Loading...
HomeMy WebLinkAbout2158 TWAIN AVE; ; CB031198; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 12-17-2003 Residential Permit Permit No: CB031198 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: 06/04/2003 # Dwelling Units: Bedrooms: Project Title: Building Inspection Request Line (760) 602-2725 2158 TWAIN AV CBAD RESDNTL 2081802400 Sub Type: Lot #: SFD 65 $323,286.00 Construction Type: VN CT97-16A Reference #: Structure Type: SFD 5 Bathrooms: 3.5 SPYGLASS-KELL RNCH-VIL J-PHS 1 PLN 2-3535 SF,656 SF GAR,203 SF DECKS,74 SF PORCH Owner: Status: Applied: Entered By: Issued: Inspect Area: Orig PC#: Plan Check#: ISSUED 04/09/2003 RMA Plan Approved: 06/04/2003 RB PC03-05 PC030022 Applicant: SHEA HOMES LIMITED PARTNERSHIP C/O PAUL BARNES SHEA HOMES LIMITED PARTNERSHIP C/O PAUL BARNES 10721 TREENA ST #200 10721 TREENA ST #200 SAN DIEGO CA 92131 SAN DIEGO CA 92131 Building Permit $1,236.48 Meter Size Add'I Building Permit Fee $0.00 Add'I Reel. Water Con. Fee $0.00 Plan Check $803.71 Meter Fee $160.00 Add'I Plan Check Fee $0.00 SDCWA Fee $2,004.00 Plan Check Discount ($64.30) CFO Payoff Fee $3,004.39 Strong Motion Fee $32.33 PFF $5,883.81 Park in Lieu Fee $3,251 .00 PFF (CFO Fund) $0.00 Park Fee $0.00 License Tax $0.00 LFM Fee $0.00 License Tax (CFO Fund) $0.00 Bridge Fee $0.00 Traffic Impact Fee $630.00 Other Bridge Fee $0.00 Traffic Impact (CFO Fund) $0.00 BTD #2 Fee $0.00 Sidewalk Fee $0.00 BTD #3 Fee $0.00 PLUMBING TOTAL $196.00 Renewal Fee $0.00 ELECTRICAL TOTAL $60.00 Add'I Renewal Fee $0.00 MECHANICAL TOTAL $85.00 Other Building Fee $0.00 Housing Impact Fee $0.00 Pot. Water Con. Fee $3,420.00 Housing lnlieu Fee $0.00 Meter Size D3/4 Housing Credit Fee $0.00 Add'I Pot. Water Con. Fee $0.00 Master Drainage Fee $0.00 Reel. Water Con. Fee $0.00 Sewer Fee $3,675.00 Additional Fees $0.00 TOT AL PERMIT FEES $24,377.42 Total Fees: $24,377.42 Total Payments To Date: $23,337.42 Balance Due: $1,040.00 ~--.i,..ko .,\ ~ - .:::-ci-·· Date: Clearance: at a proval of your project includes the "Im sition' fees, dica ns, reservations, or other exactions hereafter collectively referred to as "fees/exactions.' You h ve 90 days from the date this permit w s issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exac a NOTICE imil rt this r a to which th st . -: ·:v ,, ✓ City of Carlsbad Bldg Inspection Request For: 12/31 /2003 Permit# CB031198 Inspector Assignment: RB --- Title: SPYGLASS-KELL RNCH-VIL J-PHS 1 Descri ption: PLN 2-3535 SF,656 SF GAR,203 SF DECKS,74 SF PORCH Type: RESDNTL Sub Type: SFD Job Address: Suite: Location: 2158 TWAIN AV Lot 65 Phone: 6198432173 Inspector: APPLICANT SHEA HOMES LIMITED PARTNERSHIP Owner: SHEA HOMES LIMITED PARTNERSHIP Remarks: RAIL CORRECTION Total Time: CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Associated PCRs/CVs lnsQection Histo!Y Date Description Act 12/30/2003 89 Final Combo co 12/29/2003 89 Final Combo CA 12/15/2003 34 Rough Electric WC 12/15/2003 39 Final Electrical AP 12/01/2003 39 Final Electrical NR 11/26/2003 39 Final Electrical NR 11/10/2003 17 Interior Lath/Drywall AP 11/10/2003 18 Exterior Lath/Drywall AP 10/21/2003 17 Interior Lath/Drywall PA 10/21/2003 18 Exterior Lath/Drywall co 10/21/2003 23 Gasrrest/Repairs AP 10/17/2003 16 Insulation AP 10/16/2003 16 Insulation co 10/14/2003 84 Rough Combo AP 10/09/2003 84 Rough Combo co 10/08/2003 84 Rough Combo CA lnsp PS PS RB RB RB RB RB RB RB RB RB RB RB RB RB RB Comments Requested By: RICK Entered By: CHRISTINE NO GAS METER BY RICK EMA MISSING FLASH GUARDS NEED ENG. FIX ~ City,, Carlsbad e:. Final Building Inspection Dept: Building Engineering PlanninG St Lite Plan Check #: PC030022 Permit#: CB031198 Project Name: SPYGLASS-KELL RNCH-VIL J-PHS 1 PLN 2-3535 SF,656 SF GAR,203 SF DECKS,74 SF PORC Address: 2158 TWAIN AV Contact Person: RICK Sewer Dist: CA Phone: 6198432173 Water Dist: CA Lot: Fire Date: Permit Ty Sub Type: 65 SFD ••••• ■••11,111 lll■tll I I ttl i 11 It■ l l lllltl l ttll I ti I tt I I I ti I I•····•• ■I■ I I■ It■ I I I II 111111111 ■ttlllllll■III I II II 11 llt I I 111 ······••■■I■•••·•• ti■ tt■ ••··•·•·••■ ■I Inspected Date By: ·~ ~t)~Q.S Inspected: Approved: )l Disapproved: __ Inspected Date By: Inspected: Approved: Disapproved: __ Inspected Date By: Inspected: Approved: Disapproved: __ Comments: ______________________________ _ GEOCON INCORPORATED 6960 FLANDERS DRIVE GEOTECHNICAL CONSULTANTS ~~ ■ SAN DIEGO, CALIFORNIA 92121-2974 ■ TEL (858) 558-6900 ■ FAX (858) 558-6159 • FOUNDATION OBSERVATION REPORT PROJECT NAME· __:.,.,K~e /,...\...:.; . ._• _,_(...,_o'-''.,,_<' ______________ _ • I ,-PROJECT NO. 54.on ~ 2 .... 02A LOCATION : ~ h, • 1 6'1, /. DATE : 6/t./03 FOUNDATION LOCATION ('f 1 no en ,re UI 1ng t' b ·1d· PLAN FILE NO. PERMIT NOS : -J. 1,,p('.) \Z..\ ~ □ ADDITIONAL OBSERVATION REQUIRED FOUNDATION TYPE : J,.,t t.'I. C..SO~l'Z...li D CONVENTIONAL oi ,.;-: C Go-; I\'\ e □ SUBSTANTIAL CONFORMANCE 0 POST-TENSIONED • PURPOSE OF OBSERVATION 0 Verify soil conditions exposed are similar to those anticipated []f Verify footing excavations extend to minimum depth recommended in soil report D Verify foundation reinforcement complies with minimum recommended in soil report D Verify slab reinforcement, sand bedding and moisture barrier comply with minimum recommended in soil report 0 Verify footings have been extended to an appropriate bearing strata 0 Other -------------------------------------- • APPLICABLE SOIL REPORT: TITLE: .,_,,c,,M=k::........c:.:,.!:..,;.-==..:........:::....:..____L~~~==-i'---'=~!,!.._---'-?~-''~_.,A~t:i~1~=--.-- -'-'-'--=1..--=-J _,_,_, .........,_.~-~,_Lt ..,...L.,__c•~AJ....._~• +(+{ .LI! __£~_.:.....;__;,1_.,,,!...IT...;;;!L....;-::.....L;..,._:::.::.z..:.:i.....:=;:........:=-.c..:.....::.=L-!:~ DA TE : ~}.,! 0 3 'I • SOIL REPORT RECOMMENDATIONS BASED ON: 0 Expansion Condition O VERY LOW 0 LOW 0 MEDIUM □ HIGH 0 VERY HIGH .., O Fill Geometry ~...L,_-'-----'~------------------------------- ' 0 Other:-------------------------------------- • MINIMUM FOUNDATION REs;OMMENDATIONS: □ Footing Depth : D ~2 Inches D 18 Inches □ 24 Inches OTHER __ ~,;,__,,.----------- Footing Reinforcement: □ No.4 T&B D 2-No.4 T&B D 2-No.5 T&B D Post-Tensioned OTHER : _____ _ Interior Slab Reinforcement : D 6x6-10/10 D 6x6-6/6 D No.3@24Inches D No.3@18Inches D Post-Tensioned Slab Bedding Material and Thickness : ____________ Vapor Barrier : Foundation Width : _,_ __ ..!,.,-'•c...::J<------------------------------ • OBSERVATIONS: 0 Substantial conformance with Soil Reports (see "Purpose of Observation") ' D Substantial conformance with Foundation Plans. Identify : -------------------- 0 Other • COMMENTS : NOTE: IT IS ASSUMED.fHA,! ALIJ90TING EXCAVATIONS WILL Bs9,~ED OF LOOSE~TEBIALJ'J.IOR TO PLe,CIN\i_COIOETE AND THAT TH: SOIL MOISTURE CONTENT WILL BE MAINTAINED \4,, FIELD COPIES TO ----G~ON REPRESENTATIVE P8EFERRED-CONSTRUCTION INSPECTIONS, INC. 4888 RONSON COURT "G" SAN DIEGO, CA 92111 TELEPHONE (858) 576-9110 CERTIFIED INSPECTOR'S WEEKLY REPORT I JOB NO. lFORWEEK / / ENDtNG COVERING WO RK PERFORMED WHIC H REQUIRED APPROVAL BY THE SPECIAL INSPEC TOR O F JOB AOORESS Ti,v d ,hv ,... ~v/ ..-v.<-1 / OWNER OR PROJECT NAME ~y t,.( ,1 ~ 0 REINFORCED CONCRETE 0 PRE-STRESSED CONCRETE 0 REINFORCED MASONRY 0 STRUCT. STEEL ASSEMBLY 0 REINFORCED GYPSUM 0 DEEP FOUNDATION BUii.DiNG PERMIT NUMBER t £ ARCHITECT 0 SPRAY-APPLIED FIREPROOFING □OTHER ---------I PUN FILE NUMBER CONSTR. MAT'l. (TYPE. GRADE, ere., IOESK3N I SOURCE OF MFGR. STRENGTH ENGINEER DESCRIBE MAT'l. (MIX DESIGN, RE-BAR GRADE & MFOR., WELO-ROO, ere., GENERAL CONTRACTOR )4 ¢1 /•/ r / / CONTR. DOING REPORTED WORK INSPEC-TlON DATE , ~ /' - ARRIVAL OETAll.ED TIME. REPORT OF DEPARTURE WOAK TIME INSPECTED LAB. RECEIVING I TESTING CONSTR. MA'l'L. SAMPLES LOCATION OF WORK INSPECTED, TEST SAMPLES TAKEN, WORK REJECTED, JOB PA081.EMS, PAOGRESS. REMARKS, ETC. INCUIOll ld'OMIATION M0\11'.....wou,nt Ol'MATl!-. PVICIDOl'I -l'l!-«D: ,._11. TVl'I! I IIM!Nf. NO'S. Ol'Tl!IT S.-u!I TAKfN; ITNJCT. CCNIICTICNI (WllDI MADI, H.T.101.TI TOIIOUl!DI CHICICID; ITC. ;< .-,;{,;.,,/ / 2/, 7 /1,,,. A I /4¢ c / ,'.,I , 1 LV /~5 2/ :/CJ ,, , . /J J NSPECTOA ,_ Ol'lnN)___._.....,<1/;....;:,L:;;;..;;;.;E~__;_·__;:;.L);:.._£,=-:..:✓--::~"/::.......,;/ ___ _ _,-_/ / SIONATUAE_......,..'--______ ..;., ___________ _ 7 CERTIFICATION OF COMPLIANCE: To the best of our knowledge, all of the reported work, unless otherwise noted, substantially complies with approved plans specifications and applicable sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering opin- ion or project control. 06/17/03 TUE 09:08 FAX 6192342758 "PltoJECTDESTGN CoNSVl'.,TANTS PLUiNIN(; • F.NV11WHMliNT.il • li>lrJNl!l!IUNG • ~lnnn/Gl'S File: 2129.05 June 17, 2003 CITY OF CARLSBAD Building Department 1635 Faraday Avenue Carlsbad, CA 92008-7314 SUBJECT: Kelly Core-Village J, Phase 1 To Whom It May Concem: ProjectDesign Consultants has field verified the building foundation formwork for Buildings I, 64-67 and 69-76 of the above~referenced project. Upon our review of the survey data collected on June 13, 2003, the constructed building formwork conforms hori;r,ontally and vertically (±0.1 ') to the approved design. * Please note that the foundation for Lot 68 sits 0.5' East of the designed position. This position does not violate setback limits designated by City of Carlsbad zoning requirements. Sincerely, Scott Peters, PLS Vice President LS 7190, Exp. 12/31/03 701 B Strccl Suite 800 San !Jieso, California 9?.101 619-2:35-c.471 Tel 619-234-0J4q Fax R/WPII.Er/2100f212905VJL-.J-PHl-fC.OOC (lJOOl ...