Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2186 TWAIN AVE; ; CB031197; Permit
City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 ·12-17-2003 Residential Permit Permit No: CB0311 97 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: 2186 TWAIN AV CBAD RESDNTL 2081803000 Sub Type: SFD Status: Lot#: 71 Applied: Valuation: $252,096.00 Construction Type: VN CT97-16A Entered By: ISSUED 04/09/2003 RMA Plan Approved: Occupancy Group: 06/04/2003 Reference #: Structure Type: SFD Issued: 06/04/2003 # Dwelling Units: Bedrooms: 4 Bathrooms: 2.5 Inspect Area: RB SPYGLASS-KELL RNCH-VIL J-PHS 1 Orig PC#: Project Title: PLAN 1-2746 SF,597 SF GAR,208 SF PORCH Plan Check#: PC03-05 PC030022 Applicant: SHEA HOMES LIMITED PARTNERSHIP C/O PAUL BARNES 10721 TREENA ST #200 SAN DIEGO CA 92131 Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'I Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'I Pot. Water Con. Fee Reel. Water Con. Fee $1 ,017.80 $0.00 $661.57 $0.00 ($52.93) $25.21 $3,251.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3,420.00 03/4 $0.00 $0.00 Owner: SHEA HOMES LIMITED PARTNERSHIP C/O PAUL BARNES 10721 TREENA ST #200 SAN DIEGO CA 92131 Meter Size Add'! Reel. Water Con. Fee Meter Fee SDCWA Fee CFO Payoff Fee PFF PFF (CFO Fund) License Tax License Tax (CFO Fund) Traffic Impact Fee Traffic Impact (CFO Fund) Sidewalk Fee PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Housing Impact Fee Housing lnlieu Fee Housing Credit Fee Master Drainage Fee Sewer Fee Additional Fees TOT AL PERMIT FEES $0.00 $160.00 $2,004.00 $3,004.39 $4,588.15 $0.00 $0.00 $0.00 $630.00 $0.00 $0.00 $168.00 $60.00 $56.50 $0.00 $0.00 $0.00 $0.00 $3,675.00 $0.00 $22,668.69 Total Fees: $22,668.69 Total Payments To Date: $21,628.69 Balance Due: $1,040.00 FINAL APPROVAL DATE ).. ...--:3 .. 4" 'tLEARANCE._....,_&{$--==- SIGNATURE ________ _ UNSCHEDULED BUILDING INSPECTION • ~jg. DATE . !eto 2, Za:JC/ • INSPECTOR ffe;@ € • PERMIT# C/tl{}:3/ !97 • PLAN CHECK.# ---- JdB ADDRESS 21% WA/N Ab DESCRIPTION .r;N'1L, C,/J?{?O CODE DESCRIPTION ACT _h_O C0111v!ENTS Inspection List Permit#: CB031197 Type: RESDNTL SFD Date Inspection ltem _______ lnspector Act 01/30/2004 89 Final Combo RB CO 01/30/2004 89 Final Combo 01/28/2004 89 Final Combo 01/28/2004 89 Final Combo • -01/08/2004 34 Rough Electric ~ 11/10/2003 82 Drywall/Ext Lath/Gas Test -11/05/2003 82 Drywall/Ext Lath/Gas Test --11/04/2003 82 Drywall/Ext Lath/Gas Test 10/29/2003 16 Insulation -10/29/2003 84 Rough Combo -10/28/2003 16 Insulation 10/22/2003 15 Roof/Re roof -10/22/2003 84 Rough Combo --10/20/2003 15 Roof/Re roof -10/09/2003 13 Shear Panels/HD's --10/03/2003 15 Roof/Re roof 06/20/2003 81 Underground Combo 06/12/2003 21 Underground/Under Floor 06/12/2003 22 Sewer/Water Service Monday, February 02, 2004 RB TP RB RB RB RB RB RB RB RB RB RB RB RB RB RB AP AP ---£;f!,r Ge] @ .,. AP 1 LP~l ~ SPYGLASS-KELL RNCH-VIL J-PHS 1 PLAN 1-2746 SF,597 SF GAR,208 SF POR Comments ELEC MTR RELEASE AP ON CO NEED ROOF LOADED 1 ST STOP OK TO PAPER ONLY _ 1c -i Page 1 of 1 ,,, '0 ( ,-.,, 3}\11.,U~ ~ t;~(