HomeMy WebLinkAbout2415 CALENDULA LN; ; CBRA2023-0216; PermitBuilding Permit Finaled
(city of
Carlsbad
Residential Associated Permit
Print Date: 11/04/2024
Job Address: 2415 CALENDULA LN, CARLSBAD, CA 92008-3748
Permit Type: BLDG-Associated Permit Residential Work Class: Condo
Parcel#: 2071013500 Track#: CT 16-07
Valuation: $349,121.01 Lot#:
Occupancy Group: R3/U Project#: DEV16038
#of Dwelling Units: 1 Plan#:
Bedrooms: 3 Construction Type:V-B
Bathrooms:
Occupant Load: O
Code Edition: 2019
Sprinkled: Yes
Project Title: MARJA ACRES
Orig. Plan Check#: PC2022-0005
Plan Check#: PC2023-0044
Permit No:
Status:
CBRA2023-0216
Closed -Finaled
Applied: 12/13/2023
Issued: 04/23/2024
Finaled Close Out: 11/04/2024
Final Inspection: 10/29/2024
INSPECTOR: Renfro, Chris
Alvarado, Tony
Description: MARJA ACRES: (CORAL RIDGE) PHASE F5 // BLDG F13 // UNIT 15S // 1732 SF LIV// 487 SF GARAGE
Applicant:
KB HOME COASTAL INC
ELIZABETH SHOEMAKER
9915 MIRA MESA BLVD, # 100
SAN DIEGO, CA 92131-7001
FEE
ATTACHED ACCESSORY & UTILITY USES
DUP FLRPLN SFD & DUPLEXES
PARK IN-LIEU ATTACHED(> 4 UNITS) NW
PUBLIC FACILITIES FEES -outside CFD
SB1473 -GREEN BUILDING STATE STANDARDS FEE
STRONG MOTION -RESIDENTIAL (SMIP)
Total Fees: $20,722.36 Total Payments To Date:
Building Division
$20,722.36
Contractor:
KB HOME COASTAL INC
9915 MIRA MESA BLVD, # STE 100
SAN DIEGO, CA 92131-7001
(951) 691-5300
Balance Due:
AMOUNT
$938.77
$1,314.96
$6,190.00
$12,219.24
$14.00
$45.39
$0.00
Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
PERMIT INSPECTION HISTORY for (CBRA2023-0216)
Permit Type: BLDG-Associated Permit Residentii Application Date: 12/1 3/2023 Owner:
Work Class: Condo Issue Date: 04/23/2024 Subdivision: RANCHO AGUA HEDIONDA POR
OF
Status: Closed -Finaled Expiration Date: 04/28/2025 Address: 241 5 CALENDULA LN
IVR Number: 53802 CARLSBAD, CA 92008-3748
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Re inspection Inspection
Date Start Date Status
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-Plumbing Final Yes
BLDG-Mechanical Final Yes
BLDG-Structural Final Yes
BLDG-Electrical Final Yes
BLDG-SW-Inspection 266235-2024 Passed Tony Alvarado Complete
Checklist Item COMMENTS Passed
Are erosion control BMPs Yes
functioning properly?
Are perimeter control BMPs Yes
maintained?
Is the entrance stabilized to Yes
prevent tracking?
Have sediments been tracked Yes
on to the street?
Has trash/debris accumulated Yes
throughout the site?
Are portable restrooms Yes
properly positioned?
Do portable restrooms have Yes
secondary containment?
10/30/2024 10/30/2024 BLDG-71 Set Ups 266300-2024 Passed Tony Alvarado Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency B-sg form and receipts verified Yes
Monday, November 4, 2024 Page 6 of 6
PERMIT INSPECTION HISTORY for (CBRA2023-0216)
Permit Type: BLDG-Associated Permit Residenti, Application Date: 12/13/2023 Owner:
Work Class: Condo Issue Date: 04/23/2024 Subdivision: RANCHO AGUA HED IONDA POR
OF
Status: Closed -Finaled Expiration Date: 04/28/2025 Address: 2415 CALENDULA LN
IVR Number: 53802 CARLSBAD, CA 92008-3748
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Re inspection Inspection
Date Start Date Status
08/22/2024 08/22/2024 BLDG-17 Interior 258683-2024 Passed Tony Alvarado Complete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-SW-Inspection 258929-2024 Partial Pass Tony Alvarado Reinspection Incomplete
Checklist Item COMMENTS Passed
Are erosion control BMPs Yes
functioning properly?
Are perimeter control BMPs Yes
maintained?
Is the entrance stabilized to Yes
prevent tracking?
Have sediments been tracked Yes
on to the street?
Has trash/debris accumulated Yes
throughout the site?
Are portable restrooms Yes
properly positioned?
Do portable restrooms have Yes
secondary containment?
09/19/2024 09/19/2024 BLDG-Electric Meter 261496-2024 Passed Tony Alvarado Complete
Release
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-SW-Inspection 261 626-2024 Partial Pass Tony Alvarado Reinspection Incomplete
Checklist Item COMMENTS Passed
Are erosion control BMPs Yes
functioning properly?
Are perimeter control BMPs Yes
maintained?
Is the entrance stabilized to Yes
prevent tracking?
Have sediments been tracked Yes
on to the street?
Has trash/debris accumulated Yes
throughout the site?
Are portable restrooms Yes
properly positioned?
Do portable restrooms have Yes
secondary containment?
10/29/2024 10/29/2024 BLDG-Final Inspection 266022-2024 Passed Tony Alvarado Complete
Monday, November 4, 2024 Page 5 of 6
PERMIT INSPECTION HISTORY for {CBRA2023-0216)
Permit Type:
Work Class:
Status:
Scheduled
Date
08/19/2024
BLDG-Associated Permit Residenti; Application Date:
Condo Issue Date:
Closed -Finaled Expiration Date:
IVR Number:
Actual Inspection Type
Start Date
Inspection No.
Checklist Item
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
COMMENTS
BLDG-SW-Inspection
Checklist Item
258102-2024
COMMENTS
Are erosion control BMPs
functioning properly?
Are perimeter control BMPs
maintained?
Is the entrance stabilized to
prevent tracking?
Have sediments been tracked
on to the street?
Has trash/debris accumulated
throughout the site?
Are portable restrooms
properly positioned?
Do portable restrooms have
secondary containment?
08/19/2024 BLDG-16 Insulation
Checklist Item
258322-2024
COMMENTS
BLDG-Building Deficiency
BLDG-SW-Inspection
Checklist Item
258461-2024
COMMENTS
Are erosion control BMPs
functioning properly?
Are perimeter control BMPs
maintained?
Is the entrance stabilized to
prevent tracking?
Have sediments been tracked
on to the street?
Has trash/debris accumulated
throughout the site?
Are portable restrooms
properly positioned?
Do portable restrooms have
secondary containment?
Monday, November 4, 2024
12/13/2023 Owner:
04/23/2024 Subdivision: RAN CHO AGUA HEDIONDA POR
OF
04/28/2025 Address: 2415 CALENDULA LN
53802 CARLSBAD, CA 92008-3748
Inspection
Status
Primary Inspector Reinspection Inspection
Partial Pass Tony Alvarado
Passed Tony Alvarado
Partial Pass Tony Alvarado
Passed
Yes
Yes
Yes
Yes
Reinspection
Passed
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Passed
Yes
Reinspection
Passed
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Incomplete
Complete
Incomplete
Page 4 of 6
PERMIT INSPECTION HISTORY for (CBRA2023-0216)
Permit Type: BLDG-Associated Permit Residenti; Application Date: 12/13/2023 Owner:
Work Class: Condo Issue Date: 04/23/2024 Subdivision: RANCHO AGUA HEDIONDA POR
OF
Status: Closed -Finaled Expiration Date: 04/28/2025 Address: 2415 CALENDULA LN
IVR Number: 53802 CARLSBAD, CA 92008-3748
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Re inspection Inspection
Date Start Date Status
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-SW-Inspection 255140-2024 Partial Pass Chris Renfro Reinspection Incomplete
Checklist Item COMMENTS Passed
Are erosion control BMPs Yes
functioning properly?
Are perimeter control BMPs Yes
maintained?
Is the entrance stabilized to Yes
prevent tracking?
Have sediments been tracked Yes
on to the street?
Has trash/debris accumulated Yes
throughout the site?
Are portable restrooms Yes
properly positioned?
Do portable restrooms have Yes
secondary containment?
08/06/2024 08/06/2024 BLDG-13 Shear 257000-2024 Passed Chris Renfro Complete
Panels/HD (ok to wrap)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-SW-Inspection 257160-2024 Partial Pass Chris Renfro Reinspection Incomplete
Checklist Item COMMENTS Passed
Are erosion control BMPs Yes
functioning properly?
Are perimeter control BMPs Yes
maintained?
Is the entrance stabilized to Yes
prevent tracking?
Have sediments been tracked Yes
on to the street?
Has trash/debris accumulated Yes
throughout the site?
Are portable restrooms Yes
properly positioned?
Do portable restrooms have Yes
secondary containment?
08/15/2024 08/15/2024 BLDG-84 Rough 257895-2024 Passed Tony Alvarado Complete
Combo(14,24,34,44)
Monday, November 4, 2024 Page 3 of 6
PERMIT INSPECTION HISTORY for (CBRA2023-0216)
Permit Type: BLDG-Associated Permit Residenti; Application Date: 12/13/2023 Owner:
Work Class: Condo Issue Date: 04/23/2024 Subdivision: RANCHO AGUA HEDIONDA POR
OF
Status: Closed -Finaled Expiration Date: 04/28/2025 Address: 2415 CALENDULA LN
IVR Number: 53802 CARLSBAD, CA 92008-3748
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
Checklist Item COMMENTS Passed
Are erosion control BMPs Yes
functioning properly?
Are perimeter control BMPs Yes
maintained?
Is the entrance stabilized to Yes
prevent tracking?
Have sediments been tracked Yes
on to the street?
Has trash/debris accumulated Yes
throughout the site?
Are portable restrooms Yes
properly positioned?
Do portable restrooms have Yes
secondary containment?
06/12/2024 06/12/2024 BLDG-14 251502-2024 Partial Pass Chris Renfro Reinspection Incomplete
Frame/Steel/Bolting/We
lding (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency 2nd story deck nailing Yes
BLDG-SW-Inspection 251638-2024 Partial Pass Chris Renfro Reinspection Incomplete
Checklist Item COMMENTS Passed
Are erosion control BMPs Yes
functioning properly?
Are perimeter control BMPs Yes
maintained?
Is the entrance stabilized to Yes
prevent tracking?
Have sediments been tracked Yes
on to the street?
Has trash/debris accumulated Yes
throughout the site?
Are portable restrooms Yes
properly positioned?
Do portable restrooms have Yes
secondary containment?
06/25/2024 06/25/2024 BLDG-14 252888-2024 Partial Pass Chris Renfro Reinspection Incomplete
Frame/Steel/Bolting/We
lding (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency 3rd story deck nailing Yes
07/17/2024 07/17/2024 BLDG-15 Roof/ReRoof 255056-2024 Passed Chris Renfro Complete
(Patio)
Monday, November 4, 2024 Page 2 of 6
Building Permit Inspection History Finaled
{city of
Carlsbad
PERMIT INSPECTION HISTORY for (CBRA2023-0216)
Permit Type: BLDG-Associated Permit Residenti, Application Date: 12/13/2023 Owner:
Work Class: Condo Issue Date: 04/23/2024 Subdivision: RANCHO AGUA HEDIONDA POR
OF
Status: Closed -Finaled Expiration Date: 04/28/2025 Address: 2415 CALENDULA LN
IVR Number: 53802 CARLSBAD, CA 92008-3748
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Re inspection Inspection
Date Start Date Status
05/06/2024 05/06/2024 BLDG-21 247389-2024 Passed Chris Renfro Complete
Underground/Underflo
or Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-SW-Inspection 247504-2024 Partial Pass Chris Renfro Reinspection Incomplete
Checklist Item COMMENTS Passed
Are erosion control BMPs Yes
functioning properly?
Are perimeter control BMPs Yes
maintained?
Is the entrance stabilized to Yes
prevent tracking?
Have sediments been tracked Yes
on to the street?
Has trash/debris accumulated Yes
throughout the site?
Are portable restrooms Yes
properly positioned?
Do portable restrooms have Yes
secondary containment?
05/16/2024 05/16/2024 BLDG-11 248634-2024 Passed Chris Renfro Complete
Foundation/Ftg/Piers
(Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-31 248633-2024 Passed Chris Renfro Complete
Underground/Conduit.
Wiring
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-SW-Inspection 248763-2024 Partial Pass Chris Renfro Reinspection Incomplete
Monday, November 4, 2024 Page 1 of 6
RECORD~~ Page 1
lsbad
AUG O 5 2024
Structural BUILDING DIVISION
KB Home -Coral Ridge at Maria Acres Townhomes
Job#: 10-11634
Date of Observation: 08/05/2024
Structura I Observation Report#6
Date: 8/05/2024
Page: I of 6
Structural Observation Requested by: Structural Observation performed by: Area Observed:
Craig Sti nger
D Foundation
D Footing & Slab
D Holdown, Anchor
bolts & associated
Rebar
181 Roof & f-'loor Trusses
181 Roof Sheathing
□ Roof Loaded
181 Second Floor wall
181 Third Floor Wall
□ Fourth Floor Wall
□
□
□
□
Shawn Afshar, PE Building Fl3 (phase4)Lots 11-15
Fram in
Observed Structural Elements and their connections
Floor Sheathing D Roof Sheathing 181 Exterior 181 Framing D Others
2nd Floor 181 I st Level 181 I" Level
3rd Floor 181 2nd Level 181 2"d Level
4th Floor 181 3rd Level 181 3rd Level
□ 4th Level □ 4th Level
Status of Construction
181 Stair Instal led 181 Bathtub Installed
□ Window Installed 181 Preliminary Drywall Installed
□ Flashing Installed 181 Drywall Stacked in Units
□ Building Wrapped □ Drywall on Wall
D Building Stuccoed □ Drywall on Ce iling
181 MEP installation on going 181 Sheathing one side Party Wall
Pursuant to your request, a visit to the project site was made on the above date to perform a structural observation in
conformance with CBC 20 I 6 section 1702 and 1704.6.
Please note, not all symmetric or repetitive areas were observed, therefore please have your field personnel verify the
correction items in all similar areas. Where repair recommendations are given, verify if additional coordination may be
necessary with other trades or design professionals.
The structural observations do not constitute an approval of the work nor do they relieve the contractor or inspection agencies
from complying with project and code requirements. All observations were conducted from the ground or floor level and no
testing or inspection was performed. Our observations do not include a review of the contractors means or methods of
construction, shoring, erection, bracing, nor any associated safety precautions.
T: (714) 978-9780 I F: (714) 978-9788 I w ww.vcastructural.com I 1845 W. Orangewood Ave., Ste. 200 I Orange, CA 92868
Page 2
GENERAL ITEMS
G I. At Exterior and Shear wall, sill plates should have minimum of(2) anchor bolts. One bolt within 12
inches but no less than 7 bolt diameters at the end of a sill plate.
G2. Install MSTA36 strap at the top plates at all shear walls or exterior wal ls wherever the plumbing
penetrates the top plates.
G3. Insta ll additional nailing where shiners are observed in the sheathing.
G4. Notches and bo red holes in structural members larger than allowed by the plans must be identified and
subm itted to our office for review. Please submit RF! on all these structural members to show locations
and size of al l holes and notches and we will provide our recommendations.
GS. At shear walls around openings, the sheathing shall be nailed to common studs at all panel joints
including above and below the opening. In some areas the sheathing was observed to be split onto
adjacent studs. Stitch nail adjacent studs at all panel joints with l6ds at the edge nailing spacing per the
shear wall schedule.
G6. Ensure that all point loads such as from headers, beams have sufficient suppo1t beneath that matches the
width of the beam or girder truss.
G7. Ensure that beam to beam connection hangers receive max. nailing.
G8. All exterior non-shearwalls shou ld have min. l/2"¢anchor bolts@ 48 "o.c. shearwall schedule.
G9. AC line sets that will penetrate shear walls must be brought to the attention of the engineer before
installation.
GI 0. Ensure al I floor diaphragm and shear wall sheathing is no less than 24" wide.
GI I. Install trimmers for beam s and headers per structural plan.
Ensure that fl oor joists are installed per plan .
Headers must fully bear on trimmers, add hardwood shim in the gap or reinstall headers.
Fasteners for pressure preservative treated and fire retardant treated wood sh al I be of hot dipped zinc
coated galvanized or stainless steel. Exception: Provide a letter from the manufacturer of the treated wood
product stating that corrosion resistant fasteners are not required.
Carry all multiple studs, posts or trimmers from floor above down to floor below or beam below. Provide
sol id blocking at floor level to transfer load from upper post/studs/trimmer to lower post/studs/trimmer.
T: (714) 978-9780 IF: (714) 978-9788 J www.vcastructural.com J 1845 W. Orangewood Ave., Ste. 200 J Orange, CA 92868