Loading...
HomeMy WebLinkAboutAMEND 2021-0004; DISTRIBUTE LOTS 13-15 SHELL BUILDING; TDM - TRANSPORTATION DEMAND MANAGEMENT PLAN; 2021-08-31DATE: TRANSPORTATION DEMAND MANAGEMENT PLAN FOR 3266 LIONSHEAD AVENUE LAST MILE DELIVERY STATION August 31, 2021 LOCATION: Carlsbad, California PREPARED FOR: City of Carlsbad City of Carlsbad' OCT O 4 1011 _!'lanning Division TOM PLAN C-7 SECTION IV: Infrastructure TDM Selections The developer will work with the TA to detennine infrastructure strategies applicable to the site and the appropriate placement of TOM infrastructure. Please reference Table 2-4 Menu of TOM Strategies, Part I: Infrastructure found in the Non- Residential Developer TOM Plan Guidelines within the TOM handbook for infrastructure strategies and points. An average new development is required to achieve a total of 18 points while a redevelopment/tenant improvement is required to achieve 9 points. Required strategies add 4 points towards the total required number of points. New developments must achieve a minimum of 6 points through infrastructure strategies unless otherwise agreed upon with city staff. Tenant improvement projects are eligible to achieve all required points in Part II. In case of a tenant improvement, if the tenant has access to any infrastructure amenity below, the tenant can claim that amenity in their plan unless that amenity does not meet minimum standards or is, on average, fully utilized, such as two carpool spaces that are both occupied on most weekdays. The capacity of an existing infrastructure amenity will need to be evaluated at the time the strategy is proposed. Points not earned through infrastructure strategies will be expected to be earned in Part II. Reference Part II strategies to ensure that the appropriate infrastructure is selected to support desired amenities or programs. Infrastructure strategies must be selected and approved prior to building pennit issuance. Programmatic strategies in Part II may be submitted after the building pennit has been issued but must be approved prior to occupancy. Check the box to the left of the strategy to include it in the plan. Provide infonnation as requested in the box below the strategy and indicate the points requested for the strategy, using the handbook as a guide. For strategies with a range of points, work with the TA who will assist in detennining the appropriate number of points based on the unique context of the site and the proposed project. Refer to the Carlsbad TOM Handbook for details about each strategy. Provide one building/site plan that shows all infrm,tructure improvements. If credit is claimed for existing infrastructure elements, please differentiate exii;ting and proposed improvements on the plan. • Tier 2 and 3 TDM Plan Template for Non-Residential Projects SECTION V: Authorization Occupancy City ofCarlsbad 1200 Carlsbad Village Dr. Carlsbad, CA 92008 By signing below, developer and transportation coordinator certify that the information provided in this document is complete and accurate. By signing this document, the transportation coordinator is committing to providing the strategies identified in this document and to participate in monitoring activities described in Section IV. Name and Signature of Developer Representative or Designated Applicant: ------------------------------- Printed Name and Ornanization Sig:nature Date Name and Signature of (Interim or Final) Transportation Coordinator: Neal Abbott, Amazon Nm A.bbrx-t--8/31/21 Printed Name and Organization Signature Date Name and Signature of City of Carlsbad Representative: I Printed ~•me _ I Signamre ]Date_ I 21