HomeMy WebLinkAboutPD 2023-0004; HILLSIDE PATIO HOMES SLOPE REPAIR; DRAINAGE REPORT; 2024-06-15Office: 858.451.0713 Email: dianed3@cox.net, wjdeberry@cox.net
Cell: 858.472.2783 www.deberryeng.com
'(%(55<(1*,1((5,1*$662&,$7(6,1&
2OG:LQHU\&RXUW3RZD\&DOLIRUQLD
DRAINAGE REPORT HILLSIDE PATIO HOMES
3325 &3327 Vivienda Cir
3311 & 3313 Dorado Pl
Carlsbad, California
Lot 489 US 55 & 56 Carlsbad Tract 72-20 Unit 3
Lot 492 US 130 & 131 Carlsbad Tract 72-20 Unit 3
in the City of Carlsbad
County of San Diego
APN:
223-200-16-55, 223-200-16-56, 223-200-32-26,
223-200-32-27
Project ID: PD 2023 – 0004
PeUPLt ID: GR 2023- 0005 (DWG 541-5A)
December 22, 2022
Updated 7-1-2023
Updated 11-15-2023
PROJECT APPLICANT:
Price, Moore, Curry Walker
PROJECT CONTACT:
DeBerry Engineering Associates, Inc.
William DeBerry
(858) 451-0713
DeBerryEng@gmail.com
Updated1-25-2024
Updated 5-1-2024
8SGDWHG
'(%(55<(1*,1((5,1*$662&,$7(6,1&
Office: 858.451.0713 Email: dianed3@cox.net, DeBerryEng@gmail.com
Cell: 858.472.2783 www.deberryeng.com
2OG:LQHU\&RXUW3RZD\&DOLIRUQLD
-XQH 2024
SUBJECT: Drainage Report
PROJECT:
3325 &3327 Vivienda Cir
3311 & 3313 Dorado Pl
Carlsbad, California
As a part of this slope repair project, a representative of DeBerry Engineering
Associates, Inc. has conducted an investigation of slope failure of the above project
over the period of time from approximately April 2020 through September 2021. As a part
of that investigation, a drainage study to evaluate the anticipated drainage flow on the
slope repair was conducted. The drainage report is prepared in accordance with the San
Diego County Hydrology Manual, June 2003 and City of Carlsbad Engineering Standards
2022.
The following report is understood to be an expression of professional opinion by this
engineer, which is based on his knowledge, information and belief of the conditions
noted at the time of the investigation. As such, it consists of neither a guarantee nor a
warranty, expressed or implied as to the condition of the property or possible defects
which may not have been apparent at the time of the investigation. This report is
provided solely for the exclusive use of the above noted client. If either party becomes
involved in litigation arising as a result of the contents of this report, both parties agree
to mediation through the Better Business Bureau.
We appreciate this opportunity to be of Professional Service to you in this matter. If you
have any questions regarding this report please contact us.
Respectfully Submitted,
DeBerry Engineering Associates
William J. DeBerry, R.C.E. #34545
:LOOLDP-'H%HUU\NO. 34545EXPIRES 09/30/25
OFESSIONA
E
M J DEBE
R
RY
CIVI L
FCALI F O
E
P R
WILLI A
EO
William J DeBerry
'(%(55<(1*,1((5,1*$662&,$7(6,1&
17708 Old Winery Court, Poway, California 92064
Office: 858.451.0713 Email: dianed3@cox.net, wjdeberry@cox.net
Cell: 858.472.2783 www.deberryeng.com
TABLE OF CONTENTS
PURPOSE AND SCOPE: …………………………………………………..…………..… 1
PROJECT DESCRIPTION: …………………………………………………………….… 1
DESIGN METHODOLOGY: ……………………………………………………………… 2
DECLARATION OF RESPONSIBLE CHARGE: ………………………………………. 2
DRAINAGE CALCULATION: ……………………………………………………………...3-5
VICINITY MAP: ……………………………………………………………………………. 6
DRAINAGE AREA MAP: ……………………………………………………………….….7
APPENDIX
Office: 858.451.0713 Email: dianed3@cox.net, DeBerryEng@gmail.com
Cell: 858.472.2783 www.deberryeng.com
3325 &3327 Vivienda Cir
3311 & 3313 Dorado Pl
Page 1
PURPOSE AND SCOPE:
The properties involved are more particularly referred to as Lot 489 US 55 & 56 Carlsbad
Tract 72-20 Unit 3 and Lot 492 US 130 & 131 Carlsbad Tract 72-20 Unit 3, in the City of
Carlsbad, County of San Diego. APNs 252-200-16-55, 223-200-16-56, 223-200-32-26, 223-
200-32-27.
It was indicated that there had been a slope failure on the slope between the Price and
Moore properties at the base of the slope and the Curry and Walker properties at the top of
the slope on April 10, 2020. The primary purpose of this limited Hydrology Study Report is to
identify drainage at the repaired slope areas at the rear of the properties to assess the run-
off potential at the rear of the property. This project does not increase the run-off from the
site.
PROJECT DESCRIPTION:
The subject slope consists of graded topography from a subdivision constructed
approximately1980. Prior to development the natural topography consisted of a slope with a
down to a generally flat plane area at La Costa Ave. The slope has a gradient of
approximately 2:1 (H:V). Grading consisted of cutting house pads at the top of the slope on
Dorado Pl and the base of the slope at Vivienda Cir. There was a concrete drainage swale
near the upper portion of the slope which was damaged in the slide. The scope of the project
is to re-construct the slope between the Price -Moor and the Curry Walker properties with a
reinforced concrete retaining wall with concrete pier supports at the toe of the slope and re
construction of the slope and damaged concrete drainage swale.
CLEAN WATER ACT:
This project is not required to obtain approval from the Regional Water quality Control
Board under the Federal Clean Water Act.
Section 401 of the CWA states: Any applicant for a Federal license or permit to conduct
any activity including, but not limited to, the construction or operation of facilities, which
may result in any discharge into the navigable waters, shall provide the licensing or
permitting agency a certification from the State in which the discharge originates. This
minor grading for a slope repair does not include the construction of operation of facilities
which may result in any discharge into the navigable waters.
Section 404 of the Clean Water Act (CWA) establishes a program to regulate the discharge
of dredged or fill material into waters of the United States, including wetlands. Activities in
waters of the United States regulated under this program include fill for development, water
resource projects (such as dams and levees), infrastructure development (such as
highways and airports) and mining projects. This minor grading for a slope repair does not
include discharge of dredged or fill material into waters of the United States, including
wetlands.
DESIGN METHODOLOGY:
This study was conducted utilizing the Rational Method, (RM) formula for the calculation of the
maximum run-off rate from a given rainfall for intersecting sub basins. It has particular
application in urban storm drainage, where it is used to estimate peak run-off rates from small
urban and rural watersheds for the design of storm drains and small drainage structures.
3325 &3327 Vivienda Cir
3311 & 3313 Dorado Pl
Page 2
Office: 858.451.0713 Email: dianed3@cox.net, DeBerryEng@gmail.com
Cell: 858.472.2783 www.deberryeng.com
Methodology and Data for this report is obtained from the San Diego County Hydrology Manual,
June 2003 and City of Carlsbad Engineering Standards 2022.
This study is conducted to determine the peak run-off from the repaired site area based upon
the 100 year rainfall event, The 100 year rainfall peak run-off determination is used for the
permanent drainage facilities on the site.
The flow calculations are computed from each of two drainage areas. Area A at the top of the
slope behind the Curry-Walker properties to the concrete drainage swale. Area B from the
concrete drainage swale to the retaining wall and drain at the rear of the Price-Moore
properties. The calculations indicate that the flow rate from the drain outlet from the rear slope
is:
A Q100=0.09 Cubic feet per second
B Q100=0.15 Cubic feet per second,
DECLARATION OF RESPONSIBLE CHARGE
I hereby declare that I am the Engineer of work for this project, that I have exercised
responsible charge over the design of the project as defined in section 6703 of the business
and professions code and the design is consistent with current design
William J. DeBerry, R.C.E. #34545 -XQH, 2024 ::LOOLDP-'H%HUU\
NO. 34545EXPIRES 09/30/25
OFESSIONA
E
M J DEBE
R
R
Y
CIVI L
FCALI F O
E
P R
WILLI A
EO
William J DeBerry
DeBerry Engineering Associates Project:
Job #: By: wjd
Phone (858) 451-0713 Date: June 15, 2024 Page: 1 of 3
Project:
Client
Subject: Drainage Calculations
Calculated By: William DeBerry
C 34545
Land use Residential Per Design Manual Conc Time Tc
Soils Group D Drainage Area Intensity Water Course Dist Per Fig 3.3
Q = CIA A 7.02 16 5.25
100 year event, 6hr P6 2.75 B 5.41 36 7.87
Run-off Coefficient C 0.52 Per Table 3-1
Concentration timeTc= 12.00 min
I (intensity) A 7.02 in/hr Per Appendix B
I (intensity)B 5.41 in/hr
Drainage Area sf ac Q100
A 2139.00 0.05 0.18 Cu. Ft per sec
B 3462.00 0.08 0.29 Cu. Ft per sec
FLOW FROM FLOW TO TOTAL Q100 V100
A DRAIN SWALE 0.18 1.08 Ft per sec
B RETAINING WALL 0.29 1.75 Ft per sec
Carlsbad, California 92009
Price, Moore, Walker and Curry
3311 & 3313 Dorado
3325 & 3327 Vivienda
3325 & 3327 Vivienda
CALCULATIONS
DRAINAGE CALCULATION for HYDROLOGY ANALYSIS
DESIGN CRITERIA: SAN DIEGO COUNTY HYDROLOGY MANUAL MODIFIED RATIONAL METHOD
FLOW
Check the Capacity of the Concrete Drainage Swale
Use Manning's Formula: Q=K/n *R^(2/3) * S^(1/2)
Q= Flow in cf/sec
D= depth of water= 8 in = 0.66 ft
d= Diameter of channel = 36"
K= 1.486 Plan Checker
s= slope of channel = 0.017
n= roughness coefficient = 0.016 for concrete lined channel from Civil Engineering Handbook, table 19 Section 4-77
Channel is a circular with depth D = 8" and d = 12"
Q= 4.27 cf/sec
1.08 Ft per sec
Q100 @ concrete = 0.12 0.18<4.27 OK The concrete swale discharges
Thus this drainage ditch will more than handle Q100 to the existing which discharges
to a public street drainage way
Check the Capacity of the Concrete Drainage V ditch at the retaining wall
Use Manning's Formula: Q=K/n * D8/3s1/2
Q= Flow in cf/sec
D= depth of water 0.66 ft
K= 1.74from Civil Engineering Handbook, table 20 Section 4-79
s= slope of channel = 0.017
n= roughness coefficient = 0.016 for concrete lined channel from Civil Engineering Handbook, table 19 Section 4-77
Channel is a V shaped with depth D = 12" and w 30" Q= 2.37
0.29<2.37 OK cf/sec
Thus this drainage ditch will more than handle Q100
Check the Required Size of the Atrium Drain Inlet at the end of the V ditch
Flow into a 6" drain inlet at 0.017 % slope
Calculation to size sd outlet pipe
Flow to Outlet Pipe= 0.29 CuFt / sec
Use Manning Equation:
Diameter of Drain Inlet (ft)= [3.208*(n/Kn)*(Qp/So^0.5)]^3/8
n= 0.016 Manning's roughness coefficient
Kn= 1.49 Constant
Qp= 0.29 CuFt/sec Design discharge
So 0.017 % Local Slope to Pipe
d= 0.38 ft
Drain Inlet size= 4.6 inches 6" inlet is OK
1'
+
/
-
a
6"
3" MIN
3' min
J DRAIN TO MATCH EXISTING
1 1/2" x 1 1/2" 17GAGE STUCCO NETTING.CONCRETE WITH 3" 2500 PSI,
6"
12" min
SDRSD D 75 TYPE D MODIFIED
3" 2500 PSI CONCRETE WITH 1 1/2" X 1 1/2"
17 GAGE STUCCO NETTING
30" +/-
12" MIN 6"
6"
RETAINING WALL
CONCRETE DITCH PER
SDSRD D75
TYPE A3
Page 3 of 3
Check the Required Size of the Drain Outlet Pipe and Sump Pump
Calculation to size sd outlet pipe
Flow to Outlet Pipe=0.29 CuFt / sec
131 Gal/min
Capacity of 3" pipe with .003 roughness is 0.202 cfs
0.202 < 0.29 use 4" pipe
SPBS Series Sump
Pump Battery
Backup 10 EC
67 gpm along with the 6' x 2' sump will handle most of the peak flow. The excess flow will
come out of the top of the sump without damaging the property. This is rare occurrence
7RFRPSOHWHO\FRYHUDOO\HDUHYHQWVZRXOGUHTXLUHWRRODUJHRIDSXPSZKLFKZRXOGQRW
EHIHDVLEOHIRUDUHVLGHQWLDOLQVWDOODWLRQ
266
260262
268 270272274 276
278
260
270
270
280
272274 280276278
282284
288
288
286
280
266
268270272274 276
280
3327 Vivienda CirEXISTING SINGLE FAMILY RESIDENCE
3325 Vivienda CirEXISTING SINGLE FAMILY RESIDENCE
280.5 F
L
268266264262
262264266268270272
274276278280
Rem
o
v
e
S
l
i
d
e
S
o
i
l
TW 261.5BW 258.0
TW 261.5BW 258.0
TW 261.0BW 257.5
TW 262.5BW 258.0
TW 261.0BW 257.5
TW 261.5BW 258.0
282 284286288
D/5
3329 Vivienda Cir
3323 Vivienda Cir
EXISTING SINGLE FAMILY RESIDENCE
EXISTING SINGLE FAMILY RESIDENCE
2:1
S
L
O
P
E
Section A
Section B
Section B
1/4
2/4
3" TRIPLE WALL HDPE DRAIN PI PE2.5 % SLOPE TO DISCHARGE TO GUTTERIE 252.6'
1/4
LAWN A
R
E
A
N
O
H
ARDSCAP
E
2:1 S
L
O
P
E
EXISTING RETAINING WALL TO REMAIN
TOP OF SLOPE288'
288'
289
.
5(P) P
A
T
I
O
290
.
0
290.2
5
288
.
0
290.0
290
.
5
(P)
P
A
T
I
O
(P) PA
T
I
O
FG 255'FL 249.9
FG 255'FL 250'
FG 255'FL 249.7'
FG 255'FL 249'
FG 255'FL 249.65'
FG 255'FL 249.5'
FG 255'FL 249.4'
FG 255'FL 249.2'
1
3
4
1
1
1
3
3
2
4
4
5
IE 253.7
Sump
Sump Pump
Float Switch
Steel Cover
72" +/-
Out flow
Two pump system. Main pump hard wired to house power,secondary pump with batteryback-up in case of power loss
Grade Level
LITTLE GIANTSump/Battery Back-UpSystem: 1/3 (Primary) HP
Cast Iron (Primary)Plastic(Secondary)
Item 48ZJ79 Mfr. Model 506411
SUMP PIT24"Corrugated HDPE Pipe with cover
72" deep
3" TRIPLE WALL HDPE DRAIN PIPE2.5 % SLOPE TO DISCHARGE TO GUTTER
FL 25
5
.
0
FL 251.5
12"
FL 255.1
Sump is Fiberglass
GB-24 X 072-100 with 5/32" wall and floor
thickness By AK Industries Inc or Similar
5/32" fiberglass
5/3
2
"
f
i
b
e
r
g
l
a
s
s
5/3
2
"
f
i
b
e
r
g
l
a
s
s
SPBS Series Sump Pump Battery Backup10EC
Flow/Capacity in liters Per Minute
40 80 120 160 200 240
f7
10 20 30 40 so 60
Flow/Capacity in US Gallons Per Minute
2500 3360 6EC lOEC Head GPM (LPM) GPM (LPM) GPM (LPM) GPM (LPM)
0' 42 (159) 53 (200 6)
5' 29 (109.8) 39 (147.6) 53 (200.6) 67 (253.6)
10' 20 (75.7) 24 (90.8) 50 (189.3) 57 (215.8)
15' 13 (49.2) 42 (159) 54 (204.4)
20' 34 (128.7) 47 (177.9)
30' 28 (106)
3325 &3327 Vivienda Cir
3311 & 3313 Dorado Pl
Page 6
Office: 858.451.0713 Email: dianed3@cox.net, DeBerryEng@gmail.com
Cell: 858.472.2783 www.deberryeng.com
SAN
T
A
F
E
CITY OF ENCINITAS
OCEAN
PACIFIC
BL
V
D
LA COSTA AVE
RA
N
C
H
O
R
E
A
L
C
I
T
Y
O
F
C
A
R
L
S
B
A
D
CANNON
PALOMAR
C
A
R
L
S
B
A
D
A
V
I
A
R
A
PKW
Y
.
AIRPO
R
T
CITY OF OCEANSIDE
I
N
T
E
R
S
T
A
T
E
5
HIGHWAY 78
RD.
EL
CAM
I
N
O
ROA
D
CITY OF VISTA
ROAD
ALGA
ROAD
MARCOSCITY OFSAN
SCALENOT TON
VICINITY MAP
C
O
L
L
E
G
E
B
L
.
CO
L
L
E
G
E
BLV
D
.
XSITE
SITE
3325 &3327 Vivienda Cir
3311 & 3313 Dorado Pl
Page 7
Office: 858.451.0713 Email: dianed3@cox.net, DeBerryEng@gmail.com
Cell: 858.472.2783 www.deberryeng.com
DRAINAGE AREAS
2
6
6
26
0262
26
8
2
7
0
27
2
27
4
27
6
2
7
8
26
0
2
7
0
27
0
28
0
27
2
27
4
28
0
27
6
27
8
28
2
2
8
4
28
8
2
8
8
28
6
2
8
0
266
268
270
272
274 276
280
282
3311 Dorado Pl
EXISTING SINGLE FAMILY RESIDENCE
3313 Dorado Pl
EXISTING SINGLE FAMILY RESIDENCE
3327 Vivienda Cir
EXISTING SINGLE FAMILY RESIDENCE
3327 Vivienda Cir
EXISTING SINGLE FAMILY RESIDENCE
280
.
5
F
L
284
26
8
2
6
626
426
2
26
2
26
4
26
6
26
8
27
0
27
2
27
4
27
6
28
0
28
0
Remove Slide Solil
Re
m
o
v
e
S
l
i
d
e
S
o
l
i
l
TW 261.5BW 258.0
TW 261.5BW 258.0
TW 261.0BW 257.5
TW 262.5BW 258.0
TW 261.0BW 257.5
TW 261.5BW 258.0
0510 10 20
AREA B NO
R
T
H
AREA A
Q= 0.18 ft per secV= 1.08 ft per sec
Q= 0.29 ft per secV= 1.75 ft per sec
---
$SSHQGL[
San Diego County Hydrology Manual
Date: June 2003
Table 3-1
Section:
Page:
RUNOFF COEFFICIENTS FOR URBAN AREAS
Land Use Runoff Coefficient "C"
Soil T e
NRCS Eleme.nts County Elements ¾IMPER. A B
Undisnirbed Nantral Terrain (Natural) Permanent Open Space O* 0.20 0.25
Low Density Residential (LDR) Residential, LO DU/A or less 10 0.27 0.32
Low Density Residential (LDR) Residential, 2.0 DU/A or less 20 0.34 0.38
Low Density Residential (LDR) Residential, 2.9 DU/A or less 25 0.38 0.41
MediUlll De.nsity Residential (MDR) Residential, 4 .3 DU/A or less 30 0.41 0.45
Medium Density Residential (MDR) Residential, 7.3 DU/A or less 40 0.48 051
Medium Density Residential (MDR) Residential, 10.9 DU/A or less 45 0.52 054
MediUlll Density Residential (MDR) Residential, 14.5 DU/A or less 50 0.55 058
High Density Residential (HDR) Residential, 24.0 DU/A or less 65 0.66 0.67
High Density Residential (HDR) Residential, 43.0 DU/A or less 80 0.76 0.77
Commercial/Industrial (N. Com) Neighborhood Commercial 80 0.76 0.77
Commercial/Industrial (G. Com) General Commercial 85 0.80 0.80
Comme.rcial/Industrial (O.P. Com) Office Professional/Commercial 90 0.83 0.84
Commercial/Industrial (Limited I.) Lintited Industrial 90 0.83 0.84
Commercial/Industrial (General I.) General Industrial 95 0.87 0.87
3
6 of 26
C D
0.30 0.35
0.36 0.41
0.42 0.46
0.45 0.49
0.48 0.52
054 0.57
057 0.60
0.60 0.63
0.69 0.71
0.78 0.79
0.78 0.79
0.81 0.82
0.84 0.85
0.84 0.85
0.87 0.87
*The values associated with 0% in1pervious may be used for direct calculation of the mnoff coefficient as described in Section 3.1.2 (representing the pervious mnoff
coefficient, Cp, for the soil type), or for areas that will remain undisntrbed in perpetuity. Justification must be given that the area will remain nanual forever (e.g., the area
is located in Cleveland National Forest).
DU/A = dwelling units per acre
NRCS = National Resources Conservation Service
3-6
10.0
9.0
8.0
7.0
6.0
5.0
4.0
3.0
2.0
0.5
0.4
0.3
0.2
0.1
' '' -.... ' .... I'-..
' '' ' ....... ~ ' r-.. • ' ' .... i-. .... r,.. .... r-.... r-
'
r-.. .... ' i-.,.... . ' "', ~~' r-.. ... -·, ... ~ ' ~ ~ ·, "' ... ~ ~ ... ' . ' '
... i-. "'~ ~
I',. ..... ...... i-., ~,
.... ~
r-..' ..... I= 3.2 in/hr r-~,
~
... ' ' '"' ~
... ' ....
...... .... ~ ~~
r-.. .... ' .... ,, '
...... ~,
i--...
' 'r-'r-~~
le= 20 min
I I I I I I 11
11111111 . 5 6 7 8 9 10 1S 20 30
Minutes
~ I
~
~
I
~
40 50
Duration
EQUATION
I = 7.44 P5 o-0·645
I = Intensity (in/hr)
P5 = 6-Hour Precipitation (in)
D = Duration (min)
~ .....
i-. ... i-. .... "', . ' i-.' r-r,. ' ' ' ~ '
' i-.' .... r-r-~ • ~
' ' r-r,. ~~ ~ ~ ' r-, r..., r...,
r-"'
~ ~ . '
' ' r-
-i.... .......
I'-. ' -~ . I', "', ~
'r,. ~
' r-' I
' ~
'r,,
r..., '
t--, ~
2 3 4
Hours
-
S 6
'?' I
~
"O
al (')
601
5.5 c:
5.0 g
4.5 5'
(')
4.0 16
3.5 .!!!..
3.0
2.5
2.0
1.5
1.0
Intensity-Duration Design Chart • Example
Directions for Appllcatlon:
(1) From precipitation maps determine 6 hr and 24 hr amounts
for the selected frequency. These maps are included in the
County Hydrology Manual (10, 50, and 100 yr maps included
in the Design and Procedure Manual).
(2) Adjust 6 hr precipitation (if necessary) so that it is within
the range of 45% to 65% of the 24 hr precipitation (not
applicaple to Desert).
(3) Plot 6 hr precipitation on the right side of the chart.
(4) Draw a line through the point parallel to the plotted lines .
(5) This line is the intensity-duration curve for the location
being analyzed.
Application Form:
(a) Selected frequency~ year
p
(b) Ps = _3_ in, P24 = ~ 'P 6 = ~ %(2)
24
(c) Adjusted p6<2> = _3_ in.
(d) lx = ~ min.
(e) I = -11.._ in./hr .
Note: This chart replaces the Intensity-Duration-Frequency
curves used since 1965.
PS 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6
Duration" I I -r--, I ,--,--,--, 7 I
5 2.63_ 3.95 5.27 6.59 7.90 9.22 10.54 11.86 13.17 14.49 15.81 --7 2.12 3.18 4.24 5.30 6.36 7.42 8.48 9.54 10.60 11.66 12.72
10 1.68 2.53 ~3.3?_ _i.21 5.05 5.90 6.74 7.58 8.42 ~7 10.11 --,5 1.30 1.95 2.59 3.24 3.89 4.54 5.19 5.84 6.49 7.13 7.78
20 1.08 1.62 2.15 2.69 3.23 3.77 4.31 4.85 5.39 _5.93 6.46
25 0.93 1.40 1.87 2.33 2.80 3.27 3.73 4.20 4.67 5.13 5.60
30 0.83_ .1,_2~ j,_66_ _2~0L ._2.49 2.90 3.32 3.73 4.15 4.56 4.98_ ~ 0.69 1.03 1.38 1.72 2.07 2.41 2.76 3.10 3.45 3.79 4.13
so 0.60 0.90 1.19 1.49 1.79 '2.09 2.3f 2.69 2.98 3.28 3.58
60 0.53 0.80 1.06 1.33 1.59 1.86 2.12 2.39 2.65 2.92 3.18
90 0.41 0.61 -0.82 I.Of T.23· 1.43 7.63 1.84 2.04 -2.25-'2.45
120 0.34 0.51 _0.5!! 0.85 1.02 1.19 1.36 1.53 1.70 1.87 2.04
150 0.29-o.« 0.59 0.73· 0.88 1.03 1.18 1.32 1..47 1.62-"T.76
180 0.26 0.39 0.52 0.65 0.78 0.91 1.04 1.18 1.31 1.44 1.57
24() 0.22 0.33 0.43 0.54 0.65 0.76 0.87 0.98 1.08 1.19 1.30
300 0.19 0.28 0.38 0.47 0.56 0.66 0.75 0.85 0.94 1.03 1.13
360 0.17 0.25 0.33 0.42 0.50 0.58 0.67 0.75 0.84 0.92 1.00
I-w w LL z
w (.) z < I-(/)
cS
w Cl)
a:::
:::> 0 (.)
a::: w .... <
:s:
2.50% slope
2.0 -+------l-'-111'
100 l--_J1~-5q ~==::1;:~~~~-
0
EXAMPLE:
Given: Watercourse Distance (D) = 70 Feet
Slope (s) = 1.3 %
Runoff Coefficient (C) = 0.41
Overland Flow Time (T} = 9.5 Minutes
SOURCE: Airport Drainage, Federal Aviation Administration, 1965
T = 1.8(1 .1-C)VD
3lfs
20
10
(/) w I-
:::> z
~
z
w ~ I-
:s: 0 ...J LL
0 z < ...J a: w > 0
FIGU R E
Rational Formula -Overland Time of Flow Nomograph 3-3
FLOW WITH A FREE SURFACE ~77
Manning proposed the following val f • uc O c m the Chezy
1 .486r~6
c =---n (15 1)
. thr ~me coeffi cient of roughn ci,s used in the carlic G •1
, 11 1~ d b H . r angu1 let-Kutter fo
«hr\ \'lllurs of 11 prepare • Y orton 3 are given in Table 19. r-
n111l~-
19 f{o RroN's VAL ES OF n TO BE UsEo WITH TLI E M F
f\l!l,E '· ' ANNINO ORM ULA
Surface Best Good Fair Bad
--
. .0-1'(! ~ewer pipe ........ • • .............. {0.010} 0.013 •
I 1i1 '
0.011 0.015 0.017
. C1n-da,· drainage tile ................. 0.011 0.012 • 0.014 • 0.017
l ,1ni0l . • . k ·1 d bnc-kwor .......................... 0.011 0.012 0.013 • 0.015
F~'i:{ in cement mortar; brick sewers ........ 0.012 0.013 0.015 * 0.0 17
x~; cement surfaces ...................... 0.010 0.011 0.012 0.013
L°fnieni m~rtar surfaces ..............•..... 0.011 0.012 0.013 • 0.015
·0ncret e p1 pe: .. • . • • • • • • • · • • • • . . . . . . . . • • • . 0.012 0.013 0.015 • 0.01 6
l\(lOO~taVe p1pe .. · . · • • • • • • • •••••••••••••• 0.010 0.011 0.012 0.013
p18nk Burnes:
Planed . . . · · · · · · · · · • • • • • • • • • •••••••••• 0.010 0.012 • 0.013 0.014
[nolaned ............................... 0.011 0.013 • 0.014 0.015
\Yiih battens .........................•. 0.012 0.015 • 0.016
Concrete-lined channels .................... 0.012 0.014 • 0.016 * 0.018
Lement-rubble surface ..................... 0.017 0.020 0.025 0.030
Dry-rubb le surface ......................... 0.025 0.030 0.033 0.035
Dressed-ashlar surface ..................... 0.013 0.014 0.015 0.017
::emicircular metal flumes, smooth ........... 0.011 0.012 0.013 0.01 5
corrugated. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.0225 0.025 0.0275 0.030
Canals and ditches:
l:ar h • h d ·r 0.017 0.020 0.0225 • 0.025
1 , straig t an uru orm ...............
P~k cuts, smooth and uniform ........... 0.025 0.030 0.033 * 0.035
\\p~ed and irregular ................. -• 0.035 0.040 0.045
D mdrn~ sl uggish canals .................• 0.0225 0.025 * 0.0275 0.030
(; redge earth channels .................. 0 .025 0.0275 • 0.030 0.033
anals with rough stony beds weeds on
~tt!tnks ........ · ........ '. .......... 0.025 0.030 0.035 • 0.040
~at I tom, rubble sides ..........•.••• 0.028 0.030 * 0.033 • 0.035
• 1 ur~ stream ~hannels: .
• ~lt:an, straight bank full stage, no nfts or 0.025 0.0275 0.030 0.033
2 8 eep pools . . . . . . . . '. . . . . . . . . . . . . . . . • • •
i \\~_me _as 1, but some weeds and stones ••• 0.030 0.033 0.035 0.040
4. S inding, some pools and shoals, clean ... 0.033 0.035 0.040 0.0-15
• slame as 3, lower stages more ineffective 0.045 0.050 0.055
ope and • ' 0.040 5. Sam sections ...............••••••
G S e as 3, some weeds and stones• ...... 0.035 0.040 0.045 0.050
• ame 0.045 0.050 0.055 0.060
7. SI .as 4, stony sections ........••••••
....,.uthggish river reaches rather weedy or 0.070 0.080
8 1 ver d ' 0.050 0.060
. Very Y eep pools . . . . . . . . • • • • • • • • • • 0.075 0.100 0.125 0.150
weedy reaches ............ • • • • • • •
• v. ijlul:6
--comrnonlv uPod in d pq-ianiDK•