Loading...
HomeMy WebLinkAbout2189 TWAIN AVE; ; CB031220; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 12-17-2003 Residential Permit Permit No: CB031220 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: 06/04/2003 # Dwelling Units: Bedrooms: Project Title: Applicant: Building Inspection Request Line (760) 602-2725 2189 TWAIN AV CBAD RESDNTL 2081803300 Sub Type: Lot#: SFD 74 $338,888.00 Construction Type: VN CT97-16A Reference #: Structure Type: SFD 5 Bathrooms: 3.5 SPYGLASS-KELL RNCH-VIL J-PHS 1 PLN 3-3737 SF,611 SF GAR, 157 SF PORCH Owner: Status: Applied: Entered By: Issued: Inspect Area: Orig PC#: Plan Check#: ISSUED 04/09/2003 RMA Plan Approved: 06/04/2003 RB PC03-05 PC030022 SHEA HOMES LIMITED PARTNERSHIP C/O PAUL BARNES SHEA HOMES LIMITED PARTNERSHIP C/O PAUL BARNES 10721 TREENA ST #200 SAN DIEGO CA 92131 Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee STD #2 Fee STD #3 Fee Renewal Fee Add'I Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'I Pot. Water Con. Fee Reel. Water Con. Fee Total Fees: $24,736.76 Inspector: $1,282.68 $0.00 $833.74 $0.00 ($66.70) $33.89 $3,251.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3,420.00 D3/4 $0.00 $0.00 10721 TREENA ST #200 SAN DIEGO CA 92131 Meter Size Add'I Reel. Water Con. Fee Meter Fee SDCWA Fee CFO Payoff Fee PFF PFF (CFO Fund) License Tax License Tax (CFO Fund) Traffic Impact Fee Traffic Impact (CFO Fund) Sidewalk Fee PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Housing Impact Fee Housing lnlieu Fee Housing Credit Fee Master Drainage Fee Sewer Fee Additional Fees TOTAL PERMIT FEES $0.00 $160.00 $2,004.00 $3,004.39 $6,167.76 $0.00 $0.00 $0.00 $630.00 $0.00 $0.00 $196.00 $60.00 $85.00 $0.00 $0.00 $0.00 $0.00 $3,675.00 $0.00 $24,736.76 Total Payments To Date: $23,696.76 Balance Due: $1,040.00 FINAL APPROVAL Date: :l-> rt) L·15 ' 7 CC )OC_ 1 -n ;: :'"iF . ; Clearance: ------ NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications. reservations, or other exactions hereafter collectively referred to as "fees/exactions.' You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a). and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any City of Carlsbad Bldg Inspection Request For: 02/04/2004 Permit# CB031220 Title: SPYGLASS-KELL RNCH-VIL J-PHS 1 Description: PLN 3-3737 SF,611 SF GAR,157 SF PORCH Type: RESDNTL Sub Type: SFD Job Address: 2189 TWAIN AV Suite: Lot 74 Location: APPLICANT SHEA HOMES LIMITED PARTNERSHIP Owner: SHEA HOMES LIMITED PARTNERSHIP Remarks: Total Time: CD Description Act Comment 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Associated PCRs/CVs lns12ection Histo[Y Date Description Act lnsp Comments 01/23/2004 39 Final Electrical AP RB EMR Inspector Assignment: RB --- Phone: Inspector: ----- Requested By: RICK Entered By: CHRISTINE 01/21/2004 39 Final Electrical CA RB NOT PRE WALKED 11/20/2003 82 Drywall/Ext Lath/Gas Test AP RB 11/13/2003 16 Insulation AP RB 11/13/2003 84 Rough Combo AP RB ON 11/12/03 11/07/2003 84 Rough Combo co RB 11/05/2003 84 Rough Combo CA RB 10/30/2003 15 Roof/Reroof AP RB 10/29/2003 15 Roof/Reroof CA RB 10/28/2003 15 Roof/Reroof CA RB 10/24/2003 15 Roof/Reroof NR RB MISSING 1ST ITEM LOOKED AT 10/10/2003 13 Shear Panels/HD's AP RB 10/09/2003 13 Shear Panels/HD's NS RB 10/03/2003 15 Roof/Reroof PA RB OK TO PAPER ONLY 06/25/2003 22 Sewer/Water Service AP PY 06/23/2003 81 Underground Combo AP PY Cltv 11 Clrlllllll Final Building Inspection Plan Check#: Dept: Building Engineering Planning CMWD . St Lite G PC030022 Date: 02/04/2004 Permit#: CB031220 Permit Type: RESDNTL Project Name: SPYGLASS-KELL RNCH-VIL J-PHS 1 Sub Type: SFD PLN 3-3737 SF,611 SF GAR,157 SF PORCH Address: 2189 TWAIN AV Lot: 74 Contact Person: RICK Phone: Sewer Dist: CA Water Dist: CA Inspected Date By: Inspected: Approved: Disapproved: __ Inspected Date By: Inspected: Approved: Disapproved: __ •■IIIIIIIIII •····••••••• ••·•·••11■■■■1111111111111 ■I·•••••••••••••■■••••••■ ■11111111111111111111111111111111II1111111■■1111111111111 Ill 1111111111 ■111111111 Comments: ______________________________ _