Loading...
HomeMy WebLinkAbout2024-10-16; Planning Commission; ; Grand Hope Medical Office BuildingMeeting Date: Oct. 16, 2024 1 To: Planning Commission Staff Contact: Lauren Yzaguirre, Associate Planner; 442-339-2634, Lauren.Yzaguirre@carlsbadca.gov Subject: Grand Hope Medical Office Building Location: 2879 Hope Avenue, Carlsbad CA 92008/ 203-202-13-00/District 1 Case Numbers: SDP2023-0025 (DEV2023-0122) Applicant/Representative: Kirk Moeller, 760-814-8128, kirk@kmarchitectsinc.com CEQA Determination: ☐Not a Project ☒ Exempt ☐ IS/ND or IS/MND ☐ EIR ☐Other: Permit Type(s): ☒SDP ☐ CUP ☐ CDP ☐ TM/TPM ☐ GPA ☐ REZ ☐ LCPA ☐Other: CEQA Status: ☐The environmental assessment IS on the Agenda for discussion ☒A CEQA determination was already issued. That decision is final and IS NOT on the Agenda Commission Action: ☐Decision ☒ Recommendation to City Council ☐ Informational (No Action) Recommended Actions That the Planning Commission ADOPT Planning Commission Resolution (Exhibit 1), RECOMMENDING APPROVAL of Site Development Plan (SDP) 2023-0025 based upon the findings and subject to the conditions contained therein. Existing Conditions & Project Description Existing Setting The subject site is a 0.16-acre (7,000-square-foot) lot, located at 2879 Hope Avenue, at the northwest corner of Hope Avenue and Grand Avenue. The lot contains an existing 1,456-square-foot, one-story medical office building and 10-space parking lot. The parcel is generally flat and mostly hardscaped with perimeter landscaping. The lot contains an existing driveway connecting the parking lot to Hope Avenue. The site is surrounded by multi-family uses to the north, south and west and single family uses to the east. Site Map Oct. 16, 2024 Item #1 1 of 85 COMM I SS I ON PLANN ING Staff Report 0 Table “A” below includes the General Plan designations, zoning and current land uses of the subject site and surrounding properties. Also refer to Exhibit 2 for larger site map. TABLE A – SITE AND SURROUNDING LAND USE Location General Plan Designation Zoning Designation Current Land Use Site Village/Barrio (V-B) Village/Barrio (V-B) – Village Center (VC) per the VBMP Medical Office North R-15, Residential (8-15 du/ac) Multiple-Family Residential Zone (R-3) Multi-Family Residential South Village/Barrio (V-B) Village/Barrio (V-B) – Village Center (VC) per the VBMP Multi-Family Residential East R-15, Residential (8-15 du/ac) Residential Density-Multiple Zone (RD-M) Single Family Residential West Village/Barrio (V-B) Village/Barrio (V-B) – Village Center (VC) per the VBMP Multi-Family Residential (Condominiums) General Plan Designation Zoning Designation Proposed Project The applicant proposes to demolish the existing 1,456-square-foot medical office building and construct a new medical office building. The modifications are as follows: •Proposed Medical Office Building A 10,671-square-foot, two story, 34-foot-tall, three-unit, medical office building will be constructed. The medical office building will contain three tenant spaces including a 2,051-square foot ground floor unit (unit 1) and a 2,0730-sqaure foot and 2,084-square-foot second floor unit (units 2 and 3 respectively). Units 2 and 3 will have private balconies. A 395-square-foot common egress balcony is proposed on the second floor fronting Hope Avenue. The ground floor will include an attached, one- story, 2,803 square-foot enclosed parking garage with a trash and recycle area and utility room. The parking garage will contain four parking spaces and two lift spaces (two parking spaces per lift) for a total of eight spaces, one of which will be an American with Disabilities Act (ADA) compliant space. All 8 spaces will be electric vehicle (EV) installed. The project also includes 441 square feet of stairs and 494 square feet of common lobby area on the ground floor as well as 284 square feet of common lobby area and 441 square feet of stairs on the second floor. The architectural design is characterized as Modern and includes building materials such as white and gray stucco, gray porcelain tile, concrete Oct. 16, 2024 Item #1 2 of 85 blocks, clear glazed storefronts and decorative metal accents. The project also includes revised perimeter landscaping. •Grading & Improvements Grading for the proposed improvements and uses consist of 55 cubic yards of cut, 20 cubic yards of fill, 35 cubic yards of export and 700 cubic yards of remedial grading. The project also proposes construction of a new 15-foot-wide parkway along Grand Avenue with a 10-foot-wide sidewalk and 5- foot-wide landscaped area with street trees. On Hope Avenue, the project will replace the existing 5- foot-wide sidewalk, curb and gutter along the project frontage to accommodate the new driveway approach. New perimeter landscaping is proposed. Project plans are attached to the staff report (Exhibit 8). The improvements and uses described above are hereinafter referred to as “Project.” Public Outreach & Comment The Developer has completed the Early Public Notice procedures pursuant to City Council Policy No. 84 (Development Project Public Involvement Policy). A notice of project application was mailed on Oct. 6, 2023 to all owners of property located within a 600-foot radius of the project site. A two-foot-tall by three-foot-wide yellow sign was also posted at the project site on Oct. 3, 2023, notifying all pass-by traffic of the project, which provides project name, application numbers, description, as well as both Developer and city staff contact information. A total of 131 property owners were notified through the notice of project application. A total of four comments were received as a result of the early public notice. Comments received listed concerns regarding traffic, noise, parking and building height. Additional concerns allege that the current property was abandoned and had become a location for illegal dumping and loitering. All public comments have all been provided as an attachment to the staff report (Exhibit 5). Response to Public Comment & Project Issues Concerns raised during the early public notice included foot and vehicle traffic, noise, parking, building height and parking, and illegal dumping/loitering. •Traffic: The medical office project is estimated to generate 394 average daily trips (ADT) which is an increase of 321 ADT from the estimated trips based on the existing medical office use. The vehicle level of service (LOS) on Grand Avenue and Hope Avenue will not be significantly impacted by the increase in ADT. Pedestrian LOS was evaluated and was found to be adequate. •Noise: Birdseye Planning Group conducted a noise study (January 2024) for the proposed project. The study found that noise levels associated with the proposed HVAC system proposed on the office building’s roof will not exceed 47 dBA at the north end and 51 dBA at the southern end of the proposed building. Noise levels would be less than the 60 dBA residential limit at all surrounding residential units and inaudible over ambient noise at the east facing first and second floor units. The report also concluded that long term traffic operation associated with the project would have no adverse effect on noise levels at sensitive properties within proximity to the site, including the surrounding residential uses. •Parking: Pursuant to Assembly Bill 2097 (AB 2097), the city is prohibited from requiring parking for projects located within one-half mile of a major transit. Irrespective of proximity to public transit, state law allows the city to continue to apply minimum parking standards for electric vehicle (EV) charging stations as well as required parking spaces accessible to persons with disabilities (ADA). The parking requirement is based on the total number of actual parking spaces that would have otherwise applied to the development if the state code section did not exist. The project is located approximately 0.4 Oct. 16, 2024 Item #1 3 of 85 miles from the Carlsbad Village Train Station and therefore no standard parking spaces are required for the development of the medical office building. The total number of actual parking spaces that would have otherwise applied to the project is 23 spaces, and therefore a total of 1 ADA space, 1 EV installed space, and 3 EV capable spaces are required. The project proposed to provide a total of eight spaces (1 EV installed ADA, 7 EV installed standard spaces), which exceed minimum parking space requirements. • Building Height: The Village & Barrio Master Plan allows for four stories and 45 feet in the Village Center (VC) District. The project is proposed at 34-feet and two stories which is under the maximum allowed. • Illegal Dumping/Loitering: After receiving comments about illegal dumping and loitering, the owner promptly addressed the issue by cleaning up the site. Additionally, the owner informed staff of their plans to install temporary fencing to help prevent further incidents. Project Analysis General Plan Consistency The City of Carlsbad General Plan includes several goals and policies that guide development and land use within the city. A discussion of how the project is consistent with the applicable General Plan policies is summarized in Exhibit 3. Village and Barrio Master Plan and Municipal Code Consistency The Village & Barrio Master Plan as well as certain requirements and provisions in Title 21 of the Municipal Code (Zoning Ordinance) guide development and land use within the city, consistent with the General Plan. Specific compliance with these relevant requirements is described in Exhibit 3 and 4. Discretionary Actions & Findings The proposed project requires the approval of a Site Development Plan, which is discussed below. Site Development Plan (SDP 2025-0025) Pursuant to Section 6.3.3 of the Village & Barrio Master Plan, approval of a Site Development Plan is required for the construction of buildings over 5,000 square feet or projects with more than four dwelling units. Staff finds that the required findings for this application can be met (Exhibit 3). Environmental Review In accordance with the California Environmental Quality Act (CEQA) and CEQA Guidelines, the City Planner has determined that the project qualified for an exemption pursuant to CEQA Guidelines Section 15332, In-fill Development Projects. On Aug. 1, 2024, a notice of intended decision regarding the environmental determination was advertised and posted on the city’s website. No comment letters or appeals were received and consistent with Chapter 21.54 (Procedures, Hearings, Notices, and Fees) of the Zoning Ordinance the City Planner’s written decision is final. Refer to Exhibit 7 for reference. Conclusion Considering the information above and in the referenced attachments, staff has found that the proposed Project is consistent with all applicable policies of the General Plan, Village and Barrio Master Plan, and the provisions of the Municipal Code and Local Facility Management Zone 1. All required public improvement and utilities are available to serve the proposed development. In addition, there are no environmental issues associated with the Project. The Project is conditioned to ensure the proposed Project’s compatibility with the surrounding properties and that the public health, safety, and welfare of the community are maintained. The Project would be required to comply with all applicable California Building Standards Codes and engineering standards through the standard building permit and civil improvement plan checking process. Staff recommends the Planning Commission adopt the resolutions, recommending approval of the proposed Project described in this staff report. Oct. 16, 2024 Item #1 4 of 85 Exhibits 1. Planning Commission Resolution 2. Location Map 3. Project Analysis 4. Village and Barrio Master Plan Design Guidelines 5. Public Comments 6. Disclosure Form 7. CEQA Determination of Exemption 8. Reduced Project Exhibits 9. Full Size Project Exhibits “A” – “R” dated Oct. 16, 2024 (on file in the Planning Division). 10. List of Acronyms and Abbreviations Oct. 16, 2024 Item #1 5 of 85 PLANNING COMMISSION RESOLUTION NO. 7522 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA, RECOMMENDING APPROVAL OF SITE DEVELOPMENT PLAN, SDP 2023-0025, TO DEMOLISH AN EXISTING MEDICAL OFFICE BUILDING AND CONSTRUCT A 10,671-SQUARE-FOOT, TWO STORY, 34-FOOT-TALL, 3- TENANT MEDICAL OFFICE BUILDING WITH PRIVATE BALCONIES, A 395- SQUARE-FOOT COMMON EGRESS BALCONY ON THE SECOND FLOOR AND A ONE-STORY, 2,803-SQUARE-FOOT ENCLOSED PARKING GARAGE CONSISTING OF FOUR PARKING SPACES AND TWO LIFT SPACES (TWO PARKING SPACES PER LIFT) FOR A TOTAL OF 8 SPACES ON A 0.16-ACRE PROPERTY LOCATED AT 2879 HOPE AVENUE IN THE NORTHWEST QUADRANT OF THE CITY, THE VILLAGE & BARRIO MASTER PLAN, AND LOCAL FACILITIES MANAGEMENT ZONE 1. CASE NAME: GRAND HOPE MEDICAL OFFICE BUILDING CASE NO.: SDP 2023-0025 (DEV2023-0122) WHEREAS, Kirk Moeller, 11Developer," has filed a verified application with the City of Carlsbad regarding property owned by William Cho, "Owner," described as LOT 26 OF SCHELL AND SITES ADDITION TO CARLSBAD, IN THE CITY OF CARLSBAD, COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO MAP THEREOF NO. 2145, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY ON FEBRUARY 20, 1929. (11the Property"); and WHEREAS, said verified application constitutes a request for a Site Development Plan as shown on Exhibit(s) "A" -"R" dated Oct. 16, 2024, on file in the Planning Division, SDP 2023-0025 (DEV2023-0122)-GRAND HOPE MEDICAL OFFICE BUILDING as provided by Chapters 21.06 and 21.35 of the Carlsbad Municipal Code and the Village & Barrio Master Plan; and WHEREAS, the Planning Division studied the Site Development Plan application and performed the necessary investigations to determine if the project qualified for an exemption from further environmental review pursuant to the California Environmental Quality Act, (CEQA, Public Resources Code section 21000 et. seq.), and its implementing regulations (the State CEQA Guidelines), Article 14 of the California Code of Regulations section 15000 et. seq. After consideration of all evidence presented, and studies and investigations made by the City Planner and on its behalf, the City Planner determined that the project was exempt from further environmental review pursuant to State CEQA Exhibit 1 Oct. 16, 2024 Item #16 of 85 "., I Oct. 16, 2024 Item #1 7 of 85 Guidelines section 15332 -In-fill Development Projects. CEQA Guidelines Section 15332 is a Class 32 exemption for projects under five acres, located within urbanized areas, and consistent with the General Plan and zoning regulations for the site. The project will not have a significant effect on the environment and all of the requirements of CEQA have been met; and WHEREAS, on Aug. 1, 2024, the city distributed a notice of intended decision to adopt the "In-fill Development Projects" exemption. The notice was posted for a 10-day period, which began on Aug. 1, 2024 and ended on Aug. 10, 2024. The city did not receive any comment letters or an appeal on the CEQA findings and determination. The effective date and order of the City Planner CEQA determination was Aug. 10, 2024. WHEREAS, the Planning Commission did, on Oct. 16, 2024, hold a duly noticed public hearing as prescribed by law to consider said request relative to the Site Development Plan land use application; and WHEREAS, at said public hearing, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, said Commission considered all factors relating to the Site Development Plan. NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning Commission of the City of Carlsbad as follows: A) B) Findings: That the foregoing recitations are true and correct. That based on the evidence presented at the public hearing, the Planning Commission RECOMMENDS APPROVAL OF SDP 2023-0025 (DEV2023-0122) -GRAND HOPE MEDICAL OFFICE BUILDING, based on the following findings and subject to the following conditions: Site Development Plan, SDP 2023-0025 1. That the proposed development or use is consistent with the General Plan and any applicable master plan or specific plan, complies with all applicable provisions of Chapter 21.06 of the Carlsbad Municipal Code, and all other applicable provisions of this code, in that the project proposes the demolition of an existing 1,456-square-foot medical office building, and in its place Oct. 16, 2024 Item #1 8 of 85 the construction of a new 10,671-square-foot, two story, 34-foot-tall, 3-tenant medical office building with private balconies, a 395-square-foot common egress balcony on the second floor fronting Hope Avenue and a one-story, 2,803 square-foot enclosed parking garage consisting of four parking spaces and two lift spaces (two parking spaces per lift) for a total of 8 spaces, all on a 0.16-acre infill site located at 2879 Hope Avenue, within the Village Center (VC) District of the Village & Barrio Master Plan. Medical office uses are permitted by right within the VC District. The project is consistent with the various elements and objectives of the Village (V) General Plan Land Use designation and the Village & Barrio Master Plan as discussed in the findings below and in the project staff report dated Oct. 16, 2024, incorporated by reference, with the exception of Village and Barrio Master Plan section 2.7.1.H, Building Massing. A Standards Modification has been requested to allow a deviation from the building massing requirement for the purpose of providing a significant public benefit. Staff has reviewed the standards modification and concurs with the request. The Standards Modification request is discussed in greater detail in findings 7 through 9 below. 2. That the requested development or use is properly related to the site, surroundings and environmental settings, will not be detrimental to existing development or uses or to development or uses specifically permitted in the area in which the proposed development or use is to be located, and will not adversely impact the site, surroundings or traffic circulation, in that the proposed medical office building is located within the Village Center (VC) District of the Village & Barrio Master Plan. The project will not be detrimental to existing uses or to uses specifically permitted in the area in which the use is located in that medical office uses are permitted by right in the VC District. The properties surrounding the Site to the south and west are designated for VC uses under the VBMP. The properties located to the north along Hope Avenue are designated as Multiple-Family Residential Zone (R-3). The properties to the east of the Site, across Hope Avenue, are designated as Residential Density-Multiple (RD-M) Zone. The project Site is immediately surrounded by residential uses on all four sides, including a four- story condominium to the west, two two-story multi-family apartment buildings to the north along Hope Avenue and south across Grand Avenue and a one-story, single-family, residential buildings to the east across Hope Avenue. However, the greater surrounding neighborhood provides a mixture of commercial and residential uses, including a hotel east of the site along Grand Avenue, a shopping center south of the site between Grand Avenue and Carlsbad Village Drive and an office building south of the site across Grand Avenue between Harding Street and Jefferson Street and north of Carlsbad Village Drive. The medical office project is estimated to generate 394 average daily trips (ADT) which is an increase of 321 average daily trips from the existing medical office use. However, the project is located in Traffic Analysis Zone (TAZ) 809 per the City's VMT Guidelines, which has an existing VMT per employee of 17.1 miles. The regional employee average for this TAZ is 20.6 miles per employee, which is 83.3 percent of the regional mean. As a result, the project does not have a significant transportation VMT impact. In addition, the vehicle level of service (LOS) on Grand Avenue and Hope Avenue will not be significantly impacted by the increase in ADT. Pedestrian LOS was evaluated and was found to be adequate. Pursuant to Assembly Bill 2097 (AB 2097), the city is prohibited from requiring parking for projects located within one-half mile of a major transit stop. The project is located approximately 0.4 miles from the Carlsbad Village Train Station, and therefore parking is not required for the proposed medical office building. However, the project proposes to provide a total of eight spaces. 3. That the site for the intended development or use is adequate in size and shape to accommodate the use, in that the project consists of the demolition of an existing 1,456-square-foot medical Oct. 16, 2024 Item #1 9 of 85 office building, and in its place the construction of a new 10,671-square-foot, two story, 34- foot-tall, 3-tenant medical office building with private balconies, a 395-square-foot common egress balcony fronting Hope Avenue and a one-story, 2,803-square-foot enclosed parking garage consisting of four parking spaces and two lift spaces (two parking spaces per lift) for a total of 8 spaces, all on a 0.16-acre infill site located at 2879 Hope Avenue, within the Village Center (VC) District of the Village & Barrio Master Plan. Medical office uses are permitted by right within the VC District. The Village Center District does not have maximum lot coverage requirements; however, the project will meet the setback and height standards of the Village Center District. 4. That all yards, setbacks, walls, fences, landscaping, and other features necessary to adjust the requested development or use to existing or permitted future development or use in the neighborhood will be provided and maintained, in that the project complies with all applicable development standards (i.e. setbacks, lot coverage, parking and height restrictions) of the Village Center District and the Village & Barrio Master Plan with the proposed standards modification. The architecture of the building is compatible with the surrounding residential and commercial development. Landscaping along the street frontages will be provided consistent with the requirements of the city's Landscape Manual and the Village & Barrio Master Plan. 5. That the street systems serving the proposed development or use is adequate to properly handle all traffic generated by the proposed use, in that the proposed project is considered a corner lot as it has two primary street frontages, Hope Avenue to the east, and Grand Avenue to the south. The Grand Avenue segment between Jefferson Street and Hope Avenue has a Village Street typology. The Hope Avenue segment between Grand Avenue and Home Avenue has a Local/Neighborhood Street typology. The project is estimated to generate 394 daily trips, which is a net increase of 321 trips as the existing medical office building is estimated to generate 73 trips. The vehicle level of service (LOS) on Grand Avenue and Hope Avenue will not be significantly impacted by the increase in ADT. The project site is also located within 0.4 miles of the Carlsbad Village major transit station which provides bus, train, and Coaster service on a daily basis. In addition, the Developer will be required to pay traffic impact fees in accordance with Carlsbad Municipal Code Section 18.42 prior to issuance of building permits that will go towards future road improvements. 6. That the proposed development or use meets all other specific additional findings as required by Title 21, in that there are no other specific additional Title 21 findings that apply to the project. Village and Barrio Master Plan, Standards Modification, Building Massing 7. That the applicant has provided acceptable evidence to demonstrate the need for the standards modification and there is no other way to reasonably achieve one or more of the purposes outlined in Section 2.6. 7 .B without the modification in that the project is requesting a standards modification from Village Center District building massing standard, Section 2.7.1.H, which states no building fa!;ade visible from any public street (excluding alleys) shall extend more than 40 feet in length without a 5-foot minimum variation in the wall plane, as well as, a change in roofline. The parking garage building fa!;ade extends 66 feet in length along Hope Avenue with only a 2-foot wall plane variation. By allowing a modification to this standard, the project is able to provide a parking garage containing 8 spaces (4 EV installed spaces, 1 ADA space and 3 regular spaces). The project is only required to provide a total of 5 parking spaces (1 EV installed, 3 EV Oct. 16, 2024 Item #1 10 of 85 capable and 1 ADA space). The project exceeds the EV requirements of the Carlsbad Climate Action Plan by providing fully installed spaces as opposed to capable spaces. In addition, the project provides 3 extra parking spaces above the required minimum of 5 total spaces which provides an added public benefit of providing increased parking above the state required minimum. Parking in this neighborhood is tightly constrained and the provision of a variety of parking options -EV, ADA and standard -will alleviate the demand for on-street parking. Diversity of parking is found to be in the public interest for this project and this neighborhood. Without the standards modification there would be no reasonable way to provide the increase in on-site parking proposed as project conformance with this standard would result in a loss of spaces. Providing as much parking as possible on site for patients and employees of the building provides a significant public benefit by reducing street parking. The project has been conditioned to provide EV parking and ADA parking in compliance with the California Building Standards Code and Green Building Standards Code as an additional ADA space may be required prior to building permit issuance. Reconfiguring the parking to provide for an additional ADA space may result in the loss of two parking spaces; however, in this scenario the remaining parking spaces would still constitute a public benefit as it exceeds the minimum number of required spaces. 8. That the standards modification is consistent with the goals and objectives of the Master Plan and the vision and intent of the applicable district in that the proposed project provides a continuous and interesting commercial frontage along Grand Avenue consistent with VBMP placemaking goal of creating great streets and placemaking policy of implementing the Grand Avenue Promenade with continuous commercial street frontage along Grand Avenue by providing parking garage access from Hope Avenue instead of Grand Avenue. In addition, that standards modification allows for enclosure of parking, trash and recycle areas effectively shielding these areas from public view and further promoting the placemaking goal of creating great streets. 9. That the decision-making authority has determined the project provides a significant public benefit that warrants the granting of the standards modification in that pursuantto Assembly Bill 2097 (AB 2097), the city is prohibited from requiring parking for projects located within one- half mile of a major transit. Irrespective of proximity to public transit, state law allows the city to continue to apply minimum parking standards for electric vehicle (EV) charging stations as well as required parking spaces accessible to persons with disabilities (ADA). The parking requirement is based on the total number of actual parking spaces that would have otherwise applied to the development if the state code section did not exist. The project is located approximately 0.4 miles from the Carlsbad Village Train Station and therefore no standard parking spaces are required for the development of the medical office building. The total number of actual parking spaces that would have otherwise applied to the project is 23 spaces, and therefore a total of 1 ADA space, 1 EV installed space, and 3 EV capable spaces are required. The project proposes to provide 4 EV installed charging spaces, 1 ADA compliant space, and 3 standard spaces, for a total of 8 parking spaces which exceed minimum parking space requirements. General 10. The Planning Commission finds that the project, as conditioned herein, is in conformance with the Elements of the city1s General Plan, based on the facts set forth in the staff report dated Oct. 16, 2024 including, but not limited to the following: Oct. 16, 2024 Item #1 11 of 85 a. Land Use & Community Design, Goal 2-G.2 and Goal 2-G.8 -The proposed project includes a request to demolish an existing medical office building and construct a new 10,671- square-foot medical office building oriented towards Grand Avenue in accordance with the Village & Barrio Master Plan. The site can be adequately served by existing utilities and is convenient to public transit including 8 bus stops and the Carlsbad Village Train Station all located within 0.5 miles from the project site. The proposed medical office building will provide a convenient essential service to surrounding residences. The medical office will also provide employment opportunities for residents who live within proximity to the site, therefore enhancing the city's position as a premier regional employment center. b. Land Use & Community Design, Goal 2-G.3 -The office project is proposed on a developed site surrounded by urban development. The project will provide the surrounding residential neighborhood with access to an essential service. Although the property is surrounded on all sides by residential uses, properties within the vicinity consist of a mixture of residential and commercial uses as permitted within the Village Center District of the Village and Barrio Master Plan. c. Land Use & Community Design, Goal 2-G.17 -The two-story, 34-foot-tall, 10,671-square- foot medical office building is proposed on a 0.16-acre (7,000-square-foot) lot in the Village and Barrio Mater Plan area. The site is surrounded on all sides by urban development, including a four-story, 124,080-square-foot residential condominium to the west (APN 203- 202-18-00) which measures 42.5-feet-tall to the roof pitch and 47-feet to the top of the architectural projections. The project site is also surrounded by two-story, multi-family residences to the north and south. d. Land Use & Community Design, Goal 2-G.30 -The proposal to construct a 10,671-square- foot medical office would enhance the vitality of the Village by providing an essential commercial office in the downtown core area. The project reinforces the pedestrian orientation desired for the downtown area by providing an essential service within walking distance of residential uses. The project's proximity to existing bus routes and other mass transit including the Village Station helps to further the goal of providing new economic development near transportation corridors. e. Mobility, Goal 3-G.3 and Policy 3-P.5 -The project also proposes construction of a new 15- foot-wide parkway along Grand Avenue with a 10-foot-wide sidewalk and 5-foot-wide landscaped area with street trees. On Hope Avenue, the project will replace the existing 5- foot-wide sidewalk, curb and gutter along the project frontage to accommodate the new driveway approach. The proposed project is located approximately 0.4 miles from the Carlsbad Village Train Station, which provides rail and bus service throughout the day. The project is also within 0.5 miles of 8 existing bus stops. The project's proximity to the transit station and bus stops would provide future medical office patients and employees with the option of using public transportation, thereby reducing vehicle miles traveled (VMTs) and the carbon footprint. Furthermore, the project supports walkability and mobility by locating the project near other existing goods and services within the Village. f. Noise, Goals 5-G.1 and 5-G.2 -Birdseye Planning Group conducted a noise study (Jan. 2024) for the proposed project. The principal noise source associated with the proposed project is traffic generated from the lnterstate-5 freeway and the surrounding street system (Grand Avenue and Hope Avenue). As it relates to exterior use areas, the project will include Oct. 16, 2024 Item #1 12 of 85 outdoor usable patio spaces. The noise study found that existing and future exterior noise levels at the property lines fronting Grand Avenue and Hope Avenue did not exceed the City's 65 dBA CNEL commercial exterior noise standard. The study further found that future interior noise levels would not exceed the City's 45 dBA CNEL commercial interior noise levels. With consideration given to traffic noise generated by the implantation of the project, the exterior noise is anticipated between 53.7 and 55.3 dBA. The project will not be built without adequately demonstrating compliance with the California Building Code (CBC), as locally amended. Current construction methods and materials would result in an interior noise level between 23.7 and 25.3 dBA. The project is anticipated to be within the 65 dBA future year (2040) noise contour. Assuming a baseline noise level of 65 dBA, a 30 dBA reduction in noise levels associated with current construction methods and materials, would result in an interior noise level of approximately 35 dBA within the proposed building. This would be within the SO dBA standard for commercial uses. The study further found that noise levels associated with the proposed HVAC system proposed on the office building's roof will not exceed 47 dBA at the north end and 51 dBA at the southern end of the proposed building. Noise levels would be less than the 60 dBA residential limit at all surrounding residential units and inaudible over ambient noise at the east facing first and second floor units. The report also concluded that long term traffic operation associated with the project would have no adverse effect on noise levels at sensitive properties within proximity to the site, including the surrounding residential uses. As is relates to airport noise, the nearest airport is McClellan-Palomar Airport, which is approximately 6.0 miles southeast of the project site and is located outside of all CNEL noise contours outlined in the McClellan-Palomar Airport Land Use Compatibility Plan (ALUCP) and included in the City's General Plan. g. Public Safety, Goal 6-G.1-The proposed project is not located in any Very High Fire Severity Zone, Flood Zones, or Earthquake Fault Zones. The proposed structural improvements would be required to meet all seismic design standards at time of building permit in accordance with the California Building Code. The Fire & Life Safety Division has approved the proposed conceptual building design with fire sprinklers included throughout per the National Fire Protection Association (NFPA) standards. h. Public Safety, Goal 6-G.4 -The proposed project will provide all supporting water infrastructure in accordance with Fire & Life Safety requirements; fire sprinklers are required and provided throughout the project; Fire protection service will be provided to the project site by a 6-inch service connection to the existing 8-inch public water line in Hope Avenue. i. Public Safety, Policy 6-P.6 -The project has been conditioned to develop and implement a program of "best management practices" for the elimination and reduction of pollutants which enter and/or are transported within storm drainage facilities. j. Public Safety, Policy 6-P.34 -The project is required to comply with all Building and Fire codes to ensure that fire protection standards are met by the proposed structures. The Fire & Life Safety Division has approved conceptual building designs with fire sprinklers included throughout per the National Fire Protection Association (NFPA) standards. Therefore, the proposed project is consistent with the applicable fire safety requirements. Oct. 16, 2024 Item #1 13 of 85 k. Public Safety, Policy 6-P.39 -The project is required to construct or pay applicable fees for necessary improvements, public utilities, and facilities in accordance with Growth Management requirements. The site is located less than 0.6-miles from fire Station No. 1. Water service will include two connections to the existing 8-inch public water line in Hope Avenue: one connection will be made for the private domestic irrigation water system and one connection will be made for the private fire protection system. No upsizing to the existing sewer mains in Hope Avenue is requires, as the existing sewer infrastructure and subsequent downstream runs have sufficient capacity to convey the anticipated sewer flows from the proposed project. I. Sustainability, Policy 9-P.1 -The project implements and is consistent with measures identified in the Climate Action Plan (CAP) through the provision of renewable energy generation (photovoltaic systems), energy conservation (Green Building Code), and by accommodating Zero-Emission vehicles and other greenhouse gas reduction measures and features. At building permit, the project will also be reviewed for compliance with the CAP ordinances. 10. The project is consistent with the Citywide Facilities and Improvements Plan, the Local Facilities Management Plan for Zone 1 and all city public facility policies and ordinances. The project includes elements or has been conditioned to construct or provide funding to ensure that all facilities and improvements regarding sewer collection and treatment; water; drainage; circulation; fire; schools; parks and other recreational facilities; libraries; government administrative facilities; and open space, related to the project will be installed to serve new development prior to or concurrent with need. Specifically, a. The Public Facility fee is required to be paid by Council Policy No. 17 and will be collected prior to the issuance of building permit. b. The Local Facilities Management fee for Zone 1 is required by Carlsbad Municipal Code Section 21.90.050 and will be collected prior to issuance of building permit. 11. The project has been conditioned to pay any increase in public facility fee, or new construction tax, or development fees, and has agreed to abide by any additional requirements established by a Local Facilities Management Plan prepared pursuant to Chapter 21.90 of the Carlsbad Municipal Code. This will ensure continued availability of public facilities and will mitigate any cumulative impacts created by the project. 12. This project has been conditioned to comply with any requirement approved as part of the Local Facilities Management Plan for Zone 1. 13. That all necessary public facilities required by the Growth Management Ordinance will be constructed or are guaranteed to be constructed concurrently with the need for them created by this project and in compliance with adopted city standards. 14. That the project is consistent with the city's Landscape Manual and Water Efficient Landscape Ordinance (Carlsbad Municipal Code Chapter 18.50}. 15. The City Planner has determined that the project belongs to a class of projects that the State Secretary for Resources has found do not have a significant impact on the environment, and it is Oct. 16, 2024 Item #1 14 of 85 therefore categorically exempt from the requirement for preparation of environmental documents pursuant to Section 15332 -In-fill Development Projects of the State CEQA Guidelines as an in-fill development project. In making this determination, the City Planner has found that the exceptions listed in Section 15300.2 of the State CEQA Guidelines do not apply to this project. No appeals were made to this determination; therefore, it is final. 16. The Planning Commission has reviewed each of the exactions imposed on the Developer contained in this resolution, and hereby finds, in this case, that the exactions are imposed to mitigate impacts caused by or reasonably related to the project, and the extent and the degree of the exaction is in rough proportionality to the impact caused by the project. Conditions: NOTE: Unless specifically stated in the condition, all of the following conditions, upon the approval of this proposed development, must be met prior to approval of the building or grading permit whichever occurs first. All references to the "Site Plan" reference the project plans dated Oct. 16, 2024, attached as Exhibits 8 and 9 of the Planning Commission Staff Report dated Oct. 16, 2024. 1. If any of the following conditions fail to occur, or if they are, by their terms, to be implemented and maintained over time, if any of such conditions fail to be so implemented and maintained according to their terms, the city shall have the right to revoke or modify all approvals herein granted; deny or further condition issuance of all future building permits; deny, revoke, or further condition all certificates of occupancy issued under the authority of approvals herein granted; record a notice of violation on the property title; institute and prosecute litigation to compel their compliance with said conditions or seek damages for their violation. No vested rights are gained by Developer or a successor in interest by the city's approval of this Site Development Plan. 2. Staff is authorized and directed to make, or require the Developer to make, all corrections and modifications to the Site Development Plan documents, as necessary to make them internally consistent and in conformity with the final action on the project. Development shall occur substantially as shown on the approved Exhibits. Any proposed development, different from this approval, shall require an amendment to this approval. 3. Developer shall comply with all applicable provisions of federal, state, and local laws and regulations in effect at the time of building permit issuance. 4. If any condition for construction of any public improvements or facilities, or the payment of any fees in-lieu thereof, imposed by this approval or imposed by law on this project are challenged, this approval shall be suspended as provided in Government Code §66020. If any such condition is determined to be invalid, this approval shall be invalid unless the City Council determines that the project without the condition complies with all requirements of law. 5. Developer/Operator shall and does hereby agree to indemnify, protect, defend, and hold harmless the City of Carlsbad, its Council members, officers, employees, agents, and representatives, from and against any and all liabilities, losses, damages, demands, claims and costs, including court costs and attorney's fees incurred by the city arising, directly or indirectly, from (a) city's approval and issuance of this Site Development Plan (b) city's approval or issuance of any permit or action, whether discretionary or nondiscretionary, in connection with the use Oct. 16, 2024 Item #1 15 of 85 contemplated herein, and (c) Developer/Operator's installation and operation of the facility permitted hereby, including without limitation, any and all liabilities arising from the emission by the facility of electromagnetic fields or other energy waves or emissions. This obligation survives until all legal proceedings have been concluded and continues even if the city's approval is not validated. 6. Prior to submittal of the building plans, improvement plans, grading plans, or final map, whichever occurs first, developer shall submit to the City Planner, a 24" x 36" copy of the (Project Site Plan or other), conceptual grading plan and preliminary utility plan reflecting the conditions approved by the final decision making body. The copy shall be submitted to the City Planner, reviewed and, if found acceptable, signed by the city's project planner and project engineer. If no changes were required, the approved exhibits shall fulfill this condition. 7. This project shall comply with all conditions and mitigation measures which are required as part of the Zone 1 Local Facilities Management Plan and any amendments made to that Plan prior to the issuance of building permits. 8. This approval shall become null and void if building or grading permits are not issued for this project within 24 months from the date of project approval. 9. Building permits will not be issued for this project unless the local agency providing water and sewer services to the project provides written certification to the city that adequate water service and sewer facilities, respectively, are available to the project at the time of the application for the building permit, and that water and sewer capacity and facilities will continue to be available until the time of occupancy. 10. Developer shall pay the Citywide Public Facilities Fee imposed by City Council Policy #17, the License Tax on new construction imposed by Carlsbad Municipal Code Section 5.09.030, and CFD #1 special tax (if applicable), subject to any credits authorized by Carlsbad Municipal Code Section 5.09.040. Developer shall also pay any applicable Local Facilities Management Plan fee for Zone 1 pursuant to Chapter 21.90. All such taxes/fees shall be paid at issuance of building permit. If the taxes/fees are not paid, this approval will not be consistent with the General Plan and shall become void. 11. Developer shall submit to the city a Notice of Restriction executed by the owner of the real property to be developed. Said notice is to be filed in the office of the County Recorder, subject to the satisfaction of the City Planner, notifying all interested parties and successors in interest that the City of Carlsbad has issued a Site Development Plan on the property. Said Notice of Restriction shall note the property description, location of the file containing complete project details and all conditions of approval as well as any conditions or restrictions specified for inclusion in the Notice of Restriction. The City Planner has the authority to execute and record an amendment to the notice which modifies or terminates said notice upon a showing of good cause by the Developer or successor in interest. 12. Prior to issuance of grading permit(s), developer shall make a separate formal landscape construction drawing plan check submittal to the Planning Division and obtain City Planner approval of a Final Landscape and Irrigation Plan showing conformance with the approved Preliminary Landscape Plan and the city's Landscape Manual. Developer shall construct and install all landscaping and irrigation as shown on the approved Final Plans. All landscaping shall be Oct. 16, 2024 Item #1 16 of 85 maintained in a healthy and thriving condition, free from weeds, trash, and debris. All irrigation systems shall be maintained to provide the optimum amount of water to the landscape for plant growth without causing soil erosion and runoff. 13. The first submittal of Final Landscape and Irrigation Plans shall be pursuant to the landscape plan check process on file in the Planning Division and accompanied by the project's building, improvement, and grading plans. 14. Prior to issuance of grading and building permits, Developer shall list the following condition on all grading and building permit construction plans. Construction activities shall take place during the permitted time and day per Carlsbad Municipal Code Chapter 8.48. Developer shall ensure that construction activities for the proposed project are limited to the hours from 7:00 a.m. to 6:00 p.m. Monday through Friday, and 8:00 a.m. to 6:00 p.m. on Saturdays; no work shall be conducted on Sundays or on federal holidays. 15. All roof appurtenances, including air conditioners, shall be architecturally integrated and concealed from view and the sound buffered from adjacent properties and streets, in substance as provided in Building Department Policy No. 80-6, to the satisfaction of the City Planner and Building Official. 16. No outdoor storage of materials shall occur onsite unless required by the Fire Chief. When so required, the Developer shall submit and obtain approval of the Fire Chief and the City Planner of an Outdoor Storage Plan, and thereafter comply with the approved plan. 17. Developer shall submit and obtain City Planner approval of an exterior lighting plan including parking areas. All lighting shall be designed to reflect downward and avoid any impacts on adjacent homes or property. 18. The project is required to provide Electric Vehicle (EV) parking and Americans with Disabilities Act (ADA) parking in compliance with the California Building Code (CBC) and California Green Building Standards Codes. In the scenario that the parking is reconfigured within the approved garage footprint to accommodate CBC Chapter 11B accessibility provisions for EV and an additional ADA space(s) or accessible EVCS vehicle space(s) are required, resulting in a loss of one or more parking space(s), no additional discretionary actions will be required and the standard modification will continue to be valid. Full compliance with standard modification requirements are substantiated by the benefits of electrical vehicle use which relies on installed infrastructure. 19. Prior to issuance of a grading permit or the commencement of any ground-disturbing activities, whichever occurs first, Developer shall: a. Retain the services of a qualified archaeologist who shall be on-site to monitor ground disturbing activities. In the event cultural resource material is encountered, the archaeologist is empowered to temporarily divert or halt grading to allow for coordination with the Luiseno Native American monitor and to determine the significance of the discovery. The archaeologist shall follow all standard procedures for cultural resource materials that are not Tribal Cultural Resources, in accordance with applicable laws and regulations including but not limited to the Carlsbad Tribal, Cultural and Paleontological Resources Guidelines (2017). Oct. 16, 2024 Item #1 17 of 85 b. Enter into a Pre-Excavation Agreement, otherwise known as a Tribal Cultural Resources Treatment and Tribal Monitoring Agreement, with the San Luis Rey Band of Mission Indians or other Luiseno Native American tribe that meets all standard requirements of the tribe for such Agreements, in accordance with applicable laws and regulations including but not limited to the Carlsbad Tribal, Cultural and Paleontological Resources Guidelines (2017). This agreement will address provision of a Luiseno Native American monitor and contain provisions to address the proper treatment of any Tribal Cultural Resources and/or Native American human remains inadvertently discovered during the course of the project. The agreement will outline the roles and powers of the Luiseno Native American monitor and the archaeologist. Engineering: NOTE: Unless specifically stated in the condition, all of the following conditions, upon the approval of this proposed development, must be met prior to approval of a building or grading permit whichever occurs first. General 20. Prior to hauling dirt or construction materials to or from any proposed construction site within this project, developer shall apply for and obtain approval from, the city engineer for the proposed haul route. 21. This project is approved upon the express condition that building permits will not be issued for the development of the subject property, unless the district engineer has determined that adequate water and sewer facilities are available at the time of permit issuance and will continue to be available until time of occupancy. 22. Developer shall include rain gutters on the building plans subject to the city engineer's review and approval. Developer shall install rain gutters in accordance with said plans. 23. Developer shall install sight distance corridors at all street intersections and driveways in accordance with City Engineering Standards. The property owner shall maintain this condition. 24. Property owner shall maintain all landscaping (street trees, tree grates, shrubs, ground cover, etc.) and irrigation along the parkway frontage with Grand Avenue and Hope Avenue as shown on the Tentative Map/Site Plan. Fees/ Agreements 25. Developer shall cause property owner to execute and submit to the city engineer for recordation, the city's standard form Geologic Failure Hold Harmless Agreement. 26. Developer shall cause property owner to execute and submit to the city engineer for recordation the city's standard form Drainage Hold Harmless Agreement. Grading Oct. 16, 2024 Item #1 18 of 85 27. Based upon a review of the proposed grading and the grading quantities shown on the site plan, a grading permit for this project is required. Developer shall prepare and submit plans and technical studies/reports as required by city engineer, post security and pay all applicable grading plan review and permit fees per the city's latest fee schedule. 28. Prior to issuance of the grading permit, the contractor shall submit a Construction Plan to the city engineer for review and approval. Said Plan may be required to include, but not be limited to, identifying the location of the construction trailer, material staging, bathroom facilities, parking of construction vehicles, employee parking, construction fencing and gates, obtaining any necessary permission for off-site encroachment, addressing pedestrian safety, and identifying time restrictions for various construction activities. 29. Concurrent with the grading plans Developer shall include shoring plans as part of the grading plans to the satisfaction of the city engineer and building official. Structural calculations for all shoring shall be submitted for review and approval by the building division. Developer shall pay all deposits necessary to cover any 3rd party review. Storm Water Quality 30. Developer shall comply with the city's Stormwater Regulations, latest version, and shall implement best management practices at all times. Best management practices include but are not limited to pollution control practices or devices, erosion control to prevent silt runoff during construction, general housekeeping practices, pollution prevention and educational practices, maintenance procedures, and other management practices or devices to prevent or reduce the discharge of pollutants to stormwater, receiving water or stormwater conveyance system to the maximum extent practicable. Developer shall notify prospective owners and tenants of the above requirements. 31. Developer shall complete and submit to the city engineer a Determination of Project's SWPPP Tier Level and Construction Threat Level Form pursuant to City Engineering Standards. Developer shall also submit the appropriate Tier level Storm Water Compliance form and appropriate Tier level Storm Water Pollution Prevention Plan (SWPPP) to the satisfaction of the city engineer. Developer shall pay all applicable SWPPP plan review and inspection fees per the city's latest fee schedule. 32. This project is subject to Trash Capture requirements. Developer shall prepare and process a Trash Capture Storm Water Quality Management Plan (TCSWQMP), subject to city engineer approval, to comply with the Carlsbad BMP Design Manual latest version. The final TCSWQMP required by this condition shall be reviewed and approved by the city engineer with final grading plans and/or building plans, whichever occurs first. Developer shall pay all applicable SWQMP plan review and inspection fees per the city's latest fee schedule. 33. Developer is responsible to ensure that all final design plans (grading plans, improvement plans, landscape plans, building plans, etc) incorporate all source control, site design, pollutant control BMP and applicable hydromodification measures. 34. Developer shall complete the City of Carlsbad Standard Stormwater Requirement Checklist Form. Developer is responsible to ensure that all final design plans, grading plans, and building plans incorporate applicable best management practices (BMPs). These BMPs include site design, Oct. 16, 2024 Item #1 19 of 85 source control and Low Impact Design (LID) measures including, but not limited to, minimizing the use of impervious area (paving), routing run-off from impervious area to pervious/landscape areas, preventing illicit discharges into the storm drain and adding storm drain stenciling or signage all to the satisfaction of the city engineer. Dedications/Improvements 35. Developer shall cause owner to dedicate an easement to the city and/or other appropriate entities for the public street & public utility purposes as shown on the site plan. The offer shall be made by a separate recorded document. All land so offered shall be free and clear of all liens and encumbrances and without cost to the city. Streets that are already public are not required to be rededicated. Additional easements may be required at final design to the satisfaction of the city engineer. 36. Developer shall design the private drainage systems, as shown on the site plan to the satisfaction of the city engineer. All private drainage systems (12" diameter storm drain and larger) shall be inspected by the city. Developer shall pay the standard improvement plan check and inspection fees for private drainage systems. 37. Prior to any work in city right-of-way or public easements, Developer shall apply for and obtain a right-of-way permit to the satisfaction of the city engineer. 38. Developer shall prepare and process public improvement plans and, prior to city engineer approval of said plans, shall execute a city standard Development Improvement Agreement to install and shall post security in accordance with C.M.C. Section 20.16.070 for public improvements shown on the site plan. Said improvements shall be installed to city standards to the satisfaction of the city engineer. These improvements include, but are not limited to: A. Replacement of five-foot wide sidewalk fronting Grand Avenue with a ten-foot wide sidewalk and replacement of sidewalk due to utility work. B. Installation of domestic, landscape irrigation, and fire services and related meters and backflow devices. C. Installation of new sewer lateral. D. Construction of new driveway. E. Grind and overlay of street pavement. F. Removal of abandoned sewer lateral and water services fronting the property. Additional public improvements required in other conditions of this resolution are hereby included in the above list by reference. Developer shall pay the standard improvement plan check and inspection fees in accordance with the fee schedule. Improvements listed above shall be constructed within 36 months of approval of the subdivision or development improvement agreement or such other time as provided in said agreement. 39. Developer is responsible to ensure utility transformers or raised water backflow preventers that serve this development are located outside the right-of-way as shown on the Site Plan and to the satisfaction of the city engineer. These facilities shall be constructed within the property. Utilities Oct. 16, 2024 Item #1 20 of 85 40. Developer shall meet with the fire marshal to determine if fire protection measures (fire flows, fire hydrant locations, building sprinklers) are required to serve the project 41. Developer shall install potable water and/or recycled water services and meters at locations approved by the district engineer. The locations of said services shall be reflected on public improvement plans. 42. The developer shall agree to install sewer laterals and clean-outs at locations approved by the city engineer. The locations of sewer laterals shall be reflected on public improvement plans. 43. The developer shall design and agree to construct public water, sewer, and recycled water facilities substantially as shown on the site plan to the satisfaction of the district engineer and city engineer. Code Reminders The project is subject to all applicable provisions of local ordinances, including but not limited to the following: 44. Developer shall pay planned local area drainage fees in accordance with Section 15.08.020 of the Carlsbad Municipal Code to the satisfaction of the City Engineer. 45. Developer shall pay traffic impact and sewer impact fees based on Section 18.42 and Section 13.10 of the City of Carlsbad Municipal Code, respectively. The Average Daily Trips (ADT} and floor area contained in the staff report and shown on the site plan are for planning purposes only. 46. Approval of this request shall not excuse compliance with all applicable sections of the Zoning Ordinance and all other applicable city ordinances in effect at time of building permit issuance, except as otherwise preempted by State law or specifically provided herein. 47. Any signs proposed for this development shall at a minimum be designed in conformance with the Village & Barrio Master Plan, shall require review and approval of the City Planner prior to installation of such signs. 48. Developer acknowledges that the project is required to comply with the city's greenhouse gas (GHG} reduction ordinances and requirements. GHG reduction requirements are in accordance with, but are not limited to, Carlsbad Municipal Code Chapters 18.21, 18.30, and 18.51 in addition to the California Green Building Standards Code (CCR, Title 24, Part 11-CALGreen), as amended from time to time. GHG reduction requirements may be different than what is proposed on the project plans or in the Climate Action Plan Checklist originally submitted with this project. Developer acknowledges that new GHG reduction requirements related to energy efficiency, photovoltaic, electric vehicle charging, water heating and traffic demand management requirements as set forth in the ordinances and codes may impact, but are not limited to, site design and local building code requirements. If incorporating GHG reduction requirements results in substantial modifications to the project, then prior to issuance of development (grading, building, etc.) permits, Developer may be required to submit and receive approval of a Consistency Determination or Amendment for this project through the Planning Division. Compliance with the applicable GHG reduction requirements must be demonstrated on or with the construction plans prior to issuance of the applicable development permits. Oct. 16, 2024 Item #1 21 of 85 NOTICE Please take NOTICE that approval of your project includes the "imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to for convenience as "fees/exactions." You have 90 days from date of final approval to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedure set forth in Government Code §66020{a) and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity charges, nor planning, zoning, grading, or other similar application processing or service fees in connection with this project; NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. PASSED, APPROVED, AND ADOPTED at a regular meeting of the Planning Commission of the City of Carlsbad, California, held on Oct. 16, 2024, by the following vote, to wit: AYES: Danna, Hubinger, Meenes, Merz, Stine NAYES: Kamenjarin, Lafferty ABSENT: None. ABSTAIN : None. ILLIAM KAMENJARIN, CARLSBAD PLANNING MIKE STRONG - Assistant Director of Community Development GRAN D A V HOME A V J E F F E R S O N S T H O P E A V H O P E A V A L L E Y H A R D I N G S T CARL S B A D V I L L A G E D R I - 5 C V D S B O F F R A M P J E F F E R S O N S T A L L E Y E L C AMINO R E A L LA COSTA AV A L G A R D C A R L S B A D B L SDP2023-0025 (DEV2023-0122) Grand Hope Medical Office Building SITE MAP J SITE Map generated on: 10/1/2024 Exhibit 2 Oct. 16, 2024 Item #1 22 of 85 PROJECT ANALYSIS The project is subject to the following regulations: A.Village-Barrio (V-B) General Plan Land Use Designation B.Village-Barrio (V-B) Zone (CMC Chapter 21.35), Village & Barrio Master Plan C.Site Development Plan (CMC Chapter 21.06) D.Village and Bario Standards Modification, Building Massing (VBMP Section 2.7.1.H) E.Growth Management Ordinance (CMC Chapter 21.90) and Local Facilities Management Plan Zone 1 The recommendation for approval of this project was developed by analyzing the project’s consistency with the applicable regulations and policies. The project’s compliance with each of the above regulations is discussed in detail within the sections below. A.Village-Barrio (V-B) General Plan Land Use Designation The subject property has a General Plan Land Use designation of Village-Barrio (V-B). As discussed in the Village & Barrio Master Plan, properties within the Village do not have an assigned residential density as it relates to Growth Management Plan compliance. The project’s compliance with the various Elements of the General Plan is outlined in Table “A” below: TABLE A – GENERAL PLAN COMPLIANCE ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE, OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY Land Use & Community Design Goal 2-G.2 – Promote a diversity of compatible land uses throughout the city, to enable people to live close to job locations, adequate and convenient commercial services, and public support systems such as transit, parks, schools, and utilities. Goal 2-G.8 Provide opportunities for continued economic growth and vitality that enhance Carlsbad’s position as a premier regional employment center. The proposed project includes a request to demolish an existing medical office building and construct a new 10,671-square-foot medical office building oriented towards Grand Avenue in accordance with the Village & Barrio Master Plan. The site can be adequately served by existing utilities and is convenient to public transit including 8 bus stops and the Carlsbad Village Train Station all located within 0.5 miles from the project site. The proposed medical office building will provide a convenient essential service to surrounding residences. The medical office will also provide employment opportunities for residents who live within proximity to the site, therefore enhancing the city’s Yes Oct. 16, 2024 Item #1 23 of 85 Exhibit 3PROJECT ANALYSIS Exhibit 3 (GENERAL PLAN, MUNIOPAL CODE, AND OTHER REGULATIONS) ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE, OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY position as a premier regional employment center. Land Use & Community Design Goal 2-G.3 – Promote infill development that makes efficient use of limited land supply, while ensuring compatibility and integration with existing uses. Ensure that infill properties develop with uses and development intensities supporting a cohesive development pattern. The office project is proposed on a developed site surrounded by urban development. The project will provide the surrounding residential neighborhood with access to an essential service. Although the property is surrounded on all sides by residential uses, properties within the vicinity consist of a mixture of residential and commercial uses as permitted within the Village Center District of the Village and Bario Master Plan. Yes Land Use & Community Design Goal 2-G.17– Ensure that the scale and character of new development is appropriate to the setting and intended use. Promote development that is scaled and sited to respect the natural terrain, where hills, public realm, parks, open space, trees, and distant vistas, rather than buildings, dominate the overall landscape, while developing the Village, Barrio, and commercial and industrial areas as concentrated urban-scaled nodes. The two-story, 34-foot-tall, 10,671- square-foot medical office building is proposed on a 0.16-acre (7,000- square-foot) lot in the Village and Barrio Mater Plan area. The site is surrounded on all sides by urban development, including a four- story, 124,080-square-foot residential condominium to the west (APN 203-202-18-00) which measures 42.5-feet-tall to the roof pitch and 47-feet to the top of the architectural projections. The project site is also surrounded by two-story, multi-family residences to the north and south. Land Use & Community Design Goal 2-G.30 Develop a distinct identity for the Village by encouraging a variety of uses and activities, such as a mix of residential, commercial office, restaurants and specialty retail shops, which traditionally locate in a pedestrian–oriented downtown area and attract visitors and residents from across the community by creating a lively, interesting social environment. The proposal to construct a 10,671- square-foot medical office would enhance the vitality of the Village by providing an essential commercial office in the downtown core area. The project reinforces the pedestrian orientation desired for the downtown area by providing an essential service within walking distance of residential uses. The project’s proximity to existing bus routes and other mass transit including the Village Station helps to Yes Oct. 16, 2024 Item #1 24 of 85 ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE, OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY further the goal of providing new economic development near transportation corridors. Mobility Goal 3-G.3 – Provide inviting streetscapes that encourage walking and promote livable streets. Policy 3-P.5 – Require developers to construct or pay their fair share toward improvements for all travel modes consistent with the Mobility Element, the Growth Management Plan, and specific impacts associated with their development. The project also proposes construction of a new 15-foot-wide parkway along Grand Avenue with a 10-foot-wide sidewalk and 5-foot- wide landscaped area with street trees. On Hope Avenue, the project will replace the existing 5-foot-wide sidewalk, curb and gutter along the project frontage to accommodate the new driveway approach. The proposed project is located approximately 0.4 miles from the Carlsbad Village Train Station, which provides rail and bus service throughout the day. The project is also within 0.5 miles of 8 existing bus stops. The project’s proximity to the transit station and bus stops would provide future medical office patients and employees with the option of using public transportation, thereby reducing vehicle miles traveled (VMTs) and the carbon footprint. Furthermore, the project supports walkability and mobility by locating the project near other existing goods and services within the Village. Yes Oct. 16, 2024 Item #1 25 of 85 ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE, OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY Noise Goal 5-G.1 – Protect public health and welfare by eliminating existing noise problems where feasible, maintaining an acceptable indoor and outdoor acoustic environment, and preventing significant degradation of the acoustic environment. Goal 5-G.2 – Ensure that new development is compatible with the noise environment, by continuing to use potential noise exposure as a criterion in land use planning. Birdseye Planning Group conducted a noise study (Jan. 2024) for the proposed project. The principal noise source associated with the proposed project is traffic generated from the Interstate-5 freeway and the surrounding street system (Grand Avenue and Hope Avenue). As it relates to exterior use areas, the project will include outdoor usable patio spaces. The noise study found that existing and future exterior noise levels at the property lines fronting Grand Avenue and Hope Avenue did not exceed the City’s 65 dBA CNEL commercial exterior noise standard. The study further found that future interior noise levels would not exceed the City’s 45 dBA CNEL commercial interior noise levels. With consideration given to traffic noise generated by the implantation of the project, the exterior noise is anticipated between 53.7 and 55.3 dBA. The project will not be built without adequately demonstrating compliance with the California Building Code (CBC), as locally amended. Current construction methods and materials would result in an interior noise level between 23.7 and 25.3 dBA. The project is anticipated to be within the 65 dBA future year (2040) noise contour. Assuming a baseline noise level of 65 dBA, a 30 dBA reduction in noise levels associated with current construction methods and materials, would result in an interior noise level of Yes Oct. 16, 2024 Item #1 26 of 85 ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE, OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY approximately 35 dBA within the proposed building. This would be within the 50 dBA standard for commercial uses. The study further found that noise levels associated with the proposed HVAC system proposed on the office building’s roof will not exceed 47 dBA at the north end and 51 dBA at the southern end of the proposed building. Noise levels would be less than the 60 dBA residential limit at all surrounding residential units and inaudible over ambient noise at the east facing first and second floor units. The report also concluded that long term traffic operation associated with the project would have no adverse effect on noise levels at sensitive properties within proximity to the site, including the surrounding residential uses. As is relates to airport noise, the nearest airport is McClellan- Palomar Airport, which is approximately 6.0 miles southeast of the project site and is located outside of all CNEL noise contours outlined in the McClellan-Palomar Airport Land Use Compatibility Plan (ALUCP) and included in the City’s General Plan. Public Safety Goal 6-G.1 – Minimize injury, loss of life, and damage to property resulting from fire, flood, hazardous material release, or seismic disasters. The proposed project is not located in any Very High Fire Severity Zone, Flood Zones, or Earthquake Fault Zones. The proposed structural improvements would be required to meet all seismic design standards at time of building permit in accordance with the California Building Code. The Fire & Life Safety Yes Oct. 16, 2024 Item #1 27 of 85 ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE, OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY Division has approved the proposed conceptual building design with fire sprinklers included throughout per the National Fire Protection Association (NFPA) standards. Public Safety Goal 6-G.4 – Maintain safety services that are responsive to citizens’ needs to ensure a safe and secure environment for people and property in the community. The proposed project will provide all supporting water infrastructure in accordance with Fire & Life Safety requirements; fire sprinklers are required and provided throughout the project; Fire protection service will be provided to the project site by a 6-inch service connection to the existing 8-inch public water line in Hope Avenue. Yes Public Safety Policy 6-P.6 – Enforce the requirements of Titles 18, 20, and 21 pertaining to drainage and flood control when reviewing applications for building permits and subdivisions. The project has been conditioned to develop and implement a program of “best management practices” for the elimination and reduction of pollutants which enter and/or are transported within storm drainage facilities. Yes Public Safety Policy 6-P.34 – Enforce the Uniform Building and Fire codes, adopted by the city, to provide fire protection standards for all existing and proposed structures. The project is required to comply with all Building and Fire codes to ensure that fire protection standards are met by the proposed structures. The Fire & Life Safety Division has approved conceptual building designs with fire sprinklers included throughout per the National Fire Protection Association (NFPA) standards. Therefore, the proposed project is consistent with the applicable fire safety requirements. Yes Public Safety Policy 6-P.39 – Ensure all new development complies with all applicable regulations regarding the provision of public utilities and facilities. The project is required to construct or pay applicable fees for necessary improvements, public utilities, and facilities in accordance with Growth Management requirements. The site is located less than 0.6-miles from fire Station No. 1. Water service will include two connections to the existing 8-inch public water Yes Oct. 16, 2024 Item #1 28 of 85 ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE, OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY line in Hope Avenue: one connection will be made for the private domestic irrigation water system and one connection will be made for the private fire protection system. No upsizing to the existing sewer mains in Hope Avenue is requires, as the existing sewer infrastructure and subsequent downstream runs have sufficient capacity to convey the anticipated sewer flows from the proposed project. Sustainability Policy 9-P.1 – Enforce the Climate Action Plan (CAP) as the city’s strategy to reduce greenhouse gas emissions. The project implements and is consistent with measures identified in the Climate Action Plan (CAP) through the provision of renewable energy generation (photovoltaic systems), energy conservation (Green Building Code), and by accommodating Zero-Emission vehicles and other greenhouse gas reduction measures and features. At building permit, the project will also be reviewed for compliance with the CAP ordinances. Yes B. Village-Barrio (V-B) Zone (CMC Chapter 21.35), Village & Barrio Master Plan The project is located within the Village Center District of the Village and Barrio Master Plan. Table B below identifies the development standards for properties located within the Village Center (VC) District of the Village & Barrio Master Plan. TABLE B- VILLAGE & BARRIO MASTER PLAN VILLAGE CENTER (VC) DISTRICT COMPLIANCE ANALYSIS Oct. 16, 2024 Item #1 29 of 85 Standard Required/Allowed Proposed Comply? Setbacks - Front/Corner Minimum: 0 feet Maximum: 5 feet Additional depth permitted where area includes a plaza, courtyard, or outdoor dining. Additional depth is also permitted to accommodate electrical transformers, utility connections, meter pedestals, and similar equipment only if other locations are infeasible as determined by the decision- maker. 0-5 feet for building frontages along Grand Avenue (south property line) and Hope Avenue (east property line). 10-feet along a portion of Hope Avenue to accommodate utility connections, meter pedestals and electrical transformers. Yes Setbacks - Side No minimum or maximum setback 1 foot (west property line) Yes Setbacks - Rear No minimum or maximum setback 1 foot (north property line) Yes Lot Size and Dimension Not applicable No changes to lot size or dimension are proposed to the existing 0.16-acre lot. N/A Building Height Maximum 45 feet and 4 stories 34 feet and 2 stories Yes Building Height Ground floor wall plate height: Minimum 14 feet. This height shall be measured from the finished floor to the top plate of the ground floor or, where there is no “plate”, to the bottom of the floor structure of the second floor. This standard shall apply only to the ground floor street frontage uses permitted within the boundaries of the use restriction area identified on Figure 2-2 of the Village and Barrio Master Plan. N/A – The project is not located within the boundaries of the use restriction area identified on Figure 2-2 of the Village and Barrio Master Plan. N/A Building Height A maximum of 30% of the 4th story, street-facing facade can have a minimum 10-foot setback (as measured from property line). The remaining 70% shall be set back a minimum of 15 feet. N/A – The project does not propose four stories. N/A Building Height The total square footage of enclosed 4th story floor space shall not exceed 80% of the of N/A – The project does not propose four stories. N/A Oct. 16, 2024 Item #1 30 of 85 Standard Required/Allowed Proposed Comply? the largest enclosed floor space below (floors one, two and three). However, in no case shall the fourth-floor enclosed space exceed the amount of the third floor enclosed space. Building Massing No building facade visible from any public street shall extend more than 40 feet in length without a 5-foot minimum variation in the wall plane, as well as a change in roofline. The ground building façade along Grand Avenue extends 36-feet before stepping back 8 feet at the corner. The second- floor building façade along Grand Avenue does not extend more than 21- feet in length without a 10-foot variation provided for a balcony. The proposed roofline along Grand Avenue breaks in three locations with the longest roofline 17-feet-long. The ground floor building façade along Hope Avenue extends 66-feet in length with only a 2-foot variation. A Standards Modification has been requested to allow a deviation from this standard for the purpose of providing a significant public benefit. Staff has reviewed the standards modification and concurs with the request. The Standards Modification request is discussed in greater detail in section D below. The second-floor building façade along Hope Avenue extends at most 40-feet before providing a minimum 5-foot variation. The proposed roofline along Hope Avenue breaks in 5 locations with the longest roofline extending 40-feet in length. Yes* Service and Delivery Areas Service and loading shall be conducted using alley access where the condition exists. N/A – The project site does not have access along an existing alley. N/A Public Space A plaza, a minimum 500 square feet or 7.5 percent of lot area, whichever is less (exclusive of right of way), with street furnishings, landscaping, accent trees, and lighting shall be N/A – The project is not located within the listed intersections. N/A Oct. 16, 2024 Item #1 31 of 85 Standard Required/Allowed Proposed Comply? provided at each corner located at the following intersections: Carlsbad Village Drive and Carlsbad Boulevard, Carlsbad Village Drive and State Street, State Street and Grand Avenue, and Carlsbad Village Drive and Harding Street. Residential Private and Common Open Space Private: Minimum of 60 square feet of private open space per unit; minimum dimension of 6 feet in any direction. Common: Applies only to projects with 10 or more units. Minimum of 15 square feet per unit, active or passive with a Minimum dimension of 10 feet in any direction. N/A – The project does not provide residential units. N/A Ground Floor Street Frontage Uses New ground floor street frontage uses permitted within the boundaries of the use restriction area identified on Figure 2-2 of the Village and Barrio Master Plan and shall occupy more than one-half of the habitable space developed on the ground floor and shall span at least 80 percent of the building frontage. In the Coastal Zone along Carlsbad Boulevard and Carlsbad Village Drive, new ground floor street frontage uses shall have a minimum average building depth of 25 feet. Up to 20 percent of a building frontage may be used for a lobby or entryway to uses above or behind ground floor street frontage uses. N/A – The project is not located within the use restriction area identified on Figure 2-2 of the Village and Barrio Master Plan. N/A *The project meets this section with approval of the standards modification as described in section D below. Oct. 16, 2024 Item #1 32 of 85 PARKING The Village and Barrio Master Plan requires parking for medical offices be provided at a ratio of one space per 355 square feet of gross floor area. Therefore, based on a gross square footage of 7,868 (building square footage not including parking garage) a total of 23 parking spaces would be required. However, pursuant to California Assembly Bill 2097 (AB 2097), the city is prohibited from requiring parking for projects located within one-half mile of a major transit stop. The intent of this legislation is to provide flexibility for project design, concurrent with planning studies that have shown that parking should be market driven. Developers could still voluntarily provide onsite parking, but the number of parking spaces provided will be based on builder preference and market demand, not by city-established minimum parking standards. Irrespective of proximity to public transit, state law allows the city to continue to apply minimum parking standards for electric vehicle (EV) charging stations as well as required parking spaces accessible to persons with disabilities (ADA). The parking requirement is based on the total number of actual parking spaces that would have otherwise applied to the development if the state code section did not exist. The project is located approximately 0.4 miles from the Carlsbad Village Train Station and therefore no standard parking spaces are required for the development of the medical office building. The total number of actual parking spaces that would have otherwise applied to the project is 23 spaces, and therefore a total of 1 ADA space, 1 EV installed space, and 3 EV capable spaces are required. However, the project proposes to provide a total of 8 spaces, including one ADA space and two car lift spaces (2 spaces per lift). All 8 spaces will include installed electric vehicle charging stations. TABLE C –VILLAGE & BARRIO MASTER PLAN AREA-WIDE STANDARDS COMPLIANCE ANALYSIS Standard Required/Allowed Proposed Comply? Ingress and Egress Where alley access is not available, vehicle access points shall be permitted as follows: Reciprocal access with adjacent properties shall be provided for parcels fronting public streets. The city engineer may waive this depending on location of existing structures, infrastructure, failure to reach an agreement between owners or other constraint. Development sites shall be permitted a maximum of one access point from public street. The city engineer may permit an additional access point or points upon demonstration of need. The driveway apron shall not exceed 20 feet in width. The project site shares a property line with a multi-family residence to the north and a residential condominium to the west. Both lots are fully developed and opportunities for reciprocal access do not exist due to the locations of the existing driveways and site layouts. One access point is proposed from Hope Avenue which will consist of a 20-foot driveway apron providing direct access into the proposed parking garage. Yes Oct. 16, 2024 Item #1 33 of 85 Standard Required/Allowed Proposed Comply? Ingress and Egress A clear zone shall be provided at the intersection of a street and an alley or driveway to maintain a free line of sight. • The clear zone shall consist of an isosceles right triangle measured 7.5 feet in both directions from the intersection of the two property lines. • The clear zone shall not be occupied by a ground floor building footprint, site features taller than 36 inches, or landscaping that is taller than 30 inches. The proposed parking garage fronts directly onto Hope Avenue. Clear areas at the intersection of the garage entrance and Hope Avenue are provided. Only 18- inch-tall landscape planters are proposed within these areas. Yes Property Line Walls and Fences Fences and walls within the front setback shall be a maximum 3.5 feet tall (42-inches). No walls or fences are proposed along Hope Avenue or Grand Avenue. Yes Building Orientation Buildings shall be oriented toward primary street frontage. The project is appropriately oriented towards Grand Avenue with the parking garage located along the rear (north) property line opposite Grand Avenue. Yes Building Entrances The primary entrance of a ground floor commercial use shall be oriented towards the primary street frontage. The primary entrance is oriented towards Grand Avenue. Yes Roof Protrusions All new development that results in additional height above the building height maximum for the applicable district shall abide by the following regulations: -- -- Roof Protrusions No roof structure or any other space or feature shall be allowed for the purpose of providing additional floor space except as provided herein. N/A – The proposed 34-foot-tall medical office building will not exceed the 45-foot height limit of the Village Center District. N/A Roof Protrusions All roof structures (excluding architectural features) shall be set back a minimum five feet from all building faces and shall not exceed the maximum stated heights below. Structures permitted to exceed five feet in height shall be setback at least an additional one foot for every foot above five feet, up to maximum stated heights. N/A – The proposed 34-foot-tall medical office building will not exceed the 45-foot height limit of the Village Center District. N/A Oct. 16, 2024 Item #1 34 of 85 Standard Required/Allowed Proposed Comply? • Guardrails or other barrier for roof decks; roof deck amenities, including permanently affixed equipment and furnishings (such as built-in seating, barbeque islands, counters, and the like) trellises, latticework, screens (including vegetative screens), or other objects designed or arranged to create a privacy screen or outdoor room; equipment screening, fire or parapet walls; skylights; and similar: Up to 42 inches above maximum height. • Roof structures specifically for the housing of elevators, stairways, tanks, ventilating fans or similar equipment required to operate and maintain the building; flagpoles, chimneys, smokestacks, wireless masts and similar structures: Up to 10 feet above maximum height. Roof Protrusions • Architectural features: Up to 10 feet above maximum building height. Architectural features that are within 10 feet of a building face shall be cumulatively limited in width to 30 percent of that building face. N/A – The proposed 34-foot-tall medical office building will not exceed the 45-foot height limit of the Village Center District. N/A Window Glazing 30 percent minimum glazing of ground-floor facade for retail uses adjacent to Hope Avenue and Grand Avenue. Facade is measured from plate height to finish floor. N/A – The project does not propose retail uses. N/A Window Glazing The bottom of any window or product display window shall not be more than 3.5 feet above the adjacent sidewalk. Storefront glazing for the ground floor office unit fronting Grand Avenue and the common lobby area fronting Hope Avenue extends to the ground. Yes Window Glazing Transparent or translucent glazing is required on the ground-floor facade of a commercial or retail use facing a public street. Opaque, reflective, or dark tinted glass is not permitted. The project proposes clear commercial glazing with storefront aluminum frame along the Hope Avenue and Grand Avenue entrances. Yes Window Glazing If “non-active” portions of a building are unavoidable along sidewalks or pedestrian areas, such as building A non-active portion of the building is proposed along Hope Avenue to accommodate the Yes Oct. 16, 2024 Item #1 35 of 85 Standard Required/Allowed Proposed Comply? walls enclosing first floor parking, ensure architectural elements and other attractive, pedestrian-oriented features are present. parking garage, however a second-floor egress balcony with a decorative metal framing accent along with two long windows provided near the top of the parking garage building façade and landscape planters will provide visual interest to pedestrians within the Hope Avenue right-of-way. The project is also required to comply with the Village and Barrio Master Plan Design Guidelines section 2.8). Please see Staff Report Exhibit 4 for additional information. C. Site Development Plan (CMC Chapter 21.06) The project requires a Site Development Plan according to section 6.3.3.B of the Village & Barrio Master Plan. A Conditional Use Permit is not required with this project because medical office uses are permitted by right within the Village Center (VC) District of the Village & Barrio Master Plan. All Site Development Plans within the Village & Barrio Master Plan area are required to be approved by the City Council. Six site development plan findings are required for the project. The required findings with justification for each are summarized below and contained in Planning Commission Resolution (Exhibit 1 to the Oct. 16, 2024 Planning Commission Staff Report). 1. That the proposed development or use is consistent with the General Plan and any applicable master plan or specific plan, complies with all applicable provisions of Chapter 21.06 of the Carlsbad Municipal Code, and all other applicable provisions of this code. The project proposes the demolition of an existing 1,456-square-foot medical office building, and in its place the construction of a new 10,671-square-foot, two story, 34-foot-tall, 3-tenant medical office building with private balconies, a 395-square-foot common egress balcony on the second floor fronting Hope Avenue and a one-story, 2,803 square-foot enclosed parking garage consisting of four parking spaces and two lift spaces (two parking spaces per lift) for a total of 8 spaces, all on a 0.16-acre infill site located at 2879 Hope Avenue, within the Village Center (VC) District of the Village & Barrio Master Plan. Medical office uses are permitted by right within the VC District. The project is consistent with the various elements and objectives of the Village (V) General Plan Land Use designation and the Village & Barrio Master Plan as discussed in the findings below and in the project staff report dated Oct. 16, 2024, incorporated by reference, with the exception of Village and Barrio Master Plan section 2.7.1.H, Building Massing. A Standards Modification has been requested to allow a deviation from the building massing requirement for the purpose of providing a significant public benefit. Staff has reviewed the standards modification and concurs with the request. The Standards Modification request is discussed in greater detail in section D below. 2. That the requested development or use is properly related to the site, surroundings, and environmental settings, will not be detrimental to existing development or uses or to development Oct. 16, 2024 Item #1 36 of 85 or uses specifically permitted in the area in which the proposed development or use is to be located, and will not adversely impact the site, surroundings, or traffic circulation. The proposed medical office building is located within the Village Center (VC) District of the Village & Barrio Master Plan. The project will not be detrimental to existing uses or to uses specifically permitted in the area in which the use is located in that medical office uses are permitted by right in the VC District. The properties surrounding the Site to the south and west are designated for VC uses under the VBMP. The properties located to the north along Hope Avenue are designated as Multiple-Family Residential Zone (R-3). The properties to the east of the Site, across Hope Avenue, are designated as Residential Density-Multiple (RD-M) Zone. The project Site is immediately surrounded by residential uses on all four sides, including a four-story condominium to the west, two two-story multi-family apartment buildings to the north along Hope Avenue and south across Grand Avenue and a one-story, single-family, residential buildings to the east across Hope Avenue. However, the greater surrounding neighborhood provides a mixture of commercial and residential uses, including a hotel east of the site along Grand Avenue, a shopping center south of the site between Grand Avenue and Carlsbad Village Drive and an office building south of the site across Grand Avenue between Harding Street and Jefferson Street and north of Carlsbad Village Drive. The medical office project is estimated to generate 394 average daily trips (ADT) which is an increase of 321 average daily trips from the existing medical office use. However, the project is located in Traffic Analysis Zone (TAZ) 809 per the City’s VMT Guidelines, which has an existing VMT per employee of 17.1 miles. The regional employee average for this TAZ is 20.6 miles per employee, which is 83.3 percent of the regional mean. As a result, the project does not have a significant transportation VMT impact. In addition, the vehicle level of service (LOS) on Grand Avenue and Hope Avenue will not be significantly impacted by the increase in ADT. Pedestrian LOS was evaluated and was found to be adequate. Pursuant to Assembly Bill 2097 (AB 2097), the city is prohibited from requiring parking for projects located within one-half mile of a major transit stop. The project is located approximately 0.4 miles from the Carlsbad Village Train Station, and therefore parking is not required for the proposed medical office building. However, the project proposes to provide a total of 8 spaces. 3. That the site for the intended development or use is adequate in size and shape to accommodate the use. The project consists of the demolition of an existing 1,456-square-foot medical office building, and in its place the construction of a new 10,671-square-foot, two story, 34-foot-tall, 3-tenant medical office building with private balconies, a 395-square-foot common egress balcony fronting Hope Avenue and a one-story, 2,803-square-foot enclosed parking garage consisting of four parking spaces and two lift spaces (two parking spaces per lift) for a total of 8 spaces, all on a 0.16-acre infill site located at 2879 Hope Avenue, within the Village Center (VC) District of the Village & Barrio Master Plan. Medical office uses are permitted by right within the VC District. The Village Center District does not have maximum lot coverage requirements; however, the project will meet the setback and height standards of the Village Center District. 4. That all yards, setbacks, walls, fences, landscaping, and other features necessary to adjust the requested development or use to existing or permitted future development or use in the neighborhood will be provided and maintained. The project complies with all applicable development standards (i.e. setbacks, lot coverage, parking and Oct. 16, 2024 Item #1 37 of 85 height restrictions) of the Village Center District and the Village & Barrio Master Plan with the proposed standards modification. The architecture of the building is compatible with the surrounding residential and commercial development. Landscaping along the street frontages will be provided consistent with the requirements of the city’s Landscape Manual and the Village & Barrio Master Plan. 5. That the street systems serving the proposed development or use is adequate to properly handle all traffic generated by the proposed use. The proposed project is considered a corner lot as it has two primary street frontages, Hope Avenue to the east, and Grand Avenue to the south. The Grand Avenue segment between Jefferson Street and Hope Avenue has a Village Street typology. The Hope Avenue segment between Grand Avenue and Home Avenue has a Local/Neighborhood Street typology. The project is estimated to generate 394 daily trips, which is a net increase of 321 trips as the existing medical office building is estimated to generate 73 trips. The vehicle level of service (LOS) on Grand Avenue and Hope Avenue will not be significantly impacted by the increase in ADT. The project site is also located within 0.4 miles of the Carlsbad Village major transit station which provides bus, train, and Coaster service on a daily basis. In addition, the Developer will be required to pay traffic impact fees in accordance with Carlsbad Municipal Code Section 18.42 prior to issuance of building permits that will go towards future road improvements. 6. That the proposed development or use meets all other specific additional findings as required by Title 21. No other specific additional Title 21 findings apply to the project. D. Village and Bario Standards Modification, Building Massing (VBMP Section 2.7.1.H) Pursuant to Section 2.6.7 of the VBMP, a modification to a development standard may be permitted by the decision-making authority in all districts. A standards modification is permitted to enable a significant public benefit as determined by the decision-making authority. A significant public benefit may include, but is not limited to the following: a. Exceeding minimum Climate Action Plan (CAP) consistency requirements; b. Exceeding local energy efficiency requirements and/or renewable energy requirements; c. Exceeding local electric vehicle parking requirements; d. Reducing vehicle miles traveled (VMT); e. Implementing programs that encourage employees to carpool or ride transit; f. Implementing an important public amenity or infrastructure component of the Master Plan; and g. Advancing other benefits as determined by the decision-making authority. The applicant is requesting a standards modification for the Building Massing Standard of the Village Center District, section 2.7.1.H, which states no building façade visible from any public street (excluding alleys) shall extend more than 40 feet in length without a 5-foot minimum variation in the wall plane, as well as, a change in roofline. The parking garage building façade which fronts Hope Avenue extends 66 feet in horizontal length with only a 2-foot wall plane variation located at the stairway entrance at the northeast corner of the building. Therefore, this section of the proposed building does not meet the Village Center District building massing Oct. 16, 2024 Item #1 38 of 85 standard, section 2.7.1.H. However, the project has been designed to reduce building massing along this section of the building by stepping back the second (upper) floor building façade and roof line approximately 4 feet to 9 feet. This step back reduces the scale of the building and promotes a pedestrian oriented design. The required standard modification findings with justification for each are summarized below and contained in Planning Commission Resolution (Exhibit 1 to the Oct. 16, 2024 Planning Commission Staff Report). 1. That the applicant has provided acceptable evidence to demonstrate the need for the standards modification and there is no other way to reasonably achieve one or more of the purposes outlined in Section 2.6.7.B without the modification. The project is requesting a standards modification from Village Center District building massing standard, Section 2.7.1.H, which states no building façade visible from any public street (excluding alleys) shall extend more than 40 feet in length without a 5-foot minimum variation in the wall plane, as well as, a change in roofline. The parking garage building façade extends 66 feet in length along Hope Avenue with only a 2-foot wall plane variation. By allowing a modification to this standard, the project is able to provide a parking garage containing 8 EV installed spaces which otherwise would not be provided if the project were required to conform to the development standard. These 8 installed spaces exceed the Carlsbad Climate Action Plan requirement of 3 EV capable spaces and 1 EV installed by increasing the number of EV spaces by 4 spaces and by providing fully installed spaces as opposed to capable spaces. Without the standards modification there would be no reasonable way to double the number of EV parking spaces as project conformance with this standard would result in a loss of spaces. Providing as much parking as possible on site for patients and employees of the building provides a significant public benefit by reducing street parking. The project has been conditioned to provide EV parking and ADA parking in compliance with the California Building Standards Code and Green Building Standards Code as an additional ADA space may be required prior to building permit issuance. Reconfiguring the parking to provide for an additional ADA space may result in the loss of two EV parking spaces; however, in this scenario the remaining 6 EV installed parking spaces would still constitute a public benefit as it exceeds the number of required EV installed spaces by 5 spaces. 2. That the standards modification is consistent with the goals and objectives of the Master Plan and the vision and intent of the applicable district. The proposed project provides a continuous and interesting commercial frontage along Grand Avenue consistent with VBMP placemaking goal of creating great streets and placemaking policy of implementing the Grand Avenue Promenade with continuous commercial street frontage along Grand Avenue by providing parking garage access from Hope Avenue instead of Grand Avenue. In addition, that standards modification allows for enclosure of parking, trash and recycle areas effectively shielding these areas from public view and further promoting the placemaking goal of creating great streets. 3. That the decision-making authority has determined the project provides a significant Oct. 16, 2024 Item #1 39 of 85 public benefit that warrants the granting of the standards modification. Pursuant to Assembly Bill 2097 (AB 2097), the city is prohibited from requiring parking for projects located within one-half mile of a major transit. Irrespective of proximity to public transit, state law allows the city to continue to apply minimum parking standards for electric vehicle (EV) charging stations as well as required parking spaces accessible to persons with disabilities (ADA). The parking requirement is based on the total number of actual parking spaces that would have otherwise applied to the development if the state code section did not exist. The project is located approximately 0.4 miles from the Carlsbad Village Train Station and therefore no standard parking spaces are required for the development of the medical office building. The total number of actual parking spaces that would have otherwise applied to the project is 23 spaces, and therefore a total of 1 ADA space, 1 EV installed space, and 3 EV capable spaces are required. The project proposed to provide 8 EV installed charging spaces, including 1 EV installed ADA compliant space, which exceed minimum parking space requirements and local EV parking requirements. E. GROWTH MANAGEMENT The proposed project is located within Local Facilities Management Zone 1 in the Northwest Quadrant of the city. The impacts on public facilities created by the project, and its compliance with the adopted performance standards, are summarized in Table “D” below. TABLE D – GROWTH MANAGEMENT COMPLIANCE Standard Impacts/Demand City Administration No Impact; does not generate population Library No Impact; does not generate population Wastewater Treatment 4.4 Equivalent Dwelling Units (EDU)/880 GPD Parks No Impact; does not generate population Drainage 0.87 CFS, Drainage Basin A Circulation Existing: 73 ADT Proposed: 394 ADT Net increase: 321 ADT Fire Fire Station 1 Open Space No Impact Schools No Impact; does not generate population Sewer Collection System 4.4 Equivalent Dwelling Units (EDU)/880 GPD Water 240 GPD Average Oct. 16, 2024 Item #1 40 of 85 I VILLAGE AND BARRIO MASTER PLAN DESIGN GUIDELINES SDP 2023-0025 (DEV2023-0122) – GRAND HOPE MEDICAL OFFICE BUILDING INTENT The Design Guidelines (guidelines) intend to implement and enhance the existing character within the Village and Barrio as new development and property improvements occur. Together, the Village and Barrio are a unique, mixed-use environment. They serve as both a shopping and entertainment destination as well as a place to live and work. The guidelines aim to improve the character of the Village and Barrio while improving livability. Guidelines address many components of building style and orientation, including site layout, building massing, roof form, building façades, and appurtenances. Images are intended to provide a visual example of a targeted topic described in the caption and may not represent all aspects and direction provided within this document. Through these areas of focus, the guidelines strive to foster authentic designs with straightforward and functional construction. All development should align with the spirit and intent of the design guidelines presented in this chapter. Designers and developers should consider at a minimum that these guidelines are a starting point for quality development, and do not comprise every possible strategy for achieving high quality design. Therefore, it is prudent that designers use their own techniques for achieving authentic, high quality design. The following guidelines apply to all new and remodeled development within the entire Master Plan Area unless exempt as determined by Section 6.3.2. 2.8.2 SITE PLANNING GUIDELINES CONSISTENCY STATEMENT A.Site layout 1.Place buildings adjacent to, and oriented towards, the street. Locate prominent architectural features near corners and intersections. 2.Orient storefronts and major building entries towards major streets, courtyards, or plazas. 3.Minimize gaps between buildings in order to create a continuous, pedestrian- oriented environment. 4.Place parking lots so as not to interrupt commercial street frontages. 5.Incorporate functional and aesthetic vehicular and pedestrian connections to adjacent sites. 6.Create small pedestrian plazas along the street wall through the use of recesses in building form. 7.Provide easily identifiable pedestrian access from the street and/or sidewalk to key areas within the site. 8.Incorporate plazas, landscaped areas, fountains, public art, textured pavement, and vertical building features to create focal points that enhance a pedestrian’s experience. 9.Utilize atriums and outdoor courtyards to increase the variety and number of views and to bring additional sunlight into large developments. 10.Give careful design consideration to corner lots, as they are typically a focal point in the urban fabric. 11.Utilize courtyards or other methods to break up the building mass and provide natural ventilation, wherever possible. The proposed site layout for the medical office project takes advantage of the configuration of the lot by placing the entry door for the ground floor office (unit 1) on Grand Avenue and placing the common ground floor lobby entrance at Hope Avenue. Parking is enclosed within an attached garage accessed via a 20- foot-wide driveway connected to Hope Avenue. The entrances to the units feature covered porches or balcony overhangs. The architecture of the building provides articulation along both street frontages to provide varied, interesting façades and incorporates perimeter landscaping. The building is stepped back at the corner of Hope Avenue and Grand Avenue to allow for additional landscaping. B.Parking and access 1.Locate parking behind buildings and away from the street, wherever possible. 2.Use pervious paving materials, whenever possible. 3.Buffer residential uses from commercial parking lots by landscaping, fencing, and/or walls. 4.When walls or fences are utilized to screen parking, provide breaks to allow for One vehicular access point is proposed off Hope Avenue. Parking will be located within an enclosed attached one-story parking garage which will buffer the parking area from the adjacent residential uses. The parking garage will contain a Exhibit 4 Oct. 16, 2024 Item #1 41 of 85 pedestrian circulation and limit height for safety and security purposes. 5. Divide large parking lots into smaller areas with landscaping and clearly marked pedestrian paths. 6. Highlight primary pedestrian access paths within parking areas with decorative paving, trellises, canopies, lighting, and similar improvements. 7. Create pedestrian paseos to parking lots of buildings. 8. Locate parking below grade or in structures, where feasible. 9. Design parking structures so their height and bulk are consistent with adjacent buildings. 10. Provide bicycle parking at convenient locations such as entrances or other visible and accessible areas. 11. Provide electric vehicle charging stations and equipment where feasible and as otherwise required. total of 8 parking spaces, two of which will be lift spaces (two spaces per lift). The two lift spaces will allow for two parking spaces below grade and two at grade. The parking garage will connect to the ground floor common lobby. Although only 1 installed electric vehicle charging space and 3 electric vehicle capable spaces are required, the project is proposing to install electric vehicle charging stations for all 8 spaces. Bicycle parking is provided near the common ground floor lobby entrance fronting Hope Avenue. C. Plazas and open space 1. Provide private or common open space and pedestrian connections to such spaces to enhance the living environment and contribute to a walkable neighborhood character. 2. Semi-public outdoor spaces, such as small plazas and courtyards are encouraged between private and public spaces to support pedestrian activity and connectivity. 3. Design plazas and building entries to maximize circulation opportunities between adjacent uses. 4. Provide landscaping and high-quality paving materials, such as stone, concrete or tile, for plazas and open spaces. 5. Place outdoor furniture, such as seating, low walls, trash receptacles, bike racks and other elements, in outdoor pedestrian spaces. 6. Site buildings to define open space areas. Ensure that outdoor areas are visible from public streets and accessible from buildings, as well as, streets and pedestrian and bicycle networks. Although the 7,000 square foot lot is small and does not provide ample room for open space, the project includes a small, landscaped area at the corner of Grand Avenue and Hope Avenue. The project proposes to replace the existing 5-foot-wide sidewalk on Grand Avenue with a new 10-foot-wide sidewalk and 5- foot landscape parkway to match the existing sidewalk to the south. The project also proposes perimeter landscaping and planters, including two new street trees in the revised parkway fronting Grand Avenue. Enhanced paving is proposed for all ground floor entrances. F. Mechanical Equipment and Service Areas 1. Carefully design, locate, and integrate service, utility, and loading areas into the site plan. These critical functional elements should not detract from the public view shed area or create a nuisance for adjacent property owners, pedestrian circulation, or vehicle traffic. 2. Locate loading areas in the rear of a site where possible. 3. Locate mechanical equipment and service areas along and accessed from alleys or the rear of properties, wherever possible. 4. Place public utility equipment, meter pedestals, and transformers underground or away from sidewalks and pedestrian areas, where feasible. 5. Screen all mechanical equipment from public view. 6. Ensure roof mounted mechanical equipment and screening do not interfere with required solar zones or installed solar photovoltaic or solar water heating systems. 7. Design trash and recycling enclosures to be consistent with the project and building architecture, and site and screen them to minimize visual impact. Air conditioning units for all five units will be located on the roof and will be adequately screened from public view by the proposed parapet. Meter pedestals and electrical transformers will be surrounded by proposed landscaping to provide a visual buffer. Trash and recyclable will be located within the enclosed parking garage. Roof plans demonstrate adequate solar zones for future photovoltaic systems. Oct. 16, 2024 Item #1 42 of 85 G. Landscaping Landscaping shall meet the policies and requirements set forth in the City of Carlsbad Landscape Manual. 1. Utilize landscaping to define building entrances, parking lots, and the edge of various land uses. 2. Utilize landscaping to buffer and screen properties. 3. Consider safety, environmental impacts, and accent elements when selecting and locating landscaping elements. 4. Landscaping, between the front property line and the building creates a visually interesting transitional space. Select and place plants to enhance and soften architectural elevations, screen undesirable building features and contribute to the overall quality of the streetscape. 5. Select species that are compatible with Carlsbad’s semi-arid Mediterranean climate, and that will grow to an appropriate size at maturity. 6. When there are minimal landscape areas between the building and the street, incorporate planters onto porches, recessed building entrances, and planters on decks and balconies. 7. Minimize paved vehicle areas such as driveways and parking areas. Design driveways to be no wider than necessary to provide access. Incorporate permeable surfaces, such as interlocking pavers, porous asphalt, power blocks, and lattice blocks/ grass-crete or ribbon driveways where feasible. 8. Utilize planting to screen less desirable areas from public view, i.e., trash, enclosures, parking areas, storage areas, loading areas, and public utilities. 9. Provide landscaping between any parking lot and adjacent sidewalks or other paved pedestrian areas, as well as, within surface parking lots. 10. Incorporate native and drought tolerant vegetation whenever possible. Avoid use of invasive or noxious plants. 11. Incorporate lattice work and landscaping onto existing blank walls to support flowering vines growing out of planters placed at their base. 12. Plant trees and fast growing and flowering vines along fences and walls to soften the appearance of the fencing and screen views to functional on-site work and storage areas. 13. Utilize vines, espaliers, and potted plants to provide wall, column, and post texture and color and to accentuate entryways, courtyards, and sidewalks. 14. Incorporate large planters into seating areas. Planters should be open to the soil below and should incorporate permanent irrigation systems. 15. Maintain landscaping and yard areas regularly to keep a desirable, healthy appearance, eliminate trash, and control vermin. 16. Incorporate Low Impact Development (LID) strategies, site design, and source control measures into projects. Examples include rain gardens, rain barrels, grassy swales, soil amendments, and native plants. 17. Utilize seasonal shading from trees and shrubs when developing planting schemes for courtyards and streetscapes on south and west facing facades. The proposed landscape plan complies with the city’s Landscape Manual. Landscaping and landscape planters will be provided between the proposed medical office and both street frontages as well as between the medical office building and the adjacent multi-family residence to the west. A new five-foot landscaped parkway with two new street trees is proposed between the sidewalk and Grand Avenue. H. Fences and walls 1. Construct fences of quality and durable materials, such as, wood, vinyl or wrought iron. 2. Architecturally treat all site walls to complement the building design. No fences or walls are proposed along the front, rear, or street side setbacks. An existing 6-foot-high metal fence along the interior side setback will remain. Oct. 16, 2024 Item #1 43 of 85 3. Chain link fences and other “see-through” fences are not appropriate for screening. 4. Fences and walls directly adjacent to sidewalks and pedestrian plazas in commercial and mixed-use areas should be avoided unless designed as a pedestrian amenity or a low wall landscape feature. 2.8.3 BUILDING FORM AND MASSING GUIDELINES CONSISTENCY STATEMENT A. Building Form and Articulation 1. Reduce the imposing appearance of tall buildings by stepping back from street level on elevations above the ground floor. 2. Utilize horizontal and vertical articulation to break up monolithic street walls and facades. 3. Utilize techniques to reduce massing, such as variation in wall plane and height and variation in roof form and levels. 4. Surface detailing may be used, but does not serve as a substitute for distinctive massing. 5. Consider adjacent low density uses when designing and orienting a building. For example, avoid balconies overlooking rear yards. 6. Minimize the vertical emphasis of architectural design elements by incorporating features such as horizontal bands, reveals, trims, awnings, eaves, and overhangs or other ornamentation, along different levels of the wall surface. 7. Minimize blank walls by: a. Adding window openings and/or entrances and other relief. b. Providing recessed glazing and storefronts. c. Adding vertical pilasters which may reflect internal building structure. d. Changing color and texture along the wall surface. e. Varying the planes of the exterior walls in depth and/or direction. f. Adding trims, projections, and reveals along different wall surfaces. 8. Articulate the building façade by varying building elements to create contrast. Integrate all architectural elements into the building design to avoid the look of “tacked on” architectural features. 9. Utilize facade projections and recesses such as bay windows, planter boxes, roof overhangs, and entry way recesses. 10. Arrange columns such that they appear to support the weight of the building or feature above and are balanced in height, weight, and depth. Spindly columns can appear out of proportion with the element it is supporting. 11. Size shutters appropriately, when used to cover the window opening. 12. Avoid exterior sliding or fixed security grilles over windows along street frontages. 13. Discourage and avoid “chain” corporate architecture and generic designs. Each project should strive to achieve the unique architectural style or character. 14. Design roofs to accommodate a solar photo-voltaic system and/or solar water heating system, as required by California Building Code. 15. Utilize details such as wall surfaces constructed with patterns, changes in materials, building pop-outs, columns, and recessed areas to create shadow patterns and depth on the wall surfaces. The building is designed with several vertical and horizontal alternating planes. The rooflines are also appropriately varied in pitch and height. The second-floor building façade along Hope Avenue is stepped back. The building is also stepped back from the corner intersection of Grand Avenue and Hope Avenue to reduce massing. Doors, windows, and balconies as well as adequately weighted architectural projections minimize potentially blank walls. A decorative metal accent framing the corner elevation at Grand Avenue and Hope Avenue provides a focal point and creates visual interest. The building exterior uses three types of materials that utilize muted colors. These include stucco, porcelain tiles, concrete blocks and metal parapets and accents. Material changes appropriately occur at corners of changing wall planes. Metal balcony railings and parapets are used as accent materials which highlight building features, complement the design, and provide architectural interest. Oct. 16, 2024 Item #1 44 of 85 16. Ensure that proportions are consistent with selected architectural styles. 17. Incorporate the characteristic proportions of traditional facades in new infill development. 18. Balance the ratio of height, width, and depth of arches and columns to emphasize strength and balance. 19. Ensure consistency between the height of a column and its mass or thickness with the weight of the overhead structure the column supports. 20. Infill buildings that are much wider than the existing facades should be broken down into a series of appropriately proportioned structural bays or components. 21. Consider transitions between the height of new development and the height of adjacent existing development. 22. Utilize vertical building focal elements. Towers, spires, or domes may foster community identity and serve as landmarks. 23. Utilize windows and open wrought iron balconies to provide opportunities for residents to passively observe and report suspicious activity. 24. Utilize accent materials to highlight building features and provide visual interest. Accent materials may include any of the following: a. Wood b. Glass c. Glass block (transom) d. Tile e. Brick f. Concrete g. Stone h. Awnings i. Plaster (smooth or textured) 25. Use building materials and finishes that are true to the structure’s architectural style. 26. Windows, doors, and entries should be designed to capture the desired architectural style of the building. 27. Generally, use no more than three different materials on exterior wall surfaces. While certain styles may successfully incorporate multiple surface materials, caution must be used as too many materials can result in a less than aesthetically pleasing building. 28. Ensure material changes occur at intersecting planes, preferably at inside corners of changing wall planes or where architectural elements intersect, such as a chimney, pilaster, or projection. 29. Utilize light and neutral base colors. Generally muted color schemes will promote visual unity and allow awnings, window displays, signs and landscaping to be given proper emphasis. 30. Ensure lighting is architecturally compatible with the building. 31. Articulate storefronts with carefully arranged doors, windows, arches, trellises, or awnings, rather than blank walls. 32. Ensure that the main entrance to a building is clearly identifiable and unique, as it is the primary point of arrival and should be treated with significance. Oct. 16, 2024 Item #1 45 of 85 33. Window type, material, shape, and proportion should complement the architectural style of the building. 34. Utilize recessed windows where appropriate to the architectural style, to provide depth. C. Balconies 1. Place balconies adjacent to operable doorways. Faux balconies or those that do not appear usable are discouraged. 2. Visually support all balconies, either from below by decorative beams and/or brackets, from above by cables, or by other parts of the building. 3. On corners, balconies may wrap around the side of the building. Usable second floor balconies are provided for units 2 and 3. The balconies are supported by adequately weighted columns and are accented with medium toned porcelain tiles mounted vertically to provide interest. D. Roof Forms 1. Ensure that roof materials and colors are consistent with the desired architecture or style of the building. 2. Utilize multi-roof forms, hips, gables, shed roof combinations, and sufficiently articulated flat roofs to create interesting and varying roof forms that will reduce building mass, add visual appeal, and enhance existing Village and Barrio character and massing. 3. Avoid long, unbroken, horizontal roof lines. 4. Avoid flat roofs unless sufficient articulation of detail is provided, such as precast treatments, continuous banding or projecting cornices, lentils, caps, corner details, or variety in pitch (sculpted), height, and roofline. 5. Avoid the “tacked on” appearance of parapets, and ensure their appearance conveys a sense of permanence. If the interior side of a parapet is visible from the pedestrian and/or motorist area of the project, utilize appropriate detail and properly apply materials. The proposed rooflines are appropriately varied in pitch and height. Varying parapet heights further break up the roofline as viewed from Grand Avenue and Hope Avenue. E. Lighting 1. Provide exterior building lighting, particularly in commercial and high- pedestrian areas. 2. Design or select light fixtures that are architecturally compatible with the building. 3. Integrate light fixtures that are downcast or low cut-off fixtures to prevent glare and light pollution. 4. Design lighting in such a way as to prevent the direct view of the light source from adjacent properties or uses, particularly residential properties or uses. 5. Utilize lighting on architectural details, focal points, and parking areas to increase safety, help with orientation, and highlight and site attributes and the identity of an area. 6. Use energy-efficient lamps such as LED lights for all exterior lighting along with adaptive lighting controls to contribute to energy conservation and potentially reduce long-term costs. Exterior lighting will be provided and reviewed as part of the building plan check. The existing light pole on Grand Avenue will remain. F. Residential Design 1. Design with architectural features such as porches, balconies, chimneys, door placement, window proportions, dormers, wood detailing, fencing, siding, and color scheme to complement the overall building design, site and neighborhood context. 2. Incorporate porches, trellises, landscaping, and other features to extend the living area toward the street, soften the transition between the street and the N/A – The project does not propose residential uses. Oct. 16, 2024 Item #1 46 of 85 dwelling, and encourage community. 3. Design and site units as much as possible to front primary streets to provide “eyes on the street,” create pedestrian environments, and support the walkable, connected character of the Village and Barrio. 4. Articulate windows with accent trim, sills, kickers, shutters, window flower boxes, balconies, awnings, or trellises authentic to the architectural style of the building. 5. Incorporate safe, efficient, and convenient access to usable open space within multifamily developments. 6. Locate garages and parking areas to have the least amount of visual impact on the street. 7. Design garages so that they are subordinate to the main living area, when viewed from the street. Where possible, recess the garage behind the dwelling unit and do not locate it between the main living area and the street. 8. Recess garage doors into the exterior wall, rather than keeping them flush. 9. Design detached garages and accessory structures to be an integral part of the architecture of the project. They should be similar in materials, color, and detail to the principal structures of a development. Oct. 16, 2024 Item #1 47 of 85 From:Keith Valentine To:Lauren Yzaguirre Subject:Project # SDP2023-0025 — Grand Hope Medical Date:Wednesday, October 11, 2023 2:19:20 PM Hi Lauren, I received a copy of the application notice for the project at 2879 Hope Avenue in Carlsbad. It seems odd that the application is taking a 1,500 sq/ft office building at 1 story with 10 parking spots to a 10,594 sq/ft building at 2 stories and reducing the spots to 8 parking spots. How can this be effective or permissible? 7 times the size with a 20% reduction in on-site parking. This poor parking situation will impact the Carlysle at 800 Grand as well as the surrounding homes and neighbors on Hope Avenue. Shouldn’t they be required to construct underground parking? Thank you. KV (Keith Valentine) CAUTION: Do not open attachments or click on links unless you recognize the sender and know the content is safe. Exhibit 5 Public Comments Oct. 16, 2024 Item #1 48 of 85 From:7605058298@vzwpix.com To:Lauren Yzaguirre Date:Wednesday, August 14, 2024 1:15:37 PM Attachments:image000000.jpgimage000001.jpgimage000002.jpgimage000003.jpgimage000004.jpgimage000005.jpgimage000006.jpg Hello Lauren, Please see the attached photos. They reveal an abandoned building in downtown Carlsbad. The area adjacent to the building is a mess that attracts problems, even has an opening that animals or kids might climb below the building. That area should be cleaned up and closed off. Also, I wish to make a statement that 8 covered parking spaces isn't sufficient for a 10,000 square foot medical building. The current building is one-fifth that size and has more parking. This will cause parking issues in the neighborhood. Please confirm you received this message. Thanks, Stan Katz CAUTION: Do not open attachments or click on links unless you recognize the sender and know the content is safe. Oct. 16, 2024 Item #1 49 of 85 Oct. 16, 2024 Item #1 50 of 85 Oct. 16, 2024 Item #1 51 of 85 Oct. 16, 2024 Item #1 52 of 85 NOTICE OF PROJECT APPLICATION • PROJECT !\'.AMF.: GRAND HOPE M EDICAL PROJECT NUMBER: SDP2023-0025 SITE DEV.;:-E;--,Lo"'r""v-:c1El\;:;;. c:;,T~P;;;E:;;, ~=11,,;Tc;;l;;;.O-;-D~EM=o;;-LJSH AN PROJECT EXISTING I-STORY MEDICALOFFlCE BUILDrNC AND DESCRIPTION: EXJSTl:\'G SITE 1"1PROVEME"ITS Al\'D PERMITTfffi COI\STRl:CTION OF A NEW 10,594-SQUARE FOOT, 2-STOHY. 34'-FOOT-I UGII J\U:DICAL OFFJCE BUTLDlNC 0"1 A .16-ACRE SITE. THE PROJECT WOULD INCLUDE 8 CO\'EHED ON-SITE PARKING SPACES. CITY OF CARlSRAll PL,\'.1/i'{l;,IG 011:i>11ssi·rco;Ji,.\· --------,P~R~OiJ~•:~C-TiliA}l'P~L~l~CA~N~T~l~R~E~l'~R~E~SE~·N~T~A~l~·•~V'!_E L • .. KIRK MOELLER ARCIOTECTS, L'1C. AVRt:'I' YZAGUIRRE, ASSOCIATF; PLAN•~•n '""' KIRK MOE LI.ER LAURE~.Y7..AGUIRRE(alC..\RI.SRADCA GOV (442)3.19-2634 • KIRk(ii kMARCHITECTSINC COM • (760) 80.l-8006 ' Oct. 16, 2024 Item #1 53 of 85 Oct. 16, 2024 Item #1 54 of 85 Oct. 16, 2024 Item #1 55 of 85 Oct. 16, 2024 Item #1 56 of 85 From:Kirk Moeller To:Lauren Yzaguirre Cc:Andy Champion Subject:FW: Grand Hope Medical 2879 Hope Ave Date:Thursday, November 2, 2023 3:36:57 PM Hi Lauren, Please see email below that we received from one of the neighbors for records purposes. Thank you, Kirk Moeller Kirk Moeller Architects, Inc. 2888 Loker Avenue East, Suite 220 Carlsbad, CA 92010 Office: 760-814-8128 Mobile: 760-803-8006 kirk@kmarchitectsinc.com kmarchitectsinc.com From: Nicole Gautreau <nicole.gautreau@westernu.edu> Sent: Friday, October 27, 2023 3:36 PM To: Kirk Moeller <kirk@kmarchitectsinc.com> Subject: Grand Hope Medical 2879 Hope Ave Hello, My name is Nicole Gautreau and I am an owner of 2820 Hope Ave Unit B. I would like to express my disapproval with the Grand Hope Medical Building on 2879 Hope Ave. Hope Ave is a quiet street where kids and dogs frequently play. The addition of the medical building will not only increase noise, foot and car traffic but it will also greatly increase the amount of parked cars. Only 8 parking spots is not enough for 2 story facility. This will cause street parking to become very limited for current residents. If approved despite the concerns a larger parking structure or garage will be needed. The tall building will also be unsightly and could increase the amount of homeless/ squatters in the area camping out in front of the medical building. For these reasons I do not condone this current building plan. A 1 story building with ample parking would be a much better option. Please do not hesitate to contact me with any questions or concerns. Thank You, Oct. 16, 2024 Item #1 57 of 85 Nicole Gautreau CAUTION: Do not open attachments or click on links unless you recognize the sender and know the content is safe. Oct. 16, 2024 Item #1 58 of 85 ( City ofCarlsbad AUTHORIATION, CONSENT, AND DISCLOSURE STATEMENT P-1(A) Development Services Planning Division 1635 Faraday Avenue 442-339-2600 www.carlsbadca.gov [fil APPLICATION AND ACKNOWLEDGEMENT INFORMATION This submittal form (Part A through Part F) must be completed as part of your application with the City of Carlsbad. Your project cannot be reviewed until this information is completed. PART A. Owner Authorization and Consent NOTE: This Consent and Disclosure Form must list the name of the principal owners (10% or greater) and attach a copy of the current corporate articles, partnership agreement, or trust document, as applicable. Provide name(s) of the person(s) authorized to sign on behalf of the organization. /A separate page may be attached if necessary.) IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE IND/CA TE NOT-APPLICABLE (N/A) IN THE SPACE BELOW. This is to certify under penalty of perjury that the undersigned is/are the record owner(s) of the property known as: AssessoPs Map Book, Page and Parcer(APJll7Al'Ns): _2_0_3_-2_0_2_-_1-3_-0_· • __________ _ ________________________________ ;and Street Address (if applicable): 2879-2885 Hope Avenue that I/we (full legal name of all record owners) consent to the filing of the Land Use Review Application on our property for processing by the City of Carlsbad Planning Division. I/We declare under penalty of perjury that f/we have reviewed this Affidavit and the information is true and correct. Name: -----'-"-'-ltJ, l..1-L=t?-"---,l,· �'f"""-· -----:;,-· ""--� Signature: -----'L--�-n------------------- Name: __________________________ _ Signature: ________________________ _ Name: __________________________ _ Signature: ________________________ _ (For additional names, please use a separate sheet of paper) Page 1 of 6 P-1 (A) Form Rev 6/2023 Exhibit 6 Oct. 16, 2024 Item #1 59 of 85 Oct. 16, 2024 Item #1 60 of 85 IMPORTANT: A Grant Deed is required if the ownership does not match city records. Ownership on the deed must correspond exactly with the ownership listed. If the owner noted on the Grant Deed does not match the person signing as Property Owner, provide paperwork documenting the person signing is authorized to sign as a Property Owner. Whenever any excavation, fill, or other project-related improvement requires entry onto adjacent property for any reason, the Land Use Review Application shall include the written consent or legal easements or other property rights of the adjacent property owner or their authorized representative, and shall include such consent with the application package. The application will not be deemed complete unless and until all necessary consent documents are so filed. The consent shall be in a form acceptable to the City Planner. If the proposed improvements on the adjacent property change the nature of the property's development rights (or implied bundle of rights), the city might require recordation of a Covenant and Agreement for Offsite Improvements and Release of Liability as a condition of project approval. Does the project's limits of disturbance encroach on property not owned by the Property Owner? □ Yes □ No If yes, attach adjacent owner authorization. PART B. Owner Declarations (to be signed by Property Owner) I/We hereby certify under penalty of perjury that I have read the information below and that: 1. I/We understand that it is the responsibility of the Applicant to substantiate the request through the requirements of the application. 2. I/We understand that if there is a zoning violation on the property, application review may be delayed. Any unpermitted structures or uses must either be removed or legalized at part of this application. 3. I/We understand that if this application is approved, I/we may be required to record a covenant --------uith-the-Gounty-Recorder's-0ffice,the-form-and-content-that-is-satisfactory-to-the-Gity-and-its------- City Attorney, to notify future owners of the project approval and restrictions. 4. If this Land Use Review Application is approved or conditionally approved, I/we hereby certify that I/we will comply with all conditions attached to the approval action. I/We understand that the failure to comply with any conditions shall constitute grounds for the revocation or modification of the approval, permit, or other authorizations provided. 5. Prior to any use of the project site pursuant to the permit issued, all conditions of approval (if --------a~r,mycl-) mw;ill be completed or secuiemrrtm\-rm,,fiii~=tato><t-nrT, Property Owner Signature(s): --~~==~---,,;~----------~~---- Name(s): 1,,,,, l1 (Ir-' llw Date: _~_,__~_,,_{ u--'lj'-. __ Page 2 of 6 P-1(A) Form Rev 6/2023 Oct. 16, 2024 Item #1 61 of 85 PART C. Project Team Information (complete all applicable fields) Applicant: □ Same as Owner IXI Different from Owner Name (if different from Owner): _K_i_rk_M_o_e_l_le_r _________________ _ Company or Firm: Kirk Moeller Architects Inc. Contact Address: 2888 Loker Avenue East, Suite 220 City: Carlsbad State: _C_A _________ Zip Code: 92010 Agent or Representative: IXI Same as Applicant □ Different from Applicant □ N/A Name (if different from Applicant): _______________________ _ Company or Firm: _____________________________ _ Contact Address: _____________________________ _ City: ____________ State: ____________ Zip Code: _____ _ Other (specify Architect, Engineer, CEQA Consultant, etc,)=-~-------~-----~- Name: ________________________________ _ Company or Firm: _____________________________ _ Contact Address: _____________________________ _ City: ____________ State: ____________ Zip Code: _____ _ NOTE: A letter of Authorization (LOA} from the Property Owner empowering a person or persons to act on the behalf af the Property, is required if anyone other than the Property Owner signs the land Use Review Application as the Applicant or Agent. The authorized person (Applicant or Agent) on the LOA must correspond with the name and signature, above. PART D. Single "Point of Contact" Designation A single "point of contact" is an individual that handles all communications with the city and its review team for the purposes of sending and receiving application materials, information, reports, etc. The pomt of contact 1s to be the single md,v1dual elected on the land Use Review Appl1cat1on form for al communications and to remain as the primary contact for all status updates relating to the land Use Review Application. Single Point of Contact: IZI Applicant □ Property Owner □ Agent □ Other ________ _ Page3of6 • P-1(A) Form Rev 612023 Oct. 16, 2024 Item #1 62 of 85 PART E. Contribution Disclosure Has the Property Owner, Applicant, or Agent had more than $900 worth of business transacted with any member of city staff, Boards, Commissions, Committees and/or Council within the past 12 months? □ Yes 00 No If yes, indicate person(s): ___________________ _ NOTE: Attach additional sheets if necessary. PART F. Applicant Declarations (to be signed by Applicant) I hereby certify under penalty of perjury that I have read the information below and that: 1. I have carefully reviewed and prepared the application and plans in accordance with the instructions. 2. I understand that the specific information needed to initiate planning case processing corresponds to those items listed in the application form's "Minimum Submittal Intake Requirements Checklist." I also understand that even if the application is duly filed and accepted for intake processing, each application submitted to the Planning Division is required to have specified information included in the application packet before it is determined to be complete. The specific information to determine completeness is in "Completeness Determination Requirements Checklist." 3. The Planning Division has developed policies to help ensure that discretionary permit applications are timely processed. The Permit Streamlining Act shot clock starts on the intake date the Planning staff accepts a duly filed application. 4. I understand that once an application is determined to be complete, project or design changes that will increase the number of units, add uses that were not previously listed, substantially --------,change-the-site-plan,or-other-changes-that-trigger-the-need-for-additional-discretionary------- approvals will require a new application, or the filing of other application permit types, which would restart the review "clock" and extend processing timelines. 5. I understand that upon city review, additional information, documents, reports, entitlements and fees might be required, including any referral fees. I understand that all fees and deposits submitted with this application will be refunded only as provided for by the ordinances, regulations, or policies in effect at the time of the application submittal. ----------,,6-. --+1 a~1=1d..,e~1•,tamtthatitinnVTesponsibilitvtcrensanrtharstatements-arnmE,,thatuiscrepancie,d-------- not exist between the project's description on the application, the architectural plans and the structural plans. If discrepancies exist between the architectural plans and the structural plans, the architectural plans shall take precedence. Ultimately, the scope of work, as described on the permit that authorizes construction, takes precedence over the plans. If there is a discrepancy between the plans and the description on the permit, the permit governs. Page 4 of 6 P-1 (A) Form Rev 6/2023 Oct. 16, 2024 Item #1 63 of 85 7. I understand that all materials submitted in connection with this application might become public record subject to inspection and copying by the public. I acknowledge and understand that the public might inspect and copy these materials and that some or all of the materials might be posted on the city website or elsewhere online, outside of the city's control. 8. I understand there are no assurances at any time, implicitly or otherwise, whether provided to me in writing or by oral communications regarding final staff recommendations to the decision- making body about this application or the determination of any decision-making body. 9. If the project is approved or conditionally approved, the approved plan set of project drawings, civil plans/grading, sections, site plans, floor plans, architectural elevations, and landscape plans shall not be altered without express authorization by the City Planner. Once a permit has been issued, the Applicant may request permit modifications. "Minor" modifications might be granted if found by the City Planner to be in substantial conformity with the approved plan set, including all exhibits and permit conditions. Modifications beyond the scope described in the approved plan set might require submittal of an amendment to the permit and approval by the authorized review body. 10. Should any proponent of the project fail to file a timely and valid appeal of the permit within the applicable appeal period, such inaction shall be deemed to constitute acceptance of the permit by the Applicant; and agreement by the Applicant to be bound by, to comply with, and to do all things required of or by the Applicant pursuant to all of the terms, provisions, and conditions of the issued permit or other approval. 11. As part of this application, the Applicant hereby agrees to defend, indemnify, and hold harmless the City of Carlsbad, its Council, boards and commissions, officers, employees, volunteers, and agents from any claim, action, or proceeding against the City of Carlsbad, its Council, boards and commissions, officers, employees, volunteers and agents, to attack, set aside, void or annul an approval of the application or related decision, including environmental documents, or to challenge·a-denial-of-the-application-or-related-decisions-c-This-indemnific-ation-shall-include,but·------- not be limited to, damages awarded against the city, if any, costs of suit, attorneys' fees, and other expenses incurred in connection with such claim, action, causes of action, suit or proceeding whether incurred by Applicant, city, and/or the parties initiating or bringing such proceeding. The Applicant shall indemnify the city for all of the city's costs, attorneys' fees, and damages that the city incurs in enforcing the indemnification provisions set forth herein. The Applicant shall pay to the city upon demand any amount owed to the city pursuant to the indemnification requirements prescribed. Page 5 of 6 P-1 (A) Form Rev 6/2023 Oct. 16, 2024 Item #1 64 of 85 By signing below, I hereby agree to defend, indemnify and hold harmless the city and I certify that the application I am submitting, including all additional required information, is complete and accurate to the best of my knowledge. I understand that any misstatement or omission of the requested information or of any Information subsequently requested might be grounds for rejecting the application, deeming the application incomplete, denying the application, suspending or revoking a permit issued on the basis of these or subsequent representations, or for the seeking of such other and further relief as deemed by t~e ~yr~ad. Applicant Signature: ~ -=- Name: Kirk Moeller Date: _______ _ This form must be stapled/attached to the application and shall be effective until replaced or revoked in writing. Page6of6 P-1(A) Form Rev 6/2023 Oct. 16, 2024 Item #1 65 of 85 ( \ ) \ . WILLIAM J. CHO, n.n.~-i.,M.~. Dlplornate, American Boiard Pr Plilr!OQOn!OIOgy i g \~ Practice Limited to Periodontics and Dental lrnplants 3144 El Camino Real, Suite 104, Carlsbad, CA 92008, tel: 760.720.7372, fax: 760.720.7305 e-mail: wjcperio@yahoo.com, website: www.wjcperio.com August30,2023 Re: Letter of Authorization To Whom It May Concern: I hereby authorize Kirk Moeller to handle all communications and will be the primary contact for the Grand Hope Project. Exhibit 7 Oct. 16, 2024 Item #1 66 of 85 CEQA DETERMINATION OF EXEMPTION Subject: This California Environmental Quality Act (CEQA) Determination of Exemption is in compliance with Carlsbad Municipal Code Section 19.04.060. An appeal to this determination must be filed in writing with the required fee within ten (10) calendar days of the City Planner's decision consistent with Carlsbad Municipal Code Section 21.54.140. City Planner Decision Date: August 1, 2024 Project Number and Title: SDP2023-0025 (DEV2023-0122) -GRAND HOPE MEDICAL OFFICE Project Location -Specific: 2879-2885 Hope Avenue (APN 203-202-13-00) Project Location -City: _C_ar_ls_b_a_d _____ _ Project Location -County: =Sa=n-'-=D-'-"ie=g=o ____ _ Description of Project: Demolish an existing 1,456 -square-foot medical office building and construct a 10,671-square-foot, 34-foot-tall, two-story medical office building. The site will have a parking garage with 8 parking spaces, including two lift spaces. Name of Public Agency Approving Project: _C_it~y_o_f _C_ar_ls_b_a_d _______________ _ Name of Person or Agency Carrying Out Project: -=-C'-"ity-'-"'-o-'-f-=-Ca=rc.:..:ls=.c:b=a=d _____________ _ Name of Applicant: ..:..W:....:i.:..:.;lli=a.:..:.m-'-C=hc.:..:o"--------------------------- Applicant's Address: 3144 El Camino Real #104, Carlsbad, CA 92008 Applicant's Telephone Number: ~(7_6_0~) _40_5_-_7_55_7 ___________________ _ Name of Applicant/Identity of person undertaking the project: Andy Champion and Kirk Moeller, Architects Exempt Status: CEQA Section 15332 -In-fill Development Projects Reasons why project is exempt: The project consists of the demolition of an existing 1,456 -square-foot medical office building and the construction of a 10,671-square-foot, 34-foot-tall, two-story medical office building with an attached parking garage containing 8 parking spaces, including two lift spaces. The project is proposed on a site that is less than five acres, is consistent with applicable general plan policies, zoning regulations and does not endanger rare or threatened species. Furthermore, the project will not result in significant effects relating to traffic, noise, air quality, or water quality, and the site can be adequately served by all required utilities and public services. Lead Agency Contact Person: Lauren Yzaguirre, Associate Planner Telephone: 442-339-2634 ERIC LARDY, City Planner Date 28 7 9 - 2 8 8 5 H O P E A V E . CA R L S B A D , C A GR A N D H O P E M E D I C A L O F F I C E GRAND HOPE MEDICAL OFFICE MEDICAL OFFICE DEVELOPMENT 2879-2885 HOPE AVENUE Exhibit 8 Oct. 16, 2024 Item #1 67 of 85 S S S G G G G G G G G G G G G G G G G G G G G G W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S G G G G G G G G G G G G G G G G G G G WW W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S W W X OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE C C C C C C C C C C C C C C C C C C C C C C C C C C OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE X X X X X X X X X X X X X X X X X X X X X X 28 7 9 - 2 8 8 5 H O P E A V E . CA R L S B A D , C A GR A N D H O P E M E D I C A L O F F I C E SCALE: 1" = 10'-0" 5' 10'0 20'SITE PLAN N Oct. 16, 2024 Item #1 68 of 85 28 7 9 - 2 8 8 5 H O P E A V E . CA R L S B A D , C A GR A N D H O P E M E D I C A L O F F I C E 1st FLOOR PLAN NSCALE: 3/16" = 1'-0" 2'-8" 5'-4"0 10'-8" Oct. 16, 2024 Item #1 69 of 85 28 7 9 - 2 8 8 5 H O P E A V E . CA R L S B A D , C A GR A N D H O P E M E D I C A L O F F I C E 2nd FLOOR PLAN SCALE: 3/16" = 1'-0" 2'-8" 5'-4"0 10'-8" N Oct. 16, 2024 Item #1 70 of 85 28 7 9 - 2 8 8 5 H O P E A V E . CA R L S B A D , C A GR A N D H O P E M E D I C A L O F F I C E ROOF PLAN SCALE: 3/16" = 1'-0" 2'-8" 5'-4"0 10'-8" N Oct. 16, 2024 Item #1 71 of 85 28 7 9 - 2 8 8 5 H O P E A V E . CA R L S B A D , C A GR A N D H O P E M E D I C A L O F F I C E Oct. 16, 2024 Item #1 72 of 85 28 7 9 - 2 8 8 5 H O P E A V E . CA R L S B A D , C A GR A N D H O P E M E D I C A L O F F I C E SOUTH ELEVATION SCALE: 3/16" = 1'-0" 2'-8" 5'-4"0 10'-8" EAST ELEVATION SCALE: 3/16" = 1'-0" 2'-8" 5'-4"0 10'-8" Oct. 16, 2024 Item #1 73 of 85 28 7 9 - 2 8 8 5 H O P E A V E . CA R L S B A D , C A GR A N D H O P E M E D I C A L O F F I C E NORTH ELEVATION SCALE: 3/16" = 1'-0" 2'-8" 5'-4"0 10'-8" WEST ELEVATION SCALE: 3/16" = 1'-0" 2'-8" 5'-4"0 10'-8" Oct. 16, 2024 Item #1 74 of 85 28 7 9 - 2 8 8 5 H O P E A V E . CA R L S B A D , C A GR A N D H O P E M E D I C A L O F F I C E BUILDING SECTION SCALE: 3/16" = 1'-0" 2'-8" 5'-4"0 10'-8" BUILDING SECTION SCALE: 3/16" = 1'-0" 2'-8" 5'-4"0 10'-8" Oct. 16, 2024 Item #1 75 of 85 SITE CARL S B A D V I L L A G E D R H O P E A V E . I N T E R S T A T E 5 GRAN D A V E . H A R D I N G S T N 34°02'38" W 140.04' N 5 6 ° 0 0 ' 2 9 " E 5 0 . 0 2 ' N 34°01'01" W 140.03' N 5 5 ° 5 9 ' 1 4 " E 4 9 . 9 5 ' HOPE AVENUE GR A N D A V E N U E 25 . 0 ' 25 . 0 ' 50 . 0 ' 50.0' PARCEL 1 PM 3260 APN: 203-202-1816 PARCEL 26 PM 3260 APN: 203-202-1300 LO T 1 1 PM 1 2 9 3 AP N : 2 0 3 - 2 0 2 - 1 7 0 0 50.0' 100.0' AREA = 7,000 SF (EXIST) 6,914 SF (PROP.) 1 J:\ACTIVE JOBS\4037 HOPE STREET\CIVIL\DRAWING\DISCRETIONARY PLANS SITE DEVELOPMENT PERMIT LEGEND GENERAL NOTES SHEET INDEX REFERENCED DRAWINGS OWNER INFORMATION APPLICANT INFORMATION LEGAL DESCRIPTION SITE ADDRESS TOPOGRAPHY BENCHMARK SITE ACREAGE EARTHWORK / PROJECT GRADING ACCESS ENGINEER OF WORK PREPARED BY PLAN VIEW - EXISTING LOT CONFIGURATION SCALE: 1" = 20' HORIZONTAL PRE 2023-0007 - DEV 2023-0037/SDP 2023-0025 SITE DEVELOPMENT PERMIT GRAND HOPE 2879 HOPE AVENUE APN: 203-202-13 CARLSBAD, CA 92008 TOPOGRAPHY OBTAINED BY FIELD SURVEY ON JUNE 9, 2023 PREPARED BY: PASCO, LARET, SUITER & ASSOCIATES BRYAN KNAPP, PE #86543 DATE LOT 26 OF SCHELL AND SITES ADDITION TO CARLSBAD, IN THE CITY OF CARLSBAD, COUNTY OF SANDIEGO, STATE OF CALIFORNIA, ACCORDING TO MAP THEREOF NO. 2145, FILED IN THE OFFICE OF THECOUNTY RECORDER OF SAN DIEGO COUNTY ON FEBRUARY 20, 1929. EXISTING PROPERTY BOUNDARY RIGHT-OF-WAY CENTERLINE OF ROAD EXISTING EASEMENTS ADJACENT LOT LINE GROSS:7,000 SF (0.16 AC)NET DEVELOPABLE:7,000 SF (0.16 AC)DISTURBED AREA: 7,000 SF (0.16 AC) *EXISTING IMPERVIOUS AREA (ONSITE): 5,478 SF (0.13 AC) *PROPOSED IMPERVIOUS AREA (ONSITE): 6,270 SF (0.14 AC) *AREAS WITHIN LIMITS OF PROPOSED ONSITE DISTURBED AREA CUT: ±55 CY MAX CUT HEIGHT: 1.5 FT FILL: ±20 CY MAX FILL HEIGHT: 1.0 FTEXPORT: ±35 CYREMEDIAL: ±700 CY (3' REMOVAL AND RECOMPACTION IN AREAS SPECIFIED PER SOILS REPORT) THESE QUANTITIES ARE APPROXIMATE AND ARE SUBJECT TO CHANGE BASED ON FINAL ENGINEERING DESIGN AND DETAILING GRAND AVENUE, A PUBLIC ROAD HOPE AVENUE, A PUBLIC ROAD PREPARED BY:PASCO, LARET, SUITER & ASSOCIATES1911 SAN DIEGO AVE, SAN DIEGO, CA 92110 PH: (858) 259-8212 PREPARED ON: JANUARY 31, 2024 LAND USE COMMERCIAL NUMBER OF LOTS 1 LOT SEWER DISTRICT CITY OF CARLSBAD WASTEWATER DIVISION WATER DISTRICT CARLSBAD MUNICIPAL WATER DISTRICT SCHOOL DISTRICT CARLSBAD UNIFIED SCHOOL DISTRICT ELECTRIC SAN DIEGO GAS & ELECTRIC TELEPHONE AT&T CATV SPECTRUM CABLE DRAINAGE BASIN / HYDROLOGIC AREA CARLSBAD / BUENA VISTA LAGOON FIRE CITY OF CARLSBAD AVERAGE DAILY TRAFFIC GENERATED (50 TRIPS/1KSF*7.868KSF ) = 394 ADT PROPOSED EXISTING AVERAGE DAILY TRAFFIC DENTAL OFFICE: (50 TRIPS/1KSF*1.456 KSF = 73 ADT EXISTING394 ADT PROPOSED - 73 ADT EXISTING = 321 ADT NET SEWER GENERATION FIGURE 7,868 SF /(1800 SF/EDU) = 4.4 EDUS TOTAL SEWER GENERATION 1 EDU = 200 GPD 4.4 EDU X (200 GPD/EDU) = 880 GPD POTABLE WATER FIGURE 1,500 GPD / ACRE (COMMERCIAL/OFFICE) TOTAL POTABLE WATER (1,500 GPD / ACRE X 0.16 AC) = 240 GPD GENERAL PLAN DESIGNATION VILLAGE BARRIO (V-B) ZONING DESIGNATION VILLAGE BARRIO (V-B) LAND USE DESIGNATION VILLAGE BARRIO MASTER PLAN, VILLAGE CENTER DISTRICT PRE-DEVELOPMENT PEAK DISCHARGE (Q100) 0.8 CFS (TOTAL FOR SITE) POST-DEVELOPMENT PEAK DISCHARGE (Q100) 0.87 CFS (TOTAL FOR SITE) 2-1/2 INCH BRASS DISK IN THE NORTHEAST CORNER OF GRAND AVENUE AND WASHINGTON STREET 52 FEET WEST OF RAILROAD TRACKS AND 4.5 FEET EAST OF THE EASTERLY CURB OF WASHINGTON STREET AND 40 FEET NORTH OF THE CENTER OF GRAND AVENUE, PER ROS 17271. ELEVATION = 40.910 DATUM = NGVD 29 SITE DEVELOPMENT PERMIT TITLE SHEET 1 DEMO SHEET 2PRELIMINARY GRADING PLAN 3SECTIONS AND DETAILS 4 PM 3260PM 1293PM 2145 DWG 146-8 DWG 89-101 DWG 509-1 DWG 938-3 WILLIAM CHO FOR:CHOSEN WISE PROPERTIES, LLC3144 EL CAMINO REAL #104 CARLSBAD, CA 92008 VICINITY MAP SCALE: NTS 01/31/2024EXISTING EASEMENT INFORMATION NO EXISTING EASEMENTS OF RECORD ENCUMBERING SUBJECT PROPERTY PER PRELIMINARYTITLE REPORT PREPARED BY WFG NATIONAL TITLE COMPANY AS ORDER NO. 23-100287, DATED4/24/2023 PROPOSED EASEMENT/DEDICATION INFORMATION PROPOSED PUBLIC ROADWAY AND PUBLIC UTILITY EASEMENT FOR GRAND AVENUE AND HOPE AVENUE TO THE CITY OF CARLSBAD 0 20 40 60 SCALE: 1" = 20' HORIZONTAL WILLIAM CHO FOR:CHOSEN WISE PROPERTIES, LLC3144 EL CAMINO REAL #104 CARLSBAD, CA 92008 BASIS OF BEARING THE BASIS OF BEARINGS IS THE CALIFORNIA COORDINATE SYSTEM, NAD 83 (CCS83) EPOCH 1999.92, ZONE 6, AS DETERMINED LOCALLY BY A LINE BETWEEN FIRST ORDER CONTROL STATIONS 130 (CLSB-130) AND 122(CLSB-122) BEING A GRID BEARING OF N63°33'33"E AS DERIVED FROM GEODETIC VALUES SHOWN ON RECORD OF SURVEY 17271, CITY OF CARLSBAD SURVEY CONTROL, FILED ONFEBRUARY 8, 2002 AS FILE NUMBER 2002-0112862 IN THE OFFICE OF THE COUNTY RECORDER OF SANDIEGO COUNTY. 1 Oct. 16, 2024 Item #1 76 of 85 -- ----------... I I I I I ~---------- I I I I I I I I □ \ I/ I I ,- I I I I PLSA 1.--, PLSAENGINEERING.COM ~II CITY OF CARLSBAD I~ SITE DEVELOPMENT PERMIT TITLE SHEET FOR: DWN BY: CHKD BY: RVWD BY: RRO BAK BAK GRAND HOPE PROJECT NO. DRAWING NO. SOP 2023-0025 G G G G G G G G G G G G G G G G G G G G G W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S G G G G G G G G G G G G G G G G G G G G G G WW W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S S S S S S S S 15"TD 5"TP 4"TP4"TP 4"TD EGG C C X OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE C C C C C C C C C C C C C C C C C C C C C C C C C C OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE S X X X X X X X X X X X X X X X X X X X X X X TC=61.15FL=60.70 TC=61.34 FL=60.87 TC=6 1 . 5 6 FL=6 1 . 0 9 TC=61.63FL=61.14 TC=61.71FL=61.26 TC=61.75 FL=61.31 TC=6 1 . 8 9 FL=61 . 4 3 TC= 6 1 . 5 7 FL=6 1 . 5 5 TC = 6 1 . 6 0 FL= 6 1 . 5 9 TC= 6 1 . 9 3 FL= 6 1 . 4 8 TC = 6 1 . 7 2 FL = 6 1 . 2 7 TC = 6 1 . 5 8 FL = 6 1 . 1 2 TC = 6 1 . 4 3 FL = 6 0 . 9 9 TC = 6 1 . 3 6 FL = 6 0 . 9 2 TC = 6 1 . 0 3 FL = 6 0 . 9 0 TC = 6 0 . 8 7 FL = 6 0 . 7 8 TC = 6 0 . 8 5 FL = 6 0 . 7 2 TC = 6 1 . 1 3 FL = 6 0 . 6 6 TC = 6 1 . 0 9 FL = 6 0 . 6 2 TC = 6 0 . 7 5 FL = 6 0 . 6 3 TC = 6 0 . 6 6 FL = 6 0 . 5 6 TC = 6 0 . 9 8 FL = 6 0 . 5 0 TC=61.30 FL=60.84 TC=61.40 FL=60.98 TC=61.11 FL=60.98 TC=61.22 FL=61.15 TC=61.60 FL=61.15 TC=61.56 FL=61.13 TC=61.25 FL=61.14 TC=61.33 FL=61.20 TC=61.69 FL=61.20 TC=61.72 FL=61.25 TC=61.36 FL=61.26 TC=61.41 FL=61.32 TC=61.80 FL=61.32 TC=61.45 FL=61.35 TC=61.45 FL=61.37 TC=61.48 FL=61.34 TC=6 1 . 5 0 FL=6 1 . 3 6 TC= 6 1 . 4 7 FL= 6 1 . 4 2 TC = 6 1 . 5 6 FL = 6 1 . 5 0 TC = 6 1 . 6 1 FL= 6 1 . 5 2 TC= 6 1 . 9 9 FL= 6 1 . 5 4 TC= 6 2 . 0 6 FL=6 1 . 6 2 TC=62. 1 2 FL=61. 6 6 TC=62.16 FL=61.70 FL= 6 1 . 5 3 FL=61.89 TC=6 2 . 3 4FL=61 . 8 7 T C = 6 2 . 3 3 FL = 6 1 . 9 0 T C = 6 2 . 3 7 F L = 6 1 . 8 9 T C = 6 1 . 9 6 F L = 6 1 . 9 6 T C = 6 1 . 9 4 F L = 6 1 . 9 2 TC = 6 2 . 2 9 FL = 6 1 . 8 7 T C = 6 2 . 2 1 FL = 6 1 . 7 3 T C = 6 1 . 7 8 F L = 6 1 . 7 1 T C = 6 1 . 7 3 F L = 6 1 . 6 6 TC = 6 2 . 1 3 FL = 6 1 . 6 7 T C = 6 1 . 7 6 F L = 6 1 . 6 5 T C = 6 1 . 6 7 F L = 6 1 . 5 8 TC = 6 2 . 0 0 FL = 6 1 . 5 5 TC = 6 1 . 8 9 F L = 6 1 . 4 1 T C = 6 1 . 7 7 F L = 6 1 . 2 8 T C = 6 1 . 3 6 F L = 6 1 . 2 7 T C = 6 1 . 2 9 FL = 6 1 . 2 0 TC = 6 1 . 6 1 F L = 6 1 . 1 8 T C = 6 1 . 5 0 F L = 6 1 . 0 5 T C = 6 1 . 3 5 FL = 6 0 . 8 8 TC=61.48FL=61.47 TC=6 1 . 9 2 FL=6 1 . 5 2 TC = 6 2 . 0 2 FL = 6 1 . 5 8 TC = 6 2 . 0 1 FL = 6 1 . 6 5 TC = 6 2 . 0 2 FL= 6 1 . 6 7 TC= 6 2 . 0 0 FL=6 1 . 9 9 TC=6 2 . 0 3 FL=62 . 0 1 TC= 6 2 . 0 4 FL=6 1 . 6 5 TC=62.06FL=61.66 TC=61 . 1 8 FL=61 . 1 2 TC=61.42FL=61.21 T C = 6 1 . 8 3 F L = 6 1 . 3 7 TC = 6 2 . 1 7 FL = 6 1 . 7 1 TC = 6 2 . 0 8 FL= 6 1 . 7 3 TC=61.99FL=61.53 TC = 6 2 . 1 6 FL = 6 1 . 6 8 TC=6 2 . 1 5 FL=6 1 . 7 0 61.5 61.4 61.5 61.5 61.0 61.1 61.3 61.7 61.8 61.9 61.9 61.9 62.1 61.8 61.7 61.6 61.3 61.6 61.4 61.7 61.8 61.5 61.6 61.9 61.7 61.8 62.0 61.8 61.7 62.0 61.8 61.8 61.9 61.8 61.9 62.0 61.9 61.8 61.8 61.7 61.5 61.6 61.5 61.1 61.4 61.3 60.8 61.2 62.3 62.4 61.9 62.1 62.0 62.1 62.4 62.1 62.2 62.1 61.8 61.9 63.2 62.0 61.0 60.9 61.0 61.1 61.1 61.3 61.5 61.9 63.4FF 63.1FF 63.3FF 59.83FF/CRAWLSPACE 62.6TW 62.6TW 62.6TW 62.6TW 62.8TW 62.8TW W 71.0RF 71.2RF 75.9RF/HP 71.1RF 71.1RF 62.4BW61.9BW61.1BW HOPE AVENUE GR A N D A V E N U E EX. 8" PVC WATER MAIN PER DWG 938-3 EX. 8" VCP SEWER MAIN PER DWG 118-9 EX. 4" ABD WATER MAIN PER DWG 146-8 EX. 1.5" HP GAS MAINPER DWG 146-8 EX. 1.5" HP GAS MAINPER DWG 146-8 EX. 6" AC WATER MAINPER DWG 146-8 EX. 3 STORY MULTI UNIT HOUSING EX . P A V E D DR I V E W A Y 24.0' 10 . 1 ' 10 . 2 ' 25 . 0 ' 25 . 0 ' 50 . 0 ' 18 ' ± C L T O F O C 18 ' ± C L T O F O C 10 . 0 ' 6. 0 ' 10 . 0 ' 20.0' 14.5' 35'± CL TO FOC 7' 50.0' 35'± CL TO FOC PARCEL 1 PM 3260 APN: 203-202-1816 LO T 1 1 PM 1 2 9 3 AP N : 2 0 3 - 2 0 2 - 1 7 0 0 EX. 6" FIRE SERVICEPER DWG 509-1 2 ℄ ℄ 1 1 1 11 2 3 3 4 7 7 7 10 11 11 11 12 12 12 3 11 11 EX. FIRE HYDRANTEX. OVERHEAD POWER LINES 13 13 14 15 15 16 16 16 17 17 17 17 18 19 19 20 21 22 23 24 5 8 9 16 33 SITE NOTES GRAPHIC SCALE: 1" = 10' 0 10'20'30' EXISTING SURVEY MONUMENT TO BE PROTECTED IN PLACE. MONUMENT SHALL BEREPLACED BY A LICENSED LAND SURVEYOR WHO SHALL FILE A CORNER RECORDWITH THE COUNTY IF DISTURBED EXISTING STRUCTURE TO BE REMOVED EXISTING PCC SIDEWALK TO BE REMOVED EXISTING PCC PAVEMENT TO BE REMOVED EXISTING PAVEMENT STRIPING TO REMAIN EXISTING PCC CURB AND GUTTER TO BE REMOVED EXISTING PCC CURB TO BE REMOVED EXISTING WATER SERVICE AND METER TO BE REMOVED EXISTING SEWER LATERAL TO BE REMOVED EXISTING OVERHEAD ELECTRIC LINE TO BE REMOVED AND UNDERGROUNDED EXISTING DECORATIVE PAVEMENT TO BE REMOVED EXISTING MONUMENT SIGN TO BE REMOVED EXISTING TREE TO BE REMOVED EXISTING PCC DRIVEWAY APRON TO BE REMOVED EXISTING STRUCTURE TO REMAIN EXISTING PCC SIDEWALK TO REMAIN EXISTING PCC CURB AND GUTTER TO REMAIN EXISTING FIRE BACKFLOW TO REMAIN EXISTING PEDESTRIAN CURB RAMP TO REMAIN EXISTING STREET LIGHT TO REMAIN EXISTING RETAINING WALL TO REMAIN EXISTING FENCE TO REMAIN EXISTING ELECTRIC CABINET TO BE RELOCATED EXISTING PCC DRIVEWAY TO REMAIN 1. EXISTING SURVEY MONUMENTS TO BE PROTECTED INPLACE. IF A MONUMENT IS DISTURBED OR DESTROYED, IT SHALL BE REPLACED BY A LICENSED LAND SURVEYOR AND A CORNER RECORD OF SURVEY SHALL BE FILED WITH THE COUNTY. 2. ALL EXISTING STRUCTURES AND WALLS WITHIN THE PROPOSED DISTURBED AREA TO BE DEMOLISHED UNLESSOTHERWISE NOTED.3. ALL EXISTING TREES WITHIN THE PROPOSED DISTURBEDAREA TO BE REMOVED AND THE AREA CLEARED/GRUBBEDUNLESS OTHERWISE NOTED. UTILITY NOTES 1. ALL UTILITIES SHOWN HEREON PER BEST AVAILABLE RECORD INFORMATION. 2. ALL ONSITE WATER, SEWER AND STORM DRAIN FACILITIES TO BE PRIVATELY MAINTAINED. 3. REMOVE EXISTING WATER SERVICES PER CITY OF CARLSBAD STANDARD SPECIFICATION 15000-3.12.REMOVE EXISTING SEWER LATERALS PER CITY OFCARLSBAD STANDARD SPECIFICATION 15000-3.12. UTILITIES ARE KNOWN TO EXIST IN THE AREA. INFORMATION SHOWN HEREON IS PER BEST AVAILABLE RECORD INFORMATION. EXACT HORIZONTAL AND VERTICAL LOCATIONOF EXISTING UTILITIES UNKNOWN. CONTRACTOR TO FIELDVERIFY LOCATION OF EXISTING UTILITIES PRIOR TOORDERING MATERIALS AND CONSTRUCTION. CONTRACTORSHALL NOTIFY ENGINEER OF WORK OF ANY DISCREPANCIES BETWEEN ACTUAL LOCATIONS AND PLAN LOCATION OF UTILITIES UPON DISCOVERY OF DISCREPANCY. PLAN VIEW - EXISTING CONDITIONS AND DEMOLITION PLAN DEMOLITION AND PROTECT IN PLACE NOTES SCALE: 1" = 10' HORIZONTAL 1 2 3 4 5 6 7 8 9 10 EXISTING PROPERTY BOUNDARY ADJACENT PROPERTY LINE / RIGHT-OF-WAY CENTERLINE OF ROAD EXISTING EASEMENTS ADJACENT LOT LINE EXISTING CONTOUR EXISTING BUILDING EXISTING RETAINING WALL EXISTING FENCE EXISTING WATER MAIN EXISTING SEWER MAIN EXISTING GAS MAIN EXISTING OVERHEAD POWER LINES EXISTING SIDEWALK TO BE REMOVED LEGEND X X W S G 100 11 12 13 14 15 16 17 18 J:\ACTIVE JOBS\4037 HOPE STREET\CIVIL\DRAWING\DISCRETIONARY PLANS SITE DEVELOPMENT PERMIT OE 19 20 21 22 23 24 Oct. 16, 2024 Item #1 77 of 85 \ I • -_I I I I I I I I I I I I I / r I II'' /I / I / I / I + I I I I I I I I I I t + + • I' /1 I I -, I "" I \ I ' I ' I + \ I "" I / I I I I I I I I I I I \ \ I I I +I I I I I I I II I I I I I I - -, ' I, I ' -I -+-+ + + I / / .\ .... ......: '(" I \ + k k -r-- ' I \ I \ I \ I \ 0 "' k) k:. I ' \ L/1.,I' I 7 + + ,I 1r----- l + + + V + 7 + I/ 1 -----v + + + + / I I I , I ' I \ I I, 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PLSAENGINEERING.co: I SH~ET 11 CITY SITE DEVELOPMENT ------ ■-------■ ~!\DR ~ No. 86542 "' Exp. 03/31 /2 c,v, OF CARLSBAD 11 SH~TS I PERMIT PRELIMINARY DEMO FOR: GRAND HOPE DWN BY: CHKD BY: RVWD BY: RRO BAK BAK PROJECT NO. DRAWING NO. SOP 2023-002S 15"TD 5"TP 4"TP4"TP 4"TD EGG C C X OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE C C C C C C C C C C C C C C C C C C C C C C C C C C OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE S X X X X X X X X X X X X X X X X X X X X X X TC=61.15FL=60.70 TC=61.34 FL=60.87 TC=6 1 . 5 6 FL=6 1 . 0 9 TC=61.63FL=61.14 TC=61.71FL=61.26 TC=61.75 FL=61.31 TC=6 1 . 8 9 FL=61 . 4 3 TC= 6 1 . 5 7 FL=6 1 . 5 5 TC = 6 1 . 6 0 FL= 6 1 . 5 9 TC= 6 1 . 9 3 FL= 6 1 . 4 8 TC = 6 1 . 7 2 FL = 6 1 . 2 7 TC = 6 1 . 5 8 FL = 6 1 . 1 2 TC = 6 1 . 4 3 FL = 6 0 . 9 9 TC = 6 1 . 3 6 FL = 6 0 . 9 2 TC = 6 1 . 0 3 FL = 6 0 . 9 0 TC = 6 0 . 8 7 FL = 6 0 . 7 8 TC = 6 0 . 8 5 FL = 6 0 . 7 2 TC = 6 1 . 1 3 FL = 6 0 . 6 6 TC = 6 1 . 0 9 FL = 6 0 . 6 2 TC = 6 0 . 7 5 FL = 6 0 . 6 3 TC = 6 0 . 6 6 FL = 6 0 . 5 6 TC = 6 0 . 9 8 FL = 6 0 . 5 0 TC=61.30 FL=60.84 TC=61.40 FL=60.98 TC=61.11 FL=60.98 TC=61.22 FL=61.15 TC=61.60 FL=61.15 TC=61.56 FL=61.13 TC=61.25 FL=61.14 TC=61.33 FL=61.20 TC=61.69 FL=61.20 TC=61.72 FL=61.25 TC=61.36 FL=61.26 TC=61.41 FL=61.32 TC=61.80 FL=61.32 TC=61.45 FL=61.35 TC=61.45 FL=61.37 TC=61.48 FL=61.34 TC=6 1 . 5 0 FL=6 1 . 3 6 TC= 6 1 . 4 7 FL= 6 1 . 4 2 TC = 6 1 . 5 6 FL = 6 1 . 5 0 TC = 6 1 . 6 1 FL= 6 1 . 5 2 TC= 6 1 . 9 9 FL= 6 1 . 5 4 TC= 6 2 . 0 6 FL=6 1 . 6 2 TC=62. 1 2 FL=61. 6 6 TC=62.16 FL=61.70 FL= 6 1 . 5 3 FL=61.89 TC=6 2 . 3 4FL=61 . 8 7 T C = 6 2 . 3 3 FL = 6 1 . 9 0 T C = 6 2 . 3 7 F L = 6 1 . 8 9 T C = 6 1 . 9 6 F L = 6 1 . 9 6 T C = 6 1 . 9 4 F L = 6 1 . 9 2 TC = 6 2 . 2 9 FL = 6 1 . 8 7 T C = 6 2 . 2 1 FL = 6 1 . 7 3 T C = 6 1 . 7 8 F L = 6 1 . 7 1 T C = 6 1 . 7 3 F L = 6 1 . 6 6 TC = 6 2 . 1 3 FL = 6 1 . 6 7 T C = 6 1 . 7 6 F L = 6 1 . 6 5 T C = 6 1 . 6 7 F L = 6 1 . 5 8 TC = 6 2 . 0 0 FL = 6 1 . 5 5 TC = 6 1 . 8 9 F L = 6 1 . 4 1 T C = 6 1 . 7 7 F L = 6 1 . 2 8 T C = 6 1 . 3 6 F L = 6 1 . 2 7 T C = 6 1 . 2 9 FL = 6 1 . 2 0 TC = 6 1 . 6 1 F L = 6 1 . 1 8 T C = 6 1 . 5 0 F L = 6 1 . 0 5 T C = 6 1 . 3 5 FL = 6 0 . 8 8 TC=61.48FL=61.47 TC=6 1 . 9 2 FL=6 1 . 5 2 TC = 6 2 . 0 2 FL = 6 1 . 5 8 TC = 6 2 . 0 1 FL = 6 1 . 6 5 TC = 6 2 . 0 2 FL= 6 1 . 6 7 TC= 6 2 . 0 0 FL=6 1 . 9 9 TC=6 2 . 0 3 FL=62 . 0 1 TC= 6 2 . 0 4 FL=6 1 . 6 5 TC=62.06FL=61.66 TC=61 . 1 8 FL=61 . 1 2 TC=61.42FL=61.21 T C = 6 1 . 8 3 F L = 6 1 . 3 7 TC = 6 2 . 1 7 FL = 6 1 . 7 1 TC = 6 2 . 0 8 FL= 6 1 . 7 3 TC=61.99FL=61.53 TC = 6 2 . 1 6 FL = 6 1 . 6 8 TC=6 2 . 1 5 FL=6 1 . 7 0 61.5 61.4 61.5 61.5 61.0 61.1 61.3 61.7 61.8 61.9 61.9 61.9 62.1 61.8 61.7 61.6 61.3 61.6 61.4 61.7 61.8 61.5 61.6 61.9 61.7 61.8 62.0 61.8 61.7 62.0 61.8 61.8 61.9 61.8 61.9 62.0 61.9 61.8 61.8 61.7 61.5 61.6 61.5 61.1 61.4 61.3 60.8 61.2 62.3 62.4 61.9 62.1 62.0 62.1 62.4 62.1 62.2 62.1 61.8 61.9 63.2 62.0 61.0 60.9 61.0 61.1 61.1 61.3 61.5 61.9 63.4FF 63.1FF 63.3FF 59.83FF/CRAWLSPACE 62.6TW 62.6TW 62.6TW 62.6TW 62.8TW 62.8TW W 71.0RF 71.2RF 75.9RF/HP 71.1RF 71.1RF 62.4BW61.9BW61.1BW W W W EV EV HOPE AVENUE GR A N D A V E N U E PROP. MEDICAL BUILDING FF=62.0 PAD~61.3 ℄ ℄EX. 8" PVC WATER MAIN PER DWG 938-3 EX. 8" VCP SEWER MAIN PER DWG 118-9 EX. 4" ABD WATER MAIN PER DWG 146-8 EX. 1.5" HP GAS MAINPER DWG 146-8 EX. 1.5" HP GAS MAINPER DWG 146-8 EX. 6" AC WATER MAINPER DWG 146-8 EX. 3 STORY MULTI UNIT HOUSING EX . P A V E D DR I V E W A Y PROP. FIRST FLOOR PARKING ELEVATOR LOBBYFF=62.0PAD~61.3 ELEV.EQUIP. MPOE/STORAGE ELEC. RECYCLE TRASH EX. PCCSIDEWALK TOREMAIN EX. FIRE HYDRANT EX. FIRE HYDRANT EX. PCC C&G TO REMAIN EX. POWER POLETO REMAIN EX. PCC DWYAPRON TO REMAIN EX. STRUCTURETO REMAIN EX. PCC RIBBONGUTTER TO REMAIN 24.0' EX. PEDESTRIANRAMP TO REMAIN EX. PEDESTRIANRAMP TO REMAIN EX. POWER POLE TO REMAIN EX. PCC SIDEWALKTO REMAIN 9.9' 15.0' PARKWAY 5.1' EX. STRUCTURE TO REMAIN EX. ROOFOVERHANG 10 . 1 ' EX. FENCE TO REMAINEX. RETAINING WALL TO REMAIN EX. WALKWAY TO BE REMOVED EX. FIRE BACKFLOW TO REMAIN10 . 2 ' 25 . 0 ' 25 . 0 ' 50 . 0 ' 18 ' ± C L T O F O C 18 ' ± C L T O F O C PROP. 20.0' PCC DWY APRON PER SDRSD G-14D 5. 0 ' S W 1. 0 ' B L D G F A C E T O R O W 10 . 0 ' 6. 0 ' 10 . 0 ' 20.0' 14.5' 10 . 0 ' 9. 2 5 ' 20.0' 12 . 0 ' 5. 0 ' 8. 5 ' 8. 5 ' 20.0' 35'± CL TO FOC 5. 0 ' 7' 50.0' 35'± CL TO FOC PARCEL 1 PM 3260 APN: 203-202-1816 PARCEL 26 PM 3260 APN: 203-202-1300LO T 1 1 PM 1 2 9 3 AP N : 2 0 3 - 2 0 2 - 1 7 0 0 EX. 6" FIRE SERVICEPER DWG 509-1 1 1 1 1 1 2 2 2 33 4 6 8 8 10 10 11 9. 0 ' EX. STREET LIGHT TO REMAIN C C B B A A 1 12 12 13 14 14 15 15 150-FT CALTRANS STOPPING SIGHTDISTANCE/VIEW CORRIDOR PERCALTRANS HIGHWAY DESIGN MANUAL AND CITY OF CARLSBAD STANDARDS 330-FT CALTRANS CORNER SIGHT DISTANCE/VIEW CORRIDOR PER CALTRANS HIGHWAY DESIGN MANUAL AND CITY OF CARLSBAD STANDARDS 3. 0 ' 16 PROP. 10.0' SW 1 17 18 S S S WM G G G G G G G G G G G G G G G G G G G G G W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S G G G G G G G G G G G G G G G G G G G G G G WW W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S S S S S S S S S W W 19 20 20 8 8 2 SC-F SC-F SD-B SC-B SD-K SD-K SD-K SC-A SC-B SC-C SC-D SC-F SC-D 7 7 2 5 8 9 21 5.5' EX. GAS SERVICE TOBE ABANDONED TC/FL=60.80 TC=61.27FL=60.77 (TC=61.43) (FL=60.93) TC/FL=60.90 (TC=61.12) (FL=60.62) 0.63% TC=61.40 FS=60.90 TC=61.50FS=61.0TC/ FS=61.37 (TC/ FS=61.5) FS=60.95 FS=61.10 (FS=61.18) (TW=61.1)(BW=62.6) (TC=61.70) (FL=61.20) (0 . 5 0 % ) FS=62.0 (FS/HP=61.6) FS=62.0 (TC=61.56) (FL=61.06) (0.55%) (TW=62.6) (BW=62.4) (TW=62.6)(BW=61.97) (FS=61.76)(FS=61.78) (FS=61.86) FS=61.77FS=62.35 FS=61.3 FS=62.41 (FS=62.5)(FS=62.4)(TW=62.6) (BW=61.9) (FS=61.2) 1. 8 % 2. 0 % 1. 4 % FS=61.55 FS=61.7 FS=61.63 FS=62.0 FS=61.9 1. 5 % 2.0% (FL=60.6) FG=62.6 FL=62.1 FG=61.9 FG=62.1 FG=62.2FG=62.0 1. 8 % 1. 8 % (FS=61.6) 8.3% (TC=61.13) (FL=60.66) FS=61.91 FS=62.01 FS=61.88 FS=61.48 (FS=61.7) (2 . 0 % ) (0.74%) (FS=61.9) (FS=61.8) FS=61.9 FS=61.9 (2.0%) 4. 6 % 3. 0 % FS=61.72 FS=61.45 TG=60.83IE=54.37 TG=61.29IE=54.79 (TC=61.62) FL/IE=61.12 TG=61.8 IE=61.35 (0 . 2 2 % ) FL=62.3 1.0% 2. 0 % (FL=61.2) 1.5% 1.35% 1.5% 1. 5 % 2.1% 2.0% (IE 60.6) TG= 61.7IE= 60.7 TG=60.94 IE=60.73 TG=61.09 IE=60.79 SITE NOTES J:\ACTIVE JOBS\4037 HOPE STREET\CIVIL\DRAWING\DISCRETIONARY PLANS SITE DEVELOPMENT PERMIT GRAPHIC SCALE: 1" = 10' 0 10'20'30' EXISTING SURVEY MONUMENT TO BE PROTECTED IN PLACE. MONUMENT SHALL BEREPLACED BY A LICENSED LAND SURVEYOR WHO SHALL FILE A CORNER RECORDWITH THE COUNTY IF DISTURBED PROPOSED AC SAWCUT, SEE DETAIL SHEET 4 PROPOSED 2" GRIND AND OVERLAY; HALF WIDTH OF STREET PROPOSED 6" SEWER LATERAL PER CITY OF CARLSBAD S-7 PROPOSED 2" DOMESTIC WATER SERVICE W/2" METER AND BACKFLOW PER CITY OF CARLSBAD W-4 AND W-6; SERVICE FOR BOTH DOMESTIC AND ONSITE IRRIGATIONUSE PROPOSED 6" FIRE SERVICE AND BACKFLOW PER CITY OF CARLSBAD W-9 PROPOSED ROOF DOWNSPOUT TRENCH AND RESURFACING W/ AC PAVEMENT PER CITY OF CARLSBAD GS-26, GS-28 EXISTING WATER SERVICE, METER, AND BFP TO BE REMOVED PROPOSED 4" PCC SIDEWALK PER SDRSD G-7 PROPOSED PCC CURB AND GUTTER PER SDRSD G-2 PROPOSED 12" AREA DRAIN BY NDS OR APPROVED EQUAL PROPOSED 6" TRENCH DRAIN BY NDS OR APPROVED EQUAL PROPOSED SIDEWALK UNDERDRAIN PER SDRSD D-27 EXISTING TREE TO BE REMOVED PROPOSED TRANSFORMER PROPOSED GAS METER LOCATION PROPOSED MAILBOX LOCATION PROPOSED 6" STORM DRAIN PROPOSED 12" X 12" BROOKS BOX W/ REM TRITON TDAM FILTER (TDAM5-PK-PERFPFTC) EXISTING SEWER LATERAL TO BE REMOVED 1. EXISTING SURVEY MONUMENTS TO BE PROTECTED IN PLACE. IF A MONUMENT IS DISTURBED OR DESTROYED, IT SHALL BE REPLACED BY A LICENSED LAND SURVEYOR AND A CORNER RECORD OF SURVEY SHALL BE FILED WITH THE COUNTY. 2. ALL EXISTING STRUCTURES AND WALLS WITHIN THEPROPOSED DISTURBED AREA TO BE DEMOLISHED UNLESSOTHERWISE NOTED.3. ALL EXISTING TREES WITHIN THE PROPOSED DISTURBED AREA TO BE REMOVED AND THE AREA CLEARED/GRUBBED UNLESS OTHERWISE NOTED. UTILITY NOTES 1. ALL UTILITIES SHOWN HEREON PER BEST AVAILABLE RECORD INFORMATION. 2. ALL ONSITE WATER, SEWER AND STORM DRAIN FACILITIES TO BE PRIVATELY MAINTAINED. 3. REMOVE EXISTING WATER SERVICES PER CITY OF CARLSBAD STANDARD SPECIFICATION 15000-3.12.REMOVE EXISTING SEWER LATERALS PER CITY OFCARLSBAD STANDARD SPECIFICATION 15000-3.12. UTILITIES ARE KNOWN TO EXIST IN THE AREA. INFORMATIONSHOWN HEREON IS PER BEST AVAILABLE RECORD INFORMATION. EXACT HORIZONTAL AND VERTICAL LOCATION OF EXISTING UTILITIES UNKNOWN. CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING UTILITIES PRIOR TO ORDERING MATERIALS AND CONSTRUCTION. CONTRACTORSHALL NOTIFY ENGINEER OF WORK OF ANY DISCREPANCIESBETWEEN ACTUAL LOCATIONS AND PLAN LOCATION OFUTILITIES UPON DISCOVERY OF DISCREPANCY. PLAN VIEW - PRELIMINARY GRADING PLAN CONSTRUCTION NOTES SCALE: 1" = 10' HORIZONTAL 1 2 3 4 5 6 7 8 9 10 EXISTING PROPERTY BOUNDARY ADJACENT PROPERTY LINE / RIGHT-OF-WAY CENTERLINE OF ROAD EXISTING EASEMENTS ADJACENT LOT LINE SETBACK LINE EXISTING CONTOUR PROPOSED CONTOUR PROPOSED BUILDING FOOTPRINT PROPOSED FLOW LINE PROPOSED DIRECTION OF FLOW PROPOSED AC SAWCUT PROPOSED LIMITS OF GRADING PROPOSED 6" PCC CURB AND GUTTER PROPOSED PCC PAVEMENT PROPOSED ASPHALT PAVEMENT PROPOSED AC GRIND AND OVERLAY PROPOSED WATER LATERAL PROPOSED SEWER LATERAL EXISTING RETAINING WALL EXISTING FENCE EXISTING WATER MAIN EXISTING SEWER MAIN EXISTING GAS MAIN LEGEND W S X X W S G 100 100 11 12 13 14 15 16 PROPOSED PUBLIC ROADWAY AND PUBLIC UTILITY EASEMENT FOR GRAND AVENUE AND HOPE AVENUE TO THE CITY OF CARLSBAD PROPOSED EASEMENTS 1 17 18 19 20 OVERHEAD ELECTRIC NOTE: ALL EXISTING OVERHEAD LINES SERVICING PROJECT TO BE REMOVED AND UNDERGROUNDED QUANTITY BMP TABLE CASQA NO.SYMBOLBMP TYPE TRASH CAPTURE BMPS TC-50 2 EA SOURCE CONTROL BMPS SEPARATION 2 EAFLOWS FROMADJACENT AREAS SC-B 1 EAWINDPROTECTIONSC-C 3 EASTORM WATER SC-FDISCHARGEMANAGEMENT SITE DESIGN BMPS DIRECT RUNOFF TO PERVIOUS 1 EASD-B 730 SFSUSTAINABLELANDSCAPINGSD-K SC-B SC-C SC-F SD-B SD-K OVERHEAD 1 EACOVERINGSC-A SC-A 2 EASANITARY SEWER SC-D SC-D REM TRITON TDAMFILTER MODEL:TDAM 5-PK-PERF-FTC (3"X 5" CARTRIDGE) 21 PLANNING NOTES 1. ADDITIONAL STREET G&O FROM THAT SHOWN ON THE PLAN MAY BE REQUIRED, SUBJECT TO THE CITY ENGINEER'S DIRECTION, AT FINAL DESIGN ONCE TRENCH ALIGNMENT FOR NEW ELECTRICAL OR GAS SERVICE IS DETERMINED Oct. 16, 2024 Item #1 78 of 85 9>---____ __/ T \ I .l_ I _ ___j " . + -----,---------- - f -.:.. / \ ~ - D D D D D D D -I = I '(' / I • . I ' i \ ~ ~ JL,_ + ~--;-T -=-,' ~-- -E--,-'v-+ ;,-... .·1 ~ J ' .... ..... ~ " .,--. -. ' ..,-,-~ -i ' -"' . / /~<':~~w.~:~:~~q } j CD I / tl-,,~ \ ~ '\ , ' -~," · · ,., J ill_L :': t I f-iJl:lj'ij::-=".---;,<_ :tn.n,., ,, ;, ~ , flfi!Af'~,~ ~ ~ ~IB ~/ - -'1 • 1 ~·-,( ~ ~j~~=~=~:~· 11 ( ~'-"'--✓ ' ~==~ 11 , I ------------ / --\ D I I I 11 11 11 11 ,/ 0 ' f-. ~ / I,- L • I I I \ \ \ '1 - I / ' '(' I 7 t 11,.---l > t I ' / ... -< .. ---- /I • '('' I t' / • I ~ ' / '(' / '(' ' • ' I I \ ' I \~ 0 I (' ''(' I \ ' / / '('/ / '(' ,1,J__1 + i I I I / '('. .L t '(' I / 7 7 t t t I I / 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 □ -- \V \V L~~~~~'\"0i I' 0:-S,\, '-"' .'<' .1 ■-------■ -~ No. 86542 "' Exp. 03/31 /2 c,v, \. OF Cf>,\. I SH3EET 11 CITY OF C . ARLSBAD 11 SH~TS I SITE DEVELOPMENT PERMIT PRELIMINARY GRADING FOR: DWN BY: RRO CHKD BY: BAK RVWD BY: BAK GRAND HOPE PROJECT NO. DRAWING NO. SOP 2023-0025 GU T T E R L I N E SA W C U T L I N E 3.0' MIN 2.0' MIN 6" PCC CURB & GUTTER PER SDRSD G-2 STRUCTURAL SECTION 4" AC OVER 6" CLASS II AB OVER NATIVE SUBGRADE COMPACTED TO 95%REL. COMP.* COLD PLAN AND OVERLAY (2" MIN. DEPTH) TO PROVIDE SMOOTHTRANSITION EXISTING AC PAVEMENT. SEETYPICAL STREETSECTIONS FORPAVEMENT SECTION *TO BE VERIFIED BY PROJECT GEOTECHNICAL ENGINEER PER FIELD OBSERVED "R" VALUES 15"TD 5"TP 4"TP4"TP 4"TD EGG C C OE OE OE OE OE OE OE OE OE OEOEOEOEOEOEOEOEOECCCCCCCCCOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE OE OE OE OE OE OE OE OE S X X X X X X X W GR A N D A V E N U E EV EV C C B B A A HOPE AVENUE LOT 11 PM 1293 APN: 203-202-1700 PRIVATE DRIVEWAY PROP. FIRST FLOOR PARKING 1.0' ⅊ EXISTING GRADE PARKING LIFT PERARCHITECTURAL PLANS 6. 5 ' NOTE: TEMPORARY SHORING PER STRUCTURAL DESIGN ANTICIPATED FOR PARKING LIFT LIMITS OFTEMPORARYSHORING EXISTING RETAININGWALL AND FENCE TOREMAINTW=62.6 X X PROP. FIRST FLOOR PARKING PARCEL 1 PM 3260 APN: 203-202-1816 EXISTING STRUCTURE 10.3'1.0' ⅊ EXISTING GRADE PARKING LIFT PER ARCHITECTURAL PLANS NOTE: TEMPORARY SHORINGPER STRUCTURAL DESIGNANTICIPATED FOR PARKING LIFT LIMITS OF TEMPORARY SHORING EXISTING FENCE TO REMAINX X X PROP.MEDICAL BUILDING FF=62.0 PARCEL 1 PM 3260 APN: 203-202-1816 EXISTING STRUCTURE 10.3'3.0' ⅊R/W 1.0' EXISTING GRADE HOPE AVE. PROPOSED VEGETATED SWALE, 2.0% MIN SLOPE 1.5'1.5' EX. PCC CURB AND GUTTER TO REMAIN EX. PCC CURBAND GUTTERTO REMAIN ℄ R/W R/W50.0' 25.0'25.0' EX. AC PAVEMENT TO REMAIN 2" AC/4" AB PER DWG 146-8 EX. 4" PCC SIDEWALKTO REMAINEX. 4" PCC SIDEWALKTO REMAIN 18.0'18.0'5.5'1.5'5.5'1.5' EX. 8" PVC WATERMAIN PER CMWDDWG 89-101EX. 4" AC WATERMAIN PER DWG 146-8 EX. 1.5" GAS MAINPER DWG 146-8 EX. 8" VCP SEWER MAIN PER DWG 118-9 100.0' 50.0'50.0' 10.0'5.0'35.0'35.0'15.0' R/W ℄ R/W EX. PCC CURB AND GUTTER TO REMAIN EX. PCC CURB AND GUTTER TO REMAIN EX. AC PAVEMENTTO REMAIN2.5" AC/6" AB PERDWG 146-8 EX. 4" PCC SIDEWALKTO REMAINPROP. 4" PCCSIDEWALK EX. 6" AC WATERMAIN PER DWG 146-8 EX. 1.5" GAS MAIN PER DWG 146-8 EX. LANDSCAPE PARKWAY TO REMAIN SITE CARL S B A D V I L L A G E D R H O P E A V E . I N T E R S T A T E 5 GRAN D A V E . H A R D I N G S T CARLSBAD VILLAGETRAIN STATION 12 MILE RADIUS FROMPROJECT SITE 12 MILE RADIUS FROMPROJECT SITE J:\ACTIVE JOBS\4037 HOPE STREET\CIVIL\DRAWING\DISCRETIONARY PLANS SITE DEVELOPMENT PERMIT TYPICAL DETAIL - SAWCUT AC PAVEMENT NOT TO SCALE PLAN VIEW - KEY MAP NOT TO SCALE SECTION CUT A-A SCALE: 1" = 5' HORIZONTAL; 1" = 5' VERTICAL SECTION CUT B-B SECTION CUT C-C NOT TO SCALE TYPICAL SECTION - HOPE AVENUE NOT TO SCALE TYPICAL SECTION - GRAND AVENUE NOT TO SCALE TRANSPORTATION NETWORK MAP SCALE: NTS LEGEND EXISTING BUS STOP SCALE: 1" = 5' HORIZONTAL; 1" = 5' VERTICAL Oct. 16, 2024 Item #1 79 of 85 I I I ~ ,___, I I I I I I I I I I //1--~-!-----------l / 1/, ~~-1/ 1/ I I I I --I ~ r ~ c-5?\~~v:: .Y>; , ✓-:-0~'0 \/. '°""" ~0 ~ -e<-::;::;, ~ ~ • ~ ~ ~ . ~ • . .. • ~ » ~~~~~\".<~1/,,'0~~~~~~~%;?'1/. ~~~%~~~ V/\Y,,~Y\~~~ :(/C ~\~~~~~ I'\ I / , I I / • I I / r , ;1 \ I \ I ' t, •-, 0 . ' ~ '· -' ,, ,-_ ... " • / / No. 86542 xp. 03/31/ ~II CITY OF CARLSBAD I~ SITE DEVELOPMENT PERMIT SECTIONS & DETAl!.'l FOR: GRAND HOPE DWN BY: RRO PROJECT NO. DRAWING NO. CHKD BY: BAK RVWD BY: BAK SOP 2023-0025 Oct. 16, 2024 Item #1 80 of 85 s FICUS BENJAMINA EXISTING TREE 6" CALIPER TREE TO BE REMOVED --,_ I 1 L+-4 r--~~~---s---:s----s+-,==~----s-----~~---s-----~----s-----~----s---~,,,eeccc--5-~-~ s --• ; \ ~ ~ ~ I AVE. -I ----·w---w --w ----w "'w --w --w-.--."',, w Gl o --\ ~ w ,w lw w w --vr w w -;;: ----w ---.,- I L_-+-~-• • ;--_;;::--:-----t===;, . - ' M.O . . c ' c J I ', .--!!:" -G\ ;;: - .,. ~ ' S)o ' ' ' ' = ~ 11 11 T ,-7 I w I -r I I I I I I I -1 17 ' ' T MEDICAL OFFICE DYPSIS LUTESCENS EXISTING TREE (1) B'BTH, (1) 11'BTH, (1) 12'BTH, (1) 14'BTH TREE TO BE RELOCATED ON SITE ._, \1 \ J:r \ \ \ \ ·4---w ---/- G \ ' -" " " " " " \ \ \ • w ~ C z ~ (!) I " I --w --w --++-- I 1r--W--t----"~W'.+--w~~ PROGRESS SUBMITTAL NOT FOR CONSTRUCTION 10 0 5 10 20 ~~ I_I 40 I SCALE: 1"=10'-0" FEET CT SDP 2023-0025 DEV daedalus DESIGN GROUP P.O. boxJ+ vista, calJornia jzoa, p, 760.720.~Jll STAMP Signature 4-30-25 Renewal Date Dae PROJECT I ij , iH ~ UII I I t,. I ~ 0 0 1 ~ (ril ~ ii 1j 1 .. ~ i I I It I f 1 0 ~ ru ~ (j 41 I ~ ~ m I l ~ ~ ~z,! ~I ~I I I t Ull ~ ~ It i ~ 1 m ~ ~I DATE: OB/10/23 SCALE: PER PLAN DRAWN BY: JSS CHECKED BY: JSS ISSUED FOR DATE CITY SUBMITTAL PRELIMINARY -1 et 6/26/23 CITY SUBMITTAL 11/30/23 PRELIMINARY -2nd GITY SUBMITTAL PRELIMINARY -!>rd 1/ 1 f,/24 CITY SUBMITTAL 2/2"1/24 PRELIMINARY -4th REVISIONS DATE & in & & SHEET TITLE TREE SURVEY PLAN I PROJECT NO.: 29-004 SHEET: L-1 OF __ S __ SHEETS Oct. 16, 2024 Item #1 81 of 85 PLANTING AND IRRIGATION NOTES: 1. 50% OF THE SHRUBS USED ON THIS PROJECT (EXCEPT ON SLOPES 3:1 OF STEEPER) SHALL BE A MINIMUM OF 5-GALLON IN SIZE. 2. ALL UTILITY ENCLOSURES SHALL BE HIDDEN WITH VEGETATION SO AS TO SCREEN FROM VIEWS ALONG THE STREET FRONTAGE. FINAL LANDSCAPE CONSTRUCTION DRAWINGS WILL BE REQUIRED TO SHOW AND LABEL ALL UTILITIES AND PROVIDE APPROPRIATE SCREENING. 3. SLOPES 6:1 OR STEEPER REQUIRING EROSION CONTROL MEASURES AS SPECIFIED HEREIN SHALL BE TREATED WITH ONE OR MORE OF THE FOLLOWING PLANTING STANDARDS: a. STANDARD 1 -COVER CROP/REINFORCED STRAW MATTING: COVER CROP SHALL BEA SEED MIX TYPICALLY MADE UP OF QUICK GERMINATING AND FAST COVERING GRASSES, CLOVERS,AND/OR WILD FLOWERS. SUBMIT THE SPECIFIC SEED MIX FOR CITY APPROVAL PRIOR TO APPLICATION. THE COVER CROP SHALL BE APPLIED AT A RATE AND MANNER SUFFICIENT TO PROVIDE 90% COVERAGE WITHIN THIRTY (30) DAYS. TYPE OF REINFORCED STRAW MATTING SHALL BE APPROVED BY THE CITY AND STAKED TO THE SLOPE AS RECOMMENDED BY THE MANUFACTURER. REINFORCED STRAW MATTING SHALL BE REQUIRED WHEN PLANTING OCCURS BETWEEN AUGUST 15ANDAPRIL 15. THE COVER CROP AND/OR REINFORCED STRAW MAT SHALL BE USED THE REMAINDER OF THE YEAR. b. STANDARD #2 -GROUND COVER ONE HUNDRED (100%) PERCENT OF THE AREA SHALL BE PLANTED WITH A GROUND COVER KNOWN TO HAVE EXCELLENT SOIL BINDING CHARACTERISTICS (PLANTED FROM A MINIMUM SIZE OF FLATTED MATERIALAND SPACED TO PROVIDE FULL COVERAGE WITHIN ONE YEAR). c. STANDARD 113 -LOW SHRUBS LOW SPREADING WOODY SHRUBS (PLANTED FROM A MINIMUM 1-GALLON SIZE CONTAINER) SHALL COVER A MINIMUM OF SEVENTY (70%) PERCENT OF THE SLOPE FACE (AT MATURE SIZE). d. STANDARD #4 -TREES AND/OR LARGE SHRUBS TREES AND/OR LARGE SHRUBS SHALL BE (PLANTED FROM A MINIMUM OF 1 GALLON CONTAINERS) AT A MINIMUM RATE OF ONE (1) PER TWO HUNDRED (200) SQUARE FEET. ~s----s s MO 1 ~·· ,1. ., "., ' A4.0~ UJ KEYNOTES 0 PROPERTY LINE, TYPICAL 0 0 0 ~ @] 0 @] @] GAS METER LOCATION, PROPOSED MAILBOX, PROPOSED BIKE RACK, PROPOSED BUILDING AND IRRIGATION WATER METERS, PROPOSED ENHANCED PAVING, PROPOSED ELECTRICAL TRANSFORMER, PROPOSED PRODUCTION CONCRETE PAVING WITHIN PUBLIC ROW, EXISTING PRODUCTION CONCRETE PAVING WITHIN PUBLIC ROW, PROPOSED ' SLOPES -6:1 OR STEEPER AND: a. 3' OR LESS IN HEIGHT AND ARE ADJACENT TO PUBLIC WALKS OR STREETS REQUIRE AT MINIMUM STANDARD #1. b. 3' TO 8' IN VERTICAL HEIGHT REQUIRE STANDARD #1 (EROSION CONTROL MATTING SHALL BE INSTALLED IN LIEU OF A COVER CROP). #2AND #3. c. IN EXCESS OF 8' IN VERTICAL HEIGHT REQUIRE STANDARDS #1 (EROSION CONTROL MATTING SHALL BE INSTALLED IN LIEU OF A COVER CROP). #2, #3, AND #4. AREAS GRADED FLATTER THAN 6:1 REQUIRE STANDARD #1 (COVER CROP) WITH TEMPORARY IRRIGATION WHEN THEY HAVE ONE OR MORE OF THE FOLLOWING CONDITIONS: a. SHEET GRADED PADS NOT SCHEDULED FOR IMPROVEMENTS WITHIN 6 MONTHS OF COMPLETION OF ROUGH GRADING. b. A POTENTIAL EROSION PROBLEM AS DETERMINED BY THE CITY. c. IDENTIFIED BY THE CITY AS HIGHLY VISIBLE AREAS TO THE PUBLIC OR HAVE SPECIAL CONDITIONS THAT WARRANT IMMEDIATE TREATMENT. 4. THE FINAL IRRIGATION CONSTRUCTION PLAN SHALL USE ONLY SUBSURFACE IRRIGATION METHODS TO IRRIGATE ANY PROPOSED VEGETATION PLANTED WITHIN 24" OF AN IMPERMEABLE SURFACE UNLESS THE PERMEABLE SURFACES ARE DESIGNED AND CONSTRUCTED TO CAUSE WATER TO DRAIN ENTIRELY INTO A LANDSCAPED AREA 5. THE CONTRACTOR SHALL PROVIDE POSITIVE SURFACE DRAINAGE (2% GRADE IN PLANTING AREAS) AWAY FROM STRUCTURES AND TERMINATING IN AN APPROVED DRAINAGE SYSTEM. 6. FINAL PLANTING DESIGN TO ADDRESS THE SCREENING OF ALL ABOVE GRADE UTILITIES WHILE STILL PROVIDING ACCESS FOR FUTURE MAINTENANCE. 7. ALL PROPOSED TREES LOCATED WITHIN THE VEHICULAR SIGHT LINES INDICATED ON THESE PLANS SHALL HAVE ALL LIMBS REMOVED TO A HEIGHT OF 6 FEET ABOVE THE ADJACENT TOP OF CURB ELEVATION IN ORDER TO MAINTAIN SAFE EGRESS FROM ALL DRIVEWAYS. 8. NO LANDSCAPE ELEMENTS OR PLANTINGS WILL BE ALLOWED WITHIN THE SIGHT LINES THAT WILL EXCEED 30" IN HEIGHT. / kll I ~~~ ~· ( _____ . MfDICAL OFFICf -i ,,.,...,.,..........,,.,., r-" I I ~~~~ 11 1111 111 11 1111 111 ~ LIGHT STANDARD, EXISTING PLANTERS, 18" H X 3'-6" X 3'6" W, PROPOSED FIRE SERVICE, PROPOSED EXISTING WATER METER, TO BE ABANDONED SEWER SERVICE LINE, PROPOSED CAST IN PLACE CONCRETE STEPPERS, PRODUCTION CONCRETE COLORAND .FINISH, PROPOSED CALTRANS SIGHT DISTANCE LINE TREES FALLING WITHINS THE LIMITS OF THE SIGHT DISTANCE LINE ARE REQUIRED TO BE MAINTAIN THE TREE CANOPY HEIGHT AT A MINIMUM OF 6'-0" ABOVE THE ADJACENT CURB EXISTING SEWER SERVICE TO BE REMOVED X , 16 C> C> \ I • ' ' ' ' ' " / " \ \ \ ■ w ~ C z ~ C) I \ I ---w ---w --tt--- I PLANTING LEGEND SYMBOL BOTANICAL NAME COMMON NAME ---lDYPSIS LUTESCENS CANE PALM PIGMY QUEEN PALM GOLD MEDALLION TREE o-SHRUBS • Low Level Accent JASMINUM ANGULARE SOUTH AFRICAN JASMINE NANDINA DOMESTICA 'HARBOR DWARF' DWARF HEAVENLY BAMBOO LANTANA X 'NEW GOLD' NEW GOLD LANTANA HAMEL/A PATENS 'SIERRA RED' FIRE CRACKER BUSH PH/LODENRON ZANADU DWARF PHILODENDRON CARISSA SPP. NATAL PLUMB ACACIA COGNNATA 'COUSIN ITT' LITTLE RIVER WATTLE WESTR/NG/A FRUT/COSA MUND/ LOW COAST ROSEMARY WESTRINGIA 'WYNYABBIE HIGHLIGHT' VARIEGATED AUTRAILIAN ROSEMARY MAHON/A SPP. OREGON GRAPE PAVON/A PRAEMORSA YELLOW MALLOW GREVILLEA LANIGERA 'COASTAL GEM GREVILLEA SALVIA CHINOPHYLLA SNOWFLAKE SAGE VINES AND ESPALIERS HARDENBERGIA VIOL.ACEA 'HAPPY WANDERER' PURPLE VINE LILAC LOBEL/A LAX/FLORA ORANGE TORO BELLS TRADESCANTIA PALL/DA PURPLE HEART HYMENOXYSACAUL/S ANGELITA DAISY ERIGERON KARVINSKJANUS SANTA BARBARA DAISY KNIPHOFIA 'PINAPPLE POPSICLE' YELLOW POKER PLANT TEUCRIUM CHAMAEDRYS GERMANDER DIETES GRAND/FLORA 'VARIEGATA' STRIPPED FORTNIGHT LILY RUELL/A BRITTON/ANA 'KATIE' DWARF RUELLIA CL/VIA MINIATA KAFIR LILY SUCCULENTS AND CACTI PEDILANTHUS MACROCARPUS LADY SLIPPER PLANT AEON/UM SPP. NON COMMON NAME PORTULACARIA AFRA MINIMA EMERALD ELEPHANT CARPET SENEC/0 VITALIS BUSH BLUE PICKLE BULB/NE NATALENSIS ROOLWORTEL CRASSULA ARBORENSCENS UNDULATIFOLIA 'RIPPLE JADE' RIPPLE JADE CEPHALOPHYLWM 'RED SPIKE' SANSEV/ERIA TRIFASC/ATA 'MOONSHINE' MANGAVE SPP. COTYLEON SPP. GRASSES • Lar e & Small Scale CAREX DIVULSA LOMANDRA LONG/FOL/A 'ARCTIC FROST' LOMANDRA CONFERTIFOL/A 'SHORTY' LOMARDRA LONG/FOL/A BREEZE CHONDROPETALUM TECTORUM JUNCUS EFFUSUS 'SP/RAUS DIANELLA REVOLUTA GROUND COVER • Organic SEDUMSPP. DYMOND/A MARGARETAE KURAPIA GROUND COVER • Inorganic 3/8' PEA GRAVEL, (COLOR TO BE DETERMINED) RED SPIKE ICE PLANT SILVER SNAKEPLANT MANGAVE NCN BERKELEY SEDGE ARTIC FROST MAT RUSH SHORTY MAT RUSH DWARF MAT RUSH BAMBOO RUSH CORKSCREW RUSH LITTLE REV NCN SILVER CARPET KURAPIA 1 2 2 SIZE ON SITE RELOCATION 24" BOX, MULTI 36" BOX, MULTI. 5 GAL. 5 GAL. 5 GAL 5 GAL 5 GAL. 5 GAL. 1 GAL. 5 GAL. 5 GAL. 5 GAL. 5 GAL. 5 GAL. 1 GAL. SGAL 5 GAL. 1 GAL. 1 GAL. 1 GAL. 5 GAL. 1 GAL. 5 GAL. 1 GAL 1 GAL. 5 GAL. 1 GAL. 5 GAL. 1 GAL. 1 GAL 5 GAL. 1 GAL 1 GAL. 5 GAL 1 GAL. 1 GAL. 5 GAL. 5 GAL. 5 GAL. 5 GAL. 1 GAL. 1 GAL. FROM FLATS FROM FLATS FROM FLATS PROGRESS SUBMITTAL NOT FOR CONSTRUCTION 10 0 5 10 20 40 ~-I I_I I SCALE: 1"=10'-0" FEET CT SDP 2023-0025 DEV SPACING WUCOLS 4'O.C. 3'O.C. 3'O.C. 4'O.C. 3'0.C. 3'O.C. 4'O.C. 4'O.C. 3'O.C. 3'O.C. 4'O.C. 4'O.C. 3'O.C. 6'O.C. 2'O.C. 2'O.C. 2'O.C. 3'O.C. 2'O.C. 2'O.C. 2'6' o.c. 2'O.C. 2'O.C. 2'6'O.C. 1'6" o.c. 4'O.C. 2'6' o.c. 2'O.C. 3'O.C. 1'6' O.C. 2'O.C. 3'O.C. 1'6' O.C. 18' O.C. 3'O.C. 2'O.C. 3'O.C. 4'O.C. 2'O.C. 2'O.C. 12"O.C. 12"O.C. 12"O.C. H H L M L L L M L L L L L L L L L L M L L L L L L L VL L VL L L L L L L L L LX M L L M L L L L VL daedalus DESIGN GROUP P.O. boxJ+ vista, calJornia jzoa, p, 760.720.~Jll STAMP Signature 4-30-25 Renewal Date Dae PROJECT I ij , iH ~ UII I I t,. I ~ 0 0 1 ~ (ril ~ ii 1j 1 .. ~ i I I It I f 1 0 ~ ru ~ (j 41 I ~ ~ m I l ~ ~ ~z.! ~I ~I I I t Ull ~ ~ It i ~ 1 m ~ ~I DATE: OB/10/23 SCALE: PER PLAN DRAWN BY: JSS CHECKED BY: JSS ISSUED FOR DATE CITY SUBMITTAL PRELIMINARY -1 et 6/26/23 CITY SUBMITTAL 11/30/23 PRELIMINARY -2nd GITY SUBMITTAL PRELIMINARY -!>rd 1/ 1 f,/24 CITY SUBMITTAL 2/2"1/24 PRELIMINARY -4th REVISIONS DATE & in & & SHEET TITI.E GONGEPTUAL LANDSGAPE PLAN I PROJECT NO.: 29-004 SHEET: L-2 OF __ S __ SHEETS MAXIMUM APPLIED WATER ALLOWANCE A landscape project subject to the Water Efficient Landscape Ordinance shall include the MAWA for the plans, including the calculations used to determine the MAWA. A landscape project shall not exceed the MAWA. The MAWA for a landscape project shall be determined by the following equation: MAWA = (ETo)(0.62)[(0.7 x LA) + (0.3 x SLA)] The abbreviations used in the equation have the following meanings: MAWA Maximum Applied Water Allowance in gallons per year. ETo Evapotranspiration in inches per year. 0.62 Conversion factor to gallons per square foot. 0.7 ET adjustment factor (ETAF) for plant factors and irrigation efficiency. LA Landscaped area includes special landscaped area in square feet. 0.3 The additional ET adjustment factor for a special landscaped area (1.0 - 0.7 = 0.3) SLA Special landscaped area in square feet. Show Calculation: MAXIMUM APPLIED WATER ALLOWANCE = ______________________ GALLONS PER YEAR = (40.0) (0.62) [(.55X)] = (24.8) (400) = 9,920 GPY 9,920 Hydrozone Table for Calculating ETWU Please complete the hydrozone table(s). Use as many tables as necessary. CITY OF CARLSBAD ESTIMATED TOTAL WATER USE (ETWU) Hydrozone Number (1 – 5 with SLA Zone Below – use as many tables as necessary to complete all hydrozones) Process Step No. (Below) 1 2 3 4 5 SLA Evapotranspiration Rate (ETo)* 1 Conversion Factor 2 0.62 (Step 1 x Step 2) 3 Plant Factor (PF)** (From WUCOLS) (VLW –HW) (0.1 - 0.8)4 Area of Hydrozone (sq. ft.) (HA) 5 (Step 4 x Step 5) 6 Irrigation Efficiency (IE)*** 7 (Step 6 ÷ Step 7) 8 (Total All Step 8 + Total SLA sq. ft. in Step 5) 9 (Step 3 x Step 9) Estimated Total Water Use in gallons per year (ETWU) - Total shall not exceed MAWA 10 ETo* West of I-5 = 40.0 East of I-5 and West of El Camino Real = 44.0 East of El Camino Real = 47.0 Applicant may provide a different ETo if supported by documentation subject to approval by the City Planning Division ***IE Micro-spray = .80 Spray = .55 Rotor = .70 Bubbler = .75 Drip = .80 Applicant may provide a different IE if supported by documentation subject to approval by the City Planning Division (Turf and Landscape Irrigation Best Management Practices, April 2005) ** Plant Factor & Water Use 0.1 = VLW - Very Low Water Use Plants 0.3 = LW - Low Water Use Plants 0.5 = MW - Moderate Water Use Plants 0.8 = HW - High Water Use Plants 40.0 24.8 7,986 .80 .30 80 648 64 194 .80 .80 80 242 322 MAXIMUM APPLIED WATER ALLOWANCE A landscape project subject to the Water Efficient Landscape Ordinance shall include the MAWA for the plans, including the calculations used to determine the MAWA. A landscape project shall not exceed the MAWA. The MAWA for a landscape project shall be determined by the following equation: MAWA = (ETo)(0.62)[(0.7 x LA) + (0.3 x SLA)] The abbreviations used in the equation have the following meanings: MAWA Maximum Applied Water Allowance in gallons per year. ETo Evapotranspiration in inches per year. 0.62 Conversion factor to gallons per square foot. 0.7 ET adjustment factor (ETAF) for plant factors and irrigation efficiency. LA Landscaped area includes special landscaped area in square feet. 0.3 The additional ET adjustment factor for a special landscaped area (1.0 - 0.7 = 0.3) SLA Special landscaped area in square feet. Show Calculation: MAXIMUM APPLIED WATER ALLOWANCE = ______________________ GALLONS PER YEAR = (40.0) (0.62) [(.55X)] = (24.8) (400) = 9,920 GPY 9,920 P-25(C)Page 1 of 4 Revised 04/12 Development Services Planning Division 1635 Faraday Avenue (760)602-4610 www.carlsbadca.gov WELO WORKSHEETS LANDSCAPE MANUAL APPENDIX E P-25(C) WATER EFFICIENT LANDSCAPE WORKSHEET This worksheet is filled out by the project applicant and it is a required element of the Landscape Documentation Package. HYDROZONE INFORMATION TABLE Please complete the hydrozone table(s) for each hydrozone. Use as many tables as necessary to provide the square footage of landscape area per hydrozone. * Hydrozone VLW - Very Low Water Use Plants LW - Low Water Use Plants MW - Moderate Water Use Plants HW - High Water Use Plants **Irrigation Method MS = Micro-spray S = Spray R = Rotor B= Bubbler D= Drip O = Other ***Plant Factor from WUCOLS III or list as water feature as appropriate Controller # Hydrozone* Zone or Valve Irrigation Method** Plant Type/Factor*** (PF) Hydrozone Area (Sq. Ft.) % of Total Landscaped Area Total 100% * Hydrozone VLW - Very Low Water Use Plants LW - Low Water Use Plants MW -Moderate Water Use Plants HW -High Water Use Plants **Irrigation Method MS = Micro- spray S = Spray R = Rotor B= Bubbler D= Drip O = Other N/A N/A LWU HWU N/A N/A DRIP DRIP .80 .30 80 648 89 11 GRAND HOPE MEDICAL BLDG. 728 _01-18-24 Oct. 16, 2024 Item #1 82 of 85 -~s,----s ----s---------1,------r "' "' ------W----w ---w ---w _J w ---w ---w --.,-w --- LWU (D) ~ ' ... , LWU (D) - 1 + -~ ' L f t.., T l [ "' ('city of Carlsbad "' ~--------Lwu - ' ' ' "' (D) ' ' ... , ' ' ' ' " ~ ~ '~~ -• u -· u • / ... " ~ H~P. ~1 ~ ~ ' I 0 w ~LWU' I~ I I I (D) AVE. I ,w lw :;:: . ~ HWU (D) ~'°'· :;:: ,-7 -w w --- LW (D) \ Mf DICAL OFFICf -- I I I ---w---w -a ·. \ \ \ LWU (D) \ LWU (D) w \ LWU (D) . ·, .. • \ ■ w ~ C z ~ ~ C) ~ w ---w ---w --tt--- ---w ---w --+f--- HYDROZONE DATA LEGEND SYMBOL DESCRIPTION HIGH WATER USE-DRIP IRRIGATION • 80 S.F. • .BO PLANT FACTOR (PF) HIGH WATER USE• STREAM ROTOR IRRIGATION • 00 S.F. • .80 PLANT FACTOR (PF) MEDIUM WATER USE· DRIP IRRIGATION • 00 S.F. • .50 PLANT FACTOR (PF) MEDIUM WATER USE. STREAM ROTOR IRRIGATION • 00 S.F. o .50 PLANT FACTOR (PF) LOW WATER USE· DRIP IRRIGATION o 648 S.F. o .30 PLANT FACTOR (PF) LOW WATER USE • STREAM ROTOR IRRIGATION • 00 S.F. • .30 PLANT FACTOR (PF) ACCOMMODATIONS FOR RECLAIMED WATER 1. ALL PLANTED AREAS REPRESENTED IN A HATCH PATTERN ON nil$ SHEET ARE TO BE IRRIGATED WITH POTABLE WATER AT THIS TIME, HOWEVER THE NEW IRRIGATION SYSTEM WILL BE DESIGNED TO ACCOMMODATE THE USE OF RECLAIMED WATER IN THE FUTURE SHOULD IT BECOME AVAILABLE. CT SDP 2023-0025 DEV WATER CONSERVATION PRINCIPALS TO BE IMPLEMENTED WITHIN THIS PROJECT 1. GOOD PLANTING DESIGN BASED ON THE SELECTION OF A BALANCED PALLET OF LOW AND MEDIUM WATER CONSUMING PLANTS AND MINIMAL USE OF HIGH WATER CONSUMING PLANT SPECIES. ARRANGMENT OF THESE PLANTS INTO LIKE WATER USE ZONES. 2. THOROUGH SOIL PREPARATION BY INCORPORATING PROCESSED ORGANICS NTO THE EXISTING SITE SOIL THIS WILL INCREASE THE SOIL'S WATER HOLDING CAPACITIES AND ALSO ENCOURAGE HIGHER LEVELS OF MICROBICACTIVITY IN lliE SOIL HIGHER LEVELS OF MICROBICACTIVITY PROMOTE GOOD PLANT HEALTH AND GROWTH THUS LIMITING THE USE OF CHEMICAL FERTILIZERS. 3. LIMIT THE USE OF ORNAMENTAL TURF AREAS. NO ORNAMENTAL TURF WILL BE A PART OF THIS PROJECT. 4. SELECTION OF LOW WATER DEMAND PLANTS (PLEASE REVIEW PLANT LEGEND). 5. INCORPORATION OF EFFECTIVE AND EFFICIENT IRRIGATION DESIGN CONCEPTS, I.E. CIRCUIT ZONES BASED UPON SUN/ SHADE EXPOSURE AND SLOPE VS LEVEL PLANTING AREAS, GROUP TREES, SHRUBS, AND GROUND COVERS SEPARATELY FROM LAWNS, USE OF SUBSURFACE DRIP AND MICROSPRAY IRRIGATION WATER DELIVERY HARDWARE, SPECIFICATION OF WEATHER BASED IRRIGATION CONTROLLER WITH THE ABILITY TO MANAGE MULTIPLE PROGRAMS, INCORPORATE ANTI DRAIN CHECK VALVES TO ELIMINATE LOW HEAD DRAINAGE AND USE OF A FLOW SENSOR/MASTER VALVE CONFIGURATION PROGRAMMED TO DETECT LINE AND SPRINKLER BREAKS AND TO SHUT lliE SYSTEM DOWN WHEN BREAK ARE DETECTED. 6. INCORPORATION OF SHREDDED WOOD MULCH APPLIED TO THE SURFACE OF ALL SHRUB AND GROUND COVER AREAS IN ORDER TO REDUCE SOIL MOISTURE EVAPORATION AND TO IMPROVE SOIL STRUCTURE BY THE DECOMPOSITION OF THE ORGANIC MULCH OVER TIME. 7. PROPER LANDSCAPE MAINTENANCE AND MANAGEMENT. THIS WILL BE ACCOMPLISHED BY HIRING A PROVEN LANDSCAPE MAINTENANCE CONTRACTOR KNOWLEGABLE IN THE PRACTICE OF GOOD XERISCAPE PRINCIPALS. THIS CONTRACTOR WILL PROVIDE AN ONGOING EVALUATION AND ADJUSTMENT PROGRAM TO INSURE THE ABOVE MENTIONED PRINCIPALS ARE WORKING TO THEIR UTMOST EFFICIENCY OVER lliE LIFE OF THIS LANDSCAPE. STATEMENT OF UNDERSTANDING AND COMPLIANCE "I AM FAMILIAR WITH THE REQUIREMENTS FOR THE LANDSCAPE AND IRRIGATION PLANS CONTAINED IN THE CITY OF CARLSBAD'S LANDSCAPE MANUAL AND WATER EFFICIENT LANDSCAPE REGULATIONS. I HAVE PREPARED THIS PLAN IN COMPLIANCE WITH THOSE REGULATIONS AND THE LANDSCAPE MANUAL AND AGREE TO COMPLY WITH ALL REQUIREMENTS WHEN SUBMITTING CONSTRUCTION DOCUMENTS. I CERTIFY lliATTHE PLAN IMPLEMENTS THOSE REGULATIONS TO PROVIDE EFFICIENT USE OF WATER." DAEDALUS S N GROUP F'O. BOX34 VISTA, CALIFORNIA 92085 (760) 720-9337 PROGRESS SUBMITTAL NOT FOR CONSTRUCTION 10 0 5 10 20 ~~I I I 40 I SCALE: 1"=10'-0' FEET DATE: 01-18-24 daedalus DE:51GN ~R □UP P.O.boxlt vis!a, california ~206) p: 760-720,,,,7 STAMP Si!lnature 4-30-25 Renewal Date PROJECT ~ Ii ~ ill 0 1 I , 0 1 , I ~ I -z ~ ~ t ~ () 41 ~ ~l IJ\I ~ tpl ~I tfl, I [jll ~ I~ ~ tfl, 4 I I ~I 'fl1 DATE: oe,11 01:;. s SCALE: PER PLAN DRAWN BY: J;,;, a-lECKED BY: J;,;, ISSUED FOR DATE GITY SUB MITT AL PRELIMINARY -1 ~t &/2&/2S C.IT"!' SU6MITTAL. 111~012; PlltELIMINA!ltY -:2nd C.IT"!' SU6MITTAL. P~ELIMINARY -3rd i/1&/24 C.IT"!' SU6MITT AL. Pf<EL.IMINAF<"!' • 4th 2/:211!/24 REVISIONS DATE ffi ffi ffi & SHEET TITLE ~ATER CONSERVATION PLAN I PROJECT NO.: .29-004 SHEET: L-9 OF __ S __ SHEETS Oct. 16, 2024 Item #1 83 of 85 ~-s----!l ----'>-$------<>----r "' ,_ I 1 + ---4-c~=~----S---➔---r---S---➔----s---➔----s-~,.,~---s-~-s-s. ---• s \ ~ €'iJ ~ I -----W---w --w --w ~ w --w --w --"'-w I __, ·- • "·" I. . . ---- ---- "' "' --'"- ,,. ~ ... +++ --w--w ~-"'low;;: __ -\ ' 0 .• --- r igJ I I ,-; I ;;: ,- I -r I J I ,' J ~ . ( ____ _ -4 i.,~ ~ I l -~~ " 111111111111= 1111111111 If TTt TTTTTTTT f •• . • -. . 7 w l ,.,,. ME= DICAL OFFICF :·:;&i}:~·t,:?i/~?>'.~-;~;:~~';J/?·!e!· ~-:: ::·'i,·•·~ -~,; ''~:~ • -~1:';. '.•<:: ·L ·• · ,f;c,;{: .: ·'·•:<·!· -'.:-· · ::. < ,: : .. _-: :----;t-,-: •:' :· ,, C) \ \ \ \ w w C z ~ (!) --w --w ----ll-- w w LEGEND SYMBOL DESCRIPTION RECYCLED WATER USE AREA POTABLE WATER USE AREA PROGRESS SUBMITTAL NOT FOR CONSTRUCTION 10 0 5 __ ~~I 10 20 I_I 40 I SCALE: 1"=10'-0" FEET CT SDP 2023-0025 DEV daedalus DESIGN GROUP P.O. boxJ+ vista, calJornia jzoa, p, 760.720.~Jll STAMP Signature 4-30-25 Renewal Date Dae PROJECT u ~I iH ~ UII I I (,. I ~ 0 0 1 ~ (ril ~ ii ,J 1 .. ~ i I I It I f 1 0 ~ ru ~ (j 41 I ~ ~ m I l ~ ~ ~z.! ~I ~I I I t Ull ~ ~ It i ~ 1 m ~ ~I DATE: OB/10/23 SCALE: PER PLAN DRAWN BY: JSS CHECKED BY: JSS ISSUED FOR DATE CITY SUBMITTAL PRELIMINARY -1 et 6/26/23 CITY SUBMITTAL 11/30/23 PRELIMINARY -2nd GITY SUBMITTAL PRELIMINARY -!>rd 1/ 1 f,/2-4 CITY SUBMITTAL 2/2"1/24 PRELIMINARY· 4th REVISIONS DATE & in & & SHEET TlnE LANDSC.APE Y'IATEII' USE EXHIBIT I PROJECT NO.: 29-004 SHEET:L-4 OF __ 5 __ SHEETS Oct. 16, 2024 Item #1 84 of 85 ---'W~--w-- ' M.O . . w - r "' w-Jw "' ---- "' "' w --w --"'~ w ' -.... , er; • UJ 1 t t lgj I I I I J ' -7 ,- 1 ; ( ____ _ 4 I;, J [ lllllllllll]A 11111111111Jl TTT TT MEDICAL OFFICE >< 1 \ \ C> \ MAINTENANCE AREA LEGEND SYMBOL DESCRIPTION COMMON AREA MAINTAINED LANDSCAPE LANDSCAPE MAINTENANCE RESPONSIBILITIES CT SDP 2023-0025 DEV 1. THE PROPERTY OWNER WILL BE RESPONSIBLE FDR MAINTAINING ALL LANDSCAPED AREAS THAT LIE WITHIN THE LIMITS OF THE SITE'S PROPERTY LINES AND THE PLANTERS THAT FALL WITHIN THE PUBLIC RIGHT-OF-WAY. C z ~ (!) I I I --w --w --++-- --w --w ---ti-- PROGRESS SUBMITTAL NOT FOR CONSTRUCTION 10 0 5 10 20 ~-I I_I 40 I SCALE: 1"=10'-0" FEET daedalus DESIGN GROUP P.O. boxJ+ vista, calJornia jzoa, p, 760.720.~Jll STAMP Signature 4-30-25 Renewal Date Dae PROJECT DATE: OB/10/23 SCALE: PER PLAN DRAWN BY: JSS CHECKED BY: JSS ISSUED FOR DATE CITY SUBMITTAL PRELIMINARY -1 et 6/26/23 CITY SUBMITTAL 11/30/23 PRELIMINARY -2nd GITY SUBMITTAL PRELIMINARY -!>rd 1/ 1 f,/24 CITY SUBMITTAL 2/2"1/24 PRELIMINARY -4th REVISIONS DATE & in & & SHEET TITI.E LANDSCAPE MAINTENANCE RESPONSIBILITY I PROJECT NO.: 29-004 SHEET: L-5 OF __ S __ SHEETS Full Size Exhibits “A” – “R” dated October 16, 2024 (on file in the Planning Department) Oct. 16, 2024 Item #1 85 of 85 Exhibit 9 Lauren Yzaguirre, Associate Planner Community Development October 16, 2024 Grand Hope Medical Office Building SDP 2023-0025 1 C cityof Carlsbad PROJECT LOCATION 2879 Hope Ave. •0.16 acres •V-B •Village Center (VC) District 2 RD-MR-3 VC FC Grand Hope Medical Office Building SDP2023-09V2023-0122) 0 10 20 40 60 Feet {cityof Carlsbad PROJECT FEATURES •Two -story medical office •3 tenant spaces •Ground floor unit 1 (2,051 SF) •Second floor unit 2 (2,073 SF) & 3 (2,084 SF) •Common egress balcony (395 SF) •Parking Garage 3 {cityof Carlsbad PROJECT DESCRIPTION Unit 1 Parking Garage 4 WO' f ,•(I" .,.,. '¥IO' UO' ,.,,. JJ'IO' .... .. ,, ' a:r,v L<EB'f fRJ;ff:MiE ... , t--t-i-:::----r ------------ ---:::..-=-I===--=--- - -,- - - ----- ' F·-===-=--""'-==-=--1==---;:=I::--r-------,--~ l ' □1 ~ _, r r -..--:?ii:-----r=- I ~ -!8f ~ ~ I .... --:'\ I ~ -----------------------1- D r l I I i;, I ,~ca:,oFtcl<l" 7 ---.-- I I ~ :-.:::~ l.( 1 ~ I I STAIR2 I 'IIO•tlt1<$1ffl E.V.C.S.(NSTM.LED) L ______ !.I r ---,--~, t- I ~ ~ : ~ ' I ,r- r, IF --,-=-t-..J ,.....-- ? I -----~ ~ ' I ~l I -----t,ECYCLf ~ .. j ELEVATOR I -----v ~I ' I C ----- I ----- "" ~ I ---------- Irr ' ~ 2 I F,v.c.s. ("61ALLFO) .. -----', l036Y I ----- ( -,ca,s,auoooit _j S-I ----- '" ---i.,_-~I El.[CiRIC .. r-L-----~ I ROQM ~ ' ~~~~~~~ t-~ ~ O' lr. ~ -! L==; ,__) I I ~ Ir f ,, CMLFfS-"-1.S TOeEU!El)OILY ,.,, r-- ~S'NJ.IDr:,.e.UTIUI TC Ir UStD El.EVMOR IJi'OE/ ll'fTIWIEDEM?Ol'EES lhU I IY l\£;12tiD1WIJ;l'lil L...SON.Y I EOW!.ll:NT SlOAAG:: 7 OCOFf M BU~I~ ,., I ' ,., 3 I~ ' / I ;( E.Y.C.$,(r;sTo\LWl) \.. ii I ' PltRo()tlGllf17/8 ,, : I __ _/ --~v.c.s. tNSTALLEO) / 11 Ll 7!Jol/ --..,,_ ~ I \ ,111· r1 1 1 I 1 1 1 1 11 111 YI! I/ .... , r.Jo'r ,." I ,_,-_ -• I I I I I I I I I I , ~ -·r-- ? i i i i i i i i i i ii ~---------.. STAI~! .. ,, " I ii I ,., " 11 ,., " • I ~--P~NGlli'T~/6 ', I ~ !! I Ii ,., t ,V.C.S.(1-.SToUJ:ll) ', I E.Y.CS.(KSTJII.LEO) I.I' I ,., ' f]RERISER 1 ,., ' ,., 'J I I/ 11 -ii 1----------' :;; ~ I I ~----t---L -::..-~~::-~ --I \ I ---------- I I f ii-~ -- - - - - - - - - - --~-Clty-0 I ff Carlsbad PROJECT DESCRIPTION Unit 2Unit 3 5 Egress Balcony Lobby Patio Patio ,._,. -.,,,. ~ •,CfOCtl<,:E --~~., ------ ...... ll,1-0' --------__ _ ,..,. C cityof Carlsbad 6 White Stucco Medium Grey Stucco Medium Tone Porcelain Tile Dark Tone Porcelain Tile Decorative Metal Accent ... , --------- Grand Hope Medical Office Building 7 General Public Concerns •Building height •Illegal dumping/trespassing •Parking {city of Carlsbad Carlsbad Village Train Station Grand Hope Medical OfficeAB 2097 Ca~sbad Village Train Station All Parcels Within Half Mile Radius STANDARDS MODIFICATION VBMP Section 2.6.7.B – PURPOSE Standards modifications are permitted only for the following purposes: 1.To provide housing affordable to low and/or moderate income households; or 2.To construct residential development at densities at the minimum set forth for the applicable land use district; or 3.To enable a significant public benefit as determined by the decision-making authority. A significant public benefit may include, but is not limited to, one or more of the following: a.Exceeding minimum Climate Action Plan (CAP) consistency requirements; b.Exceeding local energy efficiency requirements and/or renewable energy requirements; c.Exceeding local electric vehicle parking requirements; d.Reducing vehicle miles traveled (VMT); e.Implementing programs that encourage employees to carpool or ride transit; f.Implementing an important public amenity or infrastructure component of the Master Plan; and g.Advancing other benefits as determined by the decision-making authority; or 4.To protect or accommodate a designated or potential historic resource as defined in California Environmental Quality Act Guidelines Section 15064.5; or 5.To recognize an established building or site character that is unique and desirable to maintain. STANDARDS MODIFICATION 10 Village and Barrio Master Plan Section 2.7.1.H - Building Massing “Maximum wall plane and roofline: No building façade visible from any public street (excluding alleys) shall extend more than 40 feet in length without a 5-foot minimum variation in the wall plane, as well as, a change in roofline.” • Wall Plane Maximum ft minimum -m 5 • 40 ft. max1mu PROJECT DESCRIPTION Unit 1 Parking Garage 11 66’ I~ L_ I ' , r.Nl::LFT &:JIIU& TOeE U!EDCR.r / / ~ ',, B't flW'EDnPO'l'H:!l 'Mlil '-000.Fl ltE lllJUlNll / ' / •! ',-. PAR~l14GLJFT7t8 ,,✓ .. '"' ---..., I I \ r1-J .--·1:.._ _________ ~- STAl~I • E.Y.C.S. (l-;sTIIL.lEDj FlRCRl&rR\ ! ! ! ! ! ! ! ! ! ! I ~ I I I I I I I I I I I I I I I 11 I I I I I 1 I.I' -,- ----------t--------:-:-t------t--I-- I --- I I I I I I I I I lh========±::::::====~~~~I ii-~ -------------~ C1ty-o-~ Carlsbad ELEVATIONS 12 66’ PROJECT ANALYSIS General Plan (V-B) Zoning Ordinance (V-B) Village & Barrio Master Plan 13 Recommended Action ITEM 1: GRAND HOPE MEDICAL OFFICE BUILDING 14 ADOPT the Planning Commission Resolution RECCOMENDING APPROVAL of Site Development Plan SDP 2023-0025 based upon the findings and subject to the conditions contained therein. C cityof Carlsbad 16(E) 3-Story Condo I \ I ' ,-------1 I .. ______ L __ _ I ■ s ---------7 ,--------, ____ _ L ______ J ------1 I r ---- 1.--------..I --~, I I I I ~ .. , . I ,., -" " wl , , S"TP • STANDARDS MODIFICATION 17 VBMP Section 2.6.7.C – FINDINGS To grant a standards modification, the decision-making authority shall make the following findings. These findings are in addition to any other findings required to approve a project. 1.The applicant has provided acceptable evidence to demonstrate the need for the standards modification and there is no other way to reasonably achieve one or more of the purposes outlined in Section 2.6.7.B without the modification. 2.The standards modification is consistent with the goals and policies of the Master Plan and the vision and intent of the applicable district. 3.(If applicable) The decision-making authority has determined the project provides a significant public benefit that warrants the granting of the standards modification. 4.In the Coastal Zone, a standards modification is permitted only when the decision-making authority determines that the modification is consistent with the certified Local Coastal Program, and if applicable, with the public access and recreation policies of Chapter 3 of the Coastal Act. ELEVATIONS 18 CEQA Determination GRAND HOPE MEDICAL OFFICE BUILDING 1919 •Aug. 1, 2024 – City Planner issues determination of exemption pursuant to CEQA Guidelines Section 15332 – In-Fill Development Project •Aug. 1, 2024 – CEQA determination of exemption is posted for 10-day noticing period •No comments received •No appeal filed 1111111 {city of Carlsbad ELEVATIONS 20 EAST/HOPE AVENUE WEST/INTERIOR SIDE l -+ ,.,.. 7- I ■ • ~ -+ IIJ'. • ~ ~ UNIT 1 ELEVATIONS 21 NORTH/REARSOUTH/GRAND AVE I I I ~ ~ I I ~ ~ ROOF ------------I-- -+ ROOF 1:1::i rr I ; tr~ -10'-2' ~ I ls I I g ~ F.F.E. p g ---I= w ~ ~ - 1-1,----,J t=¢ . ·, ~ ;.. F.F.E.-GRAOE ~ PROJECT DESCRIPTION 22 ---------------------------------------- {city of Carlsbad CROSS SECTIONS 23 ~ ~ .... B'U!:!Jl~LE!Dl~N~GJS~E£C]Tl~O!!N ___ _ G)I:>: , . ..., ~ ~ lt-1 MIUl ~ {city of Carlsbad LANDSCAPE PLANS 24 -----=:: -W-..,---w ---w ---w ---------- D CA OFF C I w_)(-w -w -