HomeMy WebLinkAbout1808 ASTON AVE; ; CBC2023-0267; RecycleC Cityof
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
APPLICABLE TO NEW CONS RU CTION, RESIDENTIAL ADDITIONS AND ALTERATIONS OVER $6OK
VALUATION AND COMMERCIAL ADDITIONS AND ALTERATIONS OVER $200K. You are required to list
materials that will be reused, recycled or disposed from your project. If you have questions about the recycling
requirement or completing this form, please contact Republic Services at (760) 332-6464, a certified C&D recycler, or
the Carlsbad Building Division at (442) 339-2719 Please note: Unless you are self-hauling, Republic Services or approved
haulers must be used for all construction projects within the City of Carlsbad.
PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued
Applicant Information
Permit No. CBC2023-0267 Project Title Wells Fargo Bank -Tl Rno Suite 270
Project Address 1808 Aston Ave
Applicant Name Robertson, Jessie
Last First
Applicant Address 2028 2nd St Norco Ca 92860
Contractor
[Z]
APN 212-120-07-00
Architect Other □□--
Phone ( 951 ) 847-2471 E-mail Address jgrafflin@grafflinconstruction.com
Applicant Mailing Address _n_/_a _____________________________ _
(if different than project address)
Project Type
(check all that apply):
Residential
□
Commercial
[Z]
Brief Description Remodel of Administrative offices
Public Building □
Project Size Carpet 22,968, Construction 2,789 Estimated Cost of Project $_$_1_,5_0_0_,0_0_0 __________ _
(square footage)
Please check the appropriate box:
D I plan on using REPUBLIC SERVICES roll-off bin(s) for all materials and will provide all receipts after construction.
I ✓ I I plan on using a City Approved hauler and will provide all receipts at the final occupancy inspection.
D This is a proposed LEED certified project. I plan on separating materials on site in conjunction with Republic.
Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information
provided in and with this form pertains to construction and demolition debris generated only from the project listed
in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the
best of my knowledge and belief.
Print Name Jessica Robertson s;gnatu,e ~ Date 8/6/2024-
Page 1 of4
Rev. 2. 10.21
PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will
not be issued without a completed Construction Waste Management Plan.
DEBRIS RECYCLING ESTIMATE:
I . Permit No. CBC2023-0267 Project Title Wells Fargo Bank -Tl Rno Suite 2j
Project Address 1808 Aston Ave Carlsbad APN 212-120-07-00
Applicant Name Grafflin Construction c/o Jessie Robertson Phone 951.847.2471
Last First -Complete the following table with estimated waste tonnage to be generated by your project.
This is your plan for construction waste management. Changes can be made on the final recycle report.
Goal: the diversion rate shall be 65% by weights of debris.
A B C
Material Type Estimated Place a (✓) check Place a(✓) check next Place a(✓) check next
Waste Quantity next to items to be to items to be to items to be
(tons) reused or salvaged recycled disposed at landfill
Complete this line of the table only if 2 only using WASTE MANAGEMENT
roll-off bins.
Mixed C&D Debris
Parking lot Asphalt & Concrete
Brick/ Masonry/ Tile
Mixed Inert Debris
Cabinets, Doors, Fixtures,
Windows (circle all that apply)
Carpet
Carpet Padding/ Foam
Cardboard
Ceiling Ti le (acoustic}
Drywall (used, new, scrap}
Landscape Debris (brush, trees,
stumps, etc.) No dirt.
Unpainted Wood & Pallets
Concrete Roofing Materials
Scrap Metal
Stucco
Other:
TOTAL
-..,::1.u11
To m eet 65% Diversion Requirement (estimate) 2 X 0.65 = 1.3 tons
Total Estimated Waste from above Minimum Required Diversion
ia'#/4--Date Contractor/Owner Signature 8/6/2024
o-'j/fff"/' , , ,
Page 2 of 4 Rev. 711120
PART 2 Complete before final inspection, obtain City Approved hauler receipts and return prior to final
building approval.
DEBRIS RECYCLING REPORT (ACTUAL): -Acknowledgement
I certify under penalty of perjury under the laws of the State of California that the information provided in and with
this form pertains to construqion and demolition debris generated only from the project listed in PART 1, that I have
reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge
and belief.
Permit No. CBC2023-0267 Print Name Grafflin Construction (Jessie Robertson)
Address 1808 Aston Ave Carlsbad Date 8/6/2024
:::1.1,,h.,•:• Use this Final Log below to track loads of materials as they leave the job site.
@@SAVE RECEIPTS@@
Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken.
Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons.
A B C
Date Material Type Actual Amt Actual Amt Actual Amt Destination Facility
Reused or Recycled Disposed in (Name, Address, Phone)
Salvaged Landfill
Examete: Palomar Transfer Station, 5960 El
01/01/2020 Concrete (broken) 5 tans Camino Reol
-(760) 603-0153
8/22 Mixed C&D 0 2.01 1.08 Sance Resource Lemon Grove
8/23 Mixed C&D 0 2.55 1.37 Sance Resource Lemon Grove
8/24 Mixed C&O 0 2.11 1.14 Sance Resource Lemon Grove
8/29 Mixed C&D 0 .62 .33 Edee Station La Mesa
(!!)TOTAL 0 7.29 3.92
a."''"•ur,
Diversion Rate Achieved 7.29 / 3.92 :65 % ~65%[~] S65%
Total of columns A + 8 Total of columns A + B + C DIVERSION
Digitally sign~ by' Jtuie Robertsoo
,~
ON: cna1essle RotM-rtson, o-G,affl,n
Contractor/Owner Signature_ ;:~::;,~c;;;i~~~~:S!~~.'°"-com, Date 2/3/2025 -
-c-O~
Dat~ 2025.02.03 1 2:22·49 .()8'00' Return completed form and documentation to: Attach the following documentation to this Report: . Original recycling weight tickets, landfill weight tickets City of Carlsbad . Original donation receipts with photos and/or itemized descriptions Building Division (1st Floor) . Any other relevant information to support Recycling Report 1635 Faraday Avenue
Carlsbad, CA 92008
v
Page 3 of 4 Rev. 04122
Date: 9/5/2024
Project: WFA-Carlsbad
CONSTRUCTION AND DEMOLITION DEBRIS RECYCLING LOG
3825 Bancroft Drive, Spring Valley, CA 91977
P -619-589-6001 F -619-589-7158
Daily Log of Construction and Demolition (C&D} Materials Removed or Reused on Job Site
Job No: 2441
Customer: Grafflin Conslruclion. Inc.
Address: 1808 Aston Ave. 2nd Fl., Stes 245, 250, 260-265 & 270, Carlsbad, CA 92008
(TONS) (TONS)
DATE TICKET NO. DESTINATION LOCATION RECYCLED TRASH 'll. RECYCLABLE
8/22/24 6652 SANCO Resource Recoverv Lemon Grove CA 2.01 1.08 65%
8/23/24 6827 SANCO Resource Recoverv Lemon Grove CA 2.55 1.37 65%
8/24/24 7026 SANCO Resource Recoverv Lemon Grove CA 2.11 1.14 65%
8/29/24 33776 EDCO Station La Mesa CA 0.62 0.33 65%
7.29 3.92
• 10 wheeler holds 5 CY of concrete with allowable air space or 20,250 lbs/10.12 tons of concrete
TOTAL RECYCLED:
65%
Name of Person Verifying Accuracy:
Signature:
MATERIAL TYPE
Mixed C& D
Mixed C & D
Mixed C &D
Mixed C & D
EDCO Station
8184 Commercial St.
La Mesa, CA 91942
{619) 466-3355
Customer: 0171 Ticket: 33776 In:
Date: 08/29/24 out:
CASPER CO
-~ 5 BANCROFT DR.
SP:RJ;.NG VAT.J,EY CA 919.1].
Commodity Units Rate
55 C&D Certified .96
7:58
8:14
Truck:
Container:
Route:
Origin:
INVOICE
.1101/1101
02055
020 SAN DIEGO
[Gross(In): 9.78 tons Scl#3 Tare 8.82 tons Man Wt Net:
Extended
Charge
122.88
.96 tons)
TOTAL DUE 122 .88
Construction & Demolition Diversion Certificate --Diversion Percenta9.e 65%
This certifies that the company listed above has utilized an EDCO f ac1lity to divert construction demolition materials in accordance
with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility.
NOLAN Driver
$.ANCO Resource Recovery
,.6750 Federal Blvd.
,.Lemon Grove, CA 91945
(619) 287-7555
customer: 0569 Ticket: 7026
Date : 08/24/24
CASPER CO
3825 BANCROFT DR
SPRING VALLEY CA
1808 ASTON AVE
9.1977
Rate
0 -5
In: 10 : 06
Out: 10:13
108.00 per TON
Truck: 1103/1103
Container: -
Route : 03034
Origin: 030 UNINCORPO
Commodity Units
:3·4 CONSTRUCTION / DEMOL 3 . 2 6
[Gross(In): 40,300. lbs Scl#2 Tare 33,780. lbs Scl#2
Extended
Charge
352.08
Net: 6,520. lbs]
TOTAL DUE 352.08
Construction & Demolition Diversion Certificate --Diversion Percentage 65%
This certifies that the company listed above has utilized an EDCO facility to divert construction demolition materials in accordance
with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility.
Edgar Almazan Driver
SANCO Resource Recovery
6750 Federal Blvd.
2., '-\ \ 018
Lemon Grove, CA 91945
(619) 287-7555
Customer: 0569
CASPER CO
3825 BANCROFT DR
SPRING VALLEY CA 91977
1808 ASTON AVE
CQmmodity
Ticket: 6827
Date: 08/23/24
Rate
o -5
In:
Out:
5:48
5:54
108.00 per TON
INVOICE
Truck: 1108/1108
Container: -
Route: 02034
Origin: 020 SAN DIEGO
34 CONSTRUCTION/ DEMOL
[Gross ( In) :~42, 740. lbs
Units
3. 93
Scl#2 Tare 34 ,880. lbs Scl#2 Net:
Extended
Charge
424.44
7,860 . lbs]
Jd>##//0-?8
TOTAL DUE 424.44
Construction & Demolition Diversion Certificate --Diversion Percentage 65%
This certifies that the company listed above has utilized an EDCO facility to divert construction demolition materials in accordance
with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility.
Valeria Lopez Driver
SANCO Resource Recovery
6750 Federal Blvd.
Lemon Grove, CA 91945
(619) 287-7555
Customer: 0569 Ticket:
CASPER CO
3825 BANCROFT DR
SPRING VALLEY CA 91977
1808 ASTON AVE
Date:
6652
08/22/24
Rate
o-5
In:
Out:
108.00 per TON
5:50
5:59
INVOICE
Truck: 0021/0021
Container: -
Route: 02034
Origin: 020 SAN DIEGO
Commodity Units
34 CONSTRUCTION/ DEMOL 3.10
[Gross(In): 39,920. lbs Scl#2 Tare 33,720. lbs Scl#2
Extended
Charge
334.80
Net: 6,200. lbs]
TOTAL DUE 334.80
Construction & Demolition Diversion Certificate •· Diversion Percentage 65%
This certifies that the company listed above has utilized an EDCO facility to divert construction demolition materials in accordance
with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility.
Jaime Lopez Driver