HomeMy WebLinkAbout2113 TWAIN AVE; ; CB040531; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
04-28-2004 Residential Permit Permit No: CB040531
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
2113 TWAIN AV CBAD
RESDNTL
2081811200
Sub Type: SFD Status:
Lot#: 32 Applied:
Valuation: $322,916.00 Construction Type: VN
CT97-16A
Entered By:
ISSUED
02/09/2004
RMA
Occupancy Group:
04/28/2004
# Dwelling Units:
Reference #:
Structure Type: SFD
Plan Approved:
Issued: 04/28/2004
Bedrooms: 5 Bathrooms: 3.5 Inspect Area: RB
Project Title: SPYGLASS-KELL RNCH-VIL J-PHS 5 Orig PC#: PC03-05
PC04-10 PLN 2-3535 SF,656 SF GAR,137 SF DECKS,74 SF PORCH Plan Check#:
Applicant:
SHEA HOMES LIMITED PARTNERSHIP
C/O PAUL BARNES
10721 TREENA ST #200
SAN DIEGO CA 92131
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
$1,233.40
$0.00
$801.71
$0.00
($64.14)
$32.29
$3,251.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$4,274.00
03/4
$0.00
$0.00
Owner:
SHEA HOMES LIMITED PARTNERSHIP
C/O PAUL BARNES
10721 TREENA ST #200 3933 J'-ft 28 Of+ 0002 J.!.
SAN DIEGO CA 92131 CGP
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWA Fee
CFO Payoff Fee
PFF
PFF (CFO Fund)
License Tax
License Tax (CFO Fund)
Traffic Impact Fee
Traffic Impact (CFO Fund)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOT AL
Housing Impact Fee
Housing lnlieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
$0.00
$160.00
$2,004.00
$2,598.37
$5,877.07
$0.00
$0.00
$0.00
$640.00
$0.00
$0.00
$196.00
$60.00
$85.00
$0.00
$0.00
$0.00
$0.00
$2,572.00
$0.00
$23,720.70
Total Fees: $23,720.70 Total Payments To Date: $0.00 Balance Due: $23,720.70
Inspector:
FINAL APPROVAL
Date: 1(2--I~ ~tYy--Clearance: ______ _
NOTICE: Please take NOTICE that approval of your project includes the 'Imposition' of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions.' You have 90 days from the date this permit was issued to protest imposition of thes& fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
f • hi h h v r vi Tl whi h h im" i n h I
'l
City of Carlsbad Bldg Inspection Request
For: 1 0/07 /2004
Permit# CB040531 Inspector Assignment: RB ---
Title: SPYGLASS-KELL RNCH-VIL J-PHS 5
Description: PLN 2-3535 SF,656 SF GAR,137 SF DECKS,74 SF PORCH
Type: RESDNTL Sub Type: SFD
Job Address:
Suite:
Location:
2113 TWAIN AV
Lot 32
APPLICANT SHEA HOMES LIMITED PARTNERSHIP
Owner: SHEA HOMES LIMITED PARTNERSHIP
Remarks:
Total Time:
CD Description Act Comment
rJ?
Phone: 8585186178
Inspector: -----
Requested By: JIM
Entered By: CHRISTINE
19 Final Structural -----------------------
29 Final Plumbing
39 Final Electrical ±---
49 Final Mechanical
Associated PCRs/CVs
lns12ection Histo[Y
Date Description Act lnsp Comments
10/05/2004 89 Final Combo co RB
09/14/2004 39 Final Electrical AP RB EMR
08/03/2004 17 Interior Lath/Drywall AP RB
08/02/2004 17 Interior Lath/Drywall PA RB OK EXCEPT ATTIC ACCESS IN GARAGE
08/02/2004 18 Exterior Lath/Drywall AP RB
08/02/2004 23 Gas/Test/Repairs AP RB
07/23/2004 16 Insulation AP RB
07/21/2004 84 Rough Combo AP RB
07/13/2004 13 Shear Panels/HD's AP RB
07/07/2004 14 Frame/Steel/Bolting/Welding WC RB
07/07/2004 15 Roof/Reroof AP RB
07/06/2004 15 Roof/Reroof NR RB
05/07/2004 11 Fig/Foundation/Piers AP PD
04/29/2004 21 Underground/Under Floor AP RB
04/29/2004 22 Sewer/Water Service AP RB