Loading...
HomeMy WebLinkAbout2425 CALENDULA LN; ; CBRA2023-0217; PermitBuilding Permit Finaled (city of Carlsbad Residential Associated Permit Print Date: 11/04/2024 Job Address: 2425 CALENDULA LN, CARLSBAD, CA 92008-3748 Permit Type: BLDG-Associated Permit Residential Work Class: Parcel#: 2071013500 Track#: Valuation: $341,184.99 Lot#: Occupancy Group: R3/U Project#: #of Dwelling Units: 1 Plan#: Condo CT 16-07 DEV16038 Bedrooms: 3 Construction Type:V-B Bathrooms: Orig. Plan Check#: PC2022-0005 Occupant Load: O Plan Check#: PC2023-0044 Code Edition: 2019 Sprinkled: Yes Project Title: MARJA ACRES Permit No: Status: CBRA2023-0217 Closed -Finaled Applied: 12/13/2023 Issued: 04/23/2024 Finaled Close Out: 11/04/2024 Final Inspection: 10/29/2024 INSPECTOR: Alvarado, Tony Renfro, Chris Description: MARJA ACRES: (CORAL RIDGE) PHASE F5 // BLDG F13 // UNIT 14S // 1688 SF LIV// 493 SF GARAGE Applicant: KB HOME COASTAL INC ELIZABETH SHOEMAKER 9915 MIRA MESA BLVD, # 100 SAN DIEGO, CA 92131-7001 FEE ATTACHED ACCESSORY & UTILITY USES DUP FLRPLN SFD & DUPLEXES PARK IN-LIEU ATTACHED(> 4 UNITS) NW PUBLIC FACILITIES FEES -outside CFD SB1473 -GREEN BUILDING STATE STANDARDS FEE STRONG MOTION -RESIDENTIAL (SMIP) Total Fees: $20,435.49 Total Payments To Date: Building Division $20,435.49 Contractor: KB HOME COASTAL INC 9915 MIRA MESA BLVD, # STE 100 SAN DIEGO, CA 92131-7001 (951) 691-5300 Balance Due: AMOUNT $943.03 $1,302.64 $6,190.00 $11,941.47 $14.00 $44.35 $0.00 Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov PERMIT INSPECTION HISTORY for (CBRA2023-0217) Permit Type: BLDG-Associated Permit Residenti; Application Date: 12/13/2023 Owner: Work Class: Condo Issue Date: 04/23/2024 Subdivision: RANCHO AGUA HEDIONDA POR OF Status: Closed -Finaled Expiration Date: 04/28/2025 Address: 2425 CALENDULA LN IVR Number: 53804 CARLSBAD, CA 92008-3748 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Status Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-Plumbing Final Yes BLDG-Mechanical Final Yes BLDG-Structural Final Yes BLDG-Electrical Final Yes BLDG-SW-Inspection 266236-2024 Passed Tony Alvarado Complete Checklist Item COMMENTS Passed Are erosion control BMPs Yes functioning properly? Are perimeter control BMPs Yes maintained? Is the entrance stabilized to Yes prevent tracking? Have sediments been tracked Yes on to the street? Has trash/debris accumulated Yes throughout the site? Are portable restrooms Yes properly positioned? Do portable restrooms have Yes secondary containment? 10/30/2024 10/30/2024 BLDG-71 Set Ups 266303-2024 Passed Tony Alvarado Complete Checklist Item COMMENTS Passed BLDG-Building Deficiency B-59 form and receipts verified. Yes Monday, November 4, 2024 Page 6 of 6 PERMIT INSPECTION HISTORY for (CBRA2023-0217) Permit Type: BLDG-Associated Permit Residenti; Application Date: 12/13/2023 Owner: Work C lass: Condo Issue Date: 04/23/2024 Subdivision: RANCHO AGUA HEDIONDA POR OF Status: Closed -Finaled Expiration Date: 04/28/2025 Address: 2425 CALENDULA LN IVR Number: 53804 CARLSBAD, CA 92008-3748 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Status 08/22/2024 08/22/2024 BLDG-17 Interior 258682-2024 Passed Tony Alvarado Complete Lath/Drywall Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-SW-Inspection 258927 -2024 Partial Pass Tony Alvarado Reinspection Incomplete Checklist Item COMMENTS Passed Are erosion control BMPs Yes functioning properly? Are perimeter control BMPs Yes maintained? Is the entrance stabilized to Yes prevent tracking? Have sediments been tracked Yes on to the street? Has trash/debris accumulated Yes throughout the site? Are portable restrooms Yes properly positioned? Do portable restrooms have Yes secondary containment? 09/19/2024 09/19/2024 BLDG-Electric Meter 261619-2024 Passed Tony Alvarado Complete Release Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-SW-Inspection 261627-2024 Partial Pass Tony Alvarado Reinspection Incomplete Checklist Item COMMENTS Passed Are erosion control BMPs Yes functioning properly? Are perimeter control BMPs Yes maintained? Is the entrance stabilized to Yes prevent tracking? Have sediments been tracked Yes on to the street? Has trash/debris accumulated Yes throughout the site? Are portable restrooms Yes properly positioned? Do portable restrooms have Yes secondary containment? 10/29/2024 10/29/2024 BLDG-Final Inspection 266020-2024 Passed Tony Alvarado Complete Monday, November 4, 2024 Page 5 of 6 PERMIT INSPECTION HISTORY for (CBRA2023-0217) Permit Type: Work Class: Status: Scheduled Date 08/19/2024 BLDG-Associated Permit Residenti; Application Date: Condo Issue Date: Closed -Finaled Expiration Date: IVR Number: Actual Inspection Type Start Date Inspection No. Checklist Item BLDG-14 Frame-Steel-Bolling-Welding (Decks) BLDG-24 Rough-Topout BLDG-34 Rough Electrical BLDG-44 Rough-Ducts-Dampers COMMENTS BLDG-SW-Inspection Checklist Item 258103-2024 COMMENTS Are erosion control BMPs functioning properly? Are perimeter control BMPs maintained? Is the entrance stabilized to prevent tracking? Have sediments been tracked on to the street? Has trash/debris accumulated throughout the site? Are portable restrooms properly positioned? Do portable restrooms have secondary containment? 08/19/2024 BLDG-16 Insulation Checklist Item 258321-2024 COMMENTS BLDG-Building Deficiency BLDG-SW-Inspection Checklist Item 258464-2024 COMMENTS Are erosion control BMPs functioning properly? Are perimeter control BMPs maintained? Is the entrance stabilized to prevent tracking? Have sediments been tracked on to the street? Has trash/debris accumulated throughout the site? Are portable restrooms properly positioned? Do portable restrooms have secondary containment? Monday, November 4, 2024 12/13/2023 04/23/2024 04/28/2025 53804 Inspection Status Owner: Subdivision: RANCHO AGUA HEDIONDA POR OF Address: 2425 CALENDULA LN CARLSBAD, CA 92008-3748 Primary Inspector Reinspection Inspection Passed Yes Yes Yes Yes Partial Pass Tony Alvarado Reinspection Incomplete Passed Yes Yes Yes Yes Yes Yes Yes Passed Tony Alvarado Complete Passed Yes Partial Pass Tony Alvarado Reinspect ion Incomplete Passed Yes Yes Yes Yes Yes Yes Yes Page 4 of 6 PERMIT INSPECTION HISTORY for (CBRA2023-0217) Permit Type: BLDG-Associated Permit Residenti, Application Date: 12/13/2023 Owner: Work Class: Condo Issue Date: 04/23/2024 Subdivision: RANCHO AGUA HEDIONDA POR OF Status: Closed -Finaled Expiration Date: 04/28/2025 Address: 2425 CALENDULA LN IVR Number: 53804 CARLSBAD, CA 92008-3748 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Status Checklist Item COMMENTS Passed Are erosion control BMPs Yes functioning properly? Are perimeter control BMPs Yes maintained? Is the entrance stabilized to Yes prevent tracking? Have sediments been tracked Yes on to the street? Has trash/debris accumulated Yes throughout the site? Are portable restrooms Yes properly positioned? Do portable restrooms have Yes secondary containment? 07/17/2024 07/17/2024 BLDG-15 Roof/ReRoof 255055-2024 Partial Pass Chris Renfro Re inspection Incomplete (Patio) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-SW-Inspection 255136-2024 Partial Pass Chris Renfro Reinspection Incomplete Checklist Item COMMENTS Passed Are erosion control BMPs Yes functioning properly? Are perimeter control BMPs Yes maintained? Is the entrance stabilized to Yes prevent tracking? Have sediments been tracked Yes on to the street? Has trash/debris accumulated Yes throughout the site? Are portable restrooms Yes properly positioned? Do portable restrooms have Yes secondary containment? 08/06/2024 08/06/2024 BLDG-13 Shear 256999-2024 Passed Chris Renfro Complete Panels/HD (ok to wrap) • Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 08/15/2024 08/15/2024 BLDG-84 Rough 257894-2024 Passed Tony Alvarado Complete Combo(14,24,34,44) Monday, November 4, 2024 Page 3 of 6 PERMIT INSPECTION HISTORY for (CBRA2023-0217) Permit Type: BLDG-Associated Permit Residenti; Application Date: 12/13/2023 Owner: Work Class: Condo Issue Date: 04/23/2024 Subdivision: RANCHO AGUA HEDIONDA POR OF Status: Closed -Finaled Expiration Date: 04/28/2025 Address: 2425 CALENDULA LN IVR Number: 53804 CARLSBAD, CA 92008-3748 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Status Checklist Item COMMENTS Passed Are erosion control BMPs Yes functioning properly? Are perimeter control BMPs Yes maintained? Is the entrance stabilized to Yes prevent tracking? Have sediments been tracked Yes on to the street? Has trash/debris accumulated Yes throughout the site? Are portable restrooms Yes properly positioned? Do portable restrooms have Yes secondary containment? 06/12/2024 06/12/2024 BLDG-14 251503-2024 Partial Pass Chris Renfro Reinspection Incomplete Frame/Steel/Bolting/We ldlng (Decks) Checklist Item COMMENTS Passed BLDG-Building Deficiency 2nd story deck nailing Yes BLDG-SW-Inspection 251639-2024 Partial Pass Chris Renfro Reinspection Incomplete Checklist Item COMMENTS Passed Are erosion control BMPs Yes functioning properly? Are perimeter control BMPs Yes maintained? Is the entrance stabilized to Yes prevent tracking? Have sediments been tracked Yes on to the street? Has trash/debris accumulated Yes throughout the site? Are portable restrooms Yes properly positioned? Do portable restrooms have Yes secondary containment? 06/25/2024 06/25/2024 BLDG-14 252887-2024 Partial Pass Chris Renfro Re inspection Incomplete Frame/Steel/Bolting/We lding (Decks) Checklist Item COMMENTS Passed BLDG-Building Deficiency 3rd story deck nailing Yes BLDG-SW-Inspection 252988-2024 Partial Pass Chris Renfro Re inspection Incomplete Monday, November 4, 2024 Page 2 of 6 Building Permit Inspection History Finaled {cityof Carlsbad PERMIT INSPECTION HISTORY for (CBRA2023-0217) Permit Type: BLDG-Associated Permit Residenti; Application Date: 12/13/2023 Owner: Work Class: Condo Issue Date: 04/23/2024 Subdivision: RANCHO AGUA HEDIONDA POR OF Status: Closed -Finaled Expiration Date: 04/28/2025 Address: 2425 CALENDULA LN IVR Number: 53804 CARLSBAD, CA 92008-3748 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Re inspection Inspection Date Start Date Status 05/06/2024 05/06/2024 BLDG-21 247390-2024 Passed Chris Renfro Complete Underground/Underflo or Plumbing Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-SW-Inspection 247503-2024 Partial Pass Chris Renfro Reinspect ion Incomplete Checklist Item COMMENTS Passed Are erosion control BMPs Yes functioning properly? Are perimeter control BMPs Yes maintained? Is the entrance stabilized to Yes prevent tracking? Have sediments been tracked Yes on to the street? Has trash/debris accumulated Yes throughout the site? Are portable restrooms Yes properly positioned? Do portable restrooms have Yes secondary containment? 05/16/2024 05/1 6/2024 BLDG-11 248636-2024 Passed Chris Renfro Complete Foundation/Ftg/Piers (Rebar) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-31 248635-2024 Passed Chris Renfro Complete Underground/Conduit - Wiring Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-SW-Inspection 248761-2024 Partial Pass Chris Renfro Reinspection _Incomplete Monday, November 4, 2024 Page 1 of 6 VCJI Structural AUG O 5 2024 BUILDING DIVISION KB Home -Coral Ridge at Marja Acres Townhomes Job #: 10-11634 Date of Observation: 08/05/2024 Structural Observation ReportH6 Date: 8/05/2024 Page: I of 6 Structural Obser\'ation Requested by: Structural Observation performed by: Area Observed: Craig Stinger Shawn A fshar, PE BuildingFl 3(phase4)Lots 11-15 Framing Observed Structural Elements and their connections □ Foundation □ Floor Sheathing D Roof Sheathing 181 Exterior 181 Framing D Others □ Footing & Slab □ 2nd Floor 181 1st Level 181 I" Level □ I loldown, A nchor □ 3rd Floor 181 2nd Level 181 2nd Level bolts & associated □ 4th Floor 181 3rd Level 181 3rd Level Rebar □ 41h Level □ 4th Level Status of Construction 18! Roof & Floor Trusses 181 Stair Installed 18! B:nhtltb Installed 181 Roof Sheathing □ Window Installed 181 Preliminary Drywall Installed □ Roof Loaded □ Flashing Installed 181 Drywall Stacked in Units 181 Second Floor wall □ Building Wrapped □ Dr;wall on Wall 181 Third Floor Wall D Building Stuccoed □ Drywall on Ceiling □ Fourth Floor Wall 181 l\1FP installation on going 181 Sheathing one side Part) Wall Pursuant to your request, a visit to the proj ect site was made on the above date to perform a structural observation in conformance with CBC 2016 section 1702 and 1704.6. Please note, not all symmetric or repetitive areas were observed, therefore please have your field personnel verify the correction items in all similar areas. Where repair recommendations are given. verify if additional coordination may be necessary with other trades or design professionals. The structural observations do not constitute an approval of the work nor do they relieve the contractor or inspection agencies from complying with project and code requirements. All observations were conducted from the ground or floor level and no testing or inspection was performed. Our observations do not include a review o f the contractors means or methods o f construction, shoring, erection, bracing, nor any associated safety precautions. -T: (714) 978-9/80 IF: (714) 978-9788 I www.vcastrue111ral.com I 1845 W. Orangewood Ave., Ste. 200 I Orange, CA 9)868