HomeMy WebLinkAbout110 SYCAMORE AVE; ; CBR2023-1646; Recycle,.
('city of
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59
Deve/opmenf_Services
Building Division
1635 Faraday Avenue
442-339-2719
www.carlsbadca.gov
APPLICABLE TO NEW CO NSTRUCTION, ALL RES IDENTIAL ADDITIONS AND ALTERATIONS AND
CO MMERCIAL ADDITIONS AND ALTERATIONS OVER $200K. If you have questions about the recycling
requirement or completing this form, please contact Republic Services at (760) 332-6464 a certified C&D
recycler, or the Carlsbad Building Division at (442) 339-2700. Please note: Unless you are self-hauling, Republic
Services or approved haulers must be used for all construction projects within the City of Carlsbad.
PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued
without a completed Construction Waste Management Plan.
Applicant Information
Permit No. ____________ Project Title
Project Address.-1-,l ,-/__.6_,___3=4yKG="'c«utU<'/,LJ1 f:"'-"'Lt-t'....__.A~v'--e~-e.___ __________ .APN
Applicant Name _,_M---',~✓'-------'f.}'-'---'Le.:=,..,x'--_______ □ CEr t~~r
Last First
2 0¥-IZL-05(
[!] 'C) tf/',~/b/<.
Applicant Address /7 q 7 s·-&oq< PR1..1Jrt£11 /JI. J?cwtl)v: ll4 11 o(e9"
/4-tu @.. 14'1 14 De: fl ,<#' / Iv Ii -c C/M Phone (7 tJ(j ) 39 0 --0007 E-mail Address
Applicant Mailing Address
(if different than project address)
Project Type
(check all that apply): R•r2r•I
Brief Description P 11-r-c ti
Commercial □ Public Building □
4-f: t -Pf.A CG $rC/( C 0
Project Size __ ?i~lf'----3=--=0=--______ Estimated Cost of Project $_4-'4.c..' -"''CJ"'--k:_ _____________ _
(square footage)
Please check the appropriate box:
I plan on using REPUBLIC SERVICES roll-off bin(s) for all materials and will provide all receipts after construction.
I plan on using a City Approved Hauler and will provide all receipts after construction.
This is a proposed LEED certified project and I plan on separating materials on site in conjunction with Republic
Acknowledgement: I certify under penalty of perjury un der the laws of the Stat e of California that the information
provided in and with this form pertains to construction and demolition debris generated only from the project listed
in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the
best of my knowledge and belief.
Print Name ~t¼,t,1 <b.d ec/,y s;gnatu,e /P4oL g Date
Page 1 of 3 Rev. 05122
PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will
(cont'd) not be issued without a completed Construction Waste Management Plan.
DEBRIS RECYCLING ESTIMATE:
-..,:r-i1111.,•• Permit No. ____________ Project Title <::Z\/ ,,,./1.,n ef/£" 14vt:: "r~c u --i
Project Address //0 5'(Cl4 l?f (}/! C J1.V 6-
Applicant Name fl<( /4-(.Q.'l'::
Last First
1
APN '2 01/-/ {, I-CY/
Phone
Complete the following table with estimated waste tonnage to be generated by your project.
This is your plan for construction waste management. Changes can be made on the final recycle report.
Material Type
Complete this line of the toble only if
only using WASTE MANAGEMENT
roll-off bins.
Mixed C&D Debris
Asphalt & Concrete
Brick/ Masonry/ Tile
Mixed Inert Debris
Cabinets, Doors, Fixtures,
Windows (circle all that apply)
Carpet
Carpet Padding/ Foam
Cardboard
Ceiling Tile (acoustic)
Drywall (used, new, scrap)
Landscape Debris (brush, trees,
stumps, etc.) No dirt.
Unpainted Wood & Pallets
Roofing Materials
Scrap Metal
Stucco
Other:
TOTAL --
Goal: the diversion rate shall be 65% by weights of debris.
A B C
--
Estimated
Waste Quantity
(tons)
Place a (0) check
next to items to be
reused or salvaged
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
Place a (0) check next
to items to be
recycled
□
□
□
□
□
□
n
□
□
n
□
□
□
□
n
□
Place a (0) check next
to items to be
disposed at landfill
□
□
□
□
□
□
n
□
□
□
□
□
□
□
1'J.
□
To meet 65% Diversion Requirement (estimate) -~-~--=CJ_,;/_9...__ __ x 0.65 = _ ____,?:...__S"-'1'--._c.....;_r _._/....,..b.._s.1...:.· ,_tons
,/4 Total Estimated Waste from above
Contractor /Owner Signature /l ///J, Jt ,,/; Date
f..YV" •p / /
Minimum Required Diversion
Page 2 of4 Rev. 05122
Conversion Table for Common Construction Waste
This document is informational onlv. It is here to helo vou convert truckload auantities to tons. if necessarv.
Column A Column B Column C
Category Material Volume TonsLUnit Tons
Mixed Debris Construction )6 cy X 0.18 = !,?!-
Demolition cy X 1.19 =
Asphalt/Concrete Asphalt (broken) cy X 0.70 =
Concrete (broken) cy X 1.20 =
Concrete (solid slab) cy X 1.30 =
Brick/Masonry/Tile Brick (broken) cy X 0.70 =
Brick (whole, palletized) cy X 1.51 =
Masonry brick (broken) cy X 0.60 =
Tile sq ft X 0.00175 =
Building Materials (cabinets, doors, windows, etc.) cy X 0.15 =
Cardboard (flat) cy X 0.05 =
Carpet By square foot sq ft X 0.0005 =
By cubic yard cy X 0.30 =
Carpet Padding/Foam sq ft X 0.000125 =
Ceiling Tiles Whole (palletized) cy X 0.0003 =
Loose cy X 0.09 =
Drywall (new or used) 1/2" (by square foot) sq ft X 0.0008 =
5/8" (by square foot) sq ft X 0.00105 =
Demo/used (by cu. yd.) cy X 0.25 =
Landscape Debris (brush, trees, etc.) cy X 0.15 =
Asphalt Composition
Shingles, asphalt Shingle cy X 0.22 =
Unpainted Wood/Pallets By board foot bd ft X 0.001375 =
By cubic yard cy X 0.15 =
Trash/Garbage cy X 0.18 =
Other (estimated weight) cy X estimate =
cy X est imate =
cy X estimate =
cy X estimate =
Total all =
Page 3 of 3
Rev .. 05122