Loading...
HomeMy WebLinkAboutSDP 2022-0003; FPC RESIDENTIAL; GEOTECHNICAL - PAVEMENT RECOMMENDATIONS; 2024-10-24 ADVANCED GEOTECHNICAL SOLUTIONS, INC. 485 Corporate Drive, Suite B Escondido, California 92029 Telephone: (619) 867-0487 Fax: (714) 409-3287 ADVANCED GEOTECHNICAL SOLUTIONS, INC. H.G. Fenton Company October 24, 2024 7577 Mission Valley Road P/W 2107-12 San Diego, California 92108 Report No. 2107-12-B-14R Attention: Ryley Webb Subject: Asphalt Concrete Pavement Recommendations, Ponto Road (Public), Ponto Drive (Public), Beach Way (Private), Interior Driveways A through E (Private), FPC Residential Multi-Family Residential Development, 7200-7294 Ponto Drive, Carlsbad, California References: See Appendix Gentlepersons, As requested, Advanced Geotechnical Solutions, Inc. (AGS) herein provides recommendations for the design of pavement sections for private drives within the FPC Residential Development and adjoining public streets Ponto Drive and Ponto Road in Carlsbad, California. The pavement sections are subject to the review and approval of the City of Carlsbad. Typically, fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus (not less than 75,000 lbs) and shall be provided with an approved surface so as to provide all‐ weather driving capabilities. It is AGS’s opinion that the proposed road sections provided in Table 2 will meet the above criteria and be able to support a 75,000 pound fire truck. 1.0 R-VALUE TEST RESULTS A representative of AGS recently collected samples of the subgrade soils of the streets areas and transported the samples to our approved laboratory for R-value testing. R-Value samples were initially sampled on June 19, 2024, prior to utility construction, and were not used for the design of the pavement section. The R- value test results are summarized in Table I below and laboratory test results have been appended. TABLE 1 R-VALUE TEST RESULTS Sample Number Sample Location Represents Stations R- Value RV-1* Driveway C Sta. 15+60 (Private) 67* RV-2* Driveway C Sta. 11+00 (Private) 67* RV-1 Driveway C Sta. 11+00 (Private) Beach Way Sta. 12+15 to 13+78 (Private); Driveway C Sta. 10+00 to 11+37 (Private); Driveway B Sta. 10+00 to 13+50 (Private) 68 RV-2 Driveway C Sta. 14+00 (Private) Driveway C Sta. 11+37 to 15+25 (Private) 56 RV-3 Driveway B Sta. 15+60 (Private) Driveway A (Private); Driveway B Sta. 14+50 to 17+17 (Private); Driveway C Sta. 15+25 to 16+66 (Private); Driveway D (Private); 25 ~GS October 30, 2024 Page 2 P/W 2107-12 Report No. 2107-12-B-14R ADVANCED GEOTECHNICAL SOLUTIONS, INC. Driveway E (Private) RV-4 Ponto Drive Sta. 13+30 (Public) Ponto Drive Sta. 10+00 to 15+90 (Public); Ponto Road Sta. 10+00 to 12+15 (Public) 71 * Sampled prior to utility construction and was not used for the final pavement design 2.0 FLEXIBLE PAVEMENT DESIGN RECOMMENDATIONS Presented below are preliminary pavement sections based on the design R-value and a range of traffic indices (TI) for public streets and private interior streets. The design traffic index and/or street classification was provided by the design civil engineer. Supporting calculations are appended as Plates 1 through 4, and in some cases, the City of Carlsbad minimum pavement sections as shown on Standard No. GS-17 are greater than the minimum sections needed based on the R-Value test results. TABLE 2.0 RECOMMENDED STRUCTURAL PAVEMENT SECTIONS Section R-Value Design Traffic Index Asphalt Concrete (inches) Aggregate Base (inches) Beach Way Sta. 12+15 to 13+78 (Private); Driveway C Sta. 10+00 to 11+37 (Private); Driveway B Sta. 10+00 to 13+50 (Private) 68 5.0 4** 4** Driveway C Sta. 11+37 to 15+25 (Private) 56 5.0 4** 4** Driveway A (Private); Driveway B Sta. 14+50 to 17+17 (Private); Driveway C Sta. 15+25 to 16+66 (Private); Driveway D (Private); Driveway E (Private) 25 5.0 4 4 Ponto Drive Sta. 10+00 to 15+90 (Public); Ponto Road Sta. 10+00 to 12+15 (Public) 71 6.0* 4** 6** Notes: *Classified as Neighborhood Collector ** City of Carlsbad minimum section The subgrade soils should be at or near optimum moisture content and should be compacted to a minimum of 95 percent of the maximum dry density as determined by ASTM D1557. After subgrade compaction and prior to placement of aggregate base, the exposed finish subgrade should be “proof-rolled” with heavy equipment to ensure the grade is not “pumping” and is verified as non-yielding. Aggregate base should be compacted to a minimum of 95 percent of the maximum dry density as determined by ASTM D1557 and should conform with the specifications listed in Section 200-2.4 of the Standard Specifications for Public Works Construction (Green Book) or Section 26 of Caltrans Standard Specifications. The asphalt concrete should conform to Section 26 of the Caltrans Standard Specifications or Section 203-6 of the Green Book. October 30, 2024 Page 3 P/W 2107-12 Report No. 2107-12-B-14R ADVANCED GEOTECHNICAL SOLUTIONS, INC. The opportunity to be of service is sincerely appreciated. If you should have any questions, please do not hesitate to contact the undersigned. ___________________________________ JOHN J. DONOVAN, Geotechnical Engineer RCE 65051, RGE 2790, Reg. Exp. 6-30-25 2107-12-B-14R (Oct 30, 2024, Pavement Recs, Ponto Rd, Ponto Dr, FPC Residential, Carlsbad).docx Distribution: (1) Addressee (pdf) Appended –Cited References, Laboratory Test Results and Structural Pavement Design Calculations (Plates 1-4), City of Carlsbad GS-17 October 30, 2024 Page 4 P/W 2107-12 Report No. 2107-12-B-14R ADVANCED GEOTECHNICAL SOLUTIONS, INC. APPENDIX, CITED REFERENCES Advanced Geotechnical Solutions, Inc. (2021). “Due Diligence Geotechnical Study, Proposed Multi- Family Residential Development, 7200-7590 Ponto Drive, Carlsbad, County of Orange, California,” dated December 3, 2021, Report No. 2107-12-B-2R. ---. (2022a). “Preliminary Geotechnical Investigation and Infiltration Study, Proposed Multi-Family Residential Development, 7200-7294 Ponto Drive, Carlsbad, California,” dated March 16, 2022, Report No. 2107-12-B-4. ---. (2022b). “Preliminary Infiltration Feasibility Study, Proposed Multi-Family Residential Development, 7200-7294 Ponto Drive, Carlsbad, California,” dated March 16, 2022, Report No. 2107-12-B-5. ---. (2022c). “Additional Comments, Feasibility of Onsite Infiltration, Proposed Multi-Family Residential Development, 7200-7294 Ponto Drive, Carlsbad, California,” dated August 18, 2022, Report No. 2107-12-B-6. ---. (2022d). “Addendum Report and Response to City Geotechnical Comments, Proposed Multi-Family Residential Development, 7200-7294 Ponto Drive, Carlsbad, California,” dated October 6, 2022, Report No. 2107-12-B-7R. ---. (2023). “Addendum Report and Response to City Geotechnical Comments, Proposed Multi-Family Residential Development, 7200-7294 Ponto Drive, Carlsbad, California,” dated December 1, 2023, Report No. 2107-12-B-8. ---. (2024). “Advanced Geotechnical Solutions, Inc. (2024). “Project Grading Report, FPC Residential, Buildings 1 Through 23, Proposed Multi-Family Residential Development, 7200-7294 Ponto Drive, Carlsbad, California,” Report No. 2107-12-C-12, August 23, 2024. City of Carlsbad. (2022). City of Carlsbad Engineering Standards, Volume 3, Standard Drawings and Specifications 2022 Edition. Group Delta. (2010a). “Response to Review Comments, Hilton Carlsbad Oceanfront Resort & Spa, Carlsbad, California,” dated May 10, 2010 (Document No. 10-0288, Project No. 0703-002-01. ---. (2010b). “Response to Request for Information, Hilton Carlsbad Oceanfront Resort, Carlsbad, California,” dated October 6, 2010 (Document No. 10-0526, Project No. SD-126. ---. (2010c). “Grading Plan Review, Hilton Carlsbad Oceanfront Resort & Spa, Carlsbad, California,” dated November 30, 2010 (Document No. 10-0601, Project No. SD-126. ---. (2020). “Geotechnical Update Letter, Planned Stormwater BMPs, Proposed Viking View Lane Private Road Improvements, Valley Center, County of San Diego,” Project No. GI-17-09-146, April 23, 2020. VINJE & MIDDLETON ENGINEERING, INC. 2450 AUTO PARK WAY ESCONDIDO, CALIFORNIA 92029 vinje.middleton@sbcglobal.net (760) 743-1214 JOB NUMBER CLIENT NAME 24 -105-L DATE: 6-27-24 JOB NAME JOB LOCATION STREET NAME STATIONING ADVANCED GEOTECHNICAL SOLUTIONS ADVANCED GEOTECHNICAL SOLUTIONS FPC RESIDENTIAL 2107-1~ PRIVATE DR.-C 15+60 RV-1 SOIL SAMPLE PROVIDED BY: AGS DATE SUBMITTED TO LABORATORY: 6-21-24 SOIL DESCRIPTION: BROWN FINE-MED SAND R-VALUE REPORT NUMBER: RV-57-24 R VALUE DATA A ___ B ___ C ___ D COMPACTOR PRESSURE -P.S.I. MOISTURE@ COMPACTION -PERCENT DENSITY -POUNDS/CUBIC FOOT R-VALUE -STABILOMETER EXUDATION PRESSURE -P.S.I. COVER THICKNESS BY STABILOMETER (FEET ) COVER THICKNESS BY EXPANSION (FEET) T. I. {ASSUMED) BY STABILOMETER@ 300 PSI, EXUD. BY EXPANSION PRESSURE AT EQUILIBRI UM 350 11.2 125.7 59 146 .39 0.0 4.5 67 N/A 67 350 10.8 125.3 64 232 .34 0.0 350 10.4 125.6 74 517 .25 0.0 CLIENT: Al)\IA )JC.~ G: Evi1:L}W1CAL jQJ.. \ITIBlJ:, ·PROJECT: E P '-~5( 0 E.AJ 116 4. J..! o] -\ ).. oescR1PT10N: J~>&o wJJ Fu,£ .. .Mt.I} 5AJJ8 LocArtoN: Pv,, On.l\J~-c.. STA~ 1546 BV-.1.. R.VALUENO.: R~ -57 -l.lh JOB NO, :J._6' ~_5 • I. DATE RECD.: _ -_ __j ~ ): 4 TESTED BY: R CALCULATED BY· B F Frame Number "1 \ 2. Compactor Pressure • P.S.I. Sieve Wl Rel As Red. As Used •1 112 13 %R 11---~-----l..._-4_ Size ~ Cum. %P %P J.-,;;;=.....,.=.+=,;=..11-....,._;,;;;._-4--.=....-.l1 Sand 4• Moisture Orig. Ory 3" Clay Water Addld, ML (Totall 2" S.E. Moist. @ • Compadlon • % l I. 1 10 .fJ ID .4 t• S.E. • Batch Wis.· 1200 G v,• GtOSS Wt (Sample 1-Mold} Tare WI. (Mold} l1J,30. S lJlli,~ .1122;; 14 •a Wet Weight of Briqullle • GMS. •ts Height of Briquele -Inches 130 Pass 114 1150 Total Density• Lb. Per Cu. Fl ll.5.7 Iii, J I ).5. b 1100 Slabilometar Ph At 2000 Lbs. 47 '+I 19 lt200 Cumulallvs Weight Tums Oisplacelnint R. 1/alue I Uncorr. / FcfrWt: Exudation Pressure • Pounds Pass-4 14 6 i:,2 c:; n :~s r.L(Assumed) 4. c; Slab. Thick-Feet 'l. I\ '1./1 1_ C::.. ' 7 --------ii-;..' .:::...:.l..!..1 ~• :.J"'-''~~• =-1.L+---l~-+--...;;.;130~-~-+---I----I----II I By Exud. • h _Expansio __ • n_P_ress_ur_a --------1-~.:,,a.---4_'&~~&::,,:;:,..-J---1----t"__,,;,;.;;:~- 00-J--+----+--+---+---u a! By Expan. • N/ A Q.0 0 .Q lt200 AtEquU.• 6 7 Exudation Pressure. P.5.1. Expan. Presa. Thlck-Faet a .CJ EXPANSION PRESSURE CHART EXUDATION PRESSURE CHART 70 ti 3.0 60 w LL . a: ~ 50 ::E g iii 2.0 ~ I ::l~::t:t:t:t:1~::tttt:1~:tttt:1~::ttt:t:ll:t::t:t:tt:ltt::t:t:tt:t:t~-1-40 • j ► al II) II) w 30 z :,:: u ~ 1.0 ffi > 0 u 10 0 0 0 1.0 2.0 3.0 4.0 COVER THCKNESS BY EXPANSION PRESSURE. FEET VINJE & MIDDLETON ENGINEERING, INC. 2450 AUTO PARK WAY ESCONDIDO, CALIFORNIA 92029 vinje.middleton@sbcglobal.net (760) 743-1214 JOB NUMBER CLIENT NAME 24-105-L DATE: 6-27-24 JOB NAME JOB LOCATION STREET NAME STATIONING ADVANCED GEOTECHNICAL SOLUTIONS ADVANCED GEOTECHNICAL SOLUTIONS FPC RESIDENTIAL 2107-12 PRIVATE DR.-B/C INTERSECTION 11+00 RV-2 SOIL SAMPLE PROVIDED BY: AGS DATE SUBMITTED TO LABORATORY: 6-21-24 SOIL DESCRIPTION: BROWN FINE-MED SAND R-VALUE REPORT NUMBER: RV-58-24 R VALUE DATA A ___ B ___ C ___ D COMPACTOR PRESSURE -P.S.I. -MOISTURE@ COMPACTION -PERCENT DENSITY -POUNDS/CUBIC FOOT R-VALUE -STABILOMETER EXUDATION PRESSURE -P.S.I. COVER THICKNESS BY STABILOMETER {FEET ) COVER THICKNESS BY EXPANSION {FEET) T . I . (ASSUMED) BY STABILOMETER@ 300 PSI, EXUD. BY EXPANSION PRESSURE AT EQUILIBRIUM SAND EQUIVALENT 350 11.0 125.9 54 177 .44 0.0 4.5 67 N/A 67 I 350 10 .6 126.0 66 269 .32 0.0 350 10.1 126.6 68 330 .31 0.0 cueNT: J\DVA)Jc.~ CTfv11:.L#Al1CAi. ,oL-\JTUHJS ·PROJECT: F pc:.. ~51 I) F-h ,., ,4 i, l. IO ] -l ,: oescA1PT10N: s&~WAJ r 1.u:c.-f1t..o 5A.y~ LOCATION: PVT,I\JE.-8/c. t JJT.,A·, lltCO )~\}· 1--, ··-· .. A.VALUENO.: R~-5 'o-1 ~ JOB NO.: J.-Y·~,5 -L.. DATE RECD.: b -_ ~ ~ :).. g TESTED BY: __ ----;,(~.,...._ _____ _ CALCULATED BY· B F Frame Number 4 ~ 6 Sieve WLRat AsRcd. As Used 111 112 113 -%R %P Compactor Pressure • P .S.I. "i.SO 35D 350 Size Cum. Cum. %? Sand 4• Moisture Orig. Ory 3• Clay Water Added, ML (Total) lt'1 ~ ,,_c; 2" S.E. 10 ,/, n;• S.E.-Moist @ • Compaction • % I I. (1 In I t• ¾" Saleh Wis.• t200 G Yi" Gross Wl (Sample + Mold) 1,197,1 lJJ/j,C ':l,27~f '11,• 1"-¾" Tare Wt (Moldl 111l.bH 111/,,1 .212 c;,o 114 1,4•~· 118 '111"414 Wet Weight of Briquette -GMS. 1171. '? ll!f'.I. ~ IL50.o 1116 ·J.Si+ 11. c;o ?.SO 1130 Passlt4 Height of Briquette. Inches 111..1, 1150 Total Densily • Lb. Per Cu. Fl IJ.5.q 126/J 11100 Stabilometer Ph At 2000 Lbs. sb 40 }6 11200 Cumulative Weight Tums Displaceinent ~.01 D-e-0 3,07 1•-¾· R. Value I Uncorr. / Corr. ~ ~ ~ :/ I/ 3"•.'11,• For Ht ¾"--4 Exudation Pressure • Pounds 111t. .1i-,,v 1 4-145 114 Pass-4 Exudation Pressure -P.S.I. \7, ]..6, :i30 118 T.1. (Assumedl 4.S 1116 Stab. Thfcl<-Feet ,4-4 ~3A . 2, \ 1130 .. By Exud. • I-. 7 "' Expansion Pressure ~ '&. ~ 1150 i By Expen. • NIA II: 11100 E$pan. Press. Thick-Feet Cl.Cl 0-0 o.o 11200 AtEqult-/.,, 7 EXPANSION PRESSURE CHART EXUDATION PRESSURE CHART 800 700 600 500 400 300 200 100 0 ti 3.0 w u.. I a: ~ " 50 2 9 iii 2.0 < I;; > Ill I 40 ·I I : II) f3 30 z la:: u 1.0 :c I-20 ffi Ei u 10 0 0 0 1.0 2.0 3.0 4.0 COVER THICKNESS BY EXPANSION PRESSURE • FEET EXUDATION PRESSURE (PSI) VINJE & MIDDLETON ENGINEERING, INC. 2450 AUTO PARK WAY ESCONDIDO, CALIFORNIA 92029 vinje.middleton@sbcglobai.net (760) 743-1214 JOB NUMBER CLIENT NAME 24-105 -L DATE: 10-10-24 JOB NAME JOB LOCATION STREET NAME STATIONING ADVANCED GEOTECHNICAL SOLUTIONS ADVANCED GEOTECHNICAL SOLUTIONS PONTO DRIVE 2107-12 DWY-B 11+00 SOIL SAMPLE PROVIDED BY: AGS DATE SUBMITTED TO LABORATORY: 10-8-24 SOIL DESCRIPTION: DARK BROWN FINE-MED SAND R-VALUE REPORT NUMBER: RV-77-24 R VALUE DATA A B C D COMPACTOR PRESSURE -P.S.I. MOISTURE@ COMPACTION -PERCENT DENSITY -POUNDS/CUBIC FOOT R-VALUE-STABILOMETER EXUDATION PRESSURE -P.S.I. COVER THICKNESS BY STABILOMETER {FEET) COVER THICKNESS BY EXPANSION (F~ET) T. I . {ASSUMED) BY STABILOMETER@ 300 PSI, EXUD. BY EXPANSION PRESSURE AT EQUILIBRIUM ---~------- 350 10.4 127.6 53 155 .45 0.0 4.5 68 NNN/A 68 350 9 .·9 126 .8 65 255 .34 0.0 350 9 •. 5 126.6 74 407 .25 0.0 CUENT:--1-........,,..z..cLC:..:1:::...=:~~=..:...;::=.i.=.r=:..i.c::-=..::;....;:;;.:....;.~;.,c,__;::5;._ _____ _ PROJECT: -~.w.:1~;-,-¥.L.1..1..-......c:;.:..:~-.r,.::=---r-----,.....--------- DESCRIPTION.~~u.:..~~,!.;..=.::.Y.-..!....!.,t::..:.=-,,,.~=~~..:..c.L.:.L-------- LOCATION: W -SiA: + 0 . ----- A.VALUE NO.: --=-R~V!"-----=-7...1.1_-.c:l--14 __ _ JOB NO.: _ ___,1=-..4:1--_Jl~Q~S~-~L,__ __ DATE RECD.: _ _J]Wl,O~-.... • ~B :_-.J:.6:::.:~;J----- TESTED BY:--~B~f,..,_ ____ _ f\f CALCULATED BY· As Red. As Used Frame Number . .Ii I / Sieve Wt.Rel 111 112 13 35() Non %R %P %P :ompaclor Pressure • P.S.I. :,50 350 .IOisture . Orig. Ory Neter Added, ML (Tolal) 4.5 4-0 3 c:, .loisL @ • Compaction • % JO.ll lq_q 1q.c, 3ross Wt. (Sample+ Mold) i'Ji.ZO.,l, 1 3JPPJ l.3~., rere Wl (Mold) l.130,5 1111'1.q ')./77 ,j Nel Weight of Briquette • GMS. 1rn7 llb:i.1 1161, q -!eight of Briquette • Inches :z..s:z.. 12 S'l 2.5'1 Jensity • lb. Per Cu. FL 111.6 Jfb.R 11l.h ~tabilometer Ph At 2000 Lbs. .~4 40 ,?,(j rums Displacement 4,3q 4,15 .3.qo it Velue I UncOIT. / c°i!k. For ~ ~ :?X I/ Exudation Pressure • Pounds 1q5q l3J05 5ll0 Exudation Pressure • P.S.I. 15S l25~ 407 Slab. Thick-Feet • 4-5 -~ /J t; Expansion Pressure 0 \ \ Expan. Pn!SS. Thick-Feet o.o o.o o.o EXPANSION PRESSURE CHART 4.0 loo Iii 3.0 w - 14, . a: w Iii 9 in ~ 1/) 2.0 > ID 1/) 1/) w z :,: (J 1.0 x ... a: w > 0 () 0 0 1.0 2.0 3.0 COVER THICKNESS BY EXPANSION PRESSURE • FEET i/ 4.0 Size Cum. Cum. 4• 3" 2" 1Yi" 1• ¾" Yi· ~- 114 18 1116 1130 1150 11100 11200 114 118 1116 130 1150 11100 11200 Sand Clay S.E. S.E. • Balch Wis. • 1200 G IOO'J 1"-¾" 1.4•.~· *"•114 Pass 114 Total Cumulative Weight 1•.3,4• •.4•.~· ~---4 Pass--4 T.I. (Assumed) 4-, l=j ! ByExud.-cbR ~ By Expan. -N / A a! At EquU .• f,f1 EXUDATION PRESSURE CHART 70 60 I 40 ·j . l:l:1::l~:t::t:::::::::::t:t:t:t:!::l:1t:l:t:t::t:::::::t:t:tt:!::!::1~t:l:t::t::t:t:t:t:t:~~ 30 20 10 0 EXUDATION PRESSURE (PSI) JOB NUMBER CLIENT NAME JOB NAME JOB LOCATION STREET NAME STATIONING VINJE & MIDDLETON ENGINEERING, INC. 2450 AUTO PARK WAY ESCONDIDO, CALIFORNIA 92029 vinje.middleton@sbcalobal.net (760) 743-1214 24 -105-L ADVANCED GEOTECHNICAL SOLUTIONS ADVANCED GEOTECHNICAL SOLUTIONS PONTO DRIVE 2107-12 DWY-C 14+00 SOIL SAMPLE PROVIDED BY: AGS DATE SUBMITTED TO LABORATORY: 10-8-24 SOIL DESCRIPTION: BROWN SILTY FINE-MED SAND R-VALUE REPORT NUMBER: RV-78-24 DATE: 10-10-24 R VALUE DATA COMPACTOR PRESSURE -P .S .I . MOISTURE @ COMPACTION -PERCENT DENSITY -POUNDS/CUBIC FOOT R-VALUE-STABILOMETER EXUDATION PRESSURE • P.S.I. COVER THICKNESS BY STABILOMETER (FEET) COVER THICKNESS BY EXPANSION (FEET) T. I. (ASSUMED) BY STABILOMETER @ 300 PSI, EXUD. BY EXPANSION PRESSURE AT EQUILIBRIUM SAND EQUIVALENT A ___ B ___ C ___ D 275 325 11.0 10.5 126.0 126.0 36 48 168 241 . 62 . 52 0.0 0.0 4.5 56 N/A 56 I 350 10.1 127.4 60 337 .39 0 .1 cuENT: A OVAJJ c~n G-~onc.." "1 lcAL soiJ.1,10>.1 5 PROJECT: PolliC1 ll P,, 1 10 7 ~ ) 1. R.VALUENO.: Jl V-'Jf,-)..4- JOB NO.: 1 4 -10 5 -L • DESCRIPTION: sgow)J SIL1'f r-1.AJE, /rl?.D 5 .A)J /) LOCATION: 0 WY -c.. s't~: 14:t O Q OATEAECD.: 10 -B-:t4- TESTED BY: Q ):.. CALCULATED BY· ~ f-·--.. Fram■ Number I, ~ 4-Sieve Wt.Rel As Red. As Used •1 •2 a3 Nan %R :ompactor Pressure -P .S.I. 275 1,,1_, l1.SC'J Size Cum. Cum. •A,p %P Sand 4• ~olsture Orig, Oiy 3• Clay l\'aler Addtd, ML {Totaij 5,c; 50 4c, 2" S.E. 1v.• S.E.-Aoisl @ -Compacllon • % 11.0 10. 'i >O. I 1• ¾· Batc:h Wis. -1200 G v.· 3ross WL (Sample + Mold) 3;01,l 3?/)l , y;;: ¾" lOO/, 1"-¾" rare Wt. (Mold) :21,c; .0 7116-~ 2}lb,~ ... 2,4•4\• 11a,;,q •e ¾"414 Nel Weight of Briquette • GMS. 1177,1 1175,9 •16 1.e:;_i; 7.So 1.SLl .30 Passll-4 ➔eight ol Briquette -Inches IJ~.c 117.~ 1150 Total )ensity • Lb. Per Cu. Fl 116.0 •100 Stabllometer Ph Al 2000 Lbs. 80 66 41 •200 Cumulative Welghl rums Displacement 4.56 4,3/ ~-11 1"•¾· rl. Value I Uoc:orr. / Corr. ~ ¾ lsB< 7 / '¾"•"'-" ForHL :iii"• -4 ElludaUon Pressure• Pounds 111) ~J I ~1:,~ 114 Pass -4 lh 5 J.4 l 3)7 •a Elludalion Pressure • P.S.1. T.I. (Assumed) LJ.~ 1116 Slab. Thick-Feet . 6" .SJ. ,3q 1130 i By Exud. -5b Expansion Pressure 0 l _?, 1150 By Expan. • N/ A rt. D-1 11100 5 I, Expan. Press. Thick-Feet 00 D.0 11200 Al Equil. • EXPANSION PRESSURE CHART EXUDATION PRESSURE CHART 800 700 600 500 400 300 200 100 0 li:i . 3.0 60 w u. . a: lli :::E 50 0 d CD ~ 2.0 ► CD II) II) w 30 z :.: ~ 1.0 a: w > 0 u tt:lt:l:t:t:t:tttt:lr::l:::t:t:t:t:t:tl:1t:l:t::t:tt:t:tt:lr:1t:l:::t::t:t:tttt:~ 20 10 0 0 0 1.0 2.0 3.0 4.0 COVER THICKNESS BY EXPANSION PRESSURE· FEET EXUDATION PRESSURE (PSI) JOB NUMBER CLIENT NAME JOB NAME JOB LOCATION STREET NAME STATIONING VINJE & MIDDLETON ENGINEERING, INC. 2450 AUTO PARK WAY ESCONDIDO, CALIFORNIA 92029 vin;e.middleton@sbcqlobal.net (760) 743-1214 24-105 -L ADVANCED GEOTECHNICAL SOLUTIONS ADVANCED GEOTECHNICAL SOLUTIONS 2107-12 PONTO DRIVE DWY A-E@ DWY-A 15+00 RV-3 SOIL SAMPLE PROVIDED BY: AGS DATE SUBMITTED TO LABORATORY: 10 -14-24 SOIL DESCRIPTION: BROWN SILTY to CLAYEY SAND R-VALUE REPORT NUMBER: RV-80-24 DATE:·10-18-24 R VALUE DATA COMPACTOR PRESSURE -P.S.I. MOISTURE @ COMPACTION -PERCENT DENSITY -POUNDS/CUBIC FOOT R-VALUE-STABILOMETER EXUDATION PRESSURE -P.S.I. COVER THICKNESS BY STABILOMETER (FEET ) COVER THICKNESS BY EXPANSION (FEET) T. I. (ASSUMED) BY STABILOMETER@ 300 PSI, EXUD. BY EXPANSION PRESSURE AT EQUILIBRIUM SAND EQUIVALENT A B C D --------- so 12 .8 121.6 16 176 .82 0.0 4.5 25 N/A 25 I 125 11.9 200 11.0 124.5 • 126.9 22 258 .75 0.0 31 375 .67 0.1 CLIENT: AD \/AJJCE.0 GW 1Ec.}t .Alt CAL 5C-L l(TI OJI 5 PROJECT: Po.t1 ro olt 11 07: J l: 0EscR1PTioN: B~ovJNi ,n q to <-£'41}1 S1t uD LOCATION: n w -A~ @.. D v.Jy -s 1 A ~ 15 :t 00 . -- Frame Number ~ompac:104' Pressure • P .S.I. .1oisture , Nater Added, ML (Total) .toist. @ • Compactlon • % 3ross Wl (Sample + Mold) rare Wt (Mold) Nel Welghl ol Briquette • GMS. -telght ol Briquette• Inches :>enSity • Lb. Par Cu. Fl 5tabilometer Ph Al 2000 Lbs. Tums Displacement i=I. value I Uncorr. / ElcudaUon Pressu111 • Pounds Exudation Pressure• P.S.I. Slab. Thick-Feet Eicpansion Pressure Expan. Press. Thick-Feet 4.0 ti 3.0 w u. I m g m 2.0 ~ 1a II) Ill ~ G ~ 1.0 a: § o 0 .. f, _c:; 4- .50 125 200 Orig. Dry 1-,5 55 1t-5 I 1.0 f) 'q II, 0 3.2~3.l 3119.= 32~l 1217'1, 0 ll/6.1 I111M llb6.I 1lb~~ 1166,l 12_~0 2.c;.3 11.51 \ 11./, ll'f.~ 11l,.q )lO 104 9:l 5,05 lf .ti1 4,l) Coo. For Ht. % ~ ~ / J...'J.07 ~J,4q 14-111 11 /, :}..50 17S .t1-,75 ,6 7 0 l 't C>.0 o.o 0' \ EXPANSION PRESSURE CHART ~ . 1.0 2.0 3.0 COVER THICKNESS BV EXPANSION PRESSURE· FEET 1/ .. 4.0 RVALUENO.: RV-80-24 J..4-10~-L JOB NO.:-~-"'?-~~-::..:_~..,.;::.-.----- DATE RECD.: I O - \ - 1-4: TESTED BY: &; CALCULATED BY· Sleva Wt.Rel As Red. As Used 111 112 a3 -%fl Size c-. Cum %? %P Sand 4• 3• Clay 2" S.E. 1¥.t" S.E. • 1• •.4• Batch Wis.· 1200 G v..· ""' Teo·/. 1"·'14" 114 '.4'-""' 118 ""'-ll4 1116 1130 Pass 114 •so Total 11100 11200 Cumulative Weight 1•-•.4• '-''-""" 'Ii"· -4 114 Pass-4 118 4-7 1116 T.I. (Assumed) 1130 .. By Exud.-25 3 ~ 1150 By Expan. -N / A a: 11100 11200 Al Equll. • 1'5 EXUDATION PRESSURE CHART 800 700 600 500 400 300 200 100 0 70 50 • l::l::1t:l:t:t:t:±±ttt:lt:t::t:t±±ttt:lt:t:t::ttttt:lt:Jtjjj:±±±tt:Jt:t 40 • j 30 20 t::~i:l:::t::t::t:l::tt:~i:l:::t::t:t:l::t:t:t:i:l:::t::t:tttt:l:i~i:l:::t::l::t:t::t::t:t:~ 10 0 EXUDATION PRESSURE (PSI) VINJE & MIDDLETON ENGINEERING, INC. 2450 AUTO PARK WAY ESCONDIDO, CALIFORNIA 92029 vinje.middleton@sbcqlobal.net (760) 743-1214 JOB NUMBER CLIENT NAME 24-105-L DATE: 10-18-24 JOB NAME JOB LOCATION STREET NAME STATIONING ADVANCED GEOTECHNICAL SOLUTIONS ADVANCED GEOTECHNICAL SOLUTIONS 2107 -12 PONTO DRIVE PONTO DRIVE 13+30 RV-4 SOIL SAMPLE PROVIDED BY: AGS DATE SUBMITTED TO LABORATORY: 10-14-24 SOIL DESCRIPTION: DARK BROWN FINE-MED SAND R-VALUE REPORT NUMBER: RV-81-24 R VALUE DATA A ___ B ___ C ___ D COMPACTOR PRESSURE -P.S .I . MOISTURE@ COMPACTION -PERCENT DENSITY -POUNDS/CUBIC FOOT R-VALUE-STABILOMETER EXUDATION PRESSURE -P.S.I. COVER THICKNESS BY STABILOMETER (FEET) COVER THICKNESS BY EXPANSION (FEET) T . I . (ASSUMED) BY STABILOMETER@ 300 PSI, EXUD. BY EXPANSION PRESSURE AT EQUILIBRIUM SAND EQUIVALENT 350 10 .2 126.2 61 98 .38 0 .0 4.5 71 N/A 71 I 350 9 .3 125.3 69 235 .30 o.o 350 8 .9 125.4 74 413 .25 0.0 CLIENT: A D~A ~C::f: Q C,WT~HU !C~L,. 5QLli1 ( CJJ 5 RVALUENO.: PROJECT: Qo.U!Q D Ei1 l(QJ -1 l.. JOB NO.: DESCRIPTION: Q~A){ f.29..Ct~J/ rl .4Jt~ J'1.E.9 SAJJV DATE RECD.: LOCATION: ~OM7(J DR, SiAi l~±:?JQ 8~ .. 4--TESTED BY: CALCULATED BY· fl..~ ·---- Frame Number 7 H ~ Sleva WLAel As Red. As Used 111 112 113 Non %A %P %P :ompactor PreSSUfe -P.S.I. 350 350 :,so Size °"" Cum. Sand 4• .lolstur, . Ong . Dry 3• Clay 'lalar Added, ML (Total) 45 ?J.'7 ?,n 2" S.E. 1~• S.E. • .4olsl @ -Compaction -% )0.1 q. 'l, 8,q 1• •.4• Batch Wts. • 1200 G ¼" 3ross Wl (Sample + Mold) 3l13.I lJl75,I 3)}'.),1 D 'Ill" 1001. t•-¾· rare WL {Mold) 1211J..IJ-1.111,q J.lJb, I 114 ·--·~· 118 'lll"-114 Net Weight ol Briquetle • GMS. 1170,7 ll'l-3., 11~4.~ 1116 2.~c; 2.51 7.5'f 1130 Passll4 ~eight ol Briquette -Inches 1150 Total )ensily • U,. Per Cu. Fl 11-b, ;;t_ ,is.:; 125.~ 11100 5labilomlller Ph Al 2000 Lbs. 4-5 2i5 30 11200 Cumulative Weight Tums Displacement ~J I Lt-11 J,f}q 1•.•.4• n. Value I Uncorr. / Feorr. IQK ~ 7),-( / / ¾"•'Ill· orHL ~---4 Exudallon Pressure • Pounds 11:, l 1957 s1qo 114 Pass -4 Exudation Pressure • P.S.I. qa 1-JS 4-13 118 T.I. (Assumed) 4.S 1116 Slab. Thick-Feat :~r; .30 ,l5 1130 .! By Exud .• 71 Expansion Pressure 0 C) 0 1150 ~ By Expan. • t,J /A. a: 11100 71 Expan. Press. Thick-Feet 00 0.0 o.o 11200 Al Equll. • EXPANSION PRESSURE CHART EXUDATION PRESSURE CHART 800 700 600 500 400 300 200 100 0 4,0-+-,..,...,..-r+.....,.....,.....+ ................ 1-.-,,......4-,.....,.....4-,_..,..+,....,...~l-.-..........l lu 3.0 60 w ~ . a: w lu ::::E 0 ~ 2.0 ~ 1/) I tt:JtJjj:t:tttjjtJjj:tittttljjj:fttt:1tjtjjj:t:tttttr 40 • j I > ID C/l 30 Cl) w z :.:: !,2 ~ 1.0 l-l--l~~~-l-l-ll,...l..,4-+-l--l-+--l-l-~-+-l-.a.4--1-1-1~--I-J.--l-l-4-I-~ 20 a: LU > 0 (.) l:l:1t:l:t:t±±:tt:l::i:::l;:t:::t::t:±:t:tt::::l:t:::t:tttt:t:il::1:::l:t::t:t::t::t:tt::::-10 0 0 0 10 2.0 3.0 4.0 COVER THICKNESS BY EXPANSION PRESSURE· FEET EXUDATION PRESSURE (PSIJ October 24, 2024 P/W 2107-12 Report No. 2107-12-B-14 ASPHALT CONCRETE PAVEMENT STRUCTURAL SECTION CALCULATIONS Beach Way Sta. 12+15 to 13+78 (Private) Driveway C Sta. 10+00 to 11+37 (Private) Driveway B Sta. 10+00 to 13+50 (Private) Based on Caltrans Highway Design Manual 6th Ed. (20 year design life) Design Values: SUBGRADE SOILS R-VALUE R = 68 AGGREGATE BASE (AB) R-VALUE R = 78 (Class II or Equivalent) Gf (AB) = 1.1 Design Calculations: Gravel Equivalent (Total) GE (total) = 0.0032 (TI)(100-R) (feet) where TI= Traffic Index, R = R-Value *Includes 0.2 feet added to GE(AC) as a "safety factor" for determining the minimum AC thickness Gravel Factor (Gf) for thickness<0.5feet :Gf = 5.67 / [(TI)^0.5] thickness>0.5feet : Gf = 7.00 * [(t)^1/3)/(TI)^0.5] *Minimum TI=5 USE USE Check TI GE(total)AC GE(AC) Gf(AC) t (AC)AB GE(AB) Gf(AB) t (AB) GE(actual) > GE(total) (feet)(feet)(feet) (feet) (feet)(feet)(feet) (feet) (feet) 5.0 0.51 0.25 0.55 2.54 0.22 0.33 -0.12 1.10 -0.11 1 > 0.51 OK 5.0 0.51 0.33 0.55 2.54 0.22 0.33 -0.33 1.10 -0.30 1.21 > 0.51 OK ADVANCED GEOTECHNICAL SOLUTIONS, INC.PLATE 1 October 24, 2024 P/W 2107-12 Report No. 2107-12-B-14 ASPHALT CONCRETE PAVEMENT STRUCTURAL SECTION CALCULATIONS Driveway C Sta. 11+37 to 15+25 (Private) Based on Caltrans Highway Design Manual 6th Ed. (20 year design life) Design Values: SUBGRADE SOILS R-VALUE R = 56 AGGREGATE BASE (AB) R-VALUE R = 78 (Class II or Equivalent) Gf (AB) = 1.1 Design Calculations: Gravel Equivalent (Total) GE (total) = 0.0032 (TI)(100-R) (feet) where TI= Traffic Index, R = R-Value *Includes 0.2 feet added to GE(AC) as a "safety factor" for determining the minimum AC thickness Gravel Factor (Gf) for thickness<0.5feet :Gf = 5.67 / [(TI)^0.5] thickness>0.5feet : Gf = 7.00 * [(t)^1/3)/(TI)^0.5] *Minimum TI=5 USE USE Check TI GE(total)AC GE(AC) Gf(AC) t (AC)AB GE(AB) Gf(AB) t (AB) GE(actual) > GE(total) (feet)(feet)(feet) (feet) (feet)(feet)(feet) (feet) (feet) 5.0 0.70 0.25 0.55 2.54 0.22 0.33 0.07 1.10 0.06 1 > 0.7 OK 5.0 0.70 0.33 0.55 2.54 0.22 0.33 -0.14 1.10 -0.13 1.21 > 0.7 OK ADVANCED GEOTECHNICAL SOLUTIONS, INC.PLATE 2 October 24, 2024 P/W 2107-12 Report No. 2107-12-B-14 ASPHALT CONCRETE PAVEMENT STRUCTURAL SECTION CALCULATIONS Driveway A (Private) Driveway B Sta. 14+50 to 17+17 (Private) Driveway C Sta. 15+25 to 16+66 (Private) Driveway D (Private) and Driveway E (Private) Based on Caltrans Highway Design Manual 6th Ed. (20 year design life) Design Values: SUBGRADE SOILS R-VALUE R = 25 AGGREGATE BASE (AB) R-VALUE R = 78 (Class II or Equivalent) Gf (AB) = 1.1 Design Calculations: Gravel Equivalent (Total) GE (total) = 0.0032 (TI)(100-R) (feet) where TI= Traffic Index, R = R-Value *Includes 0.2 feet added to GE(AC) as a "safety factor" for determining the minimum AC thickness Gravel Factor (Gf) for thickness<0.5feet :Gf = 5.67 / [(TI)^0.5] thickness>0.5feet : Gf = 7.00 * [(t)^1/3)/(TI)^0.5] *Minimum TI=5 USE USE Check TI GE(total)AC GE(AC) Gf(AC) t (AC)AB GE(AB) Gf(AB) t (AB) GE(actual) > GE(total) (feet)(feet)(feet) (feet) (feet)(feet)(feet) (feet) (feet) 5.0 1.20 0.33 0.55 2.54 0.22 0.33 0.35 1.10 0.32 1.21 > 1.2 OK ADVANCED GEOTECHNICAL SOLUTIONS, INC.PLATE 3 October 24, 2024 P/W 2107-12 Report No. 2107-12-B-14 ASPHALT CONCRETE PAVEMENT STRUCTURAL SECTION CALCULATIONS Ponto Drive Sta. 10+00 to 15+90 (Public) Ponto Road Sta. 10+00 to 12+15 (Public) Based on Caltrans Highway Design Manual 6th Ed. (20 year design life) Design Values: SUBGRADE SOILS R-VALUE R = 71 AGGREGATE BASE (AB) R-VALUE R = 78 (Class II or Equivalent) Gf (AB) = 1.1 Design Calculations: Gravel Equivalent (Total) GE (total) = 0.0032 (TI)(100-R) (feet) where TI= Traffic Index, R = R-Value *Includes 0.2 feet added to GE(AC) as a "safety factor" for determining the minimum AC thickness Gravel Factor (Gf) for thickness<0.5feet :Gf = 5.67 / [(TI)^0.5] thickness>0.5feet : Gf = 7.00 * [(t)^1/3)/(TI)^0.5] *Minimum TI=5 USE USE Check TI GE(total)AC GE(AC) Gf(AC) t (AC)AB GE(AB) Gf(AB) t (AB) GE(actual) > GE(total) (feet)(feet)(feet) (feet) (feet)(feet)(feet) (feet) (feet) 6.0 0.56 0.25 0.62 2.31 0.27 0.33 -0.02 1.10 -0.02 0.95 > 0.56 OK 6.0 0.56 0.33 0.62 2.31 0.27 0.50 -0.21 1.10 -0.20 1.32 > 0.56 OK ADVANCED GEOTECHNICAL SOLUTIONS, INC.PLATE 4 MINIMUM STRUCTURAL SECTION IN INCHES Tl= 1.35 (EWL) T.I 4.5 5.0 Rn 7.0 Rn R "i 9.0 TYPE CUL-DE-LOCAL COLLECTOR LIGHT SECONDARY MAJOR PRIME SUBGRADE SAC STREET INDUSTRIAL ARTERIAL ARTERIAL ARTERIAL R-VALUE AC AB AC AB AC AB AC AB AC AB AC AB AC AB 8 4 7 4 13 4 15 10 4 5 4 18 5 18 6 18 12 4 6 4 12 4 14 14 4 17 5 17 6 17 16 4 4 4 11 4 13 5 16 6 16 18 4 5 4 16 -20 4 10 4 12 4 15 5 15 6 15 -22 6 14 -24 I 4 41 4 9 4 11 4 14 5 14 -26 5 13 6 13 -28 4 8 4 10 4 13 -30 5 12 6 12 -32 4 7 4 9 4 12 6 11 -34 4 11 5 11 -36 I 4 61 4 8 6 10 -38 4 10 5 10 6 9 -40 4 7 5 9 42 4 9 6 8 -44 4 6 5 8 -46 4 8 6 7 -48 5 7 6 6 -50 4 7 5 6 52 -54 4 6 -1. SOILS HAVING AN R VALUE LESS THAN 12 REQUIRE SPECIAL CONSIDERATION. AN ALTERNATIVE TO INCREASING THE STRUCTURAL SECTION IS TO TEST FOR LIME STABILIZATION. THE CORRESPONDING STRUCTURAL SECTION DETERMINED AND % LIME ESTABLISHED. 2. A.8. = ALL AGGREGRATE BASE MATERIALS SHALL BE CLASS II PER CALTRANS SECTION 26-1.02A OR CMS PER SECTION 200-2.4 SSPWC. 3. THE BOTTOM FIGURES LISTED ARE THE MINIMUM PERMITTED. 4. TOP 12» OF SUB-GRADE TO BE 95% COMPACTION. 5. PAVING SHALL BE DONE IN A MINIMUM OF TWO LIFTS WITH THE SURFACE COURSE DONE JUST PRIOR OCCUPANCY. THE BASE COURSE SHALL BE 2.5" MIN. 6. POTABLE, RECLAIMED WATER AND GAS, VALVE BOXES SHALL BE RAISED TO GRADE OR MADE ACCESSIBLE AT EACH PAVING LIFT AS APPROVED BY THE CITY ENGINEER. IF THE SEWER MAIN IS IN SERVICE, THE ACCESSHOLE SHALL BE RAISED TO AT EACH PAVING LIFT. RAISING APPURTENANCES TO FS BEFORE AC CAP WILL NOT BE ALLOWED. RAISING VALVE BOXES, CLEANOUTS OR ACCESSORIES TO FINISH GRADE BEFORE FINISH AC CAP IS PLACED WILL NOT BE ALLOWED. REV. APPROVED DATE CITY OF CARLSBAD ~L6L 6-04 STRUCTURAL SECTION CITY ENGINEER DATE OF STREETS AND ALLEYS SUPPLEMENTAL GS-17 STANDARD NO.