HomeMy WebLinkAboutAMEND 2021-0004; DISTRIBUTE LOTS 13-15 SHELL BUILDING; TDM - TRANSPORTATION DEMAND MANAGEMENT PLAN; 2021-08-31DATE:
TRANSPORTATION DEMAND MANAGEMENT PLAN FOR
3266 LIONSHEAD AVENUE
LAST MILE DELIVERY STATION
August 31, 2021
LOCATION:
Carlsbad, California
PREPARED FOR:
City of Carlsbad
City of Carlsbad'
OCT O 4 1011
_!'lanning Division
TOM PLAN C-7
SECTION IV: Infrastructure TDM Selections
The developer will work with the TA to detennine infrastructure strategies applicable to the site and
the appropriate placement of TOM infrastructure.
Please reference Table 2-4 Menu of TOM Strategies, Part I: Infrastructure found in the Non-
Residential Developer TOM Plan Guidelines within the TOM handbook for infrastructure strategies
and points. An average new development is required to achieve a total of 18 points while a
redevelopment/tenant improvement is required to achieve 9 points. Required strategies add 4 points
towards the total required number of points. New developments must achieve a minimum of 6
points through infrastructure strategies unless otherwise agreed upon with city staff. Tenant
improvement projects are eligible to achieve all required points in Part II.
In case of a tenant improvement, if the tenant has access to any infrastructure amenity below, the
tenant can claim that amenity in their plan unless that amenity does not meet minimum standards or
is, on average, fully utilized, such as two carpool spaces that are both occupied on most weekdays.
The capacity of an existing infrastructure amenity will need to be evaluated at the time the strategy
is proposed.
Points not earned through infrastructure strategies will be expected to be earned in Part II.
Reference Part II strategies to ensure that the appropriate infrastructure is selected to support
desired amenities or programs.
Infrastructure strategies must be selected and approved prior to building pennit issuance.
Programmatic strategies in Part II may be submitted after the building pennit has been issued but
must be approved prior to occupancy.
Check the box to the left of the strategy to include it in the plan. Provide infonnation as requested in
the box below the strategy and indicate the points requested for the strategy, using the handbook as
a guide. For strategies with a range of points, work with the TA who will assist in detennining the
appropriate number of points based on the unique context of the site and the proposed project. Refer
to the Carlsbad TOM Handbook for details about each strategy.
Provide one building/site plan that shows all infrm,tructure improvements. If credit is claimed for
existing infrastructure elements, please differentiate exii;ting and proposed improvements on the
plan.
•
Tier 2 and 3 TDM Plan Template for
Non-Residential Projects
SECTION V: Authorization Occupancy
City ofCarlsbad
1200 Carlsbad Village Dr.
Carlsbad, CA 92008
By signing below, developer and transportation coordinator certify that the information provided
in this document is complete and accurate. By signing this document, the transportation
coordinator is committing to providing the strategies identified in this document and to
participate in monitoring activities described in Section IV.
Name and Signature of Developer Representative or Designated Applicant:
-------------------------------
Printed Name and Ornanization Sig:nature Date
Name and Signature of (Interim or Final) Transportation Coordinator:
Neal Abbott, Amazon Nm A.bbrx-t--8/31/21
Printed Name and Organization Signature Date
Name and Signature of City of Carlsbad Representative:
I Printed ~•me _ I Signamre ]Date_ I
21