HomeMy WebLinkAbout2025-02-03; Traffic Safety and Mobility Commission; 03; Barrio Lighting Phase 2 Project, Capital Improvement Program Project No. 4013Meeting Date: Feb. 3, 2025 To: Traffic Safety & Mobility Commission Staff Contact: Hossein Ajideh, Engineering Manager hossein.ajideh@carlsbadca.gov, 442-339-2756 Subject: Barrio Lighting Phase 2 Project, Capital Improvement Program Project No. 4013 Recommended Action Provide feedback and support staff’s recommendation to the City Council to approve the plans and specifications of the Barrio Lighting Phase 2 Project, Capital Improvement Program (CIP) Project No. 4013. Background The Barrio is the City of Carlsbad’s oldest neighborhood and home to the senior center, Harding and Pine community centers, Chase Field, Pine Avenue Community Park, a community garden, and ballfields used by residents from throughout the city. To enhance safety and livability in this neighborhood, and values emphasized in the Village and Barrio Master Plan, the city is making improvements to lighting in the area. The first phase of the project focused on vehicular scale street lighting. The second phase of the infrastructure project focuses on adding new pedestrian lights to enhance pedestrian visibility and safety while creating a welcoming streetscape during evening hours. Staff are seeking feedback regarding the pedestrian light locations and recommendation of approval from the Traffic Safety & Mobility Commission to the City Council for the design of the Barrio Lighting Project. New streetlights – Phase 1 Thirteen new streetlights were added to the Barrio in 2021/2022 as part of Phase 1 of the Barrio Lighting Project. Locations were selected based on prior community input from the development of the Village and Barrio Master Plan, technical analysis, city engineering standards and lighting guidelines for where there was little to no existing streetlights. Streetlights are mounted on higher, 24-foot new poles or existing utility poles to ensure street crossings and intersections are well lit for drivers, bicyclists and pedestrians. TRAFFIC SAFETY & MOBILITY COMMISSION Feb. 3, 2025 Item #3 Page 1 of 66 Staff Report Pedestrian lights – Phase 2 About 130 new pedestrian-scale lights are proposed throughout the Barrio to enhance sidewalk illumination and improve safety for people walking after dark. • The new lights are considered “pedestrian lights,” rather than streetlights. • They are smaller than the existing streetlights, on shorter, 17-foot poles and not as bright. • The lights are light emitting diode (LED) and the color temperature will be 3,000 Kelvin, which will have a warmer color than the lights in the Village and the Barrio’s existing streetlights, while producing the same amount of lumens. • Based on community feedback, the city will use the same style of lights that are currently used in the Village. Community feedback The Barrio Lighting Project was developed as part of the Village and Barrio Master Plan, which included significant input from the community. Since that time, staff have kept the community informed about the project and invited feedback. In 2022, the city gathered community input to help understand where more lighting was needed. Most recently, staff have notified affected property owners, business owners, residents and others who may be interested in the project of the proposed locations through a direct mailer which was in English and Spanish. The mailer was also left on the front door of properties where construction of the lighting poles would need permission for right of entry and staff placed copies at all the city facilities in the Barrio. These community members were invited to contact the city’s project manager with questions or concerns. Staff also notified others who may be interested in the project through email updates and on Nextdoor. Feb. 3, 2025 Item #3 Page 2 of 66 Example pedestrian light on Roosevelt Street* *Exact location may vary. Trees may be tnmmed to accommodate new lights. Ultimately, locations were chosen based on community input and technical lighting studies evaluating darkness levels, while ensuring the preservation of the area's large city trees. As staff continue to get community feedback, light locations will be finalized. In the case where there is feedback about removing a certain light location, staff will re-evaluate the lighting study and make a determination if the illumination in the area is sufficient without the new pedestrian light. Federal grant In 2021, the city collaborated with U.S. Representative Mike Levin to secure $5 million in federal funding for projects in the Barrio. This funding includes $4 million to support the construction of the Barrio Traffic Circles Project and $1 million to offset the construction costs of the Barrio Lighting Project. To obtain the grant, the city has been working with Caltrans, who administers the grant, and has recently completed the necessary environmental clearance and the right-of-way certification. In order to use the federal funds, this project must be provided an Authorization to Proceed from Caltrans and the funds must be obligated to the project by September 2025. Next Steps Following feedback and support from the Traffic Safety & Mobility Commission, staff will finalize the locations and plans as needed and go to the City Council with a recommendation to approve the plans, specifications, and contract documents, and authorize the City Clerk to advertise for construction bids for new pedestrian lights in the Barrio. Exhibits 1. Proposed location map 2. Improvement plans Feb. 3, 2025 Item #3 Page 3 of 66 Proposed locations for new pedestrian lights in the Barrio •• •• Harding • co;e~~~lty • • • • • • • • •• • • • • • • • • • • • • • • •••• .. •community • Center • • Senior • Center • •• • • • ~--·· • • Boys & Girls Club Pine Park • • • ••••• • • ••• • (City of Carlsbad 3. Public Input Report 4. Recent resident feedback on pedestrian light locations Feb. 3, 2025 Item #3 Page 4 of 66 I- 5 M A D I S O N S T CHESTN U T A V H A R D I N G S T R O O S E V E L T S T S T A T E S T PINE AV C A R L S B A D B L CARLS B A D V I L L A G E D R TAMARA C K A V JE F F E R S O N S T OAK AV MAGNOLIA AV PLO TTED BY: Andy Cha ng PLO T DATE: 1/29/2025 PATH: Z:\Eric_Zielke\Barrio_ Wate rAndSewer\LocMap_BarrioLightin gPha seII.mxd PROJECT NAME EXHIBITPROJECTNUMBERCIP 4013 1BARRIO LIGHTING PHASE 2 LOCATION MAP CARLSBAD VISTA SAN MARCOS ENCINITAS OCEANSIDE CIP 4013 PROJECT LIMIT Exhibit 1 Feb. 3, 2025 Item #3 Page 5 of 66 ®www.imegcorp.com PH: 858.368.340013400 SABRE SPRINGS PARKWAY SUITE 225 SAN DIEGO, CA 92128 CONSTRUCTION PLANS FOR BARRIO LIGHTING PHASE 2 PROJECT NO. CITY OF CARLSBAD CARLSBAD, CA CITY COUNCIL KEITH BLACKBURN - MAYOR PRIYA BHAT-PATEL - MAYOR PRO TEM MELANIE BURKHOLDER - COUNCIL MEMBER TERESA ACOSTA - COUNCIL MEMBER KEVIN SHIN - COUNCIL MEMBER GEOFF PATNOE CITY MANAGER PAZ GOMEZ DEPUTY CITY MANAGER LOCATION MAP N.T.S. THE BARRIO NEIGHBORHOOD SHEET INDEX DRAWING NUMBER DESCRIPTION VICINITY MAP N.T.S. SOURCE OF TOPOGRAPHY AERIAL IMAGERY AND UTILITY LOCATIONS SHOWN ON THESE PLANS WAS GENERATED BY GIS METHODS FROM INFORMATION GATHERED FROM THE CITY OF CARLSBAD AND SanGIS. RIGHT-OF-WAY AND PROPERTY LINES ARE APPROXIMATE AND ARE NOT SURVEYED AS PART OF THIS PROJECT. Exhibit 2 Feb. 3, 2025 Item #3 Page 6 of 66 J -Iii 0 I g i C .ll '" SIOf. .. -~r.ti:..-~ (' CA \ •. Ill Walmart SiJpercen1er~ Calavera Pk Q asavon Pa'lern. I Paving tC EA.f( HILLS " ., Walmart Supe,:center f+' lj)bb q cruckeo v;s,~ Buemi Vista Park Carl -vH \ \ Contraclor San Diego Co .. CALAVE.IM HILLS VILL4GE l Q PROJECT AREA Tamarac Surf Beech EOOO E100 E101 E200 E201 E202 E203 E204 E205 E206 E207 E20B E209 E210 E211 E212 E213 E214 E215 E300 E301 E302 E303 \ ad.$,ln:iwbe~8 'Compan T \ c"""""fl.:J TEiRAM-/l \\•,.. ~ LEGOLANO C8hfornre 9 ~""" <'!I Po1c.,r1W T :i;; \ \ Poinsettia Pk ; ~.. ~ 'f 1:J .O.Vl..,RA \ '1'\So lsMd ~Courtyard b)' Marriott T San Diego Garlsbad Alga Norte Pk Y stat ~ Park Hya1t Aviara \ T Res on, Golf Club & Spa Liflfgu.ard Tower 23 PROJECT INFORMATION OVERALL ELECTRICAL SITE PLAN AND GENERAL NOTES OVERALL ELECTRICAL SITE PLAN CIRCUITS DESIGNATION PARTIAL ELECTRICAL SITE PLAN (ROOSEVELT STREET) PARTIAL ELECTRICAL SITE PLAN {ROOSEVELT STREET) PARTIAL ELECTRICAL SITE PLAN {ROOSEVELT STREET) PARTIAL ELECTRICAL SITE PLAN {MADISON STREET) PARTIAL ELECTRICAL SITE PLAN {MADISON STREET) PARTIAL ELECTRICAL SITE PLAN (MADISON STREET) PARTIAL ELECTRICAL SITE PLAN {JEFFERSON STREET) PARTIAL ELECTRICAL SITE PLAN (HARDING STREET) PARTIAL ELECTRICAL SITE PLAN (HARDING STREET) PARTIAL ELECTRICAL SITE PLAN {HARDING STREET) PARTIAL ELECTRICAL SITE PLAN (OAK AVENUE) PARTIAL ELECTRICAL SITE PLAN {OAK AVENUE) PARTIAL ELECTRICAL SITE PLAN {PINE AVENUE) PARTIAL ELECTRICAL SITE PLAN {CHESTNUT AVENUE) PARTIAL ELECTRICAL SITE PLAN (CHESTNUT AVENUE) PARTIAL ELECTRICAL SITE PLAN {MAGNOLIA AVENUE) ELECTRICAL DETAILS ELECTRICAL DETAILS ELECTRICAL DETAILS ELECTRICAL DETAILS DIAL TOLL FREE 811 Leo C:arrillo Historic:Pk '; \ .. ~, LINIVrn COIAIA ' ....... 1 AND ELECTRICAL DETAILS I \ __,., ~ Ci ', '-- J \ ♦IMEG fsHml CITY OF CARLSBAD ~ 1-----l--+------------------11-----1----1----1---1 ~:==1 :::=..=::=1R=A=N=S=P=O::RT::A::TI::O::N=D::E::P::A::R::1M::E::N::T=~~==3=::: IIFROVEMENT Pl.ANS F'OR: CARLSBAD BARRIO PEDESTRIAN LIGHTING PHASE II PROJECT NFORMATION APPROVED: HOSSEIN AJIDEH w ~ I n.. C, z i= I C, :J Q a: a: ~ 0 ~ ~ a: <t: 0 LL 0 ~ 0 I Cl) z j n.. !z w :i!: ~ n.. :i!: C1a C1a C1a C1b C1b C1b C1a C1a C1 b C1 b C2a C2a C2a C2b C2b C3b C3b C3b C3b C3b C5bC5bC5bC5bC5bC5b C4b C7b C7c C7c C10a C10a C2a C2a C2b C3a C3a C3a C5aC5aC4aC4a C7b C7c C7c C8b C10a C10a C10a C4a C8a C8a C8b C8b C8b C12 C12 C12 C1 2 C12 C12 C11 a C7a C7a C7 a C6a C6a C6a C6b C6b C9a C9a C10 b C1 0 b C1 4 a C14 a C4a C4b C7a C7a C11 a C1 1 a C11 b C2b C5a C5a C13 C13 C13 C3a C3a C3a C6a C6a C6b C6b C9a C9a C9a C9b C9b C9b C10 b C10 b C14 a C14 b C15 C15 C15 C11 b C11b C12 C15 C15 (E) (E) (E) (E ) (E) (E) (E) (E ) (E) (E) (E) (E ) (E) (E) (E) (E) (E) (SDRSD G-7)(SDRSD G-7) (SD R S D G - 7 ) (SDR S D G - 7 ) (SDR S D G - 7 ) (SD R S D G - 7 ) (SDR S D G - 7 ) ( S D R S D G - 7 ) (SD R S D G - 7 ) (SDR S D G - 7 ) (SDR S D G - 7 ) (SD R S D G - 7 ) (SDR S D G - 7 ) (SD R S D G - 7 ) (SD R S D G - 7 ) (SDR S D G - 7 ) (SD R S D G - 7 ) (SDR S D G - 7 ) (SD R S D G - 7 ) (SDRSD G-7)(SDRSD G-7)(SDRSD G-7)(SDRSD G-7)(SDRSD G-7) (SDRSD G-7)(SDRSD G-7) (SDRSD G-7) (SDRSD G-7)(SDRSD G-7) (SDRSD G-7)(SDRSD G-7) (SDRSD G-7) (SDRSD G-7) (SDRSD G-7)(SDRSD G-7)(SDRSD G-7) (SDRSD G-7)(SDRSD G-7) (SDRS D G - 7 ) (SDR S D G - 7 ) (SDRSD G - 7 ) (SDRS D G - 7 ) (SDR S D G - 7 ) (SDRSD G-7) (SDRSD G-7) (SD R S D G - 7 ) (SD R S D G - 7 ) C14b C15 C14 b C15 C15 C15 C15 (SDR S D G - 7 ) (SDR S D G - 7 ) (SD R S D G - 7 ) (SDR S D G - 7 ) (SDR S D G - 7 ) (SD R S D G - 7 ) E4 E5 E6 E3 E2 E1 PALM AVE MAGNOLIAAVE PINE AVE CHESTNUT AVE PALM AVE OAK AVE CARLSBAD VILLAGE DR TY L E R S T RO O S E V E L T S T MA D I S O N S T HA R D I N G S T M A G N O L I A A V E I- 5 N B WALNUT AVE JE F F E R S O N S T CAROL PL I- 5 S B AVOCADO LN PALM AVE JE F F E R S O N S T JE F F E R S O N S T CAMELLIA PL VIL L A G E C I R VIL L A G E D R VILLAGE DR ST A T E S T SH E E T 2 0 0 SH E E T 2 0 0 SH E E T 2 0 1 SH E E T 2 0 1 SH E E T 2 0 2 SH E E T 2 0 3 SH E E T 2 0 3 SH E E T 2 0 4 SH E E T 2 0 4 SH E E T 2 0 5 SH E E T 2 0 7 SH E E T 2 0 7 SH E E T 2 0 8 SH E E T 2 0 8 SH E E T 2 0 9 SH E E T 2 0 5 SH E E T 2 0 6 SH E E T 2 0 6 SH E E T 2 0 9 SHEET 210 SHEET 210 SHEET 211 SHEET 211 SHEET 212 SHEET 212 SHEET 213 SHEET 213 SHEET 214 SHEET 214 S H E E T 2 1 5 S H E E T 2 1 5 ®www.imegcorp.com PH: 858.368.340013400 SABRE SPRINGS PARKWAY SUITE 225 SAN DIEGO, CA 92128 GENERAL NOTES 1. THIS PLAN SUPERSEDES ALL OTHER PLANS PREVIOUSLY APPROVED BY THE CITY OF CARLSBAD REGARDING IMPROVEMENTS SHOWN ON THIS SET OF PLANS. 2. APPROVAL OF THIS PLAN DOES NOT LESSEN OR WAIVE ANY PORTION OF THE CARLSBAD MUNICIPAL CODE, RESOLUTION OF CONDITIONAL APPROVAL, CITY STANDARDS OR OTHER ADDITIONAL DOCUMENTS LISTED HEREON AS THEY MAY PERTAIN TO THIS PROJECT. THE ENGINEER IN RESPONSIBLE CHARGE SHALL REVISE THESE PLANS WHEN NON-CONFORMANCE IS DISCOVERED. 3. CITY APPROVAL OF PLANS DOES NOT RELIEVE THE ENGINEER-OF-WORK FROM RESPONSIBILITY FOR THE CORRECTION OF ERRORS AND OMISSIONS DISCOVERED DURING CONSTRUCTION. ALL PLAN REVISIONS SHALL BE PROMPTLY SUBMITTED TO THE CITY ENGINEER FOR APPROVAL. 4. A RIGHT-OF-WAY PERMIT FROM THE CITY ENGINEER WILL BE REQUIRED FOR ANY WORK IN THE PUBLIC RIGHT OF WAY. RIGHT-OF-WAY PERMIT FEE SHALL BE WAIVED FOR THIS CIP PROJECT. 5. NO WORK SHALL BE COMMENCED UNTIL ALL PERMITS HAVE BEEN OBTAINED FROM THE CITY AND OTHER APPROPRIATE AGENCIES. 6. ALL WORK ADJACENT TO TRANSFORMERS, EXISTING POLES, SERVICE POINTS MUST BE COORDINATED WITH SDG&E FOR FIELD MEETINGS AND APPROVALS BY SDG&E. SERVICE ORDERS ARE ATTACHED TO CONTRACT DOCUMENTS AS AN APPENDIX. 7. NO REVISIONS WILL BE MADE TO THESE PLANS WITHOUT THE WRITTEN APPROVAL OF THE CITY ENGINEER, NOTED WITHIN THE REVISION BLOCK, ON THE APPROPRIATE SHEET OF THE PLANS AND TITLE SHEET. 8. ORIGINAL DRAWINGS SHALL BECOME THE PROPERTY OF THE CITY UPON BEING SIGNED BY THE CITY ENGINEER. 9. THE ORIGINAL DRAWING SHALL BE REVISED TO REFLECT AS-BUILT CONDITIONS BY THE CONTRACTOR PRIOR TO FINAL ACCEPTANCE OF THE WORK BY THE CITY. 10. ACCESS FOR FIRE AND OTHER EMERGENCY VEHICLES SHALL BE MAINTAINED TO THE PROJECT SITE AT ALL TIMES DURING CONSTRUCTION. 11.A PRE-CONSTRUCTION MEETING SHALL BE HELD PRIOR TO THE BEGINNING OF WORK AND SHALL BE ATTENDED BY ALL REPRESENTATIVES RESPONSIBLE FOR CONSTRUCTION, INSPECTION, SUPERVISION, TESTING AND ALL OTHER ASPECTS OF THE WORK. 12. THE CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING SHORING, AND SHALL BE SOLELY RESPONSIBLE FOR CONFORMING TO ALL LOCAL STATE AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS. 13. ALL OPERATIONS CONDUCTED ON THE SITE OR ADJACENT THERETO, INCLUDING WARMING UP, REPAIR, ARRIVAL, DEPARTURE OR OPERATION OF TRUCKS, EARTHMOVING EQUIPMENT, CONSTRUCTION EQUIPMENT AND ANY OTHER ASSOCIATED GRADING EQUIPMENT SHALL BE LIMITED TO THE PERIOD BETWEEN 8:00 A.M. AND 5:00 P.M. EACH DAY, MONDAY THRU FRIDAY AND NO WORK SHALL BE CONDUCTED ON WEEKENDS OR HOLIDAYS. (A LIST OF CITY HOLIDAYS IS AVAILABLE AT THE ENGINEERING DEPARTMENT COUNTER.) 14.ALL OFF-SITE HAUL ROUTES SHALL BE SUBMITTED BY THE CONTRACTOR TO THE CITY ENGINEER FOR APPROVAL TWO FULL WEEKS PRIOR TO BEGINNING OF WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DEBRIS OR DAMAGE OCCURRING ALONG THE HAUL ROUTE OR ADJACENT STREETS AS A RESULT OF THE WORK. 15. THE EXISTENCE AND LOCATION OF UTILITY STRUCTURES AND FACILITIES SHOWN ON THE CONSTRUCTION PLANS WERE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS. ATTENTION IS CALLED TO THE POSSIBLE EXISTENCE OF OTHER UTILITY FACILITIES OR STRUCTURES NOT SHOWN OR IN A LOCATION DIFFERENT FROM THAT SHOWN ON THE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES SHOWN ON THE PLANS AND ANY OTHER EXISTING FACILITIES OR STRUCTURES NOT SHOWN. 16. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING FACILITIES ( ABOVEGROUND AND UNDERGROUND ) WITHIN THE PROJECT SITE SUFFICIENTLY AHEAD OF THE CONSTRUCTION TO PERMIT THE REVISIONS OF THE CONSTRUCTION PLANS IF IT IS FOUND THAT THE ACTUAL LOCATIONS ARE IN CONFLICT WITH THE PROPOSED WORK. 17. THE CONTRACTOR SHALL NOTIFY AFFECTED UTILITY COMPANIES (SEE BELOW) AT LEAST TWO FULL WORKING DAYS PRIOR TO STARTING CONSTRUCTION NEAR THEIR FACILITIES AND SHALL COORDINATE WORK WITH A COMPANY REPRESENTATIVE. UNDERGROUND SERVICE ALERT (DIG ALERT) 811 SDG&E (800)411-7343 AT&T (619)237-2787 SPECTRUM CABLE (800)227-2600 COX COMMUNICATIONS (619)262-1122 CITY OF CARLSBAD(STREETS AND STORM DRAIN) (760)434-2980 * CITY OF CARLSBAD(SEWER,WATER & RECLAIMED WATER) (760)438-2722 * AS APPROPRIATE 18. TRAFFIC CONTROL PLANS MUST BE SUBMITTED TO THE INSPECTOR AS PART OF THE PRE-CONSTRUCTION SUBMITTAL PROCESS. 19. THE CONTRACTOR IS ENCOURAGED TO PROTECT EXISTING CONCRETE AS MUCH AS AS POSSIBLE. BORING SHALL OCCUR ONLY WHERE FEASIBLE. 20. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL UTILITY MARKOUTS AND POTHOLING IF NECESSARY PRIOR TO CONSTRUCTION TO ENSURE THERE ARE NO SUBSURFACE CONFLICTS PRIOR TO INSTALLATION. 21. CONTRACTOR SHALL PROTECT IN PLACE ALL EXISTING CURB AND GUTTER. ALL CONDUIT CROSSING THE CURB AND GUTTER SHALL BE HAND DUG OR BORED UNDERNEATH. N O R T H 0 GRAPHIC SCALE IN FEET 0100 200 400 APPLICABLE CODES CONTRACTOR SHALL COMPLY WITH APPLICABLE CODES AND LOCAL AMENDMENTS. BUILDING CODE: 2022 CALIFORNIA BUILDING CODE FIRE CODE: 2022 CALIFORNIA FIRE CODE PLUMBING CODE: 2022 CALIFORNIA PLUMBING CODE MECHANICAL CODE: 2022 CALIFORNIA MECHANICAL CODE ELECTRICAL CODE: NFPA 70 (NEC) 2020 EDITION LIFE SAFETY CODE: NFPA 101 2021 EDITION ENERGY CONSERVATION CODE: 2022 CALIFORNIA ENERGY CODE HEALTH DEPARTMENT CODE: CURRENT EDITION LOCAL BUILDING CODE: CURRENT EDITION ABBREVIATIONS AMPERE FRAME RATING OF CIRCUIT BREAKERSAF ABOVE FINISHED FLOORAFF AMPERE FUSE RATINGAFU AMPS INTERUPTING CAPACITY RATING (RMSAIC SYMMETRICAL) AMPERESAMP, A AMPERE SWITCH RATINGAS AMPERE TRIP RATING OF BREAKERAT AMERICAN WIRE GAUGEAWG BREAKERBKR CONDUITC. CABINETCAB CATEGORYCAT. CLOSED CIRCUIT TELEVISIONCCTV CONDUIT ONLYC.O. DRAWINGDWG EMERGENCYEMERG, EM EQUIPMENTEQPT,EQ. FLUORESCENTFLUOR FIBER OPTICF.O. FUTUREFUT GROUNDGND HERTZHZ INTERMEDIATE DISTRIBUTION FRAMEIDF JUNCTION BOXJ.B. THOUSAND (KILO)K KILOVOLTSKV KILOWATTSKW KILOVOLT AMPERESKVA LIGHT, LIGHTSLT, LTS LIGHTINGLTG MAIN DISTRIBUTION FRAMEMDF MAXIMUMMAX MULTIMODEMM MOUNT, MOUNTED, MOUNTINGMT, MTD, MTG NUMBER, NUMBERSNO, NOS NOT TO SCALENTS ON CENTEROC PANELPNL POWERPWR REQUIREDREQD SHEETSHT TELEPHONE TERMINAL BACKBOARDTTB TYPICALTYP UNLESS NOTED OTHERWISEU.N.O. VOLTV WATTSW WEATHERPROOFWP TRANSFORMERXFMR TO BE DETERMINEDTBD VARIABLE FREQUENCY DRIVEVFD NATIONAL ELECTRICAL CODENEC LIGHTING CONTROL PANELLCP NEW(N) EXISTING(E) UNDER GROUNDU.G. GROUND FAULT INTERRUPTINGGFI ELECTRICAL SYMBOL LIST LED PEDESTRIAN LIGHT STREET LIGHT PULL BOX / HAND HOLE UNDERGROUND CONDUIT C1a, 120V SIDEWALK PANEL (SDRSD G-7) CIRCUIT TAG LEGEND CIRCUIT VOLTAGE CIRCUIT DESIGNATION CIRCUIT NUMBER CIRCUIT # H GAS MAIN/SERVICE WATER PIPE SEWER PIPE RIGHT OF WAY (R/W) WW SS GG Feb. 3, 2025 Item #3 Page 7 of 66 DIAL BEF"ORE YOU DIG ,--7 ,---, , /1 • -, ~ -,-, -r,=1-,=-===-'--rr-:::!-=-e I ==-I --7 / / / / I I , r ; , r , , .. r ' , ~-,. -rr-=I== ,-------/ / / / I I 1' I 1• 111 1'1 I 1' I I ,I Ir , [ -... / // / I I I I I I I Ill 111 11 1' / // / II II : ~: ll1 :l .I I I ii 'I I I / ,, / I t-. I I I I I / ,, / I I I 11 111 I I I I 1'1 ii 1' / ,, / I I , , 11 ,I , I 11 I 1 / ,, / I I , , 11 , , I :II ii : / ,, / I ~ - - - - ----t - -e,_ ~ -ii __ l !. _ . u _ _ _ _ _ ! 11 I ±c I I/ / ==·~~ '_,. ·----. ~· ..._ · -JII '.J • • -------I-._,, / // / I .,__ ~ • -, ' , , '. --1 1 "--• , •-=:-r ' -------.------=-, // /// / - - -.. 1--__Jl""":C'I' • -I • -... , _ • · • J a,;; ~ • J' I , , I • I -.. -I - - -L... =. ' -... - - - - -I L I B -' C.Jl ~-: / / / . : i 1. ~ i i! i.1 i 11· I ,-----1: i~-I: --------------' / // / I I I 11 I I 111 I 1' II I / ,, / 1 I 1 I :11 1'1· 1' 11 : : ,,,, :11 [ : I I I / ,, / I -; I I I I I I -I-IW I / / / / ~ -· :--.. ,_--=-, -J--.. _ ~--1 _ _ -! _ 1 1-_____ , i : , , / / ~-1..6:, ~~~!~~~:;;"" ;;;;"'~"";;;al " '-. " L I,, ,L...J.. / / ', "r + -I' _:-'~0 ' • ' " ' ~ T •--:--~) / // / / ": H -r1·-'" -~ 1 1c:i;v:,.,=----1J ---n -• --1 ,, 1 : I.. : I: I • I : "11 J~I: --; - ' H / /; ; I I 11 I I I I I -L ·-I JL I / , , / I I : I I • ~ I I tl_1 l J ( ~ I 1' / ,',' ,' I I I : 11 I I I I l jl II I • I I I I I / ,, / ' I I 11 I 11 I J 11, I ' '1 I • / , , / I,, I I 11 • J.-•--J L, ~: IJ I L ! ::, C • I / / / / '-=-==-L~ h II •I I , / ,, , _.=-1,1-·· ~~-=+===='=-il,,,-=1.-===-,::, Ii , I , / , , / I I I ] I T" 'I Ill, I "'\ C. ' I / / / / 1 I , I : , : 11, ~~-~ '-......-..I I / / / / .. • -, H : I -, • 1 ri//f_,---'-~-ir7--, ":o I,, H : / /,/ / I ' ;= ,.,L / / / I I I I I I I le,_; 1' ...J '1 >--.... - • / / / I I'--I I I I l ,,..,,,JI' I ~ I ' , , / I 11 I I I I LCJI~ I I I O 1 1 Ii : / , , / ,------. __ ; -_;_J l __ r:. t. ~]~1n .!.=--~ .]! 1 ! / /,/ ,/ I : -=-J.,, I .1 I ~ 1'1-=+,, ~ ----~--'o •-· n·--------7' ,, / II{ · ~ __, '· 0 · , , , c: , • -.. • • ,)) 1 -. t '"I I -1·1 --, -r · "'-, __ , -, ,,, . • ·<-~ ,,, ,' ----------' ---__ LJ, ____ L---1.,_ I l O I ' ~--I/ -:11 ,, I I I, I I I ! . I - --, -1 ' -i -- -V ;I -7 - - - - - -f / / / TWO WORK1NG DA'l'S BEF0RE YOU DIG '1 r~H· J1 ··7 : l tl •Ir I / ,, / --I I I ... -' _J I I p, I I I I I / / : r I • iJ ,_f 17 j 1 1 j 1 -..._ I /1 ' I N'i Ill: jl l 1' :t t · ;1·; ;;II : ." 1 : U : I : I I I I I I / / I I ! I I I •1 l : : ' : / / / / II • I: : I : __ _, ,~ / / ,' / / 1·'1 I I : I ,, I -:.. I I , J I / il--llli,/ / , ,, ,' , , , ~ ur:--------.. ' ' ~. ~ '-.... .:;, i I ~ i~ ~ :_ L; "'~ / / / / ~~~ "--.... :' ~ : -• :-/ I I I I "r,. ~ 'L. I I I : ' I I I I ,.. ~ I ~ / " I ,· / / / / .. , ... I ~• .. ,/' o I 1 !, I / / / / I Know what's below. Call before you dig. .... ~.. ·~l .... , .. ~' i j I / I I I .. '-~~ .. .. ; ! ; / / / / .. ...,, ' I I I ,, I I I .. .. ! / ,, / I I ~':<=, .. , I / / / / L --_J .. .. c::: .... :_~ i ; ' t t t t · ~---: •• -::.J / / / / DIAL TOU. FREE 811 AT LEAST 1WO DAYS IIEFllRE YOU DIG I ,' I 1' I .... V I II I ' I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I UlllERGRCUII) SER\1CE ALERT OF SOU11ERN CAlFllRIIA I I I I I I __ I-----' o---Q * D !'Z.21 ♦IMEG '==t=t====---===~=+=t==i~[SHml CITY OF CARLSBAD ISHEETSI t""r==i==t=======----==+==i:==t=~=~ ~ TRANSPORTATION DEPARlMENT 23 r~=t==t====------==i==+==t===t~ IMPRO\CEIIENT PLANS FOR: 1--~=t==t=====-----====i==t==t===t~ CARLSBAD BARRIO PEDESTRIAN LIGHTING PHASE II OVERALL ELECTRICAL SITE PLAN AND ~=t==i=====------==+==+==~~t=~ GENERAL NOTES ~=t==i======----====i==+==!===t~ DA~PPIPRf<loMVE~D;=: =~~~~~~~H;:;:;o"=ss==E:::1N=A=J=10E==:JH ENG. MANAGER P.E. 75991 EXPIRES 6 22 DAlE DAlE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DAlE INITIAL DAlE INITIAL OTID APPROVAL CITY APPROVAL DWN BY: ASC I CHKD BY: 61 H PRO.ECT NO. I DRAE100WING NO. RVWD BY: 61 H _ _ w ~ I a.. 0 z ~ Q _J 0 a: a: <( m 0 ~ ~ a: <( 0 LL 0 ~ 0 I en z <( _J a.. !z w ~ ~ a.. ~ - C1a C1a C1a C1b C1b C1b C1a C1a C1 b C1 b C2a C2a C2a C2b C2b C3b C3b C3b C3b C3b C5bC5bC5bC5bC5bC5b C4b C7b C7c C7c C10a C10a C2a C2a C2b C3a C3a C3a C5aC5aC4aC4a C7b C7c C7c C8b C10a C10a C10a C4a C8a C8a C8b C8b C8b C12 C12 C12 C1 2 C12 C12 C11 a C7a C7a C7 a C6a C6a C6a C6b C6b C9a C9a C10 b C1 0 b C1 4 a C14 a C4a C4b C7a C7a C11 a C1 1 a C11 b C2b C5a C5a C13 C13 C13 C3a C3a C3a C6a C6a C6b C6b C9a C9a C9a C9b C9b C9b C10 b C10 b C14 a C14 b C15 C15 C15 C11 b C11b C12 C15 C15 (E) (E) (E) (E ) (E) (E) (E) (E ) (E) (E) (E) (E ) (E) (E) (E) (E) (E) (SDRSD G-7)(SDRSD G-7) (SD R S D G - 7 ) (SDR S D G - 7 ) (SDR S D G - 7 ) (SD R S D G - 7 ) (SDR S D G - 7 ) ( S D R S D G - 7 ) (SD R S D G - 7 ) (SDR S D G - 7 ) (SDR S D G - 7 ) (SD R S D G - 7 ) (SDR S D G - 7 ) (SD R S D G - 7 ) (SD R S D G - 7 ) (SDR S D G - 7 ) (SD R S D G - 7 ) (SDR S D G - 7 ) (SD R S D G - 7 ) (SDRSD G-7)(SDRSD G-7)(SDRSD G-7)(SDRSD G-7)(SDRSD G-7) (SDRSD G-7)(SDRSD G-7) (SDRSD G-7) (SDRSD G-7)(SDRSD G-7) (SDRSD G-7)(SDRSD G-7) (SDRSD G-7) (SDRSD G-7) (SDRSD G-7)(SDRSD G-7)(SDRSD G-7) (SDRSD G-7)(SDRSD G-7) (SDRS D G - 7 ) (SDR S D G - 7 ) (SDRSD G - 7 ) (SDRS D G - 7 ) (SDR S D G - 7 ) (SDRSD G-7) (SDRSD G-7) (SD R S D G - 7 ) (SD R S D G - 7 ) C14b C15 C14 b C15 C15 C15 C15 (SDR S D G - 7 ) (SDR S D G - 7 ) (SD R S D G - 7 ) (SDR S D G - 7 ) (SDR S D G - 7 ) (SD R S D G - 7 ) E4 E5 E6 E3 E2 E1 PALM AVE MAGNOLIAAVE PINE AVE CHESTNUT AVE PALM AVE OAK AVE CARLSBAD VILLAGE DR TY L E R S T RO O S E V E L T S T MA D I S O N S T HA R D I N G S T M A G N O L I A A V E I- 5 N B WALNUT AVE JE F F E R S O N S T CAROL PL I- 5 S B AVOCADO LN PALM AVE JE F F E R S O N S T JE F F E R S O N S T CAMELLIA PL VIL L A G E C I R VIL L A G E D R VILLAGE DR ST A T E S T CIRCUIT "C1a, 120V" CI R C U I T "C 1 4 b , 1 2 0 V " CIRCUIT "C15, 240V" CI R C U I T "C 8 b , 1 2 0 V " CI R C U I T "C 7 a , 1 2 0 V " CIRCUIT "C10a, 120V" CI R C U I T "C 1 2 , 2 4 0 V " CI R C U I T "C 1 1 a , 1 2 0 V " CI R C U I T "C 1 3 , 1 2 0 V " CIRCUIT "C1b, 120V" CI R C U I T "C 6 a , 1 2 0 V " CI R C U I T "C 9 b , 1 2 0 V " CIRCUIT "C2a, 120V" CIRCUIT "C3a, 120V" CIRCUIT "C3b, 120V" CIRCUIT "C4a, 120V" CIRCUIT "C4b, 120V" CIRCUIT "C5a, 120V" CIRCUIT "C5b, 120V" CIRCUIT "C7c, 120V" CI R C U I T "C 6 b , 1 2 0 V " CI R C U I T "C 9 a , 1 2 0 V " CI R C U I T "C 1 0 b , 1 2 0 V " CI R C U I T "C 1 4 a , 1 2 0 V " CIRCUIT "C2b, 120V" CI R C U I T "C 8 a , 1 2 0 V " CI R C U I T "C 1 1 b , 1 2 0 V " CIRCUIT "C7b, 120V" ®www.imegcorp.com PH: 858.368.340013400 SABRE SPRINGS PARKWAY SUITE 225 SAN DIEGO, CA 92128 N O R T H 0 GRAPHIC SCALE IN FEET 0100 200 400 GENERAL NOTES A. DRAWINGS ARE DIAGRAMMATIC ONLY. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING UTILITIES PRIOR TO THE START OF WORK AND HAND DIG WHERE NECESSARY TO PREVENT DAMAGE TO EXISTING UTILITY LINES. B. CONTRACTOR SHALL REPAIR TRENCH PER NARROW TRENCH BACKFILL AND PAVEMENT RESURFACING STANDARD DRAWING, GS-24, OF THE CITY OF CARLSBAD ENGINEERING STANDARDS. C. PEDESTRIAN LIGHTS SHALL BE INSTALLED AS SHOWN ON THESE PLANS, UNDERGROUND CONDUIT RUNS, SERVICE POINTS AND HAND-HOLES SHALL BE SHOWN ON THE ALL LUMINAIRES SHALL BE "CUT OFF" TYPE. SEE CONTRACT "AS-BUILT" PLANS. NO DIRECT BURIAL PEDESTRIAN LIGHT FOUNDATIONS WILL BE ALLOWED. SEE SPECIFICATIONS FOR REQUIREMENTS. D. ALL UNDERGROUND UTILITIES AND LATERALS SHALL BE INSTALLED PRIOR TO CONSTRUCTION OF CURBS, CROSS GUTTERS OR SURFACING OF STREETS. E. ALL SURVEY MONUMENTS AND POINTS THAT ARE DISTURBED BY THIS WORK SHALL BE REESTABLISHED, PERPETUATED, AND DOCUMENTED PER THE PROFESSIONAL LAND SURVEYORS ACT. F. ALL POLES, CONDUIT, AND PULL BOX LOCATIONS SHOWN ARE APPROXIMATE. ACTUAL LOCATIONS SHALL BE DETERMINED BY FIELD CONDITIONS AT THE TIME OF CONSTRUCTION AND AS DIRECTED BY THE ENGINEER. POLE SHALL BE PLACED SUCH THAT AN ADA COMPLIANT 4' MINIMUM PATH IS PROVIDED. PULL BOXES SHALL NOT BE PLACED WITHIN THE PEDESTRIAN CURB RAMP AND DRIVEWAYS UNLESS APPROVED BY THE ENGINEER. G. LOCATION OF ALL UNDERGROUND UTILITIES ARE APPROXIMATE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATIONS AND VERIFY ALL CONDITIONS ON THE JOB SITE PRIOR TO INSTALLING EQUIPMENT. H. CONTRACTOR SHALL POTHOLE EACH PEDESTRIAN LIGHT LOCATION PRIOR TO INSTALLATION. I. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO REPAIR ANY DAMAGES THAT OCCUR DURING INSTALLATION OF ELECTRICAL EQUIPMENT. ALL COSTS FOR ANY REPAIRS SHALL BE AT THE CONTRACTORS EXPENSE. J. PULL BOXES SHALL BE NO. 3 1/2 AND CONDUIT 2" UNLESS OTHERWISE NOTED. PULL BOXES SHALL BE INSTALLED PER CITY OF CARLSBAD SUPPLEMENTAL STANDARD NO. GS-21. K. ALL NEW PEDESTRIAN LIGHTS SHALL HAVE A PULLBOX ADJACENT TO THE POLE. L. NATIONAL ELECTRICAL CODE (NEC) WIRE COLOR CODING SHALL BE USED FOR ALL ELECTRICAL WORK. M. ALL SHRUBS SHALL BE TRIMMED OR REMOVED AND TREES SHALL BE TRIMMED (NOT REMOVED) AS REQUIRED AND DETERMINED BY THE ENGINEER. N. PROVIDE 6" VERTICAL AND 12" HORIZONTAL MINIMUM SEPARATION BETWEEN GAS LINE AND NEW LIGHTING UNDERGROUND CONDUIT. O. NO UNDERGROUND RUNS LONGER THAN 200’ BETWEEN PULL BOXES. P. INSTALL DUCT PUTTY IN CONDUIT OPENINGS AT EACH PULL BOX. Q. CONTRACTOR TO COORDINATE WITH SDG&E FOR CONDUIT INSTALLATION AND CLEARANCES ADJACENT TO SDG&E FACILITIES PRIOR TO EXCAVATION. R. THE CONTRACTOR SHALL MAINTAIN EXISTING ELECTRICAL CIRCUITS FOR EQUIPMENT NOT REMOVED DURING DEMOLITION. S. OVERHEAD ELECTRICAL, CABLE AND TELEPHONE LINES ARE NOT SHOWN ON THE PLANS. CONTRACTOR SHALL NOT IMPACT THESE OVERHEAD UTILITY LINES AT ANYTIME DURING CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATING THE OVERHEAD UTILITY LINES PRIOR T0 MOBILIZATION AND CONSTRUCTION. T. VERIFY THE EXISTENCE AND HORIZONTAL/VERTICAL LOCATION OF ALL UTILITIES WITHIN THE PROJECT AREA THAT MAY CONFLICT WITH THE PROPOSED CONSTRUCTION. VERIFY THAT ANY UTILITIES SHOWN TO BE RELOCATED BY OTHERS HAVE BEEN RELOCATED AND ARE NO LONGER IN CONFLICT. U. LOCATIONS SHOWN ON ELECTRICAL DRAWINGS ARE DIAGRAMMATIC AND ARE SUBJECT TO CHANGE. COORDINATE FINAL LOCATIONS OF ALL EQUIPMENT WITH THE ENGINEER PRIOR TO INSTALLING ASSOCIATED ELECTRICAL WORK. V. EXACT ROUTING OF ALL FEEDERS, CONDUITS, ETC. SHALL BE FIELD VERIFIED AND APPROVED BY THE ENGINEER PRIOR TO EXCAVATION. COORDINATE THE INSTALLATION WITH EXISTING CONDITIONS AND OTHER TRADES. W. ELECTRICAL WORK SHALL CONFORM TO NATIONAL ELECTRICAL CODES, CALIFORNIA ELECTRICAL CODE, APPLICABLE STATE AND LOCAL CODES, AND SHALL BE DONE IN ACCORDANCE WITH EQUIPMENT MANUFACTURER'S RECOMMENDATIONS. NOTHING INDICATED ON THE PLANS OR CONTAINED HEREIN SHALL BE INTERPRETED AS ALLOWING WORK TO BE LESS THAN THAT REQUIRED BY THE APPLICABLE STANDARDS. X. CONTRACTOR INSTALLING THE LIGHT POLES SHALL FIELD STAKE POLE LOCATIONS AND OBTAIN APPROVAL PRIOR TO START OF FOUNDATION EXCAVATION. Y. ONCE INSTALLED, ALL LIGHTS SHALL BE ENERGIZED FOR 100 HOURS BEFORE FINAL INSPECTION. THE CONTRACTOR SHALL NOTIFY THE ENGINEER, A MAXIMUM OF TWO (2) WEEKS PRIOR TO FINAL ELECTRICAL INSPECTION. Z. LOCATIONS OF CONDUIT ARE DIAGRAMMATIC. THE CONTRACTOR SHALL SUBMIT A CONDUIT LAYOUT PLAN FOR APPROVAL PRIOR TO STARTING WORK. AA. CONTRACTOR SHALL COORDINATE WITH SDG&E. AND INSTALL SERVICE CONDUCTORS, CONDUIT, AND METER PER SDG&E SERVICE ORDER. CONTRACTOR SHALL COORDINATE THE ELECTRICAL SERVICE PLACEMENT WITH SDG&E, COORDINATE AND SCHEDULE POWER OUTAGES WITH SDG&E. AND INSTALL SERVICE CONDUIT IN ACCORDANCE WITH SDG&E'S REQUIREMENTS. AB. TOP OF PULL BOXES SHALL BE FLUSH WITH FINISH GRADE. 2' MIN 13'-1" CURB AND GUTTEREXISTING SIDEWALK EXISTING LANDSCAPING SCALE: NONE1TYPICAL PEDESTRIAN LIGHTING PLACEMENT DETAIL (SIDE VIEW) PRESTRESSED CONCRETE POLE PER PLANS AND SPECIFICATIONS, REFER TO SHEET E302. POST TOP LUMINAIRE, PER PLANS AND SPECIFICATIONS, REFER TO SHEET E301. 3'-8" Feb. 3, 2025 Item #3 Page 8 of 66 DIAL BEF"ORE YOU DIG -, I I I I I I I I I I I I I I I I I I TWO WORK1NG DA'l'S BEF0RE YOU DIG ii TOLL FREE 1-800-227-2600 IL :§ A PUBLIC SERVICE BY UNDERClROUND SER'IICE ALERT ---, --- 811 11 I I I I I I I I I I 11 11 11 ---- r-------1 l I I I I ' I I I I I I I I ~ I I I I I I J I I I I I I l ----------, C --, 0 Qo = I I I l1 I I I I I 1 ° r-------. I I ' 1 I ' I I I I I I ........... ,/ ,,. DIAL TOLL FREE 811 I ;""""--...=.,,,,.= iliG'-J~ Know what's below. Call before you dig. AT LEAST TWO DAYS IIEFllRE YOU DIG UlllERGRCUII) SER\1CE ALERT OF SOU11ERN CAI.FllRIIA I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ---~ ~ I :J / / / / -~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I : ; I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ,' I I I / / / / I I I I I 0--------- ♦IMEG '==t=t====----===~=+=t==i~[SHml CITY OF CARLSBAD ISHEETSI t""r==i==t=======----==+==i:==t=~=~ ~ TRANSPORTATION DEPARlMENT 23 r'°==t==t====------==i==+==t===t~ IMPROVEMENT PLANS FOR: 1-~=t==t=====-----====i==t==t===t~ CARLSBAD BARRIO PEDESTRIAN LIGHTING PHASE II ~==1==3===================~===E==t==~==j OVERALL ELECTRICAL SITE PLAN CIRCUITS t-DESIGNA 110N AND ELECTRICAL DETAILS APPROVED: HOSSEIN AJIDEH DATE INITIAL DATE INITIAL DATE INITIAL ENGINEER OF WDRK REVISION DESCRIPTION OTID APPROVAL CITY APPROVAL ENG. MANAGER DWN BY: ASC CHKD BY: 61 H RVWD BY: 61 H P.E. 75991 EXPIRES 6 22 DAlE PROJECT NO. I DRA~~ NO. --w C/J <( I a.. 0 z F I Q _J 0 a: a: <( m 0 <( m C/J _J a: <( 0 LL 0 ~ 0 I C/J z <( _J a.. I-z w ~ w ~ a: a.. ~ - C1 a (S D R S D G - 7 ) (S D R S D G - 7 ) OA K A V E CA R L S B A D V I L L A G E D R ROOSEVELT ST TY P . C1b C4a (S D R S D G - 7 ) ROOSEVELT ST PI N E A V E 34TYP. TY P . 56TYP. 12TYP.78 ®www.imegcorp.com PH: 858.368.340013400 SABRE SPRINGS PARKWAY SUITE 225 SAN DIEGO, CA 92128 ELECTRICAL AND LIGHTING NOTES NO R T H NO R T H MA T C H L I N E S E E A B O V E R I G H T MA T C H L I N E S E E B E L O W L E F T MA T C H L I N E S E E S H E E T E 2 0 1 0 GRAPHIC SCALE IN FEET 2010 20 40 2 3 4 5 6 1 GENERAL NOTES A. DRAWINGS ARE DIAGRAMMATIC ONLY. B. REFER TO SHEET E101 FOR GENERAL NOTES. FURNISH AND INSTALL CONCRETE PEDESTRIAN SCALE LIGHT STANDARD AND FOUNDATION PER PLAN AND PROJECT SPECIFICATIONS. POLE HEIGHT SHALL BE 13'-1" ABOVE GRADE. LUMINAIRE SHALL BE ACORN STYLE POST-TOP LED WITH 5,100 LUMENS MAXIMUM, COLOR TEMPERATURE OF 3000K MAXIMUM, AND TYPE III DIFFUSED LENS DISTRIBUTION. CONTRACTOR SHALL TRIM TREE(S) IN CONFLICT WITH STREET LIGHT. FURNISH AND INSTALL NO. 3-1/2 PULL BOX FOR STREET LIGHTING. CONTRACTOR TO REPLACE SIDEWALK PANEL(S) AFFECTED BY INSTALLATION OF PULL BOX. FURNISH AND INSTALL INLINE FUSE HOLDER AND 10A FUSE IN PULL BOX FOR PERMANENT POWER TO LUMINAIRE SYSTEM PER SDG&E REQUIREMENTS. FURNISH AND INSTALL 1-1/4" CONDUIT. INSTALL 2#8 CONDUCTORS AND 1#8 GROUND IN CONDUIT. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH SDG&E FOR JOINT MEETING IN FIELD FOR FINAL CONDUIT SWEEPS AND PERMANENT POWER CONNECTION. THE PRECISE LOCATION OF THE LIGHT POLE AND ITS FOOTING MUST BE APPROVED IN ADVANCE BY THE CITY ENGINEER’S REPRESENTATIVE. THIS APPROVAL IS REQUIRED BEFORE INSTALLATION BEGINS. IN CASES WHERE THE LIGHT POLE LOCATION CONFLICTS WITH THE EXISTING FENCE, THE CONTRACTOR SHALL REMOVE AND REINSTALL THE FENCE AS REQUIRED TO ENSURE PROPER ALIGNMENT WITH THE DESIGNATED RIGHT-OF-WAY. 7 8 Feb. 3, 2025 Item #3 Page 9 of 66 r----------------------------------------------------------------------- I I I I I I I I I \ ::e 0 :c\-i\-' ~~ R/W ------------------------------------------------r-a-----, ~~ ,-----0-□-, __ \ _____ \ []@ ----w----t--------w---------w---------w---------w~------'1------w--------L--W--+--------w---+------4--4 1 I I I :e ----+--+------..1---w ___;:__J_...J_-4-_~~---1 0 C!) C!) -------1---s---------s---------s---------s----------1---si---1--------s------1------+---s---+------___._ s ---1------1-----1--~ s----...----1 DIAL BEF"ORE YOU DIG I --~---G---G---G---G---G---G---G---G--r----'~G-+-..+~G--4--G---G------G-'---G--.----+-G G G G G ~ G I : I I I I I I ! en I ~~~~~~~~Kr~==y=:~~~a/f==--!~_~)e_,~r=~,--,~~==J~$1 ~n:l~~O~t~-= __ .= .~~.--f'~~-M)--1-------l --~R/W == ---o-=--------7 ::e \ IH\\:\\!:(" c;') I I I I I ) G G--0 ---0 r- ' 0 R/W 0 0 0 0 w----------W---------W'-----------1--W----''---------I----W--~-----\---'-W---------'--W--------~W-------J--.L.. " ---t-----------1..-M------:---1 ~ - - - - - - - - - - - - - - - ----'-----------C!) 1------s---------s---------s-------..1------s----+-------s---------s---------s---------s-----+----s---------s~------1 -G --=---G----... --G ---G ---G ---G ---G 7 □--1 ___ _J (------] ------ 811 I ........... ,/ ,,. Know what's below. Call before you dig. DIAL TOLL FREE 811 AT LEAST TWO DAYS IIEFllRE YOU DIG UlllERGRCUII) SER\1CE ALERT OF SOU1IERN CAI.FllRIIA l---'--G,---G----.--~G---G---G---G---G7G7G---G---G---G---G---G+---G--+-~G---G---G-I---G ♦IMEG CITY OF CARLSBAD I SHEETS I f---+---+-------------+-----1----1---l----l TRANSPORTATION DEPARlMENT 23 f---+---+-------------+-----1----1---l----l f---+---+-------------+-----1----1---l----l IMPROVEMENT PLANS FOR: CARLSBAD BARRIO PEDESTRIAN LIGHTING PHASE II PARTIAL ELECTRICAL SllE PLAN {ROOSEVELT ST) 1----+---+-------------+----1-----1---1-----1 APPROVED: HOSSEIN AJIDEH f---+---+-------------+-----1----1---l----l ENG. MANAGER P.E. 75991 EXPIRES 6 22 DAlE DATE INmAL DATE INITIAL DWN BY: ASC PRO.ECT NO. I DRAEWl200NG NO. 1---...._--+-----'-";;......i...;;.;;.;;;.;;;;__i CHKD BY: 61 H OTID APPROVAL CITY APPROVAL RVWD BY: 61 H DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION w ~ I a.. 0 z ~ Q _J 0 a: a: <( m 0 ~ ~ a: <( 0 LL 0 ~ 0 I en z <( _J a.. 1-z w ~ ~ a.. ~ - C7a C7a C7a C4b C7a ROOSEVELT ST WA L N U T A V E 31 5 TYP.6TYP.42TYP.78 C7 b C7a C11a (E ) (E ) (E) (E) ROOSEVELT ST CH E S N U T A V E 12 34TYP. 56TYP. TYP.78 ®www.imegcorp.com PH: 858.368.340013400 SABRE SPRINGS PARKWAY SUITE 225 SAN DIEGO, CA 92128 NO R T H NO R T H MA T C H L I N E S E E A B O V E R I G H T MA T C H L I N E S E E B E L O W L E F T MA T C H L I N E S E E S H E E T E 2 0 2 0 GRAPHIC SCALE IN FEET 2010 20 40 MA T C H L I N E S E E S H E E T E 2 0 0 ELECTRICAL AND LIGHTING NOTES 2 3 4 5 6 1 GENERAL NOTES A. DRAWINGS ARE DIAGRAMMATIC ONLY. B. REFER TO SHEET E101 FOR GENERAL NOTES. FURNISH AND INSTALL CONCRETE PEDESTRIAN SCALE LIGHT STANDARD AND FOUNDATION PER PLAN AND PROJECT SPECIFICATIONS. POLE HEIGHT SHALL BE 13'-1" ABOVE GRADE. LUMINAIRE SHALL BE ACORN STYLE POST-TOP LED WITH 5,100 LUMENS MAXIMUM, COLOR TEMPERATURE OF 3000K MAXIMUM, AND TYPE III DIFFUSED LENS DISTRIBUTION. CONTRACTOR SHALL TRIM TREE(S) IN CONFLICT WITH STREET LIGHT. FURNISH AND INSTALL NO. 3-1/2 PULL BOX FOR STREET LIGHTING. CONTRACTOR TO REPLACE SIDEWALK PANEL(S) AFFECTED BY INSTALLATION OF PULL BOX. FURNISH AND INSTALL INLINE FUSE HOLDER AND 10A FUSE IN PULL BOX FOR PERMANENT POWER TO LUMINAIRE SYSTEM PER SDG&E REQUIREMENTS. FURNISH AND INSTALL 1-1/4" CONDUIT. INSTALL 2#8 CONDUCTORS AND 1#8 GROUND IN CONDUIT. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH SDG&E FOR JOINT MEETING IN FIELD FOR FINAL CONDUIT SWEEPS AND PERMANENT POWER CONNECTION. THE PRECISE LOCATION OF THE LIGHT POLE AND ITS FOOTING MUST BE APPROVED IN ADVANCE BY THE CITY ENGINEER’S REPRESENTATIVE. THIS APPROVAL IS REQUIRED BEFORE INSTALLATION BEGINS. IN CASES WHERE THE LIGHT POLE LOCATION CONFLICTS WITH THE EXISTING FENCE, THE CONTRACTOR SHALL REMOVE AND REINSTALL THE FENCE AS REQUIRED TO ENSURE PROPER ALIGNMENT WITH THE DESIGNATED RIGHT-OF-WAY. 7 8 Feb. 3, 2025 Item #3 Page 10 of 66 --.. -- DIAL BEF"ORE YOU DIG I I I I I I ---_L_R/W - --- -- --- -_J I -A3 ---------------------------------------------------A6 __________________________ .J ---, ~-~-.--h--00;;-o----------o, ------l-----1-""?"vS.·-_ -~-o--~---:~ c J-,,1 (!) \ I I I I I I I I I " " - V> I I I I I I I I I ~, _ L_R_fw ________________ _ '--------------------------------1~-r.. 1---•M------,-----'M---~--__l_---M-------'------M------,c---___J'----M,-1---~------M------'---____,."'°'--LM---------1---M----------,-------'-+----.----M-_,_-------1 0 -----------+-s-----------+-s---------~ s------'----s----------s--------------'---------s------1------+s---+--------s 1---G---G---G---++--G-+---G---G--- \ __________ .l I .._ _____________ .J ___ G ---G __JG ---G ---\\G ---G ---G ---G ---G ---G ---GC"}---G ___ G _._~-G __ _ _____ \ 0 ---=-=~--,....-,;,--..------ ------------------------- ::e (!) ::e I I I I I I I I JJ (!) l __ L1,;w -~-~-----~ ~-----~ ,---------1 r---------, I I __ , D □ □ * H □ 0 0 0 0 0 0 0 G) 1-----M-1""1-----'-u.....--t----M------'---,,-.+----M'-----~----M-----'--------M--_.__------.d:::,,,--M--~b:::==t~~-+-M-----'-----'---~--M-------'----M--_.__---\..,......,,--__ M __ ~--,--1 \ 1---------s O I ?----------s-1-----------s----------s-----~_..µ1--1+1-------s-----'--------s----------s-------------=--=..::::_-_-, s G ---G ---G , ___ G -+---,/I: _l , ---G ---G -~-G -1--l---G ---G ---G ---G ---G ---G --~\lt-...---t- \ \ ----------~ ------ 811 I ........... ,/ ,,. Know what's below. Call before you dig. I L DIAL TOLL FREE 811 AT LEAST TWO DAYS IIEFllRE YOU DIG UlllERGRCUII) SER\1CE ALERT OF SOU1IERN CAI.FllRIIA I I I N I I I I V> ::e ::e f.J D \'-----~ 1-------------------------~ I ♦IMEG L------------ CITY OF CARLSBAD I SHEETS I ,------1-----1----------------1----+----1----1----1 TRANSPORTATION DEPARlMENT 23 ,------1-----1----------------1----+----1----1----1 r------1-----1----------------1----+----l----1----1 IMPROVEMENT PLANS FOR: CARLSBAD BARRIO PEDESTRIAN LIGHTING PHASE II PARTIAL ELECTRICAL SllE PLAN {ROOSEVELT ST) f------1----+--------------+---'-----1----1---1 APPROVED: HOSSEIN AJIDEH ,------1-----1----------------1----+----1----1----1 ENG. MANAGER P.E. 75991 EXPIRES 6 22 DAlE DA1E INITIAL ENGINEER OF WORK REVISION DESCRIPTION DA1E INmAL DWN BY: ASC PRO.ECT NO. I DRAEWl201NG NO. --~---+_D_AlE _ _.__INI_TIAL___, CHKD BY: 61 H OTID APPROVAL CITY APPROVAL RVWD BY: 61 H --w ~ I a.. 0 z ~ Q _J 0 a: a: <( m 0 ~ ~ a: <( 0 LL 0 ~ 0 I en z <( _J a.. 1-z w ~ ~ a.. ~ - C11a C11a C11b MAG N O L I A AVE ROOSEVELT ST 31 5 TYP.6 TYP.42TYP.78 ®www.imegcorp.com PH: 858.368.340013400 SABRE SPRINGS PARKWAY SUITE 225 SAN DIEGO, CA 92128 NO R T H MA T C H L I N E S E E S H E E T E 2 0 1 0 GRAPHIC SCALE IN FEET 2010 20 40 ELECTRICAL AND LIGHTING NOTES 2 3 4 5 6 1 GENERAL NOTES A. DRAWINGS ARE DIAGRAMMATIC ONLY. B. REFER TO SHEET E101 FOR GENERAL NOTES. FURNISH AND INSTALL CONCRETE PEDESTRIAN SCALE LIGHT STANDARD AND FOUNDATION PER PLAN AND PROJECT SPECIFICATIONS. POLE HEIGHT SHALL BE 13'-1" ABOVE GRADE. LUMINAIRE SHALL BE ACORN STYLE POST-TOP LED WITH 5,100 LUMENS MAXIMUM, COLOR TEMPERATURE OF 3000K MAXIMUM, AND TYPE III DIFFUSED LENS DISTRIBUTION. CONTRACTOR SHALL TRIM TREE(S) IN CONFLICT WITH STREET LIGHT. FURNISH AND INSTALL NO. 3-1/2 PULL BOX FOR STREET LIGHTING. CONTRACTOR TO REPLACE SIDEWALK PANEL(S) AFFECTED BY INSTALLATION OF PULL BOX. FURNISH AND INSTALL INLINE FUSE HOLDER AND 10A FUSE IN PULL BOX FOR PERMANENT POWER TO LUMINAIRE SYSTEM PER SDG&E REQUIREMENTS. FURNISH AND INSTALL 1-1/4" CONDUIT. INSTALL 2#8 CONDUCTORS AND 1#8 GROUND IN CONDUIT. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH SDG&E FOR JOINT MEETING IN FIELD FOR FINAL CONDUIT SWEEPS AND PERMANENT POWER CONNECTION. THE PRECISE LOCATION OF THE LIGHT POLE AND ITS FOOTING MUST BE APPROVED IN ADVANCE BY THE CITY ENGINEER’S REPRESENTATIVE. THIS APPROVAL IS REQUIRED BEFORE INSTALLATION BEGINS. IN CASES WHERE THE LIGHT POLE LOCATION CONFLICTS WITH THE EXISTING FENCE, THE CONTRACTOR SHALL REMOVE AND REINSTALL THE FENCE AS REQUIRED TO ENSURE PROPER ALIGNMENT WITH THE DESIGNATED RIGHT-OF-WAY. 7 8 Feb. 3, 2025 Item #3 Page 11 of 66 DIAL BEF"ORE YOU DIG I I I I I R~ / -==--==--~_,_ -==-===cc - ---- ---- ---- ---- -:::: - -L ------~== - -~~ _-_------~----\--.I ') , t------M~""f---------1--M--r----+-----'----'----M / 'l \ /_ 0 \ .J ~ ~ --+-----------') ----''----------5--------+----5----+------+--5----------5----l---+----5----------5----~---' 0---0---0 0 0 0 /0---0--- 811 I ........... ,/ ,,. Know what's below. Call before you dig. DIAL TOLL FREE 811 AT LEAST TWO DAYS IIEFllRE YOU DIG UlllERGRCUII) SER\1CE ALERT OF SOU1IERN CAI.FllRIIA a □ / I L _____ J -_-_-::...=----==-+ ~R/W -{ ,o O O ao '-------------------------------------- 0 0 0 0 0 --==-------_-_ -_----=~------=-----_----_ -_-_----_-_-_--:::..--~-ttt---- ♦IMEG --Jr-----rl-1-I -----M- l I ::e I 0 0 CITY OF CARLSBAD I SHEETS I ,----1----1---------------+---+---1----1----1 TRANSPORTATION DEPARlMENT 23 ,----1----1---------------+---+---1----1----1 ,----1----1----------------1----+---l----1----1 IMPROVEMENT PLANS FOR: CARLSBAD BARRIO PEDESTRIAN LIGHTING PHASE II PARTIAL ELECTRICAL SllE PLAN {ROOSEVELT ST) f----+-----1---------------+----+----1----1---1 APPROVED: HO55EIN AJIDEH ,----1----1---------------+---+---1----1----1 ENG. MANAGER P.E. 75991 EXPIRES 6 22 DAlE l--::D""ATE=-+-,I""Nl=l1AL,.,...+--------------+---+---l----1----1 DWN BY: ASC PRO.ECT NO. ,__DA_TE___,~IN_m_AL-+_D_ATE _ _.__INI_TIAL___, CHKD BY: 61 H ENGINEER or WDRK REVISION DESCRIPTION OMR APPROVAL CITY APPROVAL RVWD BY: 61 H I DRAWING NO. E202 --w ~ I a.. 0 z ~ Q _J 0 a: a: <( m 0 ~ ~ a: <( 0 LL 0 ~ 0 I en z <( _J a.. 1-z w ~ ~ a.. ~ - C1a C1a C2 a (S D R S D G - 7 ) OA K A V E CA R L S B A D V I L L A G E D R MADISON ST 34TYP.56TYP. 12TYP.78 C1b C4a (E ) (E) (E) (SDRSD G-7)(SDRSD G-7) MADISON ST PI N E A V E 35TYP.6 4TYP. 12TYP.78 ®www.imegcorp.com PH: 858.368.340013400 SABRE SPRINGS PARKWAY SUITE 225 SAN DIEGO, CA 92128 NO R T H NO R T H MA T C H L I N E S E E A B O V E R I G H T MA T C H L I N E S E E B E L O W L E F T MA T C H L I N E S E E S H E E T E 2 0 4 0 GRAPHIC SCALE IN FEET 2010 20 40 ELECTRICAL AND LIGHTING NOTES 2 3 4 5 6 1 GENERAL NOTES A. DRAWINGS ARE DIAGRAMMATIC ONLY. B. REFER TO SHEET E101 FOR GENERAL NOTES. FURNISH AND INSTALL CONCRETE PEDESTRIAN SCALE LIGHT STANDARD AND FOUNDATION PER PLAN AND PROJECT SPECIFICATIONS. POLE HEIGHT SHALL BE 13'-1" ABOVE GRADE. LUMINAIRE SHALL BE ACORN STYLE POST-TOP LED WITH 5,100 LUMENS MAXIMUM, COLOR TEMPERATURE OF 3000K MAXIMUM, AND TYPE III DIFFUSED LENS DISTRIBUTION. CONTRACTOR SHALL TRIM TREE(S) IN CONFLICT WITH STREET LIGHT. FURNISH AND INSTALL NO. 3-1/2 PULL BOX FOR STREET LIGHTING. CONTRACTOR TO REPLACE SIDEWALK PANEL(S) AFFECTED BY INSTALLATION OF PULL BOX. FURNISH AND INSTALL INLINE FUSE HOLDER AND 10A FUSE IN PULL BOX FOR PERMANENT POWER TO LUMINAIRE SYSTEM PER SDG&E REQUIREMENTS. FURNISH AND INSTALL 1-1/4" CONDUIT. INSTALL 2#8 CONDUCTORS AND 1#8 GROUND IN CONDUIT. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH SDG&E FOR JOINT MEETING IN FIELD FOR FINAL CONDUIT SWEEPS AND PERMANENT POWER CONNECTION. THE PRECISE LOCATION OF THE LIGHT POLE AND ITS FOOTING MUST BE APPROVED IN ADVANCE BY THE CITY ENGINEER’S REPRESENTATIVE. THIS APPROVAL IS REQUIRED BEFORE INSTALLATION BEGINS. IN CASES WHERE THE LIGHT POLE LOCATION CONFLICTS WITH THE EXISTING FENCE, THE CONTRACTOR SHALL REMOVE AND REINSTALL THE FENCE AS REQUIRED TO ENSURE PROPER ALIGNMENT WITH THE DESIGNATED RIGHT-OF-WAY. 7 8 Feb. 3, 2025 Item #3 Page 12 of 66 ' I I I I I I I I I I ' -----------------------=----------------------- R W Vl .-----,--------- -e----- 0 --~--s-1-----------------w---------W'------,-e----l----1-w~----'---.------w,~--------W---'------,-_J---w-------~--w----+-+------1---w+--+--+----l-w--1 s---------s---------s---+l----1----s----+------1-s---------s---l-------s--,----+----s-----,H--____jl----1, s----t--+--L..,_--1 --------- -------------~---------~----~=~~---:_--=~-= n= - -- ------_L ___ J I I I I I - --I---- -- -- -- -- --~ '---------1-------· ~-... --1-- / "' p w s G G :e ------ l -0 -.. -- DIAL BEF'ORE YOU DIG ,_ ~ -- ·- - - TWO WORK1NG DA'l'S BEF0RE YOU DIG ii TOLL FREE 1-800-227-2600 IL :§ A PUBLIC SERVICE BY UNDERClROUND SER'IICE ALERT G / " / "' w w s s G G G G G ~ ·'-. ' -~ / ~ ·--' '-I~ . _,._ - ---- -- ( X )---( I Y I 811 I ........... ,/ ,,. ---- DIAL TOLL FREE 811 Know what's below. AT LEAST TWO DAYS Call before you dig. IIEFllRE YOU DIG UlllERGRCUII) SER\1CE ALERT OF SOU11ERN CAI.FllRIIA B16-- / s G "' J...- _ L__R/W "" G 7 - - '---G---G--~G---G-+---G---G---G---G---G---G--- '------ I I I I I I I I I (!) I I 1 I I 1 1 I I I _J II I I (!) --- - I I - - - - - -- -- -I '- •➔ / ' ----r,w / " ---_, <7 (!) / " w w .. /1/,A w s I/I s s s (!) G ~ G G G G G G G G V"\ ---'-' " / ---·--"'--~ *J=~---....... ~ ·-H -----------, (!) - -- -- - ----'-\_ 815 ----" , R/W 7 f,~ (!) I I I I I ♦IMEG +--I---G --1,11---G +--L ---G- i ( I I I f~ I I I I I == I I I I I U ',~- 1 , '1 ) / L._ .... ~ / 0 0 0 0 0 0 0 w~ '\ ' w ',I s s J 11/ _., 'I., G G G G ' i ~ "' '),_ --L----- .I / ---------- I tp,/ v / - -- - I ,{ . 1- I I " I I I I I '==t=t====----===~=+=t==i~[SHml CITY OF CARLSBAD ISHEETSI t""r==t==t=======----===t==+==t==1t~ ~ TRANSPORTATION DEPARlMENT 23 r IMPROVEMENT PLANS FOR: CARLSBAD BARRIO PEDESTRIAN LIGHTING PHASE II PARTIAL ELECTRICAL SllE PLAN ~=t==t====-----==+==+==t==t~ (MADISON ST) ~==t=j======-----====+===+==1t=t=j r,AiJPipP~R001VE1IDD:~=~~~~~~~~Hc:=:o===s=sE=1N===A=J1=0E==:JH ENG. MANAGER P.E. 75991 EXPIRES 6 22 DAlE DATE INITIAL ENGINEER OF WDRK REVISION DESCRIPTION DATE INITIAL DATE INITIAL OTID APPROVAL CITY APPROVAL DWN BY: ASC I CHKD BY: 61 H PROJECT NO. I DRAEWl203NG NO. RVWD BY: 61 H _ _ w ~ I a.. 0 z ~ Q _J 0 a: a: <( m 0 ~ ~ a: <( 0 LL 0 ~ 0 I en z <( _J a.. !z w ~ ~ a.. ~ - C8a C8a C8b (SDRSD G-7)(SDRSD G-7)(SDRSD G-7) (SDRSD G-7) WA L N U T AV E MADISON ST 31 5 TYP.6TYP.42TYP.78 C8b C8b C12 (E) (E) (E ) (E ) (SDRSD G-7)(SDRSD G-7) MADISON ST CH E S N U T A V E 34TYP.56TYP. 12TYP.78 ®www.imegcorp.com PH: 858.368.340013400 SABRE SPRINGS PARKWAY SUITE 225 SAN DIEGO, CA 92128 NO R T H NO R T H MA T C H L I N E S E E A B O V E R I G H T MA T C H L I N E S E E B E L O W L E F T MA T C H L I N E S E E S H E E T E 2 0 5 0 GRAPHIC SCALE IN FEET 2010 20 40 MA T C H L I N E S E E S H E E T E 2 0 3 ELECTRICAL AND LIGHTING NOTES 2 3 4 5 6 1 GENERAL NOTES A. DRAWINGS ARE DIAGRAMMATIC ONLY. B. REFER TO SHEET E101 FOR GENERAL NOTES. FURNISH AND INSTALL CONCRETE PEDESTRIAN SCALE LIGHT STANDARD AND FOUNDATION PER PLAN AND PROJECT SPECIFICATIONS. POLE HEIGHT SHALL BE 13'-1" ABOVE GRADE. LUMINAIRE SHALL BE ACORN STYLE POST-TOP LED WITH 5,100 LUMENS MAXIMUM, COLOR TEMPERATURE OF 3000K MAXIMUM, AND TYPE III DIFFUSED LENS DISTRIBUTION. CONTRACTOR SHALL TRIM TREE(S) IN CONFLICT WITH STREET LIGHT. FURNISH AND INSTALL NO. 3-1/2 PULL BOX FOR STREET LIGHTING. CONTRACTOR TO REPLACE SIDEWALK PANEL(S) AFFECTED BY INSTALLATION OF PULL BOX. FURNISH AND INSTALL INLINE FUSE HOLDER AND 10A FUSE IN PULL BOX FOR PERMANENT POWER TO LUMINAIRE SYSTEM PER SDG&E REQUIREMENTS. FURNISH AND INSTALL 1-1/4" CONDUIT. INSTALL 2#8 CONDUCTORS AND 1#8 GROUND IN CONDUIT. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH SDG&E FOR JOINT MEETING IN FIELD FOR FINAL CONDUIT SWEEPS AND PERMANENT POWER CONNECTION. THE PRECISE LOCATION OF THE LIGHT POLE AND ITS FOOTING MUST BE APPROVED IN ADVANCE BY THE CITY ENGINEER’S REPRESENTATIVE. THIS APPROVAL IS REQUIRED BEFORE INSTALLATION BEGINS. IN CASES WHERE THE LIGHT POLE LOCATION CONFLICTS WITH THE EXISTING FENCE, THE CONTRACTOR SHALL REMOVE AND REINSTALL THE FENCE AS REQUIRED TO ENSURE PROPER ALIGNMENT WITH THE DESIGNATED RIGHT-OF-WAY. 7 8 Feb. 3, 2025 Item #3 Page 13 of 66 DIAL BEF"ORE YOU DIG ----------- -- LR/W - --- ---- •➔ ---<---"' / "' ·- / " "''--------1-------/r===----~~ / - -- ---- - ..... . _,_ / "' Q ~ ,.___../ I I/ I I I I" I I I I I I I / (I) -e- / w s w s-------L • ):l:l :6 -----+----s --t-w~:::::::::::-Js_J-'...._ _____ w_-_-_-_-_-~_-_-_-_-_-_-~s_1_~w--'------------1-w----------.-_L-w---------w--r------1.-~ I --r -------------------,------+------i-s-------S-+------1 ~G---G--~G---G---G-----1--G~----,7:--G --1-G ---G -...--I-G ---G ---I--G ---G \ , ---G--4.G---G {,.---,------\ ~ ~' ---G ---1---G ---G ---/ ~ / '-. / ' G ---G ---G ------G - ----1--,_~ ----...-<:I-• - - ----~~ ---- -"_/ - -*[j!l ', ~ • ~ I V -----------------_,_ - ~R/W 81 2 '--, ' I --- I I I I I I \ I ---' r- 1 I / I v / I I I I I ! ---1,- 1 I '---- I I I '\ ' I ________ ~ \ I '-------------------~ I I I r- :----------\,\ ________ () \) _____ l !-------------------------, i : i O ! I I \ \ ' / I I ', I I I II I /------\ ---I I \ I I I Cl I I ✓✓, ', I I \ I I ~ I d_ • I I ' ' I I ------I L---------~ ' ' I I ¢ \ ----~----" '-----------~ L \ I --' L ~ I '(g/ '-------1---l'l--/1-~'~ Cl tz I -----:: ~ I I - -- -- - LR/W - --,_ --~ --/ "'-/ ""- ~w w w w w----__L_---r-_ _J f w I II I ~ w ---------W---'--------W--'---r------W,---,----l 1--S-t-----------_ _ s------+--s:-----1-----s------1----/ - - --~-- - - - -_,__ - ~;G-+--G ---G ---1-G ---G ---\ /-- - - ----- - - - - - - G -+---; --\ G 7-1---1---G ~--G ----1--G ---G ---G __ ....1... )s -____,,, G G \ r --..:::: ,.__ (I) It s -ti-/ .____,, ..--,:::; G >-.-(, ; . , --------s---------s--------1------s----1-----l ,,-,-- - - --1 ---G ---G ---G ---G _L G -~-G ---,--I ---~-- I I G "'--___,/ ' _ __,,/ Cl Cl (I) C.J Cl --• ~ ci\_Gi "-00-J_ (_~!-~~ 0 0 0 0 0 0 0 0 811 ♦IMEG '==t=t====-----===~=+=t==i~[SHml CITY OF CARLSBAD ISHEETSI 1f-==t==t======-------===ir==+=::t==I=~ ~ TRANSPORTATION DEPARlMENT 23 r IMPROVEMENT PLANS FOR: CARLSBAD BARRIO PEDESTRIAN LIGHTING PHASE II TWO WORK1NG DA'l'S BEF0RE YOU DIG I ........... ,/ ,,. DIAL TOLL FREE 811 Know what's below. AT LEAST 1WO DAYS Call before you dig. IIEFllRE YOU DIG UlllERGRCUII) SER\1CE ALERT OF SOU11ERN CAI.FllRIIA PARTIAL ELECTRICAL SllE PLAN ~=t==t====-----==+==+==t==t~ (MADISON ST) r:==:t==t======-----===+==t==1~=t=j riAiJPipPRCRO~VE~DD::==~;;;;;;~~~~===:H=::;Oc::S'=:SE=1N=AJ=1o=EJH ENG. MANAGER P.E. 75991 EXPIRES 6 22 DAlE ii TOLL FREE 1-800-227-2600 DATE INITIAL DATE INmAL DATE INITIAL DWN BY: ASC I CHKD BY: 61 H PROJECT NO. I DRAEWl204NG NO. IL :§ A PUBLIC SERVICE BY UNDERClROUND SER'IICE ALERT ENGINEER OF WORK REVISION DESCRIPTION OTID APPROVAL CITY APPROVAL RVWD BY: 61 H _ _ w ~ I a.. 0 z ~ Q _J 0 a: a: <( m 0 ~ ~ a: <( 0 LL 0 ~ 0 I en z <( _J a.. !z w ~ ~ a.. ~ - C12 C12 C12 C12 (SDRSD G-7)(SDRSD G-7)(SDRSD G-7)(SDRSD G-7) PA L M A V E MADISON ST 34TYP. 56TYP. 12TYP.78 C12 C12 (SDRSD G-7) E3 MADISON ST MA G N O L I A AV E 51 TYP.62 34TYP. TYP.78 ®www.imegcorp.com PH: 858.368.340013400 SABRE SPRINGS PARKWAY SUITE 225 SAN DIEGO, CA 92128 NO R T H MA T C H L I N E S E E S H E E T E 2 0 4 0 GRAPHIC SCALE IN FEET 2010 20 40 MA T C H L I N E S E E A B O V E R I G H T MA T C H L I N E S E E B E L O W L E F T NO R T H ELECTRICAL AND LIGHTING NOTES 2 3 4 5 6 1 GENERAL NOTES A. DRAWINGS ARE DIAGRAMMATIC ONLY. B. REFER TO SHEET E101 FOR GENERAL NOTES. FURNISH AND INSTALL CONCRETE PEDESTRIAN SCALE LIGHT STANDARD AND FOUNDATION PER PLAN AND PROJECT SPECIFICATIONS. POLE HEIGHT SHALL BE 13'-1" ABOVE GRADE. LUMINAIRE SHALL BE ACORN STYLE POST-TOP LED WITH 5,100 LUMENS MAXIMUM, COLOR TEMPERATURE OF 3000K MAXIMUM, AND TYPE III DIFFUSED LENS DISTRIBUTION. CONTRACTOR SHALL TRIM TREE(S) IN CONFLICT WITH STREET LIGHT. FURNISH AND INSTALL NO. 3-1/2 PULL BOX FOR STREET LIGHTING. CONTRACTOR TO REPLACE SIDEWALK PANEL(S) AFFECTED BY INSTALLATION OF PULL BOX. FURNISH AND INSTALL INLINE FUSE HOLDER AND 10A FUSE IN PULL BOX FOR PERMANENT POWER TO LUMINAIRE SYSTEM PER SDG&E REQUIREMENTS. FURNISH AND INSTALL 1-1/4" CONDUIT. INSTALL 2#8 CONDUCTORS AND 1#8 GROUND IN CONDUIT. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH SDG&E FOR JOINT MEETING IN FIELD FOR FINAL CONDUIT SWEEPS AND PERMANENT POWER CONNECTION. THE PRECISE LOCATION OF THE LIGHT POLE AND ITS FOOTING MUST BE APPROVED IN ADVANCE BY THE CITY ENGINEER’S REPRESENTATIVE. THIS APPROVAL IS REQUIRED BEFORE INSTALLATION BEGINS. IN CASES WHERE THE LIGHT POLE LOCATION CONFLICTS WITH THE EXISTING FENCE, THE CONTRACTOR SHALL REMOVE AND REINSTALL THE FENCE AS REQUIRED TO ENSURE PROPER ALIGNMENT WITH THE DESIGNATED RIGHT-OF-WAY. 7 8 Feb. 3, 2025 Item #3 Page 14 of 66 I I I I I I I I I (/) I 3: I--- ----- ---__ +---_ --l----~R/_w_ ----------J ) __ ,,.,..,,,/0>7) ~ ~--·------/ ' -------..--'-----------,,,'IY '------(/)+----1-3:-- / tt w w I-+---s--t----t-_L. __ _ s .... - - - -_,_ I I I I I I I I I I I I 1-c " '------' ----------' ------- ' '· t I \ / .. '- __LR/W - . -'-·- / " 0 s- --- 1--1---G ---' ---G G---G---G---1 r\ I G\ 7 ' ___ , ---G . I \ 7 G ~--G ---G ---IG ---G -+---~ \ . . G ---GI \ 7 G t---G ---G --+-G ---G ---G I 0 \ o/ G 0 . , / ~ I'-/ /W ---~ ~5 --------,..~~---------------------,..-~-..----- DIAL BEFORE YOU DIG G ~ \ G TWO WORK1NG DA'l'S BEF0RE YOU DIG ii TOLL FREE 1-800-227-2600 IL :§ A PUBLIC SERVICE BY UNDERClROUND SER'IICE ALERT s ~G s s ----------- G G G G G G r-G \ /<) --------\ ----------0 -...... , I <) 811 I ........... ,/ ,,. DIAL TOLL FREE 811 Know what's below. AT LEAST TWO DAYS Call before you dig. IIEFllRE YOU DIG UlllERGRCUII) SER\1CE ALERT OF SOU11ERN CAI.FllRIIA '\ : ./ ), I At ) 0 I ~ / <) I <) <) I /; /1 I I, I I; I <) I, I, I, I <) . ---~~~0:-~~~1 __ 8_3 _____________ .~ ____ _ ~ .... / -- H -- ( y ) l " "'-/ " ~1~ --0 0 0 0 0 I ♦IMEG '==t=t====---===~=+=t==i~[SHml CITY OF CARLSBAD ISHEETSI ir==t==t=======----===t==+==t==1t~ ~ TRANSPORTATION DEPARlMENT 23 r IMPROVEMENT PLANS FOR: CARLSBAD BARRIO PEDESTRIAN LIGHTING PHASE II PARTIAL ELECTRICAL SllE PLAN ~=t==t====-----==+==+==t==t~ (MADISON ST) ~==t=j======-----====+===+==1t=t=j r,AiJPipP~R001VE1IDD:~=~~~~~~~~H;:;:;o='=s=sE=1N===A=J1=0E==:JH ENG. MANAGER P.E. 75991 EXPIRES 6 22 DAlE DATE INITIAL ENGINEER OF WDRK REVISION DESCRIPTION DATE INITIAL DATE INITIAL OTID APPROVAL CITY APPROVAL DWN BY: ASC I CHKD BY: 61 H PROJECT NO. I DRAWING NO. RVWD BY: 61 H . _ E205 w ~ I a.. 0 z ~ Q _J 0 a: a: <( m 0 ~ ~ a: <( 0 LL 0 ~ 0 I en z <( _J a.. !z w ~ ~ a.. ~ - C5 b C5 b C2b C5a C5a (E) (SDRSD G-7)(SDRSD G-7) JEFFERSON ST 5 TYP.6 34TYP. 12TYP.78 C13 C13 C13 (SDRSD G-7)(SDRSD G-7)(SDRSD G-7) JEFFERSON ST 5 TYP.6 3 TYP. 4 1 TYP. 2 7 8 ®www.imegcorp.com PH: 858.368.340013400 SABRE SPRINGS PARKWAY SUITE 225 SAN DIEGO, CA 92128 NO R T H NO R T H MA T C H L I N E S E E A B O V E R I G H T MA T C H L I N E S E E B E L O W L E F T 0 GRAPHIC SCALE IN FEET 2010 20 40 ELECTRICAL AND LIGHTING NOTES 2 3 4 5 6 1 GENERAL NOTES A. DRAWINGS ARE DIAGRAMMATIC ONLY. B. REFER TO SHEET E101 FOR GENERAL NOTES. FURNISH AND INSTALL CONCRETE PEDESTRIAN SCALE LIGHT STANDARD AND FOUNDATION PER PLAN AND PROJECT SPECIFICATIONS. POLE HEIGHT SHALL BE 13'-1" ABOVE GRADE. LUMINAIRE SHALL BE ACORN STYLE POST-TOP LED WITH 5,100 LUMENS MAXIMUM, COLOR TEMPERATURE OF 3000K MAXIMUM, AND TYPE III DIFFUSED LENS DISTRIBUTION. CONTRACTOR SHALL TRIM TREE(S) IN CONFLICT WITH STREET LIGHT. FURNISH AND INSTALL NO. 3-1/2 PULL BOX FOR STREET LIGHTING. CONTRACTOR TO REPLACE SIDEWALK PANEL(S) AFFECTED BY INSTALLATION OF PULL BOX. FURNISH AND INSTALL INLINE FUSE HOLDER AND 10A FUSE IN PULL BOX FOR PERMANENT POWER TO LUMINAIRE SYSTEM PER SDG&E REQUIREMENTS. FURNISH AND INSTALL 1-1/4" CONDUIT. INSTALL 2#8 CONDUCTORS AND 1#8 GROUND IN CONDUIT. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH SDG&E FOR JOINT MEETING IN FIELD FOR FINAL CONDUIT SWEEPS AND PERMANENT POWER CONNECTION. THE PRECISE LOCATION OF THE LIGHT POLE AND ITS FOOTING MUST BE APPROVED IN ADVANCE BY THE CITY ENGINEER’S REPRESENTATIVE. THIS APPROVAL IS REQUIRED BEFORE INSTALLATION BEGINS. IN CASES WHERE THE LIGHT POLE LOCATION CONFLICTS WITH THE EXISTING FENCE, THE CONTRACTOR SHALL REMOVE AND REINSTALL THE FENCE AS REQUIRED TO ENSURE PROPER ALIGNMENT WITH THE DESIGNATED RIGHT-OF-WAY. 7 8 Feb. 3, 2025 Item #3 Page 15 of 66 I I 11 I I 11 I 3::: I I I I I I I I I I I I I I 11 I I I l I I I I I I ~ '------ / -----I 3:: ---- ========= _c.6=======-----------1 ---------1 L _____ _ --- C4 --- -_)// / / ---------/ ------- --- I I I I I I I I I / C!) \ 3::: ( I I I I V I I I I I I' I I I J I I I I --1 I I I I I I I I II 11 I '("""" I I 0 I M M---------M---_J_-.------M.---L,--_.l ___ M ---- ----• , - - :7~------H--l-l---+----+--s-l-----------7~-----+---si-------------l-s;---------1---s----~1----s--~---_-_-_-_-~r--_-_--_-_-_-_~s~-M::::~~~~~~----+-----l M M M- 3:: \ C) I I C!) *\ I I I I I ( I 0 :e I_____ I ________________________ \ I I I I I \ I ' 1----\ L \ I -----===---=====~~~'--,,~ '\ Cll--+ I I I \ 1-----~ I \ L _________ _. I I I I I I I I I I I I I I I I / I C!) I I I I 0 I I I I C!) I I 0 Id I I __ ..l 3::: I I ----0 I C!) I I --, ----0 I II 0 0 j I I I \ '\ ' --~-'------------------------------* C3 C2 t:--\c::l ---------------------- C1 H *-------/ (/] I I I I I I (/] 1--lr---M--'O,__...,£ ______ M---------M--,-------M--,--------M --------s -------:-+-- ------------------/ ------ C!) ;)-------- / DIAL BEF"ORE YOU DIG (/] I C!) /1------1 \ I I TWO WORK1NG DA'l'S BEF0RE YOU DIG ii TOLL FREE 1-800-227-2600 IL :§ A PUBLIC SERVICE BY UNDERClROUND SER'IICE ALERT 811 I ........... ,/ ,,. DIAL TOLL FREE 811 Know what's below. AT LEAST 1WO DAYS Call before you dig. IIEFllRE YOU DIG UlllERGRCUII) SER\1CE ALERT OF SOU11ERN CAI.FllRIIA ------------------------ ------ ♦IMEG / i I I I I I I I (/] '==t=t====----===~=+=t==i~[SHml CITY OF CARLSBAD ISHEETSI 1f-==t==t======-----===ir==+=::t==I=~ ~ TRANSPORTATION DEPARlMENT 23 r IMPROVEMENT PLANS FOR: CARLSBAD BARRIO PEDESTRIAN LIGHTING PHASE II PARTIAL ELECTRICAL SllE PLAN ~~~=t====-----=+==t==t==t~ {JEFFERSON ST) r:==:t==t======-----===+==t==1~=t=j riAiJPipPRCRO~VE~DD::==~~~~~~~H=::;O:=::s=:;;sE=1N=AJ=1o=EJH ENG. MANAGER P.E. 75991 EXPIRES 6 22 DAlE DATE INITIAL ENGINEER OF WDRK REVISION DESCRIPTION DATE INITIAL DATE INITIAL OTID APPROVAL CITY APPROVAL OWN BY: ASC I CHKD BY: 61 H PROJECT NO. I DRAEWl206NG NO. RVWD BY: 61 H _ _ w ~ I a.. 0 z ~ Q _J 0 a: a: <( m 0 ~ ~ a: <( 0 LL 0 ~ 0 I en z <( _J a.. !z w ~ ~ a.. ~ - C3 b C3a C3a C3a OA K A V E CA R L S B A D V I L L A G E D R HARDING ST 5 TYP.6 34TYP. 12TYP.78 C6a C6a C6a C6b C6a C6a (E) (E) (E ) HARDING ST PI N E A V E 34TYP. 56TYP. 12TYP.78 ®www.imegcorp.com PH: 858.368.340013400 SABRE SPRINGS PARKWAY SUITE 225 SAN DIEGO, CA 92128 NO R T H NO R T H MA T C H L I N E S E E A B O V E R I G H T MA T C H L I N E S E E B E L O W L E F T MA T C H L I N E S E E S H E E T E 2 0 8 0 GRAPHIC SCALE IN FEET 2010 20 40 ELECTRICAL AND LIGHTING NOTES 2 3 4 5 6 1 GENERAL NOTES A. DRAWINGS ARE DIAGRAMMATIC ONLY. B. REFER TO SHEET E101 FOR GENERAL NOTES. FURNISH AND INSTALL CONCRETE PEDESTRIAN SCALE LIGHT STANDARD AND FOUNDATION PER PLAN AND PROJECT SPECIFICATIONS. POLE HEIGHT SHALL BE 13'-1" ABOVE GRADE. LUMINAIRE SHALL BE ACORN STYLE POST-TOP LED WITH 5,100 LUMENS MAXIMUM, COLOR TEMPERATURE OF 3000K MAXIMUM, AND TYPE III DIFFUSED LENS DISTRIBUTION. CONTRACTOR SHALL TRIM TREE(S) IN CONFLICT WITH STREET LIGHT. FURNISH AND INSTALL NO. 3-1/2 PULL BOX FOR STREET LIGHTING. CONTRACTOR TO REPLACE SIDEWALK PANEL(S) AFFECTED BY INSTALLATION OF PULL BOX. FURNISH AND INSTALL INLINE FUSE HOLDER AND 10A FUSE IN PULL BOX FOR PERMANENT POWER TO LUMINAIRE SYSTEM PER SDG&E REQUIREMENTS. FURNISH AND INSTALL 1-1/4" CONDUIT. INSTALL 2#8 CONDUCTORS AND 1#8 GROUND IN CONDUIT. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH SDG&E FOR JOINT MEETING IN FIELD FOR FINAL CONDUIT SWEEPS AND PERMANENT POWER CONNECTION. THE PRECISE LOCATION OF THE LIGHT POLE AND ITS FOOTING MUST BE APPROVED IN ADVANCE BY THE CITY ENGINEER’S REPRESENTATIVE. THIS APPROVAL IS REQUIRED BEFORE INSTALLATION BEGINS. IN CASES WHERE THE LIGHT POLE LOCATION CONFLICTS WITH THE EXISTING FENCE, THE CONTRACTOR SHALL REMOVE AND REINSTALL THE FENCE AS REQUIRED TO ENSURE PROPER ALIGNMENT WITH THE DESIGNATED RIGHT-OF-WAY. 7 8 Feb. 3, 2025 Item #3 Page 16 of 66 I ::E I I I I I I I I I l _ _ __ _ _ __ __ __ __ rR;w -----------------=--=----=~----~---- -~--L__ r------------------7 -,,_-_-----~--~-=--=---u3o= ----- -------=-________ ------- --------- I I "' I I I I I I I I I I I I I I I I I J I I \ -) ·-----(.') / 3.5 -----------------------(.') I (/) · ----------------D34 ___________ ,,,, rc----J ------, -------- I l ,,,------.--1 ----+----1---M M-,-+------1--M,---------M-t,---L-----~ -------~ • 0 •,-------~-Mt-~4----+- ---~-+--s------L_ --G ---G _s==r=-..LG-~--~~~-G---_-_-_-_-':~~~-=--=---G--~---_-_-G-=c_G__. ___ -_ -,---1-r-1_:------I-S'----,----__J_ ___ s------.---G--¥---r----,,-----------l s--------i-...../.....Q... G---G-+---Gt---G---G---G+---_J I S-----'--+-+-+----s- M M M 0 ----, ,-------- w w " ------ DIAL BEFORE YOU DIG D33 TWO WORK1NG DA'l'S BEF0RE YOU DIG ii TOLL FREE 1-800-227-2600 IL :§ A PUBLIC SERVICE BY UNDERClROUND SER'IICE ALERT -e- 811 I ........... ,/ ,,. DIAL TOLL FREE 811 Know what's below. AT LEAST TWO DAYS Call before you dig. IIEFllRE YOU DIG UlllERGRCUIID SER\1CE ALERT OF SOU11ERN CAlFllRIIA -e- w ::e ---G -I---G ---G -l---+-J ::E G----1--G+---G-~ 0 0 ' I I I I I -----------_J i -------l)Y2[9"" ______________ J -------------------, L __ J I I I __ w W---------W -e- L ---------------------------=--=----------' ----------- R/W 1\ I \ \ I I ♦IMEG (/) I I I I I I ! I I I I I I I I I I I I I I I I I I I I I I I \~~-7'-J ~ - --- ---------- '----- ,,.,-= I " I I I I I I I I I I I I ---G---G---G---G 0 0 0 0 0 '==t=t====---===~=+=t==i~[SHml CITY OF CARLSBAD ISHEETSI 1f-==t==t======-----===ir==+=::t==I=~ L...22_J TRANSPORTATION DEPARlMENT 23 r IMPROVEMENT PLANS FOR: CARLSBAD BARRIO PEDESTRIAN LIGHTING PHASE II PARTIAL ELECTRICAL SllE PLAN ~=t==t====-----==+==+==t==t~ (HARDING ST) r:==:t==t======-----===+==t==1~=t=j riAiJPipPRCRO~VE~DD::==~~~~~~===:H=::;Oc::s'=:sE=1N=AJ=1o=EJH ENG. MANAGER P.E. 75991 EXPIRES 6 22 DAlE DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DATE INITIAL DATE INITIAL OTID APPROVAL CITY APPROVAL DWN BY: ASC I CHKD BY: 61 H PROJECT NO. I DRAWING NO. RVWD BY: 61 H _ _ E207 w ~ I a.. 0 z ~ Q _J 0 a: a: <( m 0 ~ ~ a: <( 0 LL 0 ~ 0 I en z <( _J a.. !z w ~ ~ a.. ~ - C6b C9a C9a C6b C6b C9a C9a C9a HARDING ST 34TYP. 56TYP. 12TYP.78 C1 0 a C10b C9b C9b C9b C10b C10b HARDING ST CH E S N U T A V E 5 TYP.6 3 TYP. 4 1 TYP. 2 7 8 ®www.imegcorp.com PH: 858.368.340013400 SABRE SPRINGS PARKWAY SUITE 225 SAN DIEGO, CA 92128 NO R T H NO R T H MA T C H L I N E S E E A B O V E R I G H T MA T C H L I N E S E E B E L O W L E F T MA T C H L I N E S E E S H E E T E 2 0 9 0 GRAPHIC SCALE IN FEET 2010 20 40 MA T C H L I N E S E E S H E E T E 2 0 7 ELECTRICAL AND LIGHTING NOTES 2 3 4 5 6 1 GENERAL NOTES A. DRAWINGS ARE DIAGRAMMATIC ONLY. B. REFER TO SHEET E101 FOR GENERAL NOTES. FURNISH AND INSTALL CONCRETE PEDESTRIAN SCALE LIGHT STANDARD AND FOUNDATION PER PLAN AND PROJECT SPECIFICATIONS. POLE HEIGHT SHALL BE 13'-1" ABOVE GRADE. LUMINAIRE SHALL BE ACORN STYLE POST-TOP LED WITH 5,100 LUMENS MAXIMUM, COLOR TEMPERATURE OF 3000K MAXIMUM, AND TYPE III DIFFUSED LENS DISTRIBUTION. CONTRACTOR SHALL TRIM TREE(S) IN CONFLICT WITH STREET LIGHT. FURNISH AND INSTALL NO. 3-1/2 PULL BOX FOR STREET LIGHTING. CONTRACTOR TO REPLACE SIDEWALK PANEL(S) AFFECTED BY INSTALLATION OF PULL BOX. FURNISH AND INSTALL INLINE FUSE HOLDER AND 10A FUSE IN PULL BOX FOR PERMANENT POWER TO LUMINAIRE SYSTEM PER SDG&E REQUIREMENTS. FURNISH AND INSTALL 1-1/4" CONDUIT. INSTALL 2#8 CONDUCTORS AND 1#8 GROUND IN CONDUIT. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH SDG&E FOR JOINT MEETING IN FIELD FOR FINAL CONDUIT SWEEPS AND PERMANENT POWER CONNECTION. THE PRECISE LOCATION OF THE LIGHT POLE AND ITS FOOTING MUST BE APPROVED IN ADVANCE BY THE CITY ENGINEER’S REPRESENTATIVE. THIS APPROVAL IS REQUIRED BEFORE INSTALLATION BEGINS. IN CASES WHERE THE LIGHT POLE LOCATION CONFLICTS WITH THE EXISTING FENCE, THE CONTRACTOR SHALL REMOVE AND REINSTALL THE FENCE AS REQUIRED TO ENSURE PROPER ALIGNMENT WITH THE DESIGNATED RIGHT-OF-WAY. 7 8 Feb. 3, 2025 Item #3 Page 17 of 66 ~---:-~----=--=----- - - - - -/TlR/W M._ ~L ~-7""± _-_------= ~D2l ~ -~---·--~ -,/ ~24~------~--~~-------t• ~2_? =~- '-.\ G) [/ ~ H ------ " \-- --~ , 'H // "-. -~ G) >-W w G) w \ w w w s ,s s s G) G I s G ~ G G G _J__ G ~ G G G G G G G \ ~-----~---"'-~ ' ' -, ti I ->-~*I~ @-~ ..... *-~- ~ . ' -D., I . ..-:,__ LJ , I UZ.J I I I I I I ~ l I I I I I I I I I I I I I(!) j I I I I I \ I \. c, 18...-- ----=---~ - --=-= - - - - - - - - -J.-L.L-1-• ....t. ----,-/-~ == - -~= //';c----.:-:11 D16__ --------- -------------"\ ----- (!) -- I -1 G - / G I ;: I l s i-------s ---t--------s _ __._ _______ s ___ J..._ __ L.--+-- ----------------------------------------------- _______________ _,/ DIAL BEF'ORE YOU DIG ,---------- TWO WORK1NG DA'l'S BEF0RE YOU DIG ii TOLL FREE 1-800-227-2600 IL :§ A PUBLIC SERVICE BY UNDERClROUND SER'IICE ALERT ------------ 811 I ........... ,/ ,,. ,---------------1 I ----------------- I I I \ I \ DIAL TOLL FREE 811 Know what's below. AT LEAST 1WO DAYS Call before you dig. IIEFllRE YOU DIG UlllERGRCUII) SER\1CE ALERT OF SOU11ERN CAI.FllRIIA ,,,.---.. \ l l \. I -...:_/ ' ' (.!) ' (.!) (/) (.!) -- " ~- w G \_R/W l --o-zr alrN *~ I 1/ L__Cil__ -'I"""- I I w I G) s s I G G I G G ~! :-/·-ft~,~ ;_ ~_t1 /L)Lu IJ ()I'/'<: I Y---- . -Bffi= ------~ '~·*.1 t--s '// "! I I 1 I ., G) w w s G) G_JS G G G G ~ ~ -~ ~ '--------------------------- - ---- - L ..----.. I' \ r ' \ / ....... ---- 0 0 0 -y i l 1 -I 0 0 0 \ 0 0 L I -,-----s ---------s ------0---.l_-5 I ---D __ :_ D ---/ ---D ---D --- I ___ , __ -e------------------------' --=---~ R/W ♦IMEG '==t=t====----===~=+=t==i~[SHml CITY OF CARLSBAD ISHEETSI 1f-==t==t======------===ir==+=::t==I=~ L..2.:_j TRANSPORTATION DEPARlMENT 23 r IMPRO\IEIIENT PLANS FOR: CARLSBAD BARRIO PEDESTRIAN LIGHTING PHASE II PARTIAL ELECTRICAL SllE PLAN ~=t==t====-----==+==+==t==t~ (HARDING ST) r:==:t==t======-----===+==t==1~=t=j riAiJPipPRCRO~VE~DD::==~~~~~~===:H=::;Oc::s'=:sE=1N=AJ=1o=EJH ENG. MANAGER P.E. 75991 EXPIRES 6 22 DAlE DATE INITIAL ENGINEER OF WDRK REVISION DESCRIPTION DATE INITIAL DATE INITIAL OTID APPROVAL CITY APPROVAL DWN BY: ASC I CHKD BY: 61 H PROJECT NO. I DRAWING NO. RVWD BY: 61 H _ _ E208 w ~ I a.. 0 z ~ Q _J 0 a: a: <( m 0 ~ ~ a: <( 0 LL 0 ~ 0 I en z <( _J a.. !z w ~ ~ a.. ~ - C10b C14a C14a C14a C14b C1 4 b C14b (SDRSD G-7) (SDRSD G-7) PA L M A V E PA L M A V E AV O C A D O L N HARDING ST 12 34TYP. 56TYP. TYP.78 C1 5 C15 C15 C15 C15 (SDRSD G-7) (SDRSD G-7) (SDRSD G-7) (SDRSD G-7) HARDING ST CA M E L L I A PL MA G N O L I A AV E 34TYP. 56TYP. 12TYP.78 ®www.imegcorp.com PH: 858.368.340013400 SABRE SPRINGS PARKWAY SUITE 225 SAN DIEGO, CA 92128 NO R T H MA T C H L I N E S E E S H E E T E 2 0 8 0 GRAPHIC SCALE IN FEET 2010 20 40 MA T C H L I N E S E E A B O V E R I G H T MA T C H L I N E S E E B E L O W L E F T NO R T H ELECTRICAL AND LIGHTING NOTES 2 3 4 5 6 FURNISH AND INSTALL CONCRETE PEDESTRIAN SCALE LIGHT STANDARD AND FOUNDATION PER PLAN AND PROJECT SPECIFICATIONS. POLE HEIGHT SHALL BE 13'-1" ABOVE GRADE. LUMINAIRE SHALL BE ACORN STYLE POST-TOP LED WITH 5,100 LUMENS MAXIMUM, COLOR TEMPERATURE OF 3000K MAXIMUM, AND TYPE III DIFFUSED LENS DISTRIBUTION. CONTRACTOR SHALL TRIM TREE(S) IN CONFLICT WITH STREET LIGHT. FURNISH AND INSTALL NO. 3-1/2 PULL BOX FOR STREET LIGHTING. CONTRACTOR TO REPLACE SIDEWALK PANEL(S) AFFECTED BY INSTALLATION OF PULL BOX. FURNISH AND INSTALL INLINE FUSE HOLDER AND 10A FUSE IN PULL BOX FOR PERMANENT POWER TO LUMINAIRE SYSTEM PER SDG&E REQUIREMENTS. FURNISH AND INSTALL 1-1/4" CONDUIT. INSTALL 2#8 CONDUCTORS AND 1#8 GROUND IN CONDUIT. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH SDG&E FOR JOINT MEETING IN FIELD FOR FINAL CONDUIT SWEEPS AND PERMANENT POWER CONNECTION. THE PRECISE LOCATION OF THE LIGHT POLE AND ITS FOOTING MUST BE APPROVED IN ADVANCE BY THE CITY ENGINEER’S REPRESENTATIVE. THIS APPROVAL IS REQUIRED BEFORE INSTALLATION BEGINS. IN CASES WHERE THE LIGHT POLE LOCATION CONFLICTS WITH THE EXISTING FENCE, THE CONTRACTOR SHALL REMOVE AND REINSTALL THE FENCE AS REQUIRED TO ENSURE PROPER ALIGNMENT WITH THE DESIGNATED RIGHT-OF-WAY. 1 GENERAL NOTES A. DRAWINGS ARE DIAGRAMMATIC ONLY. B. REFER TO SHEET E101 FOR GENERAL NOTES. 7 8 Feb. 3, 2025 Item #3 Page 18 of 66 r-----------, w w s s ---- D13 ' s-----__l Q-----s s Q 3: I ~ ... "-7 r I/ If I I I I • I\ I I ii I t: f/ I I I I I ' DIAL BEF'ORE YOU DIG TWO WORK1NG DA'l'S BEF0RE YOU DIG ii TOLL FREE 1--800--227-2600 IL :§ A PUBLIC SERVICE BY UNDERClROUND SER'IICE ALERT -Q. Q ---"' ----- \_~~w 811 I ........... ,/ ,,. Q -Q ~-1=-- DIAL TOLL FREE 811 Know what's below. AT LEAST TWO DAYS Call before you dig. IIEFllRE YOU DIG UlllERGRCUII) SER\1CE ALERT OF SOU11ERN CAI.FllRIIA ~---------------e----------------~ r-- I I I 3: ---(/) -- i i/ I I I I I I I I I w -t--t-------W-----r:r--...L.._ ____ W '----t-T-L-W---_µ __ I ...___ -- ------I W---______ : -_.----"!" J____,__ ----=::._;:;;-=c-_-I ' s -----------j~--s I s/ I ---- --u,,~ R/W I s Q / / ✓- ~. -:----' / 05 --TI9' '\. \ \ \ \ \ \ I \ w---f,lL_ ~ - -s - II I I I I I I I I Q :E I ' (!) ,--:=. ~c/--.j.__ I -------.-c-------- / r--' I I I I (!) I I I . M I -s s _t-1-~w=====--f--LJ_=::::::::::::::::::::::::::::::--::-~-~-111-:-d- \ s-c_._--M----L ---Jl.___ ~ ---S -------~ M 0 I M ♦IMEG D--- en I I 3: l 1/ 0 0 0 0 0 0 0 '==t=t====---===~=+=t==i~[SHml CITY OF CARLSBAD ISHEETSI 1f-==t==t======-----===ir==+=::t==I=~ L...2.:_J TRANSPORTATION DEPARlMENT 23 r IMPROVEMENT PLANS FOR: CARLSBAD BARRIO PEDESTRIAN LIGHTING PHASE II PARTIAL ELECTRICAL SllE PLAN ~=t==t====-----==+==+==t==t~ (HARDING ST) r:==:t==t======-----===+==t==1~=t=j riAiJPipPRCRO~VE~DD::==~~~~~~===:H=::;Oc::s'=:sE=1N=AJ=1o=EJH ENG. MANAGER P.E. 75991 EXPIRES 6 22 DAlE DATE INITIAL ENGINEER OF WDRK REVISION DESCRIPTION DATE INITIAL DATE INITIAL OTID APPROVAL CITY APPROVAL DWN BY: ASC I CHKD BY: 61 H PROJECT NO. I DRAEWl209NG NO. RVWD BY: 61 H _ _ w ~ I a.. 0 z ~ Q _J 0 a: a: <( m 0 ~ ~ a: <( 0 LL 0 ~ 0 I en z <( _J a.. !z w ~ ~ a.. ~ - C1a C1a C1a C1b (SDRSD G-7)(SDRSD G-7) (SDRSD G-7) (SDRSD G-7)(SDRSD G-7) (SDRSD G-7) OAK AVE TY L E R S T TY P . 1TYP.2 3TYP.4 5TYP.6 TY P . TY P . 7 8 78 C1a C1b C1b C1 a C2a C2a C2a C2a C2a (SDRSD G-7)(SDRSD G-7)(SDRSD G-7)(SDRSD G-7)(SDRSD G-7) (SDRSD G-7)(SDRSD G-7) OAK AVE 12 3TYP.4 5TYP.6 TYP.78 ®www.imegcorp.com PH: 858.368.340013400 SABRE SPRINGS PARKWAY SUITE 225 SAN DIEGO, CA 92128 N O R T H N O R T H MA T C H L I N E S E E A B O V E R I G H T MA T C H L I N E S E E B E L O W L E F T MA T C H L I N E S E E S H E E T E 2 1 1 0 GRAPHIC SCALE IN FEET #### #### ELECTRICAL AND LIGHTING NOTES 2 3 4 5 6 1 GENERAL NOTES A. DRAWINGS ARE DIAGRAMMATIC ONLY. B. REFER TO SHEET E101 FOR GENERAL NOTES. 8 FURNISH AND INSTALL CONCRETE PEDESTRIAN SCALE LIGHT STANDARD AND FOUNDATION PER PLAN AND PROJECT SPECIFICATIONS. POLE HEIGHT SHALL BE 13'-1" ABOVE GRADE. LUMINAIRE SHALL BE ACORN STYLE POST-TOP LED WITH 5,100 LUMENS MAXIMUM, COLOR TEMPERATURE OF 3000K MAXIMUM, AND TYPE III DIFFUSED LENS DISTRIBUTION. CONTRACTOR SHALL TRIM TREE(S) IN CONFLICT WITH STREET LIGHT. FURNISH AND INSTALL NO. 3-1/2 PULL BOX FOR STREET LIGHTING. CONTRACTOR TO REPLACE SIDEWALK PANEL(S) AFFECTED BY INSTALLATION OF PULL BOX. FURNISH AND INSTALL INLINE FUSE HOLDER AND 10A FUSE IN PULL BOX FOR PERMANENT POWER TO LUMINAIRE SYSTEM PER SDG&E REQUIREMENTS. FURNISH AND INSTALL 1-1/4" CONDUIT. INSTALL 2#8 CONDUCTORS AND 1#8 GROUND IN CONDUIT. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH SDG&E FOR JOINT MEETING IN FIELD FOR FINAL CONDUIT SWEEPS AND PERMANENT POWER CONNECTION. THE PRECISE LOCATION OF THE LIGHT POLE AND ITS FOOTING MUST BE APPROVED IN ADVANCE BY THE CITY ENGINEER’S REPRESENTATIVE. THIS APPROVAL IS REQUIRED BEFORE INSTALLATION BEGINS. IN CASES WHERE THE LIGHT POLE LOCATION CONFLICTS WITH THE EXISTING FENCE, THE CONTRACTOR SHALL REMOVE AND REINSTALL THE FENCE AS REQUIRED TO ENSURE PROPER ALIGNMENT WITH THE DESIGNATED RIGHT-OF-WAY. 7 Feb. 3, 2025 Item #3 Page 19 of 66 .. -- DIAL BEF"ORE YOU DIG I i I I I I I I I I 4 1 I __ ] I I I I I I I I l I I I I I I I I 1~----------------- t---------- s s I I I / / I ....1.I I ""-' I I I I I I I l / - ----------__ I ---------- I -0-H1 *------------------------ ------------ ~i I I I L I I I I H I _J C) H2 C) I H4 I I ___ ] .____ 3:...._ --a--J_ ---~ .______ J ---------s---------s--------1--st---+--+----s----------=--- - - - - --s---------s------1 I I I I I I I I I I I! M C) ii C) C) 1/) ' I I I I I ,I I ::e ~: :~ ,/ \ ~', ----- C) 1/) -7 I ;:o I '--:;; ,--'\ I I I I l~I I 101 I I I C) L_I M M- ------------- ----- --~- -1 I 11~--I I ;:o I I '-- □ I I :;; I 11 □ I I I II _J 11 -----·--------, H3 I I I I I I 11 I I I I -0---,--=----==:----------- ----- \ 0 0 0 0 0 0 0 0 st---t-------1---t--+-----s---------s-------~L--s---------''.L.-s--------\.J.-s---------S-----l M--;'-+-.-----C) ::e I ___ M-.--------M----,---...L--1.---IA----1----::1/171--M------.---~r--------M~--------M _ _ _ _ _ _ _ _ _ _ I -r-------M--\\--------M----1 \ --, I I I I I I I I I Ii \ I I I I I I I I I I TWO WORK1NG DA'l'S BEF0RE YOU DIG HS ------ 811 I ........... ,/ ,,. H6 DIAL TOLL FREE 811 Know what's below. AT LEAST 1WO DAYS Call before you dig. IIEFllRE YOU DIG UlllERGRCUII) SER\1CE ALERT OF SOU11ERN CAI.FllRIIA -------- ' ' ' -_\_ ----I I I / / ' I I I G) I I I I I I I I I I I I I G) 1/) I I I I I ♦IMEG '==t=t====---===~=+=t==i~[SHml CITY OF CARLSBAD ISHEETSI 1f-==t==t======------===ir==+=::t==I=~ ~ TRANSPORTATION DEPARlMENT 23 r IMPROVEMENT PLANS FOR: CARLSBAD BARRIO PEDESTRIAN LIGHTING PHASE II PARTIAL ELECTRICAL SllE PLAN ~=t==t====-----==+==+==t==t~ (OAK AVE} r:==:t==t======-----===+==t==1~=t=j riAiJPipPRCRO~VE~DD::===~~~~~===:H=::;Oc::s'=:sE=1N=AJ=1o=EJH ENG. MANAGER P.E. 75991 EXPIRES 6 22 DAlE ii TOLL FREE 1-800-227-2600 DATE INITIAL DATE INITIAL DATE INITIAL DWN BY: ASC I CHKD BY: 61 H PROJECT NO. I DRAWING NO. RVWD BY: 61 H . _ E210 IL :§ A PUBLIC SERVICE BY UNDERClROUND SER'IICE ALERT ENGINEER OF WDRK REVISION DESCRIPTION OTID APPROVAL CITY APPROVAL w ~ I a.. 0 z ~ Q _J 0 a: a: <( m 0 ~ ~ a: <( 0 LL 0 ~ 0 I en z <( _J a.. !z w ~ ~ a.. ~ - C2b C2b C3b C2b (E ) (E) OAK AVE 12 3TYP.4 5TYP.6 TYP.78 C3b C3b C3b C3b C3a C3a C3a OAK AVE 12 3TYP.4 5TYP.6 TYP.78 ®www.imegcorp.com PH: 858.368.340013400 SABRE SPRINGS PARKWAY SUITE 225 SAN DIEGO, CA 92128 N O R T H N O R T H MA T C H L I N E S E E A B O V E R I G H T MA T C H L I N E S E E B E L O W L E F T 0 GRAPHIC SCALE IN FEET #### #### MA T C H L I N E S E E S H E E T E 2 1 0 ELECTRICAL AND LIGHTING NOTES 2 3 4 5 6 1 GENERAL NOTES A. DRAWINGS ARE DIAGRAMMATIC ONLY. B. REFER TO SHEET E101 FOR GENERAL NOTES. FURNISH AND INSTALL CONCRETE PEDESTRIAN SCALE LIGHT STANDARD AND FOUNDATION PER PLAN AND PROJECT SPECIFICATIONS. POLE HEIGHT SHALL BE 13'-1" ABOVE GRADE. LUMINAIRE SHALL BE ACORN STYLE POST-TOP LED WITH 5,100 LUMENS MAXIMUM, COLOR TEMPERATURE OF 3000K MAXIMUM, AND TYPE III DIFFUSED LENS DISTRIBUTION. CONTRACTOR SHALL TRIM TREE(S) IN CONFLICT WITH STREET LIGHT. FURNISH AND INSTALL NO. 3-1/2 PULL BOX FOR STREET LIGHTING. CONTRACTOR TO REPLACE SIDEWALK PANEL(S) AFFECTED BY INSTALLATION OF PULL BOX. FURNISH AND INSTALL INLINE FUSE HOLDER AND 10A FUSE IN PULL BOX FOR PERMANENT POWER TO LUMINAIRE SYSTEM PER SDG&E REQUIREMENTS. FURNISH AND INSTALL 1-1/4" CONDUIT. INSTALL 2#8 CONDUCTORS AND 1#8 GROUND IN CONDUIT. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH SDG&E FOR JOINT MEETING IN FIELD FOR FINAL CONDUIT SWEEPS AND PERMANENT POWER CONNECTION. THE PRECISE LOCATION OF THE LIGHT POLE AND ITS FOOTING MUST BE APPROVED IN ADVANCE BY THE CITY ENGINEER’S REPRESENTATIVE. THIS APPROVAL IS REQUIRED BEFORE INSTALLATION BEGINS. IN CASES WHERE THE LIGHT POLE LOCATION CONFLICTS WITH THE EXISTING FENCE, THE CONTRACTOR SHALL REMOVE AND REINSTALL THE FENCE AS REQUIRED TO ENSURE PROPER ALIGNMENT WITH THE DESIGNATED RIGHT-OF-WAY. 7 8 Feb. 3, 2025 Item #3 Page 20 of 66 VI I VI ___ -1-1-----1 M---+--~ I , I I I I I I I I I : ix----- ____ __,. I I ) / ,~~ '----------A ---------~Y-~,--+------s-/--------------~~ r -----------------------------I V -++-+--+I---M+-__J'---_ __J I I I I I I ---------------------iJ ---_________________________ ! -------------~ *-H15 ---------@ / / / VI VI I Gl I I I I I I I I \ \ \~-7'-' ----------------· ---------------- G G G - / / ---J t---+------- - - ----s---------s-0 t------M-7~~~~~f-~w-----,--~----=---=--_w---=-----=--:~:---w-=-._--=---=----=-._---=-._-w-=------e-...._---/-----,.L/-/-w---------w---------w M ----M 0 H13 -------= ~-I VI I -tt-----l----l I ( -----------------------) I ------------- I I I I I I 1 I I I I I I I ' I ----bl-4-=r n I ,------------------------7==== -- (.!) ----1-------r---=:::::::::~. -- - - -----=--= ------______ J:t'<> ---l--0----- DIAL BEF"ORE YOU DIG TWO WORK1NG DA'l'S BEF0RE YOU DIG ii TOLL FREE 1--800--227-2600 IL :§ A PUBLIC SERVICE BY UNDERClROUND SER'IICE ALERT 811 I ........... ,/ ,,. DIAL TOLL FREE 811 Know what's below. AT LEAST TWO DAYS Call before you dig. IIEFllRE YOU DIG UlllERGRCUII) SER\1CE ALERT OF SOU11ERN CAlFllRIIA H14 ------------- 20::_ --------------, ( '11 I II I I I I I I I I I II I I, ♦IMEG L /- / \ I I I I I I VI I I I I I I I I I 1a-=_ I I I I I -----0 0 0 0 0 0 '==t=t====---===~=+=t==i~[SHml CITY OF CARLSBAD ISHEETSI 1f-==t==t======-----===ir==+=::t==I=~ ~ TRANSPORTATION DEPARlMENT 23 r IMPROVEMENT PLANS FOR: CARLSBAD BARRIO PEDESTRIAN LIGHTING PHASE II PARTIAL ELECTRICAL SllE PLAN ~=t==t====-----==+==+==t==t~ (OAK AVE} r:==:t==t======-----===+==t==1~=t=j riAiJPipPRCRO~VE~DD::===~~~~~===:H=::;O:=::S=:;;SE=1N=AJ=1o=EJH ENG. MANAGER P.E. 75991 EXPIRES 6 22 DAlE DATE INITIAL ENGINEER OF WDRK REVISION DESCRIPTION DATE INITIAL DATE INITIAL OTID APPROVAL CITY APPROVAL DWN BY: ASC I CHKD BY: 61 H PROJECT NO. I DRAEWl211NG NO. RVWD BY: 61 H _ _ w ~ I a.. 0 z ~ Q _J 0 a: a: <( m 0 ~ ~ a: <( 0 LL 0 ~ 0 I en z <( _J a.. !z w ~ ~ a.. ~ - C5b C4b C5aC4aC4a (E) (E ) (E ) (SDRSD G-7)(SDRSD G-7) (SDRSD G-7) PINE AVEPINE AVE 12 3TYP.4 5TYP.6 TYP.78 C5bC5bC5bC5bC5bC5b C5a JE F F E R S O N S T 12 3TYP.4 5TYP.6 TYP.78 ®www.imegcorp.com PH: 858.368.340013400 SABRE SPRINGS PARKWAY SUITE 225 SAN DIEGO, CA 92128 N O R T H N O R T H MA T C H L I N E S E E A B O V E R I G H T MA T C H L I N E S E E B E L O W L E F T 0 GRAPHIC SCALE IN FEET #### #### ELECTRICAL AND LIGHTING NOTES 2 3 4 5 6 1 GENERAL NOTES A. DRAWINGS ARE DIAGRAMMATIC ONLY. B. REFER TO SHEET E101 FOR GENERAL NOTES. FURNISH AND INSTALL CONCRETE PEDESTRIAN SCALE LIGHT STANDARD AND FOUNDATION PER PLAN AND PROJECT SPECIFICATIONS. POLE HEIGHT SHALL BE 13'-1" ABOVE GRADE. LUMINAIRE SHALL BE ACORN STYLE POST-TOP LED WITH 5,100 LUMENS MAXIMUM, COLOR TEMPERATURE OF 3000K MAXIMUM, AND TYPE III DIFFUSED LENS DISTRIBUTION. CONTRACTOR SHALL TRIM TREE(S) IN CONFLICT WITH STREET LIGHT. FURNISH AND INSTALL NO. 3-1/2 PULL BOX FOR STREET LIGHTING. CONTRACTOR TO REPLACE SIDEWALK PANEL(S) AFFECTED BY INSTALLATION OF PULL BOX. FURNISH AND INSTALL INLINE FUSE HOLDER AND 10A FUSE IN PULL BOX FOR PERMANENT POWER TO LUMINAIRE SYSTEM PER SDG&E REQUIREMENTS. FURNISH AND INSTALL 1-1/4" CONDUIT. INSTALL 2#8 CONDUCTORS AND 1#8 GROUND IN CONDUIT. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH SDG&E FOR JOINT MEETING IN FIELD FOR FINAL CONDUIT SWEEPS AND PERMANENT POWER CONNECTION. THE PRECISE LOCATION OF THE LIGHT POLE AND ITS FOOTING MUST BE APPROVED IN ADVANCE BY THE CITY ENGINEER’S REPRESENTATIVE. THIS APPROVAL IS REQUIRED BEFORE INSTALLATION BEGINS. IN CASES WHERE THE LIGHT POLE LOCATION CONFLICTS WITH THE EXISTING FENCE, THE CONTRACTOR SHALL REMOVE AND REINSTALL THE FENCE AS REQUIRED TO ENSURE PROPER ALIGNMENT WITH THE DESIGNATED RIGHT-OF-WAY. 7 8 Feb. 3, 2025 Item #3 Page 21 of 66 r----------------------------------------------------------------------- I c5 -.. -- 1 DIAL z BEF'ORE I'. YOU DIG m 1/l I 1/l I I I I :: I I I l ( I ----1- 1/l I I I I ~ I I I ~ I I r7 I I I I LJ I I I _J I I I I I I I L__ : I ~''----------~=3'*--G-2--;::_-_-______________ ~j ~-G C) L ------;_==--~ ------- --------/ --G---G---/-r G \---G---G '---G---G---G---G---G---G--~G I\ \ J \ -----------------------__________ , ' ' I C) I I C) I I I C) I I 1/l /---- / ,,...._--1-_.G ---G ---G ---G -~n I :--------G-=--· - -:__ - - - - - -r _ - - - - --W=---=--~---=--~---~W=--------W---------W-------=r~~~~---t--t-----W---------W-------__J ~ I / I /---------------- (~ -- 111 1 1 :,;: I I I I ----------------, I I I 1/l ,------~~··----------=~----~=---------~ I G G ---G "---'.-+.."" ~,',-----" I l I , ___________ \ I £ _______________ _ G9 1,-----F-~Ld ,_,._ I I 1'\..-.J I I :Ct--------...--, I C) I I I I I I I I ' I I ',l _ ---- ---- ---- ---- - -1-+--- ', ~~I '----------------------------1--7 _j -------' ~---------------------- 0 0 0 0 0 0 0 0 G ---G ---G ---G ---G ---G ---G ---G ---G=--G ---G ---G ---G ---G ---G ---G ---G ---G ---G ---G ---G ---G ---G ---G ---G ---G ---G - w---------w---------w---------w---------W----'-~------w---------w---------w~-~------w---.----.--------w------- ------------~ I ___ .I 7 I I I I I I 1 I \ / ______ ~ I ' 811 I ........... ,/ ,,. Know what's below. Call before you dig. H DIAL TOLL FREE 811 AT LEAST TWO DAYS IIEFllRE YOU DIG UlllERGRCUII) SER\1CE ALERT OF SOU1IERN CAlFllRIIA I I '--~ I I I I I I I I ~-------/1 ---------~ H1~G1 I ~ I L--------------------~-------------------- ------------------------------- ♦IMEG 0 G15 r------ 1 I I I I I I . CITY OF CARLSBAD I SHEETS I f--+---+--------------l------l----11----l----l TRANSPORTATION DEPARlMENT 23 f--+---+--------------l------l----11----l----l f--+---+--------------l------1-----lf---l----l IMPROVEMENT PLANS FOR: CARLSBAD BARRIO PEDESTRIAN LIGHTING PHASE II PARTIAL ELECTRICAL SllE PLAN (PINE AVE} r---+---+----------------1------1-----11----I----I APPROVED: HOSSEIN AJIDEH f--+---+--------------l------l----11----l----l ENG. MANAGER P.E. 75991 EXPIRES 6 22 DAlE l---;;D:..;ATE;;:-t-::IN::;111;-:-;AL-+--------------l---:-DA,-::TE::--l-:-INc=m""'AL-+-D:-:A=TE-+-1Nl---llAL---I DWN BY: ASC PRO.ECT NO. REVISION DESCRI 1----'---+--;.;.;;;;_-'--"'=--1 CHKD BY: 61 H ENGINEER OF WORK PTlON OMR APPROVAL CITY APPROVAL RVWD BY: 61 H I DRAWING NO. E212 w ~ I a.. 0 z ~ Q _J 0 a: a: <( m 0 ~ ~ a: <( 0 LL 0 ~ 0 I en z <( _J a.. 1-z w ~ ~ a.. ~ - C7b C7b (E) (E ) (SDRSD G-7) (SDRSD G-7) TY L E R S T 12 3TYP.4 5TYP.6 TYP.78 C7c C7c C7c C7c (E ) (E ) (E) (E)(E) (E ) (SDRSD G-7)(SDRSD G-7) (SDRSD G-7)(SDRSD G-7) CHESNUT AVECHESNUT AVE 12 3TYP.4 5TYP.6 TYP.78 ®www.imegcorp.com PH: 858.368.340013400 SABRE SPRINGS PARKWAY SUITE 225 SAN DIEGO, CA 92128 N O R T H N O R T H MA T C H L I N E S E E A B O V E R I G H T MA T C H L I N E S E E B E L O W L E F T MA T C H L I N E S E E S H E E T E 2 1 4 0 GRAPHIC SCALE IN FEET #### #### ELECTRICAL AND LIGHTING NOTES 2 3 4 5 6 1 GENERAL NOTES A. DRAWINGS ARE DIAGRAMMATIC ONLY. B. REFER TO SHEET E101 FOR GENERAL NOTES. FURNISH AND INSTALL CONCRETE PEDESTRIAN SCALE LIGHT STANDARD AND FOUNDATION PER PLAN AND PROJECT SPECIFICATIONS. POLE HEIGHT SHALL BE 13'-1" ABOVE GRADE. LUMINAIRE SHALL BE ACORN STYLE POST-TOP LED WITH 5,100 LUMENS MAXIMUM, COLOR TEMPERATURE OF 3000K MAXIMUM, AND TYPE III DIFFUSED LENS DISTRIBUTION. CONTRACTOR SHALL TRIM TREE(S) IN CONFLICT WITH STREET LIGHT. FURNISH AND INSTALL NO. 3-1/2 PULL BOX FOR STREET LIGHTING. CONTRACTOR TO REPLACE SIDEWALK PANEL(S) AFFECTED BY INSTALLATION OF PULL BOX. FURNISH AND INSTALL INLINE FUSE HOLDER AND 10A FUSE IN PULL BOX FOR PERMANENT POWER TO LUMINAIRE SYSTEM PER SDG&E REQUIREMENTS. FURNISH AND INSTALL 1-1/4" CONDUIT. INSTALL 2#8 CONDUCTORS AND 1#8 GROUND IN CONDUIT. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH SDG&E FOR JOINT MEETING IN FIELD FOR FINAL CONDUIT SWEEPS AND PERMANENT POWER CONNECTION. THE PRECISE LOCATION OF THE LIGHT POLE AND ITS FOOTING MUST BE APPROVED IN ADVANCE BY THE CITY ENGINEER’S REPRESENTATIVE. THIS APPROVAL IS REQUIRED BEFORE INSTALLATION BEGINS. IN CASES WHERE THE LIGHT POLE LOCATION CONFLICTS WITH THE EXISTING FENCE, THE CONTRACTOR SHALL REMOVE AND REINSTALL THE FENCE AS REQUIRED TO ENSURE PROPER ALIGNMENT WITH THE DESIGNATED RIGHT-OF-WAY. 7 8 Feb. 3, 2025 Item #3 Page 22 of 66 j c5 -.. -- DIAL BEF"ORE YOU DIG s M I I I I 11 11 I ___ _J I ;2~===--;;-4¾=~==~===--;;--==~~~----=-----L==::::..._____ \, ¢ I I ', F2 1 G ---G __,.......,_ G ---G ---G ---G ---G ---/---"" ==========:=:::::::'.i \ ' * / G ---G ---G ---G ---G ---G ---G ---G ~~-:~-~: ___ ,G _____ G _____ G------------~~ _____ / G G G G / ------------------------- _,,,,. --_J -------- --------------------- 0 I I I I i I I f----T~~~~:--~=~~~~~~-=--s= - M --------M--------- -----4--- F1 ------M--------- G) I I 1-------1--1--I M J s M \ \ \ I I I I I 11 11 11 G) G 0 M 0 0 -~ I L 0 I I (!) I 0 I I C 0 I I ,. 0 0 I r7 I I I I I I I I I I I I I I I I I I I I I L.J I I I I I I I I I --J I I I \ \ ___ ---------- G G G G G s s M M M ,---------------- I --, ,-- I I I 1"-i I I I --1 TWO WORK1NG DA'l'S BEF0RE YOU DIG ;u ' ::;: 811 I ........... ,/ ,,. DIAL TOLL FREE 811 Know what's below. AT LEAST TWO DAYS Call before you dig. IIEFllRE YOU DIG UlllERGRCUII) SER\1CE ALERT OF SOU11ERN CAI.FllRIIA I I I I I I I I I I I I _I I ~--' I __ ---- G M H ~6 ________ _ ___ _J : I /) ______________ .J / I / I \ ~ (/) ___________ I I __ _ /---------------------- ~_____,-._--/1 -- - - - - - - - - - - - L_ -------, //___ -------------------- (// c---- 1 I I I I I I I ♦IMEG '==t=t====----===~=+=t==i~[SHml CITY OF CARLSBAD ISHEETSI 1f-==t==t======------===ir==+=::t==I=~ L..2.:_j TRANSPORTATION DEPARlMENT 23 r IMPROVEMENT PLANS FOR: CARLSBAD BARRIO PEDESTRIAN LIGHTING PHASE II PARTIAL ELECTRICAL SllE PLAN ~=t==t====-----==+==+==t==t~ (CHESTNUT AVE) r:==:t==t======-----===+==t==1~=t=j riAiJPipPRCRO~VE~DD::==~~~~~~~H=::;O:=::S=:;;SE=1N=AJ=1o=EJH ENG. MANAGER P.E. 75991 EXPIRES 6 22 DAlE ii TOLL FREE 1-800-227-2600 DATE INITIAL DATE INITIAL DATE INITIAL OWN BY: ASC I CHKD BY: 61 H PROJECT NO. I DRAEWl213NG NO. IL :§ A PUBLIC SERVICE BY UNDERClROUND SER'IICE ALERT ENGINEER OF WDRK REVISION DESCRIPTION OTID APPROVAL CITY APPROVAL RVWD BY: 61 H _ _ w ~ I a.. 0 z ~ Q _J 0 a: a: <( m 0 ~ ~ a: <( 0 LL 0 ~ 0 I en z <( _J a.. !z w ~ ~ a.. ~ - C8b 1 TYP.2 3 TYP.4 7 8 C10a C10a C10a C10a C10a C1 0 b CHESNUT AVE CHESNUT AVE 12 3TYP.4 5TYP.6 TYP.78 ®www.imegcorp.com PH: 858.368.340013400 SABRE SPRINGS PARKWAY SUITE 225 SAN DIEGO, CA 92128 N O R T H N O R T H MA T C H L I N E S E E A B O V E R I G H T MA T C H L I N E S E E B E L O W L E F T 0 GRAPHIC SCALE IN FEET #### #### MA T C H L I N E S E E S H E E T E 2 1 3 ELECTRICAL AND LIGHTING NOTES 2 3 4 5 6 1 GENERAL NOTES A. DRAWINGS ARE DIAGRAMMATIC ONLY. B. REFER TO SHEET E101 FOR GENERAL NOTES. FURNISH AND INSTALL CONCRETE PEDESTRIAN SCALE LIGHT STANDARD AND FOUNDATION PER PLAN AND PROJECT SPECIFICATIONS. POLE HEIGHT SHALL BE 13'-1" ABOVE GRADE. LUMINAIRE SHALL BE ACORN STYLE POST-TOP LED WITH 5,100 LUMENS MAXIMUM, COLOR TEMPERATURE OF 3000K MAXIMUM, AND TYPE III DIFFUSED LENS DISTRIBUTION. CONTRACTOR SHALL TRIM TREE(S) IN CONFLICT WITH STREET LIGHT. FURNISH AND INSTALL NO. 3-1/2 PULL BOX FOR STREET LIGHTING. CONTRACTOR TO REPLACE SIDEWALK PANEL(S) AFFECTED BY INSTALLATION OF PULL BOX. FURNISH AND INSTALL INLINE FUSE HOLDER AND 10A FUSE IN PULL BOX FOR PERMANENT POWER TO LUMINAIRE SYSTEM PER SDG&E REQUIREMENTS. FURNISH AND INSTALL 1-1/4" CONDUIT. INSTALL 2#8 CONDUCTORS AND 1#8 GROUND IN CONDUIT. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH SDG&E FOR JOINT MEETING IN FIELD FOR FINAL CONDUIT SWEEPS AND PERMANENT POWER CONNECTION. THE PRECISE LOCATION OF THE LIGHT POLE AND ITS FOOTING MUST BE APPROVED IN ADVANCE BY THE CITY ENGINEER’S REPRESENTATIVE. THIS APPROVAL IS REQUIRED BEFORE INSTALLATION BEGINS. IN CASES WHERE THE LIGHT POLE LOCATION CONFLICTS WITH THE EXISTING FENCE, THE CONTRACTOR SHALL REMOVE AND REINSTALL THE FENCE AS REQUIRED TO ENSURE PROPER ALIGNMENT WITH THE DESIGNATED RIGHT-OF-WAY. 7 8 Feb. 3, 2025 Item #3 Page 23 of 66 .. -- DIAL BEFORE YOU DIG I I I I _________ .J ---/ ' .,__,,,,.__.c,,.-6, _______ !/ ,,..-, '-\~:~~~-~~:_::::::=:=~I'~J==============-----------------------------r,---------------J~~~I ,-------------J'L -\_ -----------I I --r---~-\, ,/ ----=-=-------= =--,::_-_/ L - ---- -_-:=::::::-_ ----=--,~::::::-=---=-----~~--- -) ( --, _, --~--------------------------/ \ I ---------------- / -----------, r------------------------ ' ' --------, ------------ / l I ' I ~==~....... \ /,.....------------------------------, I I 1 -'1 I I I I I I F10 /----------------------- { --G---G---G---G--~ ---s---rA\----s--------s-------- ,____ G --G /] r---t----+-~L S•-""'-::1------+-----l...-c::-::::~=:=========----------. G ---G ---G ---G ---G ---G ---G ---G __ __). / / • ----------s~~~~~~~~~~~~~~~~~~L s----------S--t----------s----....W I \ I I I I __ _, // -0- / -______ / I, \ I I \ I \ ..__/ ' I I I I I I I " -------------------------...... I I I I I I I I I I I ,/ 'I I I I I 11 11 ---- !L_ \ ----- --, \ \ I I I I I I I ' / ' \~--r-.. ------------------------- ~ w__;~;;;J;;~----w--------w·--------w-----..__ -_-_-_-_-_-w _______ ____,, ~ ------Y '_'.:~~~~~~~~~~==~=-=_= _===~~~~~========:::J ----=~~================d ------------------------------- / ( I . / I I I I ---- --------------- ------------------ I I I ------------ ✓---------, r---------------1 I----G ---G ---I--G , __ / G I ' -1f---G G --G --G --G --G --G --G ~-...... 1~-H--31:::::::_-::: ::: H *E33~~~~ :,---- S--t--------s --- - -G J \ G G G ~r '-,_G 1---w-----✓-=~-+--w---+------1--w---------w------s-~ s - -----s-=-----=-=-=--=-=:._-=-~=-±:::::::::...~--"-;_., _____ _J __ s-'--------- G G ~ I I I i---+-----s -, \ I CJi Cl Cl 7 w--+---r----w-7--t-------:~------+---lw-,v.--.------w-----'-,_ ----------Cl /_____ Cl ----------.............._ ----- s '- '- ----- ---------- I I I I I ~~ I I I I I I I I 0 0 0 0 0 0 0 0 811 ♦IMEG '==t=t====---===~=+=t==i~[SHml CITY OF CARLSBAD ISHEETSI ir==t==t=======----===t==+==t==1t~ ~ TRANSPORTATION DEPARlMENT 23 r IMPROVEMENT PLANS FOR: CARLSBAD BARRIO PEDESTRIAN LIGHTING PHASE II TWO WORK1NG DA'l'S BEF0RE YOU DIG I ........... ,/ ,,. DIAL TOLL FREE 811 Know what's below. AT LEAST TWO DAYS Call before you dig. IIEFllRE YOU DIG UlllERGRCUII) SER\1CE ALERT OF SOU11ERN CAlFllRIIA PARTIAL ELECTRICAL SllE PLAN ~=t==t====-----==+==+==t==t~ (CHESTNUT AVE) ~==t=j======-----====+===+==1t=t=j r,AiJPipP~R001VE1IDD:~=~;;~~~~~~H;:;:;o='=s=sE=1N===A=J1=0E==:JH ENG. MANAGER P.E. 75991 EXPIRES 6 22 DAlE ii TOLL FREE 1-800-227-2600 DATE INITIAL DATE INITIAL DATE INITIAL DWN BY: ASC I CHKD BY: 61 H PRO.ECT NO. I DRAEWl214NG NO. IL :§ A PUBLIC SERVICE BY UNDERClROUND SER'IICE ALERT ENGINEER OF WDRK REVISION DESCRIPTION OTID APPROVAL CITY APPROVAL RVWD BY: 61 H _ _ w ~ I a.. 0 z ~ Q _J 0 a: a: <( m 0 ~ ~ a: <( 0 LL 0 ~ 0 I en z <( _J a.. !z w ~ ~ a.. ~ - C15C11bC11bC12 (SDRSD G-7)(SDRSD G-7)(SDRSD G-7) (SDRSD G-7) E4E3E2E1 MAGNOLIA AVE 34TYP. 12TYP. 56TYP. 78 C15 C15 C15 C15 (SDRSD G-7)(SDRSD G-7) (SDR S D G - 7 ) (SDR S D G - 7 ) E5 E6 MAGNOLIA AVE 34TYP. 12 56TYP. TYP.78 ®www.imegcorp.com PH: 858.368.340013400 SABRE SPRINGS PARKWAY SUITE 225 SAN DIEGO, CA 92128 NORTH MA T C H L I N E S E E A B O V E R I G H T MA T C H L I N E S E E B E L O W L E F T 0 GRAPHIC SCALE IN FEET #### #### NORTH ELECTRICAL AND LIGHTING NOTES 2 3 4 5 6 1 GENERAL NOTES A. DRAWINGS ARE DIAGRAMMATIC ONLY. B. REFER TO SHEET E101 FOR GENERAL NOTES. FURNISH AND INSTALL CONCRETE PEDESTRIAN SCALE LIGHT STANDARD AND FOUNDATION PER PLAN AND PROJECT SPECIFICATIONS. POLE HEIGHT SHALL BE 13'-1" ABOVE GRADE. LUMINAIRE SHALL BE ACORN STYLE POST-TOP LED WITH 5,100 LUMENS MAXIMUM, COLOR TEMPERATURE OF 3000K MAXIMUM, AND TYPE III DIFFUSED LENS DISTRIBUTION. CONTRACTOR SHALL TRIM TREE(S) IN CONFLICT WITH STREET LIGHT. FURNISH AND INSTALL NO. 3-1/2 PULL BOX FOR STREET LIGHTING. CONTRACTOR TO REPLACE SIDEWALK PANEL(S) AFFECTED BY INSTALLATION OF PULL BOX. FURNISH AND INSTALL INLINE FUSE HOLDER AND 10A FUSE IN PULL BOX FOR PERMANENT POWER TO LUMINAIRE SYSTEM PER SDG&E REQUIREMENTS. FURNISH AND INSTALL 1-1/4" CONDUIT. INSTALL 2#8 CONDUCTORS AND 1#8 GROUND IN CONDUIT. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH SDG&E FOR JOINT MEETING IN FIELD FOR FINAL CONDUIT SWEEPS AND PERMANENT POWER CONNECTION. THE PRECISE LOCATION OF THE LIGHT POLE AND ITS FOOTING MUST BE APPROVED IN ADVANCE BY THE CITY ENGINEER’S REPRESENTATIVE. THIS APPROVAL IS REQUIRED BEFORE INSTALLATION BEGINS. IN CASES WHERE THE LIGHT POLE LOCATION CONFLICTS WITH THE EXISTING FENCE, THE CONTRACTOR SHALL REMOVE AND REINSTALL THE FENCE AS REQUIRED TO ENSURE PROPER ALIGNMENT WITH THE DESIGNATED RIGHT-OF-WAY. 7 8 Feb. 3, 2025 Item #3 Page 24 of 66 \ s M M M M M ----==--=--=.-=--=----=--==-----==-=-==-==--:±= ------- -------H ----------7-""-........ --- ------- J M---------M--------1 ____ _ ~,------,-----_.lMr-----,r-----M-----L~--M------1---✓ DIAL BEF"ORE YOU DIG TWO WORK1NG DA'l'S BEF0RE YOU DIG ii TOLL FREE 1-800-227-2600 IL :§ A PUBLIC SERVICE BY UNDERClROUND SER'IICE ALERT 811 I ........... ,/ ,,. Know what's below. Call before you dig. ------==-= DIAL TOLL FREE 811 AT LEAST TWO DAYS IIEFllRE YOU DIG UlllERGRCUII) SER\1CE ALERT OF SOU11ERN CAI.FllRIIA ==--=--------=-c===== -------- ' 0 s M \ \ \ \ ',,, \__ ~ ----~=----..,.....--<" ~ -------- 0 s s s M M M '\ 7 --==--=-=~=--=-=-=-==-----=--===-===-==::cG-: --=-==----=c.-t= -_---:..:==-= \ 0 \ --- ----=== 0- 0 0 0 0 0 0 0 0 ♦IMEG '==t=t====-----===~=+=t==i~[SHml CITY OF CARLSBAD ISHEETSI 1f-==t=j========-----===t==+===t==t=j L...2.:_J TRANSPORTATION DEPARlMENT 23 r IMPROVEMENT PLANS FOR: CARLSBAD BARRIO PEDESTRIAN LIGHTING PHASE II PARTIAL ELECTRICAL SllE PLAN ~=t==t====-----==+==+==t==t~ (MAGNOLIA AVE) ~==!==t======-----====J===+==t:==j=~ r.AAfPifP~ROOVEVECD~: ==~;;;;~~~~~=:::=Ho==s=s:;E:::1N=A=J=1o=EJH ENG. MANAGER P.E. 75991 EXPIRES 6 22 DAlE DAlE INITIAL ENGINEER OF WDRK REVISION DESCRIPTION DAlE INITIAL DAlE INITIAL OTID APPROVAL CITY APPROVAL DWN BY: ASC I CHKD BY: 61 H PROJECT NO. I DRAEWl215NG NO. RVWD BY: 61 H _ _ w ~ I a.. 0 z ~ Q _J 0 a: a: <( m 0 ~ ~ a: <( 0 LL 0 ~ 0 I en z <( _J a.. !z w ~ ~ a.. ~ - ®www.imegcorp.com PH: 858.368.340013400 SABRE SPRINGS PARKWAY SUITE 225 SAN DIEGO, CA 92128 24" MIN. 6" MAX NATIVE BACKFILL COMPACTED TO 95% PVC SCHEDULE 40 CONDUIT/WIRE PER SITE PLAN (TYPICAL) CONTINUOUS ELECTRICALLY DETECTABLE YELLOW PLASTIC WARNING TAPE FINISHED GRADE SCALE: NONE 1 24" MIN. 6" MAX NATIVE BACKFILL COMPACTED TO 95% PVC SCHEDULE 40 CONDUIT/WIRE PER SITE PLAN (TYPICAL) CONTINUOUS ELECTRICALLY DETECTABLE YELLOW PLASTIC WARNING TAPE FINISHED GRADE 3"3" 2" SCALE: NONE 2 CONTRACTOR SHALL PROVIDE SHOP DRAWING OF EXACT REQUIREMENTS OF FOOTING STAMPED AND SIGNED BY A REGISTERED CALIFORNIA STRUCTURAL ENGINEER NOTES: POLE - 12 FOOT, NOMINAL HEIGHT, 4" DIA. ROUND POLE, 11 GAUGE, CAST ALUMINUM. FINISH SHALL BE POWDER COAT FINISH OVER 2 COATS OF 5% ZINC OXIDE PRIMER, 2 MILS THICKNESS DRY. POLE AND FIXTURE SHALL BE COLOR TO BE FROM SAME MANUFACTURER. POLE BUTT BASE PER MANUFACTURER, FINISHED SAME AS POLE, WITH 2-PIECE STEEL BASE CANOPY COVER FINISHED SAME AS POLE. CANOPY COVER SHALL BE SECURED WITH TAMPER-PROOF 316 STAINLESS STEEL BOLTS. POURED IN PLACE ROUND CONCRETE SUPPORT BASE. REINFORCED BASKET, FABRICATED FROM RE-BAR, (6) #6 VERTICAL AND #3 TIES AT 12" O.C. ANCHOR BOLTS. QUANTITY, SIZE AND TENSILE STRENGTH DETERMINED BY POLE/LUMINAIRE MFGR. TO CONFORM TO SPECIFIED WIND LOAD CRITERIA. ANCHOR BOLTS SHALL EXTEND CONTINUOUSLY FROM POLE BASE ATTACHMENT POINTS TO WITHIN 6" FROM BOTTOM OF CONCRETE BASE. FOLLOWING INSTALLATION AND LEVELING OF POLE/LUMINAIRE ASSEMBLY, GROUT-IN ALL AROUND BETWEEN BOTTOM OF POLE BASE AND TOP OF CONCRETE BASE. STUB SERVICE CONDUIT UP INTO POLE BASE WIRING CAVITY AND BUSH. PROVIDE SUPPORT AND LEVELING NUTS AT TOP AND BOTTOM OF POLE BASE PLATE. TWO NUTS PER ANCHOR BOLT. BOLT SPACING PER MOUNTING PLATE. TYPICAL 3/4" PVC, 2#12 AND 1#12 GND. SOLID CONDUCTOR TO LIGHT FIXTURE. TYPICAL INCOMING EXTERIOR BRANCH CIRCUIT CONDUIT AND WIRING. 1-1/4" PVC, 2#8 AND 1#8 GND. TOP OF FINISH GRADE. TYPICAL GRADE MOUNTED JUNCTION BOX. 3#3 TIES WITHIN TOP 6" OF BASE STRUCTURE. IN LINE WATER TIGHT FUSE HOLDER WITH FUSE. SIZE FUSE PER MANUFACTURERS RECOMMENDATIONS. LOCATE IN HANDHOLE. CONCRETE MIX SHALL BE 4000 LB. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 2#12 AND 1#12 GND. INSULATED SOLID CONDUCTOR TO LIGHT FIXTURE 10 111214 8 6 2 13 4 3 5 9 1 (TYP) 4'-0" 2" 1'-4" 24" TYPE 'B' FIXTURE BASE DETAIL SCALE: NONE 4 REINFORCED PRECAST GRADE MOUNTED JUNCTION BOX. PROVIDE WITH OPEN BOTTOM. CAST IRON TRAFFIC COVER SHALL INSTALL FLUSH IN TOP OF GRADE JUNCTION BOX. FURNISH TOP OF COVER WITH CHECKERED SURFACE, LIFTING SLOTS AND RECESSED HOLD DOWN TAMPER PROOF NUTS. BOTTOM OF COVER SHALL BE FURNISHED WITH INTEGRAL CAST REINFORCING RIBS. USE ONLY AT VEHICLE TRAFFIC AREAS. 1 2 1. INSTALL AT ALL TELEPHONE PULLBOX LOCATIONS U.O.N. AND AS SPECIFIED ON SITE PLANS. 2. INSTALL WITH 6" DEEP GRAVEL BASE. 1 2 7.5" 19" 12" 3.5"3" 24" 12" SCALE: NONE 3 TYPICAL GRADE MOUNTED JUNCTION BOX TYPICAL UNDERGROUND SITE LIGHTING RACEWAY INSTALLATION DETAIL TYPICAL UNDERGROUND SITE LIGHTING RACEWAY INSTALLATION DETAIL 3 -#3 TIES WITHIN TOP 6" OF BASE STRUCTURE 6 -#6 VERTICAL REBAR CAGE #3 TIES @ 12" OC Feb. 3, 2025 Item #3 Page 25 of 66 -------------------------------------------------------------------------------------------------------------------------- 1 DIAL z BEF"ORE I'. YOU DIG m [ TWO WORK1NG DA'l'S BEF0RE YOU DIG 0----- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0---- 811 I ........... ,/ ,,. Know what's below. Call before you dig. DIAL TOLL FREE 811 AT LEAST TWO DAYS IIEFllRE YOU DIG UlllERGRCUII) SER\1CE ALERT OF SOU1IERN CAI.FllRIIA 0 0----- ♦IMEG 0 0 > 0----- fSHml CITY OF CARLSBAD I SHEETS I 1----+---+---------------+----1-----,1---+-----1 ~ TRANSPORTATION DEPARlMENT 23 l----+---+---------------+----1-----,1---+-----I 1----+---+---------------+----1-----,1---+-----1 IMPROVEMENT PLANS FOR: CARLSBAD BARRIO PEDESTRIAN LIGHTING PHASE II ELECTRICAL DETAILS 1----+---+---------------+------1-----,1-----+------1 APPROVED: HOSSEIN AJIDEH 1----+---+---------------+----1-----,1---+-----1 ENG. MANAGER P.E. 75991 EXPIRES 6 22 DAlE OWN BY: ASC PRO.ECT NO. I DRAEWl300NG NO. ,__DA_TE~_INm_AL--+-_D_ATE~_INl_ll_AL_, CHKD BY: 61 H OTID APPROVAL CITY APPROVAL RVWD BY: 61 H DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION -w ~ I a.. 0 z ~ Q _J 0 a: a: <( m 0 ~ ~ a: <( 0 LL 0 ~ 0 I en z <( _J a.. 1-z w ~ ~ a.. ~ - ®www.imegcorp.com PH: 858.368.340013400 SABRE SPRINGS PARKWAY SUITE 225 SAN DIEGO, CA 92128 Feb. 3, 2025 Item #3 Page 26 of 66 .µ ill 1 iii j ai 1 z !,:, m l ii: DIAL BEF'ORE YOU DIG Construction -Classic Look Die-cast aluminum housing -Internal heat sink ensuring maximum heat CUSTOMER NAME CTTYOFCARLSBAD PROJECT NAME Carlsbad Barrio Pedestrian Licli.tim: DATE -------TYPE CATALOG NUMBER E02005B301CJAHLCK EPAS Avery StreetDreams'~ LED Post Top Lighting The Evolve' LED Post Top Avery StreetDreams' (EPAS) offers energy efficiency and quality of light in a classic, traditional style. The advanced LED optical system provides improved horizontal and vertical uniformity, reduced glare and improved lighting control. Current's unique optical ring technology effectively aims the light where you need it. Lumen Maintenance Projected Lxx per IES TM-21 at 25°( Housing: transfer for long LED life -Scroll or Medallion Crown & Ribs appearance options LKX(IOK) @ Hours lumen Codes D,str1bu1ion 25,000 HR 50,000 HR 60,000 HR -Cupola compatible with C136.41 PE's, Shorting Caps and LightGrid Nodes 03 -09 A, B L97 L% L96 r,.uLe: Prc,jeclecl L<s ba,d on LMOO :, 10,,)0~ hour ,...,tirog·, Acceµie,.J lmlu,lry ic,lerar.ce, ,p_oly le ir, tial le 1r1i·1uus ilu, ard lurner, rn,airilenaric.e rne:;suren1e11l1 Lensing: UV Resistant Acrylic Globe Paint: Corrosion resistant polyester powder paint, minimum 2.0 rnil thickness Standard = Black, Dark Bronze (RAL & custom colors available) Luminaire Ambient Temperature Factor ilii!MIMS#Mil iliiliiOHiitil 10 1.02 30 0.99 Weight: 43 lbs (19.5 kg)-54 lbs (24.5 kg) 20 25 1.01 100 40 50 0.98 0.97 Optical System Lumens; 2,600 -9,300 Distribution: Symmetric Type V Syrnmetric Type V Diffused Asymmetric Type Ill I Asymmetric Type Ill Diffused I Efficacy: 76 to 116 LPW CCT: ~4000K CRI (Min): ~70 Electrical Input Voltage: 120-277Vand 347-480V Input Frequency: 50/60Hz Power Factor: ?: 90% at rated watts !: 20% at rated watts Surge Protection* Standard Optional 0 6kV/3kA 0 Secondary 10kV/5kA (R Option) 'f'er.>J<SI C1h2-2015 Operating Temperature: Vibration: Ratings -40°( to 50°( 2.0 G per Per ANSI (136.31-2010 LM-79: Testing in accordance with IES Standards Controls Dimming: Standard -0-10V Optional -DAU (Option U) LJ □ Sensors: Photo Electric Sensors (PE) available UghtGrid-1-"-1 Compatible Warranty 7 5 Year (Standard) D 10 Year (Optional) ~@li e LISIED e ~ C(]NTFIGtS ES;_SLED Not a I p1Xuct ,.1i.n.cn, I stcd ~n :l1i, PJ" aoc· OL~ quaWicd .,.,, t \".WM,drng,oli;;hl,cry_-'search tu COili rm SJSI lical,U",I Current@, LED.com <sl 2C<3 8u·,u,-L L,at,·_;,,y Sulul,u"'· Cl!: All -;,,., ,c•cc,.,cc1. l,-k·,·,cuu" anc "I-''" l>cuo,,.~ sCUjccl lo"""'"'' Mltoc_, nro<.-,,_ All •.-~ues '"' """'"' c, tw,ce ,_,...,, ,.·oen n-.ea900,J <r>ee, abonsw,, cend,lans P"s)~ 1 of7 tPe,12/20,•28) OLP281ltl_R07 EV C) L VE CUSTOMER NAME ______________ _ PROJECT NAME DATE TYPE EPAS Avery StreetDreamsE' LED Post Top Light CATALOG NUMBER ______________ _ EPASOZ TYPE V SYMMETRIC-NO CAGE 9.300 Lumens 4000K EPAS02*09A*4QH~{A, Dor G) EPAS02 TYPE Ill ASYMMETRIC -NO CAGE 9,300 Lumens 4000K EPAS02'09A'40"'(A, Dor G) EPASOZ TYPE V SYMMETRIC-MEDALLION C&R 8,300 Lumens 4000K EPAS02"08A"40~**(B, E or H) I / ,-' " / ' ' " / ' / c-, Grid Distcn-:e in Unit; of ~ountir,q He>_;ht at 16' lrlita Foutcandl• \'alu~s ct Gro:J~ ,-,-__ / "] '' I I I I / ' I )'' ----~ Grid Distcnce in Units of rounting H~i<;ht ot 16' lrii':;al Faolcoridl• l'alu..s cl GroJ~ I I I! -/1/ ', ,1, / V I -'icrt1ccl Plane 1",ru Hcnzotnal •'.nglc oi r,a•. Cd at o• -Hon,cntal Con~ thru Vcr:1,xl/\ngle of MJI'. Wat ~?0 I I -'.'ert1ccl Plane t'11u I lcrizotnal ~.ngle ai ~;a•. CC :rt 0' -Hori,cntal Cone thru Ver:,ccl Angle c-1 M:i>. Cc at 60" Grid Distcn-c~ in II nit, nf ~:ountir,g H~'"ht ct 16' -'."ertical Plcoe1hfu Hccb;,t,o A~,1'eoi ~:ex. Cdot 10' IM.al ro-,tcondle 1•,lue; ct tiro:J< -Hori,crilul Corie tlnu Ver\1ccl /\riyle ol M:i>. Cc al 59• Current@ LED.com TWO WORKING DA'l'S BEFORE YOU DIG c, cca ~,---,~rt Ll,lh":>1g so:ut1ons Lt.c: All -ism r,s,r,co.1ercT1a:10· ar,:o ;.p,ac ,~a•ons sLtl]C-:t to cnango ,.;,t,c,.1 n.,--;;,., MIi ,.,_,.,,., aca -~,, « r,o;c;; var,.,,-,_., • .,., maam~rl ,,-,,_ff a.......,,,.,.,. =nrl;, on, 811 I -... / ,. Know what's below_ Call before you dig, DIAL TOLL rREE 811 AT LEAST TWO DAYS IIEF'ORE YOU DIG lllllERIIIClllll SEll\1a; IIIS!T Of SIJll1IERN W Page 6 of7 (Pav 12/2ll/23• 0L~2691a!_R07 TOLL FREE 1-800-277-2600 A PUBUC SERVICE BY UNDERGROUND SER't'ICE ALERT EV C) L VE EPAS Avery StreetDreams@ LED Post Top Light Ordering Information EPAS 02 o 05 B 30 CUSTOMER NAME ClTY OF CARLSBAD PROJECT NAME Carlsbad HJITio Pedestrian Li9:ht·in9: DATE _________ TYPE _________ _ CATALOG NUMBER E02005R301CJABLCK C A BLCK P =Pod H-3L7-04 ,~ -As-1mmetr,r -ypc,111 40 -4:)()0.{ 2 = P[ Rec. (in Pod:i'' A -Frar1e' A -Colon:, T~r , A -/l.(orn McJ:,llion C&R IJKA7 -Li =DALI'' Top 4/lOV;,' A• Avery See chart below for a,•ailabilitv QTI m rn cs C -Syn,rri~lric Type I/ Diifuscd Optical Lens" D " A~1mm~tric Ty~:, Ill Diffused Optical Lens• 'Lem cove, OVHOptical assemblv Only a,·ailable with Top/Cage Types A,B,C,D.E & F 2, 4 & 5 (in Podj NOT compa,iblc w/wirdcss controls Only avililahle with fop/Ca<Je nption G, H & J Cont<1ct Manvfacturer for Lead Time Nol av<1ilal;le wilh DALI Top/CJgQ Type G. H, Jnd J only Not availabl~ in 'l47-.~80V LED..com 4-PE ~ec with Shorting Cap (in 1-'od)"" 5 -PE R~c. (in Pod) w_lstd Pt in box'--' A = 7-Pi11 PE Re<:eptacle on T~p -:co!or1y sty:~ PE Toal1 D = 7-Pin PE Receptacle on Top {Colony sty c PC ·10~) w/ShnrrinqCap' E -7-Pin FE R.,.;:eptode or1 fop {Colony sty,e PE Tv.a) w/ non Dimming PE ;,.l,rn' DJr:, Bronze Prn~rsmmable le -Colum11I C -Coluroyfo;, + C -flo~r-De-Li, Scroll C&R :O:X -Spiccial O,atio115 D = Flui,, D -Scrnll Tor E • Suull fop • Medallion C&R r = Suol Tuµ+ Scroll C&R E -Slos,om F • Spike G -Colony St;lc H -s,ccplc w/PE Top H -Colony Style X -None w/PE Top + Medallion C&R J -Colo11,· Styl• w/PE Toµ+ Suc,11 me ':at ,II prc:J•Jct ,·ari,t,om li>lec 011 1111, ooge are Dll "u,hfied . h ,.,,.,_,..<!e<g"I' 9htc.o,g.'...,-ch tc =,'km 9ual;f;c,Oonc Current@1 t> 10'.l-3 Gu·,ml L,yl-.L "" Sulcl;,,,,, LLG ~!I ,;yt,lc ,ccc,·.uJ 1,,:rnm.io,· '"" """"'",cat,u,·,c oaljcc' le cl·ce,ge "'""°"' noOc--e. Al .~Ices an; dee"'" o, "'"d ,~,es.,,,,.,, c,ee,•a"'e ,nee lobocstm; co,o.Jrt,cn, Pa,Je2o17 (R"" 1?/70/'.';,) OLP2896_R07 EV C) L VE EPAS Avery StreetDreams@ LED Post Top Light EPAS02 TYPE Ill ASYMMETRIC-MEDALLION C&R 8.300 Lumens 4000K EPAS02~08B*40""*'(B, E or HJ EPAS02 TYPE V SYMMETRIC -SCROLL C&R 7,000 Lumens 4000K EPAS02~08A*40°*(C, For J] EPAS02 TYPE Ill ASYMMETRIC -SCROLL C&R Current@ 7,000 Lumens 4000K EPAS02'07B'40'' '(C, For J] LED.com CUSTOMER NAME ______________ _ PROJECT NAME DATE TYPE CATALOG NUMBER ______________ _ ' I I -~ ' ~ :; \ ~ 1 I ' -/J '-- GriJ C+s:-cn-ce in Un'ts -ci t,,:a,, tins R,i~ht c; JC' -Ve, tir;·al 0'c,., ,h, u Hcrixtn-J' Ar·"'e ,/ Mw, ( ,J ul 10' Ir.,·. a' Fo-atcond!a v-,lua, cl ~ro:Je -1-!cri,ontol Cvne :hru 'ierticd ~ngle of ;1a, Cd ot 5~' I I; :,c ~ ~I\ i---- I I I I I ,,, V ~ _, ~ 11/ 1~ -- ' Gri'.I C·is,uice in Un:ts :-f ~:~,rt,ng R1!(;ht~, 16 lnr"a' Fo0trnndle -..·ah,, cl ~raJe '"' ~ Ir . I -a -~)-- '-t;1 - -Ve,tir;·ul 'me t_hru Huriet;lrd Ar-,ie o'Mm. Cd ul 25' -1-!crizontol -:one :hru '.'erticol ~ngle of Max Cd ct 5~' Gci:I C·i-o:•cn:e io Un:t, .;,f M~_r,tir,q f-:eCsht~: lC -'✓er;icol 0'rn, :hru Hcr.:o;na' Arq'e CCMo,.C:J at 2,, loi!:u' Foulrn11J!, ··J.:alu-. cl ~ru:J, -1-!cnzontal 2one :hru '-'erticcl .~ngle of Max Cd ot 6C·' ,; ,o-n CtJTlll\t ugr.t r,g saIctI0,,,. LLC. All nghtS ro,a,_ ln"crmaXlr anc ,r,ocr>oatlors sJOjSc: tc cranoo ·,,;t,c,_,t ooHcs Al ,·ah.ea""" rle<'J" m --,·p.-0,I '"'-'"' whan "'""''·'"'" ""'"' lah-o,atmy ,oncm,.n, P"'Je6"17 (lsev 12/20/231 OLP289B_R07 EV C)LVE CUSTOMER NAME ______________ _ EPAS Avery StreetDreams'0 LED Post Top Light PROJECT NAME ----------------- DATE TYPE _________ _ CATALOG NUMBER _______________ _ Spec Tables • Symmetric TypeV • Asymmetric Tyf.'E' Ill A Symmetric Type V • Asymmetric Type Ill A Symmetri'- Type V O.l 04 05 06 07 00 09 03 04 05 06 07 08 09 03 04 05 06 07 NIA 03 04 05 06 07 NIA 03 04 05 05 07 N/A OJ 04 'l(]OO 4000 5000 6200 7200 8200 9300 3000 4000 5000 6200 7200 8200 9300 3500 4400 5500 6400 7300 83[){) NIA 3500 4400 5500 6400 7300 7800 NIA 3700 4700 5400 6200 7000 N/A 3700 4700 2800 .'l800 4700 5800 6800 7700 8800 2800 3800 4700 5800 6800 7700 8800 3300 4100 5200 6700 (;900 78()0 N/A 3300 4100 52.00 6100 6900 8300 NIA 3500 4400 5100 5800 6600 N/A .'l500 4400 27 15 43 54 27 35 43 54 35 43 54 35 43 54 43 54 43 65 74 85 65 74 B5 65 74 05 NIA 65 74 65 NIA 65 74 85 N/A NIA N/A NIA NIA N/A N/A NIA N/A NIA NIA N/1\ NIA N/A N/A NIA NIA N/A 54 NIA Asymmetric [ru 5400 js10o j [ill T Ill 06 6200 5800 74 07 7000 6600 85 N/A NIA NIA NIA Fo r additional information on EPAS IES files, please refer to LED.com Current@> LED.com ,;·, 2-J:13 C..,c·,L[>Jl•,l;,-J Sc<ul,_,,-~ LLG "1I.,yl,C.. recm~U. t,run,·ut "' c ,o ,,-_--ec,r....,oon.; cat.,=L £ ""'""'" ·.,;.-out not-c-e. Al .,...,, eae cae,sn c, ''°""' "''""' ,Aa,n °"""'""'" "'>dee lsbo·atue1 =c.drbocs B2-U2-G1 B2-U2-G1 B3-U2-G1 B3-U3-G1 B3-U3-G2 B3-U3-G2 B3-U3-G2 B1-U2-G1 B1 -U2-G1 B1-U3-G2 B1-U3-G2 B1-U3-G2 B1-U3-G2 B2-U3-G2 A2-U2-G1 82-U2-G1 83-U2-G1 B3-U2-G1 B3 U2 G1 B3 LB G2 N/A B1-U2-G1 B1-U2-G1 B1-U2-G2 B1-U2-G2 B1-U3-G2 B1-U3-G2 NIA B2-U2-G1 B2-U2-G1 83-U2-G1 B3-U2-G1 B3-U2-G1 N/A B1 U2 G1 81 -UZ-Gl B1-U2-G2 B1-U3-G2 B1-U3-G2 N/A 82 U2 G1 B2-U2 -G1 B3-U2 -G1 83-U3-G1 B3 -U3-G2 B3-U3-G2 B3-U3-G2 B1-U2-G1 B1 -U2-G1 B1-U3-G2 B1-U3-G2 B1-U3-GZ B1-U3-G2 B2-U3-G2 82-U2 -G1 82-U2-G1 B3-U2-G1 B3-U2 -G1 B3 U2 G1 83 LB G1 NIA B1-U2-G1 B1 -U2-G1 B1-U2-G2 B1-U2-G2 B7-UJ-GZ NIA B2-U2-G1 82-U2-G1 B2-U2 -G1 B3-U2-G1 B3-U2 -G1 N/A B1 LJ2 G1 B1-U2-G1 B1-U2-G2 B1-U3-G2 NIA A. D, G No C&R B, E or H Medallion C&R C. For J Sc:rull C&R Fage 3 of7 ,:Rm· 1?/?0P"l OLP2896_R07 EV C) L VE CUSTOMER NAME ______________ _ PROJECT NAME DATE TYPE EPAS Avery StreetDreams"' LED Post Top Light CATALOG NUMBER ______________ _ ~Jin ,:\ [20! rrn1] ~ <4.0 ;, [6<4rum] ! \ / I ' :t::::-:::::::: A (,-===:::=L~, D ~-----,, 8 2ii.2 ;,. 1000 mml U 1in [:;32mri] I Mounting I ' '. ,. ·-....,, I ~'. G FINIAL t C -Fl,ur-D•-Lis TOP/CAGE TYPE n i \ = ' ' B C E F H Pod D Effective Projected Area Mounts to 2-3/8 to 3-inch (50-76mm) OD vertical tenon Suggested Mounting Height= 8-16 ft. (2.5 -5.5M) • 1.4 sq. ft max (0.15 sq M max) Weight Approximate Net Weight: 43 lbs (19.5 kgs)-54 lbs (24.5 kgs) Current@ LED.com ,:, 2•f.!3 cum-it u.ir,11,0 '""""'~ LLC All rlgtm. "''"'~"-'1t0rrral ,n a,o soocmcat1ona '"t:lrlct :c Chango ·.,ifl-c,.r not'os S.l •,ahBS ,., ces;-:.n o, t,-p"'-I """"'° --.<,so .....,.suceO ""''"' lsho-atmy mc,amocs ♦IMEG ~ESS DAlE INITIAL Paq~ 7 of7 ,:Rev12/20/23J OLP2896_!107 EV C) L VE CUSTOMER NAME ______________ _ PROJECT NAME DATE TYPE _________ _ EPAS Avery StreetDreams"' LED Post Top Light CATALOG NUMBER _______________ _ C Symmetric TypeV Diffuse Lens D Asymmetric Type Ill Diffuse Lens C Symmetric TypeV Diffuse Lens D Asymmetric Type Ill Diffuse Lens C Symmetric TypeV Diffuse Lens D Asymmetri( T~pelll Diffuse Lens 03 04 05 06 07 08 09 03 04 05 oc 07 08 09 03 04 05 0G 07 08 N/A OJ 04 05 06 07 NIA Ol 04 05 06 07 NIA 03 04 05 06 07 NIA 2800 3800 4700 5900 6900 7800 8900 ~80ll 4700 '.i900 6900 -/800 8900 3300 4200 5300 (;100 7000 8000 N/A 3300 4200 5300 6100 7000 8000 N/A 3(,00 4600 5:mu 6700 6900 N/A .'1500 4600 5300 6100 6900 N/A 2800 27 NIA 3800 35 N/A 4700 43 N/A 5900 54 N/A 6900 65 7800 74 8900 85 2&00 27 NIA 3&00 35 NIA 4500 N/A 5SOO S4 N/A 6SOO 6S /300 8350 85 3100 35 N/A 3900 43 N/A 5000 54 N/A 5700 65 66()0 74 7500 N/A NIA 3100 35 NIA 3900 43 NIA 5000 54 NIA 5700 65 6600 74 7500 85 NIA 3400 43 NIA 4300 54 N/A 5000 5700 74 6500 85 N/A NIA -~400 43 N/A 4300 NIA 5000 65 5700 74 6500 NIA NIA For additional information on EPAS IES fi les, plea se refer to LED.com Current@1 LED.com ,:: 2813 C•"T l <Jf,O,y &cluL,,,,,, c£. Al ''""" '"'""'-""· ,,,b ,·,·dLC" '"'" sµ-cc,,;cci cm c,.,Lr,cl Lu , '""''" w,chculnctic-e. > I ·.'E.Ues e·e des,g· oc t·,i:"al """'"wt.en'''""""'" uadec l•oorab, ,.,,.-~ru"os. DAlE DAlE INITIAL 82-U2-G1 82-U2-G1 B2-U2-G2 Fl3-Ll3 -G/ B3-U3-G2 B3 U3 -G2 Bl UZ Gl 81-UZ·Gl 81-LJ2-G2 81 LJ3-G2 81 -LJ3-G2 ll2-U3-G2 82-U2-G1 B2-U2-G1 83-U2-G1 B3-U2.-G1 83-U2.-G1 B3-U2-G1 N/A 131-UZ-Gl B1-U2.-G1 B1-Ll2.-G1 81-U2-G2 61-U2-G2 61-U2-G2 N/A B2.-U2-G1 B2-U2-G1 82-U2-G1 83·U~·G1 8'l-U3-G1 N/A B1-Ll2-G1 Bl-UZ-Gl B1-U2-G2 B1-U3-G2 B1-U3-G2 NIA [SHml ~ B2-U2-G1 B2-U2-G1 B2-U2-G1 B3-U2-G2 Fl3-U3-G/ Fl3-U3-G2 B3-U3 G2 Bl U2 Gl B1-U2-G1 B1-U2-G2 B1-U2 G2 B1-U3-G2 m-u3-GZ ll2-U3-G2 B2-U2-G1 B2-U2-G1 B2-U2-G1 B3-U2-G1 B3-U2-G1 B3-U2-G1 N/A lll-UZ-Gl B1-U2-G1 B1-U2-G1 B1-U2-G2 B1-U2-G2 B1-U2-G2 NIA B2.-U2-G1 B2-U2-G1 B2-U2-G1 B3-U2-G1 B'l-U3 -G1 N/A B1-U2-G1 Bl-UZ-Gl 81-UZ-Gl B1-U2-G2 B1-U3-G2 NIA A, D.G NoC&R B, E or H Med~llion C&R C. For J Scroll C&R Page4~·f7 (Rt',"rpop .. 1·, OI.P:1896_R07 CITY OF CARLSBAD TRANSPORTATION DEPARlMENT IMPROVEMENT PLANS FOR: CARLSBAD BARRIO PEDESTRIAN LIGHTING PHASE II ELECTRICAL DETAILS APPROVED: HOSSEIN AJIDEH ENG. MANAGER P.E. 75991 EXPIRES 6 22 DAlE DWN BY: Ase PROJECT NO. DRAWING NO. ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL CHKD BY: _R~l-!lH!--RWID BY: 61 H E301 --w ~ I a.. 0 z ~ Q _J 0 a: a: <( m 0 ~ ~ a: <( 0 LL 0 ~ 0 I en z <( _J a.. 1-z w ~ ~ a.. ~ - ®www.imegcorp.com PH: 858.368.340013400 SABRE SPRINGS PARKWAY SUITE 225 SAN DIEGO, CA 92128 Feb. 3, 2025 Item #3 Page 27 of 66 13'-1" POLE HEIGHT ABOVE GRADE 13'-4" OVERALL POLE LENGTH / ~---+- 36" t (24") - g CAST ALUMINUM A5 TENON DELPHI-K ALLOY I'--5-1 /8" TOP O.D. (ACROSS FLATS) 2" COLLAR CASTING I.D'.~<D~ (SEE POLE TOP DIMENSIO~ r~~, FOR CONCRETE RACEWAY -, + ),~~t,-+--- 1.D. & TOLERANCE) ~ a 3" O.D.----- -'----t r-+-,,Tl TENON TO BE ATTACHED PRIOR TO SHIPMENT (4) 3/8"-16UNC x 1-1/4" LG FLAT HEAD MACHINE SCREWS ALLOY STEEL F835 ZN WITH 1-3/4" ± 1/4" I.D. RACEWAY SPUNCAST, PRESTRESSED CONCRETE POLES 1-5/8" x 9" HANDHOLE WITH CAST ALUMINUM FRAME & COVER @ o· COVER TO BE ATTACHED PRIOR TO SHIPMENT WITH STANDARD (STD) DOOR SCREWS 3" LG VIEW "A" t "A" 180· 5" OCT. (ACROSS FLATS) I'-CAST ALUMINUM TOP COLLAR ;~(STANDARD MOD38 POLE TOP) .• (4) 3/8"-16UNC x 1-3/4" LG COUPLINGS EQUALLY SPACED ON A 3-1 /2" DIA BOLT CIRCLE EACH WITH 12" LG ANCHOR go· 270" POLE TOP DETAIL o· HANDHOLE & POLE 1.D. TAG POLE ORIENTATIONS HANDHOLE FRAME . . . . -----.-~ ----- " • '• ' . f-----1 /2" CLEAR COVER (NOM) (8) 7mm PRESTRESSING STEEL WIRES ASTM A421 1-3/8" WALL (TYP) ~ I/POLE I.D. TAG @ o· #8 GA x 6" BARE COPPER~ _,, \,.. -----;.,,- GROU N DWI RE "'..__ -~ i .... # 12 GA SPIRAL STEEL WIRE AT 3" PITCH ASTM A1064 CT I) C. SPIRAL CAGE WIRE-' (AT FRAME LOCATION) ~r-,.. & GROUND WIRE ARE t-1'.l..!,...I. rs~ -- TO BE CONNECTED & c-- ~ • • " ' ~ r---_ ' #11 GA LONGITUDINAL STEEL WIRE WELDED TO SP IRAL WIRE ASTM A1064 ....__ ~i-~----. GRADE LINE ~--~-f-----cc::::=':::::=:::'.::::::=, SECURED PRIOR TO CASTING CONCRETE POLE SECTION 15" SQ x 1" THK GALV. STEEL PLATE ASTM A36 (4) 1" O.D. x 2-1/4" LG SLOTS EQUALLY SPACED ON A 16" TO 18-1/2" DIA BOLT CIRCLE BASE PLATE DETAIL 1 6" /, \ \ I I 1 "-\ R 1 "--1-~ J I 6-11/16" ACROSS FLATS 12" ACROSS FLATS 14" ACROSS FLATS ( 4) 3/ 4" x 24" x 4" GALVANIZED ANCHOR BOLTS WITH HEX NUTS & WASHERS ASTM F1554 GR 36 (P /N: 4201 OE OR EQUIVALENT BY OTHERS). DEFAULT ANCHOR BOLT SHOWN; FOUNDATION DESIGN IS BY OTHERS. SPECIFIC STEP BASE DETAIL FOUNDATION DESIGNS MAY COMPLIANCE TO ANY CODE NOT EXPLICITLY LISTED ON TH/$ DRAWING 1$ NOT GUARANTEED. PLEASE CONTACT NATIONAL OILWELL VARCO IF YOU HAVE SPECIFIC CODE REQUIREMENTS. REQUIRE ALTERNATIVE BOLT REQUIREMENTS .µ ill 1 iii ! JDTIG~Ji-OIBiT 1~ ~ ~ z BEF"ORE DA'l'S BEFORE !.'. YOU DIG YOU DIG m __ _ "" TOLL FREE 1-800-277-2600 i A PUBUC SERVICE BY ii: UNDERGROUND SER't'ICE ALERT ►•◄ I Know what's below. Call before you dig. DIAL TOLL rREE 811 AT LEAST TWO DAYS IIEF'ORE YOU DIG lllllERIIIClllll SEll\1a; IIIS!T Of SIJll1IERN W ♦IMEG REV DATE DESCRIPTION BY APPR A 3/8/24 ADDED SHIPPING ASSEMBLY JMW VICTORIAN IV BASE PLATE OCTAGONAL STEP BASE POLE POLE OVERALL BASE O.D. ULTIMATE POLE POLE HEIGHT BOLT GROUND LINE POLE (ACROSS WEIGHT DESIGNATION ABOVE CIRCLE MOMENT GRADE LENGTH FLATS) (ft-lbs) (lbs) VBS04 13'-1" 13'-4" 14" 17" 12,000 470 "F" LEVEL POLE CONFIG CODES "P" LEVEL POLE CONFIG CODES OPTION CLASS ENTRY INFO OPTION CLASS ENTRY INFO COATING I MIX 12 HH COVER 66521E FINISH 3 DOOR SCREWS STD BASE PLATE 62500E COLLAR 65830E OCT. POLE TOP CONFIG. MOD38 STRUCT. MOD MODDCI NOTES QTY BILL OF MATERIAL FOR SHIPPING ASSEMBLY 1708-054 1 VBS04 *1231-8 1 40075EA -CAST ALUMINUM A5 TENON ASSEMBLY, 3" O.D. x 3" LG NOTES: 1. MIX (1231): GRAY TERRAZZO, EXPOSED AGGREGATE FINISH WITH AMERSHIELD ANTI-GRAFITTI COATING. 2. ASTM C-595 TYPE IL GRAY CEMENT. 3. f'c@ 28 DAYS= 7,000 PSI, USING SPUN CYLINDER TEST. 4. f'c@ 28 DAYS= 5,000 PSI, USING ASTM C-31 CYLINDER TEST. 5. POLES MANUFACTURED PER ASTM C-1089-19 SPECIFICATIONS. 6. PROTECTIVE COAT EXPOSED P.C. WIRES AT POLE ENDS. 7. BASE PLATE FULLY PRESTRESSED WITH (8) 7mm ASTM A421 STEEL WIRES. 8. MODDCI: CORROSION INHIBITOR MIX MODIFICATION. 9. THE POLE (& IMPLIED TENON TOP ASSEMBLY) DEPICTED ON THIS DRAWING IS DESIGNED TO WITHSTAND THE LOADS IMPARTED BY A SINGLE POST TOP LUMINAIRE (NOT TO EXCEED 2.5 SQ FT EPA & 50 LBS) AS DESIGNED PER THE 2013 AASHTO L TS-6 USING A 90 MPH WIND ZONE (3-SECOND GUSTS) CRITERIA FOR STREET LIGHT POLES. PLEASE CONTACT & ADVISE MANUFACTURER IF INTENDED LOADING EXCEEDS THESE VALUES. MATERIAL LIST QTY PART NUMBER DESCRIPTION ORG NOTES 1 1708-054 4 42010E APPROVED BY SHIPPING ASSEMBLY 3/4" x 24" x 4" ASTM F1554 GR 36 GALVANIZED ANCHOR BOLTS ANN ANN POLE PRODUCTS www.ameronpoles.com CITY OF CARLSBAD CARLSBAD, CA REQUIRED SEPARATELY DATE K9 Y VBS04 POLE WITH TENON ASSEMBLY THIS DOCUMENT CONTAINS INFORMATION WHICH IS PROPRIETARY TO NATIONAL OILWELL VARCO. IT SHALL NOT BE REPRODUCED, USED OR DISCLOSED TO ANYONE WITHOUT THE PRIOR WRITTEN PERMISSION OF NATIONAL OILWELL VARCO. DRAWN: J.C. DATE: 08/17 APPR: DATE: DRAWING NUMBER REVISION SHEET SCALE 1708-054 A 1 OF 1 NTS CITY OF CARLSBAD I SHEETS I f----1----1---------------1-----1---1----1---1 TRANSPORTATION DEPARlMENT 23 ,----1---+--------------1----1---1----1---1 ,----l----l---------------1----1---1----1---1 IMPROVEMENT PLANS FOR: ,----1----1---------------1----1---1----1---1 CARLSBAD BARRIO PEDESTRIAN LIGHTING PHASE II ELECTRICAL DETAILS ,----l---+--------------1----1---1----1---1 APPROVED: HOSSEIN AJIDEH f----1----1---------------1-----1---1----1---1 ~EN;;;G.~M;;AN~A~GER~::::::;--;:P.~E.~759~9~1~EXP~IRES~6:::'l:vl~"~22;:::::::D~A~lE=:::! i---,,.DA=1E=--+-=1N111=•.,....l-·--------------I-----I---I-----I---I DWN BY: ASC I PROJECT NO. I DRAEWl30NG2NO. ~ 1--DA_lE__._~_m_AL-+-_DA=lE--'-l"'-~ll=AL"-I CHKD BY: RIH ENGINEER OF WORK REVISION DESCRIPTION OMR APPROVAL CITY APPROVAL RWID BY: 61 H --w ~ I a.. 0 z ~ Q _J 0 a: a: <( m 0 ~ ~ a: <( 0 LL 0 ~ 0 I en z <( _J a.. 1-z w ~ ~ a.. ~ - ®www.imegcorp.com PH: 858.368.340013400 SABRE SPRINGS PARKWAY SUITE 225 SAN DIEGO, CA 92128 Feb. 3, 2025 Item #3 Page 28 of 66 Revision ORIGINAL UPDATED Reviewed NOTES: w z ::J I .. I.~ . • / ,, 2 WEAKENED 6" ~ \ • PLANE JOI NT 1/2" R /-\ ~3 • • \ {/1 R TYPE w G 24" H 30" • 6" CURB HEIGHT I. CONCRETE SHALL BE 520-C-2500 . 2. SEE STANDARD DRAWINGS G-9 AND G-10 FOR JOINT DETAILS, 3. SLOPE TOP OF CURB 2% MAX TOWARD GUTTER . V, z 0 ~ w ~ V, w ~ w "' "' w w I I f-" 0 f-w ~ " w 0 0 0 X w " N z " " 0 I I -V, --I *AREA 1.34 SQ. FT. 1.60 SQ FT. LEGEND ON PLANS RECOMMENDED BY THE SAN DIEGO By Approved Date SAN DIEGO REGIONAL STANDARD DRAWING REGIONAL STANDARDS COMMITTEE 12/75 KERCHEVAL f CV CV 12/1 5 '~ 4 "J/zf/2022 KE T. Stanton 10/18 CURB AND GUTTER -COMBINED Chairperson R.C.E. 52241 Dote 5' -o• WIDTH OR VARIES I 1/2'' R \ TO EXISTING CONDmON 1 4" 1/2' R I j -2% MAX CROSS-SLOPE i . . \ ' ' ·- 1 2" WEAKENED PLANE JOINT - NON-CONTIGUOUS s·-o· WIDTH OR TO EXISTING CONDn-lON -4" 1/2" R j • \ -2% MAX CROSS-SLOPE • ,-7 ... ".. -------'"'--'-;-', I !'7_>-'-----,-------•·-/ ~·' " . ' ' / l« ""' \ 2'' WEAKENED I ---__ _J ~ PLANE JOINT - I r L__ I -------_ _j CONTIGUOUS 1/2" R NOTES: 1 CONCRETE SHALL BE 520-C-2500. LEGEND ON PLANS 2. SEE STANDARD DRAWINGS G-9 AND G-10 FOR JOINT DETAILS. Revision By Approved Date RECOMMENDED BY THE SAN DIEGO SAN DIEGO REGIONAL STANDARD DRAWING REGIONAL STANDARDS COMMITTEE ORIGINAL KERCHEVAL 12/75 ~ REVIEWED CV DI 12/15 · ~ r/ 4 , s/21/20,z R<,viewed KE S. St □ntcn 10/18 SIDEWALK -TYPICAL SECTIONS Chairperson R.C.E. 52241 Date ReYision ORIGINAL UPDATED RE\liEWED ' ' I f-_!'.C.R ._RAD IL§_ / ~ \ ,,.--//; I I ,,.-/ I I / I I Al j / I I / ~. ~ I "' I • ' ~ . : . ---I ..... ·•·.-. ~I I ---~ -_, ' ' -__:___~ I . -.. -,, . ~ :: ··~· . ! . ""!"• .. ··,,. •. ;, -~ ' A_j LcoNTACT JOI NTS PER STANDARD ' DRAWING G-10 WHEN SEPARATE POURS ARE MADE PLAN 1 O' UNLESS OTHERWISE T l SHOWN ON PLAN I 1/2'' R TYP. uis_ I 1.5% l/4p OF PAVING I'" ..• " • • ,• . • .' ·-1 /////cl•;/>~////~,,,~:;-:,,".,,'.'.'.,'.'.,'.,' ' I \_ B.1'SE MATERIAL AS SHOWN ON PLANS SECTION A-A NOTES: 1. CONCRETE SHALL BE 560-C-3250. 2. ---------= WEAKENED PLANE JOINTS. 3. ------= TYPICAL FLOWUNES. 4. o = ELEVATIONS TO BE SHOWN ON PLANS. 5. RETURN SEGMENTS TO BE 7" THICK. 6. CURB BETWEEN PC RS SHALL BE CONSIDERED A.S PART OF THE CROSS GUTTER. 7. IN ALL CASES SUBGRADE SHALL BE COMPACTED TO 95% MIN. RELATIVE COMPACTION TO DEPTH OF 12". LEGEND ON PLANS By Approved Date RECOMMENDED BY THE SAN DIEGO SAN DIEGO REGIONAL STANDARD DRAWING REGIONAL ST AND ARDS COMMITTEE KERCHEVAL 12/75 ,,l CV ~m;cv 11/11 \.-( d "3/2-,/2022 CV CV 12/15 CROSS GUTTER Chairperson R.C.E. 52241 Date 0 G) 190-E-400 CONCRETE, MAXIMUM 8" SLUMP SLURRY BACKFILL TO SURFACE. FOLLOW WITH 12" WIDE BY 1-1/2" DEEP GRIND AND RESURFACING, ALLOW MIN. 72 HOURS CURE BEFORE GRINDING. (1) D2-PG-64-10 ASPHALT CONCRETE @ @ ® ® ALL CONDUIT AND CABLE EXISTING A.C. PAVEMENT EXISTING BASE MA TERI AL MORTAR SAND COMPACTED TO 95% RELATIVE DENSITY. CZ) UNDISTURBED SOIL H SECTION N.T.S. @ SYMMETRICAL ABOUT CENTERLINE OF TRENCH. @ GRADE SS-lh EMULSIFIED ASPHALT APPLIED AT 0.15 GALLON PER SQUARE YARD. (@) EXISTING ASPHALT PAVEMENT FINISHED GRADE, SMOOTHNESS & COMPACTION OF RESURFACING SHALL MEET THE REQUIREMENTS OF SEC 302-5.6.2 SSPWC EXCEPT THAT TH E SMOOTHNESS SHALL BE DETERMINED OVER THE LEN GTH & WIDTH OF PAVEM~NT AREAS DISTURBER BY THE CONTRACTORS/ PERMITEE S OPERATIONS. U') e-U') w e- W w °' w f-°' U') e- __, U') <( °" °" w ~F °' 0 <( __, __, __, __, <( <( °" °' 0 0 c_ c_ 'z z --:,; ::e " 0 <D n n TOP OF CONDUIT AND CABLE * 3 MINIMUM WIDTH 4" MAXIMUM WIDTH 6" (jJ) RESPRAY GRADE SS -1h EMULSIFIED ASPHALT AT 0.15 GALLON PER SQUARE YARD 6" WIDE, CENTERED ON EDGE LINE OF GRIND AFTER PLACING A.C. & BEFORE SURFACE TREATMENT. @ SURFACE 1REATMENT TO MATCH EXISTING PAVEMENT (E.G. SEAL COAT, CHIP SEAL) @ WHEN THE EDGE OF THE GRIND LINE IS WITHIN 12" OF EDGE OF PAVEMENT, ANY STRUCTUR~, AN ADJACENT TRENCH PATCH OR ANY O 1MER PAVING JOIN LINE THE 1-1 /2'' DEEP GRIND SHALL BE EXTENDED TO 'rHE EXISTING STRUCTURE OR JOIN LINE. REV. APPROVED DATE CITY OF CARLSBAD NARROW TRENCH BACKFILL & CITY ENGINEER DATE Reviewed RP S. Engedo 03/22 DRAWING G-02 Reviewed RP S. Engeda 03/22 DRA\1/lNG G-07 Reviewed RP S. Engeda 03/22 DRA\1/lNG G-12 NUMBER NUMBER NUMBER f .__ _ _,__, __ .,____._ _____________ _,__'-'=""'------' .__ _ _,__, __ .,____._ _____________ _,__ _____ ~ .__ _ _,__, __ .,____._ _____________ _,__ _____ ~ 1----+---+-----1 ASPHALT CONCRETE RESURFACING I SUPPLEMENTAL GS 24 STANDARD NO. - ~ ~ 9- f "6 t ~ 8 ~ ' / .µ ill 1 iii ♦IMEG ►•◄ ! JDTIG~Il-OIBiT I DIAL~~~ rREE ~ESS/a~ fsHml CITY OF CARLSBAD ~ 1-----,1--------------------+-----1----+----+----1~ TRANSPORTATION DEPARlMENT l__::_j :==~=========:'..==:::::: IMPROVEMENT PLANS FOR: CARLSBAD BARRIO PEDESTRIAN LIGHTING PHASE II ELECTRICAL DETAILS APPROVED: HOSSEIN AJIDEH 1 ~ ~ ~ Knowwhat'sbelow. AT.==':OYS t?t~.~ t ~~~fo D~B~E Callbeforeyoudig. i ~~~ ~ e ENG. MANAGER P.E. 75991 EXPIRES 6/30122 DAlE m UlllERIIICUII SEJl\1a; IIIS!T Of SIJll1IERN W * r,p. 9/J0/20 * -c, TOLL FREE 1-800-277-2600 d)l., D.sc;Tf',\r:,~~ DATE INITIAL DATE INITIAL DATE INITIAL DWN BY: ASC I PROJECT NO. I DRAEWl303NG NO. D ¥ ~ ~~ B~ ~H 'ii A PUBUC SERVICE BY 0, c~~,._, ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL RWID BY: Bl H a: L--~uN:D!ER::GR:ou~N~D~SER~~'t'l~CE~A~ill;~RT~--L-----------------------------------------------------------------------------.JL.. ________ _:::::::::: ______ J:::=:.:..:::L. ___ _.:;:,_~.:_ .. :,:,:.:.:,_ __ ..,: ______ J,;:;:,,:::;:::~~::.;,:_::::::::;..L!;;;;;;;;;;;;;;;;;;;:!:;;;;;:~;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;!;;;;;;;;;;;;;;;;;;;;;;;;;;.J --w ~ I a.. 0 z ~ Q _J 0 a: a: <( m 0 ~ ~ a: <( 0 LL 0 ~ 0 I en z <( _J a.. 1-z w ~ ~ a.. ~ - Barrio Lighting Improvements Project Phase Two Pedestrian Lighting PUBLIC INPUT REPORT March 2022 Exhibit 3 Feb. 3, 2025 Item #3 Page 29 of 66 • Barrio Lighting Public Input Report March 2022 2 Table of Contents Introduction 3 How we engaged 4 Who participated 5 What we heard 7 Next steps 12 Appendix 13 A. How opportunities were promoted B. Comments Harding Sreet C. Comments Madison Street D. Comments Roosevelt Street E. Comments Magnolia Avenue F. Comments for areas outside of the project scope of work Feb. 3, 2025 Item #3 Page 30 of 66 Barrio Lighting Public Input Report March 2022 3 Introduction The Barrio is the City of Carlsbad’s oldest neighborhood and home to the senior center, Harding and Pine community centers, Chase Field, Pine Avenue Community Park, a community garden and ballfields used by residents from throughout the city. To enhance safety and livability in this neighborhood, values emphasized in the Village and Barrio Master Plan, the city is making improvements to lighting in the area. This infrastructure project focuses on adding new streetlights and pedestrian lights to ensure people feel safe driving, walking and biking after dark. Phase one of the Barrio Lighting Improvements Project is underway and includes adding streetlights throughout the area. Phase two focuses on pedestrian lighting, which illuminates sidewalks rather than streets. The city sought input from the neighborhood and others who visit the area about the areas they thought were most urgently in need of pedestrian lighting, among the streets included in the project: Harding Street, Madison Street, Roosevelt Street and Magnolia Avenue. Pedestrian-scale lighting will be mounted on shorter, 15-foot poles with a decorative lighting element that will provide light on walkways to create a safer, more walkable neighborhood. Qualitative nature of the input By providing multiple ways for the public to provide input, decision makers can hear from a large and diverse group of community members. However, unlike a scientific survey, the findings of this survey cannot be generalized to the entire neighborhood population within a defined margin of error. That’s why the input in this report should be considered with a similar weight as other qualitative forms of feedback that have always been part of the city’s decision-making process, such as comments made at City Council meeting or emails sent to the city expressing an opinion. Feb. 3, 2025 Item #3 Page 31 of 66 Barrio Lighting Public Input Report March 2022 4 How we engaged City of Carlsbad staff utilized two approaches to solicit input from neighbors and those who visit the area: An online map and personal interviews. Participants Online mapping tool Feb. 2 – 27, 2022 131 Intercept interviews with Spanish speaking households Feb. 2, 5, 8 61 What we asked Participants were asked to place pins along the four highlighted corridors in the Barrio in specific locations they thought lights were needed the most. They could leave comments with their pin drop and then choose their preference between two decorative lighting options the city currently uses for pedestrian lights. Feb. 3, 2025 Item #3 Page 32 of 66 Cityof Carlsbad -••...----·-· ,,....,, ..... I;\G{iij~~o•,e:.7~• ;,:. -•=/:?.~~~:c~::~:,:~~~c~;;~~;~ ::~:.,~--... .., ... "' ..... ~.;::-:.""-=-~ --- " Barrio Lighting Public Input Report March 2022 5 Who participated 1,487 Times someone came to the project page 592 Unique people who looked at the page 170 Houses were visited 61 Spanish speaking residents who provided input 191 Total number of people who provided input 193 Number of locations recommended for lighting Feb. 3, 2025 Item #3 Page 33 of 66 Barrio Lighting Public Input Report March 2022 6 Those who provided comments on the mapping tool were asked optional demographic questions. Age group About the participants Feb. 3, 2025 Item #3 Page 34 of 66 18-29 ■ 30-49 50-64 65 and older 0 2 4 I live in the Barrio. I live in Carlsbad, not the Barrio. I work in the Barrio. - I go to businesses in the Barrio. I use city services in the Barrio. I use Pine Avenue Park/playgroun ... I enjoy walking in the Barrio. I have a garden box at Pine Comm... • I live in the village • I live in the Village, on the corner o... • I live just on the other side of Tam • I visit friends who live in the Barrio • I walk past Pine Ave. Park/playgro... • 0 6 12 • Total 15 e Total 14 20 16 Responses 25 Responses Barrio Lighting Public Input Report March 2022 7 What we heard The online mapping tool gave participants an opportunity to share where light was needed along four specific corridors in the Barrio: Harding Street, Roosevelt Street, Madison Street and Magnolia Avenue. The map below shows a snapshot of all the lighting suggestions that were related to each street. Where is light needed in the Barrio? • Harding Street – 60 pins • Madison Street – 54 pins • Roosevelt Street – 42 pins • Magnolia Avenue – 26 pins • Other areas outside the project scope of work – 50 pins Feb. 3, 2025 Item #3 Page 35 of 66 Barrio Lighting Public Input Report March 2022 8 Main themes In the comments section of the survey, there are general statements or themes about lighting in the Barrio. • More light is needed at all intersection corners and crossings in the Barrio to ensure drivers can see pedestrians crossing the street. • More lights in the neighborhood will help drivers to see pedestrians and slow down. • Make sure pedestrian lighting doesn’t shine into people’s homes. • More lights are needed in areas where people regularly gather for events. Below are community comments why more light is needed according to each corridor. Harding Street • The entire block of sports fields gets very dark after city shuts off the lights. Need better pedestrian lights around the fields after they are closed. • With the added occupancy with the new large development across from Camellia on Harding extra lighting would possibly reduce crime at night. • After games are over and field lights turned off, the segment between the Fwy and Roosevelt gets too dark. • After the soccer/baseball fields turn off their lights, the street and all around the park gets too dark. • At night it can be hard to see pedestrians using this corner especially on the west side of this intersection where there the all ages recreation center is located. • Better lighting would be beneficial in this area, especially when events happen in some of the churches/community halls in this area. • Due to the larger development going in across from Camellia there is worry over increased crime due to increased occupancy, and poor lighting at the entrance of this neighborhood directly across from the large apartment. • It’s pretty dark when there isn’t a game going on, field lights are off. • Need very good lighting at the Senior Center stairs and parking lot areas and parking lot entrances and exits. • Too many cars rushing down the street and they barely see people crossing streets. Feb. 3, 2025 Item #3 Page 36 of 66 Barrio Lighting Public Input Report March 2022 9 • The street needs to be lit on both sides due to high traffic between Pine and CVD. • With the new large high density low income housing project on Harding, directly across from Camellia Pl. more lighting is needed at the intersection of Harding and Camellia Pl Madison Street • More light in Madison St. between Magnolia and Pine is needed. The entire block of sports fields gets very dark after city shuts off the lights. Need better pedestrian lights around the fields after they are closed. • Pine Park has some pretty dark corners, especially on the west side • After the soccer/baseball fields turn off their lights, the street and all around the park gets too dark. • Important too to have good lighting in the area of the Community gardens area. • Madison is very dark close to Pine Park • Need good lighting in all school areas in the Barrio, including daycare for children and seniors. • Pine Avenue Community Garden is almost totally dark at night. • People travel too fast on Madison. Roosevelt Street • Extremely dark area, many apartment dwellers have to park blocks from their home and walk at night. • More light is needed from CB Village Drive south on Roosevelt to Lola’s Market, on both sides of the street. • Good lighting around the Boys and Girls Club is super important. • Provides some protection for those carrying goods after shopping or with $. • More lights are needed at the bend/transition between Magnolia and Roosevelt. Many people go too fast and it feels unsafe when drivers almost can’t make the curve. • The entire side from Roosevelt Street to Laguna is completely dark. Especially since we have a lot of pedestrian activity from Hennessey’s, the post Office, Fiesta Liquor, and random transients. Feb. 3, 2025 Item #3 Page 37 of 66 Barrio Lighting Public Input Report March 2022 10 Magnolia Avenue • All of Magnolia between Roosevelt and Harding needs more light. • More lights are needed at the bend/transition between Magnolia and Roosevelt. Many people go too fast and it feels unsafe when drivers almost can’t make the curve. • All of Magnolia needs more light. Decorative lighting option Participants were asked to choose their preference between two decorative lighting fixtures that the city currently uses. Option 1 can be seen throughout the Village and option 2 can be seen throughout La Costa. Of the 150 responses, 111 responded to the question. 81 people or 73% favored Option 1, with 26 people or 22% favoring Option 2, and 5 people or 4.5% with no preference. Feb. 3, 2025 Item #3 Page 38 of 66 Option 1 Option 2 Barrio Lighting Public Input Report March 2022 11 What light fixture do you prefer? Option 1 Option 2 No preference Feb. 3, 2025 Item #3 Page 39 of 66 ■ ■ ■ Barrio Lighting Public Input Report March 2022 12 Next steps Staff will prepare a technical lighting assessment, evaluate electrical infrastructure and power availability and existing site conditions and constraints. Public input, along with the lighting assessment study will be used to help guide design and street corridor prioritization of pedestrian lights in the Barrio. Following project design, staff will install new pedestrian lights in phases based on funding availability and coordination with San Diego Gas & Electric for power. The city will continue to keep those who participated in this survey informed of how their input was used, what progress is being made to finalize this phase of the project, and additional opportunities to get involved. Feb. 3, 2025 Item #3 Page 40 of 66 Barrio Lighting Public Input Report March 2022 13 Appendix View the Appendix for verbatim responses gathered through all the engagement opportunities. Table of Contents A. How opportunities were promoted B. Comments Harding Sreet C. Comments Madison Street D. Comments Roosevelt Street E. Comments Magnolia Avenue F. Comments for areas outside of the project scope of work Feb. 3, 2025 Item #3 Page 41 of 66 Barrio Lighting Public Input Report March 2022 14 How opportunities to engage were promoted City staff notified community members about opportunities to get involved through a wide variety of digital tools and tailored in person outreach. Reach Stakeholder emails to those interested in Village and Barrio updates, Barrio businesses and apartment housing complexes 61 intercept surveys to Barrio residents Project webpage News release Nextdoor post Facebook post Instagram story Twitter post Feb. 3, 2025 Item #3 Page 42 of 66 -------- -------- G 0 ------ (1) 0 ------ Barrio Lighting Public Input Report March 2022 15 Eblast example Sent to those interested in Village and Barrio news, Barrio businesses, and apartment complexes in the area Feb. 3, 2025 Item #3 Page 43 of 66 Lighting up the Barrio To help create a more walkable and inviting Barrio neighborhood, the city is looking for community input to help guide the placement and priority of new pedestrian lights along four street corridors: Harding Street Madison Street, Roosevelt Street and Magnolia Avenue. You can use this maQl2i!]g tool, which allows you to drop a pin in areas where walkWays may need more light. If you need support with the tool or want to provide feedback another way, let us know and a member of our team will get in touch with you. Madison St Background Adding new pedestrian lights in the Barrio is the second part of a two-Qhase LJghting_llli)j~ to enhance safety and visibility and promote walking and biking in the Barrio. Over the last year, 14 new streetlights have been installed to help light up streets and intersections. Eight are currenUy turned on. Streetlights are mounted on higher poles or existing utility poles and are meant to be brighter to light up streets and intersections. Pedestrian lights are lower in intensity and on shorter poles to light up walkways. Barrio Lighting Public Input Report March 2022 16 Nextdoor post in English and Spanish Feb. 3, 2025 Item #3 Page 44 of 66 City of Carlsbad 0 Kristina Ray • 8 Feb Help prioritize lighting locations in the Barrio. Hi everyone. You may have noticed some new streetlights in your neighborhood. This was the first phase of a project to create -'· ---·· "-L•'·· -'·-·•--~--··' -----_,_ .... '------' - who want to walk and bike after Helo a todos. ~s pos!l:le que haya notodo qu algunas ca res e intersecaones en el Barno t enen lights designed specifically to Ii~ rnIe\'<"i~ fnrnln..,. F\~t>-' ..-o!o J:>;1 p1lrn .. r jln\O d~I p1oy~:lo p,m-t c 1~,u 1111 \'ec indHlill t11'i·1 The city is looking for feedback area -Harding, Madison, Roose use this mapping tool where yo more light is needed in the Barr https://cityofcarlsbad.mysocialp If you'd like support with the to, email us at communications@c. Finally, here is more informatior https://www.carlsbadca.gov/de1 m,s ~e<lor ~ asegurarse cfe que las ~erso1a;se sientan segLras al cam·nar, ardar en b,c,cleta o ccnducir despues dal anoc11ecer. Estamos plcnifi:ando la pr6xi~a fase de ilun·ina,:·on para agregar nuevas 'uces pilr-l pea tone~ en l~s occras y cstamos pidlcndo '.lll opinion pMil ~yudur .i prioriznr c6nde debe ir la pr6xirna ronda de in;talacbres. Para darsu opiniCn~ utilice e-s1a lle11 dtrie11lo tie ir oµeo <iomle JJUeue wlota, •1·1 dlrile1 en LIi 'ugo1 es)JetiriLU <.1011tle crea que se necesita mas lt,z en el Dairic. rttps:f/cityofc3rlsbad.mysoc1alp1npo,ntcom,r:iamo-hgh:1ng Fara hablar con alguien en esparol y dar su opinion por otro medic, envfe un ccrreo electr6nico a melb3@no11oacommunicaticrs.com o l!ame al 760.173-3511. Aqur le oirecemos mas infoirnaci6r sobre las mejaras de iluminaci6n para el Bairio: l·ttps;/Jw11v1.o.,rls.)ddca.gov/departmen~/PLblic-"'◊il<:s/traffic-circles (City Socia I Pinpoint -Barrio lighting trlsb; cityoka·lsbad.mysoc,alpirpointccn Pos:ed ~o Subscribers of Cit:t of CartsOad in ~ neighborhood -75 Impress ons 'v Like y 1 Comment ~ Share A_ Jul PA. • K.=nin •• • V I don't recall the city doing an ontine SJ!Yey for evetyone in Carlsbad to chime in 011 how I<• liljhl F:c1he.1l..;rn1 Rnm h rn <1ny ulh~1 l!t·'i9hln rrhix rel..,? t./ullir,..- stucies ~ave already been cone. en :his subject over the past decade. Cnough With the s:ud1es & suiveys on the same lev/ square blocks. 9 Feb l ike Repy Share Barrio Lighting Public Input Report March 2022 17 News release and City Manager Update Feb. 3, 2025 Item #3 Page 45 of 66 Input wanted for Barrio pedestrian lights Post Date: 02/03/2022 To help create a more walkable Barrio neighborhood, the city is looking for JlUblic inP.ut to help guide the placement of new pedestrian lights along four street corridors: Harding Street, Madison Street, Roosevelt Street and Magnolia Avenue. Use the city's maP.Jling tool to drop a pin in a specific spot in the Barrio where you think more light is needed. If you need assistance with the tool or want to provide feedback another way, you can always reach out to communications@carlsbadca.g.QY. Para proporcionar su opinion en espanol, comuniquese con Melba Novoa a melba@novoacommunications.com o 760-473-3511. Background Adding new pedestrian lights in the Barrio is the second part of a two-12hase lighting_12roject to enhance safety and visibility and promote walking and biking in the Barrio. Over the last year, 14 new streetlights have been installed to help light up streets and intersections. Eight are currently turned on. Streetlights are mounted on higher poles or existing utility poles and are meant to be brighter to light up streets and intersections. Pedestrian lights are lower in intensity and on shorter poles to light up walkways. These lighting improvements are outlined in the Village and Barrio Master Plan, enhancing safety, livability and community character in the Barrio. Lighting up the Barrio Speaking of the Barrio, if you've been there after sunset recently, you may have noticed some streets and intersections have new streetlights. This is just the first step in a project to create an even more inviting environment in the Barrio and make sure people feel safe walking after dark. Why is this important? Did you know the Barrio is Carlsbad's oldest neighborhood? It's also home to our senior center, a community center, Pine park and community garden and ballfields used by residents from throughout the city. What to know ... • As we plan this next phase of lighting improvements, we're looking for community input on which areas should be prioritized for the next round of installations . • You can use this mapping tool, which allows you to drop a pin in a specific spot where you think more light is needed in the Barrio. • These lighting improvements are part of the implementation of the Village and Barrio Master Plan and support the city's goals of encouraging people to walk and bike instead of always using a car. Learn more Barrio Lighting Public Input Report March 2022 18 Social media posts Feb. 3, 2025 Item #3 Page 46 of 66 City of Carlsbad -Official February 8 at 6:30 PM • 0 To make it safer to walk and bike after dark in the Barrio, the city is planning to add new lights to light up sidewalks • • Which streets should be prioritized for the next round of installations? Let us know ~ l https://loom.ly/K99wPrM J: Leslie Gaudreau Richter Grand and Washington Like Reply 3w Norma V. Gut ierrez Adams st from magnolia av --chestnut av • Like Reply Jw 4 1 Reply Monita Larson Kelsey How about all of it!! Sun sets the earliest at, what 4:15 ... walk it. Like Reply 3w Mike Hake Drive around at night, you'll see. Like Reply ::w 0 2 JC Rangel Why they call it the barrio? Like Reply 3w 0 1 9 Tophin A11thony Martinez JC Riingii! In the early 1900 this part of Carlsbad was settled mostly by Hispanics most specifically by Mexican and Mexican-American. You will find Lola's mini market, El Torilo market. Polios Maria lo name a few. Lik• R•ply 3w JC Rangel Anthony Martinez thanks for the info like Reply Jw o , Mos: f-.elevant s selected. so some repl·es may have been filtered 01..t. • ~eply to JC Range!... Q @ I Elsc1 Anderson This site use lo be my grandma & grandpa's house that they sold to the city then moved to Adams Street Like Reply ~w Tina Dahl Oak al State Like Reply ~w Barrio Lighting Public Input Report March 2022 19 Feb. 3, 2025 Item #3 Page 47 of 66 City of Carlsbad O @carlsbadcagov • Feb 8 To make it safer to walk after dark in the Barrio, the city is planning to add new lights to light up sidewalks i i • • Which streets should be prioritized for the next round of installations? Let us know loom.ly/K99wPrM #Carlsbad #CarlsbadBarrio Barrio Lighting Public Input Report March 2022 20 Lighting pin drops Specific placement of suggested lighting areas can be evaluated on the engagement tool map or reviewed by the latitude and longitude in the raw data file. Feb. 3, 2025 Item #3 Page 48 of 66 • C..-bad Seniot Cenl@f Oz Barrio Lighting Public Input Report March 2022 21 Comments associated with Harding Street Comment On Madison, Harding and Roosevelt and parts of Magnolia the existing street lights are spaced too far apart. Please add additional lighting on both sides of these streets SP-All of Magnolia between Roosevelt and Harding needs more light. SP-As long as you continue to put more street lights, I don’t care about the order. The bottom line is this, the entire Barrio area is very poorly lit to include the major north south streets, the shorter east west streets and the alleyways. All of these areas/streets need additional pedestrian and street lights, Lighting is needed from the end of Magnolia where it turns into Harding and down Harding until it meets Palm Ave. it’s very dark there now and drivers take that turn very quickly especially down Harding which is dangerous for the bikers on Harding. Also, with the added occupancy with the new large development across from Camellia on Harding extra lighting would possibly reduce crime at night. SP-More light in Madison St. between Magnolia and Pine is needed. The entire block of sports fields gets very dark after city shuts off the lights. Need better pedestrian lights around the fields after they are closed. Sp-This corner could use more light. SP-We need more light between Magnolia and Palm, on Harding St. SP-After games are over and field lights turned off, the segment between the Fwy and Roosevelt gets too dark. SP-All blocks between Harding and Roosevelt on Chestnut. SP-All the sidewalks between Pine and CVD need more light. SP-Walking between Harding and Roosevelt on Pine is really dark and it feels dangerous. Install well lit pedestrian crossings. All along Carlsbad Village Dr. good lighting to encourage walking, riding, and rolling around the Village and to/from the Barrio. An on-demand pedestrian crosswalk button (like those on Carlsbad Blvd) that lights up so cars know humans want to cross the street is needed at the intersection of Harding &amp; Oak. I’ve stood in the crosswalk with my dog waiting to cross and the cars just blow through this intersection and do NOT stop even though there is a dip and a flashing yellow sign on the south side alerting drivers a crosswalk is ahead. At night it can be hard to see pedestrians using this corner especially on the west side of this intersection. Where there the all ages recreation center is located. Better lighting would be beneficial in this area, especially when events happen in some of the churches/community halls in this area. Corners where pedestrians cross benefit for more lighting so that they can be seen at night as they are crossing. Due to the larger development going in across from Camellia there is worry over increased crime due to increased occupancy, and poor lighting at the entrance of this neighborhood directly across from the large apartment. Would prefer some additional street lighting down Camellia and Avocado to deter suspicious activities down these family friendly streets. Harding st needs lights Harding st. needs lights Feb. 3, 2025 Item #3 Page 49 of 66 Barrio Lighting Public Input Report March 2022 22 It’s pretty dark when there isn’t a game going on, field lights are off. Need very good lighting at the Senior Center stairs and parking lot areas and parking lot entracnes and exits. For safety, fall prevention, security, and more. On Harding maybe. Roosevelt doesn’t need lighting In front of our single-family homes. Your map is inaccurate. There are currently NO schools at Pine Park. On the SW corner of Harding and Oak we desperately need better lighting on that corner! Pine Park has some pretty dark corners, especially on the west side Sp-After Madison, Harding needs more light. SP-After the soccer/baseball fields turn off their lights, the street and all around the park gets too dark. It feels dangerous. (Between Pine and Palm) SP-All of Harding between CVD and Chestnut needs more lights and illuminated pedestrian crossing lights. Too many cars rushing down the street and they barely see people crossing streets. SP-Besides Harding, this segment is an area very dark in Madison. SP-Crossing and sidewalks are very dark. SP-Crossing needs more light at Harding and Pine. SP-Drivers are not watching for pedestrians at this intersection. The crossing is too dark and there have been many close calls. The new illuminated pedestrian crossing has helped. SP-First priority should be Harding St. between Pine and Palm. SP-Harding between Pine and Chestnut needs more light. First priority. SP-Harding first priority, between Pine and Chestnut. SP-Light is needed here. The new pedestrian crossing helps a bit. SP-More light is needed between Pine and CVD. SP-More light is needed between Pine and CVD. The new lit pedestrian crossing is helping. SP-More light is needed here. SP-More light needed here. SP-People travel too fast at this intersection and don’t stop for pedestrians. SP-Second priority, Harding between CVD and Magnolia due to the high pedestrian traffic and cars traveling too fast. SP-The street needs to be lit on both sides due to high traffic between Pine and CVD. SP-Third priority. First tackle Madison, then Harding, and Roosevelt last. SP-This crossing is really dangerous because people travel too fast and the street is dark. SP-This crossing is really dangerous. Many people park along Pine due to the lack of parking East of Harding on Pine and you can’t see the sidewalks. SP-This crossing needs better lighting. Sp-This crossing needs more light and some solution to slow down drivers. They travel too fast through this part of town. Sp-This part of Harding is really dark. Sp-This part of Harding is very dark. SP-This part of Harding needs more light so drivers can see people crossing the street. They travel too fast. SP-Too dark. SP-We need more light here. Feb. 3, 2025 Item #3 Page 50 of 66 Barrio Lighting Public Input Report March 2022 23 Street lights are important at parking lot entrances and exits all across Barrio Logan. Tagged here at the Pine Park parking lot. There are several side streets (Avocado, Palm, Cameilla and Carol’s place) which connect to Harding that are poorly light. More and better lighting needs to be added to these streets. There is a huge need for more lights at this intersection—and really, one of those signals pedestrians can turn on before they cross the street going from east to west or vice versa. My husband and I walk our dog here often at night and always feel unsafe crossing the street when there are cars coming. There is very little street lighting on either side of the south end of Harding street. Lighting is needed on both side of the south end of Harding. This will be even more important as Windsor Pointe will be completed and opening very soon. This intersection is in DESPERATE need of extra lighting. I often see pedestrians waiting to cross SAFELY. Pedestrian light strips or something that really lights up to catch the drivers’ attention would be great. This street is very dark at night. Extra light is needed to keep residents safe and light the street. With the new large high density low income housing project on Harding, directly across from Camellia Pl. more lighting is needed at the intersection of Harding and Camellia Pl. Also more lighting is needed on Camellia Place to deter criminal activity on Camellia Pl. Please consider helping the residents with this. Thank you Feb. 3, 2025 Item #3 Page 51 of 66 Barrio Lighting Public Input Report March 2022 24 Comments associated with Madison Street Comment On Madison, Harding and Roosevelt and parts of Magnolia the existing street lights are spaced too far apart. Please add additional lighting on both sides of these streets SP-As long as you continue to put more street lights, I don’t care about the order. The bottom line is this, the entire Barrio area is very poorly lit to include the major north south streets, the shorter east west streets and the alleyways. All of these areas/streets need additional pedestrian and street lights, SP-More light in Madison St. between Magnolia and Pine is needed. The entire block of sports fields gets very dark after city shuts off the lights. Need better pedestrian lights around the fields after they are closed. SP-All blocks between Harding and Roosevelt on Chestnut. SP-All the sidewalks between Pine and CVD need more light. Pine Park has some pretty dark corners, especially on the west side Sp-After Madison, Harding needs more light. SP-After the soccer/baseball fields turn off their lights, the street and all around the park gets too dark. It feels dangerous. (Between Pine and Palm) SP-Besides Harding, this segment is an area very dark in Madison. SP-Third priority. First tackle Madison, then Harding, and Roosevelt last. SP-All of Madison between Magnolia and CVD needs more light. SP-Lights are needed between Magnolia and Chestnut. SP-Madison between Magnolia and Pine needs more light. First priority. SP-Madison should be priority #2, especially between Palm and Magnolia. SP-On Madison, the blocks between Chestnut and Magnolia need the most light. Priority 1. First, more light is needed from CB Village Drive south on Roosevelt to Lola’s Market, on both sides of the street. Secondly, would love to see Roosevelt from Lola’s south and Madison St with LED Mexican luminarias, on short lamps or LED embedded in the sidewalk like backlit tiles (see picture sample), to become an area heritage feature like in San Antonio TX. Harding doesn’t need as much light because it already has the ballfields, but some additional standard lighting could be good. Sp-After Madison, Roosevelt needs more light. SP-After Madison, Roosevelt needs more light. SP-Pine between Madison and Roosevelt needs more light. Block at the corner of Pine and Roosevelt towards CVD through Oak needs more light. SP-We need more light between Roosevelt and Madison, at the crossings. The alley ways that need to be lit as well as the streets. There are alleyways between Jefferson and Madison. Between Madison and Roosevelt between Madison and the Senior center. Corner of Oak and Madison I noticed that there is little or no lighting for alleyways throughout the Barrio. This was a matter of concern for many residents that use alleyways as short cuts rather than circling the block as pedestrians. Also, there are a number of driveways along these alleyways. There is also a need to diminish criminal activity on these alleyways i.e. drug use, tagging, etc. Important too to have good lighting in the area of the Community gardens area. Feb. 3, 2025 Item #3 Page 52 of 66 Barrio Lighting Public Input Report March 2022 25 Lighting requested for small parking lot adjacent to the pine ave garden. Madison is very dark close to Pine Park More light on both sides of street for pedestrian crossing on 25ights25. Need a stop sign as well. Need good lighting in all school areas in the Barrio, including daycare for children and seniors. Need more Lightning from pine ave to walnut. Very dark block during the night hours Needs here on 25ights25 west side of street there is no lighting from chestnut to magnolia. Need more light on west side of street. On 25ights25 west side of street there is no lighting from chestnut to magnolia. Need more light on west side of street. Pine Avenue Community Garden is almost totally dark at night. If one walks along the pathway to the west, the lights there are motion activated. However, they only lartially light the garden and go out too soon. There should be lights in the garden itself and if they are motion activated, they should stay on for at least 15 minutes. Sp- Madison between Chestnut and Pine needs more light. SP-All of Madison is too dark, but specially this part. SP-First priority. Sp-Madison between Chestnut and Pine needs more light. SP-Madison between Magnolia and Pine should go first. SP-Madison between Pine and CVD needs more lights. Priority 1. SP-Madison should be first priority between Magnolia and Chestnut. SP-Madison should come second in priority, especially the crossing at Madison and Chestnut. SP-People travel too fast in Madison. SP-Priority 1, Madison between Magnolia and Pine. SP-Second priority should be Madison. Al of it. SP-This block in Madison needs more light. SP-This corner gets really dark. Continue lights toward CVD. SP-This corner needs better light and safer crossings. Sp-this part of Madison is very dark. SP-This part of Madison needs more light. SP-This segment in Madison is really dark. Sp-This segment in Madison St. is very dark. Street lights are needed almost the entire west side of Madison st. Since there are none on that side of Madison St, West side of Madison. Feb. 3, 2025 Item #3 Page 53 of 66 Barrio Lighting Public Input Report March 2022 26 Comments associated with Roosevelt Street Comment On Madison, Harding and Roosevelt and parts of Magnolia the existing street lights are spaced too far apart. Please add additional lighting on both sides of these streets SP-As long as you continue to put more street lights, I don’t care about the order. The bottom line is this, the entire Barrio area is very poorly lit to include the major north south streets, the shorter east west streets and the alleyways. All of these areas/streets need additional pedestrian and street lights, SP-All blocks between Harding and Roosevelt on Chestnut. SP-All the sidewalks between Pine and CVD need more light. First, more light is needed from CB Village Drive south on Roosevelt to Lola’s Market, on both sides of the street. Secondly, would love to see Roosevelt from Lola’s south and Madison St with LED Mexican luminarias, on short lamps or LED embedded in the sidewalk like backlit tiles (see picture sample), to become an area heritage feature like in San Antonio TX. Harding doesn’t need as much light because it already has the ballfields, but some additional standard lighting could be good. Sp-After Madison, Roosevelt needs more light. SP-After Madison, Roosevelt needs more light. SP-Pine between Madison and Roosevelt needs more light. Block at the corner of Pine and Roosevelt towards CVD through Oak needs more light. SP-We need more light between Roosevelt and Madison, at the crossings. The alley ways that need to be lit as well as the streets. There are alleyways between Jefferson and Madison. Between Madison and Roosevelt between Madison and the Senior center. SP-All of Magnolia between Roosevelt and Harding needs more light. SP-After games are over and field lights turned off, the segment between the Fwy and Roosevelt gets too dark. SP-Walking between Harding and Roosevelt on Pine is really dark and it feels dangerous. Install well lit pedestrian crossings. SP-All of Roosevelt between Pine and Magnolia needs more light. Priority 1. Sp-More lights are needed at the bend/transition between Magnolia and Roosevelt. Many people go too fast and it feels unsafe when drivers almost can’t make the curve. SP-People travel too fast at this intersection. Many people barely make the turn to Magnolia/Roosevelt. SP-Roosevelt between Magnolia and Pine needs to go second. This turn can be dangerous for drivers and pedestrians Boys n Girls Club corners are very dark. Extremely dark area, many apartment dwellers have to park blocks from their home and walk at night. Good lighting around the Boys &amp; Girls Club is super important. Please and thank you. great idea Feb. 3, 2025 Item #3 Page 54 of 66 Barrio Lighting Public Input Report March 2022 27 Had to walk along Roosevelt from Chestnut to the street before the Boys &amp; Girls Club the other night. There are several really dark spots. Tyler would have been another option, but Tyler has several dark spots as well. Problem is how more lighting will blast into the windows of the homes along both corridors. What is being done to prevent that? (I was not able to drag &amp; drop specific light recommendations on my tablet. Sorry) Thank you for seeking community input. need more lighting here on 27ights2727t east side of street there is no lighting from chestnut to magnolia. Need more light on east side of street. Provides some protection for those carrying goods after shopping or with $. Roosevelt road all the way to Laguna is DARK! SP-All of Roosevelt needs more light. SP-More lights are needed between Chestnut and Oak. SP-On Roosevelt, the blocks between Chestnut and Pine need more light. SP-Roosevelt between Magnolia and CVD needs more pedestrian lights overall. SP-Roosevelt needs more light. Priority 1. Between Chestnut and Pine. SP-Roosevelt should be priority #1 between Pine and Magnolia. Sp-The entire street segment between the Fwy and Roosevelt needs more light. SP-This area needs more light. Second in priority. Sp-This crossing is too dark. SP-This part is too dark. SP-This part of Roosevelt could use more light at the crossings. Sp-This part of Roosevelt feels dangerous and dark. Sp-This part of the street could use more light. The entire side from Roosevelt Street to Laguna is completely dark. Especially since we have a lot of pedestrian activity from Hennessey’s , the post Office, Fiesta Liquor, and random transients. For those of us that like to walk to these establishments or exercise at night and early morning , it feels very unsafe. Feb. 3, 2025 Item #3 Page 55 of 66 Barrio Lighting Public Input Report March 2022 28 Comments associated with Magnolia Avenue Comment On Madison, Harding and Roosevelt and parts of Magnolia the existing street lights are spaced too far apart. Please add additional lighting on both sides of these streets SP-As long as you continue to put more street lights, I don’t care about the order. The bottom line is this, the entire Barrio area is very poorly lit to include the major north south streets, the shorter east west streets and the alleyways. All of these areas/streets need additional pedestrian and street lights, SP-All of Magnolia between Roosevelt and Harding needs more light. SP-All of Roosevelt between Pine and Magnolia needs more light. Priority 1. Sp-More lights are needed at the bend/transition between Magnolia and Roosevelt. Many people go too fast and it feels unsafe when drivers almost can’t make the curve. SP-People travel too fast at this intersection. Many people barely make the turn to Magnolia/Roosevelt. SP-Roosevelt between Magnolia and Pine needs to go second. This turn can be dangerous for drivers and pedestrians SP-More light in Madison St. between Magnolia and Pine is needed. The entire block of sports fields gets very dark after city shuts off the lights. Need better pedestrian lights around the fields after they are closed. SP-All of Madison between Magnolia and CVD needs more light. SP-Lights are needed between Magnolia and Chestnut. SP-Madison between Magnolia and Pine needs more light. First priority. SP-Madison should be priority #2, especially between Palm and Magnolia. SP-On Madison, the blocks between Chestnut and Magnolia need the most light. Priority 1. Lighting is needed from the end of Magnolia where it turns into Harding and down Harding until it meets Palm Ave. it’s very dark there now and drivers take that turn very quickly especially down Harding which is dangerous for the bikers on Harding. Also, with the added occupancy with the new large development across from Camellia on Harding extra lighting would possibly reduce crime at night. Sp-This corner could use more light. SP-We need more light between Magnolia and Palm, on Harding St. lighting and crosswalk needed with school here. On 28ights28 west side of street there is no lighting from chestnut to magnolia. Need more light on west side of street. Magnoi Magnolia Av needs lights SP-All of Magnolia needs 28ights. SP-All of Magnolia needs more light. SP-all of Magnolia needs more light. SP-All of Magnolia needs more lights. This corner is abrupt and would be safer with more lighting. Feb. 3, 2025 Item #3 Page 56 of 66 Barrio Lighting Public Input Report March 2022 29 Comments associated with areas outside of the project scope of work Sp-The entire street segment between the Fwy and Roosevelt needs more light. A needed crosswalk flashing light at the end of the rail trail. Pedestrians on the south side of Tamarack have difficulty crossing and accessing the rail trail. Additional Lights are needed on Tyler St. This will benefit seniors who live in housing on Tyler St. Alley needs lights alley needs lights Alley needs lights Alley needs lights Alleys are unlit Alleys are unlit Alleys are unlit Alleys need light Alleys need lights Alleys need lights Along Carlsbad Village Drive for upscale aesthetic. Avocado Ln is unlit Avocado Ln is unlit. Both of the choices for the lighting polls are very unattractive. The pedestrian bullet lights in the park and the bell shaped taller lights which border the path next to the gardens would be a more attractive option. Cammilia Ln needs lights Good lighting at all of the railroad crossings? Very very important for safety and to encourage more walking, riding, and rolling. https://carlsbadca.new.swagit.com/videos/126600 link to the17 Sep 2019 meeting where the lighting was approved. Agenda item # 10 https://carlsbadca.new.swagit.com/videos/126600 link to the17 Sep 2019 meeting where the lighting was approved. Agenda item # 10 https://carlsbadca.new.swagit.com/videos/126600 link to the17 Sep 2019 meeting where the lighting was approved. Agenda item # 10 https://mikelevin.house.gov/media/press-releases/house-passes-appropriations-legislation-with- funding-for-key-projects-in-ca-49 https://carlsbadca.new.swagit.com/videos/126600 link to the17 Sep 2019 meeting where the lighting was approved. Agenda item # 10 https://mikelevin.house.gov/media/press-releases/house-passes-appropriations-legislation-with- funding-for-key-projects-in-ca-49 Feb. 3, 2025 Item #3 Page 57 of 66 Barrio Lighting Public Input Report March 2022 30 I prefer more pedestrian lights near the Chestnut underpass toward Chase field. This area is frequently used by people without housing coming from Holiday Park and sometimes feels unsafe. Important to have good lighting at the Chestnut undercrossing to I-5 to encourage walking, biking, and rolling west to east and east to west through this key corridor. Would apply for the undercrossing at Carlsbad Village Dr too. Is the lighting along the Coastal Rail Trail good enough - frequently enough and bright enough? Need for security and fall prevention. light here to eliminate homeless sleeping Light needed at pine and jefferson Lighting for pedestrian crossings at round-about lights needed Lights needed More lighting is needed near Jefferson Elementary for obvious reasons… it’s a school. With the barrier being more lit bums will move into this area and take advantage ( more so) of the abandoned See tree age and Lion. A new development is happening here as well. The developers should be required to light the area appropriately. More lighting is needed on Tyler St. Tyler Senior Apartments need lighting close to their apartment living area. More lights and the removal of the portable toliet behind the Chase Bank parking area south of Grand would be one clear way to minimize loitering and suspicious behaviors in the village day and night. More lights needed on rail trail. On Linmar Lane, just off of Tamarack, we have no nights at all. We definitely would feel safer if we had some, sidewalks would be nice as well. Palm Av is unlit Palm Av is unlit Parts of Tyler street need additional lighting. Provides a safer street crossing SP-All Pine St. needs light. SP-The crossing under the bridge and around Holiday Park is too dark. Street lighting is easily added on Tyler as there are utility poles available. Pedestrian lighting is needed at all intersections, especially at designated crosswalks and surrounding Pine Park. I found this difficult to use so perhaps there is less feedback than expected. Good effort compared to past performance. There is zero light, zero sidewalks chestnut ave from tracks to ocean. Lots of foot traffic from condos , large apartment complex. Cars pulling out or Turing on street almost hit people walking dogs. Lots of crime, cars broken into also in this small area There should be additional lighting near the highway 5 underpass at night it can dark when passing under the overpass. Tyler St needs lighting Feb. 3, 2025 Item #3 Page 58 of 66 Barrio Lighting Public Input Report March 2022 31 Tyler St needs lights Tyler St. Needs additional lighting Under the freeway on Chestnut. When the new lighting is installed. That would be a smart time to underground all of the overhead wiring throughout the Barrio. The overhead wiring looks unseemly and is unsafe. As there are lots of trees growing into the wires. This is going to cause an electrical fire and or damage to the electrical infrastructure which supports the Barrio. Why does the announcement about the lighting survey say based on funds availability when the money for street and pedestrian lights was approved in 2019 as part of the Capital Improvement Budget and Congressmen Levin was able to secure $5 million dollars in additional money for lighting and traffic circles in the village and Barrio. Feb. 3, 2025 Item #3 Page 59 of 66 1 Eric Zielke From:Carl Venstrom <cvenstrom@gmail.com> Sent:Monday, December 30, 2024 4:52 PM To:Eric Zielke Subject:lighting Hi Eric, The lighting seems like a great idea. I have owned a 8 unit complex at 3512 Harding St for over 30 years. I will look forward to more lighting. Thanks Carl Carl Venstrom Owner, Carl's Bad Properties 760 505 7736 cvenstrom@gmail.com CAUTION: Do not open attachments or click on links unless you recognize the sender and know the content is safe. Exhibit 4 Feb. 3, 2025 Item #3 Page 60 of 66 1 Eric Zielke From:Mike Staudinger <mstaudinger@hotmail.com> Sent:Tuesday, December 31, 2024 8:42 AM To:Eric Zielke Subject:Question on Pedestrian Lights in Barrio Good Morning and Happy New Year, We live in the Barrio on Camellia Place and wanted to say we are excited with your project on installing pedestrian lights. We often walk to the village in the evenings and the additional lighting will not only look great but will improve safety. My question concerns Palm Avenue. Is there a reason that no lights are going in on Palm? As a runner, I often return home via Chestnut and Palm. That area is so dark; either no street lights or they are out (need to be fixed?). The street by the park is a multiday camping site for motorhomes and the corresponding trash on the sidewalks and streets is hazardous. Looking at the map the city provided, it seems Palm is the only street that will not have lighting. Hence my question. Thanking you in advance for your response and Happy New year Mike Staudinger CAUTION: Do not open attachments or click on links unless you recognize the sender and know the content is safe. Feb. 3, 2025 Item #3 Page 61 of 66 1 Eric Zielke From:Autumn Wallace <autumndwallace@hotmail.com> Sent:Monday, January 6, 2025 3:43 PM To:Eric Zielke Subject:Barrio As long as the intersec ons are well lit. We have been here about 30 years. Many of the residents have been asking for unobstructed sidewalks, line of sight clearance at intersec ons , stop signs and well lit intersec ons since before we moved here. Funny how one intersec on is now a 4 way stop. Sent from my iPhone CAUTION: Do not open a,achments or click on links unless you recognize the sender and know the content is safe. Feb. 3, 2025 Item #3 Page 62 of 66 1 Eric Zielke From:Gary Raskin <garymraskin@gmail.com> Sent:Monday, January 6, 2025 3:58 PM To:Eric Zielke Subject:lighting on Roosevelt Street We are a business at 3060 Roosevelt St. We notice in the lighting plan that there are no additional lights planned on our section of the street between Oak and Carlsbad Village Drive ( we note that you plan on adding them in this stretch on Harding). Our section is a very popular stretch for Barrio residents (and dog walkers) to enter and leave the village, and to frequent the restaurants on the west side of the street. Please consider adding lights in this very dark stretch. Regards, Gary Raskin Barrio Glassworks CAUTION: Do not open attachments or click on links unless you recognize the sender and know the content is safe. Feb. 3, 2025 Item #3 Page 63 of 66 1 Eric Zielke From:Peterson, Katherine <Katherine.Peterson@sdcounty.ca.gov> Sent:Tuesday, January 7, 2025 8:01 AM To:Eric Zielke Subject:New Light Fixtures Eric, I may have missed the Kelvin Spec. I’m assuming your using LEDs, and the temperature can very from 2700K to 5000K. Sorry for my work e-mail, I live in Carlsbad. Katherine Peterson, NCIDQ® Facilities Analyst Financial & Support Services Division County of San Diego, Health & Human Services Agency Cell: (619) 548-4431 SanDiegoCounty.gov | News Updates | Engage Submit all work order requests and inquiries to FacilitiesMgt.HHSA@sdcounty.ca.gov. Please visit the Facilities SharePoint Resource Page for more information. CAUTION: Do not open attachments or click on links unless you recognize the sender and know the content is safe. Feb. 3, 2025 Item #3 Page 64 of 66 1 Eric Zielke From:Carolyn Martus <carolynmartus@gmail.com> Sent:Sunday, January 26, 2025 8:38 AM To:Eric Zielke Subject:3685 Harding St Carlsbad Hi Eric, I received the no ce for the permission for right of entry. I don’t have a problem with the light placement but I have a few ques ons. Will the lime tree and avocado tree in the front yard be impacted? Can they move the pole slightly to the right so its less likely to impact the lime tree and more in between the two mature trees? Can they do the work by hand, or at least no machinery or grading on my property? In other words, only shovels on my side of the sidewalk. I’m just trying to minimize the impact to my front yard? I would like to be no fied when they are working on my property? Thank you, Carolyn Martus CAUTION: Do not open a.achments or click on links unless you recognize the sender and know the content is safe. Feb. 3, 2025 Item #3 Page 65 of 66 1 Eric Zielke From:Denise Childs <childsqt@gmail.com> Sent:Monday, January 27, 2025 7:16 AM To:Eric Zielke Subject:Pedestrain Street Lighting 1/27/2025 Dear Mr. Zielke, We recently received a notice about the placement of pedestrian lights in the Barrio. Our property is located at 3331 Madison Street. We are directly across from the Pine Street Park. The map shows 2 lights on the middle part of Madison (after Pine), and 3 lights on the middle part (before Chestnut). From the diagram it appears as if a light will be placed directly in front of our house as one of the 3 lights. Since the other section only has 2 lights, we are requesting that the light in front of our house be removed. We already have more than enough illumination from the park lights that are directly across from our home. We also noticed that the lights would be placed on the side of the street where residences are located. A better location would be if the lights were placed on the opposite (park side) of the street. Placement there would provide significant illumination for the park, as well as, ample illumination for the street and pedestrians. Additionally,the diagram included in the notice shows that the placement of the pedestrian lights on Roosevelt Street is closer to the resident's house. All of the lights would be better placed if they were closer to the street. The lights should be placed as close to the street as possible! Thank you for your attention to this matter. Sincerely, Denise Childs, Trustee CAUTION: Do not open attachments or click on links unless you recognize the sender and know the content is safe. Feb. 3, 2025 Item #3 Page 66 of 66 Barrio Lighting Project Hossein Ajideh, Engineering Manager Feb. 3, 2025 {city of Carlsbad 2 PROPOSED ACTION 1)Provide feedback about the Barrio lighting project, phase two, CIP 4013 2)Support staff’s recommendation to the City Council to approve the plans and specifications ITEM 3: BARRIO LIGHTING {city of Carlsbad 3 VILLAGE AND BARRIO MASTER PLAN ITEM 3: BARRIO LIGHTING 4 ITEM 3: BARRIO LIGHTING PHASE 1 – STREET LIGHTING 4 Harding Community Center • • • Community Center Senior Center Pine Park ------------• Fields • • • 5 Proposed locations for new pedestrian lights in the Barrio •• •• Harding • Community • Center • • •• • • ••••••••• •• • • • • • • • •• • • • • • ••••• • • •• • • Boys & Girls Club Community Center Senior Center Pine Park • • Fields • • • •••• • ••• • • • • •• • • • • • • • • • • {city of Carlsbad 6 Example pedestrian light on Roosevelt Street* *Exact location may vary. Trees may be trimmed to accommodate new lights. 7 8 ITEM 3: BARRIO LIGHTING Community input Technical analysis LIGHT LOCATIONS WNltwthHrd n,,. __________ ..,. __ _ ... ....,.._ .. __ ...,... ____ _ _ ...,... _____ ._.,, .. ____ _ ~ ... ,_.,, .......... , ........ --IG- •---k- •--..-U-. .,...... ___ _ • ____ ... .,....._., __ 1111_ {city of Carlsbad 9 COMMUNITY NOTIFICATION ITEM 3: BARRIO LIGHTING City~~ ,_..._,,i-.t,llWl,5....,. c.,,c.....;io..-...1200c..-Yl11""'c,,,;,,.. W,!d,..-.,~ {cityof Carlsbad _....,,....,..,..,.,,ft_....,..,_, _ _,.;...._w,..,._""'""'•-..,;, -.......... ._ .. ____ , ___ "" ........ ~•-.,C.-...:"•"-Ml-119-UU . ._.,. __ ,.,_,.,. -,~ ..... ,.._ .. ,.,..~ ...... Cityc.....d. 10 COMMUNITY NOTIFICATION ITEM 3: BARRIO LIGHTING nextdoor Q Search Nextdoor City of Carlsbad O City of Carlsbad • Just now t New lights coming to the Barrio About 130 new lights are proposed for streets throughout the Barrio to light up sidewalks for people walking after dark. The new lights are considered ·pedestrian lights,· rather than streetlights. They are smaller than the existing streetlights, on shon.er poles and not as bright. The city will use the same style of lights that is currently used in the Village. They are about 17 feet tall. The lights proposed for the Barrio 'Mill have a waITTler color than the lights in the Village and the Barrio's existing streetlights. Feedback wanted Because these new lights will be directly in front of homes, the city is asking residents and property owners to review the plans and contact Eric Zielke, the project manager with any questions or concerns. eric.zielke@carlsbadca.g~ ~- The Barrio lighting project will also be discussed at the next Traffic Safety & Mobility Commission on Feb. 3, 4 p.m. Sign up for email updates and review the proposed locations at b..ttps://wNw.car1sbadca.g~~~Q!Qi~ig!lling Proposed locations for new pedestrian lights in the Barrio . . :· ............ ·. . . ..... .. . . .. . . . .. . . . . -. -.. . . . . . : : .. . ... . ......... :· . . . . .. . . . . . . . aIyof Garlsbad f New lights coming to the Barrio • City of Carlsbad <communications@carlsbadc [ © I E, I <~ I ➔ J ~ D To O Nikki Matosian 1/6/202S Rtt,nt1on Policy Carlsbad Email Retention (2 years) Expires 1/6/2027 (D If there are problems with how this messaoe is displayed, click here to view it in a web browser, New lights coming to the Barrio Aboot 130 new lights are proposed for streets throughout the Barrio to light up sidewalks for people walking after dark. The new lights are considered ~pedestrian lights; rather than streedights. They are smaller than the existing streeUights, on shorter poles and not as bfight. Feedback wanted Because these new lights will be directly in front of homes, the city is asking residents and property owners to rev;ew the plans and contact the project manager with any ques- tions or concerns. Eric Ztelke, Senior Engineer eric..zie¼ke@car1sbadca.gov, 442-339-2230 The Barrio ltghIDg project Wil also be reviewed at the next Traffic Safety & Motility Com- mission for another input opportunity . Traffic Safety & Mobility Commission Monday, Feb. 3, 4 p.m . Council Chamber 1200 Carlsbad Village Drtve .. .. -. '="" •• . . . . . . :· . ....... . · .. {city of Carlsbad 11 COMMUNITY FEEDBACK ITEM 3: BARRIO LIGHTING •General excitement about adding new lights •Questions about why no lights are added to certain streets •Working with certain property owners on right-of-entry during construction {city of Carlsbad 12 FEDERAL GRANT FUNDING ITEM 3: BARRIO LIGHTING CARLSBAD Carlsbad gets $5 million for Barrio improvement project THE COAST NEWS GROUP T1rn C oA-,-EWS I T1tE I N D E o1T10N Congressman secures $SM for Carlsbad Barrio lights, traffic circles {city of Carlsbad 13 NEXT STEPS ITEM 3: BARRIO LIGHTING •Work with appropriate property owners as needed •Finalize lighting locations •City Council for approval of design, authorization to bid •Award construction contract anticipated by mid-2025 •Construction anticipated start by end of 2025 {city of Carlsbad 14 PROPOSED ACTION 1)Provide feedback about the Barrio lighting project, phase two, CIP 4013 2)Support staff’s recommendation to the City Council to approve the plans and specifications ITEM 3: BARRIO LIGHTING {city of Carlsbad 15 THANK YOU ITEM 3: BARRIO LIGHTING