Loading...
HomeMy WebLinkAbout2839 LOKER AVE; E; CBC2022-0343; PermitBuilding Permit Finaled C cityof Carlsbad Commercial Permit Print Date: 03/18/2025 Job Address: 2839 LOKER AVE E, CARLSBAD, CA 92010-6626 Permit Type: BLDG-Commercial Work Class: Parcel#: 2090831400 Track#: Valuation: $868,346.60 Lot#: Occupancy Group: S-1 Project#: #of Dwelling Units: Plan#: Bedrooms: Bathrooms: Occupant Load: Code Edition: Sprinkled: Project Title: 2019 No Construction Type: Orig. Plan Check#: Plan Check #: Tenant Improvement Permit No: Status: CBC2022-0343 Closed -Finaled Applied: 09/19/2022 Issued: 12/21/2022 Finaled Close Out: 03/18/2025 Final Inspection: 08/15/2024 INSPECTOR: Kersch, Tim Description: 15,065 SF T.I. -ADDING NEW PANEL TO EXISTING ELECTRICAL FOR NEW MACHINERY Applicant: ROBERT AARSLEFF 14427 ELMPORT LN POWAY, CA 92064-5905 FEE BUILDING PLAN CHECK Property Owner: 5TH AXIS INC 7140 ENGINEER RD SAN DIEG O, CA 92111-1422 (858) 505-0432 BUILDING PLAN REVIEW-MINOR PROJECTS (LOE) BUILDING PLAN REVIEW-MINOR PROJECTS (PLN) COMM/IND Tl -NON-STRUCTURAL SB1473 -GREEN BUILDING STATE STANDARDS FEE STRONG MOTION -COMMERCIAL (SMIP) Total Fees: $4,325.95 Total Payments To Date: $4,325.95 Contractor: MONIZ ELECTRIC AND SOLAR INC 12361 HILL COUNTRY DR POWAY, CA 92064-6015 (760) 688-0437 Balance Due: AMOUNT $1,479.56 $194.00 $98.00 $2,276.25 $35.00 $243.14 $0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from t he date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Munici pal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APP LY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection w ith this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherw ise expired. Building Division Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov { City of Carlsbad COMMERCIAL BUILDING PERMIT APPLICATION B-2 Plan Check C/:¼x()~ (J3li'J Est. Value ~ Qblf, Cl&. too PC Deposit Date Job Address 2839 Loker Ave. East Suite: APN: 209-083-14-00 -----· Tenant Name#: 5th Axis Lot#: 37C Year Built: 1989 --------------------------- Year Built: __ _ Occupancy: __ _ Construction Type: tilt-up Fire sprinklers:@'ES0NO A/C:0YEs0No BRIEF DESCRIPTION OF WORK: Adding new panels to an existing electrical service to feed new machinery D Addition/New: ____________ New SF and Use,. __________ New SF and Use ______ SF Deck, SF Patio Cover, SF Other (Specify). ___ _ [Z)Tenant Improvement: 15,065 SF, Existing Use: Whse/Mfg Proposed Use: Whse/Mfg _____ SF, Existing Use: _______ Proposed Use: ______ _ D Pool/Spa: _____ SF Additional Gas or Electrical Features? ____________ _ D Solar: ___ KW, ___ Modules, Mounted: ORoof OGround D Re roof: __________________________________ ....... _ [{] Plumbing/Mechanical/Electrical Electrical panels and branch circuitry to machinery D Other: ---==-=--=-----!.-;'-------t-,---~-=-=-,;--~~+-:----::~~~~-:---~-,-!,---::-::-:::-:-:~~...:...._=---...!.:--,,-!--- APPLICANT (PRIMARY CONTACT) Name: Robert Aarsleff Address· 14427 Elmport Lane City: Poway State: CA Zip: 92064 Phone· 858-449-5 732 Ema i 1. robe rt. aa rsleff@conceptelectrical solutions. com PROPERTY OWNER Name: Loker Axis LLC Address: 7140 Engineer Rd City: San Diego Phone: (858) 505-0432 Email: ap@5thaxis.com DESIGN PROFESSIONAL CONTRACTOR OF RECORD State:_C_A __ .Zip: 92111 Name: Milton Niederhaus Business Name: Moniz Electric & Solar Inc. Address:2165 North Nutmeg Street Address: 12361 Hill Country Dr City: Escondido State:CA Zip:92026 City: Poway State: CA Zip:_9_20_6_4 ____ _ Phone: 760-735-8883 Phone: (760) 688-0437 Email: mniederhaus1@cox.net Email: office@monizeleclctric.net Architect State License: _E_8_6_3_6 _________ CSLB License #:_9_80_6_5_5 _____ Class:_C_-1_0 _____ _ Carlsbad Business License# (Required): BLOS012151-07-2022 APPLICANT CERTIFICATION: I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. /agree to comply with all City ordinances and Stat laws relating to building construction. NAME (PRINT): Robert Aarsleff SIGN:_.__:::;.L~~c...::;..;1'.-,,1,----DATE: 9-13-2022 1635 Faraday Ave Carlsbad, CA 92008 Email: Building@carlsbadca.gov REV. 07/21 THIS PAGE REQUIRED AT PERMIT ISSUANCE PLAN CHECK NUMBER: ______ _ A BUILDING PERMIT CAN BE ISSUED TO EITHER A STATE LICENSED CONTRACTOR OR A PROPERTY OWNER. IF THE PERSON SIGNING THIS FORM IS AN AGENT FOR EITHER ENTITY AN AUTHORIZATION FORM OR LETTER IS REQUIRED PRIOR TO PERMIT ISSUANCE. (OPTION A): LICENSED CONTRACTOR DECLARATION: lherebyaffirmunderpenaltyofperjurythatlam/icensedunderprovisionsofChapter9(commencingwithSection7000)ofDivision3 of the Business and Professions Code, and my license is infu/1 force and effect. I also affirm under penalty of perjury one of the fol lowing declarations (CHOOSE ONE}: D 1 have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the labor Code, for the performance of the work which this permit is issued. PolicyNo. ______________________________________ _ -OR- (!]1 have and will maintain worker's compensation, as required by Section 3700 of the labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Insurance Company Name: _B_er_kl-'ey'--N_e_w _________________ _ Policy No. BNUWC0149477 Expiration Date: _10_,_20_23 _____________ _ -OR- O certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California. WARNING: Failure to secure workers compensation coverage is unlawful and shall subject an employer to criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for in Section 3706 of the Labor Code, interest and attorney's fees. CONSTRUCTION LENDING AGENCY, IF ANY: I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code). Lender's Name: ____________________ Lender's Address: ____________________ _ CONTRACTOR CERT/FICA TION: I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. /agree to comply with all City ordinances and State laws relating to building construction. NAME (PRINT}: THOMAS MONIZ Note: If the person signing above is an authorized agent for the contractor provid -OR - (OPTION B): OWNER-BUILDER DECLARATION : I hereby affirm that I am exempt from Contractor's License Law for the following reason: n I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure Is not intended or offered for sale (Sec. L..yd44, Business and Professions Code: The Contractor's license Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). -OR- D1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's license Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's license law). -OR-□1 am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason: A 'D, D FORM 8-61 "Owner Builder Acknowledgement and Verification Form" is required for any permit issued to a property owner. By my signature below I acknowledge that, except for my personal residence in which I must have resided for at least one year prior to completion of the improvements covered by this permit, I cannot legally sell a structure that I have built as an owner-builder if it has not been constructed in its entirety by licensed contractors./ understand that a copy of the applicable law, Sectian 7044af the Business and PrafessionsCode, is available upon request when this application is submitted or at the following Web site: http: I /www.leginfo.ca.gav/calaw.html. OWNER CERT/FICA TION: I certify that I have read the application and state that the above information is correct and that the information on the p/a ns is accurate. I agree to comply with al I City ordi nonces and S tote laws relating to bui /ding construction. NAME {PRINT): SIGN: __________ DATE: ______ _ Note: If the person signing above is an authorized agent for the property owner include form B-62 signed by property owner. 1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov 2 REV. 07/21 Building Permit Inspection History Finaled {cityof Carlsbad PERMIT INSPECTION HISTORY for (CBC2022-0343) Permit Type: BLDG-Commercial Application Date: 09/19/2022 Owner: 5TH AXIS INC Work Class: Tenant Improvement Issue Date: 12/21/2022 Subdivision: PARCEL MAP NO 15562 Status: Closed -Finaled Expiration Date: 02/10/2025 Address: 2839 LOKER AVE E IVR Number: 43364 CARLSBAD, CA 92010-6626 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date 08/14/2024 08/14/2024 BLDG-34 Rough 257860-2024 Electrical Checklist Item COMMENTS BLDG-Building Deficiency 08/15/2024 08/15/2024 BLDG-Final Inspection 257859-2024 Tuesday, March 18, 2025 Checklist Item BLDG-Building Deficiency BLDG-Plumbing Final BLDG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final COMMENTS Status Passed Tim Kersch Passed Tim Kersch Passed Yes Passed Yes Yes Yes Yes Yes Complete Complete Page 1 of 1 October 5, 2022 City of Carlsbad Community Development Department -Building Division 1635 Faraday Ave. Carlsbad, CA 92008 Plan Review: Electrical Panel Addition Address: 2939 Loker Ave, Carlsbad, CA Applicant Name: Robert Aarsleff Applicant Email: Robert.aarsleff@conceptelectricalsolutions.com OCCUPANCY AND nun.DING SUMMARY: Occupancy Groups: S-1 OccupantLoad:NIA Type of Construction: NIA Sprinklers: NIA Stories: NI A Area of Work (sq. ft.): I 5,065 sq. ft. The plans have been reviewed for coordination with the permit application. Valuation: Confirmed Scope of Work: Confirmed Floor Area: Confirmed Attn: Building & Safety Department, 'lrue North COMPLIANCE SERVICES City of Carlsbad -FINAL REVIEW City Pennit No: CBC2022-0343 True North No.: 22-018-280 True North Compliance Services, Inc. has completed the final review of the following documents for the project referenced above on behalf of the City of Carlsbad: 1. Drawings: One (1) copy by Concept Electrical Solutions, Inc. The 2019 California Building, Mechanical, Plumbing, and Electrical Codes (i.e., 2018 IBC, UMC, UPC, and 2017 NEC, as amended by the State of California), 2019 California Green Building Standards Code, 2019 California Existing Building Code, and 2019 California Energy Code, as applicable, were used as the basis of our review. Please note that our review has been completed and we have no further comments, however, we bring the following to your attention: l . In order to expedite the permitting process, we have made annotations (in red ink) to the Title Sheet. We have enclosed the above noted documents bearing our review stamps for your use. Please call if you have any questions or if we can be of further assistance. Sincerely, True North Compliance Services Review By: Alaa Atassi -Plan Review Engineer True North Compliance Services, Inc. 3939 Atlantic Avenue Suite 116, Long Beach, CA 90807 T / 562.733.8030 OFFICE USE ONLY SAN DIEGO REGIONAL HAZARDOUS MATERIALS QUESTIONNAIRE RECORD ID # __________________ I PLAN CHECK # __________________ I Business Name 5th Axis Project Address (include suite) Business Contact Scott Butler City State BP DATE Telephone# 760-274-7646 Zip Code APN# 2839 Loker Ave. East Carlsbad CA 92010 209-083-14-00 Mailing Address (include suite) Cit State Zip Code Plan File# 7140 Engineer Road ~an Diego CA 921 11 Project Contact Telephone# 858-449-5732 Robert Aarsleff telectricalsolutions.com The following questions represent the facility's activities, NOT the specific project description. PART I: FIRE DEPARTMENT -HAZARDOUS MATERIALS DIVISION: OCCUPANCY CLASSIFICATION: (not required for projects within the City of San Diego\: Indicate by circling the item, whether your business will use, process, or store any of the following hazardous materials. If any of the items are circled, applicant must contact the Fire Protection Agency with jurisdiction prior to plan submittal. Occupancy Rating: Facility's Square Footage (including proposed project): 1. Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives 13. Corrosives 2. Compressed Gases 6. Oxidizers 10. Cryogenics 14. Other Health Hazards 3. Flammable/Combustible Liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials 15. None of These. 4. Flammable Solids 8. Unstable Reactives 12. Radioactives PART 11: SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEAL TH -HAZARDOUS MATERIALS DIVISION (HMD): If the answer to any of the questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 5500 Overland Avenue, Suite 170, San Diego, CA 92123. Call (858) 505-6700 prior to the issuance of a building permit. FEES ARE REQUIRED Project Completion Date: Expected Date of Occupancy: 1. 2. 3. 4. 5. 6. 7. 8. YES NO (for new construction or remodeling projects) Is your business listed on the reverse side of this form? (check all that apply). !Kl □ !Kl □ □ !Kl Will your business dispose of Hazardous Substances or Medical Waste in any amount? Will your business store or handle Hazardous Substances in quantities greater than or equal to 55 gallons, 500 pounds and/or 200 cubic feet? □ □ □ [] □ [8J Will your business store or handle carcinogens/reproductive toxins in any quantity? 1K] Will your business use an existing or install an underground storage tank? 1K] Will your business store or handle Regulated Substances (CalARP)? D Will your business use or install a Hazardous Waste Tank System (Title 22, Article 1 0)? 1K] Will your business store petroleum in tanks or containers at your facility with a total facility storage capacity equal to or greater than 1,320 gallons? (California's Aboveground Petroleum Storage Act). 0 CalARP Exempt 9-13-22/ SB Date Initials 0 CalARP Required I Date Initials □ CalARP Complete I Date Initials PART 111: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT (APCO}: The following questions are intended to identify the majority of air pollution issues at the planning stage. Your project may require additional measures not identified by these questions. Some residential projects may be exempt from APCD requirements. If yes is answered for either questions 1, 2 or 5 or for more comprehensive requirements, please contact APCD at apcdcomp@sdcounty.ca.gov; (858) 586-2650; or 10124 Old Grove Road, San Diego, CA 92131 . YES NO 1. D !Kl Will the project disturb 100 square feet or more of existing building materials? 2. D !Kl Will any load supporting structural members be removed? 3. D D (ANSWER ONLY IF QUESTION 1 or 2 IS YES) Has an asbestos survey been performed by an individual that has passed an EPA-approved building inspector course? 4. D D (ANSWER ONLY IF QUESTION 1 or 2 IS YES) Based on the survey results, will the project disturb any asbestos containing material? If yes, a notification may be required at least 10 working days prior to commencing asbestos removal. Additionally, a notification may be required prior to the removal of a load supporting structural member(s) regardless of the presence of asbestos. 5. D I!] Will the project or associated construction equipment emit air contaminants? See the reverse side of this form for typical equipment requiring an APCD permit. If yes, contact APCD prior to the issuance of a building permit. 6. D D (ANSWER ONLY IF QUESTION 5 IS YES) Will the project or associated construction equipment be located within 1,000 feet of a school bounda ? Briefly describe business activities: Briefiy describe proposed project: CNC Machine Shop Machine Shop I declare under penalty of perjury that to the best of my knowledge and belief t e responses made herein are true and correct. Scott Butler 9 / 13 / 22 Name of Owner or Authorized Agent Signature of Owner or Authorized Agent Date FOR OFFICAL USE ONLY: FIRE DEPARTMENT OCCUPANCY CLASSIFICATION.:_------------------------------- BY· DATE·/./. EXEMPT OR NO FURTHER INFORMATION REQUIRED RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY COUNTY-HMO• APCD COUNTY-HMO APCD COUNTY-HMO APCD •A stamp 1n this box only exempts businesses from completing or updating a Hazardous Materials Business Plan. Other perm1tt1ng requirements may still apply HM-9171 (9/18) County of San Diego -DEH -Hazardous Materials Division {city of Carlsbad PURPOSE CLIMATE ACTION PLAN CONSISTENCY CHECKLIST 8-50 Development Services Building Division 1635 Faraday Avenue 442-339-2719 www.carlsbadca.gov This checklist is intended to help building permit applicants identify which Climate Action Plan (CAP) ordinance requirements apply to their project. This completed checklist (B-50) must be included with the building permit application. The Carlsbad Municipal Code (CMC) can be referenced during completion of this document by clicking on the provided links to each municipal code section. NOTE: The following type of permits are not required to fill out this form ❖ Patio I ❖ Decks I ❖ PME (w/o panel upgrade) I ❖ Pool Consultation with a certified Energy Consultant is encouraged to assist in filling out this document. Appropriate certification includes, but is not limited to: Licensed, practicing Architect, Engineer, or Contractor familiar with Energy compliance, IECC/HERS Compliance Specialist, ICC G8 Energy Code Specialist, RESNET HERS rater certified, certified ICC Residential Energy Inspector/Plans Examiner, ICC Commercial Energy Inspector and/or Plans Examiner, ICC CALgreen Inspector/Plans Examiner, or Green Building Residential Plan Examiner. If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance, check N/A and provide an explanation or code section describing the exception. Details on CAP ordinance requirements are available at each section by clicking on the municipal code link provided. The project plans must show all details as stated in the applicable Carlsbad Municipal Code (CMC) and/or Energy Code and Green Code sections. B-50 Page 1 of 7 Revised 05/22 Use the table below to determine which sections of the Ordinance checklist are applicable to your project. For alterations and additions to existing buildings, attach a Permit Valuation breakdown on a separate sheet. Building Permit Valuation (BPV) $ breakdown _______ _ Construction Type □ Residential D New oonstruction D Additions and alterations: D BPV < $60,000 D BPV ~ $60,000 D Electrical service panel upgrade only D BPV ~ $200,000 I ~ Nonresidential I D New construction \f;{' Alterations: . ~ BPV ~ $200,000 or additions~ 1,000 square feet D BPV ~ $1,000,000 D ~ 2,000 sq. ft. new roof addition Checklist Item Complete Section(s) Notes: A high-rise residential building is 4 or more stories, including a Low-rise High-rise mixed-use building in which at least 20% of its conditioned floor area is residential use 2A*, 3A*, 18, 28, *Includes detached, newly constructed ADU 4A*, 38,4A N/A N/A All residential additions and alterations 1A, 4A 4A 1-2 family dwellings and townhouses with attached garages only. *Multi-family dwellings only where interior finishes are removed 1A, 4A* 18, 4A* and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed 1 B, 28, 38, 48 and 5 18, 5 -- 18, 28, 5 Building alterations of~ 75% existing gross floor area 28,5 1B also applies if BPV ~ $200,000 Oleck the appropriate boxes, explain all not applica:)le and exception items, and provide supporting calculations and documentation as necessary. 1. Energy Efficiency Please refer to Carlsbad Municipal Code (CMC) 18.21.155 and 18.30.190,and the California Green Building Standards Code (CALGreen) for more information. Appropriate details and notes must be placed on the plans according to selections chosen in the design. A D Residential addition or alteration~ $60,000 building permitvaluation. □ N/A ________ _ Details of selection chosen below must be placed on the plans referencing CMC 18.30.190. □ Exception: Home energy score~ 7 ( attach certification) Year Built Single-family Requirements Multi-family Requirements □ Before 1978 Select one option: □ Ductsealing □ Attic insulation □Cool roof □ Attic insulation □ 1978 and later Select one option: □ Lighting package □ Water heating Package □ Between1978and1991 Select one option: □ Ductsealing □ Attic insulation □ Cool roof □ 1992 and later Select one option: □ Lighting package □ Water heating package Updated 4/16/2021 3 B. tr Nonresidential* new construction or alterations c? $200,000 building permit valuation, ' or additions;? 1,000square feet. See CMC 18.21.155and CALGreen Appendix AS □ NIA AS.203.1.1 Choose one: 0.1 Outdoor lighting □ .2 Restaurant service water heating (CEC 140.5) □ . 3 Warehouse dock seal doors. □ .4 Daylight design PAFs □ .5 Exhaust air heat recovery N/ A AS.203.1.2.1 Choose one: .95 Energy budget (Projects with indoor lighting OR mechanical) □ .90 Energy budget (Projects with indoorlighlingANDmechanical) □ N/A AS.211 .1** □ On-site renewable energy: N/A A5.211.3** □Green power: (If offered by local utility provider, 50% minimum renewable sources) N/A AS.212.1 □ Elevators and escalators: (Project with more than one elevator or two escalators) Y½ N/A AS.213.1 □ Steel framing : (Provide details on plans for options 1-4 chosen) ~ N/A _____ _ * Includes hotels/motels and high-rise residential buildings •• Foralterationse:: $1,000,000 BPVand affecting> 75% existi_nggross floor area, OR alterations that add 2, OOOsquarefeetof newroofaddilion: comply with CMC 18.30.130 (section 2B below) instead. 2. Photovoltaic Systems A. D Residential new construction (for low-rise residential building permit applications submitted after 1/1/20). Refer to 2019 California Energy Code section 150.1(c)14 for requirements. If project includes installation of an electric heat pump water heater pursuant to CAP section 38 below(low-rise residential Water Heating), increase system size by .3kWdc if PV offset option is selected. Floor Plan ID (use additional CFA #d.u. Calculated kWdc* sheets if necessary) Total System Size: kWdc = (CFAx.572) / 1,000 + (1.15 x #d.u.) *Formula calculation vJiere CFA = conditional floor area, #du= number of dwellings per plan type If proposed system size is less than calculated size, please explain. kWdc Exception □ □ □ □ B. D Nonresidential new construction or alterations c?$1,000,000 BPV AND affecting c?75% existing floor area, OR addition that increases roof area by c?2,000 square feet Please refer to CMC 18.30.130 when completing this section. *Note: This section also applies to high-rise residential and hotel/motel buildings. Choose one of the following methods: □ Gross Floor Area (GFA)Method GFA: □ If< 1 O,OOOs.f. Enter: 5 kWdc Min. System Size: □ If;;: 10,000s.f. calculate: 15 kWdcx (GFN10,000) ** kWdc **Round building size factor to nearest tenth, and round system size to nearest whole number. Updated 4/16/202 1 4 □Time-Dependent Valuation Method Annual TDV Energy use:*** ______ .x .80= Min. system size: ______ kWdc ***Attach calculation documentation using modeling software approved by the California Energy Commission. 3. Water Heating A D Residential and hotel/motel new construction. Refer to CMC 18.30.170 when completing this section. Provide complete details on the plans. □ For systems serving individual dwelling units choose one system: □ Heat pump water heater AND Compact hot water distribution AND Drain water heat recovery (low-rise residential only) □ Heat pump water heater AND PV system .3 kWdc larger than required in CMC 18.30.130 (high rise residential hotel/motel) or CA Energy Code section 150.1 (c) 14 (low-rise residential) D Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher D Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors D Exception: D For systems serving multiple dwelling units, install a central water-heating system with ALL of thefollowing: D Gas or propane water heating system D Recirculation system per CMC 18.30.150(8) (high-rise residential, hotel/motel) or CMC 18.30.170(8) (low- rise residential) □ Solar water heating system that is either: □ .20 solar savings fraction □ .15 solar savings fraction, plus drain water heat recovery □ Exception: B. D Nonresidential new construction. Refer to CMC 18.30.150 when completing this section. Provide complete details on the plans. □ Water heating system derives at least 40% of its energy from one of the following (attach documentation): □ Solar-thermal □ Photovoltaics □ Recovered energy □ Water heating system is (choose one): D Heat pump water heater □ Electric resistance water heater(s) □Solar water heating system with .40 solar savings fraction D Exception: It may be necessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate full compliance with CAP ordinance requirements. For example, projects that propose or require a performance approach to comply with energy-related measures will need to attach to this checklist separate calculations and documentation as specified by the ordinances. Updated 4/ 16/21 5 4. Electric Vehicle Charging A D Residential New construction and major alterations* Please refer to CMC 18.21.140 when completing this section. D One and two-family residential dwelling or townhouse with attached garage: D One EVSE Ready parking space required D Exception : ____________ _ D Multi-family residential: D Exception : ____________ _ Total Parking Spaces EVSE Spaces Proposed EVSE (10% of total) I Installed (50% of EVSE) I Other "Ready" I Other "Capable" I I I Calculations: Total EVSE spaces= .1 Ox Total parking spaces proposed (rounded up to nearestwhole number) EVSE Installed = Total EVSE Spaces x .50 (rounded up to nearest v,hole number) EVSE other may be "Ready" or "Capable" *Major alterations are: (1 )for one and two-family dwellings and townhouses with attached garages, alterations have a building permit valuation~ $60,000 or include an electrical service panel upgrade; (2) for multifamily dwellings (three units or more without attached garages), alterations have a building permit valuation~ $200,000, interior finishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed. *ADU exceptions for EV Ready space (no EV ready space required when): (1) The accessory dwelling unit is located within one-half mile of public transit. (2) The accessory dwelling unit is located within an architecturally and historically significant historic district. (3) The accessory dwelling unit is part of the proposed or existing primary residence or an accessory structure. (4) When on-street parking permits are required but not offered to the occupant of the accessory dwelling unit. (5) When there is a car share vehicle located within one block of the accessory dwelling unit. B. D Nonresidential new construction (includes hotels/motels) D Exception : ____________ _ Please refer to CMC 18.21.150 when completing this section Total Parking Spaces Proposed EVSE (10% of total) I Installed (50% of EVSE) I Other "Ready" I Other "Capable" I I I Calculation: Refer to the table below: Total Number of Parking Spaces provided Number of required EV Spaces Number of required EVSE Installed Spaces □ 0-9 1 1 □ 10-25 2 1 □ 26-50 4 2 □ 51-75 6 3 □ 76-100 9 5 □ 101-150 12 6 □ 151-200 17 9 □ 201 andover 10 percent of total 50 percent of Required EV Spaces Calculations: TotalEVSE spaces= .10x Total parking spaces proposed (rounded up to nearestwhole number) EVSE Installed= Total EVSE Spaces x .50 (rounded up to nearest v,hole number) EVSE other may be "Ready'' or "Capable" Updated 4/16/2021 6 5. D Transportation Demand Management (TOM): Nonresidential ONLY An approved Transportation Demand Management (TOM) Plan is required for all nonresidential projects that meet a threshold of employeeijenerated ADT. City staff will use the table below based on yoursubmitted plans to determinewhetheror noryourpermit requires a TOM plan. lfTDM is applicable to your permit, staff will contact the applicant to develop a site-specific TOM plan based on the permit details. Acknowledgment: Employee ADT Estimation for Various Commercial Uses Office (all)2 20 Restaurant 11 Retaib 8 Industrial 4 Manufacturing 4 Warehousing 4 1 Unless otherwise noted, rates estimated from /TE Trip Generation Manual, 10thEdition 13 11 4.5 3.5 3 1 2 For all office uses, use SAN DAG rate of 20 ADT/1 ,000 sf to calculate employee ADT 3 Retail uses include shopping center, variety store, supermarket, gyms, pharmacy, etc. Other commercial uses may be subject to special consideration Samole calculations: Office: 20,450 sf 1. 20,450 sf / 1000 x 20 = 409 Employee ADT Retail: 9,334 sf 1. First 1,000 sf= 8 ADT 2. 9,334 sf -1,000 sf = 8,334 sf 3. (8,334 sf/ 1,000 x 4.5) + 8 = 46 Employee ADT I acknov.iedge that the plans submitted may be subject t my permit require a TOM n a d und nd that e City of Carlsbad's Transportation Demand Management Ordinance. I agree to be contacted should approved TOM plan is a condition of permit issuance. Date: 1//1 /4 7-• I Person other than Applicant to be contact ~ TOM compliance (if applicable): Name(Printed)::Rz>b-c± AA?-Jz\ef< PhoneNumber.~r~~~~q ~~13'-- EmailAddress: ro~ct:'1s:,. 4,s\-1<..Efg fonC4f:te.,e.J-c-, 4._\>o\~~,o~S-lDI/-A... Updated 4/16/2021 7 Building Permit Finaled Revision Permit Print Date: 03/18/2025 Job Address: 2839 LOKER AVE E, CARLSBAD, CA 92010-6626 Permit No: Status: Ccityof Carlsbad PREV2024-0131 Closed -Finaled Permit Type: BLDG-Permit Revision Work Class: Commercial Permit Revision Parcel#: 2090831400 Track#: Valuation: $0.00 Lot#: Occupancy Group: S-1 #of Dwelling Units: Bedrooms: Bathrooms: Occupant Load: Code Edition: 2019 Sprinkled: No Project Title: Project#: Plan#: Construction Type: Orig. Plan Check#: CBC2022-0343 Plan Check#: Description: ADDING NEW MACHINERY ON PANEL IN THE ORIGINAL SUBMITTAL Applicant: ROBERT AARSLE FF 14427 ELMPORT LN POWAY, CA 92064-5905 FEE BUILDING PLAN CHECK REVISION ADMIN FEE THIRD PARTY REVIEW -Consultant Cost (BLDG) Property Owner: 5TH AXIS INC 7140 ENGINEER RD SAN DIEGO, CA 92111-1422 (858) 505-0432 Total Fees: $155.00 Total Payments To Date: Building Division $155.00 Applied: 06/26/2024 Issued: 08/13/2024 Finaled Close Out: 03/18/2025 Final Inspection: INSPECTOR: Cont ractor: MONIZ ELECTRIC AND SOLAR INC 12361 HILL COUNTRY DR POWAY, CA 92064-6015 (760) 688-0437 Balance Due: AMOUNT $35.00 $120.00 $0.00 Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov ( City of Carlsbad PLAN CHECK REVISION OR DEFERRED SUBMITTAL APP LI CATION B-15 Development Services Building Division 1635 Faraday Avenue 442-339-2719 www .carlsbadca.gov (byCitySta/11 Original Plan Check NumberL6CJJni~b'43 Plan Revision Number f Proj ectAddress 2839 LOKER AVE. EAST General Scope of Revision/Deferred Submittal: _________________ _ Adding new machinery on panel in the original submittal CONTACT INFORMATION: Name Robert Aarsleff Phone 858-449-5732 Fa ,,...._ _______ _ Address 14427 Elmport Lane City Poway Zip 92064 Email Address robert.aarsleff@conceptelectricalsolutions.com Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person. 1 . Elements revised: [j] Plans [j] Calculations D Soils D Energy D Other 2. Describe revisions in detail Adding new loads on panels for added equipment, Added Key Note, Updated service Calculation Added two new machines in the south-east corner of manufacturing 112 and revised circuit numbers for compressors Added new DNM4500 machine at demising wall in manufacturing 112 Added Three new machines in manufacturing 114 Revised Circuitry for Sander and SOCO Saw in Manufacturing 112 Revised Room Manufacturing 118 equipment circuitry to match as-built conditions. 4. Does this revision, in any w ay, alter the exterior of the project? 5. Does this revision add ANY new floor area(s)7 6. Does this revision affect any fire related issues? 7. Is this a full set replacement (all sheets)? £S'Signature ________________ _ OYes OYes OYes OYes Date 3. List page{s) where each revision is shown E0.2 and E0.3 E1 .1 E1 .1 E1 .1 E1 .1 E1 .1 ll]No ll]No [{)No [{)No 1635 Faraday Avenue, Carlsbad, CA 92008 fh: 760-602-2719 Eax: 760-602-8558 Email: bui/ding@carlsbadca gov www.carlsbadca.goy • SUBMITTAL INSTRUCTIONS: Revisions are changes to Active/Issued building permits that are not finaled or expired. Submission must be completed in the same manner as the original review (hard copy or digital). HARD COPY Residential or Commercial New, Addition, Remodels, must follow hard-copy submittal process. If you originally applied for a permit via hard copy plans, revisions are applied via a hard copy process. Hard copy su bmittals are submitted in-person at the Building Counter at 1635 Faraday Ave, Carlsbad CA 92008. Hard Copy Submittal Requirements: • Completed and signed form B-15. • A minimum of three (3) complete or partial plans is required. If the change effects any fire prevention related review items a fourth set is required. Note, if partial pages are submitted, at approval, the applicant will be responsible for slip-sheeting any new approved sheets into the city-held plan set at city offices. • If submitting revised reports/calculations, submit two (2) updated copies. If staff determine other reviewers to review the updated report/calculations, additional copies of reports/calculations may be required. • Form of payment for fees due or via on line payment. Once city receives a complete application and submittal, city will process and route plans and update you, typically via email, with next steps such as fees due, plan check updates, resubmittals, approvals and/or instructions on updating city-held plan sets or other approval documents. DIGITAL If you originally applied for a permit via the on line portal, submissions for revisions are uploaded via the self-service portal. Digital Submittal Requirements: • Completed/signed form B-15. • Updated plan set (pdf). • Updates calculations or other supporting files, if applicable (pdf). Prior to uploading, be prepared with all submittal items listed above in pdf format. Once you are ready with pdf files, log into the portal. Go to your dashboard, find 'Active Permits' and the original permit. Open the original permit, go to the Attachments tab and upload all files. Remember as you add multiple files, to select the applicable file types for the different attachments. If you do not see the permit in the portal, please contact building, as you may need attached to the permit. Once all files are attached, click submit. City will review the new/uploaded files and update you via email and review/approval status and/or fees due. Once city receives a complete application, city will update you with next steps, including review updates, approval and updated plans. Depending on the scope of change, plan check may be required. If changes trigger additional plan review, additional plan review fees will be due per the City's current Master Fee Schedule. Substantial changes may trigger updates in development impact or permit fees. Outstanding fees are due prior to approval/issuance. If you have questions with navigating the portal (finding your permit, uploading files), please see the CSS Help Guide or contact us here. True North COMPLIANCE SERVICES July 3, 2024 City of Carlsbad Community Development Department -Building Division 1635 Faraday Ave. City of Carlsbad -FINAL REVIEW City Penn it No: PREV2024-013 I True North No.: 24-0 I 8-57 1 Carlsbad, CA 92008 Plan Review: Revision New Electrical Panels Address: 2839 Loker Ave Suite E Applicant Name: Robert Aarsleff Applicant Email: Robert.aarsleff@conceptelectricalsolutions.com OCCUPANCY AND BUil.DING SUMMARY: Occupancy Groups: F-1, B, S-1 Occupant Load: N/ A Type of Construction: Y-B Sprinklers: Yes Stories: 2 Area of Work (sq. ft.): NIA sq. ft. The plans have been reviewed for coordination with the permit application. Valuation: See Notes Below Scope of Work: Confirmed Floor Area: See Notes Below Notes: Revision, no valuation or floor area. Attn: Building & Safety Department, True North Compliance Services, Inc. has completed the final review of the following documents for the project referenced above on behalf of the City of Carlsbad: I. Drawin gs: Electronic copy dated May I 0, 2024, by Concept Solutions, Inc. The 2022 California Building, Mechanical, Plumbing, and Electrical Codes (i.e., 2021 IBC, UMC, UPC, and 2020 NEC, as amended by the State of California), 2022 California Green Building Standards Code, 2022 California Existing Building Code, and 2022 California Energy Code, as applicable, were used as the basis of our review. Please note that our review has been completed and we have no further comments. I. This project is Hourly. Please charge the applicant the following hours of plan review. True North Compliance Services, Inc. 8369 Vickers Street, Suite 207, San Diego, CA 92111 T / 562. 733.8030 Review No. Hourly Rate Hours Total 1st Review $120.00 1 $120 Total $120 We have enclosed the above noted documents bearing our review stamps for your use. Please call if you have any questions or ifwe can be of further assistance. Sincerely, True North Compliance Services Review By: Alaa Atassi -Plan Review Engineer Building Permit Finaled Revision Permit Print Date: 03/19/2025 Job Address: 2839 LOKER AVE E, CARLSBAD, CA 92010-6626 Permit No: {cityof Carlsbad PREV2023-0140 Status: Closed -Withdrawn Permit Type: BLDG-Permit Revision Work Class: Commercial Permit Revision Parcel#: 2090831400 Track#: Valuation: $868,346.60 Lot#: Occupancy Group: S-1 Project#: #of Dwelling Units: Plan#: Bedrooms: Construction Type: Bathrooms: Orig. Plan Check#: Occupant Load: Plan Check#: Code Edition: 2019 Sprinkled: No Project Title: Description: RELOCATING TRANSFORMERS AND REMOVING EXTERNAL POWER Applica nt: ROBERT AARSLEFF 14427 ELM PORT LN POWAY, CA 92064-5905 FEE Total Fees: Building Division Property Owner: 5TH AXIS INC 7140 ENGINEER RD SAN DIEGO, CA 92111-1422 (858) 505-0432 Total Payments To Date: Applied: 07/07/2023 Issued: Finaled Close Out: Final Inspection: INSPECTOR: Contractor: MONIZ ELECTRIC AND SOLAR INC 12361 HILL COUNTRY DR POWAY, CA 92064-6015 (760) 688-0437 AMOUNT Balance Due: Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov