HomeMy WebLinkAbout2025-03-04; City Council; Resolution 2025-056uocus1gn 1::nve1ope 1u: tti4A4JUJ-t-t::t;Z-4t::lo-AALC-t-JUA1Al 1414:,
RESOLUTION NO. 2025-056
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
CALIFORNIA, AUTHORIZING AMENDMENT NO. 1 TO AN AGREEMENT WITH
REDDY ENGINEERING SERVICES, INC. TO PROVIDE CONSTRUCTION
MANAGEMENT, INSPECTION AND MATERIALS TESTING SERVICES FOR THE
2023 SLURRY SEAL PROJECT, CAPITAL IMPROVEMENT PROGRAM PROJECT
NO. 6001-23SS, IN AN AMOUNT NOT TO EXCEED $211,990
WHEREAS, on July 16, 2024, the City Council adopted Resolution No. 2024-173, authorizing
Reddy Engineering Services, Inc. to provide construction management, inspection and materials testing
services for the 2023 Slurry Seal Project; and
WHEREAS, the Mayor executed an agreement with Reddy to provide these services for the
Project in an amount not to exceed $415,379; and
WHEREAS, the City Council of the City of Carlsbad, California has determined that it is necessary
to amend the agreement to add additional time and funding to account for the change in construction
schedule to shift slurry seal application to the warmer spring months, consistent with the specified
quality control requirements for the project; and
WHEREAS, Reddy has tendered a proposal for a time extension through Jan. 14, 2026, for
construction management, inspection and materials testing services in an amount not to exceed
$211,990; and
WHEREAS, the total value of the contract with Reddy as amended requires the City Council's
approval; and
WHEREAS, the City Planner determined on Feb. 3, 2025, that Amendment No. 1 to the
Agreement with Reddy Engineering Services, Inc., is exempt from the California Environmental Quality
Act (CEQA) pursuant to CEQA Guidelines Section 15301(c) -Existing Facilities, which applies to the
maintenance and repair of existing public roadways with no expansion of use. A notice of intended
decision regarding the environmental determination for this project was advertised and posted on the
city's web site. No comment letters or appeals were received and, consistent with Carlsbad Municipal
Code Chapter 21.54 -Procedures, Hearing s, Notices, and Fees, the City Planner's written decision is
final.
uocus1gn t:nve lope IU: /b4A4jUj-t-t:(..;L-4t:1 b-AAL(..;-1-jLJA lA 1 / 414b
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as
follows:
1. That the above recitations are true and correct.
2. That the Mayor is authorized and directed to execute Amendment No. 1 to an
Agreement with Reddy Engineering Services, Inc., provided as Attachment A, to increase
the Agreement by $211,990 and to extend the term through Jan. 14, 2026, for
construction management, inspection and materials testing services in support of the
2023 Slurry Seal Project, Capital Improvement Program Project No. 6001-2355.
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of
Carlsbad on the 4th day of March 2025, by the following vote, to wit:
AYES:
NAYS:
ABSTAIN :
ABSENT:
Blackburn, Bhat-Patel, Acosta, Burkholder, Shin.
None.
None.
None.
I~
KEITH BLACKBURN, Mayor
SHERRY FREISINGER, City Clerk
(SEAL)
uocus1gn ~nvelope IU: /b4A4JUj-\-~(.;Z-4~lo-AALC-t<:lUA1Al /4140
PSA24-3473CMI
AMENDMENT NO. 1 TO THE AGREEMENT FOR CONSTRUCTION MANAGEMENT, INSPECTION, AND
MATERIALS TESTING SERVICES FOR THE 2023 SLURRY SEAL, PROJECT NO. 6001-23SS
REDDY ENGINEERING SERVICES, INC.
6 This Amendment No. 1 is entered into and effective as of the ___ day of
March 2025, amending the agreement dated July 17, 2024 (the "Agreement"),
by and between the City of Carlsbad, California, a municipal corporation ("City"), and Reddy Engineering
Services, Inc., a California corporation ("Contractor") (collectively, the "Parties") for Construction
Management, Inspection, and Materials Testing Services for the 2023 Slurry Seal project.
RECITALS
A. The Parties desire to alter the Agreement's scope of work to add additional inspections
and oversight needed due to the prolonged contract timeline; and
B. The Parties now desire to extend the Agreement for a period of six (6) months; and
C. The Parties have negotiated and agreed to a supplemental scope of work and fee
schedule, which is attached to and incorporated by this reference as Exhibit "A", Scope of Services and
Fee (Supplemental), and increases the Agreement amount by $211,990.
NOW, THEREFORE, in consideration of these recitals and the mutual covenants contained herein,
City and Contractor agree as follows:
1. In addition to those services contained in the Agreement, as may have been amended
from t ime to time, Contractor will provide those services described in Exhibit "A." With this Amendment,
the total allowable Agreement amount shall not exceed six hundred twenty-seven thousand three
hundred sixty-nine dollars ($627,369).
2. The Scope of Services described in Exhibit "A" of the Agreement is hereby amended as set
forth in Exhibit "A" Scope of Services and Fee Schedule (Supplemental), attached to this Amendment No.
1.
3. Section 5 of the Agreement is amended to increase the total amount paid to Contractor
for Services by $211,990, from the previous amount of $415,379 to $627,369.
4. Contractor will complete all work described in Exhibit "A" by January 14, 2026.
5. All other provisions of the Agreement, as may have been amended from time to time, will
remain in full force and effect.
6. All requisite insurance policies to be maintained by Contractor pursuant to the
Agreement, as may have been amended from time to time, will include coverage for this Amendment.
7. The individuals executing this Amendment and the instruments referenced in it on behalf
of Contractor each represent and warrant that they have the legal power, right and actual authority to
bind Contractor to the terms and conditions of this Amendment.
City Attorney Approved Version 5/22/2024
3
uocusIgn t:nveIope Iu: /ti4A4;:!UcH-t:C:.:'.-4t:lo-AALl.A-;:suA1A1 /4140
CONTRACTOR
Reddy Engineering Services, Inc.,
a California corporation
By: l
(sign here)
Vinay Reddy,
President and Chief Financial Officer
(print name/title)
By:
(sign here)
(print name/title)
PSA24-3473CMI
CITY OF CARLSBAD, a municipal corporation of
the State of Ca lifornia
By: I~
Keith Blackburn, Mayor
ATTEST:
j~ R... "'MJ,,~
for SHERRY FREISINGER, City Clerk
If required by City, proper notarial acknowledgment of execution by Contractor must be attached. lf--2
corporation, Agreement must be signed by one corporate officer from each of the following two groups:
Group A
Chairman,
President, or
Vice-President
Group B
Secretary,
Assistant Secretary,
CFO or Assistant Treasurer
Otherwise, the corporation must attach a resolution certified by the secretary or assistant secretary under
corporate seal empowering the officer(s) signing to bind the corporation.
APPROVED AS TO FORM:
CINDIE K. McMAHON, City Attorney
By: bll,,\A, fu,wu,IA,
Assistant City Attorney
City Attorney Approved Version 5/22/2024
4
uocus,gn t::nveIope Iu: /b4A4JUJ-t-t::G:l-4t::1!>-AALG-t-JUA1Al /414!>
PSA24-3473CMI
EXHIBIT"A"
SCOPE OF SERVICES AND FEE (Supplemental)
l. Extended Construction Duration -Additional inspection and oversight needed due to the prolonged
contract timeline. Refer to Weekly Statement of Working Days and/or Project Change Order Log for
additional information.
2. Increased Inspection and Documentation Efforts -Ensuring compliance with City requirements,
Department of Industrial Relations requirements, contractor operations, and necessary reporting.
3. Continued Coordination for Project Closeout -Support for final reporting, punch list completion, and
contractor compliance verification.
City Attorney Approved Version 5/22/2024
5
uocus1gn t::nvetope 1u: /b4A4j Uj-t-t::G:.1-4t::lo-AALG-t<:lUA1A l /4140
RE
SERVICES
CONSTRUCTION MANAGEMENT
5 LANDSCAPE ARCHITECTURE
January 28, 2025
PSA24-3473CMI Amend No. 1
Exhibit "A" (Cont.)
RE: PSA24-3473CMI AMENDMENT 01 REQUEST-INSPECTION AND MATERIALS TESTING SERVICES
FOR THE 2023 SLURRY SEAL PROJECT NO. 6001-23SS
Dear Mr. Didier,
Reddy Engineering Services, Inc. (RE Services) appreciates the opportunity to continue supporting the City of
Carlsbad on the 2023 Slurry Seal Project (PSA24-3473CMI).
Due to the extended duration of the project and additional inspection requirements, we are requesting
Amendment #01 to the existing Task Order for an additional $211,990.00 to cover the necessary scope
adjustments. This amendment reflects additional time required for construction management,
inspection, and documentation efforts, ensuring that the project continues to meet quality and
compliance standards.
Scope and Justification for Amendment:
The requested amendment accounts for the following:
1. Extended Construction Duration -Additional inspection and oversight needed due to the
prolonged contract timeline. Refer to Weekly Statement of Working Days and/or Project
Change Order Log for additional information.
2. Increased Inspection and Documentation Efforts -Ensuring compliance with City
requirements, Department of Industrial Relations requirements, contractor operations, and
necessary reporting.
Attached is the updated fee proposal detailing the breakdown of costs associated with this
amendment.
We appreciate your consideration of this request and look forward to your feedback. Please let us
know if you require any further information or discussion regarding this amendment.
3160 CAMINO DEL RIO SOUTH, SUITE 217 I SAN DIEGO, CA 92108 I REDDYENGINEERING.COM I DBE MBE ELBE SB-MICRO-PW
uocus1gn t:nve1ope 1u: /ti4A4JUJ-t-t::t.;L-4t:7 ::i-AALt.;-t-JUA lA 1 / 414!:l PSA24-3473CMI Amend No. 1
Exhibit "A" (Cont.)
If you have any questions or need additional information, please do not hesitate to contact us. Our
contact information is below.
Sincerely,
Project Manager
P: 510-409-2640
E: vinay@reddyengineering.com
Enter Document No. via Document Properties 2
uoc us1g n t::nve1oµe 1u: 1 O'IA'l-'U.l-r-t::1..,.l-'lt:: 1 o-AA.l1..,-r-.)UA IA 11,; 1,;o PSA24-3473CMI Amend No. 1
Exhibit "A" (Cont.)
TASK: CM and Inspection I RATE:
1.1 REVIEW CONTRACT DOCUMENTS/ ROAD REVIEWS
1.2 PREPARE/ CONDUCT PRE-CONSTRUCTION MEETING
1.3 PERFORM CONSTRUCTION MANAGEMENT AND
2 PERFORM FIELD INSPECTION AND DOCUMENTATION
2.1 INSPECTION
2.2 PUBLIC INTERFACE
2.3 DOCUMENTATION
2.4 PUNCH LIST
3. MATERIALS SAMPLING AND TESTING
3.1 FIELD SAMPLING AND TESTING
3.2 LAB TESTING
4. COMPLETE REPORTS AND JOB CLOSEOUT
4.1 FINAL REPORTS AND JOB CLOSEOUT
CM and Inspection Services Total HRS
CM and Inspection Services Total Amount
CITY OF CARLSBAD
Construction Management and Inspection Services for 2023 Slurry Seal Project (PSA24-3438CMI) Reddy Engineering Services, Inc. (RE Services)
AMENDMENT #01
CLASS/FICA T/ON
PROJECT CONSTRUCTION TECHICAL MANAGER/ SR. INSPECTOR · PINCIPAL-IN-ADVISOR (AS· STORMWATER OUTREACH MATERIALS PREVAILING CHARGE PROJECT NEEDED) WAGE(NIGHT SPECIALIST COORDINATOR TESTING
INSPECTOR WORK)
$225.00 $215.00 $230.00 $215.00 $215.00 $155.00 $0.00
616 306 64
0 616 0 306 64 0 0
s s 132,440.00 s s 65,790.00 $ 13,760.00 $ $
LABOR
COMPLIANCE/ FEE PROJECT
CONTROLS
$80.00
0
$ $211,990.00
Notes: Excluslons: Add1t1onal effort past planned completion date of June 17, 2025 {refer to VSS Preliminary Jan '25 Update Schedule); add1t1onal effort m the form of longer shifts requmng overtime, extension of proJect duration due to issues such as
problems with contract documents, right-of-way delays, permits, utility conflicts, unsuitable materials, or unreasonable inefficiencies with the Contractor's operations are not considered within this estimate, and may require an amendment to the
estimated budget.
Contract Value: CM&I Estimate: % of Contract:
6,640,120.00 627,366.00 9.4%