Loading...
HomeMy WebLinkAbout6359 PASEO DEL LAGO; ; US110097; PermitPermit Type: HI Parcel No: Lot #: 0 Reference No.: Job Address: Status: ISSUED Applied 6/9/2011 Approved: 6/9/2011 Issued: 6/9/2011 2/15/24, 11:29 AM US110097 Permit Data City of Carlsbad Hazardous Installations Permit No: US110097 PC #: Inspector: Project Title: SOUND EKLIN 6359 PASEO DEL LAGO/HIGH PILE STORAGE Applicant: Owner: VIKING COMMERCIAL CONSTRUCTION ARDEN REALTY LTD PTNSHP 1825 ASTON AV P 0 BOX 4900 DEPT 201 CARLSBAD CA SCOTTSDALE, AZ 760 931 9990 Fees ($) Add'I Fees ($) Total ($) Balance ($) 308 0 308 0 about:blank 1/1 SEE PERMIT CB110647 6359 PASEO DEL LAGO SOUND ELKIN FOR HIGH-PILED COMBUSTIBLE STORAGE , REPORT 06-09-2011 City of Carlsbad Fire Department Permit Permit No: US110097 Job Address: 6359 PASEO DEL LAGO CBAD Permit Type: HI Subtype: HPCSTOR Parcel No: 2130920900 Lot #: 0 Fire Dept Ref#: U8110097 Building Permit#: CB110647 Location: Project Title: SOUND EKLIN Description: HIGH PILE STORAGE Contractor: VIKING COMMERCIAL CONSTRUCTION Phone: 760 931 9990 Fax: 1825 ASTON AV CARLSBAD CA 92008 Status: ISSUED Applied: 06/09/2011 Issued: 06/09/2011 Entered By: CDW CbLk&k6lP FLU brtXCCI ci4 cno 4- Total Fees: $308.00 Total Payments To Date: $0.00 Permit Fee $308.00 Failed Inspection Fee $0.00 Other $0.00 Additional Fees S $0.00 TOTAL PERMIT FEES $308.00 NOTICE: Please take NOTICE that approval of your project includes the"Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as'fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. CORRECTION LIST 2 aLL ody Page: 1 of 2 Daryl K. James & Associates, Inc. Re-Checked by: Anne Marie Bland 205 Colina Terrace Date: May 9., 2011 Vista, CA 92084 T. (760) 724-7001 Email: kitfire@sbcglobal.net APPLICANT: Tina Bennett JURISDICTION: Carlsbad Fire Department PROJECT NAME: Sound Eklin PROJECT ADDRESS: 6359 Paseo del Lago PROJECT DESCRIPTION: CBI 10647 Two-Story Racking System INSTRUCTIONS This plan review has been conducted in order to verify conformance to minimum requirements of codes adopted by the Carlsbad Fire Department. The items below require correction, clarification or additional information before this plan check can be approved for permit issuance. Corrections or modifications to the plans must be clouded and provided with numbered deltas and revision dates along with a descriptive narrative of corrections addressing all comments. Please direct any questions regarding this review to: Anne Marie Bland 760434-7885 or ambIand@pacbell.net CORRECTED PLANS, DESCRIPTIVE NARRATIVE OF REVISIONS FOLLOWING EACH COMMENT ON THIS FORM, AND A COPY OF BUILDING DEPARTMENT (EsGil) COMMENTS MUST BE SUBMITTED DIRECTLY TO: ANNE MARIE BLAND 4380 CARMEL DRIVE CARLSBAD, CA 92010 COMMENTS emailed to: Tina Bennett [tbennett@rbn-design.com] RESUBMITTAL REVIEW Racking Plan - High-Piled Storage Provide a High-Piled Storage Fire Code Compliance Report prepared by qualified person acceptable to Carlsbad Fire Prevention. Report must detail storage arrangement, methods and commodities for compliance with California Fire Code Chapter 23 and NFPA 13 standard. Provide a floor plan showing location of proposed storage racks, aisles, cross aisles and access to exit doors. Show locations of smoke and heat vents. Indicate automatic operation temperature - fusible link. See below Rack!shelving plan scale (1/16) is incorrect. Please note correct scale. Provide a floor plan showing locations of required smoke and heat vents. Based on the High- Piled Storage Report prepared by Klausbruckner and Associates, smoke and heat vents are required at a ratio of 1:50. Smoke and heat vent floor plan must also include the following information: Operation of vents - smoke and heat vents must be operated by approved automatic and manual means. Note method of operation and temperature of automatic operation. Vent operating element must be a higher temperature than the fire sprinkler heads. Listing of vents - smoke and heat vents shall be listed and labeled to indicate compliance with FM 4430, /CC ES AC 331, or UL 793. Location - vents required over the storage area and 15 feet beyond. Maximum spacing of vents is 100 feet and maximum distance from vents to wall is 50 feet. Page: 20f2 L3 Provide a site plan showing location of fire access roadways for the purpose of determining location of required fire access doors. A minimum of one access door shall be provided in each 100 lineal feet, or fraction thereof, of the exterior walls that face required fire apparatus access roads. The required access doors shall be distributed such that the lineal distance between adjacent access doors does not exceed 100 feet. L3 Shelf storage - depending on fire sprinkler option chosen from the High-Piled Storage Report, the following details must be shown in the shelving plan: Option #2a - show required full height, solid vertical transverse barrier per NFPA 13 guidelines in back-to-back storage arrangement. Or, Option #2b - show solid shelf, shelf storage not classified as back-to-back shelf detail. Or, Option #2c - Show grated shelving greater than 50% open, back-to-back storage (see option #2a for back-to-back requirement) or, solid shelving not greater than 32 square feet with 3 inch gaps between shelves.