Loading...
HomeMy WebLinkAbout2025-02-04; City Council; Resolution 2025-033RESOLUTION NO. 2025-033 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, AUTHORIZING AN INCREASE TO THE CITY MANAGER'S CHANGE ORDER AUTHORITY FOR AN ADDITIONAL $150,000.00 FOR CONSTRUCTION OF THE TRAFFIC CALMING IMPROVEMENTS ON PARK DRIVE, BLACK RAIL ROAD, PLUM TREE ROAD AND CARRILLO WAY, AS PART OF CAPITAL IMPROVEMENT PROGRAM PROJECT NO. 6070 WHEREAS, on June 18, 2024, the City Council of the City of Carlsbad, California adopted Resolution No. 2024-137, awarding a $247,922.00 construction contract to Quality Construction & Engineering, Inc. for the traffic calming improvements on Park Drive, Black Rail Road, Plum Tree Road and Carrillo Way, Capital Improvement Program, or CIP, Project No. 6070, or Project; and WHEREAS, the Project scope includes installation of speed cushions on Park Drive, Black Rail Road, Plum Tree Road, and Carrillo Way, along with curb extensions at two intersections on Plum Tree Road-Hidden Valley Road and Coneflower Drive; and WHEREAS, the contractor began work in September 2024; and WHEREAS, during construction of the curb extensions on Plum Tree Road at Coneflower Drive, it was discovered that the lip of the gutter for the new curbline at the northwest corner must be lower than the existing pavement to ensure proper drainage and maintain positive water flow during rain events; and WHEREAS, this adjustment requires the roadway pavement at the intersection to be lowered by grinding before overlaying with asphalt to create a smoother transition; and WHEREAS, this additional work is estimated to increase the Project costs by $54,000.00; and WHEREAS, the concrete quantity for the sidewalk reconstruction has exceeded the original bid estimate, resulting in an additional cost of approximately $96,000.00; and WHEREAS, staff have determined that an additional $150,000.00 in project budget and change order authority is required to complete the work; and WHEREAS, staff are requesting authorization to increase the City Manager's change order authority for an additional $150,000.00 for this Project; and WHEREAS, sufficient funds are available in the Residential Traffic Improvement Program funds in CIP Project No. 6070 to complete the Project; and WHEREAS, the City Planner has determined that the project is exempt from the California Environmental Quality Act, or CEQA, under CEQA Guidelines Section 15301(c), which covers the repair, maintenance, or minor alteration of existing public structures or facilities involving negligible or no expansion of use; and WHEREAS, a notice of exemption was filed with the San Diego County Clerk and the California State Clearinghouse on May 9, 2024. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the City Manager, or designee, is hereby authorized to approve construction change orders for traffic calming improvements on Park Drive, Black Rail Road, Plum Tree Road and Carrillo Way, in CIP Project No. 6070, for an additional amount of $150,000.00. PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 4th day of February 2025, by the following vote, to wit : AYES : NAYS: ABSTAIN: ABSENT: Blackburn, Bhat-Patel, Acosta, Shin . None. Burkholder. None. KEITH BLACKBURN, Mayor