HomeMy WebLinkAbout2025-01-06; Traffic Safety and Mobility Commission; 02; Paseo Del Norte Pedestrian and Bike Safety Improvements Project, Capital Improvement Program Project No. 6115
Meeting Date: Jan. 6, 2025
To: Traffic Safety & Mobility Commission
Staff Contact: Lindy Pham, Associate Engineer
lindy.pham@carlsbadca.gov, 442-339-2768
Miriam Jim, Senior Engineer
miriam.jim@carlsbadca.gov, 442-339-5796
Subject: Paseo Del Norte Pedestrian and Bike Safety Improvements Project, Capital
Improvement Program Project No. 6115
Recommended Action
Provide feedback on the Paseo Del Norte Pedestrian and Bike Safety Improvements project,
Capital Improvement Program, Project No. 6115.
Background
In October 2022, the City Council adopted city’s first Local Roadway Safety Plan, or LRSP. The
LRSP is a data-driven traffic safety plan that uses a systematic approach to help enhance traffic
safety in the city. By analyzing citywide collision records from 2015 and 2019, intersections and
roadway segments with high collision frequencies were identified, and programmatic and site-
specific infrastructure safety countermeasures were recommended as part of the plan. With
the adopted LRSP, the city is qualified to apply for Highway Safety Improvement Program, or
HSIP, funding for safety improvement projects.
Paseo Del Norte south of Palomar Airport Road was identified as one of the segments with high
pedestrian collision frequencies in the LRSP, specifically in the vicinity of the Motel 6 and the
former Tip-Top Meat restaurant. Safety countermeasures were recommended to enhance
pedestrian safety in this area, including a high visibility crosswalk, a lane reduction on Paseo Del
Norte to calm traffic and reduce the potential for vehicle/pedestrian conflicts and buffered
bike lanes.
In November 2023, the city was successful in applying for HSIP funds and awarded funding in
the amount of $591,600 for the design and construction of the recommended improvements
along Paseo Del Norte between Palomar Airport Road to Camino Del Parque/Sea Gate Road to
enhance pedestrian and bike safety.
TRAFFIC SAFETY & MOBILITY COMMISSION
Jan. 6, 2025 Item #2 Page 1 of 11
Staff Report
Discussion
Paseo Del Norte, stretching approximately 0.5 miles from Palomar Airport Road to Camino Del
Parque/Sea Gate Road, is classified as a Neighborhood Connector Street in the General Plan
Mobility Element. See Exhibit 1. This segment features a mix of land uses, including residential,
commercial, and industrial areas, along with some open spaces. The roadway has a posted speed
limit of 40 mph.
The roadway width along most of this segment is 64 feet, accommodating two 11-foot vehicular
travel lanes and a 5-foot bike lane in each direction along with a 10-foot two-way left-turn lane
in the center. As the road approaches Palomar Airport Road to the north, it widens to 84 feet to
accommodate two left-turn lanes at the signalized intersection.
This project will implement the recommended safety improvements on Paseo Del Norte
between Palomar Airport Road and Camino Del Parque/Sea Gate Road as outlined in the LRSP
to enhance pedestrian and bike safety in the area. These improvements include a high visibility
crosswalk in the vicinity of the Motel 6 and the former Tip-Top Meat, reducing the number of
vehicular travel lanes on this segment of Paseo Del Norte from four to two, add bike buffers
and widen existing bike lanes.
The proposed marked crosswalk features refuge islands and rectangular rapid flashing beacons
to enhance pedestrian safety by increasing driver awareness of pedestrian crossings at
mid-blocks. The refuge island will allow pedestrians to cross one direction of traffic at a time.
The number of lanes on Paseo Del Norte will be reduced from four to two 11-foot lanes. Lane
reduction on Paseo Del Norte would calm traffic as well as reduce conflicts at the proposed
crosswalk. In addition, reducing the number of vehicular lanes allows repurposing of a portion
of the roadway for bike lane enhancements, widening of the existing bike lane from 5 feet to 8
feet with the addition of an 8-foot buffer separating the bike lane from vehicle lane in each
direction. The lane reduction will not extend to the signalized intersection of Paseo Del Norte
and Palomar Airport Road and traffic capacity at this intersection will be preserved. Green paint
bike lane treatment will also be added to conflict areas to enhance visibility of cyclists. The 60%
design plans for this project are included in Exhibit 2.
Policy 3-P.15 of the Mobility Element states that, “City Council shall have the sole discretion to
approve any such road diet or vehicle traffic calming improvements that would reduce vehicle
capacity to or below a LOS D. . . .” A roadway segment capacity analysis was performed for the
proposed lane reduction on Paseo Del Norte between Palomar Airport Road and Camino Del
Parque/Sea Gate Road using traffic counts collected in August 2022, Exhibit 3. The roadway
segment analysis utilized methodology in accordance with the City of Carlsbad Service Volume
Tables Report and the Highway Capacity Manual to evaluate the segment under Existing
Conditions and Conditions with Proposed Modifications. Table 1 below summarizes the
roadway segment analysis results. Under Existing Conditions, the study segment of Paseo Del
Norte has a roadway capacity of 1740 vehicles during peak hour travel and the roadway
operates at a LOS C during the AM and PM peak hours. With the proposed lane reduction, the
study segment of Paseo Del Norte will have a roadway capacity of 1720 vehicles during peak
hour and will continue to operate at LOS C during the AM and PM peak hours.
Jan. 6, 2025 Item #2 Page 2 of 11
Table 1 – Summary of Roadway Segment Analysis Results for Paseo Del Norte between
Palomar Del Norte and Camino Del Parque/Sea Gate Road
Street Limits
Lane/
Posted
Speed/
Median
Type
Direction
Peak Direction Capacity1 AM Peak Hour PM Peak Hour
ADT A B C D E Volume LOS Volume LOS
Existing 4-Lane (2-lane in each direction) Configuration
Paseo
Del
Norte
Sea
Gate
Road to
Palomar
Airport
Road
2/40/D NB ** ** 570 1620 1740 348 C 481 C
9,075
2/40/D SB ** ** 570 1620 1740 405 C 432 C
Proposed 2-Lane (1-lane in each direction) Configuration
Paseo
Del
Norte
Sea
Gate
Road to
Palomar
Airport
Road
1/40/D NB ** ** 520 1450 1720 348 C 481 C
9,075
1/40/D SB ** ** 520 1450 1720 405 C 432 C
** Indicates LOS cannot be achieved during the peak hour. (e.g., signal spacing is too close to achieve smooth traffic flows even at low volumes).
1.Peak direction capacities derived using ARTPLAN 2012 software to be consistent with City of Carlsbad Service Volume Tables Report (June 2021) -
Table 1: Roadway Service Volume Table - Specific Corridor.
Next Steps
Following the Traffic Safety & Mobility Commission’s review, staff will update the project plans
based on the feedback received. Once the plans are finalized, staff will present the final design
plans to the Commission for final review and recommendations to the City Council for approval
and as authorization for the City Clerk to advertise for construction bids for the project.
Exhibits
1.Location Map
2.60% Design Plans
3.Traffic Counts on Paseo Del Norte
Jan. 6, 2025 Item #2 Page 3 of 11
1
LOCATION MAP
Exhibit 1
Jan. 6, 2025 Item #2 Page 4 of 11
-v ~
NOT TO SCALE
PASEO DEL NORTE EXHIBIT
BICYCLE AND PEDESTRIAN SAFETY IMPROVEMENTS PROJECT
CITY COUNCIL
Exhibit 2
Jan. 6, 2025 Item #2 Page 5 of 11
::. a.
<D -co ....
N 0 ~
0 I')
"' 0 -
<(
F z <( ::.
<(
(fl
a. 0
Q'.
F <(
_J
C)
3:
0
0
I
0
I N -r---
0 0
? _J
0 / 3: a.
(fl z <(
~
0
0
<( ;:;,
~
Q'. 0 z
_J w 0
0 w
(fl
<( a. I N -r---
0
0 ~
<(
f-<(
0 ~ f-0
0
Q'.
7 -(fl
LL -<(
'.::l
Q'. <( ;:;,
rn ::::,
I
PROJECT LOCATION
PASEO DEL NORTE FROM PALOMAR AIRPORT ROAD TO CAMINO
DEL PARQUE.
WORK TO BE DONE
RD
THE IMPROVEMENT WORK SHALL BE PERFORMED IN ACCORDANCE
WITH THE FOLLOWING DOCUMENTS, CURRENT AT THE TIME OF
CONSTRUCTION, AS DIRECTED BY THE CITY ENGINEER.
1. CARLSBAD MUNICIPAL CODE
2. CITY OF CARLSBAD ENGINEERING STANDARDS
3. THIS SET OF PLANS
4. THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION (GREEN BOOK).
5. THE SAN DIEGO AREA REGIONAL STANDARD DRAWINGS AND AS
MAY BE MODIFIED BY THE CITY OF CARLSBAD STANDARDS.
6. THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL
DEVICES (CA MUTffi)
7 . CAL TRANS STANDARD PLANS
8. CALTRANS STANDARD SPECIFICATIONS
Michael Baker
INTERNATIONAL
5050 Avenida Encinas
Suite 260
Carlsbad, CA 92008
Phone: (760) 476-9193
MBAKERINTL.COM
PALOMAR
IMPROVEMENT PLANS
FOR
PASEO DEL NORTE
PEDESTRIAN AND BIKE IMPROVEMENTS
PROJECT
LOCATION
VICINITY MAP
NTS
DATE OF SURVEY
1/20/2024; 3/5/2021-MAY 2024
BENCHMARK
THE BASIS OF ELEVATIONS FOR THIS SURVEY IS THE
NATIONAL GEODETIC VERTICAL DATUM OF 1929
(NGVD29) PER RECORD OF SURVEY 17271, CITY OF
CARLSBAD SURVEY CONTROL.
BENCHMARK DES I GNAT ION: #052 - 2 . 5" BRASS DI SK
LOCATED IN DRAINAGE BOX INLET SOUTH SIDE OF
PALOMAR AIRPORT ROAD, WEST OF BEGINNING OF
BRIDGE OVER INTERSTATE 5.
ELEVATION: 74.15 (NAVD88)
BASIS OF BEARINGS
INDEX
2
3
4
5-6
THE COORDINATES AND BEARINGS SHOWN HEREON ARE BASED
UPON THE CALIFORNIA COORDINATE SYSTEM OF 1983, CCS83,
ZONE 6, (EPOCH 1991.35). SAID COORDINATES AND BEARINGS
ARE BASED LOCALLY UPON FIELD-OBSERVED TIES TO THE
FOLLOWING CONTROL STATIONS PER RECORD OF SURVEY 17271,
CITY OF CARLSBAD SURVEY CONTROL.
STATION NORTHING (ft.) GRID EASTING (ft.) GRID
052 1991148.608 6234928.995
138 1989695.304 6233260.661
THE BASIS OF BEARINGS IS THE CALCULATED BEARING
BETWEEN SAID CONTROL STATIONS 052 & 138.
I.E. S48°58'47"W
PROJECT NO. xxxx
OF SHEETS
TITLE SHEET
GENERAL NOTES
CITY OF CARLSBAD
CARLSBAD, CALIFORNIA
KEITH BLACKBURN -MAYOR
PRIYA BHAT-PATEL -MAYOR PRO TEM
CAROLYN LUNA -COUNCIL MEMBER
MELANIE BURKHOLDER -COUNCIL MEMBER
TERESA ACOSTA -COUNCIL MEMBER
SCOTT CHADWICK
CITY MANAGER
PAZ GOMEZ
DEPUTY CITY MANAGER, PUBLIC WORKS
STREET IMPROVEMENT PLAN
CONSTRUCTION DETAILS
SIGNING AND STRIPING PLANS
~l'-oFESS/o,i,
<!?"" ~ \1. ~,,/'<"' ~:s" ~~ &iB ~~ .., m
~ No. C90577 *
,s,> ~ ~;, C/V\\. 1<-"'° ~ OF C~\.l~Q DATE INITIAL
DESIGNER OF WORK
r---
------=.£--
' I
1--· I
, .
I_
1---i'l1 I ~~j
=-1
t. "··. ::. \
;,.-:o~-
, .
.. / /:\
.-'~ -.""
LEGEND
(l) IMPROVEMENT PLAN
(SHEETS 3)
<t) CONSTRUCTION DETAILS
(SHEETS 4)
(l) SIGNING AND STRIPING
(SHEETS 5-6)
~ ~\"'
'><'
KEY MAP
1"=250'
--i
•
"DECLARATION OF RESPONSIBLE CHARGEn
I HEREBY DECLARE THAT I AM THE ENGINEER OF WORK FOR THIS PROJECT, THAT I HAVE EXERCISED
RESPONSIBLE CHARGE OVER THE DESIGN OF THE PROJECT AS DEFINED IN SECTION 6703 OF THE
BUSINESS At,() PROFESSIONS CODE, AND THAT THE DESIGN IS CONSISTENT WITH ClffiENT STANDARDS.
I UNDERSTAND THAT THE CHECK OF PROJECT DRAWINGS AND SPECIFICATIONS BY THE CITY OF
CARLSBAD DOES NOT RELIEVE ME AS ENGINEER OF WORK, OF MY RESPONSIBILITIES FOR PROJECT
DESIGN.
FIRM: MICHAEL BAKER INTERNATIONAL
ADDRESS: 5050 AVENIDA ENCINAS, STE 260
CITY, ST· CARLSBAD, CA 92008
TELEPHONE: (760)476-9193
BY: ______________ DATE:
GEOFFREY H. RETEMEYER
R.C.E. N□-·----~C=90=5~77~----
REGISTRATION EXPIRATION DATE-DECEMBER 31, 2025
I SH1ET I CITY OF CARLSBAD
PUBLIC WORKS DEPARTMENT
TITLE SHEET FOR:
PASEO DEL NORTE
I SH6TS I
PEDESTRIAN AND BIKE IMPROVEMENTS
APPROVED: THOMAS FRANK
CITY ENGINEER RCE 49070 EXP. 09/30/2024 DATE
DWN BY:
I PROJECT NO. I DRAWING NO. DATE INITIAL DATE INITIAL CHKD BY: REVISION DESCRIPTION xxxx OTHER APPROVAL CITY APPROVAL RVWD BY: xxx-x
v
N
0
N ..
T"""
I"')
Ck: w
CD
0 1-u
0
I
_J
<(
I-I--:?!
CD
::>
Cf)
~
0 co
Jan. 6, 2025 Item #2 Page 6 of 11
co
st N 0 N --.....
0 ~
0
<(
F z <( ::,
<(
(/)
a_
0
0::: F
<(
_J
~
0
z
'--" I
N
0
I N -r---
0 0
?
_J
0 / 3: a_
(/) z <(
~
0
0
<( ;:;,
~
0::: 0 z
_J w 0
0 w
(/)
<( a_
I N -r---
0
0 ~
<(
f-<(
0 ~ f-0
0
0:::
7 -(/)
LL -<(
'.::l
0::: <( ;:;,
rn ::::,
I
GENERAL NOTES
1. THIS PLAN SUPERSEDES ALL OTHER PLANS PREVIOUSLY APPROVED BY THE CITY
OF CARLSBAD REGARDING IMPROVEMENTS SHOWN ON THIS SET OF PLANS.
2. APPROVAL OF THIS PLAN DOES NOT LESSEN OR WAIVE ANY PORTION OF THE
CARLSBAD MUNICIPAL CODE, RESOLUTION OF CONDITIONAL APPROVAL, CITY
STANDARDS OR OTHER ADDITIONAL DOCUMENTS LISTED HEREON AS THEY MAY
PERTAIN TO THIS PROJECT. THE ENGINEER IN RESPONSIBLE CHARGE SHALL
REVISE THESE PLANS WHEN NON-CONFORMANCE IS DISCOVERED.
3. CITY APPROVAL OF PLANS DOES NOT RELIEVE THE DEVELOPER OR ENGINEER-
OF-WORK FROM RESPONSIBILITY FOR THE CORRECTION OF ERRORS AND
OMISSIONS DISCOVERED DURING CONSTRUCTION. ALL PLAN REVISIONS SHALL
BE PROMPTLY SUBMITTED TO THE CITY ENGINEER FOR APPROVAL.
4. A RIGHT-OF-WAY PERMIT FROM THE CITY ENGINEER WILL BE REQUIRED FOR ANY
WORK IN THE PUBLIC RIGHT OF WAY. PRIOR TO PERMIT ISSUANCE, A
CERTIFICATE OF INSURANCE MUST BE FILED NAMING THE CITY OF CARLSBAD AS
AN ADDITIONAL INSURED ON THE PERMITTEE'S POLICY IN THE MINIMUM AMOUNT
OF $1,000,000.00 FOR EACH OCCURRENCE OF LIABILITY. THE INSURANCE
COMPANY WRITING THE POLICY MUST HAVE A RATING OF "A-" OR BETTER
AND A SIZE CATEGORY OF CLASS VII OR BETTER AS ESTABLISHED BY "BESTS" KEY
RATING GUIDE.
5. NO WORK SHALL BE COMMENCED UNTIL ALL PERMITS HAVE BEEN OBTAINED FROM
THE CITY AND OTHER APPROPRIA lE AGENCIES.
6. REVISION OF THESE PLANS MAY BE REQUIRED IF THE PROPOSED
IMPROVEMENTS ARE NOT CONSTRUCTED PRIOR TO THE DEADLINE DATE OF THE
IMPROVEMENT AGREEMENT.
7. NO REVISIONS WILL BE MADE TO THESE PLANS WITHOUT THE WRITTEN APPROVAL
OF THE CITY ENGINEER, NOTED WITHIN THE REVISION BLOCK, ON THE
APPROPRIATE SHEET OF THE PLANS AND TITLE SHEET.
8. ORIGINAL DRAWINGS SHALL BECOME THE PROPERTY OF THE CITY UPON BEING
SIGNED BY THE CITY ENGINEER.
9. THE ORIGINAL DRAWING SHALL BE REVISED TO REFLECT AS-BUILT CONDITIONS
BY THE ENGINEER-OF-WORK PRIOR TO FINAL ACCEPTANCE OF THE WORK BY THE
CITY.
10. ACCESS FOR FIRE AND OTHER EMERGENCY VEHICLES SHALL BE MAINTAINED TO
THE PROJECT SITE AT ALL TIMES DURING CONSTRUCTION.
11. WHERE TRENCHES ARE WITHIN CITY EASEMENTS, A SOILS REPORT COMPRISED OF:
(A) SUMMARY SHEET. (B) LABORATORY WORK SHEETS AND (C) COMPACTION
CURVES, SHALL BE SUBMITTED BY A PROFESSIONAL ENGINEER OF THE STATE OF
CALIFORNIA, PRINCIPALLY DOING BUSINESS IN THE FIELD OF APPLIED SOILS
MECHANICS. THE SOILS REPORT WlLL BE SUBMITTED TO THE CITY ENGINEERING
INSPECTOR WITHIN TWO WORKING DAYS OF COMPLETION OF FIELD lESTS. THE
WRITTEN FIELD COMPACTION REPORT(S) SHALL BE IMMEDIATELY SUBMITTED TO
THE CITY ENGINEERING INSPECTOR UPON COMPLETION OF THE FIELD TESTS.
12. A PRECONSTRUCTION MEETING SHALL BE HELD PRIOR TO THE BEGINNING OF
WORK AND SHALL BE ATTENDED BY ALL REPRESENTATIVES RESPONSIBLE FOR
CONSTRUCTION, INSPECTION, SUPERVISION, lESTING AND ALL OTHER ASPECTS OF
THE WORK. THE CONTRACTOR SHALL SCHEDULE THE MEETING BY CALLING THE
INSPECTION LINE AT (760) 438-3891 AT LEAST FIVE (5) WORKING DAYS PRIOR TO
STARTING CONSTRUCTION. APPROVED DRAWINGS MUST BE AVAILABLE PRIOR TO
SCHEDULING.
13. THE OWNER AND/OR APPLICANT THROUGH THE DEVELOPER AND/OR CONTRACTOR
SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING
SHORING, AND SHALL BE SOLELY RESPONSIBLE FOR CONFORMING TO ALL LOCAL,
STATE AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS.
14. THE CONTRACTOR SHALL CONFORM TO LABOR CODE SECTION 6705 BY SUBMITTING
A DETAIL PLAN TO THE CITY ENGINEER AND/OR CONCERNED AGENCY SHOWING
THE DESIGN OF SHORING, BRACING SLOPE OR OTHER PROVISIONS TO BE MADE
OF WORKER PROTECTION FROM THE HAZARD OF CAVING GROUND DURING THE
EXCAVATION OF SUCH TRENCH OR TRENCHES OR DURING THE PIPE INSTALLATION
THEREIN. THIS PLAN MUST BE PREPARED FOR ALL TRENCHES FIVE FEET (5') OR
MORE IN DEPTH AND APPROVED BY THE CITY ENGINEER AND/OR CONCERNED
AGENCY PRIOR TO EXCAVATION. IF THE PLAN VARIES FROM THE SHORING SYSTEM
STANDARDS ESTABI ISHED BY THE CONSTRI IC]ON SAFETY ORDERS ]Tl E 8
CALIFORNIA ADMINISTRATIVE CODE, THE PLAN SHALL BE PREPARED BY A
REGISTERED ENGINEER AT THE CONTRACTORS EXPENSE. A COPY OF THE OSHA
EXCAVATION PERMIT MUST BE SUBMITTED TO THE INSPECTOR PRIOR TO
EXCAVATION.
15. NO BLASTING SHALL BE COMMENCED WITHOUT A CITY ENGINEER APPROVED
BLASTING PROGRAM AND BLASTING PERMIT.
16. IF ANY ARCHAEOLOGICAL RESOURCES ARE DISCOVERED WITHIN ANY WORK ZONE
DURING CONSTRUCTION, OPERATIONS WILL CEASE IMMEDIAlELY AND THE
PERMITlEE WILL NOTIFY THE CITY ENGINEER. OPERATIONS WILL NOT RESTART
UNTIL THE PERMITTEE HAS RECEIVED WRITTEN AUTHORITY FROM THE CITY
ENGINEER TO DO SO.
17. ALL OPERATIONS CONDUCTED ON THE SITE OR ADJACENT THERETO, INCLUDING
WARMING UP, REPAIR, ARRIVAL, DEPARTIJRE OR OPERATION OF TRUCKS,
EARTHMOVING EQUIPMENT, CONSTRUCTION EQUIPMENT AND ANY OTHER ASSOCIATED
GRADING EQUIPMENT SHALL BE LIMITED TO THE PERIOD BETWEEN 8: 30 A.M. AND
3:30 P.M. EACH DAY, MONDAY THRU FRIDAY AND NO EARTHMOVING OR GRADING
OPERATIONS SHALL BE CONDUCTED ON WEEKENDS OR HOLIDAYS. (A LIST OF CITY
HOLIDAYS IS AVAILABLE AT THE ENGINEERING DEPARTIMENT COUNTER.) NO NIGHT
WORK UNLESS REQUESTED AND APPROVED BY THE CITY TRAFFIC ENGINEER.
18. ALL OFF-SITE HAUL ROUTES SHALL BE SUBMITTED BY THE CONTRACTOR TO THE
CITY INSPECTOR FOR APPROVAL TWO FULL WORKING DAYS PRIOR TO BEGINNING OF
WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DEBRIS OR DAMAGE
OCCURRING ALONG THE HAUL ROUTE OR ADJACENT STREETS AS A RESULT OF THE
GRADING OPERATION.
19. IMPORT MATERIAL SHALL BE OBTAINED FROM, AND WASTE MATERIAL SHALL BE
DEPOSllED AT, A SITE APPROVED BY THE CITY ENGINEER. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR ANY DEBRIS OR DAMAGE OCCURRING ALONG THE HAUL
ROUTES OR ADJACENT STREETS AS A RESULT OF THE GRADING OPERATION.
20. THE EXISlENCE AND LOCATION OF UTILITY STRUCTIJRES AND FACILITIES SHOWN
ON THE CONSTRUCTION PLANS WERE OBTAINED BY A SEARCH OF THE AVAILABLE
RECORDS. ATTENTION IS CALLED TO THE POSSIBLE EXISTENCE OF OTHER
UTILITY FACILITIES OR STRUCTURES NOT SHOWN OR IN A LOCATION DIFFERENT
FROM THAT SHOWN ON THE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE
PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES SHOWN ON THE PLANS AND
ANY OTHER EXISTING FACILITIES OR STRUCTIJRES NOT SHOWN.
21. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING FACILITIES
( ABOVEGROUND AND UNDERGROUND ) WITHIN THE PROJECT SITE SUFFICIENTLY
AHEAD OF THE CONSTRUCTION TO PERMIT THE REVISIONS OF THE CONSTRUCTION
PLANS IF IT IS FOUND THAT THE ACTUAL LOCATIONS ARE IN CONFLICT 'MTH
THE PROPOSED WORK.
Michael Baker
INTERNATIONAL
5050 Avenida Encinas
Suite 260
Carlsbad, CA 92008
Phone: (760) 476-9193
MBAKERINTL.COM
22. THE CONTRACTOR SHALL NOTIFY AFFEClED UTILITY COMPANIES (SEE BELOW) AT
LEAST TWO FULL WORKING DAYS PRIOR TO STARTING CONSTRUCTION NEAR THEIR
FACILITIES AND SHALL COORDINATE WORK WITH A COMPANY REPRESENTATIVE.
UNDERGROUND SERVICE ALERT 800)422-4133
SDG&E 800 411-7343
AT&T 800 892-0123
TIME WARNER CABLE 760 438-7741
COX COMMUNICATIONS 619 262-1122
CITY OF CARLSBAD/STREETS AND STORM DRAIN) 760)434-2980
*CITY OF CARLSBAD(SEWER,WATER & RECLAIMED WATER) (760)438-2722
*SAN DIEGUITO WATER DISTRICT !760!633-2650 *LEUCADIA WASTEWATER DISTRICT 760 753-0155
*VALLECITOS WATER DISTRICT 760 744-0460
*OLIVENHAIN WATER DISTRICT 760 753-6466
* BUENA SANITATION DISTRICT (760)726-1340 x1330 * AS APPROPRIATE
23. IN ACCORDANCE THE CITY STORM WATER STANDARDS ALL STORM DRAIN INLETS
CONSTRUCTED BY THIS PLAN SHALL INCLUDE "STENCILS" BE ADDED TO PROHIBIT
WASlE DISCHARGE DOWNSTREAM. STENCILS SHALL BE ADDED TO THE SATISFACTION
OF THE CITY ENGINEER.
STREET NOTES
1. ACTUAL STRUCTURAL SECTIONS 'MLL BE DETERMINED AFlER "R" VALUE
TESTS HAVE BEEN CONDUCTED BY A PROFESSIONAL ENGINEER OF THE STATE
OF CALIFORNIA, PRINCIPALLY DOING BUSINESS IN THE FIELD OF APPLIED
SOIL MECHANICS, ON THE PREPARED BASEMENT SOIL. THE "R" VALUE TESTS
AND THE ENGINEERED STRUCTIJRAL SECTION MUST BE SUBMITTED TO THE
ENGINEERING INSPECTOR FOR REVIEW AND APPROVAL A MINIMUM OF TWO (2)
CITY WORKING DAYS BEFORE THE WORK BEGINS.
2. STREET LIGHTS SHALL BE INSTALLED AS SHOWN ON THESE PLANS, UNDERGROUND
CONDUIT RUNS, SERVICE POINTS AND HAND-HOLES SHALL BE SHOWN ON THE
"AS-BUILT" PLANS. NO DIRECT BURIAL STREET LIGHT FOUNDATIONS WILL BE
ALLOWED. ALL LUMINAIRES SHALL BE "CUT OFF" TYPE.
3. ALL UNDERGROUND UTILITIES AND LATERALS SHALL BE INSTALLED PRIOR TO
CONSTRUCTION OF CURBS, CROSS GUTTERS OR SURFACING OF STREETS.
4. 'MHERE AN EXISTING PIPE LINE IS TO BE ABANDONED IT SHALL BE REMOVED
WITHIN TWENTY FEET OF BUILDING OR STREET AREAS AND REPLACED WITH
PROPERLY COMPACTED SOILS. IN OTHER AREAS THE PIPE WILL BE PLUGGED
WITH CONCRETE OR REMOVED AS APPROVED BY THE CITY ENGINEER.
5. WHEELCHAIR RAMPS SHALL BE INSTALLED PER REQUIREMENTS OF TITLE 24,
CALIFORNIA ADMINISTRATIVE CODE.
6. STREET TREES SHALL BE INSTALLED PER SECTION VI OF THE CITY OF CARLSBAD
LANDSCAPE MANUAL.
7. FIRE HYDRANT MARKERS SHALL BE PLACED IN THE STREET WITHIN THE LIMITS
OF WORK OF THIS PLAN PER SDRS DWG M19.
8. ALL SURVEY MONUMENTS AND POINTS THAT ARE DISTURBED BY THIS WORK
SHALL BE REESTABLISHED, PERPETUATED, AND DOCUMENTED PER THE
PROFESSIONAL LAND SURVEYORS ACT.
9. TWO (2) SETS OF SURVEY (CUT) SHEETS SHALL BE PROVIDED TO THE CITY
ENGINEERING INSPECTOR.
10. STREET LIGHTS SHALL BE 5,500 LUMEN (40 WATT) OR 13,700 PUPIL LUMEN
(100 WA TT) HIGH EFFICIENCY INDUCTION LIGHTS.
SIGNING AND STRIPING NOTES
1. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL SIGNING AND STRIPING.
2. SIGNING, SI RIPING AND PAVEMEN I MARKINGS SHALL CONFORM TO THE CALIFORNIA
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (FHWA'S MUTCD LATEST VERSION, AS
AMENDED FOR USE IN CALIFORNIA), CALTRANS STANDARD SPECIFICATIONS (JULY 2006
OR LATEST VERSION THEREOF), THESE PLANS AND THE SPECIAL PROVISIONS.
3. ALL SIGNING AND STRIPING IS SUBJECT TO THE APPROVAL OF THE TRANSPORTATION
DIRECTOR OR HIS REPRESENTATIVE, PRIOR TO INSTALLATION.
4. ANY DEVIATION FROM THESE SIGNING AND STRIPING PLANS SHALL BE APPROVED BY THE
ENGINEER OF WORK AND TRANSPORTATION DIRECTOR PRIOR TO ANY CHANGE IN THE FIELD.
5. ALL SIGNING AND STRIPING SHALL BE REFLECTIVE PER CAL TRANS SPECIFICATIONS.
STRIPING SHALL BE REPAINTED TWO WEEKS AFTER INITIAL PAINTING. SIGNING SHALL USE
ENCAPSULATED LENS REFLECTIVE SHEETING (HIGH INlENSITY OR EQUAL).
6. EXACT LOCATION OF STRIPING AND STOP LIMIT LINES SHALL BE APPROVED BY THE
TRANSPORTATION DIRECTOR OR HIS REPRESENTATIVE PRIOR TO INSTALLATION.
7. CONTRACTOR SHALL REMOVE ALL CONFLICTING PAINTED LINES, MARKINGS AND PAVEMENT
LEGENDS BY GRINDING. DEBRIS SHALL BE PROMPTLY REMOVED BY THE CONTRACTOR.
8. ALL PAVEMENT LEGENDS SHALL BE THE LATEST VERSION OF THE CALTRANS SlENCILS.
9. LIMIT LINES AND CROSSWALKS SHALL BE FIELD LOCATED. CROSSWALKS SHALL HAVE 10'
INSIDE DIMENSION UNLESS OTHERWISE SPECIFIED.
10. ALL CROSSWALKS, LIMIT LINES, STOP BARS, PAVEMENT ARROWS AND PAVEMENT LEGENDS
SHALL BE THERMOPLASTIC UNLESS OTHER'MSE SPECIFIED.
11. FIRE HYDRANT PAVEMENT MARKERS SHALL CONFORM TO THE CALIFORNIA MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES (FHWA'S MUTCD LATEST VERSION, AS AMENDED
FOR USE IN CALIFORNIA) AND SAN DIEGO REGIONAL STANDARD DRAWING M-19.
12. ALL MEDIAN NOSES AND FLARES SHALL BE PAINTED YELLOW.
13. ALL SIGNS SHALL BE STANDARD SIZE AS SHOWN IN THE CALIFORNIA MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES {FHWA'S MUTCD LAlEST VERSION, AS AMENDED FOR USE IN
CALIFORNIA) UNLESS OTHERWISE SPECIFIED.
14. SIGN POSTS SHALL BE SQUARE PERFORATED SlEEL TUBING WITH BREAKAWAY BASE PER
SAN DIEGO REGIONAL STANDARD DRAWING M-45.
15. WHEN A SIGN IS ATTACHED TO A POLE, IT SHALL BE MOUNTED USING A STANDARD CITY
OF CARLSBAD MOUNTING BRACKET WITH STRAPS.
16. EXISTING SIGNS REMOVED BY THE CONTRACTOR SHALL BE DELIVERED BY THE CONTRACTOR
TO THE CITY OF CARLSBAD PUBLIC WORKS YARD AT 405 OAK AVENUE.
17. ALL SIGNS SHOWN ON THESE PLANS SHALL BE NEW SIGNS PROVIDED AND INSTALLED BY
THE CONTRACTOR EXCEPT THOSE SIGNS SPECIFICALLY SHOWN AS EXISTING TO BE
RELOCATED OR TO REMAIN.
18. {IF NECESSARY) WHERE R4-7 SIGN AND OM1-3 OBJECT MARKER ARE TO BE INSTALLED
IN A 2-FOOT WIDE MEDIAN NOSE, THE R4-7 SIGN SHALL BE 18"X24" AND THE OM1-3
OBJECT MARKER SHALL BE 12"X12"
19. ALL NEW AND RELOCATED SIGNS SHALL BE CLEARLY VISIBLE, NOT BLOCKED BY ANY
OBSTRUCTIONS. THE CONTRACTOR IS RESPONSIBLE TO TRIM OR REMOVE ANY VEGETATION
BLOCKING THE NEW AND RELOCATED SIGNS.
LEGEND
ITEM
PCC SIDEWALK PER SDRSD G-7
AC PAVING PER PLAN
DETECTABLE WARNING SURFACE PER
SDRSD G-30
STAMPED CONCRETE MEDIAN
PROPOSED CURB RAMP, TYPE B PER
SDRSD G-27A AND G-28
CONCRETE CURB
CONCRETE CURB Be GUTTER
STREET CENTERLINE
RIGHT-OF-WAY LINE
EXISTING CONTOUR
EXISTING RECYCLED WATER
EXISTING ELECTRICAL LINE
EXISTING MANHOLE
EXISTING SEWER
EXISTING DOMESTIC WATER
EXISTING WATER METER
EXISTING TREE
EXISTING PINE
EXISTING STREET LIGHT
EXISTING FIRE HYDRANT
SAWCUT LINE
UTILITY PULLBOX
EXISTING TELEPHONE PEDESTAL
EXISTING ELECTRICAL METER
EXISTING BOLLARD
EXISTING MONUMENT
EXISTING SIGN (ONE POST)
NEW SIGN (ONE POST)
RECTANGULAR RAPID FLASHING
BEACON (RRFB)
SYMBOL
--~,----
-R/W-----
212·
---RW----
---E----
@G)@
---s----
---DW----
rn
0 • ~
A
D PB
a
~
LIST OF ABBREVIATIONS
AB
AB
AC
ACP
ADV
ARV
APS
BC
BCR
BFP
BK
BLVD
BP
C
CAB
CAV
CBcG
CL
CMP
CR
DI
DIP
DLC
DWG
EA
EC
ECR
EVAULT
EVP
EX
F
FH
FL
FLG
FO
FS
G
GV
GB
HOPE
HORIZ
HP
IRR
IVC
IE
LF
LT
MH
MIN
MJ
NO
NTS
PB
PCC
POC
AGGREGATE BASE PRC
ABANDON (TRAFFIC SHEETS ONLY) PROP
ASPHALT CONCRETE PT
ASBESTOS CEMENT PI PE PVC
ADVANCE RCP
AIR RELEASE VALVE AND ENCLOSURE RMC
ACCESSIBLE PEDESTRIAN SIGNAL RRFB
BEGIN CURVE
BEGIN CURB RETURN
BACK FLOW PREVENTER
BIKE
BOULEVARD
BOTTOM OF PIPE
CONDUIT
CRUSHED AGGREGATE BASE
SEWAGE COMBINATION AIR VALVE
CURB Be GUTTER
CENTERLINE
CORRUGATED METAL PIPE
CROWN
DUCT! LE I RON
DUCTILE IRON PIPE
DETECTOR LOOP CABLE
DRAWING
EACH
END CURVE
END CURB RETURN
ELECTRIC VAULT
EMERGENCY VEHICLE PREEMPTION
EXISTING
FUEL
FIRE HYDRANT
FLOW LINE
FLANGE
FIBER OPTIC
FINISH SURFACE
GAS/ GROUND
GAS VALVE
GRADE BREAK
HIGH DENSITY POLYETHYLINE
HORIZONTAL
HIGH POINT/ HIGH PRESSURED
IRRIGATION
IRRIGATION VALVE COVER
INVERT ELEVATION
LINEAR FEET
LEFT
MANHOLE
MINIMUM
MECHANICAL JOINT
NUMBER
NOT TO SCALE
PULL BOX
POINT OF COMPOUND CURVE
POINT OF CONNECTION
RT
RTU
RW
R/W
SC
SD
SD MH
SDRSD
SF
SFM
SM
SMH
SNS
STA
STD
STP
SWK
TC
TP
TELE
TRANS
TS
TYP
VERT
VWD
w
WC
WM
WV
POINT OF REVERSE CURVE
PROPOSED
POINT
POLYVINYL CHLORIDE PIPE
REINFORCED CONCRETE PIPE
RIGID METALLIC CONDUIT
RECTANGULAR RAPID FLASHING
BEACON
RIGHT
REMOTE TERMINAL UNIT
RECYCLED WATER
RIGHT-OF-WAY
SPLICE NEW TO EXISTING CONDUCTORS
STORM DRAIN
STORM DRAIN MANHOLE
SAN DIEGO REGIONAL STANDARD DRAWINGS
SQUARE FEET
SEWER FORCEMAIN
SURVEY MONUMENT
SEWER MANHOLE
STREET NAMESIGN
STATION
STANDARD
SHIELDED TWISTED PAIR
SIDEWALK
TOP OF CURB
TOP OF PIPE
TELECOM
TRANSFORMER
TRAFFIC SIGNAL
TYPICAL
VERTICAL
VALLECITOS WATER DISTRICT
WATER
WATER CONNECTION
WATER METER
WATER VALVE
AU. STANDARD DRAM4GS ,_ SAN DEGO REGIONAL STANDARD DRAWINGS (SDRSD) tN.ESS NOTED 01HERWISE:
• aTY aF CARLSBAD STANDARD
.. CARLSBAD IIJNCIPAL WAlER DISIRICT STANDARD DRAWING
-SDRSD AS MOOIFIED BY arr aF CARLSBAD
l---+-+-----------+--+------t---+----1 I SH2EET I CITY OF CARLSBAD I SHE6ETS I
PUBLIC WORKS DEPARTMENT :==:::::'....'.:============--=====;
DATE INITIAL DA TE INITIAL DA TE INITIAL
DESIGNER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL
GENERAL NOTES FOR:
PASEO DEL NORTE
PEDESTRIAN AND BIKE IMPROVEMENTS
APPROVED: THOMAS FRANK
CITY ENGINEER RCE 49070 EXP. 09/30/2024 DATE
DWN BY: ---PROJECT NO. I DRAWING NO.
~~~g ~~;--xxxx . xxx-x
v
N
0
N ..
T"""
I"')
Ck: w
CD
0
1-u
0
I
_J
<(
I-I--:?!
CD
::>
Cf)
~
0 co
Jan. 6, 2025 Item #2 Page 7 of 11
a_
0
Q'.
~
<(
...J
C)
5'
0
:a
I
I")
0
I N -r---
0 0
? ...J
0 / 5' a_
(/) z <(
~
0
0
<( ;:;,
~
Q'. 0 z
...J w 0
0 w
(/)
<( a_
I N -r---
0
0 ~
<(
f-<(
0 ~ f-0
0
Q'.
7 -(/)
LL -<(
'.::l
Q'. <( ;:;,
rn ::::,
I
Curve Tab I e
Curve# Length Radius
1 33.79' 1082.00'
2 31.59' 849.00'
3 6.03' 974.00'
4 3.15' 2.00'
6 3.14' 2.00'
7 5.97' 966.00'
8 3.14' 2.00'
10 3.15' 2.00'
11 4.91' 974.00'
12 3.15' 2.00'
14 3.14' 2.00'
15 7.73' 10.00'
16 7.09' 3.00'
17 4.02' 954.00'
18 12.57' 4.00'
19 3.98' 946.00'
20 3.14' 2.00'
22 3.15' 2.00'
23 4.02' 954.00'
24 3.15' 2.00'
26 3.14' 2.00'
27 3.98' 946.00'
28 12.57' 4.00'
29 7.78' 10.00'
30 7. 11' 3.00'
31 4.89' 926.00'
32 3.14' 2.00'
34 3.15' 2.00'
35 6.03' 934.00'
36 3.15' 2.00'
38 3.14' 2.00'
39 5.97' 926.00'
40 3.14' 2.00'
42 3.15' 2.00'
Michael Baker
INTERNATIONAL
Delta
1°47 1 22"
2•07'54"
0·21 • 18"
90°07'04"
89°52'54"
0·21 '14"
89°52'54"
90°07'04"
0°17'20"
90°07'04"
89°52'54"
44°16'17"
135°26'25"
0°14'29"
180°00'00"
0°14'28"
89°52'45"
90°07' 13"
0°14'29"
90°07' 13"
89°52'45"
0°14'28"
180°00'00"
44•34'01"
135°44'09"
0°18'09"
89°52'35"
90°07'23"
0°22' 13 11
90°07'23"
89°52'35"
0°22 1 09 11
89°52'35"
90°07'23"
5050 Avenida Encinas
Suite 260
Carlsbad, CA 92008
Phone: (760) 476-9193
MBAKERINTL.COM
Line Table
Line # Length Direction
1 4.00' N68° 16' 06.47"E
2 4.00' S68° 51' 32.92"W
3 4.00' N69° 26' 59.36"E
4 4.00' S68° 51' 10.53"W
5 4.00' N69° 27' 21.74"E
6 4.00' S68° 50' 47. 19"W
7 4.00' N69° 27' 45.09"E
8 4.00' S70° 04' 42.99"W
DATA TABLE
00 LENGTH BEARING/DELTA RADIUS -
1 618.23' 37°17'10" 950.00'
-
10 5 0 10 20 30 I ~t-----1 ~-I I
SCALE: 1"=10'
-----
APN 211-040-20
2 20+07.96
38.05 LT
8
G'
TREE 1 st f;l;
11) <(
• Q'.
N ~~/ o::::, / NU r
---/ZZl -
:--:::::::....J::¥sdL\::~~--:::::;... ,,,..-;:;;_ ·----. .
2 EC 20+06.19
/ 32.05 LT
. . .. . . . . . .
-------_ _ BC 20+09. 26-=-.
24.00' LT------
---
n --=--
EC 20+07.21
22.00' LT 8
BC 20+07.21
18.00' LT , ... :,c-.c.c:s,
'\ 4~----e;~~ EC 20+09. 25 F~~~S!>'-~:::::~,~
"·'\" ,-..e;~;;,,..;..;a:e,"=""
BC 20+11.49 EC 20+33.53
4.00 LT 4.00 LT
/ 20 I I __ __, +-
EC 13+58.68 I
24.10' RT ®-l
BC 20+15.67 I
16.00' RT J 15
PCC 20+08.83
18.86' RT
PB
BC 20+33.53
1
_4.00 RT _
APN 211-040-27
0+37.23
O' RT
/_
20+37.23
.DO RT
SMH
PASEO DEL NORTE
-------OJ / -•---~1 __ _
-
------
CONSTRUCTION NOTES
CD PROTECT IN PLACE
@ JOIN EXISTING
@ SAWCUT EXISTING PAVEMENT
G) CONSTRUCT TYPE G 6" CURB AND GUTTER PER SDRSD
G-2
@CONSTRUCT PCC SIDEWALK PER SDRDS G-7, 6-9 AND
G-10
@ CONSTRUCT MEDIAN CURB PER CITY OF CARLSBAD
STANDARD DRAWING GS-18
(j) CONSTRUCT MED I AN REFUGE ISLAND
@ CONSTRUCT 4' WI DE CURB RAMP CASE B PER SDRSD
G-27A. SEE DETAIL ON SHEET 4
@ CONSTRUCT 5" AC OVER 25" AB
@) REMOVE EXISTING SIDEWALK
@REMOVE EXISTING PAVEMENT SECTION AND BASE
MATERIAL
@ CLEAR AND GRUB
@ REMOVE EX I ST I NG CURB AND GUTTER
@CONSTRUCT 4" PCC MEDIAN
PAVEMENT LEGEND
AC REMOVAL AND PAVING PER PLAN
I'-·::=·=.: .. (:·=~:'.·:_:•,:.-:,; > \I PCC SIDEWALK PER SDRSD G-7
STAMPED CONCRETE MEDIAN
fSHFil CITY OF CARLSBAD I SHE6ETS I f----+----+----------------t---t-----t-----t------i ~ PUBLIC WORKS DEPARTMENT
f---+----+----------------+---t----+----t------i
DATE INITIAL DA TE INITIAL DA TE INITIAL
DESIGNER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL
STREET IMPROVEMENT PLAN FOR:
PASEO DEL NORTE
PEDESTRIAN AND BIKE IMPROVEMENTS
APPROVED: THOMAS FRANK
CITY ENGINEER RCE 49070 EXP. 09/30/2024 DATE
DWN BY: ---PROJECT NO. I DRAWING NO.
~~~g ~~;--xxxx . xxx-x
v
N
0
N ..
T"""
I"')
Ck: w
CD
0
1-u
0
I
_J
<(
I-I--:?!
CD
::>
Cf)
~
0 co
CAP DETAIL ADJACENT TO AC PAVING
Jan. 6, 2025 Item #2 Page 8 of 11
a_
0
Q'. :r: t-
<{
_J
Cl 3
0
>--' 0
I ...
0
I N -r---
0 0
? _J
0 / 3 a_
(/) z <{
~
0
0
<{ ;:;,
~
Q'. 0 z
_J w 0
0 w
(/)
<{ a_
I N -r---
0
0 ~
<{
t-<{
0 ~ t-o
0
Q'.
7 -(/)
LL -<{
'.::l
Q'. <{ ;:;,
rn ::::,
I
61 .59 TC FS
61.41 TC
60.96 FL
~ ~
-~
. 4.9%
--
60.27 TC
59.83 FL
-------------~ 3.2% 1.6% 7.4% 4.2%-..........._ ----
PASEO DEL NORTE
61.94 TC
61 .27 FS
(61 .40 FS):'i
62. 10 TC
61 .43 FS
61.54 FS
62. 17 TC
61.50 FS
62.24 TC
61 .57 FS
(61.68 FS)/i
62.22 TC
61 .55 FS I
61 .73 FS
1.35'
I
I
I
I 62.17 TC
61 .50 FS
7'
60.63 TC FL
61.67 TC
61.02 FS
4.2%
" N
4.3%
60.94 FS
61.21 FS
61.96 TC
61 .29 FS
62.00 TC
61 .33 FS
61.24 FS
5' 60.70 TC
60.57 TC FL 60.20 FS
60.76 FS
61 34 TC 61. 12 TC
60:67 FS 60.45 FS (60.27 FS)
4 •5% V 09•
61.03 FS
61.06 FS
61.65 TC
60.98 FS
4.3%
1 .
60.58 FS
60.29 TC
60.62 FS
60.57 FS (3.5l!I) 20 -=-==~·F· ·=--+--- - -
(3.5%)
61.71 FS
62.32 TC
61 .65 FS
61 .71 FS I 62. 15 TC
61.48 FS I
I
I
I
~ 62.21 TC I
61.54 FS
61.49 FS I
61.35 FS
4.3%
61.98 TC
61 .31 FS
61.22 FS
61.09 FS
61.85 TC
61.18FS
60.91 FS
61.49 TC
60.82 FS
4.3%
~(60.56 FS) I
I
I
I 61.23 TC
60.56 FS
60.41 FS
61. 10 TC
60.43 FS
1 .69'
60.30 FS
61.00 TC
60.33 FS I ,,_\
(60.19 FS)
i ; 61.01 TC
60.34 FS
60.44 TC FL 60.50 TC FL
4
,
61 .33 TC L~J6~1~-~09~TtC~7"=,~7~-F~~--jn~r=t:~~□~ ----~=~ 60.59 FL 4 0% 4.2% __,-
1-- - - - --?""--__________ 60.91 FL .·-_::;---
4
_
1
% 1.3% . ~ v::25TC -------:z 59.82 FL --
• . .f:9%
I ' •• <% • ' .. •.· .• , O C ~ .. ·,·. 8 •5% 60.78 TC • .•. ~·
Michael Baker
5050 Avenida Encinas
Suite 260
Carlsbad, CA 92008
D
R/W· --i gr~
Phone: (760) 476-9193
I N T E R N A T I O N A L MBAKERINTL.COM
61.42 FS 3.4 • ~ \.~ :J .$%,c~1 60.28 FL . ~ (60.44 TC/FS) ~◊ I> ----:·• •••••• , •• 1-/~~~~~(
...: I3.3~ . 60.84 FS ~%-~ ~
PB --r-r ---,--------6-1-. 2--2--:T::C FS
61.31 TC
60.90 FS
5 10 15 5 z .5 oi-------1 1--ii I ~ SCALE: -1-=-·=-5:-;-, -
0 61.20 TC
60.84 FS)
RRFB PER SIGNING __
AND STRIPING PLANS ----------------------
DATE INITIAL
DESIGNER OF WORK
EX ASPHALT PAVEMENT
-H
' N
EX AGGREGATE BASE
NATIVE SOIL
DA TE INITIAL
REVISION DESCRIPTION OTHER APPROVAL
12· ±
NOT TO SCALE
DA TE INITIAL
CITY APPROVAL
PAVING SECTION
PER PLAN OR AC
SLOT PATCH
T CITY OF CARLS 6 BAD I SHEETS I w PUBLIC WORKS DEPARTMENT
CONSTRUCTION DETAILS FOR:
PASEO DEL NORTE
PEDESTRIAN AND BIKE IMPROVEMENTS
APPROVED: THOMAS FRANK
CITY ENGINEER RCE 49070 EXP. 09/30/2024 DATE
I PROJECT NO. I DRAWING NO. OWN BY: ---XXX X CHKD BY: --XXXX -RVWD BY:
v
N
0
N ..
T"""
I"')
Ck: w
CD
~ u
0
I
__J
<(
~ -:?!
CD
::>
Cf)
~
0 co
LEGEND:
LIMIT
SPEED
NO
7
SIGN LEGEND TAPER CALCULATIONCONSTRUCTION NOTES
Jan. 6, 2025 Item #2 Page 9 of 11
:r:
<( ---,
_J w
<( "' "' <( m
~
0
0 a_
I
U)
0
I N
_J w 0
0 w
(/]
<( a_ I N -l'-
0
0 ~
<(
f-
<(
0 ~ f-0
0
"' 7 -(/]
LL -<(
'.::l "' <(
;!-m ::::, :r:
I I I
I
---
I I I I I I I I I I I I I I ~
I , ---'
I
I I I
I
I
I
I
1,11:11111
PASEO DEL NORTE
-(12') -= (12')
MATCH EXISTING STRIPING
E 7-9a(MOD)
-
-
f-----!IRP>----
BOTH SIDES OF STREET FROM STA 14+29
TO CAMINO DEL PARQUE
50'
TRANSITION TO EXISTING
(5' )-7' ( 12' ) 11 ' ---11 '
\
-3
6(CA)'.(1=MO=D~)----~~~~~=-----~;J STOM-~ 200' TRANSITION
33301'
;ioanuuana-~,Y:u s&, ~ 30 470'
I
_J--=--~ -==--------=
.iNl I ---+-,_ @ 1 ' I = r--4-1=-1--------<:-1-1.,.,· i,---,-'24'---=----------1-,c'-
.1.r = --,---1 --.L--_=-i==-#'':::"~==~=.l..===( 1~3=, ),-±,#'~=~~=±===~~~~
-,,,. .... -{f'
14 (12')
--+-
MATCH EXISTING STRIPING ---1O'-I----+ ----I = I \ I ' -= =-- -=::: = ~ I-I = 9'
R5-E
R2OD-1(CA)(MOD)
EXISTING TO REMAIN.
I•
INSTALL SIGN(S) AND POST IF REQUIRED AS NOTED.
RELOCATE EXISTING SIGN(S) TO NEW POST (IF
APPLICABLE) AS NOTED.
REMOVE BY GRINDING ALL EXISTING CONFLICTING
TRAFFIC STRIPING, MARKING, OR ARROW AS NOTED,
INCLUDING RAISED PAVEMENT MARKERS.
REMOVE AND SALVAGE SIGN AND POST AS NOTED.
SIGNALIZED INTERSECTION
EXISTING SIGN (ONE POST)
NEW SIGN (ONE POST)
EXISTING WIDTH
PROPOSED WIDTH
:If RECTANGULAR RAPID FLASHING BEACON (RRFB)
Michael Baker
INTERNATIONAL
5050 Avenida Encinas
Suite 260
Carlsbad, CA 92008
Phone: (760) 476-9193
MBAKERINTL.COM
24
I I I ~~ I t IS W4-2(R)
7-9a(MOD)
IS R1-5
21
I
I o, I I
I I
I
ISW9-1(R)
~---1,RP>----
WEST SIDE OF STREET
-FROM PALOMAR AIRPORT RD
TO STA 14+29
@INSTALL WHITE YIELD LINE PER CALTRANS STD PLAN A24G
@INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CALTRANS STD PLANS A24A, A24C AND DETAIL "A"
ON SHEET 6 AT APROX 500' SPACING OR OTHERWISE SHOWN ON PLAN
@INSTALL TYPE VI ARROW (LEFT) PER CALTRANS STD PLAN A24A
@INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 40' SPACING
@INSTALL 6" LANE LINE PER CALTRANS STD PLAN A2OA, DETAIL 9
@INSTALL TWO-WAY LEFT-TURN LANE PATTERN PER CALTRANS STD PLAN A2OB, DETAIL 32
@INSTALL "AHEAD" PAVEMENT LEGEND (THERMOPLASTIC)
@INSTALL "SIGNAL" PAVEMENT LEGEND (THERMOPLASTIC)
@INSTALL BIKE LANE LINE PER CALTRANS STD PLAN A2OD, DETAIL 39
@ INSTALL CONTINENTAL CROSSWALK PER DETAIL "B" ON SHEET 6
@INSTALL AND CONFIGURE CARMANAH R92O-E SOLAR RECTANGULAR RAPID FLASHING BEACON (RRFB) AND
ACCOMPANYING SINAGE PER DETAIL "C" ON SHEET 6 AND MANUFACTURER'S INSTRUCTIONS. RRFB SYSTEM
SHALL BE MOUNTED ON 2.5" SQUARE POLES PER SDRSD M-45. FURNISH AND INSTALL DOUBLE SIDED W11-2
AND W16-7P ON POLE WITH RRFB SYSTEM.
® ® 610 BIKE
BIKE LANE LANE
R7-9a(MOD) R7-9a
~~
R2-1(4O) R5-2
W11-2 W9-1(R)
---
11 '
-= 11 '
7•--
24
E 2-1(40)
R7-9a(MOD)
128' TRANSITION
PARKING ANY TIME
R26(CA)
I OVER TONS I
R2OD-1
(CA)(MOD)
PASEO DEL NORTE
NOi PARKiNG
ANY
TIME TOW AWAY ZONE
R26(CA)(MOD) CUSTOM-1
W3-3 R4-7
~ I HERE ~ .,-.:
W16-7p(L) W 16-7p(R) R1-5
~l'-oHSS/o,i,
<!?"" ~ \-1. ~,,/'<..., ~:s" ~~ &iB ~~ "-' m ~ No. C90577 *
,s,> ~ ~;, C/V\\. 1<-"'° ~ OF C~\.l~Q
•
300' MERGE TAPER
1. MERGE TAPER= L
L = ( W XS)= (11 X 402) / 60 = 293' USE 300'
L = LENGTH OF TRANSITION
W = OFFSET
S = DESIGN SPEED
DATE INITIAL
DESIGNER OF WORK REVISION DESCRIPTION
n
..e:SC:::::ALEa:..;.1'.'=4.o.· -~' 7 .z L
\
0 0 ~
rt") tO
4.
I-'. w (fl w
=--\ I ~
~ 'iw. ,._.'a\ :t
\~
NOTE: STA 30+69 END MAP CENTERLINE
BEGIN CONSTRUCTION CENTERLINE \
40 20 0 40 80 120 l~~f-------1 __ 1-------il
SCALE: 1 "=40 '
I SHSET I CITY OF CARLSBAD I SH6TS I PUBLIC WORKS DEPARTMENT
SIGNING AND STRIPING PLANS FOR:
PASEO DEL NORTE
PEDESTRIAN AND BIKE IMPROVEMENTS
APPROVED: THOMAS FRANK
CITY ENGINEER RCE 49070 EXP. 09/30/2024 DATE
OWN BY:
I PROJECT NO. I DRAWING NO. DATE INITIAL DATE INITIAL CHKD BY: xxxx OTHER APPROVAL CITY APPROVAL RVWD BY: xxx-x
v
N
0
N ..
T"""
I"')
Ck: w
CD
0 I-u
0
I
_J
<(
I-I--:?!
CD
::>
Cf)
~
0 co
LIMIT
SPEED
NO
TYPICAL CONFIGURATION
(FRONT VIEW)
DETAIL C - CARMANAH R920-E SOLAR
RECTANGULAR RAPID FLASHING BEACON (RRFB),
INSTALLATION ON NEW POLE
SIGN LEGEND
DETAIL D-GREEN BIKE LANE SKIP AT CURB
DETAIL A - HELMETED BICYCLIST SYMBOL
AND ARROW BIKE LANE MARKINGS
LEGEND:
DETAIL B - CONTINENTAL
CROSSWALK MARKINGS
TAPER CALCULATION
CONSTRUCTION NOTES
Jan. 6, 2025 Item #2 Page 10 of 11
-I")
'--0
:r:
<( ---,
_J w
<(
"' "' <( m
~
0
0 a_
I
<D
0
I N -r---
0 0 ? _J
0 ./ ~ a_
Cf) z <(
~
0
0 <(
;!--
~ "' 0 z
_J w 0
0 w Cf)
<(
a_l
N -r---0
0
_'.;!-
;:!:
<(
0
~
0 0
"' :r: ./ -Cf)
LL -<( u _J
"' <(
;!--
m ::::, :r: -<(
~ z <(
'.!),
./
I
I
E 7-90
RS W4-2(R)
30323'
0 z -
@INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CALTRANS STD PLANS A24A, A24C AND DETAIL "A"
ON SHEET 6 AT APROX 500' SPACING OR OTHERWISE SHOWN ON PLAN
@INSTALL GREEN BIKE LANE SKIP PER DETAIL "D" ON SHEET 6
@INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 40' SPACING
@INSTALL TWO-WAY LEFT-TURN LANE PATTERN PER CALTRANS STD PLAN A20B, DETAIL 32
@INSTALL BIKE LANE LINE PER CALTRANS STD PLAN A20D, DETAIL 39
1. SHIFT TAPER = L
[[]
L = ( W XS)= (3 X 402) / 60 = 80'
L = LENGTH OF TRANSITION
W = OFFSET
S = DESIGN SPEED
EXISTING TO REMAIN.
~
/r~o"'
INSTALL SIGN(S) AND POST IF REQUIRED AS NOTED.
RELOCATE EXISTING SIGN(S) TO NEW POST (IF
APPLICABLE) AS NOTED.
<® REMOVE BY GRINDING ALL EXISTING CONFLICTING
TRAFFIC STRIPING, MARKING, OR ARROW AS NOTED,
INCLUDING RAISED PAVEMENT MARKERS.
REMOVE AND SALVAGE SIGN AND POST AS NOTED.
SIGNALIZED INTERSECTION
EXISTING SIGN (ONE POST)
NEW SIGN (ONE POST)
EXISTING WIDTH
PROPOSED WIDTH
-ilf RECTANGULAR RAPID FLASHING BEACON (RRFB)
Michael Baker
INTERNATIONAL
5050 Avenida Encinas
Suite 260
Carlsbad, CA 92006
Phone: (760) 476-9193
MBAKERINTL.COM
® ® PARKING c5l€J ANY BIKE TIME LANE BIKE LANE
R7-9o R7-9o(MOD) R26(CA)
~~
R2-1(40) W4-2(R)
2514.5'X100'
--11 '
-o·--1
I
NOT TO SCALE
4' 8' 4' 8' 4'
--
17\_6" WHITE
z <(
_J a_ ~GREEN PAINT SKIP (TYP) "' (TYP) w CL
\
\_LIP OF GUTTER
STRIPING NOTE: GREEN PAINT SHALL STOP AT LIP OF GUTTER.
I
NOT TO SCALE
E ♦
.,.,.~...... -E ♦
" 0 -
72" 72 ..
NOT TO SCALE
24" WHITE OR YELLOW ----THERMOPLASTIC
12" LIMIT LINE
~l'-QFESS/o,i,
,:;,""~ r\.~.1./<~ ::_; -g ~~
&1:B ~i w ,.,
~ No.C90577 *
,JI> ~
-11: c1v11.. fie-"'
l: OF C~l-l~Q
72"
GUTTER
DATIE INITIAL
DESIGNER OF WORK
SOLAR ENGINE
W11-2 (36"X36")
(CITY FURNISHED)
LIGHT BAR
BACK TO BACK
W16-7p (24"x 12")
Bl-DIRECTIONAL
PEDESTRIAN PUSH BUTTON (PPB) WITH
R10-25(9"X12")
FACING ADJACENT CROSSWALK LANDING.
CONNECT CONDUCTOR FROM PPB TO
CONTROLLER.
GALVANIZED STEEL
TELESPAR POST PER
SDRSD M-45
FINISHED SURFACE
ANCHOR SLEEVE & POST
PER SDRSD M-45
PCC FOUNDATION
NOTE:
NOT TO SCALE
D
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
" I[)
N
., .....
-......
12"
" I")
• <D
' N st-
'
2"-24" MAX
FROM TOP OF
SIGN TO
BOTTOM OF
SOLAR ENGINE
st-co
CONFIGURE RRFB PER MANUFACTURER'S INSTRUCTIONS.
40 20 0 40 80 120 1-~>----1 __ 1------11
SCALE: 1 "=40 '
I SH6ET I CITY OF CARLSBAD I SH6TS I PUBLIC WORKS DEPARTMENT
SIGNING AND STRIPING PLANS FOR:
PASEO DEL NORTE
PEDESTRIAN AND BIKE IMPROVEMENTS
APPROVED: THOMAS FRANK
CITY ENGINEER RCE 49070 EXP. 09/30/2024 DATE
DWN BY:
I PROJECT NO. I DRAWING NO. DATIE INITIAL DA TIE INITIAL CHKD BY: REVISION DESCRIPTION xxxx OTHER APPROVAL CllY APPROVAL RVWD BY: xxx-x
v
N
0
N ..
T"""
I"')
Ck: w
CD
0
1-u
0
I
_J
<(
I-I--:?!
CD
::>
Cf)
~
0 co
Day:City:Carlsbad
Date:Project #:CA22_040145_001
NB SB EB WB
4,459 4,616 00
AM Period NB SB EB WB NB SB EB WB
00:00 3 4 7 89 99 188
00:15 3 0 3 95 90 185
00:30 5 3 8 66 120 186
00:45 3 14 6 13 9 27 79 329 110 419 189 748
01:00 2 2 4 75 108 183
01:15 1 0 1 83 94 177
01:30 1 3 4 71 91 162
01:45 2649 615 8631590383 176698
02:00 0 4 4 68 102 170
02:15 1 0 1 76 94 170
02:30 1 3 4 82 90 172
02:45 0229 211 8431084370 168680
03:00 2 3 5 81 76 157
03:15 1 1 2 89 77 166
03:30 2 0 2 93 77 170
03:45 3826 514 77340108338 185678
04:00 0 5 5 91 92 183
04:15 2 2 4 101 75 176
04:30 5 3 8 123 85 208
04:45 7 14 2 12 9 26 118 433 97 349 215 782
05:00 6 2 8 124 89 213
05:15 7 4 11 115 104 219
05:30 15 8 23 124 60 184
05:45 17 45 7 21 24 66 87 450 79 332 166 782
06:00 11 13 24 65 89 154
06:15 23 17 40 71 73 144
06:30 24 21 45 63 53 116
06:45 36 94 40 91 76 185 50 249 77 292 127 541
07:00 48 43 91 45 58 103
07:15 60 32 92 47 69 116
07:30 62 33 95 44 77 121
07:45 91 261 56 164 147 425 45 181 71 275 116 456
08:00 91 53 144 34 56 90
08:15 79 56 135 26 61 87
08:30 70 76 146 25 45 70
08:45 67 307 74 259 141 566 21 106 45 207 66 313
09:00 61 69 130 17 37 54
09:15 60 49 109 21 41 62
09:30 62 54 116 11 30 41
09:45 73 256 74 246 147 502 12 61 20 128 32 189
10:00 71 65 136 11 27 38
10:15 81 46 127 13 11 24
10:30 61 77 138 11 17 28
10:45 89 302 80 268 169 570 7 42 9 64 16 106
11:00 74 83 157 6 11 17
11:15 79 72 151 4 10 14
11:30 79 80 159 5 3 8
11:45 85 317 96 331 181 648 2 17 6 30 8 47
TOTALS 1626 1429 3055 2833 3187 6020
SPLIT %53.2%46.8%33.7%47.1%52.9%66.3%
NB SB EB WB
4,459 4,616 00
AM Peak Hour 11:30 11:45 11:45 16:45 12:30 16:30
AM Pk Volume 348 405 740 481 432 855
Pk Hr Factor 0.916 0.844 0.984 0.970 0.900 0.976
7 - 9 Volume 568 423 00991 883 681 001564
7 - 9 Peak Hour 07:45 08:00 07:45 16:45 16:30 16:30
7 - 9 Pk Volume 331 259 0 0 572 481 375 0 0 855
Pk Hr Factor 0.909 0.852 0.000 0.000 0.973 0.970 0.901 0.000 0.000 0.976
VOLUME
Prepared by NDS/ATD
13:15
8/30/2022
DAILY TOTALS
PM Period
17:30
16:15
16:30
14:00
14:15
14:30
14:45
15:00
16:00
16:45
17:00
17:15
Tuesday
13:30
13:45
12:00
12:15
12:30
12:45
13:00
6118 Paseo Del Norte
21:30
21:45
22:00
Total
9,075
19:30
19:45
20:00
20:15
TOTAL
20:30
18:00
18:15
18:30
18:45
DAILY TOTALS
22:15
22:30
22:45
23:00
23:15
23:30
23:45
TOTALS
Total
9,075
DAILY TOTALS
21:00
21:15
4 - 6 Peak Hour
4 - 6 Pk Volume
SPLIT %
TOTAL
Pk Hr Factor
PM Peak Hour
PM Pk Volume
Pk Hr Factor
4 - 6 Volume
20:45
19:15
19:00
17:45
15:15
15:30
15:45
Exhibit 3
Jan. 6, 2025 Item #2 Page 11 of 11
From:Steve Linke
To:City Attorney; Traffic
Subject:Public comment on 1/6/2025 traffic commission Item #2: Paseo Del Norte CIP No. 6115
Date:Friday, January 3, 2025 10:26:17 AM
Traffic Commission and City Attorney:
The project in this item includes a "road diet" on a large segment of
Paseo Del Norte (reduction of two vehicular travel lanes in each
direction to one travel lane in each direction). Given the peak vehicle
volumes, that part of the project is fine. However, the width of the
shared (two-way) center left turn lane has been reduced to just 10 feet.
Large vehicles with mirrors are up to 10-1/2 feet in width, which is
wider than the lane itself. With oncoming traffic traveling at 40 mph,
this is a very poor and unsafe design.
Nearly every guideline in existence says that shared center turn lanes
on streets like this, ideally, should be 12 to 14 feet wide--but an
absolute minimum of 11 feet. The extra road width available as a result
of the road diet provides ample room for a safer shared center turn
lane. The current design includes extremely wide 8-foot bike lanes with
8-foot buffers on both sides. It would certainly not compromise bicycle
safety to reduce the bike lane width to, for example, 7 feet on each
side to accommodate a much safer 12-foot shared center turn lane.
The city should be held liable for this ongoing trend to experiment with
extremely narrow shared center turn lanes on moderate to high-speed
streets, particularly when there is plenty of available road width to
make them safer.
Steve Linke
Carlsbad, CA
CAUTION: Do not open attachments or click on links unless you recognize the sender and know the content is safe.
1
Paseo Del Norte Pedestrian and
Bike Safety Improvements Project,
CIP No. 6115
Lindy Pham, Associate Engineer
Miriam Jim, Senior Engineer
Jan. 6, 2025
1
{ City of
Carlsbad
RECOMMENDED ACTION
Provide feedback on the Paseo Del Norte
Pedestrian and Bike Safety Improvements Project,
CIP Project No. 6115.
ITEM 2: Paseo Del Norte Ped and Bike Safety Improvements
2
{ City of
Carlsbad
•In October 2022, City Council adopted city’s first Local Roadway
Safety Plan (LRSP)
•Paseo Del Norte south of Palomar Airport Road was identified as
one of the segments with high pedestrian collision frequencies in
the LRSP
•In November 2023, the city was awarded HSIP funding for the
design and construction of the recommended ped. and bike
safety improvements along Paseo Del Norte between Palomar
Airport Road to Camino Del Parque/Sea Gate Road
ITEM 2: Paseo Del Norte Ped and Bike Safety Improvements
3
BACKGROUND
PROPOSED IMPROVEMENTS
Lane Reduction Enhanced Bike
LaneHigh Visibility Crosswalk
ITEM 2: Paseo Del Norte Ped and Bike Safety Improvements
4
{ City of
Carlsbad
•Classified as a Neighborhood Connector Street in
the General Plan Mobility Element
•Mix of land uses, including residential,
commercial, and industrial areas, along with
some open spaces
•Posted Speed Limit = 40 mph
ITEM 2: Paseo Del Norte Ped and Bike Safety Improvements
5
PASEO DEL NORTE
l iii ,,
f .:,
9
Encinitas
Notto Seal•
{ City of
Carlsbad
EXISTING CONDITIONS
Typical Roadway width = 64 feet
•Two 11-foot vehicular travel lanes
•5-foot bike lane in each direction
•A 10-foot two-way left-turn lane in
the center
Roadway Width at Intersection = 84 feet
•As the road approaches Palomar
Airport Road to the north, it widens
to 84 feet to accommodate two left-
turn lanes at the signalized
intersection.
Typical
At Intersection
ITEM 2: Paseo Del Norte Ped and Bike Safety Improvements
6
Palomar Airport Rd
•High visibility crosswalk with RRFB in the
vicinity of to the Motel 6 and former Tip-top
Meat increase driver awareness of
pedestrian crossings at mid-block
•Refuge Islands
Former Tip-Top Meat
Motel 6
Proposed New
Marked Crosswalk
ITEM 2: Paseo Del Norte Ped and Bike Safety Improvements
7
PROPOSED IMPROVEMENTS
(HIGH VISIBILITY CROSSWALK)
{ City of
Carlsbad
PROPOSED IMPROVEMENTS
(HIGH VISIBILITY CROSSWALK)
ITEM 2: Paseo Del Norte Ped and Bike Safety Improvements
8
•Refuge Islands allow pedestrians to cross one
direction of traffic at a time
•No impact to cyclists
I -
◄
◄
◄
◄
-
-
►
z
►
'►
►
{ City of
Carlsbad
•Reduce the number of travel lanes from four to two lanes
•Lane reduction will not extend to the signalized intersection at
Paseo Del Norte and Palomar Airport Rd
•Widen bike lane from 5 feet to 8 feet
•8-foot bike buffer separating bike lane from vehicle lane
•Green paint at conflict areas to enhance visibility of cyclists
ITEM 2: Paseo Del Norte Ped and Bike Safety Improvements
9
PROPOSED IMPROVEMENTS
(LANE REDUCTION & ENHANCED BIKE LANE)
{ City of
Carlsbad
Proposed
Existing
BU
F
F
E
R
BU
F
F
E
R
ITEM 2: Paseo Del Norte Ped and Bike Safety Improvements
10
PROPOSED IMPROVEMENTS
(LANE REDUCTION & ENHANCED BIKE LANE)
ETW <t ETW I I I i
64' .
' I
ETW <t ETW I I i i
64'
I i
8' 8' 8'
{ City of -1.~. t ] -Carlsbad L •. -~ ~-
ROADWAY SEGMENT CAPACITY ANALYSIS
11
•Policy 3-P.15 of the Mobility Element states that, “City Council shall have the sole
discretion to approve any such road diet or vehicle traffic calming improvements
that would reduce vehicle capacity to or below a LOS D. . . .”
•Utilized methodology in accordance with the City of Carlsbad Service Volume
Tables Report and the Highway Capacity Manual
•Traffic counts collected in August 2022 were utilized
ITEM 2: Paseo Del Norte Ped and Bike Safety Improvements
{ City of
Carlsbad
ROADWAY SEGMENT CAPACITY ANALYSIS
12
Street Limits
Lane/ Posted
Speed/ Median
Type
Directio
n
Peak Direction Capacity1 AM Peak Hour PM Peak Hour
ADTABCDEVolumeLOSVolumeLOS
Existing 4-Lane (2-lane in each direction) Configuration
Paseo Del
Norte
Sea Gate
Road to
Palomar
Airport Road
2/40/D NB ****570 1620 1740 348 C 481 C
9,075
2/40/D SB ****570 1620 1740 405 C 432 C
Proposed 2-Lane (1-lane in each direction) Configuration
Paseo Del
Norte
Sea Gate
Road to
Palomar
Airport Road
1/40/D NB ****520 1450 1720 348 C 481 C
9,075
1/40/D SB ****520 1450 1720 405 C 432 C
** Indicates LOS cannot be achieved during the peak hour. (e.g., signal spacing is too close to achieve smooth traffic flows even at low volumes).
1. Peak direction capacities derived using ARTPLAN 2012 software to be consistent with City of Carlsbad Service Volume Tables Report (June 2021) - Table 1: Roadway Service Volume
Table - Specific Corridor.
ITEM 2: Paseo Del Norte Ped and Bike Safety Improvements
Finalize Design Plans
Traffic Safety & Mobility Commission
City Council approval and authorization
to bid
Construction
ITEM 2: Paseo Del Norte Ped and Bike Safety Improvements
13
NEXT STEPS
ooo c3
ooo c3
______:::___ ---{ City of
Carlsbad
RECOMMENDED ACTION
ITEM 2: Paseo Del Norte Ped and Bike Safety Improvements
14
Provide feedback on the Paseo Del Norte
Pedestrian and Bike Safety Improvements Project,
CIP Project No. 6115.
{ City of
Carlsbad
THANK YOU