Loading...
HomeMy WebLinkAboutCD 2024-0005; NEW JEWISH COMMUNITY COMPLEX- CHABAD AT LA COSTA; Consistency Determination (CD)CITY OF CARLSBAD APPLICATION FORM FOR CONSISTENCY DETERMINATION APPLICATION PROJECT NAME: Chabad at La Costa ---------------------------------Ass es so r's Parcel Number(s) and 216-580-08-00 Address: 1980 La Costa Avenue, Carlsbad, Ca 92009 ___________________ _ Description of proposal (add attachment if necessary): In the rocess of finishin the basement tenant im rovements we need to add extra storage and move the Rabbi offices downstairs and move the two libra~r stairs per the attached plans.This will need less parking support to the site plan approved. y .>J N a Would you like to orally present your proposal to your assigned staff planner/engineer? es ll'i O JS Please list the staff members you have previously spoken to regarding this project. If none, please so state. Edward Valenzuela OWNER NAME (Print): Rabbi Yeruchem Eilfort MAILING ADDRESS: 1980 La Costa Avenue CITY, STATE, ZIP: Carlsbad , Ca 92009 TELEPHONE: 760--612-4577 cell EMAIL ADDRESS: y eilfort@gmail.com *Owner's signature indicates permission to conduct a preliminary review for a development proposal. IN THE PROCESS OF REVIEWING THIS APPLICATION IT MAY BE NECESSARY FOR MEMBERS OF CITY STAFF TO INSPECT AND ENTER THE PROPERTY THAT IS THE SUBJECT OF THIS APPLICATION. INJE. CONSENT TO ENTRY FOR THIS PURPOSE. I CERTIFY THAT I AM THE LEGAL OWNER AND THAT ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY ""!!i~ 3-6-2024 SI NATRE DATE APPLICANT'S REPRESENTATIVE (Print}: Robert Richardson APPLICANT NAME (Print): Robert Richardson MAILING ADDRESS: 614 Calle Vicente CITY, STATE, ZIP: San Clemente, Ca 92673 TELEPHONE: 760-828-0653 ------------EM A IL ADDRESS: kamakdesign@gmail.com I CERTIFY THAT I AM THE LEGAL REPRESENTATIVE OF THE . OWNER AND THAT ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. ~ 3-6--2024 ~ DATE --------------------------MA I LING ADDRESS: 614 Calle Vicente CITY, STATE, ZIP: TELEPHONE: EMAIL ADDRESS: ---------------------------------San Clemente, Ca 92673 760-828-0653 karnakdesign@gmail.com EGAL REPRESENTATIVE OF THE APPLICANT AND THAT ALL THE ABOVE INFORMATION IS TRUE AND Y KNOWLEDGE. 3-6-2024 DATE FEE REQUIRED/DATE FEE PAID: ~$1'-'\~~~b41 ...... palt\,',1,,,._AC+------------------ RECEIVED BY: 0l.lsTyrJ c. P-16 Page 2 of 2 Revised 3/22 PROJECT SUMMARY -CHABAD CARLSBAD CONSISTENCY DETERMINATION, MARCH 6, 2024 This Consistency Determination (CD) request seeks to accelerate the delivery of basement improvements consistent with prior city approvals for CUP 10-12(A). Chabad Carlsbad now has funding to entitle and construct these overdue improvements which will optimize operational efficiency and modernize the interior use of the structure. No enlargement of the existing Chabad structure is proposed for either the upper floor or basements. The CD request does exchange the location of currently approved interior uses between the upper floor and basement areas, without proposing any new uses or invoking more intensive parking requirements. A primary element of the proposal is increased storage area in the basement and office relocations to upper floor. No exterior changes are proposed to the structure, the site or parking area. Prior contractor efforts involved a day care element for the basement which is not being authorized or pursued by Chabad Carlsbad. Prior plancheck processing for building permit CB 2023-080 will be formally withdrawn. Attached are approved and proposed floor plans for both the basement and upper floor areas with data tables summarizing floor plan changes. Also attached is the CD application form and the Findings required to be satisfied by governing Policy 35. CONSISTENCY DETERMINATION FINDINGS PER POLICY #35 See Project Description, Application Form P-16, and exhibits in addition to Findings 1. No project condition, feature, facility or amenity is changed or deleted that had been considered essential to the project's design, quality, safety or function; the proposal is to adjust Chabad Carlsbad interior uses and floor plan elements of the already approved CUP 10-12(A) between the upper floor and basement approved with CUP 10-12(A), and increase the amount of needed storage space in the basement. Therefore, no project element is being changed or deleted since the proposal will increase operational efficiency. 2. The request represents an upgrade in overall design features and/or materials and improves upon the project's compatibility with the surrounding neighborhood; the proposal is mostly neutral in this regard since no changes to the exterior appearance, design features or materials is being proposed. No impact or change to compatibility with the surrounding neighborhood and adjacent land uses will occur. 3. The proposed revision does not change the density (i.e. the addition of units) or boundary of the subject property; the project is not a residential land use with corresponding density element; this finding is not applicable to this proposal. 4. The proposed revision does not involve the addition of a new land use not shown on the original permit (e.g. adding a commercial use to a residential project, replacing single family units with attached residential units, vice versa for each example, etc); the proposal does not introduce a new land use, nor invoke a higher standard parking for the increase in storage/warehouse space in the basement, and the swapping of already approved basement uses with approved/existing upper level floor plan uses. 5. The proposed revision does not rearrange the major land uses within the development (e.g. it does not exchange the locations of single family units with attached units); this proposal does not re-arrange major land uses onsite. the modification of interior floor plan uses are internal to the operations of the Chabad Carlsbad land use with no exterior modification elements or changes to the site. 6. The proposed revision will not create changes of greater than ten percent (10%), provided that compliance will be maintained with the applicable development standards of the Carlsbad Municipal Code as follows: Per individual lot or structure -yards, setbacks, coverage or height (height reductions of >10% are permitted); no changes to any of these elements are proposed. On an aggregate basis -parking, open space, common area or landscaping; no changes to any of these elements are proposed. See exhibits for summary of existing and proposed square footage amounts (no change or increase); square foot summary of existing/approved uses for basement and upper level vs proposed floor plan uses and square footage amounts; no increase in parking is invoked relative to the baseline of parking required, approved and already provided. 7. The proposed change will not result in any environmental impact and/or require additional mitigation; the proposal represents interior modifications to the existing Chabad use and structure (Class 1 CEQA Exemption) and will not alter or change the existing approval's compliance with CEQA and environmental review. 8. The proposed change would not result in any health, safety or welfare impacts; the buildout of the approved basement and corresponding re-location of upper level and basement uses to optimize Chabad operational function and efficiency will not result in any health safety or welfare impacts. 9. There were not any major issues or controversies associated with the original project which would be exacerbated with the proposed change; the approval of the basement with CUP 10-12(A) did not involve major land use issues or community controversies. The proposed modification will not invoke such issues or create controversy. 10. The proposed change would not be readily discernible to the decision makers as being substantially different from the project as originally approved; given the interior improvements and swapping of approved/existing floor plan uses within the Chabad, the proposed changes will not be discernible or visible to the general public or decision makers. No exterior changes to the site or Chabad structure are proposed. I? .. (_ City of STORM WATER STANDARDS QUESTIONNAIRE vA Development Services IJ:and l!>evelopment Engineering Carlsbad E-34 APR 11 2024 1635 Faraday Avenue 442-339-2750 www.carlsbadca.gov Pl NNlf\ INSTRUCTIONS: To address post-development pollutants that may be generated from development projects, the city requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMPs) into the project design per Carlsbad BMP Design Manual (BMP Manual). To view the BMP Manual, refer to the Engineering Standards (Volume 5). This questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'STANDARD PROJECT' requirements, "PRIORITY DEVELOPMENT PROJECT (PDP) requirements or not considered a development project. This questionnaire will also determine if the project is subject to TRASH CAPTURE REQUIREMENTS. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the city. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A completed and signed questionnaire must be submitted with each development project application. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrentlv ~.ps .. ·~ PROJl:CJ INFORMATION -~.' ~ • ' r PROJECT NAME: Chabad La Costa.CD 2024-0005 APN: ADDRESS: 1980 LA COST A AVE 216.580.08 The project is (check one): 0 New Development [8] Redevelopment The total proposed disturbed area is: 0 ft2 ( 0 ) acres The total proposed newly created and/or replaced impervious area is: 0 ft2 (0 ) acres If your project is covered by an approved SWQMP as part of a larger development project, provide the project ID and the SWQMP # of the larger development project: Project ID SWQMP#: Then, go to Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the city. This Box for City Use Only YES NO Date: Project ID: City Concurrence: □ □ By: E-34 Page 1 of4 REV04/23 • iK ~ • "· STEP ·1 ·,t "~;: ~t i' TO,.8E GOMPLSTJ;OFOR ALL PROJEClS•. C. ! To determine if your project is a "development project", please answer the following question: YES NO Is your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing building [8) □ or structure that do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)? If you answered "yes" to the above question, provide justification below then go to Step 6, mark the box stating "my project is not a 'development project' and not subject to the requirements of the BMP manual" and complete applicant information. Justification/discussion: (e.g. the project includes only interior remodels within an existing building): THE PROJECT INVOLVES ONLY INTERIOR IMPROVEMENTS WITHIN AN EXISTING BUILDING, NO EXTERIOR WORK, SITE WORK, EARTH WORK, PARKING LOT OR LANDSCAPING WORK. If you answered "no• to the above question, the project is a 'development project', go to Step 2. J slf STEP%' . •,1':i,it w: ~ 'f\. TO BE COMPLETED FOR ALL ~.ELOPMEJUtPROJECTS " To determine if your project is exempt from PDP requirements pursuant to MS4 Permit Provision E.3.b.(3), please answer the following questions: Is your project LIMITED to one or more of the following: YES NO 1. Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: a) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non- b) erodible permeable areas; OR Designed and constructed to be hydraulically disconnected from paved streets or roads; OR □ ~ c) Designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets guidance? 2. Retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in □ [8] accordance with the USEPA Green Streets guidance? 3. Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? □ [81 If you answered "yes• to one or more of the above questions, provide discussion(justification below, then go to Step 6, mark the second box stating "my project is EXEMPT from PDP ... " and complete applicant information. Discussion to justify exemption ( e.g. the project redeveloping existing road designed and constructed in accordance with the USEPA Green Street guidance): ' If you answered "no" to the above questions, your project is not exempt from PDP, go to Step 3. E-34 Page 2 of 4 REV04/23 U:TEDFO 1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. 2. Is your project a redevelopment project creating and/or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. 3. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial Classification (SIC) code 5812). 4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside develo ment ro· ect includes develo ment on an natural slo e that is twent -five ercent or realer. 5. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot? A parking lot is a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. 6. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious street, road, highway, freeway or driveway surface collectively over the entire project site? A street, road, highway, freeway or driveway is any paved impervious surface used for the trans ortation of automobiles, trucks, motorc cles, and other vehicles. 7. Is your project a new or redevelopment project that creates and/or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA (i.e. not commingled with nows from adjacent lands).• 8. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface that supports an automotive repair shop? An automotive repair shop is a facility that is categorized in any one of the following Standard Industrial Classffication (SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. 9. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious area that supports a retail gasoline outlet (RGO)? This category includes RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic ( AD T) of 100 or more vehicles per day. 10. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land and are expected to generate pollutants post construction? 11. Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? (CMC 21.203.040 YES NO □ ~ □ □ □ □ 18] □ □ □ □ □ □ If you answered "yes• to one or more of the above questions, your project is a POP. If your project is a redevelopment project, go to step 4. If your project is a new project, go to step 5, complete the trash capture question. If you answered "non to all of the above questions, your project is a 'STANDARD PROJECT'. Go to step 5, complete the trash capture question. • Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments): water bodies designated with the RARE beneficial use by the State Water Resources Contr~ Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego; Habitat Management Plan: and any other equivalent environmentally sensitive areas which have been identified by the City. E-34 Page 3 or 4 REV 04/23 S P4 TO BE COMPLETED FO~ REDEVEL:OPMENT PROJECTS THAT ARE PRIORITY DEVELOPMENT PROJECTS (PDP) ONt:Y Complete the questions below regarding your redevelopment project (MS4 Permit Provision E.3.b.(2)): Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the previously existing development? Complete the percent impervious calculation below: Existing impervious area (A) = ___________ sq. ft. Total proposed newly created or replaced impervious area (8) = ___________ sq. ft. Percent impervious area created or replaced (B/A)*100 = ____ % YES NO □ If you answered "yes", the structural BMPs required for POP apply only to the creation or replacement of impervious surface and not the entire development. Go to step 5, complete the trash capture question. If you answered "no," the structural BMP's required for PDP apply to the entire development. Go to step 5, complete the trash capture question. Complete the question below regarding your Project (SORWQCB Order No. 2017-0077}: YES NO Is the Project within any of the following Priority Land Use (PLU) categories? R-23 (15-23 du/ac), R-30 (23-30 du/ac), Pl (Planned Industrial), CF (Community Facilities), GC (General Commercial), L (Local Shopping Center), R (Regional Commercial), V-8 (Village-Barrio), VC (Visitor D ~ Commercial), 0 (Office), VC/OS (Visitor Commercial/Open Space), Pl/O (Planned Industrial/Office), or Public Trans ortation Station If you answered "yes", the 'PROJECT' is subject to TRASH CAPTURE REQUIREMENTS. Go to step 6, check the first box stating, "My project is subject to TRASH CAPTURE REQUIREMENTS ... • and the second or third box as determined in step 3. If ou answered "no", Go to ste 6, check the second or third box as determined in ste 3. . STEP6 . .· CHECK THE APPROPRIATE BOX(ES) AND CQMPLETE APPUCM'ff INFORMATION 0 My project is subject to TRASH CAPTURE REQUIREMENTS and must comply with TRASH CAPTURE REQUIREMENTS of the BMP Manual. I understand I must prepare a Storm Water Quality Management Plan (SWQMP). 0 My project is a 'STANDARD PROJECT' OR EXEMPT from PDP and must only comply with 'STANDARD PROJECT' stom,water requirements of the BMP Manual. As part of these requirements, I will submit a "Standard Project Requirement Checklist Form E-36" and incorporate low impact development strategies throughout my project. If my project is subject to TRASH CAPTURE REQUIREMENTS, I will submit a TRASH CAPTURE Storm Water Quality Management Plan (TCSWQMP) per E-35A. O My project is a PDP and must comply with PDP stormwater requirements of the BMP Manual. I understand I must prepare a Storm Water Quality Management Plan (SWQMP) per E-35 template for submittal at time of application. Note: For projects that are close to meeting the PDP threshold, staff may require detailed impervious area calculations and exhibits to verify if 'STANDARD PROJECT' stormwater requirements apply. [x] My project is NOT a 'development project' and is not subject to the requirements of the BMP Manual. Applicant lnfom,ation and Signature Box Applicant Name: ROBERT RICHARDS E-34 Page 4 of 4 REV 04/23