Loading...
HomeMy WebLinkAbout2310 CAMINO VIDA ROBLE; 101; CBC2024-0015; Recycle{ City of Carlsbad CONSTRUCTION WASTE MANAGEMENT PLAN B-59 Development Service Building Division 1635 Faraday Avenue www.carlsbadca.gov This form shall be completed for all demolitions and new construction, additions, and alterations. The California's Green Building Standards Code (CAL Green) requires that at least 65% of construction site debris generated during demolit ion projects, most new construction, as well as the majority of building additions or alterations be recycled, reused, or otherwise diverted from landfill disposal. STEP 1: The Applicant must submit PART 1 of this form before a building permit application is approved. STEP 2: The permit holder shall utilize a waste management company that can provide verifiable documentation that meets 65% waste diversion. Republic Services is the exclusive franchised waste hauler in the City of Carlsbad. • Option A -Roll-Off Bins: Ca ll Customer Service (760) 332-6464 and ask for a C&D account for waste diversion. Republic Services will provide roll-off bins for construction waste. • Option B -Self Ha ul to Republic Services or other dump site that can provide verifiable documentation. It must be a Certified Source Separated Recycling Facility. When you enter the site, explain to gate operator that this is C&D material. When you exit the site, request a receipt and certificate from gate operator for waste diversion. STEP 3: Prior to permit close-out (permit final), the permit holder sha ll complete PART 2 of this form a submit all trash and recycling weight receipts to the bu ilding inspector Waste log, acknowledgement, and tickets must be submitted to release your certificate of occupancy. C&D CERTIFICATION: 0 I certify under penalty of perjury under the laws of the State of California that the information provided in and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is tru e and correct to the best of my knowledge and belief. I understand the waste diversion requirements of the State of California and submit this Construction Waste Management Plan pursuant to California Green Building Standards Code 4.408.2 or 5.408.1.1. Failure to provide documentation of C&D reporting, reporting of waste diversion less than 65%, and failure to provide adequate weight receipts, may result in enforcement action against me or other responsible parties, including a notice of violation, citations, and any other remedies provided in Chapters 1.08 and 1.10 of the Carlsbad Municipal Code. Projects are required to submit their Waste Log, Acknowledgement Form, and Weight Receipts prior to Certificate of Occupancy (CO) issuance. This project does not involve disposal of universal or hazardous waste OR this project includes disposal of universal or hazardous waste in a responsible, safe and verifiable manner. Disposal of asbestos containing materials, batteries, electronic waste, fluorescent bulbs, lead based paints, mercury containing equipment and refrigerants, require special processing prior to commencement of constructi or demolition activities. I ~Q===' ~ 'o ~ ~ Date: lJ '-"-""'--L ex Signature of Applicant Page 1 of 4 rev 4/24 C cityof Carlsbad CONSTRUCTION WASTE MANAGEMENT PLAN B-59 part 2 Development Services Building Division 1635 Faraday Avenue 422-339-2719 www.carlsbadca.gov Your project qualifies for the City of Carlsbad Construction Waste Management Plan (CWMP): Section 4.408.1 and Section 5.408.1 of the California Green Building Standards Code requires at least 65% of non-hazardous construction debris is recycled and/ or salvaged for reuse. NEXT STEPS: STEP 1. Before the project - a. Review your CWMP completed prior to permit issuance. (copy is attached to your job card) This plan demonstrates how you will recycle a minimum of 65% of the construction waste generated from your project by choosing: Republ ic Services or Self Haul. STEP 2 -During the Project a. Save all receipts and/or documents from reuse facilities, recycling centers, processing facilities, and landfills where materials were taken. b. Complete the Debris Recycling Report (ORR) on the next page as your project progresses. Recycling/diversion goals are (at a minimum) 65% of the waste generated by your project STEP 3 -After the Project a. Prior to receiving inspection for final sign off t he Building Permit or Certificate of Occupancy, Applicant must submit the fully completed and approved (ORR) of the Construction Waste Management Plan (CWMP) Table. b. Provide the ORR and receipts to your building inspector. FOR M ORE INFORMATION: NOTICE: Applicant (contractor and subcontractors) shall comply with the project's CWMP. It is the Applicant's responsibility to collect all receipts from the facilities that recycle their materials AND all project waste/landfill disposal receipts. When working with the City's franchised hauler, Republic Services, one cumulative project receipt is acceptable. However, it is the Applicant's responsibility to confirm that the bins are collected for C&D Recycling. 1. This project shall generate the least amount of waste possible by planning and ordering carefully, following all proper storage and handling procedures to reduce broken and damaged materials, and reusing materials whenever possible. 2. Republic Services can provide 2 roll-off bins, one for commingled construction debris and one for trash. The commingled construction roll-off bin will be taken to a Cert ified Mixed C&D Processing Facility to sort t he material and create receipt(s), to demonstrate the project has met a 65% diversion rate or greater. 3. Applicants with a goal of recycling greater than 65% of the project's total waste should work with the City's exclusive franchised waste hauler to develop a more specific CWMP. This plan may include using additional roll-off bins for particular phases of construction (e.g., concrete and wood waste) to ensure the highest waste diversion rate possi ble. 4. Contractors/subcontractors hauling their own waste as part of their scope of work (e.g., construction clean up companies, etc.) SHALL NOT be excluded from complying with t he CWMP and shall provide weight and waste diversion receipts from a Certified Source Separated Recycling Facility. For a current list of Certified Recycling Facilities go to http://www.sandiego.gov/environmental-services/recycling/cd/index.shtml. 5. If contractors/subcontractors furnish their own debris boxes as part of their scope of work, they SHALL NOT be excluded from complying with the CWMP and shall provide weight and waste diversion receipts from a Certified Source Separated Recycling Facility. Rev. 05122 PART 2 Complete before final inspection, obtain City Approved hauler receipts and return prior to final building approval. DEBRIS RECYCLING REPORT (ACTUAL): ... , ... n,1,, •• Acknowledgement I certify under penalty of perjury under the laws of the State of Ca lifornia that the information provided in and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed t he accuracy of the information, and that the information is tru e and correct to the best of my knowledge and belief. Permit No. (l3v1o:l~ -00 (5 Print Name .k-,: tJ L\ Address ~3 lo CvM;\'\\) 'CJ~ /Oo~~t ( .9 I -Date 11 /,.., .r JO J J Cc..• It~"'-(P .J-t I 1 -1 - ... ■r,ni■:• Use this Fmal Log below to track loads of materials as they leave the job site. @@SAVE RECEIPTS@@ Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken. Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons. A B C Date M aterial Type Actual Amt Actual Amt Actual Amt Destination Facility Reused or Recycled Disposed in (Name, Address, Phone) Salvaged Landfill Examp.fe: Palomar Transfer Station, 5960 El 01/01/2020 Concrete (broken) 5 tons Camino Real -(760/ 603-0153 I /2 -r ,A vl,aJ . @TOTAL ( (01\~ 11~• ~65%,0 Diversion Rate Achieved = % ::; 65% Total of columns A+ B Total of columns A + B + C DIVERSION Contractor/Owner Signature ~ -) I \ -G-d--.iJcJ...lf -Date Attach the following docum~hi~ Return completed form and documentation to: . Original recycling weight tickets, landfill weight tickets City of Carlsbad . Original donation receipts with photos and/or itemized descriptions Building Division (1st Floor) . Any other relevant information to support Recycling Report 1635 Faraday Avenue Carlsbad, CA 92008 Page 3 of 4 Rev. 04122 PAR r 1 ompl t ..ind ubm1 thout ornplfted Constru 1■, ... ,_,. Perm No. Projec Title Kids & Coffee Project Address 2310 Camino Vida Roble Ste 101 Carlsbad CA 92011 APN 213-050-08-00 Applicant Name Nagy Endre Phone Last Firs -Complete the following table with estimated waste tonnage to be generated by your project. A B C Material Type Estimated Place a(✓) check Place a(✓) check next Place a{✓) check next Waste Quantity next to items to be to items to be to items to be (tons) reused or salvaged recycled disposed at landfill Complete this line of the table only if only using WASTE MANAGEMENT roll-off bins. Mixed C&D Debris Asphalt & Concrete 0.1 1 ✓ Brick/ Masonry/ Tile Mixed Inert Debris I Cabinets,@, Fixtures, ✓ ~indows'J(circle all that apply) I Carpet I I Carpet Padding/ Foam I Cardboard o . oo f-. i J ~ Ceiling Tile (acoustic) I Drywall (used, new, scrap) G .. ~ I ✓ Landscape Debris (brush, trees, I stumps, etc.) No dirt. Unpainted Wood & Pallets I / ,02,r./, J I - Roofing Materials Scrap Metal I 0, 1 I ./ - Stucco Other: Co-.iJ.u. (' v5 ✓ v· I TOTAL I -,~-• th'■ To meet 65% Diversion Requirement (estimate) /, 0 h x 0.65 = C, .. b B~i' tons /4 j_) _t;;;}_ e,umo,ed Wo,,e /,om ob:" Minimum Required Diversion Applicant Signature ::5v'\~ Qo c;JOd_~ <' Page 2 of 4 rev 4/24 <>DUil Diversion Report• Acco\Jnl KIDS AND COFFEE Dtverslon %: .. 0 00% ltt®'if.t:fii•tJ fitt1t'1·111iM "-Ctou/11 KIDS AND COFFEE ~~rsron %: o 00% • IDCO lftftijotttffj,j j Site Name Account Number. 661-29-01 Site Address Container Name Account Nurnt>er. 661-92.(-01 Site Address Container Name ... ~'• --. Container Ser-lice Period Year Size Compactor --...---.... I Container Service Period Year Size Compactor .. Unttof Oescr1ptlon Waste Type Account Type Schedule Tonnage Measure . RECYCLE TOTAL .00 SOLID WASTE ,.9, TOTAL GRAND TOTAL •-9' 0.00'4 ' r Unit of Description WnteType Account Type Schedule Tonnage Measure . . . RECYCLE TOTAL .00 SOLIOWASTE 2.02 TOTAL GRAND TOTAL 2.02 0.00% ·small containers are not weighed Weights provtded for small containers are only estimates and are based on your container size multiplied by the number of scheduled hauls per month multiphed by the assumed weights of 100lbs per cubic yard for waste or 501bs per cubic yard for recycling