Loading...
HomeMy WebLinkAbout5922 FARNSWORTH CT; ; AS070045; Permit10/31/24, 3:40 PM Job Address: Permit Type: Parcel No: Lot#: Reference No.: PC#: Project Title: Applicant: AS070045 Permit Data City of Carlsbad Sprinkler Permit Permit No: AS070045 5922 FARNSWORTH Status: ISSUED CT SPRINK Applied 2/26/2007 2120701100 Approved: 2/27/2007 0 Issued: 2/27/2007 Inspector: CARLSBAD TECHNOLOGIES TWO FIRE SPRINKLER INSPECTIONS @ $62/EA Owner: EPIC FIRE PROTECTION, INC. 765 TURTLE POINT WY CARLSBAD TECHNOLOGY INC SAN MARCOS, CA 760-310-6122 about:blank Fees($) 124 Add'I Fees ($) 0 5923 BALFOUR CT CARLSBAD CA Total($) 124 Balance($) 0 1/1 FILE COPY Hydraulic Design Information Sheet f.2!o,.\. '"2.~ \"2.•07 Name: CARLSBADTECHNOLOG~------Date: 1-17-07 Location: 5922 FARNSWORTII COURT, CARLSBAD Building: EXISTING System No. 1 OF 1 -----......----Ccmra ctor: -EPIC FIRE PROTECTION, INC. Cmtract No. Calculated By: RAB ________________ Drawing No. I OF 1 • Coostructicn: 0 Combustible 181 Ncn-CombustibJe Ceiling Height -14-----Ft-. SYSTEM DESIGN NFPA 13: --Light Hazard • Ordinary Hazard Group 1 2 3 Extra Huard 0 NFPA231 0 NPPA231C: Figure: -Curve: 0 Other (Specify) ------- □Specific Ruling __________ Made By Date ----- Ana of Sprinkler Operati(1) Density Area Per Sprinkler ENTIRE MEZZANINE Smem T.m _.2 ..... 0 ______ 181 Wet O Dry O Deluge O Pre-Action 130 SQ Ff MAX Sprinkler or NoµJe 100 Mab VICTAULIC Model V34 Hose Allowance GPM: Inside Hose Allowance GPM: Outside Rack S rinkler AU.awance ----------------150 Siz.e 17/32" K-factor: 8.0 ----------------N/A ~ ratu.re 165 . GPM Required --:·'Z.6;..z. '1 ?- "C" Factor Used: WaFIQWim Date ct Time 11-13--06 10:00 AM Static PSI 108 Residual PSI 103 GPMFlowing 1350 Elevatioo 0 Location ON S11E PUBLIC LOOP CALCULATION SUMMARY PSI Required . • '?z\. '2-<b Overhead 120 WATER SUPPLY Pvrm,Data Rated Capacity At.PSI Elevatioo. Source of'Informaticli CARLSBAD WATER DEPT. COMMODITY STORAGE Commodrty Clast Storage Height Area Storage Method: Solid Piled o/o Palletiz.ed Bia B SingleRow 0 Cmvawooal Pallet 0 Automatic Storage DoubloRaw □ Slave Pallet -0 Solid Shelving At Base of Riser 150 I111k 2c Reservoir Capacity Elevation ~ ProofFlow -- Location Aisle Width %Rack □ Encapsulated 0 Ncu•Encapsulated GPM ~; .. ,,,. -~. , r ' ..: -. ... ~ ... . } . . .' D Multiple Row □Opm Clearana From Ira;t 2f Storag m Ceiling~, . Plue S,p:acins ID Indies Loogitudinal Transverse Ft. { In. HoriDDtal Barrien Provided i I CARLSBAD TECH MEZZANINE .20/ENTIRE MEZZ. 125 120 115 110 106 100 "'l :.ai ~ .1-1 95 90 85 80 75 70 85 80 55 60 45 40 35 30 25 ~ 1 ~ 1 5 I :i 0 .. , .... '1 0 1so 300 4SO 800 System Demand .. Sprinkler Demand 34.91 PSI Additional nows Hose at Source Total Demand 35.02 PSI 750 900 @ 102.72 GPM 100.00 GPM 150.00 GPM @ 352.72 GPM 1050 war Flow (GPM) Sigma Dynamic• Corporation 7700 Supply / Demand Graph I Margin -Pressure 61.81 PSI now 5221.37 GPM - ~s)- 1200 1350 Water Supply .. Static 97.20 PSI Residual 92.70 PSI Elevation 0.00 PSI @ 1350.00 GPM N1.1& 1500 SUBMITI'AL SERIAL N0:2932HY7 CARLSBAD TECH MEZZANINE .20/ENTIRE MEZZ. FLOW TEST RESULTS Water Supply STATIC 97.20 PSI RESIDUAL 92.70 PSI @ 1350.00 GPM CITY PRESSURE AVAILABLE AT 352.7 GPM 96.82 PSI SUMMARY OF SPRINKLER OUTFLOWS ACTUAL MINIMUM SPR FLOW FLOW K-FACTOR -------- 310 28.75 24.00 8.00 311 25.52 24.00 8.00 312 24.45 24.00 8.00 313 24.00 24.00 8.00 TOTAL WATER REQUIRED FOR SYSTEM OUTFLOWS AT 4 OUTSIDE HOSE STREAMS AT 0 TOTAL WATER REQUIREMENT PRESSURE REQUIRED AT 0 MAXIMUM PRESSURE UNBALANCE IN LOOPS MAXIMUM VELOCITY FROM 301 TO 310 PRESSURE -------- 12.92 10.18 9.34 9.00 102.72 GPM 100.00 GPM 150.00 GPM 352.72 GPM 35.02 PSI 0.00 PSI 17.79 FPS 02-12-2007 PAGE 1 . SUBMI'lTAL SBRIAL N0:2932BY7 02-12-2007 PAGE 2 CARLSBAD TBCH MBZZANINB .20/BNTIRB MBZZ. Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Sunrnary Prom TO GPM IN Devices Ft PSI/Ft PSI 312 313 1.536 L 12.00 c-120 PT 9.00 (313) Q 24.00 F=0 F 0.00 PB 0.00 BN2 T 12.00 0.0285 PP 0.34 311 312DQ 24.45 1.536 L 8.00 C=l20 PT 9.34 (312) Q 48.45 P=0 F o.oo PB 0.00 BN2 T 8.00 0.1044 pp 0.84 310 311DQ 25.52 1.536 L 12.00 c-120 PT 10.18 (311) Q 73.97 F=0 F 0.00 PB 0.00 BN2 T 12.00 0.2284 PF 2.74 301 310DQ 28.75 1.536 L 19.00 C=120 PT 12.92 (310) Q 102.72 F=B F 3.60 PB -6.93 BN2 T 22.60 0.4193 PF 9.48 300 301 2.203 L 33.00 C=120 PT 15.47 (301) Q 102.72 F=2T,2B p 32.80 PB 0.00 BN T 65.80 0.0724 pp 4.76 14 300 4.316 L 36.00 c-120 PT 20.23 (300} Q 102.72 F•O F 0.00 PB o.oo FM T 36.00 0.0027 PF 0.10 13 14 4.316 L 12.00 C=l20 PT 20.33 ( 14) Q 102.72 P=0 F 0.00 PB 0.00 PM T 12.00 0.0027 PF 0.03 12 13 4.316 L 12.00 c-120 PT 20.36 ( 13) Q 102.72 F•0 F o.oo PB 0.00 FM T 12.00 0.0027 PP 0.03 11 12 4.316 L 7.00 C=120 PT 20.39 ( 12) Q 102.72 F=0 F 0.00 PB o.oo PM T 7.00 0.0027 PF 0.02 10 11 6.357 L 5.00 C=l20 PT 20.41 ( 11) Q 102.72 F•O F 0.00 PB 0.00 FM T s.oo 0.0004 PF o.oo 9 10 6.357 L 26.00 c-120 PT 20.41 ( 10) 0 102.72 P=0 F 0.00 PB 0.00 PM T 26.00 0.0004 PP 0.01 5 9 6.357 L 14.00 c-120 PT 20.42 ( 9) 0 102.72 F•E/T F 44.00 PB 0.00 PM T 58.00 0.0004 PF 0.02 C . . . SUBMI'lTAL SERIAL NO:2932HY7 02-12-2007 PAGB 3 CARLSBAD TECH MEZZANINE .20/BNTIRB MEZZ. Location Flow Pipe Fittings Equiv Friction Pressure in Size &: Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI ,4 5 6.357 L 24.00 C=l20 PT 20.44 ( 5) Q 102.72 F=E F 12.57 PE 10.40 FR T 36.57 0.0004 PF 0.01 3 4DQ 100.00 6.357 L 1.00 C=120 PT 30.85 { 4) 0 202.72 F=O F 0.00 PE 0.43 FR T 1.00 0.0015 PF o.oo 1 3 6.357 L 8.00 C=120 PT 31.28 { 3) Q 202.72 F=DCA,E F 12.57 PE 0.87 MA T 20.57 0.0015 PF 0.03 6" AMES lOOODCA 2.70 0 1 5.914 L 20.00 C=lSO PT 34.88 ( 1) Q 202.72 F=T,GV,E F 72.41 PE o.oo UN T 92.41 0.0014 PF 0.13 PT 35.01 0) Name: CARLSBAD TECHNOLOG • EPIC FIRE PROTECTION, INC. 76S TURTLE POINT WAY SAN MARCOS, CA 92069 (760) 310-6122 FAX (760) 798-0556 Hydraulic Design lnformation S)leet ----Location: 5922 P ARNSWOR.1H COlJllT, CARLSBAD ~. -z. \'l..• et·) Date: 1-17-07 Building: EXISTING System No. 1 OF 1 _____ ....,.;... ___ _ Cmtractor: EPIC PIRB PROTEC'llON. INC. Contraet No. Calculated By: RAB.· Drawing No. l OF I Cmstruction: ...,181,.._"""'.".Cam--bl-usti--ib--le---□-N-m--Com--busti_ible _____ Ceillug Heigbt.-29-----Ft-. SYSTEM DESIGN NFPA 13: Ligbt Hazard· Ordinary.Hazard GnJup: 1 0 NFPA 231 0 NFPA 231C: Figure: 0 Other (Specify) 2 3 Extra Huard Curve: -------- 0Specif1cRuling. _________ MadeBy _____ Date Ana of Sprinklet Opeta1icn 3000 ·Syps ~ Density .33 181 Wet D Dry □ J>eluae □ Pre-Action. Area Per Sprinkler 100 SQ PT MAX Spriqldm; or Nozzle Hose Allowance GPM! Inside 100 Mab VICTAULIC Model V34 --------t Hose Allowance GPM: Outside 400 Size ---K-factor: _s,....o _____ __. Rack S riakl8t AUawance SEE CALCS Ti --~--165 -RACK HEADS CALCULATION SUMMAR.Y GPMRequin,d :lCi:,,e'f·~o'¢ PSIRequired ~•-~'¼.o i AtBaseolB.isor •'C'' Padol' Used: -• •• ...... ----Overhead 120 ISO WATER. SUPPLY w.-Fiowr. JlumRData InokorRwaoir Date&Tnne 11-13-06 10:00 AM Rated Capacity Capacity ; Static PSI 108 • At.PSI E1evatim Residual PSI 103 Elevation. GPMFJowiog 1350 D Blevatim' 0 Proof'Flow. GPM Locatim ON SITE PUBLIC LOOP Source oflnibnnation CARLSBAD WATER. DEPT. COMMODITY STORAGE Commodity SEE TECH REPORT Class I-IV Locatim RACKS Storage Height 2s· Ana 111000 sg Fr AisleWldth g• Storage Method: Solid Piled 0 % Pa1letizecl 0 %Rack 100 Ria f8I ColMmti<mal Pallet □ Automatic Storage □ F.ncapsulatecf 181 Single Raw ~ DoubleRaw 0 Slaw Pallet □ Solid Shelving jgl Nan-&capsuJated 0 Multiple I.ow D Open ClearanaJ from Ism of Storage m tlilmg Bu1·5Rlcin1 In laches Lcqit.udinal 6" Transverse 3'" s Pt. 0 In. Horizontal Barriers Provided NIA I CARLSBAD TECH RACK UPGRADE .33/3000 W/8 IN~RACKS @ 15 PSI Sigma Dynamics Corporation 7700 Supply / Demand Graph 125 120 115 110 105 100 95 90 85 eo 75 70 85 60 55 50 45 40 35 30 25 20 15 10 5 / / , ... ~ / _/,,, JQ) , • ~ / V / .JV / ... b~ ~ 0 250 500 750 ~~ 1000 1250 1500 System Demand .. Sprinkler Demand 73.50 PSI@ 1589.03 GPH Additional rlows 100.00 GPM Hose at Source 400.00 GPM Total Demand 74.31 PSI@ 2089.03 GPM /. ... o• 1750 Water FkM (GPM) l I Margin Pressure 12.80 PSI Flow 1160.26 GPH I /4'L ' ~ ,, ~ I 2000 2250 Water Supply .. Static 97.20 PSI Residual S2.70 PSI@ 1350.00 6PM Elevation 0.00 PSI - - N1.as 2500 SUBMI'ITAL SERIAL N0:2932HY7 02-12-2007 PAGB l CARLSBAD TECH RACK UPGRADE .33/3000 W/8 IN-RACKS@ 15 PSI FLOW TEST RESULTS Water Supply STATIC 97.20 PSI RESIDUAL 92.70 PSI @ 1350.00 GPM CITY PRESSURE AVAILABLE AT 2089.0 GPM 87.ll PSI SUMMARY OF SPRINKLER OUTFLOWS ACTUAL MINIMUM SPR FLOW FLOW K-FACTOR PRESSURE ---------------- 100 40.75 31.68 8.00 25.94 101 40.10 31.68 8.00 25.13 102 39.63 31.68 8.00 24.54 103 39.50 31.68 8.00 24.37 104 40.83 31.68 8.00 26.05 105 40.18 31.68 8.00 25.23 106 39.71 31.68 8.00 24.64 107 39.58 31.68 8.00 24.47 108 41.12 31.68 8.00 26.42 109 40.47 31.68 8.00 25.59 110 40.00 31.68 8.00 24.99 111 39.86 31.68 8.00 24.83 112 41.74 31.68 8.00 27.23 113 41.09 31.68 8.00 26.38 114 40.60 31.68 8.00 25.76 115 40.47 31.68 8.00 25.59 116 42.79 31.68 8.00 28.61 117 42.12 31.68 8.00 27.72 118 41.62 31.68 8.00 27.07 119 41.49 31.68 8.00 26.89 124 43.80 31.68 8.00 29.98 125 43.12 31.68 8.00 29.05 126 42.61 31.68 8.00 28.37 127 42.47 31.68 8.00 28.18 128 43.19 31.68 8.00 29.14 129 42.51 31.68 8.00 28.23 130 42.01 31.68 8.00 27.58 131 41.87 31.68 8.00 27.39 132 43.01 31.68 8.00 28.91 SUBMITI'AL SERIAL NO:2932HY7 02-12-2007 PAGE 2 CARLSBAD TECH RACK UPGRADE .33/3000 W/8 IN-RACKS@ 15 PSI SUMMARY OF SPRINKLER OUTFLOWS ACTUAL MINIMUM SPR FLOW FLOW K-FACTOR -------- 133 42.34 31.68 8.00 134 41.84 31.68 8.00 135 41.70 31.68 8.00 200 37.74 31.00 8.00 201 35.55 31.00 8.00 202 33.85 31.00 8.00 203 32.62 31.00 8.00 204 31.79 31.00 8.00 205 31.30 31.00 8.00 206 31.07 31.00 8.00 207 31.00 31.00 8.00 TOTAL WATER REQUIRED FOR SYSTEM OUTFLOWS AT 4 OUTSIDE HOSE STREAMS AT 0 TOTAL WATER REQUIREMENT PRESSURE REQUIRED AT 0 MAXIMUM PRESSURE UNBALANCE IN LOOPS MAXIMUM VELOCITY FROM 10 TO 120 PRESSURE -------- 28.01 27.36 27.18 22.26 19.74 17.91 16.63 15.79 15.31 15.08 15.02 1589.03 GPM 100.00 GPM 400.00 GPM 2089.03 GPM 74.31 PSI 0.00 PSI 28 .39 FPS SUBMITl'AL SBRIAL N0:2932HY7 02-12-2007 PAGE 3 CARLSBAD TBCH RACK UPGRADB .33/3000 W/8 IN-RACKS@ 15 PSI Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary From To GJ?M IN Devices Ft PSI/Ft PSI 206 207 2.203 L 8.00 c-120 PT 15.02 (207) Q 31.00 F=O F o.oo PB 0.00 BN2 T 8.00 0.0079 PF 0.06 205 2060Q 31.07 2.203 L a.oo c-120 PT 15.08 (206) Q 62.07 F=O F 0.00 PB 0.00 BN2 T 8.00 0.0285 PF 0.23 204 205DQ 31.30 2.203 L 8.00 C=120 PT 15.31 (205) Q 93.37 F=O • F 0.00 PB 0.00 BN2 T 8.00 0.0607 PF 0.49 203 204DQ 31.79 2.203 L 8.00 C=l20 PT 15.80 (204} Q 125.16 F=0 F 0.00 PB 0.00 BN2 T 8.00 0.1043 PF 0.83 202 2030Q 32.62 2.203 L 8.00 C=120 PT 16.63 (203) Q 157.78 F:0 F 0.00 PB 0.00 BN2 T 8.00 0.1602 PF 1.28 201 20200 33.85 2.203 L 8.00 C=120 PT 17.91 (202) Q 191.63 FaO F 0.00 PB 0.00 BN2 T 8.00 0.2295 PF 1.84 200 2010Q 35.55 2.203 L 8.00 C=l20 PT 19.75 (201) Q 227.18 F=0 F 0.00 PE 0.00 BN2 T 8.00 0.3144 PF 2.52 32 20000 37.74 2.203 L 17.50 C-=120 PT 22.27 (200) Q 264.92 F=T F 11.60 PB 0.00 BN2 T 29.10 0.4178 PF 12.16 PT 34.43 ( 32) ------------------131 135 2.203 L 16.00 C=l20 PT 27.18 (135) Q 41.70 F::=O p 0.00 PB 0.00 BN T 16.00 0.0137 pp 0.22 127 131DQ 41.87 2.203 L 16.00 C=120 PT 27.40 (131) Q 83.57 F=0 F 0.00 PB 0.00 BN T 16.00 0.0494 PF 0.79 123 12700 42.47 2.203 L 2.00 C=120 PT 28.19 (127} 0 126.05 F=0 p 0.00 PB 0.00 BN T 2.00 0.1057 PF 0.21 PT 28.40 (123) ------------------130 134 2.203 L 16.00 C=l20 PT 27.36 (134) Q 41.84 F•0 F 0.00 PB 0.00 BN T 16.00 0.0137 PF 0.22 SUBMITI'AL SERIAL N0:2932HY7 02-12-2007 PAGE 4 CARLSBAD TECH RACK UPGRADE .33/3000 W/8 IN-RACKS@ 15 PSI Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss summary From To GPM IN Devices Ft PSI/Ft PSI 126 130DQ 42.01 2.203 L 16.00 c-120 PT 27.58 (130) Q 83.85 F•O F o.oo PE o.oo BN T 16.00 0.0497 PF 0.80 122 126DQ 42.61 2.203 L 2.00 c-120 PT 28.38 (126) Q 126.46 FsO F 0.00 PB o.oo BN T 2.00 0.1064 PF 0.21 PT 28.59 (122) ------------------129 133 2.203 L 16.00 C=l20 PT 28.01 (133) Q 42.34 F=O F o.oo PE o.oo BN T 16.00 0.0140 PF 0.22 l.25 l.29DQ 42.51 2.203 L l.6.00 C=l.20 PT 28.23 ( l.2 9) Q 84.85 F=O F o.oo PE o.oo BN T 16.00 0.0508 PF 0.81 121 125DQ 43.12 2.203 L 2.00 C=l.20 PT 29.04 (125) Q 127.96 F=O F o.oo PE o.oo BN T 2.00 0.1087 PF 0.22 PT 29.26 ( l.21) ------------------128 132 2.203 L 16.00 C=l20 PT 28.91 (132) Q 43.01 F=O F o.oo PE o.oo BN T l.6.00 O.Ol.45 PF 0.23 124 128DQ 43.19 2.203 L 16.00 C=l20 PT 29.14 (128) Q 86.20 F=O F o.oo PE 0.00 BN T 16.00 0.0523 PF 0.84 120 124DQ 43.80 2.203 L 2.00 C=l.20 PT 29.98 (124) Q l.30.00 F•O F 0.00 PE 0.00 BN T 2.00 0.1119 PF 0.22 PT 30.20 (120) ------------------107 103 2.203 L 8.00 C=l.20 PT 24.37 (103) Q 39.50 F=O F 0.00 PB 0.00 BN T 8.00 O.Ol.24 PP O.l.O 111 107DQ 39.58 2.203 L 8.00 Cml20 PT 24.47 (107) Q 79.07 F=O F 0.00 PE 0.00 BN T 8.00 0.0446 PF 0.36 ll.5 l.llDQ 39.86 2,203 L 8.00 C=l.20 PT 24.83 (l.ll) Q 118.93 F=O F o.oo PE 0.00 BN T 8.00 0.0949 PF 0.76 SUBMITTAL SBRIAL NO:2932BY7 02-12-2007 PAGE 5 CARLSBAD TBCH RACK uPGRADB .33/3000 W/8 IN-RACKS@ 15 PSI Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI 119 llSDQ 40.47 2.203 L 8.00 c-120 PT 25.59 (115) Q 159.40 F=0 F 0.00 PB 0.00 BN T 8.00 0.1632 pp 1.31 123 11900 41.49 2.203 L 6.00 c-120 PT 26.90 (119) Q 200.89 F•O F 0.00 PB o.oo BN T 6.00 0.2504 PF 1.50 14 123DQ 126.05 2 .203. L 1.00 C=l20 PT 28.40 (123) Q 326.93 F=T/T F 23.20 PB 0.43 NR T 24.20 0.6165 PF 14.92 PT 43.75 ( 14) ------------------106 102 2.203 L 8.00 C=120 PT 24.54 (102) Q 39.63 F•O F o.oo PB 0.00 BN T 8.00 0.0124 PF 0.10 110 106DQ 39.71 2.203 L 8.00 C=120 PT 24.64 (106) Q 79.33 F•O F 0.00 PB 0.00 BN T 8.00 0.0449 PF 0.36 114 ll0DQ 40.00 2.203 L 8.00 C=120 PT 25.00 (110) Q 119.33 F=0 F 0.00 PB 0.00 BN T 8.00 0.0955 PF 0.76 118 114DQ 40.60 2.203 L 8.00 C=120 PT 25.76 (114) Q 159.93 F•O 1! 0.00 PB o.oo BN T 8.00 0.1642 PF 1.31 122 118DQ 41.62 2.203 L 6.00 c-120 PT 27.07 (118) Q 201.56 J!•O F 0.00 PB o.oo BN T 6.00 0.2519 PF 1.51 13 122DQ 126.46 2.203 L 1.00 C=l20 PT 28.58 (122) Q 328.02 F=T/T F 23.20 PB 0.43 NR T 24.20 0.6203 PF 15.01 PT 44.02 ( 13) ------------------105 101 2.203 L 8.00 c-120 PT 25.13 (101) Q 40.10 1!•0 p o.oo PB 0.00 BN T 8.00 0.0127 PF 0.10 109 l0SDQ 40.18 2.203 L 8.00 c-120 PT 25.23 (105) Q 80.28 P=O F o.oo PB 0.00 BN T 8.00 0.0459 PF 0.37 113 10900 40.47 2.203 L 8.00 c-120 PT 25.60 (109) Q 120.76 F1110 F o.oo PB o.oo BN T 8.00 0.0977 PF 0.78 SUBMITTAL SERIAL N0:2932HY7 02-12-2007 PAGE 6 CARLSBAD TECH RACK UPGRADE .33/3000 W/8 IN-RACKS@ 15 PSI Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length Loss Summary From To GPM IN Devices Ft PSI/Ft PSI 117 113DQ 41.09 2.203 L 8.00 C=l20 PT 26.38 (113) Q 161.84 F=O F 0.00 PB 0.00 BN T 8.00 0.1679 PP 1.34 121 11700 42.12 2.203 L 6.00 c-120 PT 27.72 (117) Q 203.96 F=0 F o.oo PE 0.00 BN T 6.00 0.2575 PF 1.54 12 121DQ 127.96 2.203 L 1.00 C=-120 PT 29.26 {121) Q 331.92 F=T/T F 23.20 PB 0.43 NR T 24.20 0.6340 PF 15.34 PT 45.03 ( 12) ------------------104 100 2.203 L 8.00 C=120 PT 25.94 (100) Q 40.75 F=O F o.oo PB o.oo BN T 8.00 0.0131 PP 0.10 108 104DQ 40.83 2.203 L 8.00 C=120 PT 26.04 (104} Q 81.57 F=O F 0.00 PE o.oo BN T 8.00 0.0473 PP 0.38 112 108DQ 41.12 2.203 L 8.00 C:cl20 PT 26.42 (108) Q 122.70 F=O F 0.00 PB 0.00 BN T 8.00 0.1006 PF 0.80 116 112DQ 41.74 2.203 L 8.00 Ca120 PT 27.22 (112} Q 164.44 F=O F 0.00 PE 0.00 BN T 8.00 0.1729 PF 1.38 120 116DQ 42.79 2.203 L 6.00 C=120 PT 28.60 (116) Q 207.23 F:0 F 0.00 PB 0.00 BN T 6.00 0.2652 pp 1.59 10 12000 130.00 2.203 L 1.00 C=-120 PT 30.19 {120) Q 337.23 F=T/T F 23.20 PB 0.43 NR T 24.20 0.6529 PF 15.80 PT 46.42 ( 10) ------------------31 32 2.203 L 16.00 C=120 PT 34.42 ( 32) Q 264.92 P=T F 11.60 PB -6.93 FM3 T 27.60 0.4178 PF 11.53 30 31 2.703 L 19.50 C=l20 PT 39.02 ( 31) Q 264.92 F:a:O F 0.00 PE 0.00 FM2 T 19.50 0.1543 PF 3.01 7 30 3.314 L 100.00 c-120 PT 42.03 ( 30) Q 264.92 F=T F 18.90 PE 0.00 FM2 T 118.90 0.0572 PF 6.80 SUBMITI'AL SBRIAL NO:2932HY7 02-12-2007 PAGB 7 CARLSBAD TECH RACK UPGRADE .33/3000 W/8 IN-RACKS@ 15 PSI Location Flow Pipe Fittings Equiv Friction Pressure in Size & Length LOSS Summary From To GPM IN Devices Ft PSI/Ft PSI 6 7 3.314 L 23.00 C=120 PT 48.83 ( 7) Q 264.92 F=BV,B F 14.30 PB 9.97 FR2 T 37.30 0.0572 PF 2.13 4 6 3.314 L 1.50 c-120 PT 60.93 ( 6) Q 264.92 F•T,B p 26.20 PB 0.00 FR2 T 27.70 0.0572 PF 1.58 PT 62.51 ( 4) ------------------13 14 4.316 L 12.00 C=l20 PT 43.75 14) Q 326.93 F•O F o.oo PE 0.00 FM T 12.00 0.0233 PF 0.28 12 13DQ 328.02 4.316 L 12.00 C=l20 PT 44.03 ( 13) Q 654.95 F-=O p 0.00 PE 0.00 FM T 12.00 0.0843 PF 1.01 11 l2DQ 331.92 4.316 L 7.00 c.120 PT 45.04 ( 12) Q 986.87 F•O F 0.00 PB 0.00 FM T 7.00 0.1800 PF 1.26 10 11 6.357 L 5.00 C=l20 PT 46.30 ( 11) Q 986.87 P•O F 0.00 PB 0.00 FM T s.oo 0.0273 PF 0.14 9 lODQ 337.23 6.357 L 26.00 C•120 PT 46.44 ( 10) Q 1324.11 F•O F o.oo PB 0.00 FM T 26.00 0.0470 PF 1.22 5 9 6.357 L 14.00 c-120 PT 47.66 ( 9) Q 1324.ll P•B/T F 44.00 PE 0.00 FM T 58.00 0.0470 PF 2.73 4 5 6.357 t 24.00 c-120 PT 50.39 ( 5) Q 1324.11 F•E F 12.57 PE 10.40 FR T 36.57 0.0470 PF 1.72 3 4DQ 364.92 6.357 L 1.00 C=l20 PT 62.51 { 4) Q 1689.03 F•O F 0.00 PB 0.43 FR T 1.00 0.0738 PF 0.07 1 3 6.357 L 8.00 c-120 PT 63.01 ( 3) Q 1689.03 F=DCA,B F 12.57 PE 0.87 MA T 20.57 0.0738 PF 1.52 6" AMES lOOODCA 2.50 0 1 5.914 L 20.00 C=l50 PT 67.90 ( l) Q 1689.03 F=T,GV,B F 72.41 PB o.oo UN T 92.41 0.0694 PF 6.41 PT 74 .31 ( 0)