HomeMy WebLinkAboutCDP 2022-0010; MARTIN RESIDENCE ADU; Coastal Development Permit (CDP). .--=~-----------
( City of
Carlsbad
LAND USE REVIEW
APPLICATION
P-1
Development Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadca.gov
APPLICATIONS APPLIED FOR: (CHECK BOXES)
Development Permits (FOR DEPT USE ONLY) Lealslatlve Permits (FOR DEPT USE ONLY)
L, Coastal Development Permit
0 Conditional Use Permit
}8J. Minor Amendment cc,nt,n-ooi" □ General Plan
D Minor D Extension
D Day Care (Large)
D Environmental Impact Assessment
D Habitat Management Permit
D Hillside Development Permit
D Minor
D Minor
D Nonconforming Construction Permit
0 Planned Development Permit D Minor
D Residential O Non-Residential
0 Planning Commission Determination
0 Reasonable Accommodation
D Site Development Plan D Minor
D Special Use Permit
0 Tentative Parcel Map (Minor Subdivision)
0 Tentative Tract Map (Major Subdivision)
D Variance D Minor
□ Local Coastal
□ Master Plan
D Specific Plan
□ Zone Change
Program Amendment
□Amendment
0Amendment
□ Zone Code A mendment
~smfh Ci!f!Rlfl c oastal Review Area
Permits
0 Review Perml t
D Administrative D Minor D Major
VIiiage Review Ar ea Permits
D Review Permi t
D Administrative 0 Minor O Major
NOTE; A PROPOSED PftOJECT REQUIRING APPLICATION SUBMITTAL MUST BE SUBMITTED BY APPOINTMENT'. PLEASE CONTACT THE APPOINTMENT SPECIALIST
AT (760) 502-2723 TO SCHEDULE AN APPOINTMENT.
"SAME DAY APPOINTMENTS ARE NOT AVAILABLE
ASSESSOR PARCEL NO(S), 155-221-05-00 -'-'-=---.c=-='-"''-----------------------
L O CAT ION OF PROJECT, LOT 5 BUENA VISTA CIRCLE CARLSBAD, CA
(STREET ADDRESS)
NAME OF PROJECT: , MARTIN RESIDENCE
BRIEF DESCRIPTION OF
PROJECT: NEW SFD WITH ATTACHED ADU
PROJECT VALUE
(SITE IMPROVEMENTS) 1000000 ESTIMATED COMPLETION DATE 1/1/2023
FOR CITY USE ONLY
Development No. DEC/1,,()l.j_ -0\ 5'3, > LeadCaseNo. CP/'2o2'2..:-OG,08
P-1 Page 1 of 6 Revised 03117
•
OWNER NAME (PLEASE PRINT) APPLICANT NAME (PLEASE PRINT)
INDIVIDUAL NAME JOHN AND PAMELLA MARTIN INDIVIDUAL NAME STEVE RAGAN (if applicable): (if applicable):
COMPANY NAME COMPANY NAME NEW MODERN DESIGN (if applicable): (if applicable):
MAILING ADDRESS: 3301 LINCOLN ST. MAILING ADDRESS: 143 s. Cedros Ave, #b203
CITY, STATE, ZIP· CARLSBAD, CA 92008 CITY, STATE, ZIP: Solana Beach, ca 92075
TELEPHONE: 760-402-9874 TELEPHONE: 858.442.3522
EMAIL ADDRESS: jdmartin999@gmail.com EMAIL ADDRESS: steve@newmoderndesign.com
I CERTIFY THAT I AM THE LEGAL O\IVNER AND THAT ALL THE ABOVE I CERTIFY THAT I AM THE LEGAL REPRESENTATIVE OF THE OWNER
INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY AND THAT ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO
KNOWLEDGE. I CERTIFY AS LEGAL OWNER THAT THE APPLICANT AS THE BEST OF MY KNOWLEDGE.
SET FORTH HEREIN IS MY AUTHORIZED REPRESENTATIVE FOR
J:[1 PURPOSES OF THIS APPLICATION.
~M,711a,d:/4, 10.21.2021 10.21.2021
SIGNATURE DATE SIGNATURE -' 1 DATE ,
APPLICANT'S REPRESENTATIVE (Print): STEVE RAGAN
MAILING ADDRESS: 143 S. Cedros Ave, #b203
CITY, STATE, ZIP: Solana Beach, ca 92075
TELEPHONE: 858.442.3522
EMAIL ADDRESS: steve@newmoderndesign.com
I CERTIFY THAT I AM THE REPRESENTATIVE OF THE APPLICANT FOR
PURPOSES OF THIS APPLICATION AND THAT ALL THE ABOVE
INFORMA TIO~I TRUE AND CORRECT TO THE BEST OF MY
KNOWLEDGE. ~ 4=
10.21.2021
SIGNATURE . DATE
,
IN THE PROCESS OF REVIEWING THIS APPLICATION IT MAY BE NECESSARY FOR MEMBERS OF CITY STAFF, PLANNING
COMMISSIONERS OR CITY COUNCIL MEMBERS TO INSPECT AND ENTER THE PROPERTY THAT IS THE SUBJECT OF THIS
APPLICATION. ll'NE CONSENT TO ENTRY FOR THIS PURPOSE.
NOTICE OF RESTRICTION: PROPERTY OWNER ACKNOWLEDGES AND CONSENTS TO A NOTICE OF RESTRICTION BEING
RECORDED ON THE TITLE TO HIS PROPERTY IF CONDITIONED FOR THE APPLICANT. NOTICE OF RESTRICTIONS RUN WITH
THE LAND ANO BIND ANY SUCCESSORS IN INTEREST.
~ 711a,d:/4, PROPERTY OWNER SIGNATURE
FOR CITY USE ONLY
FEB O 1 2022
DATE STAMP APPLICATION RECEIVED
RECEIVED BY:
Page2of6 Revised 03117
,.
(_ City of
Carlsbad
DISCLOSURE STATEMENT
P-1(A)
Development Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadca.gov
Applicant's statement or disclosure of certain ownership interests on all applications which will
require discretionary action on the part of the City Council or any appointed Board, Commission
or Committee.
The following information MUST be disclosed at the time of application submittal. Your project
cannot be reviewed until this information is completed. Please print.
Note:
Person is defined as "Any individual, firm, co-partnership, joint venture, association, social club, fraternal
organization, corporation, estate, trust, receiver, syndicate, in this and any other county, city and county,
city municipality, district or other political subdivision or any other group or combination acting as a unit."
Agents may sign this document; however, the legal name and entity of the applicant and property owner
must be provided below.
1. APPLICANT (Not the applicant's agent)
Provide the COMPLETE, LEGAL names and addresses of ALL persons having a
financial interest in the application. If the applicant includes a corporation or partnership,
include the names, titles, addresses of all individuals owning more than 10% of the
shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE
INDICATE NON-APPLICABLE (NIA) IN THE SPACE BELOW. If a publicly-owned
corporation, include the names, titles, and addresses of the corporate officers. (A
separate page may be attached if necessary.)
Person STEVE RAGAN Corp/Part NEW MODERN DESIGN
Title DESIGNER Title --------------Address 143 S. CEDROS AVE #B203 Address SOLANA BEACH, CA 92075
2. OWNER (Not the owner's agent)
Provide the COMPLETE, LEGAL names and addresses of ALL persons having any
ownership interest in the property involved. Also, provide the nature of the legal
ownership (i.e., partnership, tenants in common, non-profit, corporation, etc.). If the
ownership includes a corporation or partnership, include the names, titles, addresses of
all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE
THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (N/A) IN THE
SPACE BELOW. If a publicly-owned corporation, include the names, titles, and
addresses of the corporate officers. (A separate page may be attached if necessary.)
Person JOHN AND PAMELLA MARTIN
Title OWNER
Address 3301 LINCOLN ST
CARLSBAD, CA 92008
Corp/Part ___________ _
Title _____________ _
Address. ___________ _
Page 1 of2 Revised 07/10
3. NON-PROFIT ORGANIZATION OR TRUST
If any person identified pursuant to (1) or (2) above is a nonprofit organization or a trust,
list the names and addresses of ANY person serving as an officer or director of the non-
profit organization or as trustee or beneficiary of the.
Non Profit/Trust. _______ _ Non ProfiVTrust. _________ _
Title. ___________ _ Title, ____________ _
Address. _________ _ Address. ___________ _
4. Have you had more than $500 worth of business transacted with any member of City
staff, Boards, Commissions, Committees and/or Council within the past twelve (12)
months?
D Yes Ill No If yes, please indicate person(s).: ___________ _
NOTE: Attach additional sheets if necessary.
I certify that all the above information is true and correct to the best of my knowledge.
' At: .
Signa 7e of owner/date
JOHN MARTIN STEVE RAGAN
Print or type name of owner Print or type name of applicant
Signature of owner/applicant's agent if applicable/date
Print or type name of owner/applicant's agent
P-1(AJ Page2of2 Revised 07110
,,,,.,..
\..._ City of
Carlsbad
PROJECT DESCRIPTION
P-1(8)
PROJECTNAME MARTIN RESIDENCE
APPLICANT NAME STEVE RAGAN
Development Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadca.gov
Please describe fully the proposed project by application type. Include any details necessary to
adequately explain the scope and/or operation of the proposed project. You may also include
any background information and supporting statements regarding the reasons for, or
appropriateness of, the application. Use an addendum sheet if necessary.
Description/Explanation: NEW SINGLE FAMILY RESIDENCE WITH A TT ACHED ADU
P-1(6) Page 1 of 1 Revised 07/10
ENVIRONMENTAL INFORMATION FORM
(To be Completed by Applicant)
Date Filed: 2. li ( 2,.)'.2, 2.-(To be completed by City)
Application Number(s): ( Pl' 2o2,'2.,· COi 0
General Information
1. Name of project _M_A_R_T_IN_R_E_S_I_D_E_N_C_E ___________ _
2. Name of developer or project sponsor: _________________ _
3.
Address LOT 5 BUENA VISTA CIRCLE
City, State, Zip Code CARLSBAD, CA 92008
Phone Number: ________________________ _
Name of person to be contacted concerning this project: _S_T_E_V_E_RA __ G_A_N ____ _
Address 143 S CEDROS AVE #B203
City, State, Zip Code: SOLANA BEACH CA 92075
Phone Number: 8584423522
4. Address of ProJect LOT 5 BUENA VISTA CIRCLE
5.
6.
7.
8.
9.
Assessors Parcel Number 155-221-05-00 --------------------
List and describe any other related permits and other public approvats required for this project,
including those required by city, regional, state and federal agencies:
c..t>P'l<>'l.'l ·OClOt> -lo.19 'i'C>'""""'\ u.,,,c.l\:,.. .. """;+-
Existing General Plan Land Use Designation: _R_-_4 _____ J _________ _
R-1-10000 Existing zoning district ______________________ _
Existing land use(s): _V_A_C_A_N_T _________________ _
NEW SINGLE FAMILY RESIDENCE Proposed use of site {Project for which this form is filed): ___________ _
WITH ATTACHED ADU
Project Description
10.
11.
12
13.
Site size: _0_._6_2_0_A_C ___________________ _
Proposed Building square footage: _8_9_3_6 ________________ _
Number of floors of construction: _2 __________________ _
Amount of off-street parking provided: _2 _________________ _
14 Associated projects cue U>22,-COOr', -(oJAC> Pc,~ 1?,,,?o.ll;":J vlo,' f-
P-1(0) Page 2 of 4 Revised 07/10
15. If residential, include the number of units and schedule of unit sizes: ~2~U~N=IT~S~----
ADU -1200
MAIN HOUSE -7736
16. If commercial, indicate the type, whether neighborhood, city or regionally oriented, square footage
of sales area, and loading facilities: -'-"-------------------
N/A
17. If industrial, indicate type, estimated employment per shift, and loading facilities:
N/A
18. Jf institutional, indicate the major function, estimated employment per shift, estimated occupancy,
loading facilities, and community benefits to be derived from the project: _______ _
N/A
19. If the project involves a variance, conditional use or rezoning applications, state this and indicate
ctearly why the application is required:
N/A
P-1(0) Page 3 of 4 Revised 07110
Are the following items applicable to the project or its effects? Discuss all items checked yes (attach
additional sheets as necessary).
Yes No
20. Change in existing features of any bays, tidelands, beaches, or hills, or substantial D IZI
alteration of ground contours.
21. Change in scenic views or vistas from existing residential areas or public lands or D IZI
roads.
22. Change in pattern, scale or character of general area of project. D IZI
23. Significant amounts of solid waste or litter. D IZI
24. Change in dust, ash, smoke, fumes or odors in vicinity. D IZI
25. Change in ocean, bay, lake, stream or ground water quality or quantity, or D IZI
alteration of existing drainage patterns.
26. Substantial change in existing noise or vibration levels in the vicinity. D IZI
27. Site on filled land or on slope of 10 percent or more. D IZI
28. Use of disposal of potentially hazardous materials, such as toxic substances, D IZI
flammables or explosives.
29. Substantial change in demand for municipal services (police, fire, water, sewage, D IZI
etc.).
30. Substantially increase fossil fuel consumption (electricity, oil, natural gas, etc.). □ IZI
31. Relationship to a larger project or series of projects. D IZI
Environmental Setting
Attach sheets that include a response to the following questions:
32. Describe the project site as it exists before the project, including information on topography, soil
stability, plants and animals, and any cultural, historical or scenic aspects. Describe any existing
structures on the site, and the use of the structures. Attach photographs of the site. Snapshots
or Polaroid photos will be accepted.
33. Describe the surrounding properties, including information on plants and animals and any
cultural, historical or scenic aspects. Indicate the type of land use (residential, commercial, etc.),
intensity of land use (one-family, apartment houses, shops, department stores, etc.), and scale of
development (height, frontage, set-back, rear yard, etc.). Attach photographs of the vicinity.
Snapshots or polaroid photos will be accepted.
Certification
I hereby certify that the statements furnished above and in the attached exhibits present the data and
information required for this initial evaluation to the best of my ability, and that the facts, statements, and
information presented are true and correct to the best of my knowl1ge and belief.
Date: 10.21.2021 Signature: __ AF_,_/)-+·----------
For: STEVE: RAGAN
P-1(0) Page 4 of 4 Revised 07/10
.• ...,
MINOR
l_ City of
Carlsbad
COASTAL DEVELOPMENT PERMIT/
SINGLE FAMILY RESIDENCE
APPLICATION
Development Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadca.gov P-6
A proposed project requiring application submittal must be submitted by appointment".
Please contact the appointment specialist at (760) 602-2723 to schedule an appointment.
'SAME DAY APPOINTMENTS ARE NOT AVAILABLE
All joint application exhibits, i.e. Tentative Map and Planned Development Site Plan should be prepared
at the same scale. (Use a scale no smaller than 1" = 40' .)
I. GENERAL BACKGROUND
A. Estimated Cost of Development:
Development costing $60,000 or more does not qualify as a Minor Coastal Development Permit.
The City Planner shall make the final determination regarding a project's cost of development.
The primary basis for determining cost of development will be the application of dollar costs per
square foot for different types of residential construction. These costs are set by the
International Conference of Building Officials (ICBO) and are applied throughout San Diego
County.
Please complete the following information to assist in the determination of this project's cost of
development (Contractor proposals may also be submitted for consideration by the City
Planner). Please refer to the current fee schedule for the appropriate $/square foot fee rate.
⇒ New Residential Square Footage:
~-,--,-----,---,--,--,,--square feet x $. ___ ~/sq. fl. = $, ________ _
Residential Addition Square Footage: ⇒
______ square feet x $. ____ ,/sq. fl.=$, ________ _
⇒ Any Garage Square Footage:
______ square feet x $ /sq. fl.=$, ________ _
⇒ Residential Conversion Square Footage:
______ square feet x $, ___ ~/sq. ft.=$, ________ _
⇒ Please contact the City of Carlsbad Building Division for current fee rate for Non-
Residential uses (i.e. Retail/Store; Restaurants; Office; and Manufacturing/Warehouse
uses.)
______ square feet x $ __ /sq. ft. = $, __________ _
COST OF DEVELOPMENT ESTIMATE:$, ___________ _
B. Do you wish to apply for:
1. A Minor Coastal Development Permit (Under $60,000 cost estimate) D
2. A Coastal Development Permit ($60,000 or more cost estimate) !i2l
C. Street address of proposed development
LOT 5 BUENA VISTA CIRCLE CARLSBAD, CA
P-6 Page 1 of? Revised 08119
D. Assessor's Parcel Number of proposed development
155-221-05-00
E. Development Description:
Briefly describe project: NEW SFD WITH A TT ACHED ADU
F. Describe the present land uses (i.e. vacant land, slngle family homes, apartments, offices,
etc.) that surround the proposed development to the:
North: LAGOON
So~h .. ·_S_F_D _____________________ _
East: SFD
West:SFD
G. Is project located within a 100-year flood plain? liZI Yes D No
II. PRESENT USE OF PROPERTY
A. Are there existing structures on the property? D Yes liZI No
If yes, please describe.
B. WIii any existing structure be removed/demolished? D Yes liZI No
If yes to either question, describe the extent of the demolition or removal, including the relocation
site, if applicable (also show on plans).
Ill. LOT COVERAGE
A. Existing and Proposed
Existing proposed Total
Building Coverage 0 sq, ft. 5580 sq, ft. sq. ft. 20.1
landscaped Area 0 sq. ft. 2162 sq. ft. sq. ft. 8
Hardscape Area 0 sq. ft. 6647 sq, ft. sq, ft. 24.6
Unimproved Area (Left Natural) 27,007 sq. ft. 12618 sq. ft. sq. ft. 46.7
P-6 Page 2 of7 Revised 08/19
%
%
%
%
P-6
B. Parking: Number of existing spaces _O _______ _
Number of new spaces proposed _3 _____ _
Existing/Proposed TOTAL: _3 ______ _
Number of total spaces required _3 _____ _
Number of covered spaces 2
Number of uncovered spaces _1 ______ _
Number of standard spaces _3 _______ _
Number of compact spaces _o _______ _
Is tandem parking existing?
Is tandem parking proposed?
D Yes # __ Ql No
0Yes#_Q]No
C. Grade Alteration:
Is any grading proposed? Ql Yes D No
If yes, please complete the following:
1. Amount of cut_1_0 _________________ .cu. yds.
2. Amount of fill 1000 cu. yds.
3. Maximum height of fill slope 2 feet
4.
5.
6.
Maximum height of cut slope _.s _____________ feet
Amount of import or export 900 import cu. yds.
Location of borrow or disposal site _______________ _
Page 3 of7 Revised 08119
•
Development Services
Planning Division
1635 Faraday Avenue
760-602-4610
www.carlsbadca.gov
PURPOSE
CLIMATE ACTION PLAN
CONSISTENCY CHECKLIST
P-30
(City of
Carlsbad
_In Sept_emb_~r _iPJ,_S, ~he _qty qf _c;:~rlsQ~_<t~Qc;,pt_e_d_ ~ !;l_im_ate AgLQ!tP_mnJCAP:)_ tbat__o!Jtl_ineiJ~illon.$,tha_t
the city will undertake to achieve its proportional share of state greenhouse gas (GHG) emissions
reductions. This checklist contains measures that are required to be implemented on a project-by-project
basis to ensure that the specified emissions targets identified in the Climate Action Plan (CAP) are
achieved. Implementation of these measures will ensure that new development Is consistent with the
CAP's assumptiofl for relevant CAP strategies toward achieving the identified greenhouse gas (GHG)
reduction targets. In this manner, a project's Incremental contribution to a cumulative GHG emissions
effect may be determined not to be cumulatively considerable if it complies with the requirements of the
CAP, Jo_accotda_oc_e with CEQA_Guidello~_s_S_ections 1506~(hl(3), 15130(d), and 15183(b). ! __
*Cltystaff are currently not assessing the greenliouse gas impacts of California Environmental Quality Act
projects by using the Climate Action Plan as a qualified GHG reduction plan under CEQA section
15183.S(b). Please consult with the Planning Department for further guidance. Additional Information
r:n~Y ~~-fol:J_!l~O_"! the ~~.!l!~-~-c_~l~_m Plan Update and Vehicle Miles Traveled calculations staff report. ___________ _
__ .Tl'!i~~hecklis:Us Jnt~n_ded to assist project applicants in identifying_CAP_ordinanc.e__re_quirements_and __________ _
___ _ demo.astr.:ate_how_their. project fulfills.those_requirements._This...cbecklist.Js_toJJe_completeclandJndude,~------
in applications for new development projects that are subject to discretionary review or require a building
permit.
APPLICATION SUBMITTAL REQUIREMENTS
• The completed checklist must be included in the project submittal package or building permit
application. Application submittal procedures can be found on the City of Carlsbad website. This
--checklist-is-designed-to assist the applicant in identifying the minimum-GAP-related requirements,-------------
specific to their project. However, it may be necessary to supplement the completed checklist with
supporting materials, calculations or certifications, to demonstrate full compliance with CAP
requirements. For example, projects that propose or require a performance approach to comply
with energy~related measures will need to attach to this checklist separate calculations and
documentation as specified by the ordinances.
• If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum
required by ordinance, an explanation must be provided to the satisfaction of the Planning Division
or building offlclat.
• The requirements in the checklist will be included in the project's conditions of approval or issuance
of building permit.
• Details on CAP ordinance requirements are available on the city's website.
P-30 Page 1 rL7 Revised 02/20
City of Carlsbad Climate Action Plan Consistency Checklist
STEP 1: LAND USE ~O~SISTENCY
The first step in determining CAP consistency for discretionary development is to assess the project's consistency
with the growth projections used in the development of the CAP. This section allows the city to determine a
project's consistency with the land use assumptions used in the CAP. Projects found not to be consistent with the
CAP's land use assumptions and that are projected to emit at or above the CAP screening threshold of 900 metric
tons of CO2 equivalent (MTCO2e) GHG will be subject to a project-specific analysis of GHG emissions' impact on the
environment in accordance with the requirements of the California Environmental Quality Act (CEQA). This may
result i_n GHG-reducing mitigation measures applied as a qmdjt)_Qn of project approval in ~ddlt[on to cprm~liance
====--=--with the:GAP.:ordinance requirements-identified-in Step-2 of:.this-checklist~=--=====-----=====--====
Checklist Item
(Check the ~ppropriate box and provide an explanation and supporting documentation for your answer)
Yes No
A. Is the proposed project consistent with the existing General Plan land use and specific/master plan or zoning designations? -
----OIR:,--------------------------------1----1--------
tthtrprop-os-ed-proJettlmornmslStentwltlrtlnrexlsting land11se-plarrand zonlngdesfgnatlonr,doe.th-e11rotectinclod1irr--+--'-~-l--....1---'-------
land use plan and/or specific plan, master plan or zoning designation amendment that would result In an equivalent or less
GHG-intensive project when compared to the existing designations?
lf"Yes";proceed·t~tep 2oftlie ctlecklist. ror~ofltlolfUnderQuestiorrA·ab~eestitnate"d proJect::relatea-Gli~mlsslonrnnller botlrexistlng-am
pro~d designation(s) for comparison. GHG emissions must be estimated in accordan~e with the Qty of Carlsbad Guidance to Demonstrating Consistency with the
Oimate Action Plan.
If "No#, proceed to Question B.
B. The CAP established a screening threshold of 900 MTCCne/year for new development projects to assist In determining
consistency with the CAP. The types and sizes of typical projects listed below have been determined to correspond to the CAP
screening threshold. Will the proposed land use change result in the construction of less than any one of the following?
• Single-family Housing; 50 dwelling units
----------Multi-FamilyHousing;--70dwellinguni!:1S--------------------1---□=--+--=-------0 • Office: 35,000 square feet
• Retail Store: 11,000 square feet
• Grocery Store: 6,300 square feet
• Other: if the proposed project is not one of the above types, provide a project-specific GHG emissions analysis to
determine whether it is below the 900 MTCOie/year screening threshold.
If "Yes', proceed to Step 2 of the checklist.
If "No", the project's GHG impact is potentially significant and must be analyzed in accordance with CEQA. Applicant must prepare a Self-developed GHG emissions
reduction program In accordance with the City of Carlsbad Guidance to Demonstrating Consistency with the Oimate Action Plan to demonstrate how it would offset
the increase In emissions rwer the existing designations. The project must incorporate each of the applicable measures identified in Step 2 to mitigate cumulative
GHG emissions impacts unless the decision maker finds that a measure is infeasible in accordance with California Environmental Quality Act Guidelines Section
15091. Mitigation in lieu of or in addition to the measures in Step 2 may be required, depending on the results of the project-specific GHG impact analysis. Proceed
and complete a project-specific Self-developed GHG emissions reduction program and Step 2 of the Checklist.
P-30 Page2 of7 Revised 02/20
City of Carlsbad Climate Action Plan Consistency Checklist
STEP 2: CAP ORDINANCE COMPLIANCE REQUIREMENTS
-----Eompletion oHhis-checklist-will document-a-project's compliance with-EAP-ordinances,and in-turn,demonstrate
consistency with the applicable measures and actions of the CAP. The compliance requirements in this Step 2 apply
to development projects that require a building permit. All other development projects shall implement all
emissions-related mitigation measures from the General Plan Update EIR.
Project No./Name: MARTIN RESIDENCE
Property
Address/APN: 155-221-05-00 ---------------------------------
App Ii cant Name/co.: STEVE RAGAN NEW MODERN DESIGN
Applicant Address: 143 S. Cedros Ave, #b203
Contact Phone: 858.442.3522 ~contact Email: steve@newmoderndesign.com
Contact information of person completing this checklist {if aifferent than above :
Name:
Com an
name/address:
Contact Phone:
----=-=-=-=-=-=-=_:::::...::::...::::.:::--========-=----
Contact Email:
Use the table below to determine which sections of the Ordinance Compliance checklist are applicable to our roject. If
your project includes alterations or additions to an existing building, please contact the Carlsbad Building Division for
assistance in estimating building permit valuation, by phone at 760-602-2719 or by email at building@carlsbadca.gov.
Estimated Building Permit Valuation (BPV): $_1_0_0_0_0_0_0 ______ _
D Alterations:
0 BPV :!: $60,000
□ BPV ~ $60,000
D Electrical service panel upgrade
D BPV ~ $200,000
D New construction
D Alterations:
P-30
lA
lA and 4A
4A
lA and4A
Page 3 of7
All residential alterations
1-2 family dwellings and townhouses with attached
garages only
Multi-family dwellings only where interior finishes are
removed and significant site work and upgrades to
structural and mechanical, electrical, and/or plumbing
systems are proposed
Revised 02120
City of Carlsbad Climate Action Plan Consistency Checklist
D BPV ~ $200,000 or additions ~ 1B,5 1,000 squareJeet '
D BPV ~ $1,000,000 18, 28 and 5 Building alterations of~ 75% existing gross floor area
D ~ 2,000 sq. ft. new roof addition 2B and 5 1B also applies If BPV.? $200,000
Please refer to cartsbad Ordinance No. CS-347 and the califomia Green Building Standards Code (CALGreen) for more information when completing this section.
A. 0 Resldentlal addition or alteratlon ~ $60,000 building permit valuation. ______ la N/A NEW CONSTRUCTION
See Ord. CS:147, Sedlon 8. D Exception: Home energy score~ 7
(attachcertitication""' ==i----------
Year Built Single-family Requirements
D Before1978 --Select one: ------D Dud sealing --□ Altic lnsulaoon □Coorroor-
GI l!n8andlate· Select one:
__DJ..lgbting packag<> □--Water heating packag"
D Between 1978 and 1990
-
D 1991 and later
a. 0 Nonresidential* new construction ot alterations~ $200,000 building permit valuation,
or additions ~ 1,000 square feet.
-------~Se~e CAfGreen Appen(fi"AS;Dlsiiisslon M.2, as amended In CS-347, Section 3-. --
AS.203.1.1.1
0 OUtdoor lighting: .90 Allowed Outdoor Lighting Power
AS.203.1.1.2
Multi-family Requirements
-------
□-Atticinsulatlon
Select one: -
QAttic insulation _Q Duct Sealing □Cool roof
Select one:
D Lighting package D Water heating package
1:a N/A RESIDENTIAL
0 N/A
D Restaurant service water heating (comply with califomia Energy Code Section 140.S, as amended) O N/A
AS.203.1.2.1
Choose one as applicable: D .95 Energy budget D .90 Energy budget 0 N/A
AS.211.l.**
□ On-site renewable energy □ N/A
AS.211.3**
D Green power (if offered by local utility prC1\lider, 50% minimum renewable sources) 0 N/A
AS.212.1
D Elevators and escalators 0 N/A
AS.213.1
0 Steel framing
P-30 Page4 of7 Revised 02/20
--
City of Carlsbad Climate Action Plan Consistency Checklist
0 N/A
---~** l~nd;:i;u~d;;;es:.;h:;ot:ie1s<l/m;;:;:o;;;t~els;;a;.nd;jjh~lgh;:_:;;rise;:;.res;;;i:;;;de:;;nt;;;ia:i"i1 bu;,ii;lld;;::in:;;;gs;:.=-=-=-=-=-=-=-=-=-=-=-=-=-=-=----======~~==~~=====--==========-=---
•• For alterations;;: $1,000,000 BPV and affecting> 75% existing gross floor area, or alterations that add 2,000 square feet of new roof addition: comply with California
Energy Code section 120.10 instead.
or mg ca ssu . . e o a a n rgv s , c or
requirements. Note: If project includes installation of an electric heat pump water heater pursuant to carlsbad ordinance CS-348, Increase system size by
.3kWdc If PV offset option is selected.
Floor Plan ID (use additional CFA #d.u. Calculated kWdc* Exception
sheets if necessary)
A-2.0 6376 S.F. 1 4.8 D
D
D
D
--Total Svstem slze-:-~4.8 --kWdc --
kWdc = (CFAx.572) / 1,000 + (1.15 x #d.u.)
--
------"• ormulacalculation.wher~oaditionaLfloor_area,_#dU..:.nUmbetoidwefllngspetplan..typ"-----------------------
lf proposed system size is less than calculated slze,~please explain.
B, D Nonresidential new construction or alterations ;;:$1,000,000 BPV and affecting :!:75% existing floor area, or addition that increases roof area by :!:2,000
square feet. Please refer to Carlsbad Ordinance CS-347, Section 6 when (Offlpleting this section.
Choose one of the following methods:
□ Gross Floor Area (GFA) Method
GFA: Min. System Size: ___ kWdc
□ If< 10,000s.f. Enter: 5 kWdc
□ If t! 10,000s.f. calculate: 15 kWdc x (GFNl0,000) ••
**Round building size factor to nearest tenth, and round system size to nearest whole number.
□Time-Dependent Valuation Method
Annual TDV Energy use:0 "' x .80= Min. system size: ____ kWdc
••• Attach calculation documentation using modeling software approved by the California Energy Commission.
P-30 Pages of7 Revised 02/20
City of Carlsbad Climate Action Plan Consistency Checklist
A. Ql Residential and hotel/motel new construction
Please refer to cartsbad Ordinance CS-347 and CS-348 when completing this sectlon.
Id For systems serving individual dwelling units choose one:
D Heat pump water heater AND compact hot water distribution AND drain water heat recovery (low-rise residential
only)
wl Heat pump water heater AND PV system .3 kWdc larger than required in CA Energy Code Section 120.10 (for high rise
======-....:r esiaentlal fiofel/motel) o"r-150: t(c)1.4 (for low-rise-resii:lential) -----
D Heat pump water heater meeting Tier 3 or higher NEEA Advanced Water Heating Specification
D Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors
D Exception:
D For systems serving multiple dwelling units, install a central water0 heating system with all of the following:
D Gas or propane water heatingdY.~St:.:e.:..:.m,.__ _______________________________ _
D Recirculation system per CS-347 (high-rise residential, hotel/motel) or CS-348 (low-rise residential)
---------□ Solar water heating system that 1s eitfier:
D .60 solar savings fraction or 40 s. f. solar collectors
D .40 solar savings fraction, plus drain water heat recovery
D Exception:
B. D Nonresidential new construction
Please refer to Carlsbad O dlnance CS-347 when com letin this section.
D Water heating system derives at least 40% of its energy from one of the following (attach documentation):-
--------El·Solar-thermal1-----El Photovoltaics---El Recovered energy
D Water heating system is (choose one):
D Heat pump water heater
D Electric resistance water heater(s)
D Solar water heating system with .40 solar savings fraction
-·Exception.
A. Q1 Residential New construction and major alterations*
Please refer to carlsbad Ordinance CS-349 when completing this section.
~ One and two-family residential dwelling or townhouse with attached garage:
Id One EVSE ready parking space required D Exception :
D Multi family residential· -D Exception •
Total Parking Spaces EVSESpaces
Proposed Capable I Ready I
I I
Calculations: Total EVSE spaces= .10 x Total parking (rounded up to nearest whole number)
EVSE Installed =Total EVSE Spaces x .SO (rounded up to nearest whole number)
EVSE other= Total EVSE spaces -EVSE Installed
(EVSE other may be #Capable," "Ready" or "Installed.")
P-30 Page6 of7
Installed T Total
I
Revised 02/20
City of Carlsbad Climate Action Plan Consistency Checklist
*Major alterations are: (1) for one and two-family dwellings and townhouses with attached garages, alterations have a building permit valuation :i! $60,000 or
include an electrical service panel u rade; (2) for multifamily dwellings (three units or more without attached garages), alterations have a building permit
valuation ~ $200,000, interior finishes are removed and significant site work and upgrades to structural and mechanical, e.lectrical, and/or plumbing systems
are proposed.
B O Nonresidential new construdlon (lndudes hotels/motels) □ Exception •
Total Parking Spaces EVSE Spaces
Proposed caoable Ready Installed Total
Calcuiatlon· Refer'to the table:;:ib:-:e:-r:10::::w::;,==-....:==
Total Number of Parkinll Soaces provided Number of reaulred EV Spaces Number of required EVSE Installed Spaces
□ 0-9 1 1
□ 10-25 2 1
□ 26-50 4 2
□ 51-75 6 3 ----~ -
□ 76-100
-9 5
□ 101-150 12 6
□ 151-200 17 9
0 201 ana over .1u u.,,, cent or-total 50 .,,.,,,cen ~ ofRec:(OIWd.EV ~.,,aces
A. List each proposed nonresidential use and gross floor area (GFA) allocated to each use.
______ ....,Be:.., __,E""'m,.,,.ployee ADT/1,000 sguare feet is selected from the City of Carlsbad Emplovee ADT Table.
Use -GFA Employee AOT/1,000 S.F. Total Employee AOT ----
Total-
If total employee AOT is greater than or equal to 110 employee ADT, a TOM plan is required.
*NOTE: Notwithstanding the 110 employee ADT threshold above, General Plan Mobility Element Policy 3-P.11 requires new development that adds vehlcletraffic
to vehicle l05-exempt street facilities to implement TOM and transportation system management strategies. Please consult with Qty of car!sbad Land Development
Engineering (LOE) staff to determine whether this policy applies to your project.
TOM plan required: Yes D No D
LOE Staff Verification: O _____ (staff Initials)
-
P-30 Page 7 of7 Revised 02/20