HomeMy WebLinkAbout1905 ASTON AVE; ; CBC2023-0338; PermitBuilding Permit Finaled
C cityof
Carlsbad
Commercial Permit
Print Date: 03/18/2025
Job Address: 1905 ASTON AVE, CARLSBAD, CA 92008-7393
Permit Type: BLDG-Commercial Work Class:
Parcel#: 2121201300 Track#:
Valuation: $33,413.00 Lot #:
Occupancy Group:
#of Dwelling Units:
Bedrooms:
Bathrooms:
Occupant Load:
Code Edition:
Sprinkled:
Project Title:
Project#:
Plan#:
Construction Type:
Orig. Plan Check#:
Plan Check#:
Description: IMPLANT INNOVATIONS: INSTALLATION OF STORAGE RACKS
Applicant:
QUALITY MATERIAL HANDLING INCORPORATE
JULIE DARR
10156 SHARON CIR
RANCHO CUCAMONGA, CA 91730-5300
(626) 812-9722
FEE
BUILDING PLAN CHECK
Property Owner:
ADVANCED BIOLOGICS LLC
1905 ASTON AVE, # STE 101
CAR LSBAD, CA 92008-7393
(800) 272-0267
BUILDING PLAN REVIEW-MINOR PROJECTS (LOE)
BUILDING PLAN REVIEW -MINOR PROJECTS (PLN)
COMM/IND Tl -NON-STRUCTURAL
SB1473 -GREEN BUI LDING STATE STANDARDS FEE
STRONG MOTION -COMMERCIAL (SMIP)
Tenant Improvement
Permit No:
Status:
CBC2023-0338
Closed -Finaled
Applied: 10/17/2023
Issued: 03/20/2024
Finaled Close Out: 03/18/2025
Final Inspection: 08/22/2024
INSPECTOR: Kersch, Tim
Contractor:
QUALITY MATERIAL HANDLING INC
10156 SHARON CIR
RANCHO CUCAMONGA, CA 91730-5300
(626) 812-9722
AMOUNT
$318.50
$197.00
$104.00
$1,046.92
$2.00
$9.36
Total Fees: $1,677.78 Total Payments To Date: $1,677.78 Balance Due: $0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Fai lure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
stat ute of limitation has previously otherwise expired.
Building Division Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
( City of
Carlsbad
COMMERCIAL
BUILDING PERMIT
APPLICATION
B-2
Plan Check Cls(2023.·-c).s~~
Est. Value ~.3:S 1'+1.S
PC Deposit ..j;319.5 D
Date I O /J 7 f .2. 3. I
Job Address._~~---'-.;...._;-,-~~..i..:i:..;:::;.._,--,---·Suite: ____ APN: Z / c6, -JrJ0-13
Tenant Name #:_-+"~,........~:;.....---=~-..;_.:i:.:.... ____ .Lot #: (tJ3 Year Built: __ fi ... 'C/9_q ____ _
Year Built: ___ Occupancy:..$.JJ..L Construction Type: l! \-B Fire sprinklers:Q1°ESON0
1
A/C:QYES{ONo
BRIEF DESCRIPTION OF WORK: Stv~ ~~
D Addition/New: ___________ New SF and Use, _________ New SF and Use
______ SF Deck, ______ SF Patio Cover, SF Other (Specify) ___ _
l'.)gTenant Improvement: ____ SF, Existing Use: --'-i_t._fv ____ Proposed Use: ) f;f {J
____ SF, Existing Use: Proposed Use: _____ _
D Pool/Spa: ____ SF Additional Gas or Electrical Features? __________ _
D Solar: ___ KW, ___ Modules, Mounted: 0 Roof 0 Ground
D Re roof: ________________________________ _
D Plumbing/Mechanical/Electrical
Oother: ________________________________ _
APPLICANT CERT/FICA TION: I certify that I have read the application and state that the above information is correct and that the
information on the plans is accurate. I agree to comply with all Cit • ces and State laws relating to building
construction.
NAME (PRINT): JVit,.,\~ D~
1635 Faraday Ave Carlsbad, CA 92008
SIGN:_...::::::,:;.~:::::...._ ___ DATE: ID f / ol-3
Email: aJ dingdcarlsbadca.gov
REV. 07/21
THIS PAGE REQUIRED AT PERMIT ISSUANCE PLAN CHECK NUMBER: _c_sc_20_2J_-0_33_a ___ _
A BUILDING PERMIT CAN BE ISSUED TO EITHER A STATE LICENSED CONTRACTOR OR A PROPERTY OWNER. IF THE PERSON
SIGNING THIS FORM IS AN AGENT FOR EITHER ENTITY AN AUTHORIZATION FORM OR LETTER IS REQUIRED PRIOR TO
PERMIT ISSUANCE.
(OPTION A): LICENSED CONTRACTOR DECLARATION:
lherebyaffirmunderpenaltyofperjurythatlamlicensedunderprovisionsofChapter9(commencingwithSection7000)ofDivision3
of the Business and Professions Code, and my license is in full force and effect. I also affirm under penalty of perjury one of the
following declarations (CHOOSE ONE):
D1 have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the
work which this permit is issued. PolicyNo .. ______________________________________ _
-OR-(!11 have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit ls issued.
My workers' compensation insurance carrier and policy number are: Insurance Company Name: travelers Property Casualty Co of Amenca
Policy No. UB3W7255062314G Expiration Date: _21_1_,2_s _____________ _
-OR-
Ocertificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become
subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage ls unlawful and shall subject an employer to
criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for In Section 3706 of the Labor Code,
interest and attorney's fees.
CONSTRUCTION LENDING AGENCY, IF ANY:
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code).
Lender's Name: ____________________ Lender's Address: ____________________ _
CONTRACTOR CERT/FICA TION: I certify that I have read the application and state that the above information is correct and that
the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building
construction.
NAME (PRINT): JULIE DARR
Note: If the person signing above Is an authorized agent for the contractor provide a let of authorization on contractor letterhead.
-OR -
(OPTION B): OWNER-BUILDER DECLARATION:
I hereby affirm that I am exempt from Contractor's License Law for the following reason: q I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec.
44, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or Improves thereon, and who does such
work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or Improvement is sold
within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
-OR-
01, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor{s) licensed
pursuant to the Contractor's License Law).
-OR-□1 am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason:
AND, D FORM 8-61 "Owner Builder Acknowledgement and Verification Form" is required for any permit issued to a property owner.
By my signature below I acknowledge that, except for my personal residence in which I must have resided for at least one year prior to completion of the
improvements covered by this permit, I cannot legally sell a structure that I have built as an owner-builder if it has not been constructed in Its entirety by licensed
contractors. I understand that a capy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application is
submitted or at the following Web site: http:I/www.leginfo.ca.gov/ calaw. html.
OWNER CERT/FICA TION: /certify that I have read the applicationandstate that the above information is correct and that the
information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building
construction.
NAME (PRINT): SIGN: __________ DATE: ______ _
Note: If the person signing above is an authorized agent for the property owner include form B-62 signed by property owner.
1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov
2 REV. 07/21
SO CAL INSPECTIONS, INC.
3783 Sierra Ave• Norco, CA 92860
Phone(951)203-9701
Fax (626) 917-8739
Email: Admin@SoCalinspectionsinc.com
TYPE OF □ Reinforced Concrete
INSPECTION □ Post Tensioned Concrete
REQUIRED □ Structural Masonry
Job Address
1905 Aston Ave.
Job Name
Implant Innovations
Type of Structure
Warehouse
Matenal Descnptlon (type, grade, source)
½" Hilti Kwikbolt TZ Wedge Anchor Bolt
Inspectors Name
Robert McGetrick
AWS/CWI-ICBO/ICC
ALL CITIES & JURISDICTIONS
INSPECTION & MATERIAL TESTING
I Job Number I Date
05/01/24
□ Structural Steel Assembly □ Quality Control
□ Fireproofing □ Epoxy Anchors
□ Asphalt [8] Other
CHy
Carlsbad, CA
Permit Number I Issued By
City of Carlsbad
ArchHect
N/A
Engineer
Structural Engineering and Design
Contractor
QMH
Subcontractor
INSPECTION SUMMARY -LOCATIONS OF WORK INSPECTED, TEST SAMPLES TAKEN, WORK REJECTED, JOB PROBLEMS, PROGRESS,
REMARKS, ETC. INCLUDES INFORMATION ABOUT AMOUNTS OF MATERIAL PLACED OR WORK PERFORMED,
NUMBER, TYPE AND IDENTIFICATION NUMBERS OF SAMPLES TAKEN. STRUCTURAL CONNECTIONS (WELD
MADE H.T. SOL TS TORQUED\ CHECKED ETC.
Wedge Anchor Bolt:
Verified that (112) ½" Hilti Kwikbolt TZ wedge anchor bolts @ (2) bolts per baseplate were
Installed with 3¼" embedment for all bolts. Wedge anchor bolts were installed into concrete floor and secured
racks to floor.
Checked torque on nuts to ensure compliance to ESR #1917. Torque met the min 40 ft-lbs
per specification.
Weather -65° F and partly sunny
SAMPLES
rn111rs:iETE I Mn~TAD I r.ll'll'!IT I ~ UC! 7 '° T
I I I I
PAGE 1 OF 1 TIME IN TIMEOUT REG. HOURS OT 1.5X OT2X
----10:00 4
CERTIFICATION OF COMPLIANCE: To the best of my knowledge, all of the reported work,
unless otherwise noted, is in conformance with the approved plans, specifications, and All Inspections based on a minimum of 4 hours. Over 4 hours= 8 hours minimum.
applicable sections of the governing building laws. Any Inspections extending past noon will be dlarged as an 8 hour minimum.
APPROVED
BY:
ICC 8273280 PROJECT SUPERINTENDENT
Signature of Special Inspector Certification Number
Building Permit Inspection History Finaled
{cityof
Carlsbad
PERMIT INSPECTION HISTORY for (CBC2023-0338)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Application Date: 10/17/2023 Owner: ADVANCED BIOLOGICS LLC
Issue Date: 03/20/2024 Subdivision: CARLSBAD TCT#85-24 UNIT#04
Status: Closed -Finaled Expiration Date: 02/18/2025 Address: 1905 ASTON AVE
CARLSBAD, CA 92008-7393 IVR Number:
Scheduled Actual Inspection Type Inspection No.
Date Start Date
08/22/2024 08/22/2024 BLDG-14 258724-2024
Tuesday, March 18, 2025
Frame/Steel/Bolting/We
lding (Decks}
Checklist Item
BLDG-Building Deficiency
COMMENTS
BLDG-Final Inspection 258725-2024
Checklist Item COMMENTS
BLDG-Building Deficiency
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
52628
Inspection Primary Inspector Reinspection Inspection
Status
Passed Tim Kersch Complete
Passed
Yes
Passed Tim Kersch Complete
Passed
Yes
Yes
Yes
Yes
Yes
Page 1 of 1
Structural
Engineering
cE. Design, Inc.
1815 Wright Ave
La Verne, CA 91750
Phone: 909.596.1.351 Fox: 909.596.7186
Project Name: IMPLANT INNOVATIONS
Project Number: 23-1009-9
Dote : 10/12/23
Street Address: 1905 ASTON AVE, STE 101
Clty/Stote : CARLSBAD, CA 92008
Scope of Work: STORAGE RACK
1/16/24
> ,_ -0
I . Structur~I
!
Engineering & Design Inc.
1815WriqhtAve La Verne, CA91750 Tel: 909.596.1351 Fax: 909.596.7186
By: NIHAL Project: IMPLANT INNOVATIONS
TABLE OF CONTENTS
1ltle Page .......................................................................................... : .................... .
Table of Contents .................................................................................................... .
Design Data and Definition of Components .......................................................... ..
Critical Configuration ............................................................................................. .
Seismic Loads ......................................................................................................... .
Column ., ................................................................................................................. .
Beam and Connector ............................................................................................. ..
Bracing ................................................................................................................... .
Anchors .................................................................................................................. .
Base Plate .............................................................................................................. ..
Slab on Grade ........................................................................................................ ..
Other Configurations ............................................................................................. ..
TYPE4 Page .:l of '-'
2
3
4
5 to 6
7
8 to 9
10
11
12
13
14 -) '
Project #: 23-1009-9
10/10/2023
Engineering & Design Inc.
1815 Wright Ave La Verne. CA 91750 Te!: 909.596.1351 Fax: 909.596.7186
By: NIHAL Project: IMPLANT INNOVATIONS Project #: 23-1009-9
Design Data
1) Toe analyses herein conforms to the requirements of the:
2021 IBC Section 2209
2022 CBC Section 2209
ANSI MH 16.1-2012 SpedRcations for the Design of Industrial Steel Storage Racks "2012 RMI Rack Design Manual"
ASCE 7-16, section 15.5.3
2) Transverse braced frame steel conforms to ASTM A570, Gr.55, with minimum strength, Fy=SS ksl
Longitudinal frame beam and connector·steel conforms to ASTM A570, Gr .55, with minimum yield, Fy=SS ksi
All other steel conforms t:o ASTM A36, Gr. 36 with minimum yield, Fy= 36 ksl
3) Anchor bolts shall be provided by Installer per ICC reference on plans and calculations herein.
4) All welds shall conform to AWS procedures, utilizing E70xx electrodes or similar. All such welds shall be performed
In shop, with no field welding allowed other than those supervised by a licensed deputy Inspector.
5) Toe existing slab on grade Is 6" thick with minimum 2500 psi compressive strength. Allowable Soll bearing capacity Is 750 psf.
Toe design of the existing slab Is by others.
6) Load combinations for rack components correspond to 2012 RMI Section 2.1 for ASD level load criteria
Definition of Components
Frama-
Helght
TYPE4
A
~ Bwn
t:=IJ::;::::/== ·==ll=l====IJ
&am
ler;gdi
Runt Vlev,1 !)own At;e
(l..ongitydinal mroe
Omnn
Page~ of f ..{,
~=~
Sedlq,r) A: Oms A191e-
Cf!ilim'trse ) flame
lbimntal
ltillOI!!
1011012023
Structura·,
Engineering & Design Inc.
1815 Wfight Ave La Verne, CA 91750 Tel: 909.596.1351 Fax: 909.596.7186
By: NIHAL Project: IMPLANT INNOVATIONS Project #: 23-1009-9
Configuration & Summary: TYPE 4 SELECTIVE RACK
-4-18"
~
18"
-->f.:--
18"
-->f.:--
18" ......,_
18"
192" --"le--18"
-"I.--
18" -+-18"
--"I.-
18" ~
18"
192"
**RACK COLUMN REACTIONS
ASOLOAOS
MJAL DL=: 375 lb
AXIAL LL= 7,500 lb
SEISMIC AXIAL Ps=+/-6,187 lb
BASE MOMENT= 0 In-lb
I
.}--96'' ----+
Seismic Criteria # Bm Lvls Frame Depth Frame Height # Di onals Beam Length Frame Type
Ss=0.992, Fa=l.2 10 36 In 192.0 in 3 96In Double Row
Component Description STRESS
Column Fy=SS ksl Mecalux 314 3.0"x2.69"x0.070" P=7875 lb, M=9000 In-lb 0.73-OK
Column & Backer None None None N/A
Beam Fy:55 ksi Intlk 36E 3,656Hx2.75Wx0.059''Thk Lu=96 in I Capacity: 4163 lb/pr 0.36-OK
Beam Connector Fv=SS ksl Lvl 1: 3 Tab OK I Mconn=5655 In-lb I Mcap=8828 In-lb 0.64-OK
Brace-Horizontal F-v=SS ksl Mclx C456 Sgl 1.7953x1.378x16ga(U31x) 0.29-OK
Brace-Diagonal Fy=55 ksi Mclx C456 Sgl 1.7953x1.378x16ga(U31x) 0.56-OK
Base Plate Fv=36 ksl 7 .283x5.118x0.394 I Fixity= 0 In-lb 0.85-OK
Anchor 2 per Base 0.5'' x 3.25" Embed HILTI TZ2 ESR 4266 Inspection Reqd (Net Seismic Upllft=192 lb) 0.175-OK
Slab&So11 6" thk x 2500 psi slab on grade. 750 psf Soll Bearing Pressure 0.92-OK
Level I Load** I Story Force I Story Force Column I Column I Conn. Beam
Per Level BeamSDca Brace Transv Longit. Axial Moment Moment Connector
1 1,500 lb 18.0 In 32.0 In 39Ib 22 Ib 7,875 lb 9,000 "# 5,655 "# 3TabOK
2 1,500 lb 18.0 In 64.0 in 78Ib 44 Ib 7,088 lb 5,302 "# 4,292 "# 3TabOK
3 1,500 lb 18.0 in 78.0 In 117 lb 66Ib 6,300 lb 5,106 "# 4,120 "# 3TabOK
4 1,500 lb 18.0 In 156Ib 87Ib 5,513 lb 4,811 "# 3,879 "# 3TabOK
5 1,500 lb 18.0 In 195Ib 109Ib 4,725 lb 4,418 "# 3,570 "# 3Tab OK
6 1,500 lb 18.0 In 234Ib 131 lb 3,938 lb 3,927 "# 3,192 "# 3TabOK
7 1,500 lb 18.0 In 273Ib 153Ib 3,150 lb 3,338 "# 2,745 "# 3TabOK
8 1,500 lb 18.0 In 312Ib 175Ib 2,363 lb 2,651 "# 2,230 "# 3Tab OK
9 1,500 lb 18.0 In 351 lb 196Ib 1,575 lb 1,866 "# 1,646 "# 3Tab OK
10 1,500 lb 18.0 In 390Ib 218Ib 788Ib 982 "# 993 "# 3TabOK
** Load deflned es product weight per pair of beams Total: 2,143 lb 1,200 lb
I -I ~ pra or d/, """~ ( "°""''h style )
TYPE4 Page ~ of f ,& 10/1012023
Structur~I
Engineering & Design Inc.
1815 Wright Ave La Verne, CA 91750 Tel: 909.596.1351 Fax: 909.596.7186
By: NIHAL Project: IMPLANT INNOVATIONS
Seismic Force11 ConflguratJon: 1YPE 4 SELECTIVE RACK
Lateral analysis Is performed with regard to the requirements of the 2012 RMI ANSI MH 16.1-2012 Sec 2,6 &. ASCE 7· 16 sec 15.5.3
Transverse (Cross Aisle} Seismic Load
V= Cs*Ip*Ws=Cs*Ip*(0.67*P*Prf+D)
Csl= Sds/R
= 0.1984
Cs2= 0.044*Sds
= 0.0349
Cs3= 0.5*51/R
= 0.0451
Cs-max= 0.1984
Cs-max* Ip= 0.1984
Vm1n= 0.015
Eff Base Shear=Cs= 0.1984
Wsc (0.67*Pl.itF1 * PL)+DL (RMI 2.6.2)
"' 10,800 lb
Vtransv=Vt= 0.1984 * (750 lb+ 10050 lb)
Base Shear Coeff=C.= 0.1984 Etnln11Yeree= 2,143 lb
Limit Statm LtJnl nan-•omit: 11MJ11r ,ur •flrlght
Level PRODUCT LOAD P P*0.67*PRFI DL hi wl*hl
1 1,500 lb 1,005 lb 75 1b 181n 19,440
2 1,500 lb 1,005 lb 751b 361n 38,880
3 1,500 lb 1,005 lb 751b 54in 58,320
4 1,500 lb 1,005 lb 751b 721n 77,760
5 1,500 lb 1,005 lb 75 1b 90 In 97,200
6 1,500 lb 1,005 lb 751b 1081n 116,640
7 1,500 lb 1,005 lb 751b 1261n 136,080
8 1,500 lb 1,005 lb 751b 144in 155,520
9 1,500 lb 1,005 lb 751b 162in 174,960
10 1,500 lb 1,005 lb 751b 1801n 194,400
sum: P=15000lb 10,050 lb 750 1b W=10800 lb 1,069,200
Lon tudinal Downaisle Seismic Load
Project #: 23-1009-9
Ss= 0.992
51= 0.361
Fa= 1.200
Fv= 1.939
Sds=2/3*5s*Fa= 0.794
Sd1=2/3*51 *Fv= 0.467
Ca=0.4*2/3*5s*Fa= 0.3174
(Transverse, Braced Frame Dir.) R= 4.0
Ip= ,,..1...,.0 __ .,...,
PRFl = ,.1 .... 0 __ _
Pallet Helght=hp= 48.0 In
DL per Beam Lvl= 75 lb
Fl Fi* hl+h /2
39.0 lb 1,638-#
77.9 lb 4,674-#
116.9 lb 9,118-#
155.9 lb 14,966·#
194.8 lb 22,207-#
233.8 lb 30,862-#
272.7 lb 40,905-#
311.7 lb 52,366-#
350.7 lb 65,230-#
389.6 lb 79,478-#
2,143 lb !=321,445
Similarly f'or longitudinal seismic loads, using R=6,0 Ws= (0.67 * Pl.itr-.z * P) + DL PRF2= 1.0
Csl=Sdl/(P'R)= 0.1111 = 10,800 lb (Longitudinal, Unbraced Dir.) R= 6.0
Cs2= 0.0349 Cs=Cs-max*Ip= 0.1111 T= 0.70 sec
Cs3= 0.0301 Vlong= 0.1111 * (750 lb + 10050 lb)
Cs-max= 0.1111 Elongitudlnal= 1,200 lb Unit StJrtu Laro/ ton(llt s,lllllk .,,.,,, ,,., uprf//ht
Level PRODUC LOAD P P*0.67*PRF2 DL hi wl*hi A Eron±.. \lli:_,y
1 1,500 lb 1,005 lb 75 lb 18in 19,440 21.8 lb
2 1,500 lb 1,005 lb 751b 361n 38,880 43.6 lb
3 1,500 lb 1,005 lb 75 1b 541n 58,320 65.5 lb
4 1,500 lb 1,005 lb 75 1b 721n 77,760 87,3 lb
5 1,500 lb 1,005 lb 751b 901n 97,200 109.1 lb
6 1,500 lb 1,005 lb 75 1b 1081n 116,640 130.9 lb
7 1,500 lb 1,005 lb 75 1b 1261n 136,080 152.7 lb
8 1,500 lb 1,005 lb 75 lb 144 In 155,520 174.5 lb
9 1,500 lb 1,005 lb 75 lb 162in 174,960 196.4 lb
10 1,500 lb 1,005 lb 751b 180 In 194,400 218.2 lb
sum: =========1=0=,0=5=0 =lb===7=50=1=b==W====10=8=00=1=b====1=,0=6=9'=20=0=====1=,2=0=0=1b=========
TYPE4 Page§ of H:, 10/10/2023
Structur~I
Engineering & Design Inc.
1815 Wright Ave La Verne. CA 91750 Tel: 909.596.1351 Fax: 909.596.7186
By: NIHAL Project: IMPLANT INNOVATIONS
Downaiale Seismic Loads Configuration: lYPE 4 SELECTIVE RACK
Determine the story moments by applying portal analysis. The base plate Is assumed to provide no fixity.
Seismic Story Forces
Vlong= 1,200 lb
Vcol=Vlong/2= 600 lb
F1=-221b
F2= 441b
F3= 66 lb
Seismic Story Moments
TypJc•I lt•m• m~<I•
Ttlbuqty •••~ ofiwo column,
ol"r,cklt,me"" ,
I I .. ~~~:~~:~
I I ---~~~:~~:~
i--96' --I , ________ ,
f.tl>nti'.kw
Conceptual System
Project #: 23-1009-9
mJlkw
Mbase-max= 0 In-lb
Mbase•v= (Vcol*hleff)/2
<=== Default capacity hl-eff= hl -beam dip helght/2
= 15 In
= 4,500 In-lb <=== Moment going to base
Mbase-eff= Minimum of Mbase-max and Mbase-v
= 0 In-lb PINNED BASE ASSUMED
M 2-2= [Vcol-(Fl)/2] * h2 M 1-1= [Veal* hleff]-Mbase-eff
= (600 lb * 15 ln)-0 In-lb = [600 lb -21.8 lb]*18 ln/2
= 9,000 In-lb
Msels= (Mupper+Mlower)/2
Mseis(1-1)= (9000 in-lb+ 5302 ln-lb)/2
= 7,151 In-lb
LEVEL hi Axial Load
1 18 In 7,875 lb
2 181n 7,088 lb
3 181n 6,300 lb
4 . 18 in 51513 lb
5 181n 4,725 lb
6 18 in 3,938 lb
7 181n 3,150 lb
8 181n 2,363 lb
9 181n 1,575 lb
10 18 in 788 lb
= 5,302 in-lb
Msels(2-2)= (5302 In-lb+ 5106 ln-lb)/2
= 5,204 in-lb
Summary of Forces
Column Moment** Mselsmic** Mend-flxi
9,000 In-lb 7,151 in·lb 927 In-lb
5,302 In-lb 5,204 In-lb 927 ln•lb
5,106 In-lb 4,958 In-lb 927 In-lb
\ 4,811 in-lb 4,615 in-lb 927 In-lb I 4,~18 In-lb 4,173 In-lb 927 in-lb
3,927 in-lb 3,633 in-lb 927 In-lb
3,338 In-lb 2,995 in-lb 927 in-lb
2,651 in-lb 2,258 In-lb 927 in·lb
1,866 In-lb 1,424 ln·lb 927 In-lb
982 In-lb 491 In-lb 927 in-lb
Mconn= (Mselsmic + Mend-flxlty)*0.70*rho
Mconn-allow(3 Pin)= 8,828 In-lb
**all moments based on limit states level loading
TYPE4 Page ( of Jl,
Veal 7~trl==========nJb,
h2
h1
Beam to Column Elevation
rho= 1.0000
Mconn** Beam Connector
5,655 In-lb 3 Tab OK
4,292 In-lb 3Tab OK
4,120 in-lb 3Tab OK
3,879 in-lb 3TabOK
3,570 in-lb 3TabOK
3,192 in-lb 3TabOK
2,745 In-lb 3 Tab OK
2,230 in-lb 3Tab OK
1,646 In-lb 3TabOK
993 in-lb 3TabOK
10/10/2023
Structural
Engineering & Design Inc.
1815 Wright Ave La Verne, CA 91750 Tel: 909.596.1351 Fax: 909.596.7186
By: NIHAL Project: IMPLANT INNOVATIONS Project #: 23-1009-9
Column (Longitudinal Loads) Configuration: TYPE 4 SELECTIVE RACK
Section Properties
Section: Mecalux 314 3.0"x2.69"x0.070"
Aeff = 0.538 ln"2
Ix= 0.765 ln"4
Sx = 0.510 ln"3
rx = 1.190 In
Qf= 1.67
Iy = 0.464 in"4
Sy= 0.307 ln"3
ry = 0.928 in
Fy= 55 ksl
Kx = 1.7
r 3.0001n -1
Cmx= 0.85
E= 29,500 ksl
Loads Considers loads at level 1
COLUMN DL= 375 lb Critical load cases are: RMI Sec 2.1
Lx = 16.2 in
Ky= 1.0
Ly= 32.0 In
Cb=-1.0
----,--I
2.690 In
J_
0.070 In
COLUMN PL= 7,500 lb
Meal= 9,000 in-lb
Sds= 0.7936
Load case S:: (1 +o.10S*Sds)D + 0.75"(1.4+0.14Sds)*8"P + 0.7S"(0.?*rho*E)<= 1.0, ASD Method
1 +0.105*Sds= 1.0833
1.4+0.14Sds= 1.5111
1+0.14Sds= 1.1111
0.85+0.14*Sds= 0.9611
axial load coeff: 0,7933296 * P seismic moment coeff: 0.5625 * Meo/
Load case 6:: (1+0.104*Sds)D + (0.85+0.14Sds)*B*P + (0.7*rho*E)<= 1.0, ASDMethod
axial load coeff: 0. 67277 seismic moment coeff: 0.7 * Meo/
By analysis, Load case 6 governs utilizing loads as such
Moment=Mx= 0.7*rho*Mc:ol
6= 0,7000
rho= 1.0000
Axial Analysis
Axial Lo11d=P11x= 1.111104•375 lb + 0.961104*0,7•7500 lb
= 5,462 lb = 0.7 * 9000 in-lb
= 6,300 in-lb
Kxl.x/rx = 1.7*16.172"/1.19"
= 23.1
Fe= n"2E/(KL/t)max"2
= 245.lksl
Pn = Aeffl'Fn
= 27,925 lb
P/Pa= 0.38 > 0.15
Bending Analysis
KyLy/ry = 1 *32"/0.9284"
= 34.5
Fy/2= 27.5 ksl
Qc= 1.92
Check: Pax/Pa + (Cmx*Mx)/(Max*µx) s LO
P/Pao + Mx/Max :S 1.0
Pno= Ae*Fy Pao= Pno/Qc
= 0.538 in"2 *55000 psi
= 29,585 lb
= 295851b/l.92
= 15,409 lb
Fe > Fy/2
Fn= Fy(1-Fy/4Fe)
= 55 ksl*[l-55 ksi/(4*245.1 ksl)]
= 51.9 ksl
Pa= Pn/Qc
= 27925 lb/1.92
= 14,5441b
Myield=My= Sx*Fy
= 0.51 in"3 * 55000 psi
= 28,050 in-lb
Max= My/Qf Per= n"2EI/(KL)max"2
= 28050 ln-lb/1.67
= 16,796 In-lb
µx= {1/(1 •(.Qc*P/Pcr)]}"-1
= {1/[1-(1.92*5462 lb/131815 lb)]}"-1
= 0.92
Combined Stresses
= n"2*29500000 psl/(1 *32 ln)"2
= 131,815 lb
(5462 lb/14544 lb) + (0.85*6300 ln-lb)/(16796 ln-lb*0.92} =
(5462 lb/15409 lb) + (6300 ln-lb/16796 In-lb) =
0.72
0.73
< 1.0, OK
< 1.0, OK
(EQ C5-1)
(EQ C5-2)
*"' For comparison, total column stress computed for load case 5 is: 70.0% It/I/zing loads 63S6.22 lb Axial and M= 4725 In-lb
TYPE4 Page r,.. of !( 10/10/2023
Structural
Engineering & Design Inc.
1815 Wright Ave La Verne, CA 91750 Tel.: 909,596.1351 Fax: 909.596,7186
By: NIHAL Project: IMPLANT INNOVATIONS
BEAM Configuration: 1YPE 4 SELECTIVE RACK
DETERMINE ALLOWABLE MOMENT CAPACI1Y
A) Check compression flange for local buckling (B2,1)
W= C -2*t -2*r
= 1.75 in -2*0.059 in -2*0.059 in
= 1.514 In
w/t= 25.66
l=lambda= (1.052/(k)A0.5] * (w/t) * (Fy/E)"0.5
= [1.052/(4)"0.5] * 25.66 * (55/29500)"0.5
= 0.583 < 0.673, Range Is fully effective
B) check web for local buckling per section b2.3
f1(comp)= Fy*(y3/y2)= 49.78 ksl
f2(tenslon)= Fy*(yl/y2)= 101.54 ksl
Y= f2/f1
= -2.04
k= 4 + 2*(1-Y)"3 + 2*(1-Y)
= 66.27
flat depth=w= yl+y3
Eq. B2.3-5
Eq. B2.3·4
= 3.420 in w/t= 57.96610169
l=lambda= [1.052/(k)'"0.5] * (w/t) * (f1/E)"0.5
= [1,052/(66,27)"0,5] * 3.42 * (49,78/29500)"0,S
C 0,308 < 0,673
be=w= 3.420 in b2= be/2
bl= be(3-Y) = 1.71 In
= 0.679
b1+b2= 2.389 In > 1.12504 In, Web Is fully effective
Determine effect of cold working on steel vleld point (Fyal per section AZ,2
Fya= C*Fyc + (1-C)*Fy (EQ A7.2-1)
Lcomer=Lc= (p/2) * (r + t/2)
0.139 ln
Lflange-top=Lf= 1.514 ln
m= 0.192*(Fu/Fy) -0.058
= 0.1590
C= 2*Lc/(Lf+2*Lc)
= 0.155 In
(EQ A7.2-4)
Be= 3.69*(Fu/Fy) -0.819*(Fu/Fy)"2 -1.79
= 1.427
since fu/Fv= 1.18 < 1.2
and r/t= 1 < 7 OK
then Fye= Be * Fy/(R/t)"m (EQ A7.2-2)
= 78.485 ksl
Tous, Fya-top= 58.64 ksl (tension stress at top)
Fya-bottom= Fya*Ycg/(depth -Ycg)
= 113.84 ksl (tension stress at bottom)
Check allowable tension stress for bottom flange
Lflange-bot=Lfb= Lbottom -2*r*-2*t
= 2.514 In
Cbottom=Cb= 2*Lc/(Lfb+2*Lc)
= 0.100
Fy-bottom=Fyb= Cb*Fyc + (1-Cb)*Fyf
= 57.34 ksl
Pya= (Fya-top)*(Fyb/Fya-bottom)
= 29,54 ksl
OK
Eq. B2.1-4
Eq. B2.1-1
Eq B2.3-2
Project#; 23-1009-9
2,75 In
~Sin 4
T 1,625 In
3,CISClln
l~ 0,059 In
Beam= Intlk 36E 3 656Hx2 75Wx0 059"Thk I I _.
Ixc 1.335 ln"4
Sx= 0.680 ln"3
Ycg= 2.413 In
t= 0.059 In
Bend Radius=r= 0.059 In
Fy=Fyv= 55.00 ksi
Fu=Fuv= 65.00 ksi
E= 29500 ksl
top flange=b= 1.750 In
bottom flange= 2.750 In
Web depth= 3.f'"' 1" .__ Fy -
m
depth
(EQ A7.2-3)
yl= Ycg-t-r= 2.295 In
y2= depth-Veg= 1.243 In
y3= y2-t-r= 1.125 In
lfF= 0.95 Toen F*Mn=F*Fya*Sx=j 19.08 ln-k
• Structural
Engineering & Design Inc.
1815 Wright Ave La Verne, CA 91750 Tel: 909.596.1351 Fax: 909.596.7186
By: NIHAL Project: IMPLANT INNOVATIONS
BEAM Contlguratlon: TYPE 4 SELECTIVE RACK
RMI Section 5, 2, PT II
Section
Beam= Intlk 36E 3.656Hx2.75Wx0.059''Thk
Ix=Ib= 1.335 ln"4
Sx= 0.680 ln"3
t= 0.059 In
Fy=Fyv= 55 ksi
Fu=Fuv= 65 ksi
Fya= 58.6 ksl
1. Check Bending Streu Allowable Loads
Mcenter=F*Mn= W*L *W*Rm/8
E= 29500 ksl
F= 150.0
L= 96In
Beam Level= 1
P=Product Load= 1,500 lb/pair
D=Dead Load= 75 lb/pair
W=LRFD Load Factor= 1.2*0 + 1.4*P+l.4*(0.125)*P
FOR DL=20/o of PL,
W= 1.599
Rm= 1 • [(2*P'L)/(6*E*Ib + 3*F*L)]
RMI 2._z Item 8
1 -(2*150*96 ln)/[(6*29500 ksl*l.3352 ln"3)+(3*150*96 in))
= 0.897
If F= 0.95
Then F*Mn-=F*Fya*Sx= 37,88 ln·k
Thus, allowable load
per beam pair=W= F*Mn*8*(# of beams)/(L*Rm*W)
= 37.88 ln-k * 8 * 2/(96In * 0.897 * 1.599)
= 4,402 lb/pair allowable load based on bending streu
Mend= W*L *(1 ·Rm)/8
= (4402 lb/2) * 96 In* (1-0.897)/8
= 2,720 In-lb @ 4402 lb max allowable load
= 0,927 In-lb @ 1500 lb imposed product load
2. Check Deflection Stress Allowable Loads
Dmax= Dss*Rd
Rd= 1 -(4*P'L)/(5*F*L + l0*E*Ib)
= 1 -(4*150*96 in)/[{5*150*96 tn)+(10*29500 ksi*1.3352 ln"4)J
= 0.876 In
If Dmax= L/180 Based on l/180 Deflection Criteria
and Dss= 5*W*L"3/(384*E*Ib)
L/180= 5*W*L"3*Rd/(384*E*Ib*# of beams)
solving for W yields,
W= 384*E*I*2/(180*S*L"2*Rd)
= 384*1.3352 ln"4*2/[180*5*(96 in)"2*0.876)
= 4,163 lb/pair allowable load based on deflection limits
Project#: 23-1009.S
2,751n
~Sin 4
T 1,625 In
3.656 In
1~ 0.059 In
1-IIIIIIIIOOOOIIIIIOOIIIOOOIIIOIOOIIOOOIIIO ')-: :tli;=====~==~ -----------·----~-
: : : : : :
f: =
"' ..
illlf!i!ml,
Lengil:h.
Allowable Deflection= L/180
= 0.533 In
Deflection at Imposed Load= 0.192 In
.. ..
Thus, based on the least capacity of item 1 and 2 above: Allowable load= 4,1 3 lb pair
Imposed Product Load= 1,500 lb/pair
Beam StreaI= 0.36 Beam at Level 1
Structural
Engineering & Design Inc.
1815 Wright Ave La Verne CA 91750 Tei· 909 596 1351 fax· 909 596 7186
By: NIHAL Project: IMPLANT INNOVATIONS Project#: 23-1009-9
3 Tab Beam to Column Connection Configuration: TYPE 4 SELECTIVE RACK
Mconn max= (Mselsmlc + Mend·fixlty)*0.70*Rho
= 5,655 in-lb Load at level 1
Connector Type= 3 Tab
Shear capacity or Tab
Tab Length= 0,50 In
Ashelir= 0.5 in * 0.135 In
= 0.0675 in''2
Pshear= 0.4 * Fy * Ashear
= 0.4 * 55000 psi * 0.0675in''2
= 1,485 lb
Bearing Capacity or Tab
t.col= 0.070 in
Omega= 2.22
Fy= 55,000 psi
Fu= 65,000 psi
a= 2.22
Pbearing= alpha * Fu * tab length * tcol/Omega
= 2.22 * 65000 psi * 0.5 in * 0.07 ln/2.22
= 2,275 lb > 1485 lb
Moment Capacity of Bracket
Edge Dlstance=aE= 1.00 In Tab Spacing= 2.0 In
C= Pl+P2+P3 = P1+P1 *(2.5"/4.5")+P1 *(0.5"/4.5")
= 1.667 * Pl
Mcap= Scllp * Fbendlng
= 0.1832 ln"3 * 0.66 * Py
= 6,650 In-lb
Pdlp= Mcap/(1.667 * d)
4 /8"
tcllp"' 0.135 In
C*d= Mcap = 1.667
= 6650.16 in-lb/(1.667 * 0.5 in)
= 7,979 lb
Thus, Pl= 1,485 lb
Mconn-allow= [Pl *4.S"+Pl *(2.5"/4.5")*2.5"+P1 *(0.5"/4.5")*0.5"]
= 1485 LB*[4.5"+(2.5"/4.5")*2.5"+ (0.5"/4.5")*0.5"]
= 8,828 In-lb > Mconn max, OK
Stress= 0.64
TYPE4 Page q of J£
1 316"
Bearing Length= 1,;;0:Ji""'. • ... m:"".""""'---'
Fy= 55,000 psi
Sclip"' 0.183 ln"3
d= E/2
= 0.50 In
0
10/10/2023
Str~ctural
Engineering & Design Inc.
1815 Wr!ght Ave La Verne. CA 91750 Tel: 909.596.1351 Fax: 909.596.7186
By: NIHAL Project: IMPLANT INNOVATIONS Project#: 23-1009-9
Transverse Brace Configuration: TYPE 4 SELECTIVE RACK
Sec:tion Properties
Diagonal Member= Mclx C456 Sgt 1.7953x1.378x16ga(U31x)
Area= 0.259 tnA2
r min= 0.449 In
Fy= ss,ooo psi
K= 1.0
nt= 1.92
Frame Dimensions
Diagonal Member
Bottom Panel Helght=H= 48.0 In
Frame Depth=D= 36.0 In
Column Wldth=B= 2.7 In
Horizontal Member= Mclx C456 Sgl 1. 7953xl.378x16ga(U31x)
Area= 0.259 tnA2
r min= 0.449 In
Fy= 55,000 psi
K= 1.0
aear Depth=D-8*2= 30.6 In
X Brace= NO
rho= 1.00
.. 0
!Load Case 6:: (t.:!:f} !04*~ + l(0.85+0.14Sds)*B*P + [0.7*rho*E]<= 1.0, ASD Method
Vtransverse= 2,143 lb
Vb=Vtnnav*0.7*rho= 2143 lb * 0.7 * 1
= 1,500 lb
Ldtag= [(D·B*2)A2 + (H-6")A2)A1/2
= 52.0 In·
Prnax= V*(Ldlag/D) * 0.75
= 1,625 lb
11x/11/ load on di on11/ brace member
(kl/r)= (k * Ldlag)/r min
= (l x 52 In /0,449 In )
= 115.8 In
Fe= pl"2*E/(kl/r)"2
= 21,712 psi
Since Fe<Fy/2,
T
~l
Pn= AREA*Fn
= 0.2591nA2 * 21712 psi
= 5,617 lb
Pallow= Pn/n
= 5617 lb /1.92
= 2,925 lb
Pn/Pallow= 0.56
Horizontal brace
Vb=Vtransv*D.7*rho= 1,500 lb
(kl/r)= (k * Lhorlz)/r min
= (1 x 36 In) /0.449 In
= 80.2 In
Since Fe>Fy/2, Fn=Fy*(1-fy/4fe)
= 38,293 psi
Pn/Pallow= 0.29
TYPE4
<= 1.0 OK
<= 1.0 OK
Fn"' Fe
= 21,712 psi B +f'
Typical t?aoel
Conflaucntion
Fe= p1A2*E/(kl/r)"2
= 45,266 psi
Pn= AREA*Fn
= 0.2591n"2*38293 psi
= 9,906 lb
Page /oot/6
Fy/2= 27,500 psi
Pallow= Pn/nc
= 9906 lb /1.92
= 5,160 lb
10/10/2023
St~uctural
Engineering & Design Inc.
1815 Wright Ave La Veme. CA 91760 Tel: 909.596.1351 Fax: 909.596.7186
By: NIHAL Project: IMPLANT INNOVATIONS
Single Row Frame OVertumlng Configuration: TYPE 4 SELECTIVE RACK
Loads
Crltlcal Load case(s):
1) RMI Sec 2.2, Item 7: (0.9-0.2Sds)D + (0.9-0.20Sds)*B*Papp • E*rho
Sds= 0.7936
(0.9-0.2Sds)= 0.7413
Project#: 23-1009-9
Vtrans=V=E=Qe= 2,143 lb
DEAD LOAD PER UPRlGHT=D= 750 lb
PRODUCT LOAD PER UPRlGHT=P= 15,000 lb
Papp=P*0.67= 10,050 lb
Wst LCl~Wstl=(0.74128*O + 0.74128*Papp*1)• 8,005 lb
(0.9-0.2Sds)= 0.7413 __ _
B= 1:1.\lj::a=.-..-.lia..i
rho= 1.0000
Product Load Top Level, ptop= 1,500 lb
DL/Lvl= 75 lb
Seismic Ovt based on E, l:(Fi*hl)= 222,750 In-lb
helaht/deoth ratio= s o In
Al Fullv Loaded Rack
Load case 1:
Movt= I:(Fl*hl)*E*rho
= 222,750 In-lb
Frame Depth=Df= 36.0 In
Htop-lvl=H= 180.0 In
# Levels= 10
# Anchors/Base= 2
ho= 480 in
h=H+hn/2= 204.0 In
Mst= Wstl * Df/2
= 8005 lb * 36 ln/2
= 144,090 In-lb
SIDE B.EVATION
T= (Movt-Mst)/Df
= (222750 In-lb· 144090 ln-lb)/36 In
= 2,185 lb Ni!t Uplift per Column
I Net Seismic Uolift= 2,185 lb StnJ,-ntJ, Level
Bl TOD Level Loaded Onlv
Load case 1:
0 Vl=Vtop= Cs * Ip * Ptop >= 350 lb for H/D >6.0 Movt= [Vl *h + V2 * H/2]*rho
= 0.1984 * 1500 lb = 74,102 In-lb
= 2981b T= (Movt-Mst)/Df
Vleff= 298 lb Critical Level= 10 = (74102 in-lb· 30022 in-lb)/36 in
V2=Vot. = Cs*Ip*D Cs*Ip= 0.1984 = l,224 lb Net Uplift per Column
= 1491b
Mst= (0.74128*D + 0.74128*Ptop*l) * 36 ln/2
= 30 022 In-lb
I Net Seismic Uolift= 1.224 lb Strenath Level
Anchor
Check (2) 0.5" x 3.25" Embed HILTI TZ2 anchor(s) per base plate.
Special inspection Is required per ESR 4266.
Fully Loaded:
Top Level Loaded:
TYPE4
Pullout Capacity=Tcap= 1,961 lb LA. City Jurtsdictlon? NO
Shear Capaclty=Vcap= 2,517 lb Phi= 1
(1092 lb/1961 lb)Al + (535 lb/2517 lb)Al =
(612 lb/1961 lb)Al + (74 lb/2517 lb)"l =
Page I( of/(
0.77
0.34
Tcap*Phl= 1,961 lb
Vcap*Phl= 2,517 lb
<= 1.2 OK
<= 1.2 OK
10/10/2023
l Strllctural
i j Engineering & Design Inc.
1815 Wriaht Ave La Verne. CA 91750 Te!: 909.596,1361 Fax: 909 596.7186
By: NIHAL Project: IMPLANT INNOVATIONS Project#: 23-1009-9
Base Plate Configuration: TYPE 4 SELECTIVE RACK
Section
Baseplate= 7.2B3x5.118x0.394
Eff Wldth=W = 7.28 In
Eff Depth=D = 5.12 In
Column Wldth=b = 3.00 In
Column Depth=dc = 2.69 In
L = 2.14 in
Plal.'8 Tolckness=t = 0.394 In
a= 2.64 In
Anchor c.c. =2*a=d = 5.28 In
N=# Anchor/Base= 2
Fy = 36,000 psi
Powoatsle EJevatJon
Down Aisle Loads Load Case 5:: (1+0.J0S*Sds)D + 0.75*[(1.4+o.14Sds)*B*P + 0.75*(0.7*rho*EJ<= 1.0, ASD Method
COLUMN DL= 375 lb Axial=P= 1.083328 * 375 lb + 0.75 * (1.511104 * 0.7 * 7500 lb)
COWMN PL= 7,500 lb = 6,356 lb
Base Moment= O In-lb Mb= Base Moment*0.75*0.7*rho
1+0.105*Sds= 1.0833 = 0 in-lb* 0.75*0.7*rho
1.4+0.14Sds= 1.5111 = 0 In-lb
B= 0 • j Axial Load P = 6,356 lb Mbase=Mb = 0 in-lb
Axial stress=fa = P/A = P/(D*W)
= 171 psi
Moment Stress=fb = M/S = 6*Mb/[(D*B"2]
= 0:0 psi
Moment Stress=fbl = fb-fb2
= 0.0 psi
M3 = (1/2)*fb2*L *(2/3)*L = (l/3)*fb2*L"2
= 0 In-lb
5-plate = (l)(t"2)/6
= 0.026 fn"3/ln
fb/Fb = Mtotal/[(S-plate)(Fb)]
= 0.56 OK
Tanchor = (Mb-(PLapp*0.75*0.46)(a))/[(d)*N/2]
= -4,003 lb No Tension
Ml = wL"2/2= fa*L"2/2
= 391 in-lb
Moment Stress=fb2 = 2 * fb * L/W
= 0.0 psi
M2= fbl *L "2)/2
= 0 in-lb
Mtotal = M1+M2+M3
= 391 in-lb/In
Fb = 0.75*Fy
= 27,000 psi
F'p= 0.7*F'c
= 1,750 psi OK
Tallow= 1,961 lb OK
Cross Aisle Loads ~,-..,.."Mis.c2.1,1Nn•4:fl+o,JJSd,)Ol.+/1+o.u,s1JSJP1.'0.m-s.'fJ.7S<•1•0,ASD-Check u lift load on Base late
Em
Effe
Pstatic= 6,356 lb
Movt*0.75*0.7*rho= 116,944 In-lb
Frame Depth= 36.0 In
P=Pstatic+Pseismic= 9,605 lb
Check uplift forces on baseplate with 2 or more anchors per RMI 7 .2.2.
tho base ploto conn~ouon consfsts of two lll1d1or bolts located on either side
TYPE4
b =Column Depth= 2.69 in
L =Base Plate Depth-Col Depth= 2.14 In
fa = P/A = P/(D*W)
= 258 psi
Sbase/in = (1)(t"2)/6
= 0.026 ln"3/ln
fb/Fb = M/[(S-plate)(Fb)]
0.85 OK
Pselsmlc= Movt/Frame Depth
= 3,248 lb
M= wL"2/2= fa*L"2/2
= 591 In-lb/In
Fbase = 0.75*Fy
= 27,000 psi
Page J).. of ''
f the column and a net uplift force exists, the minimum base plate thickness
hall be determined based on a design bending moment In the plate equel
the uplift force on one anchor times 1/2 the distance from
he centerline of the anchor to the nearest edge of the rack column•
~
Uplift per Column= 192 lb
Qty Anchor per BP= 2
Net Tension per anchor= Ta= 96 lb
C= 2.14 In
Mu=Moment on Baseplate due to uplift= Ta*c/2
fb Fb *0.75= 0.022
= 103 In-lb
Splate= 0.132 ln"3
OK
10/10/2023
'i
l Structural I j
j Engineering & C)esign 1. nc.
1815 Wriaht Ave La Verne, CA 91750 Tel: 909.596.1351 Fax: 909.596.7186
By: NIHAL Project: IMPLANT INNOVATIONS Project#: 23-1009-9
Slab on Grade Configuration: lYPE 4 SELECTIVE RACK
: [Jl : : b e
I : : •----c ____ 1
.
~
Baseplate Plan YJew
~
f'c= 2,500 psi
tslab=t= 6.0 in
fsoll= 750 psf
Movt= 222,750 in-lb
Frame depth= 36.0 In
Sds= 0.794
0.2*Sds= 0.159 Base Plate
Effec. Baseplate wldth0 B• 7.28 Jn
Effec. Baseplate DepthaDm 5.12 In
width=a= 3.00 in
depth=b= 2.69 In j3=8/D= 1.423
F'c,...0.5= 50.00 psi
Column Loads
DEAD LOAD=D= 375 lb per column
unf;,ctored ASD load
PRODUCT LOAD=P= 7,500 lb per column
unf;,ctored ,4SD load
Papp= 5,025 lb p/ar column
P-selsmlc=E= (Movt/Frar41e depth)
= 6,187 lb pt~rcolumn
unf;,ctored•I. imJt Sf:ilte /o;,d
B=
rho=
Sds= 0.7936
1.2 + 0.2*Sds= 1.3587
0. 9 -0.20Sds= 0.7413
Puncture
Apunct= [(c+t)+(ett)]*2*t
= 252.55 w t2
Fpunctl= [(4/3 + 8/(3*13)] * A. *(F'c,...0.5)
= 96.2 psi I
Fpunct2= 2.66 * A * l(Pc,...0.5)
= 79,8 psi
Fpunct eff= 79.8 psi
Slab Bending
I Pse=DL+PL+E= 14,137 lb :
.TYPE 4
Asoll= (Pse*144)f,(fsoil)
C 2,714 lnl\2
x= (L-y)/2 !
= 17.8 In /
Fb= 5*(phl)*(f'r:)A0,5
= 150. psi I
midway dist face of column to edge of plate=c= 5.14 In
midway dist face of column to edge of plate=e= 3,90 In
Load Case 1) (1.2+0.2Sds)D + (1.2+0.2Sds)*B*P+ rho*E RMI SEC 2.2 EQTN s
= 1.35872 * 375 lb + 1.35872 * 0.7 * 7500 lb+ 1 * 6187 lb
= 13,830 lb
Load case 2) (0.9-0.2Sds)D + (0.9-0.2Sds)*B*Papp + rho*E RMI SEC 2.2 EQTN 7
= 0.74128 * 375 lb + 0.74128 * 0.7 * 5025 lb+ 1 * 6187 lb
= 9,0721b
Load Case 3) 1.2*D + 1.4*P
= 1.2*375 lb + 1.4*7500 lb
= 10,950 lb
Load Case 4) 1.2*0 + 1.0*P + 1.0E
= 14,137 lb
Effective Column Load=Pu= 14,137 lb per column
L= (Asoll),...0.5
= 52.10 In
M= w*x,...2/2
= (fsoll*x,...2)/(144*2)
= 825,8 In-lb
Page /J of/£·
fv/Fv= Pu/(Apunct*Fpunct)
= 0.701 < 1 OK
y-=-(c*e)A0.5 + 2*t
= 16.5 in
S-slab= 1 *teff,...2/6
= 6,01nA3
fb/Fb= M/(S-slab*Fb)
= 0.918 < 1, OK
RMI SEC 2.2 EQTN 1,2
/lQ 31B-14 Sec 5.3.l
Eqtn 5,3.le
10/10/2023
Structural
Engineering & Design Inc.
1815 Wright Ave La Verne. CA 91750 Tel; 909 596.1351 Fax: 909.596. 7186
By: NIHAL Project: IMPLANT INNOVATIONS Project #: 23-1009-9
Configuration &. Summary: TYPE 1 SELECTIVE RACK
T
52"
t
192" 28"
1~-
28"
+
34"
.I
'
192"
32''
_L,_,
**RACK COLUMN REACTIONS
ASDLOADS
AXIAL DL= 150 lb
AXIALLL= 4,400 lb
SEISMIC AXIAL Ps=+/-2,517 lb
B4SE MOMENT= 0 In-lb
--r--96" -,1-
Seismic Criteria # Bm Lvls Frame Depth Frame Height # Dia onals Beam Length Frame Type
Ss=0.992, Fa=l.2 4 42 In 192.0 in 3 961n Double Row
Component
Column
Column & Backer
Beam
Beam Connector
Brace-Horizontal
Brace-Diagonal
Base Plate
Anchor
Slab &Soil
Level I Load**
1
2
3
4 -
Per Level
2,200 lb
2,200 lb
2,200 fb
2,200 lb
Fv=55 ksl
None
Fy=55 ksl
Fv=SS ksl
Fv=55 ksl
Fy=55 ksl
Fy=36 ksl
2 per Base
BeamSDCa
34.0 In
28.0 In
28.0 In
52.0 In
•• Load defined as product weight per pair of beams
Notes I
2 prs of d/r spacers (sandwich style )
TYPE 1
Description
Mecalux 314 3.0"x2.69"x0.070" P=4550 lb, M=14942 In-lb
None None
Intlk 35E 3.656Hx2.75Wx0.059''Thk LU=96 in I capacity: 4163 lb/pr
Lvl 1: 3 Tab OK I Mconn=8299 In-lb I Mcap=8B28 in-lb
Mclx C456 Sgl 1.7953x1.37Bx16ga(U31x)
Mclx C456 Sgl 1.7953x1.378x16ga(U31x)
7.283x5.118x0.394 I Fixity= 0 In-lb
o.s· x 3.25" Embed HILTI TZ2 ESR 4266 Inspection Reqd (Net Seismic Upllft=0 lb)
6" thk x 2500 psi slab on grade. 750 psf Soll Bearing Pressure
Brace
32.0 In
64.0 In
78.0 in
Tot.al:
I Story Force I
Transv
127 lb
2321b
3371b
5321b
1,229 lb
Story Force
Longit.
1001b
1821b
2651b
4171b
9641b
Page / 4 of Ji
Column
Axial
4,550 lb
3,413 lb
2,275 lb
1,138 lb
I Column I
Moment
14,942 "#
6,049 "#
4,773 "#
5,426 "#
Conn.
Moment
8,299 "#
4,740 "#
4,522 "#
2,851 "#
STRESS
0.83-OK
N/A
0.53-OK
0.94-OK
0.2-OK
0.63-OK
0.44-0K
0.1-OK
0.35-OK
Beam
Connector
3Tab OK
3Tab OK
3TabOK
3Tab OK
10/10/2023
.,
Structural
Engineering & Design Inc.
1815 Wriaht Ave La Verne. CA 91750 Tel: 909.596, 1351 Fax-909,596 7186
By: NIHAL Project: IMPLANT INNOVATIONS Project#:23-1009-9
Configuration & Summary: TYPE 2 SELECTIVE RACK
T
58"
192" t
86"
.I
192"
**RACK COLUMN REACllONS
ASDLOADS
A"1ALDL= 7Slb
AXTAL LL= 1,800 lb
SBSMIC M1AL Ps=+/-1,219 lb
BASE MOMENT= 0 in-lb
Seismic Criteria # Bm Lvls Frame Depth Frame Height # Dia onats Beam Length Frame Type
Ss=0.992, Fa=1.2 2 42 In 192.0 in 3 96in Double Row
Component
Column Fv=55 ksi
Column & Backer None
Beam Fv=55 ksl
Beam Connector Py=55 ksl
Brace-Horizontal FV=55 ksl
Brace-Diagonal Fv=55 ksl
Base Plate Py=36 ksl
Anchor 2 per Base
Slab & Soll
Level I Load**
Per Level BeamSDco
1 1,800 lb 86.0 In
2 1,800 lb 58.0 in
1
.. ""'= m pj,d ... hl p« ,-, " ... ~
2 p,s of d{,""""' (,a""""'.,,,)
TYPE2
Description
Mecalux 314 3.0"x2.69"x0.070" P=1875 lb, M=16559 in-lb
None None
Intlk 36E 3.656Hx2.75Wx0.059"Tok Lu=96 In I Capacity: 4163 lb/pr
Lvl 1: 3Tab OK I Mconn=7842 In-lb I Mcap=8828 in-lb
Mclx C456 Sgl 1.7953x1.378x16ga(U31x)
Mclx C456 Sgl 1.7953xl.378x16ga(U31x)
7.283x5.118x0.394 I Rxlty= 0 In-lb
0.5" x 3.25" Embed HILT! 122 ESR 4266 Inspection Reqd (Net Seismic Uplift=0 lb)
6" thk x 2500 psi slab on grade. 750 psf Soil Beating Pressure
Brace
32.0 In
64.0ln
78.0 In
Total:
I Story Force I Story Force
Transv Longit.
190 lb 149 lb
3181b 2501b
5081b 3991b
Page f 5 of /,.(
Column I Column I
Axial Moment
1,875 lb 16,559 "#
9381b 3,622 "#
Conn.
Moment
7,842 "#
2,046 "#
STRESS
0.99-OK
N/A
0.43-OK
0.89-OK
0.0S-OK
0.26-OK
0.19-OK
0.042-0K
0.16-OK
Beam
Connector
3TabOK
3TabOK
10110/2023
Structural
Engineering & Design Inc.
1815 Wrjght Ave La Verne. CA 91750 Tel: 909.596.1351 Fax: 909.596.7186
By: NIHAL Project: IMPLANT INNOVATIONS Project#: 23-1009-9
Configuration & Summary: TYPE 3 SELECTIVE RACK
T
58"
192'' + 58"
t
58"
.I
192"
32" -l r---t
**RACK COLUMN REACTIONS
ASDLOADS
AXIAL DL= 113 lb
AXIAL LL= 3,300 lb
SEISMIC AMAL Ps=+/-2,399 /b
BASE MOMENT= 0 In-lb
,-r -96'' ---,+,
Seismic Criteria
Ss=0.992, Fa=l.2
Component
Column
Column & Backer
Beam
Beam Connector
Brace-Horizontal
Brace-Diagonal
Base Plate
Anchor
Slab &Soll
Level I Load**
1
2
3
Per Level
2,200 lb
2,200 lb
2,200 lb
# BmLvls
3
Fy=55 ksl
None
Fv=55 ksi
Fv=55ksi
Fv=55 ksl
Fy=55 ksl
Fv=36 ksl
2 per Base
Beam Spcg
58.0 in
58.0 in
58.0 in
0 Load defined as product welght per pair of beams
I -I 3 pra of d/, ,,_., ( """"'"' style I
TYPE3
Frame Depth Frame Height # Dia onals Beam Length Frame Type
42 In 192.0 in 3 961n Double Row
Description
Mecalux 314 3.0"x2.59"x0.070" P=3413 lb, M=14190 In-lb
None None
Intlk 36E 3.656Hx2.75Wx0.059"Tok Lu=96 in I capacity: 4163 lb/pr
Lvl 1: 3 Tab OK I Mconn=8101 in-lb I Mcap=8828 in-lb
Mclx C456 Sgl 1.7953x1.378x16ga(U31x)
Mclx C456 Sgl 1.7953x1.378x16ga(U31x)
7 .283x5.118x0.394 I Fixity= 0 in-lb
0.5" x 3.25" Embed HILTI TZ2 ESR 4266 Inspection Reqd (Net Selsmlc Upllft=168 lb)
6" thk x 2500 psi slab on grade. 750 psf Soil Bearing Pressure
Brace
32.0 in
64.0 in
78.0 In
Total:
I Story Force I Story Force
Transv Lonalt.
1541b
307 lb
461 lb
9221b
861b
1721b
2581b
5161b
Page /6 of /I,
Column
Axial
3,413 lb
2,275 lb
1,138 lb
I Column I
Moment
14,190 "#
6,235 "#
3,741 "#
Conn.
Moment
8,101 "#
4,444 "#
2,261 "#
STRESS
0.83-OK
N/A
0.53-OK
0.92-0K
0.15-OK
0.47-OK
0.35-OK
0.075-OK
0.29-OK
Beam
Connector
3TabOK
3TabOK
3TabOK
10/12/2023
SAN DI EGO REGIONAL
HAZARDOUS MATERIALS
QUESTIONNAIRE
OFFICE USE ONLY
RECORD ID# ________________ _
PLAN CHECK# ________________ _
BP DATE
APN#
Plan File#
The following questions represent the facility's activities, NOT the specific project description.
PART I: FIRE DEPARTMENT-HAZARDOUS MATERIALS DIVISION: OCCUPANCY CLASSIFICATION: (not required for projects within the City of San
Diego): Indicate by circling the item, whether your business will use, process, or store any of the following hazardous materials. If any of the items are circled,
applicant must contact the Fire Protection Agency with jurisdiction prior to plan submittal.
Occupancy Rating: Facility's Square Footage (including proposed project):
1. Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives 13. Corrosives
2. Compressed Gases 6. Oxidizers 10. Cryogenics 14. 0th alth Hazards
3. Flammable/Combustible Liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials . None of Thes
4. Flammable Solids 8. Unstable Reactives 12. Radioactives
PART 11: SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEALTH -HAZARDOUS MATERIALS DIVISION (HMO): If the answer to any of the
questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 5500 Overland Avenue, Suite 170, San Diego, CA 92123.
Call (858) 505-6700 prior to the issuance of a building permit.
FEES ARE REQUIRED Project Completion Date: Expected Date of Occupancy: 0 CalARP Exempt
I I §s §
4.
5.
6.
7.
8.
□ □ B □
lE ;
(for new construction or remodeling projects)
Is your business listed on the reverse side of this form? (check all that apply).
Will your business dispose of Hazardous Substances or Medical Waste in any amount?
Will your business store or handle Hazardous Substances in quantities greater than or equal to 55 gallons, 500
pounds and/or 200 cubic feet?
Will your business store or handle carcinogens/reproductive toxins in any quantity?
Will your business use an existing or install an underground storage tank?
Will your business store or handle Regulated Substances (CalARP)?
Will your business use or install a Hazardous Waste Tank System (Title 22, Article 10)?
Will your business store petroleum in tanks or containers at your facility with a total facility storage capacity equal to
or greater than 1,320 gallons? (California's Aboveground Petroleum Storage Act).
Date Initials
0 CalARP Required
I
Date Initials
0 CalARP Complete
I
Date Initials
PART 111: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT APCD: The following questions are intended to identify the majority of
air po ut1on issues at t e p anrnng stage. Your project may require a 1tional measures not identified by these questions. Residences are typically
exempt, except-single building with more than four dwelling units and those with more than one detached residential buildings
on the property-e.g. granny flats [+Excludes garages & small outbuildings not used as dwelling units]. If yes is answered for the questions below
please see link for further instructions: here or for more comprehensive requirements, please contact apcdcomp@sdapcd.org or call (858) 586-2650.
YES NO
1. D llJ Will the project disturb 100 square feet or more of existing building materials? If yes, submit an asbestos survey to apcdcomp@sdapcd.org.
2. □ ~
3. □
4. □
[I
111
Will any load supporting structural members be removed? If yes, submit an asbestos survey and demolition notification to
apcdcomp@sdapcd.org at least 1 O wor1<.ing days prior to starting the demolition of a load bearing structure. A notification is required even if no asbestos is present
in the structure.
(ANSWER ONLY IF QUESTION 1 IS YES) Will 100 square feet or more of friable asbestos material be disturbed? If yes, submtt a notification of asbestos
removal to apcdcomp@sdapcd.org at least 1 O wor1<.ing days prior to starting asbestos removal.
Will any equipment or operations be installed that may require an APCD Permit to Operate? Please see the reverse side of this form for typical equipment
requiring an APCD permit. If yes, contact APCD prior to the issuance of a building permit.
Briefly describe business activities: Briefly describe proposed project:
Date
FIRE DEPARTMENT OCCUPANCY CLASSIFICATION: ________ ___,:___ _____________________ _
BY· DATE· I I
EXEMPT OR NO FURTHER INFORMATION REQUIRED RELEASED FOR BUILDING PERMrr BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY
COUNTY-HMO* APCO COUNTY-HMO APCD COUNTY-HMO APCD
.. *A stamp 1n this box only exempts businesses from completing or updating a Hazardous Matenals Business Plan. Other perm1tt1ng requirements may still apply
HM-9171 (01/22) County of San Diego -DEH -Hazardous Materials Division