Loading...
HomeMy WebLinkAbout2813 CEBU PL; ; CBR2022-2330; Recycle{'Cityof Carlsbad CONSTRUCTION WASTE MANAGEMENT PLAN B-59 Development Services Building Division 1635 Faraday Avenue 442-339-2719 www.carlsbadca.gov APPLICABLE TO NEW CONSTRUCTION, ALL RESIDENTIAL ADDITIONS AND ALTERATIONS AND COMMERCIAL ADDITIONS AND ALTERATIONS OVER $200K. If you have questions about the recycling requirement or completing this form, please contact Republic Services at (760) 332-6464 a certified C&D recycler, or the Carlsbad Building Division at (442) 339-2700. Please note: Unless you are self-hauling, Republic Services or approved haulers must be used for all construction projects within the City of Carlsbad. PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued without a completed Construction Waste Management Plan. Applicant Information Manufactured Home ADU PermitNo.L~}\2022. -Z330,rojectTitle Project Address 2813 Cebu Place APN 215-320-30-02 Ch. T Owner Applicant Name __ l_n __ u ____________ l~I Last First Other □ Applicant Address 2809 Cebu Place Phone (760 ) 458-7337 / !!:t -E-mail Address cytucivic@gmail.com/lenskab@gmail.com Applicant Mailing Address _1_n_-_O._B_i_~---------------------- (if different than project address) Project Type (check all that apply): Residential ~ Commercial □ Brief Description Manufactured Home as ADU (40x20 ft) Public Building □ Project Size 800 Estimated Cost of Project $_2_7_5_,_0_0_0 ___________ _ (square footage) Please check the appropriate box: I plan on using REPUBLIC SERVICES roll-off bin{s) for all materials and will provide all receipts after construction. I plan on using a City Approved Hauler and will provide all receipts after construction. This is a proposed LEED certified project and I plan on separating materials on site in conjunction with Republic Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information provided in and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge and belief. Page 1 of 3 Rev. 05122 PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will (cont'd) not be issued without a completed Construction Waste Management Plan. DEBRIS RECYCLING ESTIMATE: SECTION A Permit No. CBM 2022-0011 Project Title Manufactured HOme ADU Project Address 2813 Cebu Place APN 250-320-30-02 Applicant Name_C_h_in_T_u _________________ Phone 7p0 )458-7337 Last First SECTION B Complete the following table with estimated waste tonnage to be generated by your project. This is your plan for construction waste management. Changes can be made on the final recycle report. Goal: the diversion rate shall be 65% by weights of debris. A B C Material Type Estimated Place a (u) check Place a (u) check next Place a (u) check next Waste Quantity next to items to be to items to be to items to be (tons) reused or salvaged recycled disposed at landfill Complete this line of the table only if only using WASTE MANAGEMENT roll-off bins. 0-off site built Mixed C&D Debris □ □ □ Asphalt & Concrete 0 □ □ □ Brick/ Masonry / Tile 0 □ □ □ Mixed Inert Debris 0 □ □ □ cabinets, Doors, Fixtures, 0 □ □ □ Windows (circle all that apply) carpet □ □ Carpet Padding/ Foam □ cardboard □ Ceiling Tile (acoustic) □ □ □ Drywall (used, new, scrap) □ □ Landscape Debris (brush, trees, □ □ □ stumps, etc.) No dirt. Unpainted Wood & Pallets □ □ □ Roofing Materials □ □ □ Scrap Metal □ □ □ Stucco Other: □ □ □ TOTAL = SECTION C To meet 65% Diversion Requirement (estimate) o _________ x 0.65 = ___________ tons Total Estimated Waste from above Minimum Required Diversion Page 2 of 4 Rev. 05122