Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2025-01-30; On -Street Parking in the Village (District 1); Gomez, Paz
To the members of the: CITY COUNCIL Date l/~eil25°"cA /cc V CM -~-ACM _VOOI_ DCM (3) 2 Council Memorandum January 30, 2025 To: From: Via: Re: Honorable Mayor Blackburn and Members of the City Council Paz Gomez, Deputy City Manager, Public Works Sheila Cobian, Assistant City Manager ~'{20 On-Street Parking in the Village (District 1) {city of Carlsbad Memo ID# 2025018 This memorandum provides an update to staff efforts to maximize on-street parking in the Downtown Village area. Background Staff have initiated efforts to evaluate on-street parking in the Village and identify areas where currently prohibited parking may be modified to allow parking. While traffic safety is a high priority, and staff will continue to respond to concerns regarding sight distance, development and land use changes may invalidate previously established parking prohibitions. For example, red curb associated with an unused driveway opening may be re-purposed to accommodate parking. Discussion In November and December 2024, staff conducted a field review of the on-street parking in the Village. This area is generally bounded by the Pacific Ocean (west), Interstate 5 (1-5) freeway (east), Laguna Street (north) and Chestnut Avenue (south). Prohibited parking areas, whether denoted by painted curb or signage, were evaluated. If determined to be associated with limited sight distance, no changes were proposed. The new "California Daylighting Law" or Assembly Bill 413, which makes it illegal for drivers to park within 20 feet of the vehicle approach side of any marked or unmarked crosswalk or within 15 feet of any crosswalk where a curb extension is present, was also considered along with any associated parking prohibition that was not marked. A total of 288 feet of red curb was identified for removal. Additionally, removal of two parking signs and striping of one additional diagonal parking space contributed to the restoration of approximately 15 parking spaces. These modifications were issued as work orders, as shown in Attachment A, and were completed last Friday. Please see Figures 1 and 2 below, as reference. Public Works Branch Transportation Department 1635 Faraday Avenue I Carlsbad, CA 92008 I 442-339-5332 t Council Memo -On-Street Parking in the Village (District 1} January 30, 2025 Page 2 Figure 1: 20 Feet No Parking Zone Figure 2: 15 Feet No Parking Zone at Curb Extension I',.:.. •. )( , • -: • ,... , • . . . , -· • . . ,.... . • " •,.' '. ,. Next Steps Staff are continuing with a review of additional areas to evaluate as part of a second phase effort. This evaluation is expected to be completed by the end_ of February 2025. Attachment: A. On-Street Parking Evaluation and Work Orders cc: Geoff Patnoe, City Manager Cindie McMahon, City Attorney Gary Barberio, Deputy City Manager, Community Services Laura Rocha, Deputy City Manager, Administrative Services Christie Calderwood, Police Chief Michael Calderwood, Fire Chief Gina Herrera, Assistant City Attorney Tom Frank, Transportation Director/City Engineer Jeff Murphy, Community Development Director Kristina Ray, Communication & Engagement Director John Kim, City Traffic Engineer Miriam Jim, Senior Engineer Carlsbad Village & Barrio Area ATTACHMENT A BUE V1STA LA OOH BUENAPL ,-en 0 I I-UJ en it z 0 l~ ffi u. 1oc I.JI l) Project Summary Net Gain of 14-15 on-street parking spots 1. Madison St S/O Walnut Ave: Remove 32 feet of red curb. Gain 2 on-street parking spots. 2. Grand Avenue (869): Remove 41 feet of red curb. Gain 2 street on-parking spots. 3. Washington St at Oak Ave: Remove 16 feet of red curb. Gain 1 on-street parking spot. 4. Grand Ave (585): Add 1 diagonal street parking spot. Gain 1 on-street parking spot. 5. State St (2548): Remove 15 feet of red curb. Gain 1 on-street parking spot. 6. Harding St N/O Chestnut Ave: Remove 88 cumulative feet of red curb. Gain 4 on-street parking spots. 7. Pine Park Driveways on Harding St: Remove 55 feet of red curb and add red curb at driveways for sight distance. Gain 1 on-street parking spot. 6. Harding St N/O 906 Pine Ave: Remove R26(CA) & R81 B(CA) sign. Gain 1 on-street parking spot. 9. Harding St (3060): Remove R32(CA) sign and 41 feet of white curb. Gain 2 on-street parking spots. 12/3/2024, 4:24:59 PM Water Feature -Railroad Street Name --Major Minor Alley Private D City Boundary Public Access 0 0 1:9,028 0.07 0.15 0.3mi 0.13 0.25 0.5km Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, © OpenStreetMap contributors, and the GIS User Community ArcGIS Web AppBuilder Copyright nearmap 2015 I Esri, TomTom, Garmin, FAO, NOAA, USGS, EPA, USFWS I CITY OF CARLSBAD PUBLIC WORKS BRANCH NO. DATE ___ BY_EM_ TO: MICHAEL O'BRIEN, PUBLIC WORKS SUPERINTENDENT FROM: JOHN KIM, CITY TRAFFIC ENGINEER WORK ORDER TR# 132757 RES/ORD# NIA CARTEGRAPH TASK#----- LOCATION: 29 FEET S/O 3306 MADISON STREET DRIVEWAY PROJECT: REMOVE 32 FEET OF RED CURB JUSTIFICATION: EXISTING RED CURB NO LONGER NEEDED. GAIN 2 STREET PARKING SPOTS. WHEN COMPLETED, RETURN TO: WORK TO BE DONE CD REMOVE RED CURB. PAINT 32 FEET OF GREY CURB OVER EXISTING RED CURB TO THE SOUTH OF 3306 MADISON STREET DRIVEWAY. NOT TO SCALE DATE COMPLETED ____ BY __ (Traffic & Mobility Division) 1. Eduardo Martinez Ext. 5377 SHEET 1 OF 9 CITY OF CARLSBAD PUBLIC WORKS BRANCH TO: MICHAEL O'BRIEN, PUBLIC WORKS SUPERINTENDENT FROM: JOHN KIM, CITY TRAFFIC ENGINEER WORK ORDER LOCATION: GRAND AVENUE (869) PROJECT: REMOVE 41 FEET OF RED CURB NO. DATE ___ BY__EM__ TR# 132757 RES/ORD# N /A CARTEGRAPH TASK#----- JUSTIFICATION: SHORTEN EXISTING RED CURB AT BUS STOP. GAIN 2 STREET PARKING SPOTS. WORK TO BE DONE 0 EXISTING RED CURB, 56 FEET OF RED CURB TO REMAIN. 0 REMOVE RED CURB. PAINT 41 FEET OF GREY CURB OVER EXISTING RED CURB. NOT TO SCA!£ DATE COMPLETED ____ BY __ WHEN COMPLETED, RETURN TO: (Traffic & Mobility Division) 1. Eduardo Martinez Ext. 5377 SHEET 2 OF 9 CITY OF CARLSBAD PUBLIC WORKS BRANCH TO: MICHAEL O'BRIEN, PUBLIC WORKS SUPERINTENDENT FROM: JOHN KIM, CITY TRAFFIC ENGINEER WORK ORDER LOCATION: WASHINGTON STREET AT OAK AVENUE PROJECT: REMOVE 16 FEET OF RED CURB NO. DATE ___ BY__EM_ TR# 132757 RES/ORD# N/A CARTEGRAPH TASK#----- JUSTIFICATION: SHORTEN EXISTING RED CURB APPROACHING INTERSECTION, AB413 PROHIBITS PARKING WITHIN 20 FEET OF A CROSSWALK. GAIN 1 STREET PARKING SPOT. @/ ~ WORK TO BE DONE CD EXISTING RED CURB. 20 FEET OF RED CURB TO REMAIN. 0 REMOVE RED CURB. PAINT 16 FEET OF GREY CURB OVER EXISTING RED CURB. NOT TO SCAl£ DATE COMPLETED ____ BY __ WHEN COMPLETED, RETURN TO: (Traffic & Mobility Division) 1. Eduardo Martinez Ext. 5377 SHEET 3 OF 9 CITY OF CARLSBAD PUBLIC WORKS BRANCH TO: MICHAEL O'BRIEN, PUBLIC WORKS SUPERINTENDENT FROM: JOHN KIM, CITY TRAFFIC ENGINEER WORK ORDER LOCATION: GRAND AVENUE 585 NO. DATE ___ BY__EM_ TR# 132757 RES/ORD# N /A CARTEGRAPH TASK#----- PROJECT: PAINT 1 DIAGONAL PARKING SPOT & PAINT RED CURB JUSTIFICATION: AD 1 STREET PARKING SPOT 585 WORK TO BE DONE 0 PAINT 4 INCH WHITE LINE AS SHOWN FOR ADDITIONAL DIAGONAL PARKING SPOT. 0 PAINT 6 FEET OF RED CURB, AS SHOWN. 0 EXISTING RED CURB AT FIRE HYDRANT, TO REMAIN. NOT TO SCALE DATE COMPLETED ____ BY __ WHEN COMPLETED, RETURN TO: (Traffic & Mobility Division) 1. Eduardo Martinez Ext. 5377 SHEET 4 OF 9 CITY OF CARLSBAD PUBLIC WORKS BRANCH TO: MICHAEL O'BRIEN, PUBLIC WORKS SUPERINTENDENT FROM: JOHN KIM, CITY TRAFFIC ENGINEER WORK ORDER LOCATION: STA TE ST (2548) PROJECT: REMOVE 15 FEEr OF RED CURB NO. DATE ___ BY____EM_ TR# 132757 RES/ORD# N /A CARTEGRAPH TASK#----- JUSTIFICATION: REMOVE SEGMENT OF RED CURB. GAIN 1 STREET PARKING SPOT. 2548 WORK TO BE DONE 0 REMOVE RED CURB LOCATED 23 FEET NORTH OF 2548 STATE STREET DRIVEWAY. PAINT 15 FEET OF GREY CURB OVER EXISTING RED CURB. 0 EXISTING RED CURB (10 FEET), TO REMAIN. ~ NOT TO SCALE DATE COMPLETED ____ BY __ WHEN COMPLETED, RETURN TO: (Traffic & Mobility Division) 1. Eduardo Martinez Ext. 5377 SHEET 5 OF 9 CITY OF CARLSBAD PUBLIC WORKS BRANCH TO: MICHAEL O'BRIEN, PUBLIC WORKS SUPERINTENDENT FROM: JOHN KIM, CITY TRAFFIC ENGINEER WORK ORDER LOCATION: HARDING ST AT CHESTNUT AVE PROJECT: REMOVE 88 FEET OF RED CURB NO. DATE, ___ BY~ TR# 132757 RES/ORD# N /A CARTEGRAPH TASK#----- JUSTIFICATION: EXISTING RED CURB NO LONGER NEEDED. CONFIRMED WITH TODD REESE FROM PARKS AND RECREATION. GAIN 4 STREET PARKING SPOTS. 910 WORK TO BE DONE 0 EXISTING RED CURB, 20 FEET OF RED CURB TO REMAIN . 0 REMOVE RED CURB. PAINT 30 FEET OF GREY CURB OVER EXISTING RED CURB . 0 REMOVE RED CURB. PAINT 20 FEET OF GREY CURB OVER EXISTING FADED RED CURB. CD REMOVE RED CURB. PAINT 38 FEET OF GREY CURB OVER EXISTING RED CURB. ~ NOT TO SCAl£ DATE COMPLETED ____ BY __ WHEN COMPLETED, RETURN TO: (Traffic & Mobility Division) 1. Eduardo Martinez Ext. 5377 SHEET 6 OF 9 CITY OF CARLSBAD PUBLIC WORKS BRANCH NO. DATE ___ BY_EM_ TR# 132757 TO: MICHAEL O'BRIEN, PUBLIC WORKS SUPERINTENDENT RES/ORD# NIA CARTEGRAPH TASK#-----FROM: JOHN KIM, CITY TRAFFIC ENGINEER WORK ORDER LOCATION: HARDING ST (PINE PARK ENTRANCEtEXIT DRIVEWAYS) PROJECT: PAINT RED CURB & REMOVE 55 FE T OF RED CURB JUSTIFICATION: SHORTEN EXISTING RED CURB AND ADDED NEW RED CURB AT DRIVEWAYS FOR SIGHT WHEN COMPLETED, RETURN TO: DISTANCE. CONFIRMED WITH TODD REESE FROM PARKS AND RECREATION. GAIN 1 STREET PARKING SPOT. WORK TO BE DONE (i) REFRESH 20 FEET OF EXISTING RED CURB PAINT. PAINT 4 FEET OF RED CURB FROM TOP OF PED RAMP TO EXISTING RED CURB. PAINT 5 FEET OF RED CURB TO THE NORTH OF EXISTING RED CURB. G) PAINT 19 FEET OF RED CURB FROM TOP OF PED RAMP, AS SHOWN . 0 25 FEET OF EXISTING RED CURB TO REMAIN, AS SHOWN. PAINT 5 FEET OF RED CURB FROM TOP OF PED RAMP TO EXISTING RED CURB. REMOVE RED CURB, PAINT 55 FEET OF GREY CURB OVER EXISTING RED CURB. 0 PAINT 8 FEET OF RED CURB FROM TOP OF PED RAMP TO PCR. PAINT 15 FEET OF RED CURB FROM PCR, AS SHOWN. ~ NOT TO SCALE DATE COMPLETED ____ BY __ (Traffic & Mobility Division) 1. Eduardo Martinez Ext. 5377 SHEET 7 OF 9 CITY OF CARLSBAD PUBLIC WORKS BRANCH TO: MICHAEL O'BRIEN, PUBLIC WORKS SUPERINTENDENT FROM: JOHN KIM, CITY TRAFFIC ENGINEER WORK ORDER NO. DATE ___ BY_EM_ TR# 132757 RES/ORD# N /A CARTEGRAPH TASK#----- LOCATION: HARDING ST N /0 906 PINE AVE DRIVEWAY PROJECT: REMOVE EXISTING R26 (CA) & R81 B (CA) SIGNS JUSTIFICATION: EXISTING SIGNS NO LONGER NEEDED WITH NEW DEVELOPMENT AT 906 PINE AVENUE. GAIN 1 STREET PARKING SPOT. WORK TO BE DONE SGN13341 SGN13342 906 CD REMOVE EXISTING R26 (CA), "NO PARKING ANYTIME" SIGN, REMOVE EXISTING R81B (CA) "END" SIGN, REMOVE EXISTING TELESPAR POST, AND REMOVE POST ANCHOR. REMOVE SGN13341 & SGN13342 FROM GIS DATABASE/MAP. ~ NOT TO SCA!£ DATE COMPLETED ___ BY __ WHEN COMPLETED, RETURN TO: (Traffic & Mobility Division) 1. Eduardo Martinez Ext. 5377 SHEET 8 OF 9 CITY OF CARLSBAD PUBLIC WORKS BRANCH TO: MICHAEL O'BRIEN, PUBLIC WORKS SUPERINTENDENT FROM: JOHN KIM, CITY TRAFFIC ENGINEER WORK ORDER NO. DATE ___ BY_EM_ TR# 132757 RES/ORD# N/A CARTEGRAPH TASK#----- LOCATION: HARDING STREET (3060) PROJECT: REMOVE 41 FEET OF WHITE CURB AND REMOVE R32 (CA) SIGN JUSTIFICATION: LIMITED-TIME PARKING IS NOT NEEDED. CONFIRMED WITH TODD REESE FROM PARKS AND RECREATION. GAIN 2 STREET PARKING SPOTS. 3060 WORK TO BE DONE 0 REMOVE WHITE CURB. PAINT 41 FEET OF GREY CURB OVER EXISTING WHITE CURB. 0 REMOVE EXISTING R32 (CA), "3-MINUTE PARKING" SIGN. REMOVE EXISTING TELESPAR POST, AND REMOVE EXISTING POST ANCHOR. REMOVE SGN13316 FROM GIS DATABASE/MAP. NOT TO SCALE DATE COMPLETED· ____ BY __ WHEN COMPLETED, RETURN TO: (Traffic & Mobility Division) 1. Eduardo Martinez Ext. 5377 SHEET 9 OF 9