HomeMy WebLinkAbout2451 IMPALA DR; A; CBC2023-0040; Recycle(city of
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59
Develooment Services
Building Division
1635 Faraday Avenue
442-339-2719
www.carlsbadca.gov
APPLICABLE TO NEW CONSTRUCTION, ALL RESIDENTIAL ADDITIONS AND ALTERATIONS AND
COMMERCIAL ADDITIONS AND ALTERATIONS OVER $200K. If you have questions about the recycling
requirement or completing this form, please contact Republic Services at (760) 332-6464 a certified C&D
recycler, or the Carlsbad Building Division at (442) 339-2700. Please note: Unless you are self-hauling, Republic
Services or approved haulers must be used for all construction projects within the City of Carlsbad.
PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued
without a completed Construction Waste Management Plan.
Applicant Information
Permit No. CBC2023-0040 Project Title
Project Address 2451 Impala Road, Carlsbad CA
REXFORD 2451 IMPALA
APN
Applicant Name N~n lt u h
Last
Contractor 00 Architect □
209-041-11 -00
Other
□--
First c,l.fl"r<. \ VO
Applicant Address ~1~0fKJ~AsltKJ+-'-t"'-'-__ /nl ......... l--+~~cu.__.rl .......... b _t?a~d _________ _
Phone ,(R1g , fJ(f/ fl(bZ E-;ailAddress /(C1VI~ Wh(r( (Ct1tirrtAGh lrll nc -(vrvt
Applicant Mailing Address
(if different than project address)
Project Type
(check all that apply):
Residential □ Commercial 0 Public Building □
8 ri ef Description oeMO EXISTING OFFICE SPACES, KEEP EXtSTING RESTROOM ANO rr ROOM wAU.S. PROVIDE New OFFICE SP Ace AREA WITH New RESTROOMS FlxruRes. REMOVE ALL wAAeHOUse UGHTINO F1xruAes ANO PROVIDE
Project Size± 4,016 SF Estimated Cost of Project $_1_1_1_,_5_7_1_.6_9 __________ _
(square footage)
Please check the appropriate box:
□
□
□
I plan on using REPUBLIC SERVICES roll-off bin(s) for all materials and will provide all receipts after construction.
I plan on using a City Approved Hauler and will provide all receipts after construction.
This is a proposed LEED certified project and I plan on separating materials on site in conjunction with Republic
Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information
provided in and with this form pertains to construction and demolition debris generated only from the project listed
in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the
best of my knowledge and belief.
Signature_~~.a.,..c.);{_, --'~'-"-----'--'-----Date i i Z3 }Z-3
Page 1 of 3 Rev. 05/22
PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will
(cont'd) not be issued without a completed Construction Waste Management Plan.
DEBRIS RECYCLING ESTIMATE:
SECTION A Permit No. CBC2022-0368
Project Address 2451 Impala Suite A
Applicant Name Norman, Leah PC
Last First
Project Title REXFORD 2451 IMPALA
APN
Phone (760 )931-1130
SECTION B Complete the following table with estimated waste tonnage to be generated by your project.
This is your plan for construction waste management. Changes can be made on the final recycle report.
Goal: the diversion rate shall be 65% by weights of debris.
Material Type
Complete this line of the table only if
only using WASTE MANAGEMENT
roll-off bins.
Mixed C&D Debris
Asphalt & Concrete
Brick/ Masonry/ Tile
Mixed Inert Debris
Cabinets, Doors, Fixtures,
Windows (circle all that apply)
Car et
Carpet Padding/ Foam
Cardboard
Ceilin Tile (acoustic)
Drywall (used, new, scrap)
landscape Debris (brush, trees,
stumps, etc.) No dirt.
Unpainted Wood & Pallets
Roofing Materials
Sera Metal
Stucco
Other:
TOTAL
SECTION C
10
.05
.02
.75
Estimated
Waste Quantity
(tons)
.150
25
'R.25
To meet 65% Diversion Requirement (estimate)
A
Place a (u) check
next to items to be
reused or salvaged
□
□
□
□
□
□
11.25
B C
Place a (u) check next Place a (u) check next
to items to be to items to be
recycled disposed at landfill
□
□ □
□
□
□ □
x 0.65 = 7 -31 tons -------------------Total Estimated Waste from above
Contractor/Owner Signature __ ..,l,,_iU\-...... ... !A ............. M .... e:t:L._ ........ ,+'\c:(A)'-'--"-__.,""'-"-"='--',........---Date
Minimum Required Diversion
4/18/23
Page 2 of 4 Rev. 05122
RT 2 C.ompl te before final inspection obtain C.1ty Approved hauler receipts ,md return prior to fm I
building approval.
DEBRIS RECYCLING REPORT (ACTUAL):
SECTION A Acknowledgement
I certify under penalty of perjury under the laws of the State of California that the information provided in and with
this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have
reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge
and belief.
Permit No. C.(3 C 2-ov _, bO'-{D
Address 2451 Impala Dr. Carlsbad CA
Print Name
Date 9/11 /23
SECTION B Use this Final log below to track loads of materials as they leave the job site.
@@SAVE RECEIPTS@@
Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken.
Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons.
A B C
Date Material Type Actual Amt Actual Amt Actual Amt Destination Facility
Reused or Recycled Disposed in (Name, Address, Phone)
Salvaged Landfill
Exam le:
01/01/2020
Palomar Transfer Station, 5960 El
Concrete (broken) 5 tons Camino Real
-760 603-0153
3/21/23 TRASH 1.01 DM'9lrtJS,}
3/31 /23 TRASH 2.96
4/27/23 C&D 7.52
@TOTAL 7.52 3.97
SECTION C
Diversion Rate Achieved
DIVERSION
Contractor/Owner Signature,~--1--/-~b,LJj~'.:..\f-~ir=::=-~D~ate 1 j\ \ / , ... :3
Attach the following documentatio Return completed form and documentation to:
• Original recycling weight tickets, landfill weight tickets
• Original donation receipts with photos and/or itemized descriptions
• Any other relevant information to support Recycling Report
City of Carlsbad
Building Division (1st Floor)
1635 Faraday Avenue
Carlsbad, CA 92008
Page 3 of 4 Rev. 04122
At?
I I Esc ondido Resource R covery
1021 WIMission Ave
Escondido. CA 92025
(760) 745-3203 ~ I Customer: 2187
' I
Ticket: 53950
Date : 04/27/23
!
TI TAN CONSTRUCTIONS R I
8534 HUBBLES LANE
SANTEE JCA 92071 TRK T2J WGUTE SILVER DO 4500+BLK TRLR
I Commodity Rate
In: 7: 36
Out: 8:21
INVOICE
Truck : 9999
Container:
Route: 08614
Orig in: 086
Extended
Ch;,r<1o
14 MIXED C & D [Gross In): 26.760 .
Units
3.76
bs Scl#5
105.00 per TON
Tare 19,240. lbs Scl#5 Net : 7.520. lbs]
TOTAL DU E
Construction & De olition Diversion Certificate --Diversion Percentage 70%
t~is ¢er~ifies.thkt the compa~y li~ted above h~s utilized an EDCO facility to di
with .t,.BBD requ1.refnent. ·The d1.vers1.on tonnage 1s based on an overall tonnage per
'; l
-,el!"""\, -..-Urive,·
SANCO Resource Recovery ·
6750 Federal Blvd.
Lemon Grove, CA 91945
(619) 287-7555
~ustomer: 0914 Ticket: 51532
Date: 03/31/23
In: 14 : 36
Out: 14:47
TITAN CONSTRUCTION SERVI
8534 HUBBLES LANE
SANTEE CA 92071-4408
Commodity Units
34 CONSTRUCTION/ DEMOL 1.48
(Gross(In): 22,440. lbs Scl#l
Rate
83.00 per TON
Tare 19,480. lbs Scl#l
INVOICE
Truck: 3095
Container:
Route: 02034
Origin: tp£.l5,8Pr-D
Extended
Charge
Net: 2,960. lbs]
TOTAL DUE
Constructron & Demolition Diversion Certificate --Diversion Percentage 69%
This certifies that the company listed above has utilized an EDCO tacillty to divert construction demolition materials in accordance
with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility .
Dariana Ramirez
-Joh 1_~_? _4-+-r,_cA_.s..._;//;__s;. _____ _
Driver
EDCO Station
8184 Commercial St.
La Mesa, CA 91942
(619) 466-3355
Customer: 0512 Ticket: 37886
Date: 03/21/23
TITAN CONSTRUCTION SERVI
8534 HUBBLES LANE
SANTEE, CA 92071-4408
Commodity Units Rate
20 Commercial Refuse 1.01
In: 10:42
Out: 11:01
INVOICE
Truck: 9999
Container:
Route: 02020
Origin: C4/l.U.8RD
Extended
Charge
[Gross(In): 5.79 tons Man Wt Tare 4.78 tons Scl#l Net: 1. 01 tons]
TOTAL DUE
Miguel E. Driver