray developing)
o Carpet/Upholstery o Mortuaries
o Childcare Facilities o Museums
o Churches o Nail Salons
o Community Centers o Nursing Homes
o Consulting Services o Office Buildings (no process flow)
o Contractors o Optical Services
o Counseling Services o Pest Control Services (no pesticide repackaging for sale)
o Educational Services (no auto repair/film developing) o Pet Boarding/Grooming Facilities
o Financial Institutions/Services o Postal Services (no car wash/auto repair)
o Fitness Centers o Public Storage Facilities
o Gas Stations (.no car wash/auto repair) o Restaurants/Bars
o Grocery Stores (no film developing) o Retail/Wholesale Stores (no auto repair/film developing)
o Residential based Businesses o Theaters (Movie/Live)
CERTIFICATION STATEMENT
I certify that the information above is true and correct to the best of my knowledge.
Signature://~ A,)~ Print Name: Vatsala Naageshwaran ,Vice President DATE :, _ ___.:.;1 0~l2::..1~/2=.,,0C!;::22::..__
Facility Contact: Matthew Lyulkin Title: Sr. Director, Operations
ENCINA WASTEWATER AUTHORITY
6200 AVENIDA ENCINAS, CARLSBAD, CA Phone: 760-438-3941 Fax: 760-476-9852
SourceControl@encinajpa.com
Page 2 of2
C cityof
Carlsbad
PURPOSE
CLIMATE ACTION PLAN
CONSISTENCY CHECKLIST
B-50
Development Services
Building Division
1635 Faraday Avenue
(760) 602-2719
www .ca rlsbadca .gov
This checklist is intended to help building permit applicants identify which Climate Action Plan (CAP) ordinance requirements
apply to their project. This completed checklist (B-50) and summary (B-55) must be included with the building permit
application. The Carlsbad Municipal Code (CMC) can be referenced during completion of this document by clicking on
the provided links to each municipal code section.
NOTE: The following type of permits are not required to fill out this form
❖ Patio I ❖ Decks I ❖ PME (w/o panel upgrade) I ❖ Pool
Consultation with a certified Energy Consultant is encouraged to assist in filling out this document. Appropriate
certification includes, but is not limited to: Licensed, practicing Architect, Engineer, or Contractor familiar with Energy
compliance, IECC/HERS Compliance Specialist, ICC G8 Energy Code Specialist, RESNET HERS rater certified, certified
ICC Residential Energy Inspector/Plans Examiner, ICC Commercial Energy Inspector and/or Plans Examiner, ICC CALgreen
Inspector/Plans Examiner, or Green Building Residential Plan Examiner.
If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance,
check N/A and provide an explanation or code section describing the exception.
Details on CAP ordinance requirements are available at each section by clicking on the municipal code link provided. The
project plans must show all details as stated in the applicable Carlsbad Municipal Code (CMC) and/or Energy Code and
Green Code sections .
.... ,.......--=------------....--....,..,.-----------------.....-----~--=---....... --,
Project Name/Building
Permit No.:
Property Address/APN:
Applicant Name/Co.:
Applicant Address:
Contact Phone:
CBC2022-0185 BP No.: Qffi,2Q 22-()\~ S-
2820 Loker Avenue East
Absoprtion Systems
3911 Sorrento Valley Blvd, Suite 120, San Diego, Ca 92121
858.500.4618 Contact Email: ndean@waremalcomb.com
Contact information of person completing this checklist (if different than above):
Name:
Company
name/address:
Nathan A. Dean
Ware Malcomb (as above)
Contact Phone: 858.500.4618
Contact Email: ndean@waremalcomb.com
Applicant Signature: _________ i:!_"'l._r _.,,_t;1i~_~_.~_,'::' ____ Date: 7/12/2022
B-50 Page 1 of 7 Revised 04/21
Use the table below to determine which sections of the Ordinance checklist are applicable to your project. For
alterations and additions to existing buildings, attach a Permit Valuation breakdown on a separate sheet.
Building Permit Valuation (BPV) $ breakdown _______ _
Construction Type
D Residential
D New construction
D Additions and alterations:
D BPV < $60,000
D BPV ~ $60,000
D Electrical service panel upgrade only
D BPV ~ $200,000
Ii] Nonresidential
D New construction
""' Alterations:
D BPV ~ $200,000 or additions ~ 1,000
square feet
""' BPV~ $1 ,000,000
D ~ 2,000 sq. ft. new roof addition
Checklist Item
Complete Sectlon(s) Notes:
A high-rise residential building is 4 or more stories, including a
Low-rise High-rise mixed-use building in which at least 20% of its conditioned floor
area is residential use
2A*, 3A*, 1B, 2B, *Includes detached, newly constructed ADU 4A*, 3B, 4A
N/A N/A All residential additions and alterations
1A, 4A 4A 1-2 family dwellings and townhouses with attached garages
only.
*Multi-family dwellings only where interior finishes are removed
1A, 4A* 1B, 4A* and significant site work and upgrades to structural and
mechanical, electrical, and/or plumbing systems are proposed
1 B, 2B, 3B, 4B and 5
1B, 5
18,2B,5 Building alterations of~ 75% existing gross floor area
2B,5 1 B also applies if BPV ~ $200,000
Check the appropriate boxes, explain all not applicable and exception items, and provide supporting calcuations and doCllnentation as necessary.
1. Energy Efficiency
Please refer to Carlsbad Municipal Code (CMC) 18.21.155 and 18.30.190,and the California Green Building Standards Code (CAL Green) for more
information. Appropriate details and notes must be placed on the plans according to selections chosen in the design.
A D Residentialadditionoralteration=!:$60,000buildingpermitvaluation. □ N/A _________ _
Details of selection chosen belowmustbe placed on the plans referencing CMC □ Exception: Home energy score~ 7
18.30.190. (attach certification)
Year Built Single-family Requirements Multi-family Requirements
□ Before 1978 Select one option:
□ Ductsealing □ Attic insulation □Cool roof □ Attic insulation
□ 1978 and later Select one option:
□ Lighting package □ Water heating Package
□ Between1978and1991 Select one option:
□ Ductsealing □ Attic insulation □Cool roof
□ 1992 and later Select one option:
□ Lighting package □ Water heating package
Updated 4/1 6/202 1 3
B. [ii Nonresidential* new construction or alterations~ $200,000 building permit valuation,
or additions~ 1,000 square feet. See CMC 18.21.155and CALGreen Appendix AS □ N/A
AS.203.1 .1 Choose one:□ .1 Outdoor lighting D .2 Restaurant service water heating (CEC 140.5)
□ .3 Warehouse dock seal doors. !!!! .4 Daylight design PAFs □ .5 Exhaust air heat recovery □ N/A
AS.203.1.2.1 Choose one: D .95 Energy budget (Projects with indoor lighting OR mechanical)
!!!! . 90 Energy budget (Projects with indoorlightingAND mechanical) □ N/A
AS.211.1 ** l!!!I On-site renewable energy:
□ N/A
AS.211.3** □ Green power: {If offered by local utility provider, 50% minimum renewable sources)
□ N/A Not available
AS.212.1 □ Elevators and escalators: (Project with more than one elevatorortwo escalators)
□ N/A No Elevator/escalator
AS.213.1 D Steel framing: (Provide details on plans for options 1-4 chosen)
□ N/A Not affecting envelope
* Includes hotels/motels and high-rise residential buildings
** Foralterations.: $1 ,000,000 BPV and affecting> 75% existing gross floor area, OR alterations that add 2,000 squarefeet of new roof addition: comply
with CMC 18.30.130 (section 28 below) instead.
2. Photovoltaic Systems
A. D Residential new construction (for low-rise residential building permit applications submitted after 1/1/20). Refer to 2019 California
Energy Code section 150.1(c)14 for requirements. If project includes installation of an electric heat pump water heater pursuant to
CAP section 3B below(low-rise residential Water Heating), increase system size by .3kWdc if PV offset option is selected.
Floor Plan ID (use additional CFA #d.u. Calculated kWdc*
sheets if necessary)
Total System Size:
kWdc = (CFAx.572) / 1,000 + (1.1 5 x #d.u.)
*Formula calculation where CFA = conditional floor area, #du = number of dwellings per plan type
If proposed system size is less than calculated size, please explain.
kWdc
Exception
□
□
□
□
B. [j] Nonresidential new construction or alterations ~$1,000,000 BPV AND affecting ~75% existing floor area, OR addition that increases
roof area by ~2,000 square feet. Please refer to CMC 18.30.130 when completing this section. *Note: This section also applies to
high-rise residential and hotel/motel buildings.
Choose one of the following methods:
D Gross Floor Area (GFA)Method
GFA: 63 786
□ If< 1 O,OOOs.f. Enter: 5 kWdc
Min. System Size: 96
I!!!! If 2!: 1 O,OOOs.f. calculate: 15 kWdc x (GFA/10,000) **
kWdc
**Round building size fa ctor to nearest tenth, and round system size to nearest whole number.
Updated 4/16/202 I 4
□ Time-Dependent Valuation Method
Annual TDV Energy use:*** ______ x .80= Min. system size: ______ kWdc
***Attach calculation documentation using modeling software approved by the California Energy Commission.
3. Water Heating
A. D Residential and hotel/motel new construction. Refer to CMC 18.30.170 when completing this section.
Provide complete details on the plans.
□ For systems serving individual dwelling units choose one system:
□ Heat pump water heater AND Compact hot water distribution AND Drain water heat recovery (low-rise
residential only)
□ Heat pump water heater AND PV system .3 kWdc larger than required in CMC 18.30.130 (high rise
residential hotel/motel) or CA Energy Code section 150.1 (c) 14 (low-rise residential)
□ Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher
□ Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors
□ Exception:
D For systems serving multiple dwelling units, install a central water-heating system with ALL of the following:
D Gas or propane water heating system
D Recirculation system per CMC 18.30.150(8) (high-rise residential, hotel/motel) or CMC 18.30.170(8) (low-
rise residential)
□ Solar water heating system that is either:
□ .20 solar savings fraction
□ .15 solar savings fraction, plus drain water heat recovery
□ Exception:
B. D Nonresidential new construction. Refer to CMC 18.30.150 when completing this section. Provide
complete details on the plans.
□ Water heating system derives at least 40% of its energy from one of the following (attach documentation):
□ Solar-thermal □ Photovoltaics □ Recovered energy
□ Water heating system is (choose one):
□ Heat pump water heater
□ Electric resistance water heater(s)
□Solar water heating system with .40 solar savings fraction
□ Exception:
It may be necessary to supplement the completed checklist with supporting materials, calculations or certifications, to
demonstrate full compliance with CAP ordinance requirements. For example, projects that propose or require a
performance approach to comply with energy-related measures will need to attach to this checklist separate calculations
and documentation as specified by the ordinances.
Updated 4/ 16/2 I 5
4. Electric Vehicle Charging
A D Residential New construction and major alterations*
Please refer to CMC 18.21.140 when completing this section.
□ One and two-family residential dwelling or townhouse with attached garage:
□ One EVSE Ready parking space required □ Exception : _____________ _
□ Multi-familyresidential· □ Exception •
Total Parking Spaces EVSE Spaces
Proposed EVSE (10% of total) Installed (50% of EVSE) Other "Ready" Other "Capable"
Calculations: Total EVSE spaces= .10 x Total parking spaces proposed (rounded up to nearest whole number) EVSE Installed = Total EVSE
Spaces x .50 (rounded up to nearest whole number) EVSE other may be "Ready" or "Capable"
*Major alterations are: ( 1 ) for one and two-family dwellings and townhouses with attached garages, alterations have a building permit
valuation ;::$60,000 or include an electrical service panel upgrade; (2) for multifamily dwellings (three units or more without attached
garages), alterations have a building permit valuation~ $200,000, interior finishes are removed and significant site work and upgrades to
structural and mechanical, electrical, and/or plumbing systems are proposed.
*ADU exceptions for EV Ready space (no EV ready space required when):
(1) The accessory dwelling unit is located within one-half mile of public transit.
(2) The accessory dwelling unit is located within an architecturally and historically significant historic district.
(3) The accessory dwelling unit is part of the proposed or existing primary residence or an accessory structure.
(4) When on-street parking permits are required but not offered to the occupant of the accessory dwelling unit.
(5) When there is a car share vehicle located within one block of the accessory dwelling unit.
8. D Nonresidential new construction (includes hotels/motels) D Exception : ____________ _
Please refer to CMC 18.21.150 when completing this section
Total Parking Spaces
Proposed EVSE (10% of total) I Installed (50% of EVSE) I Other "Ready" I Other "Capable"
I I I
Calculation: Refer to the table below:
Total Number of Parking Spaces provided Number of required EV Spaces Number of required EVSE Installed Spaces
D 0-9 1 1
D 10-25 2 1
D 26-50 4 2
D 51-75 6 3
D 76-100 9 5
D 101-150 12 6
D 151-200 17 9
D 201 andover 1 O percent of total 50 percent of Required EV Spaces
Calculations: Total EVSE spaces= .10 x Total parking spaces proposed (rounded up to nearest whole number) EVSE Installed = Total EVSE
Spaces x .50 (rounded up to nearest whole number) EVSE other may be "Ready'' or "Capable"
Updated 4/16/2021 6
5. D Transportation Demand Management (TDM): Nonresidential ONLY
An approved Transportation Demand Management (TOM) Plan is required for all nonresidential projects that meet a threshold of employee-generated ADT.
City staff will use the table below based on your submitted plans to determinewhetheror noryourpermitrequiresa TOM plan. lfTDM is applicable to your
permit, staff will contact the applicant to develop a site-specific TOM plan based on the permit details.
Acknowledgment:
Employee ADT Estimation for Various Commercial Uses
Use
EmpADTfor
first 1,000 s.f.
EmpADT/
1000 s.f.1
Office (all}2 20
Restaurant 11
Retaib 8
Industrial 4
Manufacturing 4
Warehousing 4
1 Unless otherwise noted, rates estimated from /TE Trip
Generation Manual, 1 ()lhEdition
13
11
4.5
3.5
3
1
2 For all office uses, use SAN DAG rate of 20 ADT/1,000 sf to
calculate employee ADT
3 Retail uses include shopping center, variety store, supermarket,
gyms, pharmacy, etc.
Other commercial uses may be subject to special
consideration
sample calcvlatjons;
Office: 20,450 sf
1. 20,450 sf/ 1000 x 20 = 409 Employee ADT
Retail: 9,334 sf
1. First 1,000 sf= 8 ADT
2. 9,334 sf -1,000 sf= 8,334 sf
3. (8,334 sf/ 1,000 x 4.5) + 8 = 46 Employee ADT
I acknowledge that the plans submitted may be subject to the City of Carlsbad's Transportation Demand Management Ordinance. I agree to be contacted should
my permit require a TOM plan and l 1dL. E>igital\9~\gl{ee~oved TOM plan is a condition of permit issuance.
Nathan A. Dean / /
ApplicantSignature:_____ Date: 2022.07.12 Date: 7 12 2022
--i-5':'57. 06-0 I 00
Person other than Applicant to be contacted for TDM compliance (if applicable):
N (p . t d) Cynthia Cuellar ame nn e : ___________________ _ iSi-427-05'93 Phone Number: ____ --=aa.....
E .!Add CCuellar@sd.absorption.com ma1 ress: ___________________ _
Updated 4/16/2021 7
Building Permit Finaled
Revision Permit
Print Date: 12/06/2023
Job Address: 2820 LOKER AVE E, CARLSBAD, CA 92010-6608
Permit No:
Status:
('cityof
Carlsbad
PREV2023-0074
Closed -Fina led
Permit Type: BLDG-Permit Revision Work Class: Commercial Permit Revision
Parcel #: 2090831500 Track#: Applied: 05/02/2023
Valuation: $0.00 Lot#: Issued: 07/11/2023
Occupancy Group: B/F-1/S-1 Project#: DEV2022-0135 Finaled Close Out: 09/06/2023
#of Dwelling Units: Plan#:
Bedrooms:
Bathrooms:
Occupant Load:
Code Edition: 2019
Sprinkled: Yes
Project Title: ABSORPTION SYSTEMS
Construction Type:11I -B
Orig. Plan Check#: CBC2022-0185
Plan Check#:
Final Inspection:
INSPECTOR:
Description: ABSORPTION SYSTEMS: COM-Tl (63,786 SF) PHASE II-SHELL TO OFFICE/WAREHOUSEREVOME ON-SITE SEWER AND WATER
FROM CIVIL PUBLIC IMPROVEMENTS AND ADDED TO BUILDING PERMIT DRAWINGS, DOOR W HICNGAND PAINT FINISH
UPDATES.
Applicant:
WARE MALCOMB ARCHITECTS
NATHAN DEAN
3911 SORRENTO VALLEY BLVD, # STE 120
SAN DIEGO, CA 92121-1456
(858) 638-7277
FEE
BUILDING PLAN CHECK FEE (manual)
Total Fees: $360.00
Building Division
Property Owner:
TECHBILT INCOME PROPERTIES INC
PO BOX 80036
SAN DIEGO, CA 92138-0036
Total Payments To Date: $360.00
Contractor:
THE WHITING TURNER CONTRACTING CO
3911 SORRENTO VALLEY BLVD, # STE 100
SAN DIEGO, CA 92121-1457
(858) 792-0600
Balance Due:
AMOUNT
$360.00
$0.00
Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
, ••• ( City of
Carlsbad
PLAN CHECK REVISION OR
DEFERRED SUBMITTAL
APPLICATION
B-15
Development Services
Building Division
1635 FaradayAvenue
442-339-2719
www.carlsbadca.gov
Original Plan Check Number PREv2023.001s Plan Revision Number ~ Zo 1-3-00 7'{
Project Address 2820 LOKER AVE. EAST, CARLSBAD, CA 92010
General Scope of Revision/Deferred Submittal: DEL TA 5 -PLAN CHANGE #3, REVISIONS FROM PERMITTED SET.
INCLUDES CITY OF CARLSBAD REQUEST TO REMOVE ON-SITE SEWER AND WATER FROM CIVIL PUBLIC IMPROVEMENTS AND ADDED TO
BUILDING PERMIT DRAWINGS, DOOR SWING UPDATES, AND PAINT FINISH UPDATES'-. _______________ _
CONTACT INFORMATION:
Name NATHAN DEAN -WARE MALCOMB ARCHITECTS Phone 858-5oo-461a Fax,___ __ _
Address 3911 soRRENTO VALLEY BLvD. suITE 120 _______ _ City SAN DIEGO Zip 92121
Email Address NDEAN wAREMALCOMB.coM
Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person.
(~ Elements revised: 121 Plans D Calculations D Soils D Energy D Other
,..,_.
2. 3. cl:'·~ ~ Ii -, Describe revisions in detail List page/s) where each k "'.-
--"'<,r,."t-_ll revision is shown •· ,iJ:.,.
--P, EASE REFER TO REVISIONS SUMMARY ON NEXT SHEET, WITH LINE ITEM PER SHEET. l .
~E CHANGES INCLUDE A CLOUD AND DEL TA INDICATOR ON PLANS. [\' ,"~,:
;.. .
'[ ELTA 5 HAS BEEN INDICATED FOR EACH PERTAINING SHEET.
4. Does this revision, in any way, alter the exterior of the project? D Yes IZ! No
5. Does this revision add ANY new floor area(s)? D Yes b2J No
6. Does this revision affect any fire related issues? D Yes b2J No
7. Is this a complete set? [;a Yes@
£$'Signature C ),,.i '.J). -==--Date 51112023
1635 Faraday Avenue, Carlsbad, CA 92008 Ph: 442-339-2719 Email: building@carlsbadca.gov
www.carlsbadca.gov
May 30,2023
City of Carlsbad
Community Development Department -Building Division
1635 Faraday Ave.
Carlsbad, CA 92008
Plan Review: Commercial Revision
Address: 2820 Loker Ave
Applicant Name: Nathan Dean
Applicant Email: ndean@waremalcomb.com
OCCUPANCY AND BUILDING SUMMARY:
Occupancy Groups: B
Occupant Load: N/ A
Type of Construction: IU-B
Sprinklers: Yes
Stories: 2
Area of Work (sq. ft.): NIA sq. ft.
The plans have been reviewed for coordination with the pern1it application.
Valuation: Confirmed
Scope of Work: Confirmed
Floor Area: Confirmed
Attn: Building & Safety Department,
1rue North
COMPLIANCE SERVICES
City of Carlsbad -FINAL REVIEW
City Permit No: PREV2023-0074
True North No.: 23-018-358
True North Compliance Services, Inc. has completed the final review of the following documents for the project
referenced above on behalf of the City of Carlsbad:
1. Drawings: One (1) copy dated May 23, 2023, by Ware Malcomb.
The 2022 California Building, Mechanical, Plumbing, and Electrical Codes (i.e., 2021 IBC, UMC, UPC, and 2020
NEC, as amended by the State of California), 2022 California Green Building Standards Code, 2022 California
Existing Building Code, and 2022 California Energy Code, as applicable, were used as the basis of our review.
Please note that our review has been completed and we have no further comments, however, we bring the
following to your attention:
1. This project is Hourly. Please charge the applicant the following hours of plan review.
Review No. Hourly Rate Hours
True North Compliance Services, Inc.
15375 Barranca Pkwy, Suite A202, Irvine, CA 92618
T / 562. 733.8030
Total
Building Permit Finaled
Revision Permit
Print Date: 12/06/2023
Job Address: 2820 LOKER AVE E, CARLSBAD, CA 92010-6608
Permit No:
Status:
(cityof
Carlsbad
PREV2023-0018
Closed -Finaled
Permit Type: BLDG-Permit Revision Work Class: Commercial Permit Revision
Parcel#: 2090831500 Track#: Applied: 02/24/2023
Valuation: $0.00 Lot#: Issued: 04/12/2023
Occupancy Group: B/F-1/S-1 Project#: DEV2022-0135 Finaled Close Out: 09/06/2023
#of Dwelling Units: Plan #:
Bedrooms:
Bathrooms:
Occupant Load:
Code Edition: 2019
Sprinkled: Yes
Project Title: ABSORPTION SYSTEMS
Construction Type:I11-B
Orig. Plan Check#: CBC2022-0185
Plan Check #:
Final Inspection:
INSPECTOR:
Description: ABSORPTION SYSTEMS: DELTA 4 PLAN CHANGE TO MECH YARD EXP, ELEC, HVAC
Applicant:
WARE MALCOMB ARCHITECTS
NATHAN DEAN
3911 SORRENTO VALLEY BLVD, # STE 120
SAN DIEGO, CA 92121-1456
(858) 638-7277
FEE
BUILDING PLAN CHECK FEE (manual)
Property Owner:
TECH Bl LT INCOME PROPERTIES INC
PO BOX 80036
SAN DIEGO, CA 92138-0036
FIRE Plan Review {per hr -Regular Office Hours)
Total Fees: $720.00 Total Payments To Date: $720.00
Building Division
Contractor:
THE WHITING TURNER CON.TRACTING CO
3911 SORRENTO VALLEY BLVD, # STE 100
SAN DIEGO, CA 92121-1457
(858) 792-0600
Balance Due:
AMOUNT
$480.00
$240.00
$0.00
Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
{ City of
Carlsbad
PLAN CHECK REVISION OR
DEFERRED SUBMITTAL
APPLICATION
Development Services
Building Division
1635 FaradayAvenue
442-339-2719
www.carlsbadca.gov B-15
,
Original Plan Check Number cBc2022-01as I PRE2022-01s6 Plan Revision Number PR.£)(3)2.o-(X)ff)
Proj ect Address 2820 LOKER AVE. EAST, CARLSBAD, cA 92010
General Scope of Revision/Deferred Submittal: DEL TA 4 -PLAN CHANGE #2, REvIs1ONs FROM PERMITTED SET.
INCLUDE CHANGES MADE DUE TO COORDINATION ITEMS FOR MECHANICAL YARD EXPANSION ELECTRICAL, AND HVAC.
CONTACT INFORMATION:
Name NATHAN DEAN -WAREMALCOMB ARCHITECTS Phone ~85=8~-5~00~-4~6~18~----Fax,._ _________ _
Address 3911 SORRENTO VALLEY BLVD SUITE 120 City SAN DIEGO Zip a2121
Email Address NDEAN@WAREMALCOMB.COM
Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person.
1 . Elements revised: QI Plans D Calculations D Soils D Energy D Other
2.
Describe revisions in detail
PLEASE REFER TO REVISIONS SUMMARY ON NEXT SHEETS, WITH LINE ITEM PER SHEET.
THE CHANGES INCLUDE A CLOUD AND DELTA INDICATOR ON PLANS.
DELTA 4 HAS BEEN INDICATED FOR EACH PERTAINING SHEET.
4.
5.
Does this revision, in any way, alter the exteri or of the project?
Does this revision add ANY new floor area(s)?
6. Does this revision affect an fire related issu es?
7 . 0 No
D Yes
D Yes
(.,\
\:,
D Yes
~ No
~ No
Date
3.
List page/s) where each
revision is shown
[21 No
02/22/2023
1635 Faraday Avenue. Carlsbad, CA 92008 Ph: 442-339-27 19 Email: building@carlsbadca.gov
www.carlsbadca.gov
J>f~INS IN
IJ1l(;J{ True North
COMPLIANCE SERVICES
March 22, 2023
City of Carlsbad
Community Development Department -Building Division
1635 Faraday Ave.
City of Carlsbad -FINAL REVIEW
City Penn it No: PREV2023-0018
True North No.: 23-018-151
Carlsbad, CA 92008
Plan Review: Commercial Revision
Address: 2820 Loker Ave
Applicant Name: Nathan Dean
Applicant Email: ndean@waremalcomb.vom
OCCUPANCY AND BUILDING SUMMARY:
Occupancy Groups: B, F-1 , S-2
Occupant Load: NI A
Type of Construction: ITI-B
Sprinklers: Yes
Stories: 2
Area of Work (sq. ft.): NIA sq. ft.
The plans have been reviewed for coordination with the permit application.
Valuation: See Notes Below
Scope of Work: Confirmed
Floor Area: See Notes Below 3 1 ' l'.3
Notes: Revision, No valuation or floor area.
Attn: Building & Safety Department,
True North Compliance Services, inc. has completed the final review of the following documents for the project
referenced above on behalfofthe City of Carlsbad:
1. Drawings: One (1) copy dated February I 0, 2023, by Ware Malcomb.
2. Structural Calculations: One (1) copy dated March 7, 2023, by Wiseman+ Rohy.
3. Drawings: One (l) copy d&ioo March 16, 2023, by Ware Malcomb.
The 2022 California Building, Mechanical, Plumbing, and Electrical Codes (i.e., 2021 IBC, UMC, UPC, and 2020
NEC, as amended by the State of California), 2022 California Green Building Standards Code, 2022 California
Existing Building Code, and 2022 California Eviergy Code, as applicable, were used as the basis of our review.
Please note that our review bas been completed and we have no further comments, however, we bring the
following to your attention:
1. This project is Hourly. Please charge the applicant the following hours of plan review.
/Tr-..e North Compliance Services, Inc.
15.JJs Barranca Pkwy, Suite A202, Irvine, CA 92618
TI 562.733.8030
I
Transmittal Letter
March 6, 2023
City of Carlsbad
Community Development Department -Building Division
1635 Faraday Ave.
Carlsbad, CA 92008
Plan Review: Commercial Revision
Address: 2820 Loker Ave, Carlsbad CA
Applicant Name: Nathan Dean Applicant Email: ndean@waremalcomb.com
True North
'?.r COMPLIANCE SERVICES
FIRST REVIEW
City Permit No: PREV2023-00 l 8
True North No.: 23-01 8-15 l
True North Compliance Services, Inc. has completed the review of the fo llowing documents for the project
referenced above on behalf of the City of Carlsbad. Our comments can be found on the attached list.
1. Drawings: Electronic copy dated February I 0, 2023, by Ware Malcomb.
Attn: Permit Technician, the scope of work on the plans has been reviewed for coordination w ith the scope of
work on the pennit application. See below for information if the scope of work on plans differs from the permit
application:
Valuation:
Scope of Work:
Floor Area:
See Notes Below
Confirmed
See Notes Below
Notes: Revision, no valuation or floor area.
This project is hourly. Please charge the applicant the following hours of plan review.
Review# Hours Rate Total
I SI 2.5 $120.00 $300
Our comments follow on the attached list. Please call if you have any questions or if we can be of further
assistance.
Sincerely,
True North Compliance Services
Review By: Alaa Atassi -Plan Review Engineer
True North Compliance Services, Inc.
3939 Atlantic Avenue Suite 224, Long Beach, CA 90807
T / 562.733.8030
Building Permit Finaled
Revision Permit
Print Date: 12/06/2023
Job Address: 2820 LOKER AVE E, CARLSBAD, CA 92010-6608
Permit No:
Status:
Ccityof
Carlsbad
PREV2023-005 7
Closed -Finaled
Permit Type: BLDG-Permit Revision Work Class: Commercial Permit Revision
Parcel#: 2090831500 Track#:
Valuation: $0.00 Lot#:
Applied: 04/10/2023
Issued: 05/01/2023
Occupancy Group: B/F-1/5-1 Project#:
#of Dwelling Units: Plan#:
DEV2022-0135 Fina led Close Out: 09/06/2023
Bedrooms:
Bathrooms:
Occupant Load:
Code Edition: 2019
Sprinkled: Yes
Project Title: ABSORPTION SYSTEMS
Construction Type: 11I-B
Orig. Plan Check#:
Plan Check #:
Final Inspection:
INSPECTOR:
Description: DEFERRED SUBMITTAL: SIESMIC ANCHORING SUBMITTAL FOR ELECTRICAL EQUIPMENT
Applicant:
WARE MALCOMB ARCHITECTS
NATHAN DEAN
3911 SORRENTO VALLEY BLVD, # STE 120
SAN DIEGO, CA 92121-1456
(858) 638-7277
FEE
BUILDING PLAN CHECK FEE (manual)
Total Fees: $360.00
Building Division
Property Owner:
TECHBILT INCOME PROPERTIES INC
PO BOX 80036
SAN DIEGO, CA 92138-0036
Total Payments To Date: $360.00
Contractor:
THE WHITING TURNER CONTRACTING CO
3911 SORRENTO VALLEY BLVD, # STE 100
SAN DIEGO, CA 92121-1457
(858) 792-0600
Balance Due:
AMOUNT
$360.00
$0.00
Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
, .
1r·ue Nortl1
COMPLIA NCE SE RV ICES
April 12, 2023
City of Carlsbad
Community Development Department -Building Division
1635 Faraday Ave.
City of Carlsbad -FINAL REVIEW
City Permit No: PREV2023-0057
True North No.: 23-018-276
Carlsbad, CA 92008
Plan Review: Commercial Revision
Address: 2820 Loker Ave
Applicant Name: Karen Marin
Applicant Email: karen@rowanelectric.com
OCCUPANCY AND BUILDING SUMMARY:
Occupancy Groups: N/ A
Occupant Load: NIA
Type of Construction: NI A
Sprinklers: NI A
Stories: NI A
Area of Work (sq. ft.): NI A sq. ft.
The plans have been reviewed for coordination with the pem1it application.
Valuation: See Notes Below
Scope of Work: Confirmed
Floor Area: See Notes Below
Notes: Revision, no floor area or valuation.
Attn: Building & Safety Department,
True North Compliance Services, Inc. has completed the final review of the following documents for the project
referenced above on behalf of the City of Carlsbad:
1. Drawings: One (1) copy dated July 7, 2022, by Ware Malcomb.
2. Absorption Submittal: One (1) copy dated April 6, 2023, by Rowan Electric.
The 2022 California Building, Mechanical, Plumbing, and Electrical Codes (i.e., 2021 IBC, UMC, UPC, and 2020
NEC, as amended by the State of California), 2022 California Green Building Standards Code, 2022 California
Existing Building Code, and 2022 California Energy Code, as applicable, were used as the basis of our review.
Please note that our review has been completed and we have no further comments, however, we bring the
following to your attention:
1. This project is Hourly. Please charge the applicant the following hours of plan review.
True North Compliance Services, Inc.
15375 Barranca Pkwy, Suite A202, Irvine, CA 92618
T / 562.733.8030
{ City of
Carlsbad
PLAN CHECK REVISION OR
DEFERRED SUBMITTAL
APPLICATION
B-15
Development Services
Building Division
1635 FaradayAvenue
442-339-2719
www .ca rlsbadca .gov
Original Plan Check Number C ~ 1,,1Jl, 7,--0 l ~ Plan Revision Number l> re',J Z.02.~ -C>O'S 7
Project Address i e;i-v l,,o/u { ~ he✓. fo._~+-, Du V 16 ~ ~ a CJ i-JJ ID
General Scope of Revision/Deferred Submittal: 5e:-i~rY1 ·, v Ariciio v CJ.4tv ~ bmi 1-W
J;lzi V IZdech'.1 ( a.,Q_, 12--~ pi,w;v-I--
Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person.
1. Elements revised: D Plans @Calculations D Soils D Energy D Other
2. 3.
Describe revisions in detail List page/s) where each
revision is shown
si;~Mi V Anihov~ iJl~ls (). yJ rtt1~AA.IcJ-(1;V1S Sl.3 ,SI•"· V -I
t-2.,oo
,
f?l..\ol
4. Does this revision, in any way, alter the exterior of the project? D Yes g'No
5. Does this revision add ANY new floor area(s)? D Yes ~o
6. Does this revision affect any fire related issues? D Yes 0 No
7.
1635 Far ay Avenue, Carlsbad, CA 92008 Ph: 442-339-2719 Email: building@carlsbadca.gov
www.carlsbadca.gov
Building Permit Finaled
Revision Permit
Print Date: 10/23/2024
Job Address: 2820 LOKER AVE E, CARLSBAD, CA 92010-6608
Permit No:
Status:
{city of
Carlsbad
PREV2022-0156
Closed -Finaled
Permit Type: BLDG-Permit Revision Work Class: Commercial Permit Revision
Parcel#: 2090831500 Track#: Applied: 12/21/2022
Valuation: $0.00 Lot#: Issued: 02/14/2023
Occupancy Group: B/F-1/S-1 Project#: DEV2022-0135 Finaled Close Out: 09/06/2023
#of Dwelling Units: Plan#:
Bedrooms:
Bathrooms:
Occupant Load:
Code Edition: 2019
Sprinkled: Yes
Project Title: ABSORPTION SYSTEMS
Construction Type:III-B
Orig. Plan Check #: CBC2022-0185
Plan Check#:
Final Inspection:
INSPECTOR:
Description: ABSORPTION SYSTEMS: DELTA 2 & 3 REVISIONS; WALL LAYOUTS, ELECTRICAL, HVAC AND ROOF TOP UNITS.
Applicant: Property Owner:
WARE MALCOMB ARCHITECTS
NATHAN DEAN
TECH Bl LT INCOME PROPERTIES INC
PO BOX 80036
3911 SORRENTO VALLEY BLVD, # STE 120
SAN DIEGO, CA 92121-1456
(858) 638-7277
FEE
BUILDING PLAN CHECK FEE (manual)
SAN DIEGO, CA 92138-0036
(619) 223-1663
BUILDING PLAN CHECK REVISION ADMIN FEE
FIRE Haz Mat Storage Chem Class 26-100 Chems
FIRE Plan Review (per hr -Regular Office Hours)
Total Fees: $2,692.00 Total Payments To Date:
Building Division
$2,692.00
Contractor:
THE WHITING TURNER CONTRACTING CO
3911 SORRENTO VALLEY BLVD, # STE 100
SAN DIEGO, CA 92121-1457
(858) 792-0600
Balance Due:
AMOUNT
$960.00
$35.00
$1,297.00
$400.00
$0.00
Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
{'cityof
Carlsbad
PLAN CHECK REVISION OR
DEFERRED SUBMITTAL
APPLICATION
B-15
Development Services
Building Division
1635 FaradayAvenue
442-339-2719
www.carlsbadca.gov
Original Plan Check Number _c_Bc_2_0_22_-0_18_5 ____ _ Plan Revision Number Y e 8J"20-Z.,2.,-()/ sf.o
Project Address 2820 LOKER AVE. EAST CARLSBAD CA 92010
General Scope of Revision/Deferred Submittal: DEL TA 2 & 3 REVISIONS FROM PERMITTED SET FOR PHASE 2
INCLUDES CHANGES MADE DUE TO COORDINATION ITEMS FOR WALL LAYOUTS, ELECTRICAL, HVAC, AND ROOF TOP UNITS.
CONTACT INFORMATION:
Name NATHAN DEAN -WAREMALCOMB ARCHITECTS Phone -"8=58:....:·5=0.::..0-4..:.:6::....:1.::..8 ____ _ Fa,,_ _________ _
Address 3911 SORRENTO VALLEY BLVD, SUITE 120 City SAN DIEGO Zip 92121
Email Address NDEAN@WAREMALCOMB.COM
Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person.
1 . Elements revised: !;zl Plans !;zl Calculations D Soils D Energy D Other
2. 3.
Describe revisions in detail List page/sJ where each
revision is shown
PLEASE REFER TO THE REVISIONS SUMMARY ON NEXT SHEETS, WITH LINE ITEM PER SHEET.
THE CHANGES INCLUDE A CLOUD AND DEL TA INDICATOR ON PLANS.
DELTAS 2 & 3 HAVE BEEN INDICATED FOR EACH PERTAINING SHEET.
SUPPLEMENTAL STRUCTURAL CALCULATIONS.
UPDATED HAZMAT REPORT FOR FIRE DEPARTMENT RECORDS.
4.
5.
6.
Does this revision, in any way, alter the exterior of the project?
Does this revision add ANY new floor area{s)? D Yes
Does this revision affect any fire related issues? D Yes
7. Is this a complete set? i;:z] Yes D No
,6Signature ~
D Yes
i;zj No
~ No
Date 1211912022
0 No
1635 Faraday Avenue, Carlsbad, CA 92008 Ph: 442-339-27 19 Email: building@carlsbadca.gov
www.cartsbadca.gov
1):ue Nortl1
COMPLIA NCE SERV ICES
January 10, 2023
City of Carlsbad
Community Development Department -Building Division
1635 Faraday Ave.
City of Carlsbad -FINAL REVIEW
City Permit No: PREV2022-0156
True North No.: 22-018-544
Carlsbad, CA 92008
Plan Review: Revision
Address: 2820 Loker Ave East, Carlsbad, CA
Applicant Name: Nathan Dean
Applicant Email: ndean@waremalcomb.com
OCCUPANCY AND BUILDING SUMMARY:
Occupancy Groups: B,F-1 , S-1
Occupant Load: 483
Type of Construction: m-B
Sprinklers: Yes
Stories: 2
Area of Work (sq. ft.): 63,832 sq. ft.
The plans have been reviewed for coordination with the permit application.
Valuation: Confirmed
Scope of Work: Confirmed
Floor Area: Confirmed
Attn: Building & Safety Department,
True North Compliance Services, Inc. has completed the final review of the following documents for the project
referenced above on behalf of the City of Carlsbad:
I.
2.
Drawings: One (1) copy dated December 7, 2022, by Ware Malcomb.
Structural Calculations: One (1) copy dated December 8, 2022, by Wiseman & Rohy.
The 2019 California Building, Mechanical, Plumbing, and Electrical Codes (i.e., 2018 fBC, UMC, UPC, and 2017
NEC, as amended by the State of California), 2019 California Green Building Standards Code, 2019 California
Existing Building Code, and 2019 California Energy Code, as applicable, were used as the basis of our review.
Please note that our review has been completed and we have no further comments, however, we bring the
following to your attention:
l. This project is Hourly. Please charge the applicant the following hours of plan review.
True North Compliance Services, Inc.
3939 Atlantic Avenue Suite 116, Long Beach, CA 90807
T / 562.733.8030