Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
5962 LA PLACE CT; ; AS110006; Permit
5/6/24, 4:39 PM - ASII0006 Permit Data City of Carlsbad Sprinkler Permit Permit No: ASII0006 Job Address: 5962 LA PLACE CT Status: ISSUED Permit Type: SPRINK Applied 1/20/2011 Parcel No: Approved: 1/20/2011 Lot #: 0 Reference No.: Issued: 1/20/2011 PC #: Inspector: Project Title: THE CAMPUS CORRIDORS T.I. FIRE SPRINKLER PLAN CHECK & INSPECTIONS Applicant: Owner: CARLSBAD OAKS NORTH PARTNERS L P 3575 KENYON ST SAN DIEGO CA Fees ($) Add'I Fees ($) Total ($) Balance ($) 130 0 130 0 about:blank 1/1 City of Carlsbad 01-20-2011 Fire Department Permit Permit No: ASI 10006 Job Address: 5962 LA PLACE CT CBAD Permit Type: SPRINK Subtype: TI Parcel No: Lot #: 0 Fire Dept Ref#: ASI 10006 Building Permit#: CB101836 Location: Project Title: THE CAMPUS CORRIDORS Description: T.I. FIRE SPRINKLER PLAN CHECK & INSPECTIONS Contractor: COSCO FIRE PROTECTION Phone: 858-444-2000 10695 TREENA ST Fax: SAN DIEGO, CA 92131 Status: ISSUED Applied: 01/20/2011 Issued: 01/20/2011 Entered By: BSW Total Fees: $130.00 Total Payments To Date: $0.00 # of Systems # of Additional Risers or Floors Plan Check Fee Additional Plan Check Fee # of Heads Permit Fee Additional Permit Fee Re-Inspection Fee ByPass Meter Fee ByPass Addtl Meter Fee Other Additional Fees TOTAL PERMIT FEES I 0 0 0 $65.00 $0.00 $0.00 $65.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $130.00 NOTICE: Please take NOTICE that approval of your project includes the imposition of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions.' You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you-protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. Carlsbad Fire Department Plan Review Requirements Category. SPRINK , TI Date of Report: 02-01-2011 Reviewed by: Name: CARLSBAD OAKS NORTH PARTNERS L P Address: 3575 KENYON ST SAN DIEGO CA 92110 04 Permit #: AS1 10006 Job Name: THE CAMPUS CORRIDORS Job Address: 5962 LA PLACE CT CBAD INCOMPLETE The item you have submitted for reviewisiiicojn etto adequately :ceitt ppiicable co carefully all comments attached. resubmit the necessary plans and/or to this office for review and approval. Conditions: Cond: C0N0004366 [MET] "APPROVED: APPROVED: &thisjj]e cannot standards. Please review ons, with changes "clouded", THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUEANCE OF A BUILDING PERMIT. THIS APPROVAL IS SUBJECT TO FIELD INSPECTIONS, ANY REQUIRED TESTS, FIRE DEPARTMENT NOTATIONS, CONDITIONS IN CORRESPONDENCE AND COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS. THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE ANY VIOLATION OF THE LAW. Entry: 02/01/2011 By: cwong Action: AP INSTALLATION OF SPRINKLER SYSTEMS FILE COPY 13-222 - - CoAtractor's Material andTest Certificate for Aboveground Piping- A5110666 PROCEDURE Upon completion of work, inspection and tests shall be made by the contractor's representative ani witnessed by the property ow n e r o r their authorized agent. All defects shall be corrected and system left in service before contractor's personnel finallyleave the job. A certifioate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, ownerij and contractor. It is understood the owner's representative's signature in no way prejudices any claim against contractor for tautly ma t e r i a l , p o o r workmanship, or failure to comply with approving authority's requirements or local ordinances. Propertyname QjC .JDate/c/ Property address , y (.4A j/i4-C Qj& Accepted by approving authorities (names) _ Address - Plans Installation conforms to accepted plans 44 Yes EJ No Equipment used is approved C)Yes Ci No If no, explain deviations Has person-in charge of fire equipment been instructed as U Yes CJNo to location of control valves and care and maintenance of this new equipment? If no, explain Instructions Have copies Of the following been left on the premises? Yes J No System Components instructions Ci Yes CJNo Care and maintenance instructions l]Yes QNo 3.NFPA25 QYes IJNo Location of system Supplies buildings Yearof Orifice Temperature Make Model manufacture size Quantity rating . \ Sprinlders Pipe and Type of pipe fittings Type of fittings C...p,t tC)A') Maximum time to operate Alarm Alarm device through test connection flow "alve °" Type Make Model. Minutes Seconds indicator Diyvdlve . .. 0.0.0. Make Mcdd. Serial no. Make Model: . Serial no. lime to trip . . . Time water Alarm through test Water . Air Trip point reached operated Di'j pipe connectiona,b pressure pressure air pressure . test outieta,b property operating test. Minutes Seconds psi psi psi Minutes Seconds Yes No. With Q.O.D.otd With Q._______ _ If no, explain © 2006 National Fire Protection Assodation NFPA 13 (p.1 of 3) 5Measured frqm time inspector's test connection Is opened b NFPA 13 only requires the 60-second limitation in specific sections FIGURE 24.1 Contractor's Material and Test Certificate for Abovegteund Piping. IL 2007 Edition 13-224 INSTALLATION OFSPRINXLERSYSTEMS . Cutouts Do you certify that you have a control feature to ensure that IJYes No (discs) all cutouts (discs) are retrieved? Hydraulic Nameplate-provided , If no, explain data nameplate No Date left in service with all control valves open Remarks / Name of sprinkler contractor 4C) Q QSç(ç ) Tests witnessed by -Signatures The property owner or their authorized agent (signed) Title Date Title Date Fogçractor!sigird) Additional explanations and notes . 1, ti © 2006 National Fire Protection Association NFPA 13 (P. 3 of 3) FIGURE 24.1 Contbzued I 20Q7 Edition