HomeMy WebLinkAbout2138 TWAIN AVE; ; C031334; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
12-30-2003 Residential Permit Permit No: CB031334
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
06/06/2003
# Dwelling Units:
Bedrooms:
Project Title:
Applicant:
Building Inspection Request Line (760) 602-2725
2138 TWAIN AV CBAD
RESDNTL
2081814000
Sub Type:
Lot#:
$252,096.00 Construction Type:
Reference#:
SFD
60
VN
CT97-16A
Structure Type: SFD
4 Bathrooms: 2.5
SPYGLASS-KELL RNCH-VIL J-PHS 2
PLAN 1-2746 SF,597 SF GAR,208 SF PORCH
Owner:
Status:
Applied:
Entered By:
Issued:
Inspect Area:
Orig PC#:
Plan Check#:
ISSUED
04/15/2003
RMA
Plan Approved:
06/06/2003
RB
PC03-05
PC030025
SHEA HOMES LIMITED PARTNERSHIP
C/O PAUL BARNES
SHEA HOMES LIMITED PARTNERSHIP
C/O PAUL BARNES
10721 TREENA ST #200
SAN DIEGO CA 92131
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
Total Fees: $22,668.69
Inspector:
$1,017.80
$0.00
$661.57
$0.00
($52.93)
$25.21
$3,251.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$3,420.00
D3/4
$0.00
$0.00
10721 TREENA ST #200
SAN DIEGO CA 92131
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWA Fee
CFD Payoff Fee
PFF
PFF (CFD Fund)
License Tax
License Tax (CFD Fund)
Traffic Impact Fee
Traffic Impact (CFD Fund)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnlieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
$0.00
$160.00
$2,004.00
$3,004.39
$4,588.15
$0.00
$0.00
$0.00
$630.00
$0.00
$0.00
$168.00
$60.00
$56.50
$0.00
$0.00
$0.00
$0.00
$3,675.00
$0.00
$22,668.69
Total Payments To Date: $21,628.69 Balance_pue: $1 i9.40.00
lo,. ~ ... -1·-'
FINAL APPROVAL
Date: 3_,, Lf,... tf/'7-Clearance: _____ _
NOTICE: Please take NOTICE that approval of your project includes the "Imposition' of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions.' You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a). and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which vou have nreviouslv been niven a NOTICE similar to this or as to whir.h thR statute of limitations has nreviousl" ntherwise exnir"d.
City of Carlsbad Bldg Inspection Request
For: 03/03/2004
Permit# CB031334
Title: SPYGLASS-KELL RNCH-VIL J-PHS 2
Description: PLAN 1-2746 SF,597 SF GAR,208 SF PORCH
Type: RESDNTL Sub Type:. SFD
Job Address: 2138 TWAIN AV
Suite: Lot 60
Location:
APPLI CANT SHEA HOMES LIMITED PARTNERSHIP
Owner: SHEA HOMES LIMITED PARTNERSHIP
Remarks:
Total Time:
CD Description Act Comment
Inspector Assignment: RB ---
Phone: 8585186178
Inspector: -----
Requested By: JIM
Entered By: ROBIN
19 Final Structural 4F------
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Associated PCRs/CVs
lns12ection Histo!Y
Date Description Act lnsp Comments
03/01/2004 89 Final Combo co RB
02/19/2004 39 Final Electrical AP RB PLUS AJC OK
02/18/2004 39 Final Electrical NS RB TOO MUCH NR ON 2/17
02/09/2004 39 Final Electrical CA RB
12/23/2003 82 Drywall/Ext Lath/Gas Test AP PS
12/15/2003 16 Insulation AP RB
12/12/2003 16 Insulation NS RB
12/08/2003 84 Rough Combo CA RB
12/05/2003 84 Rough Combo AP RB
11/25/2003 13 Shear Panels/HD's co RB STOP
11/21/2003 83 Roof Sheathing/Ext Shear AP RB
11/19/2003 13 Shear Panels/HD's NR RB
11/19/2003 15 Roof/Reroof PA RB OK TO PAPER ONLY
11/18/2003 13 Shear Panels/HD's co RB
11/18/2003 15 Roof/Reroof NR RB
11/17/2003 83 Roof Sheathing/Ext Shear CA RB