HomeMy WebLinkAbout2018 AVENUE OF THE TREES; ; CBR2023-4184; Recycle(cityof Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
APPLICABLE TO NEW CONS RUCTION, RESIDENTIAL ADDITIONS AND ALTERATIONS OVER $60K
VALUATION AND COMMERCIAL ADD IT IONS AND ALTER AT IONS O \/ER $ 2 0 0 K . You are required to list
materials that will be reused, recycled or disposed from your project. If you have questions about the recycling
requirement or completing this form, please contact Republic Services at (760) 332-6464, a certified C&D recycler, or
the Carlsbad Building Division at (442) 339-2719 Please note: Unless ou are self-haulin roved
haulers must be used for all construction ro·ects within the City of Carlsbad.
PART l Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued
Applicant Information
Permit No. _____________ Project Title BATSON RESIDENCE
ProjectAddress2018 AVENUE OF THE TREES, CARLSBAD, CA 92008 APN
Applicant Name ALLAN TET A □c,E:rr r✓r Lost First
Applicant Address 300 CARLSBAD VILLAGE DR. CARLSBAD, CA 92008
Phone 760 268-9090 E-mail Address ALLAN@TREARCH.COM
Applicant Mailing Address
(if different than project address)
Project Type
(check all that apply):
Residential Commercial Public Building □
1 56-280-09
Other
Brief Description FIREPLACE CHIMNEY DEMOLITION, NEW LIVING ROOM WINDOW, INTERIOR RENOVATION
Project Size 1,523 SF Estimated Cost of Project s_1_0_o_,_0_0_0 ____________ _
(square footage)
Please check the appropriate box: D I plan on using REPUBLIC SERVICES roll-off bin(s) for all materials and will provide all receipts after construction.
I✓ I I plan on using a City Approved hauler and will provide all receipts at the final occupancy inspection.
D This is a proposed LEED certified project. I plan on separating materials on site in conjunction with Republic.
Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information
provided in and with this form pertains to construction and demolition debris generated only from the project listed
in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the
best of my knowledge and belief.
Print Name ALLAN TET A Signature ALLAN TET A
Page 1 of 4
Date 08/24/2023
Rev. 2.10.21
CBR2023-4184
y g, Republic Services or app
without a completed Coostwctloo Waste Management Piao
□
□
PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will
not be issued without a completed Construction Waste Management Plan.
DEBRIS RECYCLING ESTIMATE:
-PermitNo. Project Title BATSON RESIDENCE
Project Address 2018 AVENUE OF THE TREES, CARLSBAD, CA 92008 APN 156-280-09
Applicant Name TETA, ALLAN Phone 760-268-9090
Last First
-,~-i111m■: Complete the following table with estimated waste tonnage to be generated by your project.
This is your plan for construction waste management. Changes can be made on the final recycle report.
Goal: the diversion rate shall be 65% by weights of debris.
A B C
Material Type Estimated Place a ( ✓) check Place a (✓)check next Place a(✓) check next
Waste Quantity next to items to be to items to be to items to be
(tons) reused or salvaged recycled disposed at landfill
Complete this line of the table only if
only using WASTE MANAGEMENT
roll-oft bins.
Mixed C&D Debris
Parking lot Asphalt & Concrete
Brick/ Masonry/ Til e
Mixed Inert Debris I/ 2... v
Cabinets, Doors, Fixtures,
Windows {circle all that apply)
Carpet 2-00 u,s V
Carpet Padding / Foam '2..o I k J v
Cardboard
Ceiling Tile {acoustic)
Drywall {used, new, scrap) so" /J,5 ✓
Landscape Debris (brush, trees,
stumps, etc.) No dirt.
Unpainted Wood & Pallets -:s #() rJ 10 16> ~
Concrete Roofing Materials
Scrap Metal
Stucco
Other:
TOTAL -To meet 65% Diversion Requirement (estimate) /5~0 X 0.65 = ~ D. 9 2 s-tons
Total Estimated Waste from above Minimum Required Diversion
Contractor/Owner Signature W4---Datt! -i-/2-vzv
II ,--.
Page 2 of 4 Rev. 711120
PART 2 Complete before final inspection, obtain City Approved hauler receipts and return prior to final
building approval.
DEBRIS RECYCLING REPORT (ACTUAL): -Acknowledgement
I certify under penalty of pe rjury under the laws of the State of California that the information provided in and with
this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have
reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge
and belief.
Permit No. Print Name
Address Date
11111•'■:-Use this Final Log below to track loads of materials as they leave the job site.
@@SAVE RECEIPTS@@
Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken.
Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons.
A B C
Date Material Type Actual Amt Actual Amt Actual Amt Destination Facility
Reused or Recycled Disposed in (Name, Address, Phone)
Salvaged Landfill
Exam{!_/e: Palomar Transfer Station, 5960 El
01/01/2020 Concrete (broken) 5 tans Camino Real
-(760) 603-0153
r--
@TOTAL
1'1111, .. ,.
~ 65%
Diversion Rate Achieved = % S65%□
Total of columns A + B Total of columns A + B + C DIVERSION
Contractor/Owner Signature Date -
Attach the following documentation to this Report: Return completed form and documentation to: . Original recycling weight tickets, landfill weight tickets City of Carlsbad . Original donation receipts with photos and/or itemized descriptions Building Division (1st Floor) . Any other relevant information to support Recycling Report 1635 Faraday Avenue
Carlsbad, CA 92008
Page 3 of 4 Rev. 04122
Conversion Table for Common Construction Waste
This document is informational only. It is here to help you convert truckload auantities to tons if necessarv.
Column A Column B Column C
Category Material Volume Tons/Unit Tons
Mixed Debris Construction cy X 0.18 =
Demolition cy X 1.19 =
Asphalt/Concrete Asphalt (broken) cy X 0.70 =
Concrete (broken) cy X 1.20 =
Concrete (solid slab) cy X 1.30 =
Brick/Masonry/Tile Brick (broken) cy X 0.70 =
Brick (whole, palletized) cy X 1.51 =
Masonry brick (broken) cy X 0.60 =
Tile sq ft X 0.00175 =
Building Materials (cabinets, doors, windows, etc.) cy X 0.15 =
Cardboard (flat) cy X 0.05 =
Carpet By square foot sq ft X 0.0005 =
By cubic yard cy X 0.30 =
Carpet Padding/Foam sq ft X 0.000125 =
Ceiling Tiles Whole (palletized) cy X 0.0003 =
Loose cy X 0.09 =
Drywall (new or used) 1/211 (by square foot) sq ft X 0.0008 =
5/811 (by square foot) sq ft X 0.00105 =
Demo/used (by cu. yd.) cy X 0.25 =
Landscape Debris (brush, trees, etc.) cy X 0.15 =
Asphalt Composition
Shingles, asphalt Shingle cy X 0.22 =
Unpainted Wood/Pallets By board foot bd ft X 0.001375 =
By cubic yard cy X 0.15 =
Trash/Garbage cy X 0.18 =
Other (estimated weight) cy X estimate =
Cy X estimate =
cy X estimate =
cy X estimate =
Total all =
Page 4 of4
Rev. 2.10.21