Loading...
HomeMy WebLinkAbout1808 ASTON AVE; ; CBC2023-0267; RecycleC Cityof Carlsbad CONSTRUCTION WASTE MANAGEMENT PLAN B-59 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov APPLICABLE TO NEW CONS RU CTION, RESIDENTIAL ADDITIONS AND ALTERATIONS OVER $6OK VALUATION AND COMMERCIAL ADDITIONS AND ALTERATIONS OVER $200K. You are required to list materials that will be reused, recycled or disposed from your project. If you have questions about the recycling requirement or completing this form, please contact Republic Services at (760) 332-6464, a certified C&D recycler, or the Carlsbad Building Division at (442) 339-2719 Please note: Unless you are self-hauling, Republic Services or approved haulers must be used for all construction projects within the City of Carlsbad. PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued Applicant Information Permit No. CBC2023-0267 Project Title Wells Fargo Bank -Tl Rno Suite 270 Project Address 1808 Aston Ave Applicant Name Robertson, Jessie Last First Applicant Address 2028 2nd St Norco Ca 92860 Contractor [Z] APN 212-120-07-00 Architect Other □□-- Phone ( 951 ) 847-2471 E-mail Address jgrafflin@grafflinconstruction.com Applicant Mailing Address _n_/_a _____________________________ _ (if different than project address) Project Type (check all that apply): Residential □ Commercial [Z] Brief Description Remodel of Administrative offices Public Building □ Project Size Carpet 22,968, Construction 2,789 Estimated Cost of Project $_$_1_,5_0_0_,0_0_0 __________ _ (square footage) Please check the appropriate box: D I plan on using REPUBLIC SERVICES roll-off bin(s) for all materials and will provide all receipts after construction. I ✓ I I plan on using a City Approved hauler and will provide all receipts at the final occupancy inspection. D This is a proposed LEED certified project. I plan on separating materials on site in conjunction with Republic. Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information provided in and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge and belief. Print Name Jessica Robertson s;gnatu,e ~ Date 8/6/2024- Page 1 of4 Rev. 2. 10.21 PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will not be issued without a completed Construction Waste Management Plan. DEBRIS RECYCLING ESTIMATE: I . Permit No. CBC2023-0267 Project Title Wells Fargo Bank -Tl Rno Suite 2j Project Address 1808 Aston Ave Carlsbad APN 212-120-07-00 Applicant Name Grafflin Construction c/o Jessie Robertson Phone 951.847.2471 Last First -Complete the following table with estimated waste tonnage to be generated by your project. This is your plan for construction waste management. Changes can be made on the final recycle report. Goal: the diversion rate shall be 65% by weights of debris. A B C Material Type Estimated Place a (✓) check Place a(✓) check next Place a(✓) check next Waste Quantity next to items to be to items to be to items to be (tons) reused or salvaged recycled disposed at landfill Complete this line of the table only if 2 only using WASTE MANAGEMENT roll-off bins. Mixed C&D Debris Parking lot Asphalt & Concrete Brick/ Masonry/ Tile Mixed Inert Debris Cabinets, Doors, Fixtures, Windows (circle all that apply) Carpet Carpet Padding/ Foam Cardboard Ceiling Ti le (acoustic} Drywall (used, new, scrap} Landscape Debris (brush, trees, stumps, etc.) No dirt. Unpainted Wood & Pallets Concrete Roofing Materials Scrap Metal Stucco Other: TOTAL -..,::1.u11 To m eet 65% Diversion Requirement (estimate) 2 X 0.65 = 1.3 tons Total Estimated Waste from above Minimum Required Diversion ia'#/4--Date Contractor/Owner Signature 8/6/2024 o-'j/fff"/' , , , Page 2 of 4 Rev. 711120 PART 2 Complete before final inspection, obtain City Approved hauler receipts and return prior to final building approval. DEBRIS RECYCLING REPORT (ACTUAL): -Acknowledgement I certify under penalty of perjury under the laws of the State of California that the information provided in and with this form pertains to construqion and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge and belief. Permit No. CBC2023-0267 Print Name Grafflin Construction (Jessie Robertson) Address 1808 Aston Ave Carlsbad Date 8/6/2024 :::1.1,,h.,•:• Use this Final Log below to track loads of materials as they leave the job site. @@SAVE RECEIPTS@@ Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken. Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons. A B C Date Material Type Actual Amt Actual Amt Actual Amt Destination Facility Reused or Recycled Disposed in (Name, Address, Phone) Salvaged Landfill Examete: Palomar Transfer Station, 5960 El 01/01/2020 Concrete (broken) 5 tans Camino Reol -(760) 603-0153 8/22 Mixed C&D 0 2.01 1.08 Sance Resource Lemon Grove 8/23 Mixed C&D 0 2.55 1.37 Sance Resource Lemon Grove 8/24 Mixed C&O 0 2.11 1.14 Sance Resource Lemon Grove 8/29 Mixed C&D 0 .62 .33 Edee Station La Mesa (!!)TOTAL 0 7.29 3.92 a."''"•ur, Diversion Rate Achieved 7.29 / 3.92 :65 % ~65%[~] S65% Total of columns A + 8 Total of columns A + B + C DIVERSION Digitally sign~ by' Jtuie Robertsoo ,~ ON: cna1essle RotM-rtson, o-G,affl,n Contractor/Owner Signature_ ;:~::;,~c;;;i~~~~:S!~~.'°"-com, Date 2/3/2025 - -c-O~ Dat~ 2025.02.03 1 2:22·49 .()8'00' Return completed form and documentation to: Attach the following documentation to this Report: . Original recycling weight tickets, landfill weight tickets City of Carlsbad . Original donation receipts with photos and/or itemized descriptions Building Division (1st Floor) . Any other relevant information to support Recycling Report 1635 Faraday Avenue Carlsbad, CA 92008 v Page 3 of 4 Rev. 04122 Date: 9/5/2024 Project: WFA-Carlsbad CONSTRUCTION AND DEMOLITION DEBRIS RECYCLING LOG 3825 Bancroft Drive, Spring Valley, CA 91977 P -619-589-6001 F -619-589-7158 Daily Log of Construction and Demolition (C&D} Materials Removed or Reused on Job Site Job No: 2441 Customer: Grafflin Conslruclion. Inc. Address: 1808 Aston Ave. 2nd Fl., Stes 245, 250, 260-265 & 270, Carlsbad, CA 92008 (TONS) (TONS) DATE TICKET NO. DESTINATION LOCATION RECYCLED TRASH 'll. RECYCLABLE 8/22/24 6652 SANCO Resource Recoverv Lemon Grove CA 2.01 1.08 65% 8/23/24 6827 SANCO Resource Recoverv Lemon Grove CA 2.55 1.37 65% 8/24/24 7026 SANCO Resource Recoverv Lemon Grove CA 2.11 1.14 65% 8/29/24 33776 EDCO Station La Mesa CA 0.62 0.33 65% 7.29 3.92 • 10 wheeler holds 5 CY of concrete with allowable air space or 20,250 lbs/10.12 tons of concrete TOTAL RECYCLED: 65% Name of Person Verifying Accuracy: Signature: MATERIAL TYPE Mixed C& D Mixed C & D Mixed C &D Mixed C & D EDCO Station 8184 Commercial St. La Mesa, CA 91942 {619) 466-3355 Customer: 0171 Ticket: 33776 In: Date: 08/29/24 out: CASPER CO -~ 5 BANCROFT DR. SP:RJ;.NG VAT.J,EY CA 919.1]. Commodity Units Rate 55 C&D Certified .96 7:58 8:14 Truck: Container: Route: Origin: INVOICE .1101/1101 02055 020 SAN DIEGO [Gross(In): 9.78 tons Scl#3 Tare 8.82 tons Man Wt Net: Extended Charge 122.88 .96 tons) TOTAL DUE 122 .88 Construction & Demolition Diversion Certificate --Diversion Percenta9.e 65% This certifies that the company listed above has utilized an EDCO f ac1lity to divert construction demolition materials in accordance with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility. NOLAN Driver $.ANCO Resource Recovery ,.6750 Federal Blvd. ,.Lemon Grove, CA 91945 (619) 287-7555 customer: 0569 Ticket: 7026 Date : 08/24/24 CASPER CO 3825 BANCROFT DR SPRING VALLEY CA 1808 ASTON AVE 9.1977 Rate 0 -5 In: 10 : 06 Out: 10:13 108.00 per TON Truck: 1103/1103 Container: - Route : 03034 Origin: 030 UNINCORPO Commodity Units :3·4 CONSTRUCTION / DEMOL 3 . 2 6 [Gross(In): 40,300. lbs Scl#2 Tare 33,780. lbs Scl#2 Extended Charge 352.08 Net: 6,520. lbs] TOTAL DUE 352.08 Construction & Demolition Diversion Certificate --Diversion Percentage 65% This certifies that the company listed above has utilized an EDCO facility to divert construction demolition materials in accordance with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility. Edgar Almazan Driver SANCO Resource Recovery 6750 Federal Blvd. 2., '-\ \ 018 Lemon Grove, CA 91945 (619) 287-7555 Customer: 0569 CASPER CO 3825 BANCROFT DR SPRING VALLEY CA 91977 1808 ASTON AVE CQmmodity Ticket: 6827 Date: 08/23/24 Rate o -5 In: Out: 5:48 5:54 108.00 per TON INVOICE Truck: 1108/1108 Container: - Route: 02034 Origin: 020 SAN DIEGO 34 CONSTRUCTION/ DEMOL [Gross ( In) :~42, 740. lbs Units 3. 93 Scl#2 Tare 34 ,880. lbs Scl#2 Net: Extended Charge 424.44 7,860 . lbs] Jd>##//0-?8 TOTAL DUE 424.44 Construction & Demolition Diversion Certificate --Diversion Percentage 65% This certifies that the company listed above has utilized an EDCO facility to divert construction demolition materials in accordance with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility. Valeria Lopez Driver SANCO Resource Recovery 6750 Federal Blvd. Lemon Grove, CA 91945 (619) 287-7555 Customer: 0569 Ticket: CASPER CO 3825 BANCROFT DR SPRING VALLEY CA 91977 1808 ASTON AVE Date: 6652 08/22/24 Rate o-5 In: Out: 108.00 per TON 5:50 5:59 INVOICE Truck: 0021/0021 Container: - Route: 02034 Origin: 020 SAN DIEGO Commodity Units 34 CONSTRUCTION/ DEMOL 3.10 [Gross(In): 39,920. lbs Scl#2 Tare 33,720. lbs Scl#2 Extended Charge 334.80 Net: 6,200. lbs] TOTAL DUE 334.80 Construction & Demolition Diversion Certificate •· Diversion Percentage 65% This certifies that the company listed above has utilized an EDCO facility to divert construction demolition materials in accordance with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility. Jaime Lopez Driver