Loading...
HomeMy WebLinkAbout2025-03-04; City Council; Resolution 2025-056uocus1gn 1::nve1ope 1u: tti4A4JUJ-t-t::t;Z-4t::lo-AALC-t-JUA1Al 1414:, RESOLUTION NO. 2025-056 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, AUTHORIZING AMENDMENT NO. 1 TO AN AGREEMENT WITH REDDY ENGINEERING SERVICES, INC. TO PROVIDE CONSTRUCTION MANAGEMENT, INSPECTION AND MATERIALS TESTING SERVICES FOR THE 2023 SLURRY SEAL PROJECT, CAPITAL IMPROVEMENT PROGRAM PROJECT NO. 6001-23SS, IN AN AMOUNT NOT TO EXCEED $211,990 WHEREAS, on July 16, 2024, the City Council adopted Resolution No. 2024-173, authorizing Reddy Engineering Services, Inc. to provide construction management, inspection and materials testing services for the 2023 Slurry Seal Project; and WHEREAS, the Mayor executed an agreement with Reddy to provide these services for the Project in an amount not to exceed $415,379; and WHEREAS, the City Council of the City of Carlsbad, California has determined that it is necessary to amend the agreement to add additional time and funding to account for the change in construction schedule to shift slurry seal application to the warmer spring months, consistent with the specified quality control requirements for the project; and WHEREAS, Reddy has tendered a proposal for a time extension through Jan. 14, 2026, for construction management, inspection and materials testing services in an amount not to exceed $211,990; and WHEREAS, the total value of the contract with Reddy as amended requires the City Council's approval; and WHEREAS, the City Planner determined on Feb. 3, 2025, that Amendment No. 1 to the Agreement with Reddy Engineering Services, Inc., is exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15301(c) -Existing Facilities, which applies to the maintenance and repair of existing public roadways with no expansion of use. A notice of intended decision regarding the environmental determination for this project was advertised and posted on the city's web site. No comment letters or appeals were received and, consistent with Carlsbad Municipal Code Chapter 21.54 -Procedures, Hearing s, Notices, and Fees, the City Planner's written decision is final. uocus1gn t:nve lope IU: /b4A4jUj-t-t:(..;L-4t:1 b-AAL(..;-1-jLJA lA 1 / 414b NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the Mayor is authorized and directed to execute Amendment No. 1 to an Agreement with Reddy Engineering Services, Inc., provided as Attachment A, to increase the Agreement by $211,990 and to extend the term through Jan. 14, 2026, for construction management, inspection and materials testing services in support of the 2023 Slurry Seal Project, Capital Improvement Program Project No. 6001-2355. PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 4th day of March 2025, by the following vote, to wit: AYES: NAYS: ABSTAIN : ABSENT: Blackburn, Bhat-Patel, Acosta, Burkholder, Shin. None. None. None. I~ KEITH BLACKBURN, Mayor SHERRY FREISINGER, City Clerk (SEAL) uocus1gn ~nvelope IU: /b4A4JUj-\-~(.;Z-4~lo-AALC-t<:lUA1Al /4140 PSA24-3473CMI AMENDMENT NO. 1 TO THE AGREEMENT FOR CONSTRUCTION MANAGEMENT, INSPECTION, AND MATERIALS TESTING SERVICES FOR THE 2023 SLURRY SEAL, PROJECT NO. 6001-23SS REDDY ENGINEERING SERVICES, INC. 6 This Amendment No. 1 is entered into and effective as of the ___ day of March 2025, amending the agreement dated July 17, 2024 (the "Agreement"), by and between the City of Carlsbad, California, a municipal corporation ("City"), and Reddy Engineering Services, Inc., a California corporation ("Contractor") (collectively, the "Parties") for Construction Management, Inspection, and Materials Testing Services for the 2023 Slurry Seal project. RECITALS A. The Parties desire to alter the Agreement's scope of work to add additional inspections and oversight needed due to the prolonged contract timeline; and B. The Parties now desire to extend the Agreement for a period of six (6) months; and C. The Parties have negotiated and agreed to a supplemental scope of work and fee schedule, which is attached to and incorporated by this reference as Exhibit "A", Scope of Services and Fee (Supplemental), and increases the Agreement amount by $211,990. NOW, THEREFORE, in consideration of these recitals and the mutual covenants contained herein, City and Contractor agree as follows: 1. In addition to those services contained in the Agreement, as may have been amended from t ime to time, Contractor will provide those services described in Exhibit "A." With this Amendment, the total allowable Agreement amount shall not exceed six hundred twenty-seven thousand three hundred sixty-nine dollars ($627,369). 2. The Scope of Services described in Exhibit "A" of the Agreement is hereby amended as set forth in Exhibit "A" Scope of Services and Fee Schedule (Supplemental), attached to this Amendment No. 1. 3. Section 5 of the Agreement is amended to increase the total amount paid to Contractor for Services by $211,990, from the previous amount of $415,379 to $627,369. 4. Contractor will complete all work described in Exhibit "A" by January 14, 2026. 5. All other provisions of the Agreement, as may have been amended from time to time, will remain in full force and effect. 6. All requisite insurance policies to be maintained by Contractor pursuant to the Agreement, as may have been amended from time to time, will include coverage for this Amendment. 7. The individuals executing this Amendment and the instruments referenced in it on behalf of Contractor each represent and warrant that they have the legal power, right and actual authority to bind Contractor to the terms and conditions of this Amendment. City Attorney Approved Version 5/22/2024 3 uocusIgn t:nveIope Iu: /ti4A4;:!UcH-t:C:.:'.-4t:lo-AALl.A-;:suA1A1 /4140 CONTRACTOR Reddy Engineering Services, Inc., a California corporation By: l (sign here) Vinay Reddy, President and Chief Financial Officer (print name/title) By: (sign here) (print name/title) PSA24-3473CMI CITY OF CARLSBAD, a municipal corporation of the State of Ca lifornia By: I~ Keith Blackburn, Mayor ATTEST: j~ R... "'MJ,,~ for SHERRY FREISINGER, City Clerk If required by City, proper notarial acknowledgment of execution by Contractor must be attached. lf--2 corporation, Agreement must be signed by one corporate officer from each of the following two groups: Group A Chairman, President, or Vice-President Group B Secretary, Assistant Secretary, CFO or Assistant Treasurer Otherwise, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate seal empowering the officer(s) signing to bind the corporation. APPROVED AS TO FORM: CINDIE K. McMAHON, City Attorney By: bll,,\A, fu,wu,IA, Assistant City Attorney City Attorney Approved Version 5/22/2024 4 uocus,gn t::nveIope Iu: /b4A4JUJ-t-t::G:l-4t::1!>-AALG-t-JUA1Al /414!> PSA24-3473CMI EXHIBIT"A" SCOPE OF SERVICES AND FEE (Supplemental) l. Extended Construction Duration -Additional inspection and oversight needed due to the prolonged contract timeline. Refer to Weekly Statement of Working Days and/or Project Change Order Log for additional information. 2. Increased Inspection and Documentation Efforts -Ensuring compliance with City requirements, Department of Industrial Relations requirements, contractor operations, and necessary reporting. 3. Continued Coordination for Project Closeout -Support for final reporting, punch list completion, and contractor compliance verification. City Attorney Approved Version 5/22/2024 5 uocus1gn t::nvetope 1u: /b4A4j Uj-t-t::G:.1-4t::lo-AALG-t<:lUA1A l /4140 RE SERVICES CONSTRUCTION MANAGEMENT 5 LANDSCAPE ARCHITECTURE January 28, 2025 PSA24-3473CMI Amend No. 1 Exhibit "A" (Cont.) RE: PSA24-3473CMI AMENDMENT 01 REQUEST-INSPECTION AND MATERIALS TESTING SERVICES FOR THE 2023 SLURRY SEAL PROJECT NO. 6001-23SS Dear Mr. Didier, Reddy Engineering Services, Inc. (RE Services) appreciates the opportunity to continue supporting the City of Carlsbad on the 2023 Slurry Seal Project (PSA24-3473CMI). Due to the extended duration of the project and additional inspection requirements, we are requesting Amendment #01 to the existing Task Order for an additional $211,990.00 to cover the necessary scope adjustments. This amendment reflects additional time required for construction management, inspection, and documentation efforts, ensuring that the project continues to meet quality and compliance standards. Scope and Justification for Amendment: The requested amendment accounts for the following: 1. Extended Construction Duration -Additional inspection and oversight needed due to the prolonged contract timeline. Refer to Weekly Statement of Working Days and/or Project Change Order Log for additional information. 2. Increased Inspection and Documentation Efforts -Ensuring compliance with City requirements, Department of Industrial Relations requirements, contractor operations, and necessary reporting. Attached is the updated fee proposal detailing the breakdown of costs associated with this amendment. We appreciate your consideration of this request and look forward to your feedback. Please let us know if you require any further information or discussion regarding this amendment. 3160 CAMINO DEL RIO SOUTH, SUITE 217 I SAN DIEGO, CA 92108 I REDDYENGINEERING.COM I DBE MBE ELBE SB-MICRO-PW uocus1gn t:nve1ope 1u: /ti4A4JUJ-t-t::t.;L-4t:7 ::i-AALt.;-t-JUA lA 1 / 414!:l PSA24-3473CMI Amend No. 1 Exhibit "A" (Cont.) If you have any questions or need additional information, please do not hesitate to contact us. Our contact information is below. Sincerely, Project Manager P: 510-409-2640 E: vinay@reddyengineering.com Enter Document No. via Document Properties 2 uoc us1g n t::nve1oµe 1u: 1 O'IA'l-'U.l-r-t::1..,.l-'lt:: 1 o-AA.l1..,-r-.)UA IA 11,; 1,;o PSA24-3473CMI Amend No. 1 Exhibit "A" (Cont.) TASK: CM and Inspection I RATE: 1.1 REVIEW CONTRACT DOCUMENTS/ ROAD REVIEWS 1.2 PREPARE/ CONDUCT PRE-CONSTRUCTION MEETING 1.3 PERFORM CONSTRUCTION MANAGEMENT AND 2 PERFORM FIELD INSPECTION AND DOCUMENTATION 2.1 INSPECTION 2.2 PUBLIC INTERFACE 2.3 DOCUMENTATION 2.4 PUNCH LIST 3. MATERIALS SAMPLING AND TESTING 3.1 FIELD SAMPLING AND TESTING 3.2 LAB TESTING 4. COMPLETE REPORTS AND JOB CLOSEOUT 4.1 FINAL REPORTS AND JOB CLOSEOUT CM and Inspection Services Total HRS CM and Inspection Services Total Amount CITY OF CARLSBAD Construction Management and Inspection Services for 2023 Slurry Seal Project (PSA24-3438CMI) Reddy Engineering Services, Inc. (RE Services) AMENDMENT #01 CLASS/FICA T/ON PROJECT CONSTRUCTION TECHICAL MANAGER/ SR. INSPECTOR · PINCIPAL-IN-ADVISOR (AS· STORMWATER OUTREACH MATERIALS PREVAILING CHARGE PROJECT NEEDED) WAGE(NIGHT SPECIALIST COORDINATOR TESTING INSPECTOR WORK) $225.00 $215.00 $230.00 $215.00 $215.00 $155.00 $0.00 616 306 64 0 616 0 306 64 0 0 s s 132,440.00 s s 65,790.00 $ 13,760.00 $ $ LABOR COMPLIANCE/ FEE PROJECT CONTROLS $80.00 0 $ $211,990.00 Notes: Excluslons: Add1t1onal effort past planned completion date of June 17, 2025 {refer to VSS Preliminary Jan '25 Update Schedule); add1t1onal effort m the form of longer shifts requmng overtime, extension of proJect duration due to issues such as problems with contract documents, right-of-way delays, permits, utility conflicts, unsuitable materials, or unreasonable inefficiencies with the Contractor's operations are not considered within this estimate, and may require an amendment to the estimated budget. Contract Value: CM&I Estimate: % of Contract: 6,640,120.00 627,366.00 9.4%