HomeMy WebLinkAbout1601 TURQUOISE DR; ; CB991331; PermitCity of Carlsbad
04/26/1999 Residential Permit Permit No:CB991331
Building Inspection Request Line (760) 438-3101
Job Address: 1601 TURQUOISE DR CBAD
Permit Type: RESDNTL Sub Type: SFD Status:
Parcel No: 2122012800 Lot#: 154 Applied:
Valuation: $224,011.00 Construction Type: VN Entered By:
Occupancy Group: 6 Reference #: CT84-32
04/05/1999
# Dwelling Units: 1 Structure Type: SFD Issued:
Bedrooms: 5 Bathrooms: 2.5 Inspect Area:
Project Title: COBBLESTONE-PHASE11 Orig PC#:
PLAN 7, SFD 2570 SF, GAR 577 SF
Applicant:
GREYSTONE HOMES
101
Plan Check#:
Owner:
GREYSTONE HOMES
101
5973 AVENIDA ENCINAS
CARLSBAD CA 92008
5973 AVENIDA ENCINAS
CARLSBAD CA 92008
760-804-7700 760-804-7700
ISSUED
03/17/1999
JM
Plan Approved:
04/26/1999
PY
CB971300
990038
Total Fees: $18,058.49 Total Payments To Date: $0.00 Balance Due: $18,058.49
Building Permit $1,058.58 Reel. Water Con. Fee $0.00
Add'I Building Permit Fee $0.00 Meter Size
Plan Check $688.08 Add'I Reel. Water Con. Fee $0.00
Add'I Plan Check Fee $0.00 CFO Payoff Fee $2,685.23
Plan Check Discount ($55.05) PFF $4,077.00
Strong Motion Fee $22.40 PFF (CFO Fund) $0.00
Park in Lieu Fee $1 ,575.00 License Tax $0.00
Park Fee $0.00 License Tax (CFO Fund) $0.00
LFM Fee $0.00 Traffic Impact Fee $550.00
Bridge Fee $0.00 Traffic Impact (CFO Fund) $0.00
Other Bridge Fee $0.00 PLUMBING TOTAL $182.00
STD #2 Fee $0.00 ELECTRICAL TOTAL $41.25
STD #3 Fee $0.00 MECHANICAL TOTAL $55.00
Renewal Fee $0.00 Housing Impact Fee $2,925.00
Add'I Renewal Fee $0.00 Housing lnlieu Fee $0.00
Other Building Fee $0.00 Master Drainage Fee: $0.00
Pot. Water Con. Fee $2,400.00 Sewer Fee: $1,854.00
Meter Size D5/8
Add'I Pot. Water Con. Fee $0.00 TOTAL PERMIT FEES $18,058.49
Clearance: ,-s-,;;,o W
OTICE th t approval of your project includes the "Imposition· of fees, dedications, reservations, or other exactions hereafter collectively
referred to as 'f exactions.' You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which ou have reviousl been iven a NOTICE similar to this or as to which the statute of limitations has reviousl otherwise ex ired.
CITY OF CARLSBAD
2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161
. i) City of Carlsbad Inspection Request
. For: 1/4/2000
Permit# CB991331
Title: COBBLESTONE-PHASE 11
Description: PLAN 7, SFD 2570 SF, GAR 577 SF
Type: RESDNTL Sub Type: SFD
Job Address: 1601 TURQUOISE DR
Suite: Lot 154
Location:
APPLICANT GREYSTONE HOMES
Owner: GREYSTONE HOMES INC
Remarks:
Total Time:
Inspector Assignment: PY ---
Phone: 7606030056
Inspector: -----
Requested By: SHELDON
Entered By: CHRISTINE
CD Description Comments
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Associated PCRs
lnsgection Histo!}:'.
Date Description Act lnsp Comments
12/28/1999 89 Final Combo NS RB
12/27/1999 89 Final Combo NR PD NO SUPER
12/23/1999 89 Final Combo NS PY RESET FOR MONDAY
12/16/1999 39 Final Electrical PA PY EMR
11/10/1999 23 Gas/TesURepairs AP PY
11/9/1999 17 Interior Lath/Drywall AP PY
11 /9/1999 18 Exterior Lath/Drywall AP PY
10/28/1999 84 Rough Combo AP PY
10/22/1999 13 Shear Panels/HD's AP PY
10/6/1999 15 Roof/Reroof AP PY
8/25/1999 81 Underground Combo AP PY
8/24/1999 11 Fig/Foundation/Piers AP PY
8/23/1999 11 Fig/Foundation/Piers NS PY
8/16/1999 21 Underground/Under Floor AP PY
8/13/1999 21 Underground/Under Floor CA PY
'·
City of Carlsbad
2075 las Palmas Drive, Carlsbad·California 92009
I
INSPECTION RECORD
INSPECTION RECORD CARD WITH APPROVED PLANS
MUST BE KEPT ON THE JOB
CALL PRIOR TO 2:00 P.M. FOR NEXT WORKDAY INSPECTION
·• BUILDING INSPECTION: (760) 438-3101
JOB ADDRESS: LOT NO./SU 1lrE:
OWNERS NAME: CB991331 1601 TURQUOISE DR CBAD I /
USE/OCCUPANCY COBBLESTONE,PHASE 11 -lST. DA TE l-f"/2£/ f'f
PLAN 7, SFD 2570 SF, GAR 577 SF CONTRACTO R I v
I RESDNTL SFD
BUILDING Loi# 154 GREYSTONE HOMES
OTHER I
APPROVED TO COVER
Type of Inspection Date Inspector ~otes
BUILDING I I /'.
FOUNDATION l~/;.//ftf ~/
REINFORCED STEl:L w ff
'• ~SONRY . ,ROUT D WALL DRAINS
TILT PANELS
POUR STRIPS
COLUMN FOOTINGS
SUBFRAME □ FLOOR □-CEILING ' ROOF SHEATHING l ,,..,/ t .. l'/1 :A-r
EXT. SH.EAR PANELS Jr,/ ?1..I £U). / a,,/
FRAME ,U • 4'\/.2~ l9'f' ~'7
INSULATION . , I
EXTERIOR LATH ,./.,,/ __ -INTERIOR Li\TH & DRYWALL ''/ ~/ r l ;H ~
FINAL " ~
PLUMBING .,,
□ SEWER AND BUCO □PUCO I I
UNDERGROUND 0 WASTE D WATER ~l/<./<r 1 .A..
TOP OUT □ WASTE □ WATER vb/.2_y/M ~
TUB AND SHOWER PAN I -AS TEST 0 GAS PIPING 1111,~1C\~ I A.-, -lJ WATER HEATER □ SOLAR WATER ,
FINAL
ELECTRICAL
0 ELECTRIC UNDERGROUND DUFER t }
ROUGH ELECTRIC WALLS 1//i/,, v/..-:,.o 1.-
ROUGH ELECTRIC CEILI NG ' -1 "I , I --,,
□ ELECTRIC SERVICE 0 TEMPORARY
□ BONDING □ POOL
FINAL
MECHANICAL
UNDERGROUND DUCTS & PIPING . I .I
0 DUCT & PLEM. □ REF , PIPING /O/~Y"f ~-
HEAT · AIR COND. SYSTEMS I -.7
VENTILATING SYSTEMS ~
.FINAL
CALL FOR FINAL INSPECTION WHEN ALLAPPROPRIATE ITE:.MS ABOVE HAVE BEE"I APPROVED
FINAL Sign When Appropriate , . .
ding Dept. (Inspections) 438·3101 tli.l/D.a (J/\ .t(' L/
Fire Department 931·2121 . ' \, vv
Planning Department 438-1 161 I Z-• 1,,) • 4()J ~
Engineering Dept. (Inspections) 438-3891 11 • ),~~ C ,l;_.
Building lnspector5 (i'am-4pm) 438-3550
CMWD 438-2722 E:d 7153 t:).~1.t.l\.\ 'I IAAT.
Water Inspections 438-3891 (J
REV 9/98 SEE BACK FOR SPECIAL NOTES