Loading...
HomeMy WebLinkAbout2157 TWAIN AVE; ; CB031336; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 12-30-2003 Residential Permit Permit No: CB031336 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: 06/06/2003 # Dwelling Units: Bedrooms: Project Title: Applicant: Building Inspection Request Line (760) 602-2725 2157 TWAIN AV CBAD RESDNTL 2081810100 Sub Type: Lot#: $323,252.00 Construction Type: Reference #: SFD 21 VN CT97-16A Structure Type: SFD 5 Bathrooms: 3.5 SPYGLASS-KELL RNCH-VIL J-PHS 2 PLN 2-3535 SF,656 SF GAR,66 SF DECK,74 SF PORCH Owner: Status: Applied: Entered By: Issued: Inspect Area: Orig PC#: Plan Check#: ISSUED 04/15/2003 RMA Plan Approved: 06/06/2003 RB PC03-05 PC030025 SHEA HOMES LIMITED PARTNERSHIP C/O PAUL BARNES SHEA HOMES LIMITED PARTNERSHIP C/O PAUL BARNES 10721 TREENA ST #200 SAN DIEGO CA 92131 Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'I Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'I Pot. Water Con. Fee Reel. Water Con. Fee Total Fees: $24,376.80 Inspector: $1,236.48 $0.00 $803.71 $0.00 ($64.30) $32.33 $3,251.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3,420.00 D3/4 $0.00 $0.00 10721 TREENA ST #200 SAN DIEGO CA 92131 Meter Size Add'I Reel. Water Con. Fee Meter Fee SDCWA Fee CFO Payoff Fee PFF PFF (CFO Fund) License Tax License Tax (CFO Fund) Traffic Impact Fee Traffic Impact (CFO Fund) Sidewalk Fee PLUMBING TOTAL ELECTRICAL TOT AL MECHANICAL TOTAL Housing Impact Fee Housing lnlieu Fee Housing Credit Fee Master Drainage Fee Sewer Fee Additional Fees TOT AL PERMIT FEES Total Payments To Date: $23,336.80 Balance Due: $0.00 $160.00 $2,004.00 $3,004.39 $5,883.19 $0.00 $0.00 $0.00 $630.00 $0.00 $0.00 $196.00 $60.00 $85.00 $0.00 $0.00 $0.00 $0.00 $3,675.00 $0.00 $24,376.80 $1,040.00 2434 ·'.)1./06 ·o.; 0002 01. FINAL APPROVAL Date: 2 -z 7 -O v. Clearance: CGP NOTICE: Please take NOTICE that approval of your project includes the 'lmposilion" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any f x ti ns f whi h ou hav revi u I b n iv n a NOTI E similar to thi or as t which the sta ute of limita i n has r vi u I oth rwi ):2 L40 '.)C' City of Carlsbad Bldg Inspection Request For: 02/26/2004 Permit# CB031336 Inspector Assignment: RB --- Title: SPYGLASS-KELL RNCH-VIL J-PHS 2 Description: PLN 2-3535 SF,656 SF GAR,66 SF DECK,74 SF PORCH Type: RESDNTL Sub Type: SFD Job Address: 2157 TWAIN AV Suite: Lot 21 Location: APPLICANT SHEA HOMES LIMITED PARTNERSHIP Owner: SHEA HOMES LIMITED PARTNERSHIP Remarks: Total Time: CD Description Comment 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical -- Associated PCRs/CVs lns12ection Histo[Y Date Description Act lnsp Comments 02/11/2004 34 Rough Electric WC RB 02/11/2004 39 Final Electrical AP RB EMA 02/09/2004 39 Final Electrical NR RB 02/04/2004 39 Final Electrical co RB 12/17/2003 82 Drywall/Ext Lath/Gas Test AP RB 12/08/2003 16 Insulation AP RB 12/04/2003 84 Rough Combo CA RB 12/03/2003 84 Rough Combo AP RB 12/02/2003 84 Rough Combo NS RB 11/14/2003 83 Roof Sheathing/Ext Shear CA RB 11/14/2003 84 Rough Combo WC RB 11/13/2003 13 Shear Panels/HD's AP RB 11/13/2003 15 Roof/Reroof AP RB 11/05/2003 84 Rough Combo CA RB CA @ SITE 11/04/2003 84 Rough Combo NS RB 11/03/2003 84 Rough Combo CA JM Phone:6~ lnspectod'/ ----- Requested By: RICK Entered By: CHRISTINE