Loading...
HomeMy WebLinkAbout2025-03-04; City Council; Resolution 2025-059uocus1gn t:nvelope IU: jtiUt:SU!:J4!:J-UU /U-4Hbl--H/ / A-/Hf-jUj C/UC!:JH RESOLUTION NO. 2025-059 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING THE PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS AND AUTHORIZING THE CITY CLERK TO ADVERTISE FOR BIDS FOR PHASE I OF THE VILLAGE AND BARRIO TRAFFIC CIRCLES PROJECT WHEREAS, the City Council of the City of Carlsbad, California has determined it necessary, desirable and in the public interest to construct Phase 1 of the Village and Barrio Traffic Circles Project, Capital Improvement Program, or CIP, Project No. 4015, or Project; and WHEREAS, in keeping with the city's General Plan Mobility Element and Growth Management Plan, the Project will construct traffic circles at five intersections and enhanced crosswalks at one intersection in the Barrio neighborhood to improve traffic safety and walkability; and WHEREAS, the plans, specifications and contract documents for the Project have been prepared, are on file at the City Clerk's office and are incorporated herein by reference; and WHEREAS, staff reviewed the improvement plans, specifications and cost estimates developed by a consultant and determined that the proposed design meets the city's engineering codes, standards and policies and that the proposed construction work would ameliorate the infrastructure and neighborhood; and WHEREAS, Carlsbad Municipal Code Section 3.28.080(E) requires the City Council to approve plans, specifications and contract documents for all construction projects that are to be formally bid upon when the value exceeds $220,000; and WHEREAS, the total cost of the Project including transportation and utility improvements is estimated to be $6,727,255, including construction contingency, construction management, inspection and material testing services, and community outreach costs, of which $4,817,555 is to complete the transportation and sewer improvements using the funds in CIP Project No. 4015, and the remaining $1,909,700 is to complete the water system rehabilitation and replacement using the funds from CIP Project No. 3904-D; and WHEREAS, sufficient funding from a federal grant program, Gas Tax, TransNet, General Capital Construction and Sewer Replacement funds are available to complete the Project; and WHEREAS, the project appropriation includes $4 million of federal grant funding and was authorized to proceed with construction and bids by Caltrans on Dec. 26, 2024; and uocus1gn t:nvelope JU: j bUt:lU!:J4!:J-UU /U-4!:i!:Jf--!:I/ / A-f!:iJ-j UjC/UC!:J!:i WHEREAS, in accordance with the California Environmental Quality Act, or CEQA, and the Environmental Protection Act, the project was previously evaluated in the Final Initial Study/Mitigated Negative Declaration (Final IS/MND SCH No. 2016021056), dated April 2018, as part of the City of Carlsbad Village and Barrio Master Plan. The Final IS/MND evaluated the potential environmental effects of the project components described in the Master Plan. The project is within the scope of the Final IS/MND and no further CEQA documentation is required per CEQA guidelines Section 15162. All applicable mitigation measures contained in the prior environmental document have either been satisfied previously, or will be incorporated into the project, or are conditions of approval for the project; and WHEREAS, the Project is exempt from National Environmental Policy Act, or NEPA, review as outlined in NEPA Regulation 23, which applies to federally funded projects receiving less than $5 million or with a total estimated cost of not more than $30 million. The California Department of Transportation's determination of exclusion is recorded in a categorical exclusion, or CE, determination form dated May 5, 2023. Additionally, the CE determination was revalidated on March 27, 2024. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. 2. That the above recitations are true and correct. That the plans, specifications and contract documents for Phase 1 of the Village and Barrio Traffic Circles Project, CIP Project No. 4015, are hereby approved and on file in the Office of the City Clerk. 3. That the City Clerk is authorized and directed to publish in accordance with state law, a Notice to Contractors Inviting Bids for construction of Phase 1 of the Village and Barrio Traffic Circles Project, CIP Project No. 4015, in accordance with the plans, specifications and contract documents referred to herein. uocus1gn t::nvelope IU: jbLJl::lU!>4!>-UU /U-4H!>t--H/ / A-/Ht-jUjC/UC!>H PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 4th day of March 2025, by the following vote, to wit: AYES: NAYS : ABSTAIN : ABSENT: Blackburn, Bhat-Patel, Acosta, Burkholder, Shin. None. None. None. ) ~ KEITH BLACKBURN, Mayor SHERRY FREISINGER, City Clerk (SEAL)