Loading...
HomeMy WebLinkAbout2025-03-18; City Council; Resolution 2025-067Exhibit 2 RESOLUTION NO. 2025-067 . A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, AUTHORIZING REVISION OF THE STRIPING PLANS ON EL FUERTE STREET FROM RANCHO PANCHO TO FARADAY AVENUE TO PROVIDE TWO VEHICLE LANES IN EACH DIRECTION, RESTRIPING TO THE CITY’S CURRENT STANDARD OPERATING PROCEDURE FOR LANE WIDTHS WHEREAS, the City Council of the City of Carlsbad, California, has determined it necessary, desirable and in the public interest to resurface various city streets as part of the city’s pavement management program; and WHEREAS, on May 14, 2024, the City Council adopted Resolution No. 2024-101, approving the plans, specifications and contract documents, authorizing advertisement for construction bids for the 2023 Slurry Seal Project, Capital Improvement Program, or CIP, Project No. 6001-23SS, and approving a lane reconfiguration on El Fuerte Street; and WHEREAS, on March 4, 2025, the City Council requested that the City Manager provide options on striping plans on El Fuerte Street; and WHEREAS, on March 18, 2025, the City Council reviewed three options and selected Option 2 to revise the striping plans on El Fuerte Street from Rancho Pancho to Faraday Avenue to provide two vehicle lanes in each direction, restriping to the city’s current standard operating procedure for lane widths; and WHEREAS, the proposed option will be funded with the construction contract contingency so no additional appropriation is required. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1.That the above recitations are true and correct. 2.That the proposed action of revising striping plans for construction of the slurry seal project is categorically exempt from environmental review under CEQA Guidelines Section 15301 because it involves the maintenance, repair or minor alteration of existing facilities with negligible or no expansion of the existing or former use. No exceptions to the categorical exemption as set forth in CEQA Guidelines Section 15300.2 or Carlsbad Municipal Code 19.04.070(C) apply. March 18, 2025 Item #11 Page 9 of 48 uocus1gn t:nve1ope 1u: /U!:l t !:ltl 1 1-11-t-t:1 40!:IJ-tlL IL-Jt:ooobbJ t JJt: 3. That the proposed revisions to the striping plans of the 2023 Slurry Seal Project, CIP Project No. 6001-2355, on El Fuerte Street from Rancho Pancho to Faraday Avenue to provide two vehicle lanes in each direction, restriping to the city's current standard operating procedure for lane widths, are approved. 4. That the City Manager, or a designee, is authorized to revise the plans, specifications and contract documents for construction of the 2023 Slurry Seal Project in accordance with this resolution, proceed with construction of the revised design, and return to the City Council at a later date for the City Council to approve the revised design for the record. PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 18th day of March, 2025, by the following vote, to wit: AYES: NAYS: ABSTAIN: ABSENT: March 18, 2025 Blackburn, Bhat-Patel, Acosta, Burkholder, Shin. None. None. None. KEITH BLACKBURN, Mayor SHERRY FREISINGER, City Clerk (SEAL) Item #11 Page 10 of 48