HomeMy WebLinkAboutPD 2024-0012; CARRILLO ELEMENTARY SCHOOL; DRAINAGE STUDY FOR CARRILOO ELEMENTARY SCHOOL; 2024-10-28DRAINAGE STUDY FOR Carrillo Elementary School 2875 Poinsettia Lane Carlsbad, CA 92009 Project ID: PD2024-0012, DWG548-4A, GR2024-0014, APN: 222-011-11, 222-011-15 Prepared for: SWS Engineering, Inc. 1635 Lake San Marcos Drive, Suite 200 San Marcos, CA 92078 Engineer: SWS Engineerina:, Inc. 1635 Lake San Marcos Drive, Suite 200 San Marcos, California 92078 760-7 44-0011 PN: 24-172 I HEREBY DECLARE THAT I AM THE ENGINEER OF WORK FOR THIS PROJECT, THAT I HAVE EXERCISED RESPONSIBLE CHARGE OVER THE DESIGN OF THE PROJECT AS DEFINED IN SECTION 6703 OF THE BUSINESS AND PROFESSIONAL CODE, AND THAT THE DESIGN IN CONSISTENT WITH CURRENT STANDARDS. I UNDERSTAND THAT THE CHECK OF PROJECT DRAWINGS AND SPECIFICATIONS BY THE COUNTY OF SAN DIEGO IS ONFINED TO A REVIEW ONLY AND DOES NOT RELIEVE ME, AS ENGIN RK, OF MY RESPONSIBILITIES FOR THE PROJECT DESIGN. Prepare Date 7/3/2024 8/29/2024 10/28/2024 Comments 1st 2nd 3rd Associated General Contractors - i - County of San Diego TABLE OF CONTENTS 1.0 PROJECT DESCRIPTION ................................................................................................... 1 2.0 PURPOSE ............................................................................................................................ 1 3.0 METHODOLOGY ................................................................................................................. 1 4.0 HYDROLOGY ...................................................................................................................... 2 4.1 Pre-Development Condition ..................................................................................... 2 4.2 Post-Development Conditions ................................................................................. 3 4.3 FEMA NFIP ................................................................................................................. 3 5.0 CONCLUSION ..................................................................................................................... 4 APPENDICES Appendix A – Reference Charts Table 3-1 – Runoff Coefficients for Urban Areas Figure 3-1 – Intensity- Duration Design Chart Soil Hydrologic Groups Map 100 Year Rainfall Event – 6 Hours (P6 Rainfall Isopluvials) 100 Year Rainfall Event – 24 Hours (P24 Rainfall Isopluvials Appendix B – Pre-Development Hydrology Calculations Appendix C – Post-Development Hydrology Calculations Appendix D – Hydraulic Analysis EXHIBITS Exhibit “A” – Pre-Development Hydrology Map Exhibit “B” – Post-Development Hydrology Map Carrillo Elementary School - 3 - City of Carlsbad 1.0 PROJECT DESCRIPTION The proposed redevelopment project is a portion of the total 9.76 ac of two parcels that is located southeast of Poinsettia Lane and southwest of Melrose Drive in the City of Carlsbad, California. The redevelopment site consists of playground asphalt replacement, ADA/Path of travel improvement, new artificial turf (impermeable) in place of the existing grass field, and associated storm drain improvements, including inlets, grates, retaining walls and a treatment basin. The drainage study area is 4.97 ac, of which 1.35 ac is undisturbed slopes area that the runoff from them will bypass the disturbed area via proposed storm drain systems into the existing system located on the south portion of the site. The site has a current and future land use of Elementary School (Code 6806). 2.0 PURPOSE The purpose of this study is to determine the peak runoff rates and velocities for the pre- development and post-development conditions. Comparisons will be made between each condition to determine the extent of the effects of the proposed improvements on site drainage and adjacent properties. The adequacy of proposed conveyance facilities will also be determined. Carrillo Elementary School - 4 - City of Carlsbad 3.0 METHODOLOGY The Rational Method as outlined in the San Diego County Hydrology Manual, dated June 2003, was used to determine the runoff flow rate. The 100-year frequency storm event was analyzed to determine peak runoff rates discharging the site for both the existing and post-development condition. Soil type was determined to be type C from the Soil Hydrologic Groups map, NRCS Web Soil Survey (see Appendix A). Per the Web Soil Survey, the site has Altamont clay, Las Posas stony fine sandy loam, and Salinas clay, with slopes ranging from 0-30 percent. The runoff coefficient “C” was determined by using the closest matching land use category in Table 3-1 (Appendix A). The exhibits have been prepared for the pre-development and post-development conditions and are attached as Exhibits “A” and “B”. Runoff coefficients, “C” are summarized below.  Pre-Development: C Coefficient has been selected as follow: o Pervious area, C = 0.30 (sold type C) basins 1 & 3 o Impervious area, Weighted C = 0.89 (basins 1&2), major basins (User Entry Option was used) o Impervious area, C = 0.87 (basins 1-2) initial basins only o For basins with pervious and impervious areas, the weighted C Coefficient was used. Since the CivilD software does not have “User Entry Option” for desire C input, therefore for the initial basins being %100 impervious, the ultimate C Coefficient 0.87 (for 95% impervious is 0.87, for all soil type) was selected.  Post-Development C Coefficient has been selected as follow: o Impervious area, C = 0.87 (basins 1-7) initial basins only o Impervious area, Weighted C = 0.89 (basins 1-7), major basins (User Entry Option was used) o For basins with pervious and impervious areas, the weighted C Coefficient was used. Since the CivilD software does not have “User Entry Option” for desire C input, therefore for the initial basins being %100 impervious, the ultimate C Coefficient 0.87 (for 95% impervious is 0.87, for all soil type) was selected. o Pervious area, C = 0.30 (soil type C) (basins 8 and 9) 4.0 HYDROLOGY 4.1 Pre-Development Conditions The project is situated on two parcels of total area 9.76 ac, with the project boundary capturing 4.97 acres of the total area. The site slopes range from 0-30%. Runoff from Basin 1 of the project site will surface flow from the northwest area of the project site in the southeasterly direction, where it is captured by existing on-site storm drain inlets and routed off-site. Runoff from Basin 2 located on the southeast of the site will similarly surface flow in the southerly direction from roof tops into an existing inlet prior to discharging offsite. Runoff from Basin 3 of the project site will surface flow from the northeast area of the project site in the southerly Carrillo Elementary School - 5 - City of Carlsbad direction into existing onsite and then into public storm drain systems before discharging into San Marcos Creek, then Batiquitos Lagoon and ultimately into the Pacific Ocean. There is no offsite run-on in the existing condition. A pre-development hydrology map delineating basin areas, flow paths, and concentration points has been prepared and is attached to this report as Exhibit “A”. Pre-Development hydrology calculations can be found in Appendix “B”. 4.2 Post-Development Conditions The proposed site will consist of the replacement of the existing playground asphalt and grass field with new asphalt and artificial turf, as well as storm drain improvements such as inlets, grates, ADA/Path of travel improvement and a bioretention treatment basin. The project site is situated on two parcels with a total area 9.76 ac, although the drainage study area includes only 4.97 of which 1.35 ac is undisturbed slopes area that the runoff from them will bypass the disturbed area via proposed storm drain systems into the existing system located on the south portion of the site. The parcel is located southeast of Poinsettia Lane and southwest of Melrose Drive in the City of Carlsbad, California. The proposed site drainage from Basin 1 will surface flow south where it will enter the proposed on-site storm drain system via proposed catch basins situated along the low-points of the landscaped slope. The runoff collected from Basin 1 will be routed south, bypassing the proposed bioretention basin and connecting with the existing storm drain system on the site. Similarly, proposed site drainage from Basin 2 will surface flow south and enter the proposed on-site storm drain system via proposed catch basins on the northeastern side of the site. Runoff from Basin 2 will also be routed towards the existing storm drain system, bypassing the proposed bioretention basin. Site drainage from Basins 1-7 will surface flow in the southeasterly direction, where it will enter into proposed bioretention basin for treatment via existing and proposed inlets and storm drain systems. After treatment, the drainage from Basins 1-7 will enter the existing storm drain system on the site, where it will confluence with the untreated flows from Basins 1 and 2. All the runoff from the site will discharge into San Marcos Creek, then Batiquitos Lagoon and ultimately into Pacific Ocean. This drainage analysis has included runoff from the existing rooftop areas within the basins-1-6 that drain into treatment basin in exchange to the runoff discharging from the hard court area, ADA and path of travel improvement located on the southwest portion of the site. The proposed project site will have an increase in flow compared to the existing condition due to the coefficient C. There is no offsite run-on in the post-condition. A post-development hydrology map delineating basin area, flow paths, concentration points, and proposed drainage facilities has been prepared and is attached to this report as Exhibit “B”. Post-development hydrology calculations can be found in Appendix C. 4.2 FEMA NFIP Per FEMA-NFIP Map (Panel 1055, Map Number 06073C-1055G), the project is located within Zone X (Areas determined to be outside the 0.2% annual chance floodplain). Carrillo Elementary School - 6 - City of Carlsbad 5.0 CONCLUSION The proposed project will change the flow patterns from that of the pre-developed site. Development of the project site will increase the runoff from the pre-developed condition with the addition of imperviousness which by implementing the biofiltration basin, the post runoff will be reduced below the exiting runoff. Table 1 provides a summary of the pre-development areas and flows. Table 2 provides a summary of the post-development areas and flows. Table 3 provides a comparison between the Q for the pre and post-development conditions. Tables 4 and 5 provides the attenuated Q and pre & post comparison respectfully. Table 1 – Pre-Development Areas and Flows Table 2 – Post-Development Areas and Flows *Construction of one biofiltration basin in Basin 700, will reduce the post Q from basins 100-700. The Q before attenuation is: 24.19 cfs (See note on the post calculation) **Q from the confluence points of all basins 100-900 (node 911) prior to discharging into proposed 24-inch pipe system (before attenuation) Table 3 – Increase in Q Between Pre and Post-Condition Basins Area Pre (ac) Pre Q100 (cfs) 100 1.87 11.38 200 0.25 1.69 300 2.85 6.65 Total 4.97 19.72 Basins Area Post (ac) Post Q100 (cfs) 100 0.49 3.37* 200 0.22 1.49* 300 0.58 3.98* 400 0.15 0.94* 500 0.09 0.61* 600 0.25 1.69* 700 1.84 12.68* 800 0.75 1.75 900 0.60 1.40 Total 4.97 26.42** Condition Total Q100 (cfs) Pre-Development 19.72 Post Development (basins 1-9) 26.42 Increased Q ± (cfs) +6.7 Carrillo Elementary School - 7 - City of Carlsbad Table 4 –Q after attenuation in Basins 3-4 Table 5 –final Q comparison between pre and post Condition After the attenuation analysis, the Q discharging from the study area in post condition is reduced to much lower Q compared to existing area using the biofiltration basin. The biofiltration basin has a total depth of 2’. In the attenuation analysis, only surface storage of 1.5’ depth (storage above the riser structure to the top of the berm) has been considered. Storage from the bottom of the surface basin to top of the riser height (0.5’) is provided for the required water quality treatment control volume (DCV). In the attenuated analysis, the underground basin layers depth and surface depth have been modeled for the purpose of using the elevation for the proposed outlet pipe and riser. The volume for the underground layers as well as the surface storage to top of the riser structure have been ignored and only used dummy low numbers for the adequate modeling. The result shows the there is about 0.33’ free board from the 100yr water surface elevation to the top of the basin’s berm. There is further free board from top of the berm to the downstream system and project building footprint in case of flooding. Note: All the elevation used in drainage, attenuation and pipe analysis is based on City of Carlsbad Datum (NGVD29) Condition Total Q100 (cfs) Attenuated Q from basins (1-7) 8.47 Q from Basins (8-9) 3.07 Total Q discharging from basins (1-7) + bypass basins (8-9) into proposed 24” pipe system 11.54 Condition Total Q100 (cfs) Pre-Development 19.72 Post Development 11.54 Q ± (cfs) -8.18 Carrillo Elementary School - 8 - City of Carlsbad REFERENCES CivilDesign Corporation. San Diego County Rational Method. (Software Version 7.7) County of San Diego Department of Public Works Flood Control Section. San Diego County Hydrology Manual. (2003) County of San Diego Department of Public Works Flood Control Section. San Diego County Drainage Design Manual. (2005) Hydrologic Soil Group—San Diego County Area, California Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 5/6/2024 Page 1 of 4 36 6 4 7 0 0 36 6 4 7 3 0 36 6 4 7 6 0 36 6 4 7 9 0 36 6 4 8 2 0 36 6 4 8 5 0 36 6 4 8 8 0 36 6 4 9 1 0 36 6 4 7 0 0 36 6 4 7 3 0 36 6 4 7 6 0 36 6 4 7 9 0 36 6 4 8 2 0 36 6 4 8 5 0 36 6 4 8 8 0 36 6 4 9 1 0 477660 477690 477720 477750 477780 477810 477840 477870 477900 477930 477960 477990 477660 477690 477720 477750 477780 477810 477840 477870 477900 477930 477960 477990 33° 7' 21'' N 11 7 ° 1 4 ' 2 2 ' ' W 33° 7' 21'' N 11 7 ° 1 4 ' 9 ' ' W 33° 7' 14'' N 11 7 ° 1 4 ' 2 2 ' ' W 33° 7' 14'' N 11 7 ° 1 4 ' 9 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 11N WGS84 0 50 100 200 300 Feet 0 20 40 80 120 Meters Map Scale: 1:1,530 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: San Diego County Area, California Survey Area Data: Version 19, Aug 30, 2023 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Mar 14, 2022—Mar 17, 2022 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—San Diego County Area, California Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 5/6/2024 Page 2 of 4 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI AtD Altamont clay, 9 to 15 percent slopes, warm MAAT, MLRA 20 C 1.0 22.2% LrE Las Posas stony fine sandy loam, 9 to 30 percent slopes C 2.8 61.4% ScA Salinas clay, 0 to 2 percent slopes C 0.8 16.4% Totals for Area of Interest 4.6 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Hydrologic Soil Group—San Diego County Area, California Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 5/6/2024 Page 3 of 4 Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—San Diego County Area, California Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 5/6/2024 Page 4 of 4 t-·····t·--·+····+···+···+·--+---J-l---+--+--l----1---.. ... ... ... ...... . .... ... .. ...... ...... . ......................................... . ! t--t--+--+--+···+···+·····+· .............................. -----··l--+--+--+--+----+--·· ....................................................................... ····-······ ' t·--·--l·······l·······I·····+·--·+····+····+··· •• •••••• • .. ······· ... U) ·· ··· ··· ···· · ...... ··· ··· ······ ······ ··· ··· ······· · ···· ······· .... · ······· ······· · C) · ···ih v m ~ t--+--+-+--+--+-'~ .. ... .. ..... . .... ...... .... . .. .... ....... ..... ....... ... ... ..... ....... ... ····fp···•·····+···+-····+····+····+-·····t---+--t----,1--t--+--+--t ···tb··· ~ ························~--····::···· .·~tzrtr ··••:••···••:--••··i········· f\J\ ~r~, ···· +·· .. ;-······'········,·· .. !~--r-----· County of San Diego Hydrology Manual Rainfall lsopluvials 100 Year Rainfall Event - 6 Hours lsopluvial (inches) DPW GIS Depi.!rtmem o.f PubAc. Vl:br.1-i.s: G(_-.Y)J}K.qJ.W'.: ,1.r,'A1rrr,.:ili.:;,..~, Sw11i.-;r..~ IS Vi/c Have San Diego Covered! THIS MAP IS PROVIDED WITHOUT WARRANTY OF ANY KIND, EITHER EXPRESS OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FORA PARTICULAR PURPOSE. Copyright SanGIS. All Rights Reserved. This products may contain Information from the SANDAG Regional Information System which cannot be reproduced without the written permission of SANDAG. N ~'······+······+···--+····+····+·····+····+·····< .f E 11--1 t~t?0 ~1or 17---H-t-rt-H-1 t---t----t+-++++-+~+H-++++µ---1-+----W-+-+---+--4-+-W-+-+-+-+-4++-+-+-+-+__J___j~j_J_-U-llil---l-l-lJ-Ll_J_LLLllllil-Ll-Ll_JJ~LLJ s This product may contain information which has been reproduced with permission granted by Thomas Brothers Maps. +----+--+---+---+-1.•-1.1• .................................................................................... 8 .. ··~· . . ..... ....... .... .. ....... ....... ... .... .. ... ... ... ..... ....... ... ... ...... ~ .. 1--+-+--+--J·······I·······,······+·····+ 3 0 3 ................................................................................. ··~ .. c:.o •······<······+·····+-····+-·--·+-·····l······+······<·······I·······<·······+ &,···· I--~+-+-+--+--+--< ..... ....... .... .. . ..... ....... .... .. ....... .. .... ...... ~ :;:: . . .. ..... ...... . ....................... ···::t ... l--t--+--+--+---+----+---1-1--+-+--+ Miles ........................................................... +-••··• ••••• •••••· •••••••••••• ••••••••••••••••···• ····· ····~ ··································---········:;: "I ~~~;~E~J#7~_.,.!_;·+-+-!=~=~:+~~'-f,;L!n~F:!:=.~~=--t-:lc:.,t:::=l, ,:_~+c:_:_.+_:_L·~·L···· ·i-t--t--t---nl'~-t---+-+--+----+ ;.:, .. ~ .. r;~:tf; .• ·•·•·•·••.•.• -..~ ::: ... --- i---i--t--t--t--+-+--+--l-f---i---1-...j.._ ! ••••• ••····· ...... ······· ·····+-t--;-,--+-+---,--+-+--l---l---+-.t ·i-----t-+-+--+--+--+---i ................... ······· .............. . ·t--t--,----+---+-+-+--l·•···· ....................... ······ .... t······i······+···+-+---+--+--+-...... ······ ............. ······ ...... . ······ 3¼1145;H--J--t-t-t-+-+-t-+--+-+-+-++--l--+--l---l--l--+--I----/.....:~ , ....................... , .................. ! +-+--+-~-+--+---i .......................... . ■····j·······j······l·······j·····+·····l····+----+--+--+--l .............. ···O· ~ ··-f--'>--------''-=i~···· • •••• ••••••• •••• •• •••••• ---t·····+····+···-+·····+····+·· I·· ! ·······1·····'•i••---·••l••···••l••·····l-.....L.....L--L---l__J "'1"" ..... io ················~···· ~ ~ ............................ -0----1--~__J___J ......................................................... .. ·l-+--+---"-----'-~--'--............................................. , .............. . County of San Diego Hydrology Manual Rainfall lsopluvials 100 Year Rainfall Event -24 Hours lsopluvial (inches) DP GIS Depnrtmi::i.~f of P..Jbi'ic WO.?.-s -'S~-.:..1.g.r:;.y .. iJl'i;a· /.~~fi:i.rrr:;:1fn.r.1 &y·IJ,:.;:_~~ THIS MAP IS PROVIDED WITHOUT WARRANTY OF ANY KIND, EITHER EXPRESS OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FORA PARTICULAR PURPOSE. Copyright SanGIS. All Rights Reserved. This products may contain information from the SANDAG Regional Information System which cannot be reproduced without the written permission of SANDAG. This product may contain Information which has been reproduced with permission granted by Thomas Brothers Maps. Miles 10.0 .... ~~-ir"l"""'l~~,--,.....,.-11-T-l""l""ll"T'T"'l""Ml"T'l"'l"'l"l'tfflTil'l'ffl...,..,M"'l"l-r'T"i!"m"ITTT'l'Tffl'l'fflm"IT-r--t'-r-"1'".,...,.."'1""1'"1"'T'"T"!"T'M'T'l"l"l"IM'l"l"'l"l'IT' 9.QP'illl!l--!"ilir!-...... +""'llr-+'-.&!!-~~t-+-1-HH-++'1-ll+M-++t-~l+t+t+of-lH-+~l+H+++t+t++-tt++i~-+--+-t-+-+-++-++.....+-t-+++1"-t-++li--+1+~ ftO 7.0 6,01--:::i-...+-4-~+--4-.:1111.:-+-.:~--.pi,,ii:::-+=l"'-H.:lllo.:l--?rl.dl+H+¼-f-H+HH+H+HH+H+IH-H#¼-II 2.0 "C' ::I 0 ¢: (I) (I) ti c:: 1.0 ~0.9 ·~oJt fo] 0,6 0.5 0.4 0,3 0,2 0.1, 5 6 7 8 9 10 15 20 30 40 50 Minutes Duration EQUATION = 7.44 P6 0~0.645 = Intensity (in/hr) 6-Hour Precipitation (in) = Duration (min) 2 3 4 Hours 5 6 m ± 0 !:; ,, it1 Q. 6,o l 5.5 =i-, 5.0 g 4,5 5' 0 4.0 ;;r co 3.5 ~ 3.0 2,5 2,0 1.5 1.0 lntensity .. Duratlon Design Chart .. Template Directions for Application: (1) From precipitation maps determine 6 hr and 24 hr amounts for the selected frequency. These maps are included in the County Hydrology Manual (10, 50, and 100 yr maps included in the Design and Procedure Manual). (2) Adjust 6 hr precipitation (If necessary) so that it is within the range of 45% to 65% of the 24 hr preclprtation (not applicaple to Desert), (3) Plot 6 hr precipitation on the right side of the chart (4) Draw a line through the point parallel to the plotted lines. (5) This line is the intensity-duration curve for the location being analyzed. Application Form: (a) Selected frequency ___ year (b) P5 = __ in., Pz4 = __ .:: 4 = ___ 0/o(2l (c) Adjusted P6<2) = __ in. (d) tx = __ min. (e) l = __ in./hr. Note: This chart replaces the lntensity~Duration~Frequency curves used since 1965. P6 _____ """""L""'! tJ.5: L 2 t 2.s • , OuraUord I )I[!!! I I ! I I S . .. . .... ...... . 5.27 ! 659 \7,00!~)22 1Q,$1} 1 l86 l 13.ft(UA9 ! 15Jl1 1 2,1? J3.1s 4.24; s.ootEt3e!7. &As; 9.54110.sop1.00112.12 10 1.68 L2.:53; 3.37 t 4.21 15.05 ! 5. 6.74 7.581 BA2 I 9.27 ! 1Ct11 15 UO I U5 ! 2.59; 3.24 13.89 ! 4.54 S.19 5.84 a49 I 7.13 7.78 20 1J)8 U2 2.15; 2.69 3.23!3,n! 4.31 4JIB 5.39 [ 5,93 ! 6.46 as o'"'"" T40·--1.a112.as 2-Ero _tt~n .. 3.1s ____ 4.ao ____ 4.67 ____ s.13J5.af 30 0 U38 2.07 2.49 2.90 3.32 3.73 4.15 4.56 4.98 40 0.69 U)3 1.38 1.72 2.07 2.41 2.16 ~f10 3.45 3.7$ 4.13 .............. so 'o~oo ,roo T19 f49 1Yii ·ioo "fiif --2:ss· "imr ·s:2a s:58 so oJis tHJO 1.as 1 .59 1 .. ae 2.12 2.39 2.65 92 s.1s 90 o. 0.61 0.82 .23 1.43 t.63 1.84 2,04 5 2.45 120 0.34 0.51 t O. 1.021 U9 1.36 1.53 1.87 2.04 150 0.29 0.44f O OJ38j LOS US 1.32 H¼? 1.76 180 (t26 0.3.9!0-52! MS!0.78!0-91! 1.04 ! US 1.44 1.57 """"""'"2il"'o:22.10,33;0Asl o.M!o.s510.16! o.a1+0.se 1 ·too I us 1 1.s,r 300 0.19 ,0.28,0.38, OA7,0.00,0.6EL 0.75, 0.85, 0.94, 1.03, US """""""300 0.17 l0.25!0.33lOA2T0.50T0,58! 0.67 I CL75 i 0.84 l 0.92 ! UlO 3-1 San Diego County Hydrology Manual Date: June 2003 Table 3-1 Section: Page: RUNOFF COEFFICIENTS FOR URBAN AREAS Land Use Runoff Coefficient "C" Soil Type NRCS Elements Coun Elements % IMPER. A B Undisturbed Natural Terrain (Natural) Permanent Open Space 0* 0.20 0.25 Low Density Residential (LDR) Residential, 1.0 DU/A or less 10 0.27 0.32 Low Density Residential (LDR) Residential, 2.0 DU/A or less 20 0.34 0.38 Low Density Residential (LDR) Residential, 2.9 DU/A or less 25 0.38 0.41 Medium Density Residential (MDR) Residential, 4.3 DU/A or less 30 0.41 0.45 Medium Density Residential (MDR) Residential, 7.3 DU/A or less 40 0.48 0.51 Medium Density Residential (MDR) Residential, 10.9 DU/A or less 45 0.52 0.54 Medium Density Residential (MDR) Residential, 14.5 DU/A or less 50 0.55 0.58 High Density Residential (HDR) Residential, 24.0 DU/A or less 65 0.66 0.67 High Density Residential (HDR) Residential, 43.0 DU/A or less 80 0.76 0.77 Commercial/Industrial (N. Com) Neighborhood Commercial 80 0.76 0.77 Commercial/Industrial (G. Com) General Commercial 85 0.80 0.80 Commercial/Industrial (O.P. Com) Office Professional/Commercial 90 0.83 0.84 Commercial/Industrial (Limited I.) Limited Industrial 90 0.83 0.84 Commercial/Industrial ( General I.) General Industrial 95 0.87 0.87 3 6 of26 C D 0.30 0.35 0.36 0.41 0.42 0.46 0.45 0.49 0.48 0.52 0.54 0.57 0.57 0.60 0.60 0.63 0.69 0.71 0.78 0.79 0.78 0.79 0.81 0.82 0.84 0.85 0.84 0.85 0.87 0.87 *The values associated with 0% impervious may be used for direct calculation of the runoff coefficient as described in Section 3.1.2 (representing the pervious runoff coefficient, Cp, for the soil type), or for areas that will remain undisturbed in perpetuity. Justification must be given that the area will remain natural forever ( e.g., the area is located in Cleveland National Forest). DU/A= dwelling units per acre NRCS = National Resources Conservation Service 3-6 San Diego County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software,(c)1991-2006 Version 7.7 Rational method hydrology program based on San Diego County Flood Control Division 2003 hydrology manual Rational Hydrology Study Date: 10/02/24 ------------------------------------------------------------------- ----- 24-172 Pre Development Condition 100-Year Pre Development Basins 100-300 Onsite Area ------------------------------------------------------------------- ----- ********* Hydrology Study Control Information ********** ------------------------------------------------------------------- ----- Program License Serial Number 6144 ------------------------------------------------------------------- ----- Rational hydrology study storm event year is 100.0 English (in-lb) input data Units used Map data precipitation entered: 6 hour, precipitation(inches) = 2.950 24 hour precipitation(inches) = 5.250 P6/P24 = 56.2% San Diego hydrology manual 'C' values used +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 101.000 to Point/Station 102.000 **** INITIAL AREA EVALUATION **** ___________________________________________________________________ ___ Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 [UNDISTURBED NATURAL TERRAIN ] (Permanent Open Space ) Impervious value, Ai = 0.000 Sub-Area C Value = 0.300 Initial subarea total flow distance = 65.000(Ft.) Highest elevation = 302.980(Ft.) Lowest elevation = 274.260(Ft.) Elevation difference = 28.720(Ft.) Slope = 44.185 % Top of Initial Area Slope adjusted by User to 30.000 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 100.00 (Ft) for the top area slope value of 30.00 %, in a development type of Permanent Open Space In Accordance With Figure 3-3 Initial Area Time of Concentration = 4.63 minutes TC = [1.8*(1.1-C)*distance(Ft.)^.5)/(% slope^(1/3)] TC = [1.8*(1.1-0.3000)*( 100.000^.5)/( 30.000^(1/3)]= 4.63 Calculated TC of 4.634 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 7.772(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.300 Subarea runoff = 0.793(CFS) Total initial stream area = 0.340(Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 102.000 to Point/Station 103.000 **** SUBAREA FLOW ADDITION **** ___________________________________________________________________ ___ Calculated TC of 4.634 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 7.772(In/Hr) for a 100.0 year storm User specified 'C' value of 0.890 given for subarea Time of concentration = 4.63 min. Rainfall intensity = 7.772(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.783 CA = 1.464 Subarea runoff = 10.584(CFS) for 1.530(Ac.) Total runoff = 11.377(CFS) Total area = 1.870(Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 201.000 to Point/Station 202.000 **** INITIAL AREA EVALUATION **** ___________________________________________________________________ ___ Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 [INDUSTRIAL area type ] (General Industrial ) Impervious value, Ai = 0.950 Sub-Area C Value = 0.870 Initial subarea total flow distance = 185.000(Ft.) Highest elevation = 269.150(Ft.) Lowest elevation = 267.160(Ft.) Elevation difference = 1.990(Ft.) Slope = 1.076 % Top of Initial Area Slope adjusted by User to 2.000 % Bottom of Initial Area Slope adjusted by User to 2.000 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 70.00 (Ft) for the top area slope value of 2.00 %, in a development type of General Industrial In Accordance With Figure 3-3 Initial Area Time of Concentration = 2.75 minutes TC = [1.8*(1.1-C)*distance(Ft.)^.5)/(% slope^(1/3)] TC = [1.8*(1.1-0.8700)*( 70.000^.5)/( 2.000^(1/3)]= 2.75 The initial area total distance of 185.00 (Ft.) entered leaves a remaining distance of 115.00 (Ft.) Using Figure 3-4, the travel time for this distance is 1.36 minutes for a distance of 115.00 (Ft.) and a slope of 2.00 % with an elevation difference of 2.30(Ft.) from the end of the top area Tt = [11.9*length(Mi)^3)/(elevation change(Ft.))]^.385 *60(min/hr) = 1.360 Minutes Tt=[(11.9*0.0218^3)/( 2.30)]^.385= 1.36 Total initial area Ti = 2.75 minutes from Figure 3-3 formula plus 1.36 minutes from the Figure 3-4 formula = 4.11 minutes Calculated TC of 4.109 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 7.772(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.870 Subarea runoff = 1.691(CFS) Total initial stream area = 0.250(Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 301.000 to Point/Station 302.000 **** INITIAL AREA EVALUATION **** ___________________________________________________________________ ___ Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 [UNDISTURBED NATURAL TERRAIN ] (Permanent Open Space ) Impervious value, Ai = 0.000 Sub-Area C Value = 0.300 Initial subarea total flow distance = 79.000(Ft.) Highest elevation = 311.090(Ft.) Lowest elevation = 275.110(Ft.) Elevation difference = 35.980(Ft.) Slope = 45.544 % Top of Initial Area Slope adjusted by User to 30.000 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 100.00 (Ft) for the top area slope value of 30.00 %, in a development type of Permanent Open Space In Accordance With Figure 3-3 Initial Area Time of Concentration = 4.63 minutes TC = [1.8*(1.1-C)*distance(Ft.)^.5)/(% slope^(1/3)] TC = [1.8*(1.1-0.3000)*( 100.000^.5)/( 30.000^(1/3)]= 4.63 Calculated TC of 4.634 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 7.772(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.300 Subarea runoff = 1.073(CFS) Total initial stream area = 0.460(Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 302.000 to Point/Station 303.000 **** SUBAREA FLOW ADDITION **** ___________________________________________________________________ ___ Calculated TC of 4.634 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 7.772(In/Hr) for a 100.0 year storm Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 [UNDISTURBED NATURAL TERRAIN ] (Permanent Open Space ) Impervious value, Ai = 0.000 Sub-Area C Value = 0.300 Time of concentration = 4.63 min. Rainfall intensity = 7.772(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.300 CA = 0.855 Subarea runoff = 5.573(CFS) for 2.390(Ac.) Total runoff = 6.645(CFS) Total area = 2.850(Ac.) End of computations, total study area = 4.970 (Ac.) San Diego County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software,(c)1991-2006 Version 7.7 Rational method hydrology program based on San Diego County Flood Control Division 2003 hydrology manual Rational Hydrology Study Date: 10/02/24 ------------------------------------------------------------------- ----- 24-172 Post Development Condition 100-year Basins 100-900 Onsite Area ------------------------------------------------------------------- ----- ********* Hydrology Study Control Information ********** ------------------------------------------------------------------- ----- Program License Serial Number 6144 ------------------------------------------------------------------- ----- Rational hydrology study storm event year is 100.0 English (in-lb) input data Units used Map data precipitation entered: 6 hour, precipitation(inches) = 2.950 24 hour precipitation(inches) = 5.250 P6/P24 = 56.2% San Diego hydrology manual 'C' values used +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 101.000 to Point/Station 102.000 **** INITIAL AREA EVALUATION **** ___________________________________________________________________ ___ Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 [INDUSTRIAL area type ] (General Industrial ) Impervious value, Ai = 0.950 Sub-Area C Value = 0.870 Initial subarea total flow distance = 101.000(Ft.) Highest elevation = 274.020(Ft.) Lowest elevation = 272.360(Ft.) Elevation difference = 1.660(Ft.) Slope = 1.644 % Top of Initial Area Slope adjusted by User to 2.000 % Bottom of Initial Area Slope adjusted by User to 2.000 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 70.00 (Ft) for the top area slope value of 2.00 %, in a development type of General Industrial In Accordance With Figure 3-3 Initial Area Time of Concentration = 2.75 minutes TC = [1.8*(1.1-C)*distance(Ft.)^.5)/(% slope^(1/3)] TC = [1.8*(1.1-0.8700)*( 70.000^.5)/( 2.000^(1/3)]= 2.75 The initial area total distance of 101.00 (Ft.) entered leaves a remaining distance of 31.00 (Ft.) Using Figure 3-4, the travel time for this distance is 0.50 minutes for a distance of 31.00 (Ft.) and a slope of 2.00 % with an elevation difference of 0.62(Ft.) from the end of the top area Tt = [11.9*length(Mi)^3)/(elevation change(Ft.))]^.385 *60(min/hr) = 0.496 Minutes Tt=[(11.9*0.0059^3)/( 0.62)]^.385= 0.50 Total initial area Ti = 2.75 minutes from Figure 3-3 formula plus 0.50 minutes from the Figure 3-4 formula = 3.24 minutes Calculated TC of 3.245 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 7.772(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.870 Subarea runoff = 0.676(CFS) Total initial stream area = 0.100(Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 102.000 to Point/Station 103.000 **** SUBAREA FLOW ADDITION **** ___________________________________________________________________ ___ Calculated TC of 3.245 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 7.772(In/Hr) for a 100.0 year storm User specified 'C' value of 0.890 given for subarea Time of concentration = 3.24 min. Rainfall intensity = 7.772(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.886 CA = 0.434 Subarea runoff = 2.698(CFS) for 0.390(Ac.) Total runoff = 3.374(CFS) Total area = 0.490(Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 103.000 to Point/Station 203.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** ___________________________________________________________________ ___ Upstream point/station elevation = 265.940(Ft.) Downstream point/station elevation = 265.090(Ft.) Pipe length = 99.00(Ft.) Slope = 0.0086 Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 3.374(CFS) Given pipe size = 8.00(In.) NOTE: Normal flow is pressure flow in user selected pipe size. The approximate hydraulic grade line above the pipe invert is 9.042(Ft.) at the headworks or inlet of the pipe(s) Pipe friction loss = 7.715(Ft.) Minor friction loss = 2.176(Ft.) K-factor = 1.50 Pipe flow velocity = 9.67(Ft/s) Travel time through pipe = 0.17 min. Time of concentration (TC) = 3.42 min. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 103.000 to Point/Station 203.000 **** CONFLUENCE OF MINOR STREAMS **** ___________________________________________________________________ ___ Along Main Stream number: 1 in normal stream number 1 Stream flow area = 0.490(Ac.) Runoff from this stream = 3.374(CFS) Time of concentration = 3.42 min. Rainfall intensity = 7.772(In/Hr) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 201.000 to Point/Station 202.000 **** INITIAL AREA EVALUATION **** ___________________________________________________________________ ___ Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 [INDUSTRIAL area type ] (General Industrial ) Impervious value, Ai = 0.950 Sub-Area C Value = 0.870 Initial subarea total flow distance = 278.000(Ft.) Highest elevation = 274.020(Ft.) Lowest elevation = 267.000(Ft.) Elevation difference = 7.020(Ft.) Slope = 2.525 % Top of Initial Area Slope adjusted by User to 2.500 % Bottom of Initial Area Slope adjusted by User to 2.500 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 80.00 (Ft) for the top area slope value of 2.50 %, in a development type of General Industrial In Accordance With Figure 3-3 Initial Area Time of Concentration = 2.73 minutes TC = [1.8*(1.1-C)*distance(Ft.)^.5)/(% slope^(1/3)] TC = [1.8*(1.1-0.8700)*( 80.000^.5)/( 2.500^(1/3)]= 2.73 The initial area total distance of 278.00 (Ft.) entered leaves a remaining distance of 198.00 (Ft.) Using Figure 3-4, the travel time for this distance is 1.90 minutes for a distance of 198.00 (Ft.) and a slope of 2.50 % with an elevation difference of 4.95(Ft.) from the end of the top area Tt = [11.9*length(Mi)^3)/(elevation change(Ft.))]^.385 *60(min/hr) = 1.896 Minutes Tt=[(11.9*0.0375^3)/( 4.95)]^.385= 1.90 Total initial area Ti = 2.73 minutes from Figure 3-3 formula plus 1.90 minutes from the Figure 3-4 formula = 4.62 minutes Calculated TC of 4.624 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 7.772(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.870 Subarea runoff = 1.488(CFS) Total initial stream area = 0.220(Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 202.000 to Point/Station 203.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** ___________________________________________________________________ ___ Upstream point/station elevation = 266.430(Ft.) Downstream point/station elevation = 265.090(Ft.) Pipe length = 16.00(Ft.) Slope = 0.0838 Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 1.488(CFS) Given pipe size = 8.00(In.) Calculated individual pipe flow = 1.488(CFS) Normal flow depth in pipe = 3.64(In.) Flow top width inside pipe = 7.97(In.) Critical Depth = 6.84(In.) Pipe flow velocity = 9.62(Ft/s) Travel time through pipe = 0.03 min. Time of concentration (TC) = 4.65 min. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 203.000 to Point/Station 203.000 **** CONFLUENCE OF MINOR STREAMS **** ___________________________________________________________________ ___ Along Main Stream number: 1 in normal stream number 2 Stream flow area = 0.220(Ac.) Runoff from this stream = 1.488(CFS) Time of concentration = 4.65 min. Rainfall intensity = 7.772(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (min) (In/Hr) 1 3.374 3.42 7.772 2 1.488 4.65 7.772 Qmax(1) = 1.000 * 1.000 * 3.374) + 1.000 * 0.734 * 1.488) + = 4.466 Qmax(2) = 1.000 * 1.000 * 3.374) + 1.000 * 1.000 * 1.488) + = 4.862 Total of 2 streams to confluence: Flow rates before confluence point: 3.374 1.488 Maximum flow rates at confluence using above data: 4.466 4.862 Area of streams before confluence: 0.490 0.220 Results of confluence: Total flow rate = 4.862(CFS) Time of concentration = 4.652 min. Effective stream area after confluence = 0.710(Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 203.000 to Point/Station 304.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** ___________________________________________________________________ ___ Upstream point/station elevation = 265.090(Ft.) Downstream point/station elevation = 265.080(Ft.) Pipe length = 127.00(Ft.) Slope = 0.0001 Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 4.862(CFS) Given pipe size = 8.00(In.) NOTE: Normal flow is pressure flow in user selected pipe size. The approximate hydraulic grade line above the pipe invert is 25.058(Ft.) at the headworks or inlet of the pipe(s) Pipe friction loss = 20.550(Ft.) Minor friction loss = 4.518(Ft.) K-factor = 1.50 Pipe flow velocity = 13.93(Ft/s) Travel time through pipe = 0.15 min. Time of concentration (TC) = 4.80 min. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 203.000 to Point/Station 304.000 **** CONFLUENCE OF MINOR STREAMS **** ___________________________________________________________________ ___ Along Main Stream number: 1 in normal stream number 1 Stream flow area = 0.710(Ac.) Runoff from this stream = 4.862(CFS) Time of concentration = 4.80 min. Rainfall intensity = 7.772(In/Hr) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 301.000 to Point/Station 302.000 **** INITIAL AREA EVALUATION **** ___________________________________________________________________ ___ Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 [INDUSTRIAL area type ] (General Industrial ) Impervious value, Ai = 0.950 Sub-Area C Value = 0.870 Initial subarea total flow distance = 100.000(Ft.) Highest elevation = 274.000(Ft.) Lowest elevation = 272.160(Ft.) Elevation difference = 1.840(Ft.) Slope = 1.840 % Top of Initial Area Slope adjusted by User to 2.000 % Bottom of Initial Area Slope adjusted by User to 2.000 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 70.00 (Ft) for the top area slope value of 2.00 %, in a development type of General Industrial In Accordance With Figure 3-3 Initial Area Time of Concentration = 2.75 minutes TC = [1.8*(1.1-C)*distance(Ft.)^.5)/(% slope^(1/3)] TC = [1.8*(1.1-0.8700)*( 70.000^.5)/( 2.000^(1/3)]= 2.75 The initial area total distance of 100.00 (Ft.) entered leaves a remaining distance of 30.00 (Ft.) Using Figure 3-4, the travel time for this distance is 0.48 minutes for a distance of 30.00 (Ft.) and a slope of 2.00 % with an elevation difference of 0.60(Ft.) from the end of the top area Tt = [11.9*length(Mi)^3)/(elevation change(Ft.))]^.385 *60(min/hr) = 0.483 Minutes Tt=[(11.9*0.0057^3)/( 0.60)]^.385= 0.48 Total initial area Ti = 2.75 minutes from Figure 3-3 formula plus 0.48 minutes from the Figure 3-4 formula = 3.23 minutes Calculated TC of 3.232 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 7.772(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.870 Subarea runoff = 1.352(CFS) Total initial stream area = 0.200(Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 302.000 to Point/Station 303.000 **** SUBAREA FLOW ADDITION **** ___________________________________________________________________ ___ Calculated TC of 3.232 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 7.772(In/Hr) for a 100.0 year storm User specified 'C' value of 0.890 given for subarea Time of concentration = 3.23 min. Rainfall intensity = 7.772(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.883 CA = 0.512 Subarea runoff = 2.629(CFS) for 0.380(Ac.) Total runoff = 3.981(CFS) Total area = 0.580(Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 303.000 to Point/Station 304.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** ___________________________________________________________________ ___ Upstream point/station elevation = 265.260(Ft.) Downstream point/station elevation = 265.080(Ft.) Pipe length = 36.00(Ft.) Slope = 0.0050 Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 3.981(CFS) Given pipe size = 8.00(In.) NOTE: Normal flow is pressure flow in user selected pipe size. The approximate hydraulic grade line above the pipe invert is 6.756(Ft.) at the headworks or inlet of the pipe(s) Pipe friction loss = 3.906(Ft.) Minor friction loss = 3.030(Ft.) K-factor = 1.50 Pipe flow velocity = 11.40(Ft/s) Travel time through pipe = 0.05 min. Time of concentration (TC) = 3.28 min. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 304.000 to Point/Station 304.000 **** CONFLUENCE OF MINOR STREAMS **** ___________________________________________________________________ ___ Along Main Stream number: 1 in normal stream number 2 Stream flow area = 0.580(Ac.) Runoff from this stream = 3.981(CFS) Time of concentration = 3.28 min. Rainfall intensity = 7.772(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (min) (In/Hr) 1 4.862 4.80 7.772 2 3.981 3.28 7.772 Qmax(1) = 1.000 * 1.000 * 4.862) + 1.000 * 1.000 * 3.981) + = 8.843 Qmax(2) = 1.000 * 0.684 * 4.862) + 1.000 * 1.000 * 3.981) + = 7.305 Total of 2 streams to confluence: Flow rates before confluence point: 4.862 3.981 Maximum flow rates at confluence using above data: 8.843 7.305 Area of streams before confluence: 0.710 0.580 Results of confluence: Total flow rate = 8.843(CFS) Time of concentration = 4.804 min. Effective stream area after confluence = 1.290(Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 304.000 to Point/Station 504.000 **** CONFLUENCE OF MAIN STREAMS **** ___________________________________________________________________ ___ The following data inside Main Stream is listed: In Main Stream number: 1 Stream flow area = 1.290(Ac.) Runoff from this stream = 8.843(CFS) Time of concentration = 4.80 min. Rainfall intensity = 7.772(In/Hr) Program is now starting with Main Stream No. 2 +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 401.000 to Point/Station 402.000 **** INITIAL AREA EVALUATION **** ___________________________________________________________________ ___ Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 [INDUSTRIAL area type ] (General Industrial ) Impervious value, Ai = 0.950 Sub-Area C Value = 0.870 Initial subarea total flow distance = 229.000(Ft.) Highest elevation = 274.630(Ft.) Lowest elevation = 273.870(Ft.) Elevation difference = 0.760(Ft.) Slope = 0.332 % Top of Initial Area Slope adjusted by User to 1.000 % Bottom of Initial Area Slope adjusted by User to 1.000 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 60.00 (Ft) for the top area slope value of 1.00 %, in a development type of General Industrial In Accordance With Figure 3-3 Initial Area Time of Concentration = 3.21 minutes TC = [1.8*(1.1-C)*distance(Ft.)^.5)/(% slope^(1/3)] TC = [1.8*(1.1-0.8700)*( 60.000^.5)/( 1.000^(1/3)]= 3.21 The initial area total distance of 229.00 (Ft.) entered leaves a remaining distance of 169.00 (Ft.) Using Figure 3-4, the travel time for this distance is 2.39 minutes for a distance of 169.00 (Ft.) and a slope of 1.00 % with an elevation difference of 1.69(Ft.) from the end of the top area Tt = [11.9*length(Mi)^3)/(elevation change(Ft.))]^.385 *60(min/hr) = 2.388 Minutes Tt=[(11.9*0.0320^3)/( 1.69)]^.385= 2.39 Total initial area Ti = 3.21 minutes from Figure 3-3 formula plus 2.39 minutes from the Figure 3-4 formula = 5.60 minutes Rainfall intensity (I) = 7.229(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.870 Subarea runoff = 0.943(CFS) Total initial stream area = 0.150(Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 402.000 to Point/Station 503.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** ___________________________________________________________________ ___ Upstream point/station elevation = 268.740(Ft.) Downstream point/station elevation = 267.900(Ft.) Pipe length = 168.00(Ft.) Slope = 0.0050 Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 0.943(CFS) Given pipe size = 8.00(In.) NOTE: Normal flow is pressure flow in user selected pipe size. The approximate hydraulic grade line above the pipe invert is 0.354(Ft.) at the headworks or inlet of the pipe(s) Pipe friction loss = 1.023(Ft.) Minor friction loss = 0.170(Ft.) K-factor = 1.50 Pipe flow velocity = 2.70(Ft/s) Travel time through pipe = 1.04 min. Time of concentration (TC) = 6.63 min. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 402.000 to Point/Station 503.000 **** CONFLUENCE OF MINOR STREAMS **** ___________________________________________________________________ ___ Along Main Stream number: 2 in normal stream number 1 Stream flow area = 0.150(Ac.) Runoff from this stream = 0.943(CFS) Time of concentration = 6.63 min. Rainfall intensity = 6.478(In/Hr) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 501.000 to Point/Station 502.000 **** INITIAL AREA EVALUATION **** ___________________________________________________________________ ___ Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 [INDUSTRIAL area type ] (General Industrial ) Impervious value, Ai = 0.950 Sub-Area C Value = 0.870 Initial subarea total flow distance = 102.000(Ft.) Highest elevation = 272.520(Ft.) Lowest elevation = 272.170(Ft.) Elevation difference = 0.350(Ft.) Slope = 0.343 % Top of Initial Area Slope adjusted by User to 1.000 % Bottom of Initial Area Slope adjusted by User to 1.000 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 60.00 (Ft) for the top area slope value of 1.00 %, in a development type of General Industrial In Accordance With Figure 3-3 Initial Area Time of Concentration = 3.21 minutes TC = [1.8*(1.1-C)*distance(Ft.)^.5)/(% slope^(1/3)] TC = [1.8*(1.1-0.8700)*( 60.000^.5)/( 1.000^(1/3)]= 3.21 The initial area total distance of 102.00 (Ft.) entered leaves a remaining distance of 42.00 (Ft.) Using Figure 3-4, the travel time for this distance is 0.82 minutes for a distance of 42.00 (Ft.) and a slope of 1.00 % with an elevation difference of 0.42(Ft.) from the end of the top area Tt = [11.9*length(Mi)^3)/(elevation change(Ft.))]^.385 *60(min/hr) = 0.818 Minutes Tt=[(11.9*0.0080^3)/( 0.42)]^.385= 0.82 Total initial area Ti = 3.21 minutes from Figure 3-3 formula plus 0.82 minutes from the Figure 3-4 formula = 4.02 minutes Calculated TC of 4.024 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 7.772(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.870 Subarea runoff = 0.609(CFS) Total initial stream area = 0.090(Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 502.000 to Point/Station 503.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** ___________________________________________________________________ ___ Upstream point/station elevation = 268.600(Ft.) Downstream point/station elevation = 267.900(Ft.) Pipe length = 50.00(Ft.) Slope = 0.0140 Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 0.609(CFS) Given pipe size = 8.00(In.) Calculated individual pipe flow = 0.609(CFS) Normal flow depth in pipe = 3.64(In.) Flow top width inside pipe = 7.97(In.) Critical Depth = 4.41(In.) Pipe flow velocity = 3.93(Ft/s) Travel time through pipe = 0.21 min. Time of concentration (TC) = 4.24 min. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 503.000 to Point/Station 503.000 **** CONFLUENCE OF MINOR STREAMS **** ___________________________________________________________________ ___ Along Main Stream number: 2 in normal stream number 2 Stream flow area = 0.090(Ac.) Runoff from this stream = 0.609(CFS) Time of concentration = 4.24 min. Rainfall intensity = 7.772(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (min) (In/Hr) 1 0.943 6.63 6.478 2 0.609 4.24 7.772 Qmax(1) = 1.000 * 1.000 * 0.943) + 0.834 * 1.000 * 0.609) + = 1.451 Qmax(2) = 1.000 * 0.639 * 0.943) + 1.000 * 1.000 * 0.609) + = 1.211 Total of 2 streams to confluence: Flow rates before confluence point: 0.943 0.609 Maximum flow rates at confluence using above data: 1.451 1.211 Area of streams before confluence: 0.150 0.090 Results of confluence: Total flow rate = 1.451(CFS) Time of concentration = 6.631 min. Effective stream area after confluence = 0.240(Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 503.000 to Point/Station 504.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** ___________________________________________________________________ ___ Upstream point/station elevation = 268.350(Ft.) Downstream point/station elevation = 264.860(Ft.) Pipe length = 172.00(Ft.) Slope = 0.0203 Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 1.451(CFS) Given pipe size = 8.00(In.) Calculated individual pipe flow = 1.451(CFS) Normal flow depth in pipe = 5.63(In.) Flow top width inside pipe = 7.31(In.) Critical Depth = 6.78(In.) Pipe flow velocity = 5.53(Ft/s) Travel time through pipe = 0.52 min. Time of concentration (TC) = 7.15 min. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 504.000 to Point/Station 504.000 **** CONFLUENCE OF MAIN STREAMS **** ___________________________________________________________________ ___ The following data inside Main Stream is listed: In Main Stream number: 2 Stream flow area = 0.240(Ac.) Runoff from this stream = 1.451(CFS) Time of concentration = 7.15 min. Rainfall intensity = 6.171(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (min) (In/Hr) 1 8.843 4.80 7.772 2 1.451 7.15 6.171 Qmax(1) = 1.000 * 1.000 * 8.843) + 1.000 * 0.672 * 1.451) + = 9.817 Qmax(2) = 0.794 * 1.000 * 8.843) + 1.000 * 1.000 * 1.451) + = 8.472 Total of 2 main streams to confluence: Flow rates before confluence point: 8.843 1.451 Maximum flow rates at confluence using above data: 9.817 8.472 Area of streams before confluence: 1.290 0.240 Results of confluence: Total flow rate = 9.817(CFS) Time of concentration = 4.804 min. Effective stream area after confluence = 1.530(Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 504.000 to Point/Station 703.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** ___________________________________________________________________ ___ Upstream point/station elevation = 264.860(Ft.) Downstream point/station elevation = 259.540(Ft.) Pipe length = 151.00(Ft.) Slope = 0.0352 Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 9.817(CFS) Given pipe size = 10.00(In.) NOTE: Normal flow is pressure flow in user selected pipe size. The approximate hydraulic grade line above the pipe invert is 32.534(Ft.) at the headworks or inlet of the pipe(s) Pipe friction loss = 30.307(Ft.) Minor friction loss = 7.547(Ft.) K-factor = 1.50 Pipe flow velocity = 18.00(Ft/s) Travel time through pipe = 0.14 min. Time of concentration (TC) = 4.94 min. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 504.000 to Point/Station 703.000 **** CONFLUENCE OF MINOR STREAMS **** ___________________________________________________________________ ___ Along Main Stream number: 1 in normal stream number 1 Stream flow area = 1.530(Ac.) Runoff from this stream = 9.817(CFS) Time of concentration = 4.94 min. Rainfall intensity = 7.772(In/Hr) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 601.000 to Point/Station 602.000 **** INITIAL AREA EVALUATION **** ___________________________________________________________________ ___ Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 [INDUSTRIAL area type ] (General Industrial ) Impervious value, Ai = 0.950 Sub-Area C Value = 0.870 Initial subarea total flow distance = 185.000(Ft.) Highest elevation = 269.150(Ft.) Lowest elevation = 267.160(Ft.) Elevation difference = 1.990(Ft.) Slope = 1.076 % Top of Initial Area Slope adjusted by User to 2.000 % Bottom of Initial Area Slope adjusted by User to 2.000 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 70.00 (Ft) for the top area slope value of 2.00 %, in a development type of General Industrial In Accordance With Figure 3-3 Initial Area Time of Concentration = 2.75 minutes TC = [1.8*(1.1-C)*distance(Ft.)^.5)/(% slope^(1/3)] TC = [1.8*(1.1-0.8700)*( 70.000^.5)/( 2.000^(1/3)]= 2.75 The initial area total distance of 185.00 (Ft.) entered leaves a remaining distance of 115.00 (Ft.) Using Figure 3-4, the travel time for this distance is 1.36 minutes for a distance of 115.00 (Ft.) and a slope of 2.00 % with an elevation difference of 2.30(Ft.) from the end of the top area Tt = [11.9*length(Mi)^3)/(elevation change(Ft.))]^.385 *60(min/hr) = 1.360 Minutes Tt=[(11.9*0.0218^3)/( 2.30)]^.385= 1.36 Total initial area Ti = 2.75 minutes from Figure 3-3 formula plus 1.36 minutes from the Figure 3-4 formula = 4.11 minutes Calculated TC of 4.109 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 7.772(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.870 Subarea runoff = 1.691(CFS) Total initial stream area = 0.250(Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 602.000 to Point/Station 703.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** ___________________________________________________________________ ___ Upstream point/station elevation = 264.740(Ft.) Downstream point/station elevation = 259.540(Ft.) Pipe length = 124.00(Ft.) Slope = 0.0419 Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 1.691(CFS) Given pipe size = 8.00(In.) Calculated individual pipe flow = 1.691(CFS) Normal flow depth in pipe = 4.85(In.) Flow top width inside pipe = 7.82(In.) Critical Depth = 7.17(In.) Pipe flow velocity = 7.63(Ft/s) Travel time through pipe = 0.27 min. Time of concentration (TC) = 4.38 min. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 602.000 to Point/Station 703.000 **** CONFLUENCE OF MINOR STREAMS **** ___________________________________________________________________ ___ Along Main Stream number: 1 in normal stream number 2 Stream flow area = 0.250(Ac.) Runoff from this stream = 1.691(CFS) Time of concentration = 4.38 min. Rainfall intensity = 7.772(In/Hr) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 701.000 to Point/Station 702.000 **** INITIAL AREA EVALUATION **** ___________________________________________________________________ ___ Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 [INDUSTRIAL area type ] (General Industrial ) Impervious value, Ai = 0.950 Sub-Area C Value = 0.870 Initial subarea total flow distance = 69.000(Ft.) Highest elevation = 275.090(Ft.) Lowest elevation = 273.410(Ft.) Elevation difference = 1.680(Ft.) Slope = 2.435 % Top of Initial Area Slope adjusted by User to 2.000 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 70.00 (Ft) for the top area slope value of 2.00 %, in a development type of General Industrial In Accordance With Figure 3-3 Initial Area Time of Concentration = 2.75 minutes TC = [1.8*(1.1-C)*distance(Ft.)^.5)/(% slope^(1/3)] TC = [1.8*(1.1-0.8700)*( 70.000^.5)/( 2.000^(1/3)]= 2.75 Calculated TC of 2.749 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 7.772(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.870 Subarea runoff = 2.029(CFS) Total initial stream area = 0.300(Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 702.000 to Point/Station 703.000 **** SUBAREA FLOW ADDITION **** ___________________________________________________________________ ___ Calculated TC of 2.749 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 7.772(In/Hr) for a 100.0 year storm User specified 'C' value of 0.890 given for subarea Time of concentration = 2.75 min. Rainfall intensity = 7.772(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.887 CA = 1.632 Subarea runoff = 10.653(CFS) for 1.540(Ac.) Total runoff = 12.682(CFS) Total area = 1.840(Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 703.000 to Point/Station 703.000 **** CONFLUENCE OF MINOR STREAMS **** ___________________________________________________________________ ___ Along Main Stream number: 1 in normal stream number 3 Stream flow area = 1.840(Ac.) Runoff from this stream = 12.682(CFS) Time of concentration = 2.75 min. Rainfall intensity = 7.772(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (min) (In/Hr) 1 9.817 4.94 7.772 2 1.691 4.38 7.772 3 12.682 2.75 7.772 Qmax(1) = 1.000 * 1.000 * 9.817) + 1.000 * 1.000 * 1.691) + 1.000 * 1.000 * 12.682) + = 24.190 Qmax(2) = 1.000 * 0.886 * 9.817) + 1.000 * 1.000 * 1.691) + 1.000 * 1.000 * 12.682) + = 23.069 Qmax(3) = 1.000 * 0.556 * 9.817) + 1.000 * 0.628 * 1.691) + 1.000 * 1.000 * 12.682) + = 19.202 Total of 3 streams to confluence: Flow rates before confluence point: 9.817 1.691 12.682 Maximum flow rates at confluence using above data: 24.190 23.069 19.202 Area of streams before confluence: 1.530 0.250 1.840 Results of confluence: Total flow rate = 24.190(CFS) Time of concentration = 4.944 min. Effective stream area after confluence = 3.620(Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 703.000 to Point/Station 911.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** ___________________________________________________________________ ___ Upstream point/station elevation = 259.540(Ft.) Downstream point/station elevation = 259.030(Ft.) Pipe length = 30.00(Ft.) Slope = 0.0170 Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 24.190(CFS) Given pipe size = 24.00(In.) Calculated individual pipe flow = 24.190(CFS) Normal flow depth in pipe = 16.55(In.) Flow top width inside pipe = 22.21(In.) Critical Depth = 20.87(In.) Pipe flow velocity = 10.48(Ft/s) Travel time through pipe = 0.05 min. Time of concentration (TC) = 4.99 min. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 703.000 to Point/Station 911.000 **** CONFLUENCE OF MAIN STREAMS **** ___________________________________________________________________ ___ The following data inside Main Stream is listed: In Main Stream number: 1 Stream flow area = 3.620(Ac.) Runoff from this stream = 24.190(CFS) Time of concentration = 4.99 min. Rainfall intensity = 7.772(In/Hr) Program is now starting with Main Stream No. 2 +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 801.000 to Point/Station 802.000 **** INITIAL AREA EVALUATION **** ___________________________________________________________________ ___ Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 [UNDISTURBED NATURAL TERRAIN ] (Permanent Open Space ) Impervious value, Ai = 0.000 Sub-Area C Value = 0.300 Initial subarea total flow distance = 76.000(Ft.) Highest elevation = 311.050(Ft.) Lowest elevation = 275.190(Ft.) Elevation difference = 35.860(Ft.) Slope = 47.184 % Top of Initial Area Slope adjusted by User to 30.000 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 100.00 (Ft) for the top area slope value of 30.00 %, in a development type of Permanent Open Space In Accordance With Figure 3-3 Initial Area Time of Concentration = 4.63 minutes TC = [1.8*(1.1-C)*distance(Ft.)^.5)/(% slope^(1/3)] TC = [1.8*(1.1-0.3000)*( 100.000^.5)/( 30.000^(1/3)]= 4.63 Calculated TC of 4.634 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 7.772(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.300 Subarea runoff = 1.749(CFS) Total initial stream area = 0.750(Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 802.000 to Point/Station 803.000 **** IMPROVED CHANNEL TRAVEL TIME **** ___________________________________________________________________ ___ Upstream point elevation = 275.190(Ft.) Downstream point elevation = 274.990(Ft.) Channel length thru subarea = 116.000(Ft.) Channel base width = 0.500(Ft.) Slope or 'Z' of left channel bank = 1.300 Slope or 'Z' of right channel bank = 1.300 Manning's 'N' = 0.015 Maximum depth of channel = 1.000(Ft.) Flow(q) thru subarea = 1.749(CFS) Depth of flow = 0.654(Ft.), Average velocity = 1.980(Ft/s) Channel flow top width = 2.201(Ft.) Flow Velocity = 1.98(Ft/s) Travel time = 0.98 min. Time of concentration = 5.61 min. Critical depth = 0.484(Ft.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 803.000 to Point/Station 910.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** ___________________________________________________________________ ___ Upstream point/station elevation = 267.940(Ft.) Downstream point/station elevation = 261.240(Ft.) Pipe length = 346.00(Ft.) Slope = 0.0194 Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 1.749(CFS) Given pipe size = 10.00(In.) Calculated individual pipe flow = 1.749(CFS) Normal flow depth in pipe = 5.43(In.) Flow top width inside pipe = 9.96(In.) Critical Depth = 7.12(In.) Pipe flow velocity = 5.78(Ft/s) Travel time through pipe = 1.00 min. Time of concentration (TC) = 6.61 min. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 803.000 to Point/Station 910.000 **** CONFLUENCE OF MINOR STREAMS **** ___________________________________________________________________ ___ Along Main Stream number: 2 in normal stream number 1 Stream flow area = 0.750(Ac.) Runoff from this stream = 1.749(CFS) Time of concentration = 6.61 min. Rainfall intensity = 6.493(In/Hr) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 901.000 to Point/Station 902.000 **** INITIAL AREA EVALUATION **** ___________________________________________________________________ ___ Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 1.000 Decimal fraction soil group D = 0.000 [UNDISTURBED NATURAL TERRAIN ] (Permanent Open Space ) Impervious value, Ai = 0.000 Sub-Area C Value = 0.300 Initial subarea total flow distance = 85.000(Ft.) Highest elevation = 308.710(Ft.) Lowest elevation = 275.250(Ft.) Elevation difference = 33.460(Ft.) Slope = 39.365 % Top of Initial Area Slope adjusted by User to 30.000 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 100.00 (Ft) for the top area slope value of 30.00 %, in a development type of Permanent Open Space In Accordance With Figure 3-3 Initial Area Time of Concentration = 4.63 minutes TC = [1.8*(1.1-C)*distance(Ft.)^.5)/(% slope^(1/3)] TC = [1.8*(1.1-0.3000)*( 100.000^.5)/( 30.000^(1/3)]= 4.63 Calculated TC of 4.634 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 7.772(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.300 Subarea runoff = 1.399(CFS) Total initial stream area = 0.600(Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 902.000 to Point/Station 903.000 **** IMPROVED CHANNEL TRAVEL TIME **** ___________________________________________________________________ ___ Upstream point elevation = 277.830(Ft.) Downstream point elevation = 270.710(Ft.) Channel length thru subarea = 362.000(Ft.) Channel base width = 0.500(Ft.) Slope or 'Z' of left channel bank = 1.300 Slope or 'Z' of right channel bank = 1.300 Manning's 'N' = 0.015 Maximum depth of channel = 1.000(Ft.) Flow(q) thru subarea = 1.399(CFS) Depth of flow = 0.327(Ft.), Average velocity = 4.628(Ft/s) Channel flow top width = 1.350(Ft.) Flow Velocity = 4.63(Ft/s) Travel time = 1.30 min. Time of concentration = 5.94 min. Critical depth = 0.434(Ft.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 903.000 to Point/Station 910.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** ___________________________________________________________________ ___ Upstream point/station elevation = 265.200(Ft.) Downstream point/station elevation = 261.240(Ft.) Pipe length = 62.00(Ft.) Slope = 0.0639 Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 1.399(CFS) Given pipe size = 10.00(In.) Calculated individual pipe flow = 1.399(CFS) Normal flow depth in pipe = 3.43(In.) Flow top width inside pipe = 9.49(In.) Critical Depth = 6.35(In.) Pipe flow velocity = 8.47(Ft/s) Travel time through pipe = 0.12 min. Time of concentration (TC) = 6.06 min. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 910.000 to Point/Station 910.000 **** CONFLUENCE OF MINOR STREAMS **** ___________________________________________________________________ ___ Along Main Stream number: 2 in normal stream number 2 Stream flow area = 0.600(Ac.) Runoff from this stream = 1.399(CFS) Time of concentration = 6.06 min. Rainfall intensity = 6.866(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (min) (In/Hr) 1 1.749 6.61 6.493 2 1.399 6.06 6.866 Qmax(1) = 1.000 * 1.000 * 1.749) + 0.946 * 1.000 * 1.399) + = 3.072 Qmax(2) = 1.000 * 0.917 * 1.749) + 1.000 * 1.000 * 1.399) + = 3.003 Total of 2 streams to confluence: Flow rates before confluence point: 1.749 1.399 Maximum flow rates at confluence using above data: 3.072 3.003 Area of streams before confluence: 0.750 0.600 Results of confluence: Total flow rate = 3.072(CFS) Time of concentration = 6.608 min. Effective stream area after confluence = 1.350(Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 910.000 to Point/Station 911.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** ___________________________________________________________________ ___ Upstream point/station elevation = 261.240(Ft.) Downstream point/station elevation = 259.030(Ft.) Pipe length = 110.00(Ft.) Slope = 0.0201 Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 3.072(CFS) Given pipe size = 18.00(In.) Calculated individual pipe flow = 3.072(CFS) Normal flow depth in pipe = 5.55(In.) Flow top width inside pipe = 16.62(In.) Critical Depth = 8.00(In.) Pipe flow velocity = 6.64(Ft/s) Travel time through pipe = 0.28 min. Time of concentration (TC) = 6.88 min. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 911.000 to Point/Station 911.000 **** CONFLUENCE OF MAIN STREAMS **** ___________________________________________________________________ ___ The following data inside Main Stream is listed: In Main Stream number: 2 Stream flow area = 1.350(Ac.) Runoff from this stream = 3.072(CFS) Time of concentration = 6.88 min. Rainfall intensity = 6.324(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (min) (In/Hr) 1 24.190 4.99 7.772 2 3.072 6.88 6.324 Qmax(1) = 1.000 * 1.000 * 24.190) + 1.000 * 0.725 * 3.072) + = 26.417 Qmax(2) = 0.814 * 1.000 * 24.190) + 1.000 * 1.000 * 3.072) + = 22.752 Total of 2 main streams to confluence: Flow rates before confluence point: 24.190 3.072 Maximum flow rates at confluence using above data: 26.417 22.752 Area of streams before confluence: 3.620 1.350 Results of confluence: Total flow rate = 26.417(CFS) Time of concentration = 4.992 min. Effective stream area after confluence = 4.970(Ac.) +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 911.000 to Point/Station 912.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** ___________________________________________________________________ ___ Upstream point/station elevation = 259.030(Ft.) Downstream point/station elevation = 257.850(Ft.) Pipe length = 69.00(Ft.) Slope = 0.0171 Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 26.417(CFS) Given pipe size = 24.00(In.) Calculated individual pipe flow = 26.417(CFS) Normal flow depth in pipe = 17.67(In.) Flow top width inside pipe = 21.15(In.) Critical Depth = 21.54(In.) Pipe flow velocity = 10.65(Ft/s) Travel time through pipe = 0.11 min. Time of concentration (TC) = 5.10 min. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 912.000 to Point/Station 913.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** ___________________________________________________________________ ___ Upstream point/station elevation = 257.850(Ft.) Downstream point/station elevation = 253.250(Ft.) Pipe length = 277.00(Ft.) Slope = 0.0166 Manning's N = 0.130 No. of pipes = 1 Required pipe flow = 26.417(CFS) Given pipe size = 24.00(In.) NOTE: Normal flow is pressure flow in user selected pipe size. The approximate hydraulic grade line above the pipe invert is 374.633(Ft.) at the headworks or inlet of the pipe(s) Pipe friction loss = 377.586(Ft.) Minor friction loss = 1.647(Ft.) K-factor = 1.50 Pipe flow velocity = 8.41(Ft/s) Travel time through pipe = 0.55 min. Time of concentration (TC) = 5.65 min. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ +++ Process from Point/Station 913.000 to Point/Station 914.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** ___________________________________________________________________ ___ Upstream point/station elevation = 253.250(Ft.) Downstream point/station elevation = 240.740(Ft.) Pipe length = 59.00(Ft.) Slope = 0.2120 Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 26.417(CFS) Given pipe size = 24.00(In.) Calculated individual pipe flow = 26.417(CFS) Normal flow depth in pipe = 8.24(In.) Flow top width inside pipe = 22.79(In.) Critical Depth = 21.54(In.) Pipe flow velocity = 27.67(Ft/s) Travel time through pipe = 0.04 min. Time of concentration (TC) = 5.68 min. End of computations, total study area = 4.970 (Ac.) 1 2 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2025 Project: 24-172-Attenuation-100yr-City Datum.gpw Tuesday, 10 / 8 / 2024 Hyd.Origin Description Legend 1 Manual Post Condition (Basins 1-7) 2 Reservoir IMP-1 Hydrograph Return Period Recap 2 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s)Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 Manual ------ ------- ------- ------- ------- ------- ------- ------- 24.19 Post Condition (Basins 1-7) 2 Reservoir 1 ------- ------- ------- ------- ------- ------- ------- 8.468 IMP-1 Proj. file: 24-172-Attenuation-100yr-City Datum.gpw Tuesday, 10 / 8 / 2024 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2025 Hydrograph Summary Report 3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Manual 24.19 5 245 34,347 ------ ------ ------ Post Condition (Basins 1-7) 2 Reservoir 8.468 5 250 32,900 1 266.12 8,920 IMP-1 24-172-Attenuation-100yr-City Datum.gpw Return Period: 100 Year Tuesday, 10 / 8 / 2024 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2025 RATIONAL METHOD HYDROGRAPH PROGRAM COPYRIGHT 1992, 2001 RICK ENGINEERING COMPANY RUN DATE 10/2/2024 HYDROGRAPH FILE NAME Text1 TIME OF CONCENTRATION 5 MIN. 6 HOUR RAINFALL 2.95 INCHES BASIN AREA 3.62 ACRES RUNOFF COEFFICIENT 0.89 PEAK DISCHARGE 24.19 CFS TIME (MIN) = 0 TIME (MIN) = 5 TIME (MIN)= 10 TIME (MIN) = 15 TIME (MIN) = 20 TIME (MIN) = 25 TIME (MIN) = 30 TIME (MIN) = 35 TIME (MIN)= 40 TIME (MIN)= 45 TIME (MIN)= 50 TIME (MIN)= 55 TIME (MIN)= 60 TIME (MIN)= 65 TIME (MIN)= 70 TIME (MIN)= 75 TIME (MIN)= 80 TIME (MIN)= 85 TIME (MIN)= 90 TIME (MIN)= 95 TIME (MIN)= 100 TIME (MIN)= 105 TIME (MIN)= 110 TIME (MIN)= 115 TIME (MIN)= 120 TIME (MIN)= 125 TIME (MIN)= 130 TIME (MIN)= 135 TIME (MIN)= 140 TIME (MIN)= 145 TIME (MIN)= 150 TIME (MIN)= 155 TIME (MIN)= 160 TIME (MIN)= 165 TIME (MIN)= 170 TIME (MIN)= 175 TIME (MIN)= 180 TIME (MIN)= 185 TIME (MIN)= 190 TIME (MIN)= 195 TIME (MIN)= 200 TIME (MIN)= 205 TIME (MIN)= 210 TIME (MIN)= 215 TIME (MIN)= 220 TIME (MIN)= 225 TIME (MIN)= 230 TIME (MIN)= 235 TIME (MIN)= 240 TIME (MIN)= 245 TIME (MIN)= 250 TIME (MIN)= 255 TIME (MIN)= 260 TIME (MIN)= 265 TIME (MIN)= 270 TIME (MIN) = 275 TIME (MIN) = 280 TIME (MIN) = 285 TIME (MIN) = 290 TIME (MIN) = 295 TIME (MIN) = 300 TIME (MIN) = 305 TIME (MIN)= 310 TIME (MIN)= 315 TIME (MIN) = 320 TIME (MIN) = 325 TIME (MIN) = 330 TIME (MIN) = 335 TIME (MIN) = 340 TIME (MIN)= 345 TIME (MIN)= 350 TIME (MIN)= 355 DISCHARGE (CFS) = 0 DISCHARGE (CFS) = 0.6 DISCHARGE (CFS) = 0.6 DISCHARGE (CFS) = 0.6 DISCHARGE (CFS) = 0.6 DISCHARGE (CFS) = 0.6 DISCHARGE (CFS) = 0.6 DISCHARGE (CFS) = 0.6 DISCHARGE (CFS) = 0.6 DISCHARGE (CFS) = 0.6 DISCHARGE (CFS) = 0.6 DISCHARGE (CFS) = 0.7 DISCHARGE (CFS) = 0.7 DISCHARGE (CFS) = 0.7 DISCHARGE (CFS) = 0.7 DISCHARGE (CFS) = 0.7 DISCHARGE (CFS) = 0.7 DISCHARGE (CFS) = 0.7 DISCHARGE (CFS) = 0.7 DISCHARGE (CFS) = 0.8 DISCHARGE (CFS) = 0.8 DISCHARGE (CFS) = 0.8 DISCHARGE (CFS) = 0.8 DISCHARGE (CFS) = 0.8 DISCHARGE (CFS) = 0.9 DISCHARGE (CFS) = 0.9 DISCHARGE (CFS) = 0.9 DISCHARGE (CFS) = 0.9 DISCHARGE (CFS) = 1 DISCHARGE (CFS) = 1 DISCHARGE (CFS) = 1 DISCHARGE (CFS) = 1.1 DISCHARGE (CFS) = 1.1 DISCHARGE (CFS) = 1.2 DISCHARGE (CFS) = 1.2 DISCHARGE (CFS) = 1.3 DISCHARGE (CFS) = 1.3 DISCHARGE (CFS) = 1.4 DISCHARGE (CFS) = 1.5 DISCHARGE (CFS) = 1.6 DISCHARGE (CFS)= 1.7 DISCHARGE (CFS) = 1.8 DISCHARGE (CFS) = 2 DISCHARGE (CFS) = 2.2 DISCHARGE (CFS) = 2.4 DISCHARGE (CFS) = 3 DISCHARGE (CFS) = 3.4 DISCHARGE (CFS) = 5 DISCHARGE (CFS)= 7.8 DISCHARGE (CFS) = 24.19 DISCHARGE (CFS) = 4 DISCHARGE (CFS)= 2.7 DISCHARGE (CFS) = 2.1 DISCHARGE (CFS)= 1.7 DISCHARGE (CFS) = 1.5 DISCHARGE (CFS) = 1.4 DISCHARGE (CFS) = 1.2 DISCHARGE (CFS) = 1.1 DISCHARGE (CFS) = 1 DISCHARGE (CFS) = 1 DISCHARGE (CFS) = 0.9 DISCHARGE (CFS) = 0.9 DISCHARGE (CFS) = 0.8 DISCHARGE (CFS) = 0.8 DISCHARGE (CFS) = 0.8 DISCHARGE (CFS) = 0.7 DISCHARGE (CFS) = 0.7 DISCHARGE (CFS)= 0.7 DISCHARGE (CFS)= 0.7 DISCHARGE (CFS) = 0.6 DISCHARGE (CFS) = 0.6 DISCHARGE (CFS) = 0.6 TIME (MIN) = 360 TIME (MIN) = 365 DISCHARGE (CFS) = 0.6 DISCHARGE (CFS) = 0 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2025 Tuesday, 10 / 8 / 2024 Hyd. No. 1 Post Condition (Basins 1-7) Hydrograph type = Manual Peak discharge = 24.19 cfs Storm frequency = 100 yrs Time to peak = 4.08 hrs Time interval = 5 min Hyd. volume = 34,347 cuft 4 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 28.00 28.00 Q (cfs) Time (hrs) Post Condition (Basins 1-7) Hyd. No. 1 -- 100 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2025 Tuesday, 10 / 8 / 2024 Hyd. No. 2 IMP-1 Hydrograph type = Reservoir Peak discharge = 8.468 cfs Storm frequency = 100 yrs Time to peak = 4.17 hrs Time interval = 5 min Hyd. volume = 32,900 cuft Inflow hyd. No. = 1 - Post Condition (Basins 1-7)Max. Elevation = 266.12 ft Reservoir name = IMP-1 Max. Storage = 8,920 cuft Storage Indication method used. 5 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 28.00 28.00 Q (cfs) Time (hrs) IMP-1 Hyd. No. 2 -- 100 Year Hyd No. 2 Hyd No. 1 Total storage used = 8,920 cuft Pond Report 6 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2025 Tuesday, 10 / 8 / 2024 Pond No. 1 - IMP-1 Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 259.42 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 259.42 10 0 0 2.75 262.17 10 28 28 2.75 262.17 10 0 28 3.25 262.67 10 5 33 3.25 262.67 10 0 335.00 264.42 10 17 50 5.00 264.42 10 0 50 5.50 264.92 5,583 1,395 1,445 6.00 265.42 6,044 2,907 4,352 6.50 265.92 6,520 3,141 7,493 7.00 266.42 8,028 3,637 11,130 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in)= 24.00 Inactive 0.00 0.00 Span (in)= 24.00 0.00 0.00 0.00 No. Barrels = 1 100 Invert El. (ft)= 259.54 0.00 0.00 0.00 Length (ft)= 53.00 0.00 0.00 0.00 Slope (%)= 1.70 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a Yes No No Crest Len (ft)= 4.80 0.00 0.00 0.00 Crest El. (ft)= 264.92 0.00 0.00 0.00 Weir Coeff.= 3.33 3.33 3.33 3.33 Weir Type = 1 --- --- --- Multi-Stage = Yes NoNoNo Exfil.(in/hr)= 0.000 (by Contour) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 Stage (ft) 0.00 259.42 2.00 261.42 4.00 263.42 6.00 265.42 8.00 267.42 Elev (ft) Discharge (cfs) Stage / Discharge Total Q Culv A Weir AStruct HG Pond No. 1 -IMP-1 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 Stage (fl) 4.80 ft Riser WeirA -Elev. 264.92 Project: 24-172-Attenuation-1 00yr-City Datum.gpw \ Front View Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2025 Top of pond Elev. 266.42 '\__ Bottom of pond Elev. 259.42 53.0 LF of 24.0 in@ 1.70% CulvA -Inv. 259.54 NTS -Looking Downstream ----100-yr Inflow hydrograph = 1. Manual -Post Condition (Basins 1-7) Tuesday, 10/8/2024 Hydraflow Storm Sewers Extension for Autodesk® Civil 3D® Plan Structure - (3) Structure - (6) Project File: Basin SD to Outfall.stm Number of lines: 5 Date: 10/2/2024 Storm Sewers v2023.00 Storm Sewer Inventory Report Page 1 Line Alignment Flow Data Physical Data Line ID No. Dnstr Line Defl June Known Drng Runoff Inlet Invert Line Invert Line Line N J-Loss Inlet/ Line Length angle Type Q Area Coeff Time EIDn Slope El Up Size Shape Value Coeff Rim El No. (ft) (deg) (cfs) (ac) (C) (min) (ft) (%) (ft) (in) (n) (K) (ft) 1 End 59.000 -128.961 MH 0.00 0.00 0.00 0.0 240.74 21.20 253.25 24 Cir 0.013 1.00 266.74 1 2 1 110.580 84.371 MH 0.00 0.00 0.00 0.0 253.25 1.65 255.08 24 Cir 0.013 0.15 266.74 2 3 2 166.300 0.000 None 0.00 0.00 0.00 0.0 255.08 1.67 257.85 24 Cir 0.013 0.60 264.74 3 4 3 68.570 -33.377 MH 0.00 0.00 0.00 0.0 257.85 1.72 259.03 24 Cir 0.013 0.31 265.74 4 5 4 30.780 15.294 Grate 26.42 0.00 0.00 0.0 259.03 1.66 259.54 24 Cir 0.013 1.00 266.54 5 Project File: Basin SD to Outfall.stm Number of lines: 5 Date: 10/2/2024 Storm Sewers v2025.00 Storm Sewer Summary Report Page 1 Line Line ID Flow Line Line Line Invert Invert Line HGL HGL Minor HGL Dns Junction No. rate Size shape length ELDn EL Up Slope Down Up loss Junct Line Type (cfs) (in) (ft) (ft) (ft) (%) (ft) (ft) (ft) (ft) No. 1 1 26.42 24 Cir 59.000 240.74 253.25 21.203 241.43 255.04 1.23 255.04 End Manhole 2 2 26.42 24 Cir 110.580 253.25 255.08 1.655 255.04 256.87 n/a 256.87 1 Manhole 3 3 26.42 24 Cir 166.300 255.08 257.85 1.666 256.87 259.64 0.74 259.64 2 None 4 4 26.42 24 Cir 68.570 257.85 259.03 1.721 259.64 260.82 0.38 260.82 3 Manhole 5 5 26.42 24 Cir 30.780 259.03 259.54 1.657 260.82 261.33 1.23 261.33 4 Grate Project File: Basin SD to Outfall.stm Number of lines: 5 I Run Date: 10/2/2024 NOTES: Return period= 100 Yrs. Storm Sewers v2025.00 Hydraulic Grade Line Computations Page 1 Line Size Q Downstream Len Upstream Check JL Minor coeff loss Invert HGL Depth Area Vel Vel EGL Sf Invert HGL Depth Area Vel Vel EGL Sf Ave Enrgy elev elev head elev elev elev head elev Sf loss (in) (cfs) (ft) (ft) (ft) (sqft) (ft/s) (ft) (ft) (%) (ft) (ft) (ft) (ft) (sqft) (ft/s) (ft) (ft) (%) (%) (ft) (K) (ft) 1 24 26.42 240.74 241.43 0.69 0.96 27.50 1.23 242.66 0.000 59.000 253.25 255.04 1.79** 2.97 8.89 1.23 256.27 0.000 0.000 n/a 1.00 1.23 2 24 26.42 253.25 255.04 1.79* 2.97 8.89 1.23 256.27 0.000 110.58 D255.08 256.87 1.79** 2.97 8.89 1.23 258.10 0.000 0.000 n/a 0.15 n/a 3 24 26.42 255.08 256.87 1.79* 2.97 8.89 1.23 258.10 0.000 166.30 D257.85 259.64 1.79** 2.97 8.89 1.23 260.87 0.000 0.000 n/a 0.60 0.74 4 24 26.42 257.85 259.64 1.79* 2.97 8.89 1.23 260.87 0.000 68.570 259.03 260.82 1.79** 2.97 8.89 1.23 262.05 0.000 0.000 n/a 0.31 0.38 5 24 26.42 259.03 260.82 1.79* 2.97 8.89 1.23 262.05 0.000 30.780 259.54 261.33 1.79** 2.97 8.89 1.23 262.56 0.000 0.000 n/a 1.00 1.23 Project File: Basin SD to Outfall.stm I Number of lines: 5 I Run Date: 10/2/2024 Notes: * depth assumed; ** Critical depth. c = cir e = ellip b = box Storm Sewers v2025.00 Storm Sewer Profile Elev. (ft) 288.00 277.00 266.00 255.00 244.00 233.00 I ~:; o~I'-: ONO ci . v oiiJN c!:, -ci ii:i ,2!E> Cl) C) -= J I I I C ...J ' 0 0 m LO + 0 m cii I / :i QC -V LO LO l'-:NN co •• co C') C') N LO LO NN wu::lu::l _§ > > a::-=-= I /1/ -I §. V •-· I ~/ v ~ V //// "l/ r, ~ ::,:; .UUULT-L4 (g/ L' ~ <>A• (ro 1.65% .LUv/o 50 ----HGL----EGL 0 100 150 N C ...J ' a:, "? m <O + ~ s Cl) :i QC -v a:, a> 1--:oo co •• CO LO LO N LO LO NN wu::lu::l _§ > > a::-=-= ·--f 74• ® 1.67% 200 250 300 Reach (ft) C') .. ::::, ...J I'-; LO ;;; ' v a> a> a> <O •• a> Nl'--1'-- LO .IOIO -NN C') w .. + -ciiiJiiJ C') C s;tQC s E>> Cl) C>.=.= 350 v C ...J ' LO v -<i 0 + v m cii - :i QC -v t'? t'? 1--:oo LO • • comm N LO LO NN wu::lu::l _§ > > a::-=-= "'-'--..., I Proj . file: Basin SD to Outfall.stm ~ LO C ...J ' C') ("! LO C') + v s Cl) - :i Q Vs;t "? LO IO • com NIO N iiJii:l _§ > a::.= ~U./0 288.00 277.00 266.00 255.00 µL f -24" @ 1.66% 68.57 PU-24"@ 1.7"t.' o 400 244.00 233.00 450 Storm Sewers . BASIN-3 2.85 AC BASIN-1 1.87 AC BASIN-2 0.25 AC (SW A P ) T O B E T R E A T E D 14, 7 2 6 S F (SW A P ) N O T T O B E T R E A T E D 23, 6 6 7 S F (SWAP) TO BE TREATED 12,400 SF DATE: Oct 08, 24 2:22pm by:massy.fatini FILE:C:\Users\massy.fatini\DC\ACCDocs\SWS Engineering\2024\Project Files\24-172\PROD\Reports\Hydrology\24-172_PRE Drainage Map.dwg 1635 Lake San Marcos Drive, Suite 200 San Marcos, CA 92078 P: 760-744-0011 F: 760-744-0046 PRE DRAINAGE MAP CARRILLO ELEMENTARY SCHOOL FOR LEGEND BASIN-8 0.75 AC BASIN-9 0.60 AC BASIN-2 0.22 AC BASIN-7 1.84 AC (SW A P ) T O B E T R E A T E D 14, 7 2 6 S F BASIN-1 0.49 AC BASIN-3 0.58 AC BASIN-5 0.09 AC BAS I N - 4 0.1 5 A C BASIN-6 0.25 AC (SW A P ) N O T T O B E T R E A T E D 23, 6 6 7 S F (SWAP) TO BE TREATED 12,400 SF TOTAL Q INTO BASIN = 24.19 CFS TOTAL A INTO BASIN = 4.97 AC ATTENUATED DISCHARGE Q INTO PROPOSED PIPE = 8.47 CFS TOTAL Q = 9.82 CFS TOTAL A = 1.53 AC TOTAL Q = 26.42 CFS AFTER DETENTION = 11.26 CFS DATE: Oct 08, 24 2:25pm by:massy.fatiniFILE:C:\Users\massy.fatini\DC\ACCDocs\SWS Engineering\2024\Project Files\24-172\PROD\Reports\Hydrology\24-172_POST Drainage Map.dwg 1635 Lake San Marcos Drive, Suite 200 San Marcos, CA 92078 P: 760-744-0011 F: 760-744-0046 POST DRAINAGE MAP CARRILLO ELEMENTARY SCHOOL FOR LEGEND