HomeMy WebLinkAbout1594 MARBRISA CIR; ; CBC2022-0277; PermitBuilding Permit Finaled
Commercial Permit
Print Date: 03/12/2025
Job Address: 1594 MARBRISA CIR, CARLSBAD, CA 92008
Permit Type: BLDG-Commercial Work Class: nant Improvement
Parcel#: 2111312300 Track#:
Valuation: $225,775.88 Lot#:
Occupancy Group: A-3 / B Project#:
#of Dwelling Units: Plan#:
Bedrooms:
Bathrooms:
Construction Type:VA
Orig. Plan Check#:
Occupant Load : 628 Plan Check#:
Code Edition: 2019
Sprinkled: Yes
Project Title:
Permit No:
Status:
('cityof
Carlsbad
CBC_202Z-0Z77
Close -Flaale.d
Applied: 08/05/2022
Issued: 02/06/2023
Finaled Close Out: 03/12/2025
Final Inspection: 11/27/2024
INSPECTOR: Dreibelbis, Peter
Alvarado, Tony
Description: HILTON GRAND VACATIONS CLUB: COM-Tl (3,917 SF ) 1ST, 2ND AND THIRD FLOOR OFFICES
Applicant:
NOAA GROUP ARCHITECTS
DAN TALANT
4990 N HARBOR DR, # 201
SAN DIEGO, CA 92106-2371
(858) 736-1508
FEE
BUILDING PLAN CHECK
Property Owner:
GRAND PACIFIC PALISADES OWNERS
ASSOCIATION INC
5900 PASTEUR CT, # STE 200
CARLSBAD, CA 92008-7336
(760) 827-3200
BU ILDING PLAN REVIEW -MINOR PROJECTS (LOE)
BUILDING PLAN REVIEW -MINOR PROJECTS (PLN)
CERTIFICATE OF OCCUPANCY
COMM/IND Tl -STRUCTURAL
FIRE A-2 & A-3 Occupancies -Tl
SB1473 -GREEN BUILDING STATE STANDARDS FEE
STRONG MOTION -COMMERCIAL (SMIP)
Total Fees : $3,506.22 Total Payments To Date: $3,506.22 Balance Due:
AMOUNT
$910.26
$194.00
$98.00
$16.00
$1,523.74
$691.00
$10.00
$63.22
$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32 .030. Fa ilure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
Building Division Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
( City of
Carlsbad
PLAN CHECK REVISION OR
DEFERRED SUBMITTAL
APPLICATION
Development Services
Building Division
1635 FaradayAvenue
442-339-2719
www.carlsbadca .gov B-15
Original Plan Check Number (;.i:.c. '1d1n,..-o"l,.11
Project Address I i;i~ >\t1~g&'1t.-\SA c> \'2.<.,V<.,
Plan Revision Number ~"' '2.cn-">' <X>S:I
General Scope of Revision/Deferred Submittal: tbtV\$t Ml:;,0-\A~ l Svb~Y ~$,f;I{
A:tJ!> S~)f:t WALL 1D A.Gt:.o""....,00@:tE. -pve,::r Q-l.q%
CONTACT INFORMATION:
Address ~710 N, Jtq,,ul.t,(L.., Qi.we, ~Th 20\
Email Address dun+@ 1--\o¾; hC,, U:> 'I\'\,
Fax ~---------
Zip j0l6(,
Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person.
1 . Elements revised: ,RI Plans O Calculations O Soils D Energy O Other
2.
Describe revisions in detail
4. Does this revision, in any way, alter the exterior of the project? D Yes
5. Does this revision add ANY new floor area(s),? D Yes ~ No
6. Does this revision affect any fire related issues? D Yes ~ No
7. Is this a complete set? g Yes 181 No
~Signature ~a-Lcf/i.l Date
3.
List page/s) where each
revision is shown
,,gj No
1635 Faraday Avenue, Carlsbad, CA 92008 Ph: 442-339-2719 Email: building@carlsbadca.gov
www.carfsbadca.gov
,
( City of
Carlsbad
COMMERCIAL
BUILDING PERMIT
APPLICATION
8-2
Plan Check CW,.2.Q'l-'2.-O'i{l
Est. Value • ?-?:f', ,7~'t e,g
PC Deposit A, ,\(), • .2.(o
Date '« • S::•:Zo2:z_
Job Address 1594 Marbrisa Circle Suite: APN: 211-130-os -----
Tenant Name#: Hilton Grand Vacations Club Lot #: ____ Year Built: _________ _
Year Built:_2_01_3 __ Occupancy: A-3 t 8 Construction Type:_v_A__ Fire sprinklers@'ESQNO A/C:QYES@No
BRIEF DESCRIPTION OF WORK: Tenant Improvement to portions of 1st. 2nd & 3rd floors of existing office spaces and sales support spaces.
D Addition/New: ____________ New SF and Use, __________ New SF and Use
_______ SF Deck, SF Patio Cover, SF Other (Specify) ___ _
[{]Tenant Improvement: _3_,9_17 ____ SF, Existing Use: SALES / ADMIN Proposed Use: SALES / ADMIN
_____ SF, Existing Use: _______ Proposed Use : ______ _
□ Pool/Spa: _____ SF Additional Gas or Electrical Features? ____________ _
□solar: __ _ _ __ Modules, Mounted:0Roof 0Ground
D Reroof:.+-.....a.~;...;;. _________________________________ _
D Plumbing/Me cal
□ Other: ----=-.....-,--~.,a..,...".,...,...,.· __._1 ___________________________ _ TY OF C f\r<,L ._,, ,_
I\ ( I \
PRIMARY APPLICANT PROPERTY OWNER
Name: Dan Talant. NOAA Group Inc Name: Grand Pacific Resorts LP
Address: 4990 N. Harbor Dr. Address: 5900 Pasteur Court, Suite 200
. •
City: San Diego State: CA Zip:_s_21_0_6 ___ City: Carlsbad State:~Zip:_9_2o_o_s __ _
Phone: (858) 736-1508 Phone: 760-431-8500
Email: off;c.~{i? Qt>GlCA 1 "I c.,., (_ph'\ Email: harnold@gpresorts.com
DESIGN PROFESSIONAL CONTRACTOR OF RECORD
Name: Dan Talant. NOAA Group Inc Business Name: Grand Pacific Resorts. Inc.
Address: 4990 N. Harbor Dr. Address: 5900 Pasteur Court, Suite 200
City: San Diego State: CA Zip:_s_21_os ___ City: Carlsbad State: CA Zip:_s_2o_o_s ____ _
Phone: (85B)_736~1_508 ·-~-----------Phone: 760-431-8500
Email: of.fit e('o3 Y)p C\fi. j (\y • £ pN\ Email: harnold@gpresorts.com
Architect State License: c3s94s CSLB License#: 1018716 Class: 8 --------------------
Car Is bad Business License# (Required): _______ _
APPLICANT CERTIFICATION: I certify that I have read the application and state that the above information is correct and that the
information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building
construction. ---7'; / · 0-Z/-r
NAME {PRINT): Dan Talant SIGN:_ ~ C ~ ~ DATE: 0BI0312022
1635 Faraday Ave Carlsbad, CA 92008 Ph : 760-602-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov
REV. 07121
THIS PAGE REQUIRED AT PERMIT ISSUANCE PLAN CHECK NUMBER: ______ _
A BUILDING PERMIT CAN BE ISSUED TO EITHER A STATE LICENSED CONTRACTOR OR A PROPERTY OWNER. IF THE PERSON
SIGNING THIS FORM IS AN AGENT FOR EITHER ENTITY AN AUTHORIZATION FORM OR LETTER IS REQUIRED PRIOR TO
,...ef,RMIT ISSUANCE.
(OPTION A): LICENSED CONTRACTOR DECLARATION:
I herebyaf firm under penal tyof perjurythat I am licensed under provisions of Chapter 9 ( commencing with Section 7000) of Division 3
of the Business and Professions Code, and my license is in full force and effect. I alsoaf firm under penalty of perjury one of the
following declarations (CHOOSE ONE):
0 1 have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the
work which this permit is issued. Policy No. ______________________________________ _
-OR-
,x;il have and will maintain worker's compensation, as required by Section 3700 of the Labor Code,~ performjlnCe of th~ork for which Uiis P.ermit is issued. f-1lv workers' co'T'peQsation ·ns ance carrier and policy number are : Insurance Company Name: I l!c!t.uf!!Z.fef!i5 l.bttt.,<> e:.+ • ~,,..pico
Policy No. It:' "-l.-Expiration Date: Nev, 1 ·-2"2 3
-OR-
O certificate of Exemption: I certify that in the performance of the work for which this perm it is issued, I shall not employ any person in any manner so as to become
subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage is unlawful and shall subject an employer to
criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for in Section 3706 of the Labor Code,
interest and attorney's fees.
CONSTRUCTION LENDING AGENCY, IF ANY:
I hereby affirm that there is a construction lending agency for the performance of the work this permit IS issued (Sec. 3097 (i) Civil Code).
Lender's Name: _____________________ Lender's Address: ____________________ _
CONTRACTOR CERT/FICA TION: I certify that I have read the application and state that the above information is correct and that
the information on the plans is accurate. I agree to comply with all City ordinance__s and State laws relating to building
construction.
NAME {PRINT): A/1 i heel fh,d{ e> s1GNATURE: ' ;;?-b-2.:3
Note: If the person signing above is an authorized agent for the contractor provid etter of authorization o
-OR -
(OPTION B): OWNER-BUILDER DECLARATION:
I hereby affirm that I am exempt from Contractor's License Law for the following reason: n I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec.
'-ro44, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such
work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold
within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
-OR-D 1. as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s] licensed
pursuant to the Contractor's License Law).
-OR-
D I am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason:
AND, D FORM B-61 "Owner Builder Acknowledgement and Verification Form" is required for any permit issued to a property owner.
By my signature below I acknowledge that, except for my personal residence in which I must have resided for at least one year prior to completion of the
Improvements covered by this permit, I cannot legally sell a structure that I have bui It as an owner-builder if it has not been constructed In its entirety by licensed
contractors. I understand thatacopyof the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application is
submitted orat the following Web site: http:/ l www.leginfo.ca.gov/co/aw.html.
OWNER CERTIFICATION: I certify that I have read the application and state that the above information is correct and that the
information on the plans is accurate. I agree to comply with al I City ordinances and State laws relating to building
construction.
NAME (PRINT): SIGN: __________ DATE: ______ _
Note: If the person signing above is an authorized agent for the property owner include form B-62 signed by property owner.
1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov
2 REV. 07121
PERMIT INSPECTION HISTORY for (CBC2022-0277)
Permit Type: BLDG-Commercial Application Date: 08/05/2022 Owner: GRAND PACIFIC PALISADES OWNERS
ASSOCIATION INC
Work Class: Tenant Improvement Issue Date: 02/06/2023 Subdivision: CITY OF CARLSBAD TRACT NO
15-08
Status: Closed -Finaled Expiration Date: 03/25/2024 Address: 1594 MARBRISA CIR
CARLSBAD, CA 92008 IVR Number: 42439
Scheduled Actual Inspection Type Inspection No.
Date Start Date
Wednesday, March 12, 2025
Checklist Item
Are erosion control BMPs
functioning properly?
Are perimeter control BMPs
maintained?
Is the entrance stabilized to
prevent tracking?
Have sediments been tracked
on to the street?
Has trash/debris accumulated
throughout the site?
Are portable restrooms
properly positioned?
Do portable restrooms have
secondary containment?
COMMENTS
Inspection Primary Inspector
Status
Reinspection Inspection
Passed
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Page 6 of 6
PERMIT INSPECTION HISTORY for (CBC2022-0277)
Permit Type: BLDG-Commercial Application Date: 08/05/2022 Owner: GRAND PACIFIC PALISADES OWNERS
ASSOCIATION INC
Work Class: Tenant Improvement Issue Date: 02/06/2023 Subdivision: CITY OF CARLSBAD TRACT NO
Status:
Scheduled
Date
10/06/2023
11/27/2024
15-08
Closed -Finaled Expiration Date: 03/25/2024
IVR Number: 42439
Address: 1594 MARBRISA CIR
CARLSBAD, CA 92008
Actual Inspection Type
Start Date
Inspection No. Inspection Primary Inspector
Checklist Item
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
NOTES Created By
Angie Teanio
Status
COMMENTS
April 20, 2023:. Temporary certificate of
occupancy-(approved), for showcase
timeshare presentation rooms and admin
offices, located at second floor locations
(only) -approved.
TEXT
206-930-1644 Michael// Check Fire is Final
10/06/2023 BLDG-SW-Pre-Con
Checklist Item
226352-2023
COMMENTS
Partial Pass Tony Alvarado
BLDG-Building Deficiency October 6, 2023: (progress inspection).
1. Marbrisa Project: phase-2 sales pods on
third floor, interior tenant improvement -
progress inspection-approved.
11/27/2024 BLDG-Final Inspection 269508-2024 Passed Tony Alvarado
Checklist Item
BLDG-Building Deficiency
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
NOTES Created By
Ang ie Teanio
COMMENTS
Additional construction phases to be
completed at later date per Contractor
representative. Scope of office building
tentative improvement/remodel per plan -
OK.
TEXT
206-930-1644 Michael // Check Fire is Final
BLDG-SW-Inspection 269507-2024 Passed Tony Alvarado
Reinspection Inspection
Passed
Yes
Yes
Yes
Yes
Created Date
04/19/2023
Reinspection Incomplete
Passed
Yes
Passed
Yes
Yes
Yes
Yes
Yes
Created Date
04/19/2023
Complete
Complete
Wednesday, March 12, 2025 Page 5 of 6
PERMIT INSPECTION HISTORY for (CBC2022-0277)
Permit Type: BLDG-Commercial Application Date: 08/05/2022 Owner: GRAND PACIFIC PALISADES OWNERS
ASSOCIATION INC
Work Class: Tenant Improvement Issue Date: 02/06/2023 Subdivision: CITY OF CARLSBAD TRACT NO
15-08
Status: Closed -Finaled Expiration Date: 03/25/2024 Address: 1594 MARBRISA CIR
IVR Number: 42439 CARLSBAD, CA 92008
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
Checklist Item COMMENTS Passed
Are inactives slopes properly Yes
stabilized?
Are areas flatter than 3: 1 Yes
covered or protected?
Are sediment controls properly Yes
maintained?
Are erosion control BMPs Yes
functioning properly?
Are natural areas protected Yes
from erosion?
Do basins appear to be Yes
maintained as required?
Are perimeter control BMPs Yes
maintained?
Is the entrance stabilized to Yes
prevent tracking?
Have sediments been tracked Yes
on to the street?
Are storm drain inlets Yes
protected and maintained?
Has sediment accumulated on Yes
impeNious surfaces?
Are dumpsters and trash Yes
receptacles covered?
Has trash/debris accumulated Yes
throughout the site?
Are stockpiles and spoils Yes
protected from runoff?
Are all storage areas clean Yes
and maintained?
Are spill kits provided onsite? Yes
Are washout areas maintained Yes
and protected?
Were spills/leaks obseNed Yes
during the inspection?
Were there any discharges Yes
during the inspection?
Are portable restrooms Yes
properly positioned?
Do portable restrooms have Yes
secondary containment?
Are BMPs stockpiled for Yes
emergency deployment?
04/20/2023 04/20/2023 BLDG-Final Inspection 208578-2023 Partial Pass Tony Alvarado Reinspection Incomplete
Wednesday, March 12, .2025 Page 4 of 6
PERMIT INSPECTION HISTORY for (CBC2022-0277)
Permit Type: BLDG-Commercial Application Date: 08/05/2022 Owner: GRAND PACIFIC PALISADES OWNERS
ASSOCIATION INC
Work Class: Tenant Improvement Issue Date: 02/06/2023 Subdivision: CITY OF CARLSBAD TRACT NO
Status: Closed -Finaled Expiration Date: 03/25/2024
IVR Number: 42439
15-08
Address: 1594 MARBRISA CIR
CARLSBAD, CA 92008
Scheduled
Date
Actual Inspection Type
Start Date
Inspection No. Inspection Primary Inspector Reinspection Inspection
03/28/2023
Checklist Item
BLDG-Building Deficiency
NOTES Created By
Angie Teanio
Status
COMMENTS
TEXT
206-930-1644 Mike
03/28/2023 BLDG-84 Rough
Combo(14,24,34,44)
206385-2023 Passed Tony Alvarado
Checklist Item
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
NOTES Created By
Angie Teanio
Angie Teanio
COMMENTS
1. Non-load bearing partition walls, and
T-bar grid ceiling MEPS, scope of work per
engineered plans and deta il
specifications-approved.
TEXT
206-930-1644 Michael
206-930-1644 Michael
BLDG-85 T-Bar, Ceiling 206604-2023 Passed Tony Alvarado
Grids, Overhead
Checklist Item
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
COMMENTS
1. Non-load bearing partition walls, and
T-bar grid ceiling MEPS, scope of work per
engineered plans and detail
specifications-approved.
BLDG-SW-Inspection 206625-2023 Passed Tony Alvarado
Wednesday, March 12, 2025
Passed
No
Created Date
03/02/2023
Passed
Yes
Yes
Yes
Yes
Created Date
02/28/2023
03/27/2023
Passed
Yes
Yes
Yes
Yes
Complete
Complete
Complete
Page 3 of6
PERMIT INSPECTION HISTORY for (CBC2022-0277)
Permit Type: BLDG-Commercial Application Date: 08/05/2022 Owner: GRAND PACIFIC PALISADES OWNERS
ASSOCIATION INC
Work Class: Tenant Improvement Issue Date: 02/06/2023 Subdivision: CITY OF CARLSBAD TRACT NO
15-08
Status: Closed -Finaled Expiration Date: 03/25/2024
IVR Number: 42439
Address: 1594 MARBRISA CIR
CARLSBAD, CA 92008
Scheduled
Date
Actual Inspection Type
Start Date
Inspection No. Inspection
Status
Primary Inspector Reinspection Inspection
03/02/2023
03/03/2023
Checklist Item
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
NOTES Created By
Angie Teanio
COMMENTS
March 1, 2023:
1. Phase 1, Hilton grand vacations
MarBrisa hotel.
2. Second level, second floor, interior
commercial tenant space improvement.
3. Construct and remodel enter nonload
bearing partition walls (typical), and
relocate existing electrical outlets,
switches, and light fixtures, mechanical
ducting, minimal plumbing pipe lines.
4. Interior remodel per approve stamped
signed plans.
5. Contractor representative required to
update any As-built and field floor plan
revisions, update city approved plans To
reflect interior remodel as built site
conditions., before final inspection
certificate of occupancy is completed.
6. Rest of work-OK.
7. Fire prevention inspection and approval
required prior to above T bar/Gypsum
board, ceiling hard-lid rough inspection
completed.
TEXT
206-930-1644 Michael
03/02/2023 BLDG-16 Insulation
Checklist Item
204595-2023
COMMENTS
Partial Pass Tony Alvarado
BLDG-Building Deficiency
BLDG-17 Interior
Lath/Drywall
204596-2023 Partial Pass Tony Alvarado
BLDG-16 Insulation
Checklist Item
204690-2023
COMMENTS
Cancelled
BLDG-Building Deficiency
NOTES Created By
Angie Teanio
BLDG-17 Interior
Lath/Drywall
204689-2023
TEXT
206-930-1644 Mike
Cancelled
Peter Dreibelbis
Peter Dreibelbis
Wednesday, March 12, 2025
Passed
Yes
Yes
Yes
Yes
Created Date
02/28/2023
Re inspection Incomplete
Passed
Yes
Relnspectlon Incomplete
Reinspection Incomplete
Passed
Yes
Created Date
03/02/2023
Re Inspection Incomplete
Page 2 of 6
Building Permit Inspection History Finaled
{cityof
Carlsbad
PERMIT INSPECTION HISTORY for (CBC2022-0277)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Status:
Scheduled
Date
03/01/2023
Closed -Finaled
Actual Inspection Type
Start Date
03/01/2023 BLDG-17 Interior
Lath/Drywall
Checklist Item
Application Date: 08/05/2022 Owner: GRAND PACIFIC PALISADES OWNERS
ASSOCIATION INC
Issue Date: 02/06/2023 Subdivision: CITY OF CARLSBAD TRACT NO
15-08
Expiration Date: 03/25/2024 Address: 1594 MARBRISA CIR
CARLSBAD, CA 92008 IVR Number: 42439
Inspection No. Inspection Primary Inspector Reinspection Inspection
Status
204525-2023 Partial Pass Tony Alvarado Reinspection Incomplete
COMMENTS Passed
BLDG-Building Deficiency March 1, 2023: Yes
Wednesday, March 12, 2025
BLDG-84 Rough
Combo(14,24,34,44)
1 . Phase 1, Hilton grand vacations
MarBrisa hotel.
2. Second level, second floor, interior
commercial tenant space improvement.
3. Construct and remodel enter nonload
bearing partition walls (typical), and
relocate existing electrical outlets,
switches, and light fixtures, mechanical
ducting, minimal plumbing pipe lines.
4. Interior remodel per approve stamped
signed plans.
5. Contractor representative requ ired to
update any As-built and field floor plan
revisions, update city approved plans To
reflect interior remodel as built site
conditions., before final inspection
certificate of occupancy is completed.
6. Rest of work-OK.
7. Fire prevention inspection and approval
requ ired prior to above T bar/Gypsum
board, ceiling hard-lid rough inspection
completed.
204422-2023 Partial Pass Tony Alvarado Relnspectlon Incomplete
Page 1 of 6
~lrue Nor h
COMPllA N C S RVIC S
October 14, 2022
City of Carlsbad
Community Development Department -Building Division
1635 Faraday Ave.
City of Carlsbad -FINAL REVIEW
City Penn it No: CBC2022-0277
True North No.: 22-018-158
Carlsbad, CA 92008
Plan Review: Tl Hilton Grand Vacation Club Sales
Address: 1594 Marbisa Cricle, Carlsbad, CA
Applicant Name: Dan Talent
Applicant Email: office@noaainc.com
OCCUPANCY AND BUILDING SUMMARY:
Occupancy Groups: A-3/B
Occupant Load: 628
Type of Construction: V-A
Sprinklers: Yes
Stories: 3
AreaofWork(sq. ft.): 3,917 sq. ft.
The plans have been reviewed for coordination with the permit application.
Valuation: Confirmed
Scope of Work: Confirmed
Floor Area: Confirmed
Attn: Building & Safety Department,
True North Compliance Services, Inc. has completed the final review of the following documents for the project
referenced above on behalf of the City of Carlsbad:
1.
2.
Drawings: One(]) copy dated September 16, 2022, by NOAA Group.
Structural Calculations: One (I) copy dated August 5, 2022, by BWE.
The 2019 California Building, Mechanical, Plumbing, and Electrical Codes (i.e., 2018 IBC, UMC, UPC, and 2017
NEC, as amended by the State of California), 2019 California Green Building Standards Code, 2019 California
Existing Building Code, and 2019 California Energy Code, as applicable, were used as the basis of our review.
Please note that our review bas been completed and we have no further comments however, we bring the
following to your attention:
I. ln order to expedite the pennitting process, we have made annotations (in red ink) to Sheets A-2 & A-7.
We have enclosed the above noted documents bearing our review stamps for your use. Please call if you have any
questions or if we can be of further assistance.
Sincerely,
True North Compliance Services
Review By: Alaa Atassi -Plan Review Engineer
True North Compliance Services, Inc.
3939 Atlantic Avenue Suite 116, Long Beach, CA 90807
T / 562.733.8030
Transmittal Letter
August 24, 2022
City of Carlsbad
Community Development Department -Building Division
1635 Faraday Ave.
Carlsbad, CA 92008
Plan Review: TI Hilton Grand Vacation Club Sales
Address: 1594 Marbisa Cricle, Carlsbad CA
Applicant Name: Dan Talent Applicant Email: office@noaainc.com
Trl1 e orth
COMPI IANCJ! .RVICES
FIRST REVIEW
City Penn.it No: CBC2022-0277
True North No.: 22-018-158
True North Compliance Services, Inc. has completed the first review of the following documents for the project
referenced above on behalf of the City of Carlsbad:
1.
2.
Drawings: Electronic copy not dated, by NOAA Group.
Structural Calculations: Electronic copy dated March 26, 2020, by BWE.
Attn: Permit Technician, the plans have been reviewed for coordination with the permit application. See below
for additional information:
Valuation:
Scope of Work:
Floor Area:
Confirmed
Confirmed
Confirmed
Our comments follow on the attached list. Please call if you have any questions or if we can be of further
assistance.
Sincerely,
True North Compliance Services
Review By: Alaa Atassi -Plan Review Engineer
True North Compliance Services, Inc.
3939 Atlantic Avenue Suite 116, Long Beach, CA 90807
T / 562. 733.8030
TI Hilton Grand Vacation Club Sales
1594 Marbisa Cir
August 24, 2022
Plan Review Comments
RESUBMITTAL INSTRUCTIONS:
City of Carlsbad-FIRST REVIEW
City Pem1it No.: CBC2022-0277
True North No .: 22-018-158
Page 2
Deliver THREE corrected sets of plans and TWO corrected calculations/reports directly to the City of
Carlsbad Building Division, 1635 Faraday Ave., Carlsbad, CA 92008, (442) 339-2719. The City will route the
plans to True North, Planning and Land Development Engineering Departments (if applicable) for continued
review.
Note: If this project requires FIRE PREVENTION review, ensure that you follow their specific instructions
for resubmittal review. The City will not route plans back to Dennis Grubb & Associates for continued Fire
Prevention review.
GENERAL INFORMATION:
A. The following comments are referred to the 2019 California Building Mechanical, Plumbing, Electrical
Codes, California Green Building Standards Code, and Energy Code (i .e., 2018 IBC, UMC, UPC, and 2017
NEC, as amended by the State of California).
B. There may be other comments generated by the Building Division and/or other City departments that will
also require your attention and response. This attached list of comments, then, is only a portion of the plan
review . Contact the City for other items .
C. Respond in writing to each comment by marking the attached comment list or creating a response letter.
Indicate which details, specification, or calculation shows the required information. Your complete and
clear responses will expedite the re-check.
D. Please be sure to include the architect and engineer's stamp and signature on all sheets of the drawings and
on the coversheets of specifications and calculations per CBPC 5536.1 and CBPC 6735. This item will be
verified prior to plan approval .
OCCUPANCY & BUILDING SUMMARY:
Occupancy Groups :
Occupant Load:
Type of Construction:
Sprinklers:
Stories:
Area of Work (sq. ft.):
A-3/B
628
V-A
Yes
3
3917 sq. ft.
ARCHITECTURAL COMMENTS:
Al. A large portion of the second floor was converted from B occupancy to A-3 occupancy. Provide updated
allowable area analysis of the building in accordance with CBC 506 and 508.3 .
A2 . Sheet A-3.1 , address the following comments:
a) Specify the total occupant load of building. CBC 1004.5.
b) At plan 2, the total occupant load from the Patio and Showcase 1 is 50 occupants which requires
to have two exits. Please revise to show compliance with CBC 1006.2.1.
TI Hilton Grand Vacation Club Sales
1594 Marbisa Cir
August 24, 2022
City of Carlsbad-FIRST REVIEW
City Pennit No .: CBC2022-0277
True North No.: 22-018-158
Page 3
i) Assembly spaces with 50 or more occupants require panic hardware at doors per CBC
1010.1.10.
ii) Provide required exit signs per CBC 1013.
iii) Ensure exits are separated by more than one-third the diagonal distance from the space per
CBC 1007.1 .1
c) At plan 3, the patio north of plan has more than 10 occupants, which requires the doors to be side-
hinged swinging doors per CBC 1010.1.2 . Please revise.
A3 . Sheet A-4, plans have door tags but a door schedule was not provided. Please provide.
A4. Project information indicates the structure is Type V-A construction. Type V-A construction requires the
primary structure, bearing walls, roof, floor, and secondary members to be one hour fire resistive
construction. A structural beam is being replaced. Provide details of individual encasement primary
structural framing members per CBC 704 .2 and 704.3.
A5. Note on plans: Roof mounted equipment must be screened and roof penetrations should be minimized. City
Policy 80-6
ACCESSIBILITY COMMENTS:
D 1. CBC l lB-202.3 requires that accessibility be provided to the altered spaces. This accessibility shall include
the requirements of CBC l lB-202.4, which entails : a primary entrance, a primary path of travel, sanitary
facilities serving the area, a drinking fountain, and signs. Please address the following:
a) Show the accessible path of travel from the public way to the area of alteration.
b) On the site plan, specify the accessible route to be 5% maximum running slope with 2% maximum
cross slope per CBC 1 lB-403.3.
c) Provide detectable warning where the accessible route crosses or adjoins the vehicular path of travel
per CBC llB-247.1.2.5. Provide details in accordance with CBC llB-705. l.
d) Sho\v location and provide details for curb ramps in accordance with CBC l lB-406.
TI Hilton Grand Vacation Club Sales
1594 Marbisa Cir
August 24, 2022
City of Carlsbad-FIRST REVIEW
City Pennit No.: CBC2022-0277
True North No.: 22-018-158
Page 4
e) Show location and provide site specific plans and details for the restrooms serving the area to verify
that it meets the requirements of CBC l lB Division 6.
f) Show the location and provide details for the drinking fountain serving this area (if provided) to
verify that it meets the requirements of CBC l lB-211.1 and CBC l lB-602.
g) Provide site specific details and dimensions of accessible parking, accessible aisles, markings
signage, etc., to verify it meets the requirements of CBC l lB Division 5.
D2. Provide infonnation for the existing and proposed doors that are within the area of work.
a) Confinn the clear width of the doorways are 32" minimum per CBC 118-404.2.3.
b) Door hardware are operable ·with one hand and do not require tight grasping, pinching, or twisting
of the hand. CBC 1 lB-404.2 . 7 and 1 lB-309.4.
c) Door thresholds comply with CBC l lB-404.2.5.
d) Door opening force is 5-pounds ma-ximum for interior doors per CBC l IB-404.2 .9.
e) Door opening hardware is mounted 34" to 44" above the finish floor per CBC l lB-404.2.7 .
f) Lower 10 inch of the door surface is provided with a smooth surface for the full width of the door,
at the push side of the door per CBC 1 lB-404.2.10.
MECHANICAL COMMENTS:
No Comments.
ELECTRICAL COMMENTS:
E 1. Note on plans: Per city policy wiring is not permitted on the roof of a building and ,vi ring on the exterior
of a building requires approval by the Building Official.
E2. Sheet E201 : Revise plans to provide infonnation on lighting for the Showcase 1 space. Provide
emergency lighting in area of work. Emergency lighting shall illuminate the means of egress at all times
the building space is occupied. Emergency lighting shall have power for duration of not less than 90
minutes. CBC 1008
PLUMBING COMMENTS:
Pl. Clarify plumbing scope of work on plans.
TI Hilton Grand Vacation Club Sales
1594 Marbisa Cir
August 24, 2022
GREEN BUILDING COMMENTS:
City of Carlsbad-FIRST REVIEW
City Pennit No.: CBC2022-0277
True North No.: 22-018-158
Page5
G 1. Climate Action Plan requirements apply to all new structures, residential additions/remodels equal to or
exceeding $60,000 in valuation, and commercial City of Carlsbad requires that all projects that qualify for
CAP compliance will require a completed Climate Action Plan (CAP) Consistency Checklist (city fonn B-
50) to be completed by the APPLICANT.
a) For plans submitted to the City the following Climate Action Plan requirements apply, per Carlsbad
ordinance:
b) The submitted document is P-30 fonn . The applicant is to fill out the B-50 CAP Consistency
Checklist. The scope of work and project valuation will determine ·which sections of the CAP are
required.
c) Plan examiners review the B-50 CAP Consistency Checklist for completion.
G2 . Proposed tenant improvement pennit valuation is $200,000 or more. As such, the mandatory measures of
the 2019 California Green Building Code apply. CGBSC 301.3. Please address the following:
a) Reproduce the nonresidential occupancies application checklist onto the plan sheets.
b) Add an additional column to the checklist to indicate where the appropriate requirements are noted
within the set of plans.
c) The Code sections relevant to the additions and alterations shall only apply to the portions of the
building being added or altered with the scope of the pennit work.
ENERGY COMPLIANCE COMMENTS:
Tl. The specified address on the Indoor Lighting title 24 energy fonns is for a different building. Please revise
and provide updated title 24 energy forms .
Sf.t' lo, CAllf<Jtt~I-'
Indoor lighting
N'CCIII I
CERTIFl(.41( OF (OMPUAHCC
1h11 documtnt if used to d,monrlrot• comp/lone. with rl.'(luirements ,n ~I.~ flJl,.li, aJJlj, .tl.til.4 ond j
ooth
PfOt-(1 NanMt: 111\i:16N .. ..-DvAO<!IOft1upot1 Pa1•·
Prof0<t Addrtn: I
,, fi.15() C~LSIIAD 8LVO.J~t• Prtp,tf/d:
j .I
A. GENERAi. INFORMATION -
01 Profec1 Locat>0<1 1<11';) (CARLSB.tD (14 Iota! Cond,tlontd fl
02 lc1111u11t lone 11 0~ lot.II uncondll•Ol\4!(
03 O<eupancv 1vpe, W,thln P~N:• (l(llect •II that apptyJ 06 • of Storl~s (Habltal
1181 Office l □(Ret.111 I t8J (War<housc 0 Ho1el/Mo1el
0 P,r~ln1 Gor•B• I D )Hlah R"• Re,idenll•I I D JR•locmbl• 0 Hee1hht.1,•
STRUCTURAL COMMENTS:
S l . The structural calculations specify work on the gridline 14 of third floor, while plans do not show any
information on gridline 14.
a) Revise plans to show consistency with structural calculations.
b) Show location of proposed WIO beam . Specify size of beam on plans.
c) Provide and cross reference connection details for the proposed work.
TI Hilton Grand Vacation Club Sales
1594 Marbisa Cir
August 24, 2022
City of Carlsbad-FIRST REVIEW
City Pennit No.: CBC2022-0277
True North No.: 22-018-158
Page 6
S2. Sheet Sl: Revise the items requiring special inspections to include the steel beam welding.
S3 . Sheet S3 shows shear wall schedule. Show location on plans for the proposed shear walls, and provide
supporting calculations.
If you have any questions regarding the above comments, please contact Alaa Atassi via email
alaa@tncservices.com, or telephone (562) 733-8030.
[END]
B\VE STRUCTURAL • CIVIL •SURVEY• LAND PLANNING
9449 Balboa Avenue, Suite 270 • San Diego, CA 92123
Phone (619) 299-5550 ■ Fax (619) 299-9934
www.bwesd.com
ENGINEER: Charles Colvin
DATE: August 5, 2022
PROJECT NUMBER: 11132A.1.01
STRUCTURAL CALCULATIONS
FOR
Marbrisa Sales Building Tl for Hilton
Click here to enter text.
Grand Pacific Drive
CARLSBAD, CALIFORNIA 92008
Prepared for
GRAND PACIFIC RESORTS, INC.
5900 PASTEUR CT, #200
CARLSBAD, CALIFORNIA
>-1--cJ
ON t-o N .....__
(") 0 ·-N N --..1 ~-..... (") :st 0 ~o ..-..-I
~ N
N N
0
N
0
al
0
B\VE
Sales Tl Scope:
STRUCTURAL ■ CIVIL ■ SURVEY ■ LAND PLANNING
9449 Balboa Avenue, Suite 270 ■ San Diego, CA 92123
Phone {619) 299-5550 ■ Fax (619} 299-9934
www.bwesd.com
The majority of the scope of the Tl is an interior remodel; mostly effecting non-structural interior walls.
BWE originally designed this structure in 2013/2014 conforming to the 2010 CBC to be flexible, knowing
that it would be a sales use while there are units to sell, and then converted to living spaces once we
enter the end of the sales cycle.
The structure is a combination timber bearing wall and steel beam supported vertical gravity system
with engineered I-joist and plywood floors and wood truss supported plywood roof. The lateral system is
plywood shearwalls.
There is a door that is being relocated at level 2 along the "front" of the units near ~G and 14.
We have provided continuity strapping and hold downs around it to maintain force transfer. The
wall is lightly loaded, originally ~350 plf, now ~4so plf with the reduced length; constructed as a
"3E" wall, with a capacity of 550#/ft.
Typical Loads:
Guestrooms
DL=26 psf
LL=S0 psf
DATE __ 20_2_2-_0_8-_05 __
INCJ■lUfO 10 uura Hrl.C1Ai110N.t
Prc..V\·~._., (o. ... ~-</t3 .~-:-3-,'t.l~/~
~ ~ <::"/to-1.,~ etst~,~-
~ ) ~ <r. 'rP-v-u-Q -=-~-l) ~ I f..r..
H f) IC)
OFFICE USE ONLY SAN DIEGO REGIONAL
HAZARDOUS MATERIALS
QUESTIONNAIRE
RECORD ID# __________________ _
PLAN CHECK# ________________ _
Business Name
Hilton Grand Vacation Club
Project Address
Business Contact
Houston Arnold
Telephone#
760-431-8500
BP DATE
APN#
1594 Marbrisa Circle
City
Carlsbad
State
CA
Zip Code
92008 211 -130-02, 211-130-05
Mailing Address City
4990 N Harbor Dr, Unit 201 San Diego
State
CA
Zip Code
92106
Plan File#
CBC2022-0277
Project Contact
Dan Talant
Applicant E-mail
dant noaainc.com
Telephone#
619-297-8066
The following questions represent the facility's activities, NOT the specific project description.
PART I: FIRE DEPARTMENT-HAZARDOUS MATERIALS DIVISION: OCCUPANCY CLASSIFICATION: (not required for projects within the City of San
Diego): Indicate by circling the item, whether your business will use, process. or store any of the following hazardous materials. If any of the items are circled,
applicant must contact the Fire Protection Agency with jurisdiction prior to plan submittal.
Occupancy Rating: Facility's Square Footage (including proposed project):
1. Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives 13. Corrosives
2. Compressed Gases 6. Oxidizers 10. Cryogenics 14. Other Health Hazards
3. Flammable/Combustible Liquids 7. Pyrophorics 11 . Highly Toxic or Toxic Materials 15. None of These.
4. Flammable Solids 8. Unstable Reactives 12. Radioactives
PART II: SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEAL TH -HAZARDOUS MATERIALS DIVISION IHMDI: If the answer to any of the
questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 5500 Overland Avenue, Suite 110, San Diego, CA 92123.
Call (858) 505-6700 prior to the issuance of a building permit.
FEES ARE REQUIRED Project Completion Date: Expected Date of Occupancy:
1.
2.
3.
4.
5.
6.
7.
8.
YES NO (for new construction or remodeling projects)
Is your business listed on the reverse side of this form? (check all that apply). D IXI
D IXI Will your business dispose of Hazardous Substances or Medical Waste in any amount?
□ IX) Will your business store or handle Hazardous Substances in quantities greater than or equal to 55 gallons, 500
pounds and/or 200 cubic feet?
□ □ D D
D
IX) Will your business store or handle carcinogens/reproductive toxins in any quantity?
IX) Will your business use an existing or install an underground storage tank?
IX) Will your business store or handle Regulated Substances (CalARP)?
IX) Will your business use or install a Hazardous Waste Tank System (Tille 22, Article 10)?
IX) Will your business store petroleum in tanks or containers at your facility with a total facility storage capacity equal to
or realer than 1,320 allons? California's Above round Petroleum Stora e Act .
0 CalARP Exempt
I
Date Initials
0 CalARP Required
I
Date Initials
0 CalARP Complete
I
Date Initials
PART Ill: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT IAPCDI: Any YES* answer requires a stamp from APCD 10124 Old Grove Road, San
Diego, CA 92131 apcdcomp@sdcounty.ca.gov (858) 586-2650). [*No stamp required if Q1 Yes aDQ Q3 Yes and Q4-Q6 No]. The following questions are intended
to identify the majority of air pollution issues at the planning stage. Projects may require additional measures not identified by these questions. For comprehensive
requirements contact APCD. Residences are typically exempt, except -those with more than one building• on the property; single buildings with more than four
dwelling units; townhomes; condos; mixed-commercial use; deliberate burns; residences forming part of a larger project. rExcludes garages & small outbuildings.]
YES NO
1. IX) D Will the project disturb 160 square feet or more of existing building materials?
2. 0 IX) Will any load supporting structural members be removed? Notification may be required 10 working days prior to commencing demolition.
3. IX) D (ANSWER ONLY IF QUESTION 1 or 2 IS YES) Has an asbestos survey been performed by a Certified Asbestos Consultant or Site Surveillance
Technician?
4. D IX) (ANSWER ONLY IF QUESTION 3 IS YES) Based on the survey results, will the project disturb any asbestos containing material? Notification
may be required 1 O working days prior to commencing asbestos removal.
5. D IX) Will the project or associated construction equipment emit air contaminants? See the reverse side of this form or APCD factsheet
(www.sdapcd.org/info/facts/permits.pdf) for typical equipment requiring an APCD permit.
6. D D (ANSWER ONLY IF QUESTION 5 IS YES) Will the project or associated construction equipment be located within 1,000 feet of a school
bounda
Briefly describe business activities:
Sales Building / Administration Briefly describe proposed project:
Dan Talant 10 / 20 / 2022
Name of Owner or Authorized Agent Signature of Owner or Authorized Agent Date
I decriw~sii,{'f~?~~~f~8~ii!,t}..¾Ll\,l~J..~Mf13'X-Pl?JN':ledge and t100R fa~fr&Q~~'flt'!rein are true and correct.
BY· DATE· / /
EXEMPT OR NO FURTHER INFORMATION REQUIRED RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY
COUNTY-HMO* COUNTY-HMO APCD COUNTY-HMO APCD
·---
~~n Co11c-,
q,~ ~
1i R.ev1eweo <2
10/20/2022 MA :!!
Ollte/lnihl>IS
~,, t ~ Diego co
.. *A stamp in this box only exempts businesses from completing or updating a Hazardous Materials Business Plan. other permI1tIng requirements may still apply.
HM-9171 (08/15) County of San Diego -DEH -Hazardous Materials Division
LIST OF BUSINESSES WHICH REQUIRE REVIEW AND APPROVAL FROM THE COUNTY OF SAN DIEGO
DEPARTMENT OF ENVIRONMENTAL HEALTH-HAZARDOUS MATERIALS DIVISION
Check all that apply:
AUTOMOTIVE
D Battery Manufacturing/Recycling
D Boat Yard
D Car Wash
D Dealership Maintenance/Painting
D Machine Shop
D Painting
D Radiator Shop
D Rental Yard Equipment
D Repair/Preventive Maintenance
D Spray Booth
D Transportation Services
D Wrecking/Recycling
CHEMICAL HANDLING
D Agricultural supplier/distributor
D Chemical Manufacturer
D Chemical Supplier/Distributor
D Coatings/Adhesive
D Compressed Gas Supplier/Distributor
D Dry Cleaning
D Fiberglass/Resin Application
D Gas Station
D Industrial Laundry
D Laboratory
D Laboratory Supplier/Distributor
0 Oil and Fuel Bulk Supply
D Pesticide Operator/Distributor
CHEMICAL HANDLING
D Photographic Processing
D Pool Supplies/Maintenance
D Printing/Blue Printing
D Road Coatings
D Swimming Pool
D Toxic Gas Handler
D Toxic Gas Manufacturer
METAL WORKING
D Anodizing
D Chemical Milling/Etching
D Finish-Coating/Painting
D Flame Spraying
D Foundry
D Machine Shop-Drilling/Lathes/Mills
D Metal Plating
D Metal Prepping/Chemical Coating
D Precious Metal Recovery
D Sand Blasting/Grinding
D Steel Fabricator
D Wrought Iron Manufacturing
AEROSPACE
D Aerospace Industry
D Aircraft Maintenance
D Aircraft Manufacturing
OTHERS AND MISCELLANEOUS
0 Asphalt Plant
D Biotechnology/Research
D Chiropractic Office
D Co-Generation Plant
D Dental Clinic/Office
D Dialysis Center
D Emergency Generator
D Frozen Food Processing Facility
D Hazardous Waste Hauler
D Hospital/Convalescent Home
D Laboratory/Biological Lab
D Medical Clinic/Office
D Nitrous Oxide (NO,) Control System
D Pharmaceuticals
0 Public Utility
D Refrigeration System
D Rock Quarry
D Ship Repair/Construction
D Telecommunications Cell Site
D Veterinary Clinic/Hospital
D Wood/Furniture Manufacturing/Refinishing
ELECTRONICS
D Electronic Assembly/Sub-Assembly
D Electronic Components Manufacturing
D Printed Circuit Board Manufacturing
NOTE: THE ABOVE LIST INCLUDES BUSINESSES, WHICH TYPICALLY USE, STORE, HANDLE, AND DISPOSE OF HAZARDOUS SUBSTANCES.
ANY BUSINESS NOT INCLUDED ON THIS LIST, WHICH HANDLES, USES OR DISPOSES OF HAZARDOUS SUBSTANCES MAY STILL REQUIRE
HAZARDOUS MATERIALS DIVISION (HMO) REVIEW OF BUSINESS PLANS. FOR MORE INFORMATION CALL (858) 505-6880.
LIST OF AIR POLLUTION CONTROL DISTRICT PERMIT CATEGORIES
Businesses, which include any of the following operations or equipment, will require clearance from the Air Pollution Control District.
CHEMICAL
47 -Organic Gas Sterilizers
32 -Acid Chemical Milling
33 -Can & Coil Manufacturing
44 -Evaporators, Dryers & Stills Processing
Organic Materials
24 -Dry Chemical Mixing & Detergent Spray
Towers
35 -Bulk Dry Chemicals Storage
55 -Chrome Electroplating Tanks
COATINGS & ORGANIC SOLVENTS
27 -Coating & Painting
37 -Plasma Arc & Ceramic Deposition Spray
Booths
38 -Paint, Stain & Ink Mfg
27 -Printing
27 -Polyester Resin/Fiberglass Operations
METALS
18 -Metal Melting Devices
19 -Oil Quenching & Salt Baths
32 -Hot Dip Galvanizing
39 -Precious Metals Refining
ORGANIC COMPOUND MARKETING
(GASOLINE, ETC)
25 -Gasoline & Alcohol Bulk Plants & Terminals
25 -Intermediate Refuelers
26 -Gasoline & Alcohol Fuel Dispensing
COMBUSTION
34 -Piston Internal -Combustion Engines
13 -Boilers & Heaters (1 million BTU/hr or larger)
14-Incinerators & Crematories
15 -Burn Out Ovens
16 -Core Ovens
20 -Gas Turbines, and Turbine Test Cells & Stands
48 -Landfill and/or Digester Gas Flares
ELECTRONICS
29 -Automated Soldering
42 -Electronic Component Mfg
FOOD
12 -Fish Canneries
12 -Smoke Houses
50 -Coffee Roasters
35 -Bulk Flour & Powered Sugar Storage
SOLVENT USE
28 -Vapor & Cold Degreasing
30 -Solvent & Extract Driers
31 -Dry Cleaning
ROCK AND MINERAL
04 -Hot Asphalt Batch Plants
05 -Rock Drills
06 -Screening Operations
07 -Sand Rock & Aggregate Plants
08 -Concrete Batch, CTB, Concrete Mixers, Mixers
& Silos
1 0 -Brick Manufacturing
OTHER
01 -Abrasive Blasting Equipment
03 -Asphalt Roofing Kettles & Tankers
46 -Reverse Osmosis Membrane Mfg
51 -Aqueous Waste Neutralization
11 -Tire Buffers
17 -Brake Debonders
23 -Bulk Grain & Dry Chemical Transfer & Storage
45 -Rubber Mixers
21 -Waste Disposal & Reclamation Units
36 -Grinding Booths & Rooms
40 -Asphalt Pavement Heaters
43 -Ceramic Slip Casting
41 -Perlite Processing
40 -Cooling Towers -Registration Only
91 -Fumigation Operations
56 -WWTP (1 million gal/day or larger) & Pump
Station
NOTE: OTHER EQUIPMENT NOT LISTED HERE THAT IS CAPABLE OF EMITTING AIR CONTAMINANTS MAY REQUIRE AN AIR POLLUTION
CONTROL DISTRICT PERMIT. IF THERE ARE ANY QUESTIONS, CONTACT THE AIR POLLUTION CONTROL DISTRICT AT (858) 586-2600.
HM-9171 (08/15) County of San Diego -DEH -Hazardous Materials Division
Development Services
Planning Division
1635 Faraday Avenue
(442) 339-2610
www.carlsbadca.gov
PURPOSE
CLIMATE ACTION PLAN
CONSISTENCY CHECKLIST
P-30
REC
{l.UG O 5 ?.022
(City of
Carlsbad
I kl.SBAD
In September 2015, the Ct C s?a.d a1q11>te'sila tlimate Action Plan (CAP) that outlines actions that
the city will undertake to • dfuiev ft ' J51oportional share of state greenhouse gas (GHG) em issions
reductions. This checklist contains measures that are required to be implemented on a project-by-project
basis to ensure that the specified emissions targets identified in the Climate Action Plan {CAP) are
achieved. Implementation of these measures will ensure that new development is consistent with the
CAP's assumption for relevant CAP strategies toward achieving the identified greenhouse gas (GHG)
reduction targets. In this manner, a project's incremental contribution to a cumulative GHG emissions
effect may be determined not to be cumulatively considerable if it complies with the requirements of the
CAP, in accordance with CEQA Guidelines Sections 15064(h)(3), 15130{d), and 15183(b).*
*City staff are currently not assessing the greenhouse gas impacts of California Environmental Quality Act
projects by using the Climate Action Plan as a qualified GHG reduction plan under CEQA sect ... n
15183.S(b). Please consult with the Planning Department for further guidance. Additional informatio
may be found on the Climate Action Plan Update and Vehicle Miles Traveled calculations staff report.
This checklist is intended to assist project applicants in identifying CAP ordinance requirements air-
demonstrate how their project fulfills those requirements. This checklist is to be completed and includ .....
in applications for new development projects that require discretionary review. The specific applica o
requirements outlined in the checklist shall be required as conditions of project approval for C
compliant projects with streamlined GHG emissions assessments. This checklist (i.e. Form P-30) is
complementary to the checklist provided in Form B-50, which is specific to building permits and required
for building permit applications.
APPLICATION SUBMITTAL REQUIREMENTS
• The completed check list must be included in the project submittal package or building permit
application. Application submittal procedures can be found on the City of Carlsbad website. This
checklist is designed to assist the applicant in identifying the minimum CAP-related requ irements
specific to their project. However, it may be necessary to supplement the completed checklist with
supporting materials, calculations or certifications, to demonstrate full compliance with CAP
requirements. For example, projects that propose or require a performance approach to comply
with energy-related measures will need to attach to this checklist separate calculations and
documentation as specified by the ordinances.
• If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum
required by ordinance, an explanation must be provided to the satisfaction of the Planning Division
or building official.
• The requirements in the checklist will be included in the project's conditions of approval or issuance
of building permit.
• Details on CAP ordinance requirements are available on the city's website.
Revised 6/22
City of Carlsbad Climate Action Plan Consistency Checklist
STEP 1: LAND USE CONSISTENCY
The first step in determining CAP consistency for discretionary development is to assess the project's consistency
with the growth projections used in the development of the CAP. This section allows the city to determine a
project's consistency with the land use assumptions used in the CAP . Projects found not to be consistent with the
CAP's land use assumptions and that are projected to emit at or above the CAP screening threshold of 900 metric
tons of CO2 equivalent (MTCO2e) GHG will be subject to a project-specific analysis of GHG emissions' impact on the
environment in accordance with the requirements of the California Environmental Quality Act (CEQA). This may
result in GHG-reducing mitigation measures applied as a condition of project approval in addition to compliance
with the CAP ordinance requirements identified in Step 2 of this checklist.
(Check the appropriate box and provide an explanation and supporting documentation for your answer)
A. Is the proposed project consistent with the existing General Plan land use and specific/master plan or zoning designations?
OR,
If the proposed project is not consistent with the existing land use plan and zoning designations, does the project include a
land use plan and/or specific plan, master plan or zoning designation amendment that would result in an equivalent or less
GHG-intensive project when compared to the existing designations?
Yes No
□
If "Yes", proceed to Step 2 of the checklist. For the second option under Question A above, provide estimated project-related GHG emissions under both existing and
proposed designation(s) for comparison. GHG emissions must be estimated in accordance with the City of carlsbad Guidance to Demonstrating Consistency with the
Climate Action Plan.
If "No", proceed to Question B.
B. The CAP established a screening threshold of 900 MTC02e/year for new development projects to assist in determining
consistency with the CAP. The types and sizes of typical projects listed below have been determined to correspond to the CAP
screening threshold. Will the proposed land use change result in the construction of less than any one of the following?
• Single-Family Housing: SO dwelling units
• Multi-Family Housing: 70 dwelling units
• Office: 35,000 square feet
• Retail Store: 11,000 square feet
• Grocery Store: 6,300 square feet
• Other: If the proposed project is not one of the above types, provide a project-specific GHG emissions analysis to
determine whether it is below the 900 MTC02e/year screening threshold.
If "Yes", proceed to Step 2 of the checklist.
□ □
If "No", the project's GHG impact is potentially significant and must be analyzed in accordance with CEOA. Applicant must prepare a Self-developed GHG emissions
reduction program in accordance with the City of carlsbad Guidance to Demonstrating Consistency with the Climate Action Plan to demonstrate how it would offset
the increase in emissions over the existing designations. The project must incorporate each of the applicable measures identified in Step 2 to mitigate cumulative
GHG emissions impacts unless the decision maker finds that a measure is infeasible in accordance with california Environmental Quality Act Guidelines Section
15091. Mitigation in lieu of or in addition to the measures in Step 2 may be required, depending on the results of the project-specific GHG impact analysis. Proceed
and complete a project-specific Self-developed GHG emissions reduction program and Step 2 of the Checklist.
P-30 Page 2 of 7 Revised 06/22
City of Carlsbad Climate Action Plan Consistency Checklist
STEP 2: CAP ORDINANCE COMPLIANCE REQUIREMENTS
Completion of this checklist will document a project's compliance with CAP ordinances, and in turn, demonstrate
consistency with the applicable measures and actions of the CAP. The compliance requirements in this Step 2 apply
to development projects that require a building permit. All other development projects shall implement all
emissions-related mitigation measures from the General Pl an Update EIR.
Project No./Name: Marbrisa -Hilton Sales Building Tl
Property
Address/APN: 1594 Marbrisa Circle, Carlsbad, CA 92008. APN: 211 -1 30-02 / 211-130-05
Applicant Name/Co.: Grand Pacific Carlsbad, LP
Applicant Address: 5900 Pacific Court, Suite 200, Carlsbad, CA 92008
Contact Phone : 760-431-8500 Contact Email: HArnold@gpresorts.com
Contact information of person completing this checklist (if different than above):
Name: Dan Talant Contact Phone: 858 -736-1508
Company
name/address: NOAA Group Architects
4990 North Harbor Drive, Suite 201 Contact Email: office@noaainc.com
San Diego, CA 92106
Use the table below to determine which sections of the Ordinance Compliance checklist are applicable to your project. If
your project includes alterations or additions to an existing building, please contact the Carlsbad Building Division for
assistance in estimating building permit valuation, by phone at 760-602-2719 or by email at building@carlsbadca.gov.
□ Alterations:
□ BPV < $60,000
□ BPV 2: $60,000
□ Electrical service panel upgrade
□ BPV 2: $200,000
D New construction
IX! Alterations:
P-30
N/A
lA and 4A
4A
lA and 4A
Page 3 of 7
All residential alterations
1-2 family dwellings and townhouses with attached
garages only
Multi-family dwellings only where interior finishes are
removed and significant site work and upgrades to
structural and mechanical, electrical, and/or plumbing
systems are proposed
Revised 06/22
City of Carlsbad Climate Action Plan Consistency Checklist
IX! BPV::?: $200,000 or additions::?: 18,5 1,000 square feet
D BPV::?: $1,000,000 1B, 2B and 5 Building alterations of::?: 75% existing gross floor area
D ::?: 2,000 sq. ft. new roof addition 2B and 5 1B also applies if BPV::?: $200,000
Please refer to Carlsbad Ordinance No. CS-347 and the california Green Building Standards Code (CALGreen) for more information when completing this section.
A. D Residential addition or alteration.!: $60,000 building permit valuation.
See Ord. CS-347, Section 8.
Year Built Single-family Requirements
□ Before 1978 Select one:
□ Duct sealing □ Attic insulation □ Cool roof
□ 1978 and later Select one:
D Lighting package □ Water heating package
□ Between 1978 and 1990
□ 1991 and later
B. [RI Nonresidential* new construction or alterations.!: $200,000 building permit valuation,
or additions .!: 1,000 square feet.
See CALGreen Appendix AS, Discussion AS.2, as amended in CS-347, Section 3.
AS.203.1.1.1
□ Outdoor lighting: .90 Allowed Outdoor Lighting Power
AS.203.1.1.2
□ Restaurant service water heating (comply with california Energy Code Section 140.5, as amended)
AS.203.1.2.1
Choose one as applicable: D .95 Energy budget ll!l .90 Energy budget
AS.211.1.**
□ On-site renewable energy
AS.211.3**
D Green power (if offered by local utility provider, 50% minimum renewable sources)
AS.212.1
□ Elevators and escalators
AS.213.1
□ Steel framing
P-30 Page 4 of 7
□ N/A _________ _
□ Exception: Home energy score .!: 7
(attach certification)
Multi-family Requirements
□ Attic insulation
Select one:
□ Attic insulation □ Duct Sealing □ Cool roof
Select one:
□ Lighting package D Water heating package
0 N/A ________ _
No new Outdoor Lighting
ll!l N/A proposed in application.
No Restaurant proposed in
!RI N/A application.
□ N/A
BPV < $1 ,000,000 and affecting
ll!l N/A < 75% existing gross floor are~.
BPV < $1 ,000,000 and affecting
ll!l N/A <75% existing gross floor area.
No work proposed to existing
ll!l N/A Elevators in application.
Revised 06/22
City of Carlsbad Climate Action Plan Cons istency Checklist
• Includes hotels/motels and high-rise residential buildings
~ N/A
No work proposed to existing
Steel framing in application.
•• For alterations~ $1,000,000 BPV and affecting> 75% existing gross floor area, or alterations that add 2,000 square feet of new roof addition: comply with California
Energy Code section 120.10 instead.
A., D Residential new construction (for building permit applications submitted after 1/1/20). Refer to 2019 California Energy Code section 150.l(c) 14 for
requirements. Note: if project includes installation of an electric heat pump water heater pursuant to Carlsbad ordinance CS-348, increase system size by
.3kWdc if PV offset option is selected.
Floor Plan ID (use additional CFA #d.u. Calculated kWdc*
sheets if necessary)
Total System Size:
kWdc = (CFAx.572) / 1,000 t (1.15 x #d.u.)
*Formula calculation where CFA = conditional floor area, #du = number of dwellings per plan type
If proposed system size is less than calculated size, please explain.
Exception
□
□
□
□
kWdc
B. D Nonresidential new construction or alterations ~$1,000,000 BPV and affecting ~75% existing floor area, or addition that increases roof area by ~2,000
square feet. Please refer to Carlsbad Ordinance CS-347, Section 6 when completing this section.
Choose on e of the following methods:
□ Gross Floor Area (GFA) Method
GFA:
□ If< 10,000s.f. Enter: 5 kWdc
Min. System Size: ___ kWdc
□ If~ 10,000s.f. calculate: 15 kW de x (GFA/10,000) **
**Round building size factor to nearest tenth, and round system size to nearest whole number.
□ Time-Dependent Valuation Method
Annual TDV Energy use:*** x .80= Min. system size: ____ kWdc
***Attach calculation documentation using modeling software approved by the Californ ia Energy Commission.
P-30 Page 5 of 7 Revised 06/22
City of Carlsbad Climate Action Plan Consistency Checklist
A. 0 Residential and hotel/motel new construction
Please refer to Carlsbad Ordinance CS-347 and CS-348 when completing this section.
□ For systems serving individual dwelling units choose one:
□ Heat pump water heater AND compact hot water distribution AND drain water heat recovery (low-rise residential
only)
D Heat pump water heater AND PV system .3 kWdc larger than required in CA Energy Code Section 120.10 (for high rise
residential hotel/motel) or 150.l(c) 14 (for low-rise residential)
□ Heat pump water heater meeting Tier 3 or higher NEEA Advanced Water Heating Specification
□ Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors
□ Exception:
□ For systems serving multiple dwelling units, install a central water-heating system with all of the following:
□ Gas or propane water heating system
□ Recirculation system per CS-347 (high-rise residential, hotel/motel) or CS-348 (low-rise residential)
□ Solar water heating system that is either:
□ .20 solar savings fraction
D .15 solar savings fraction, plus drain water heat recovery
□ Exception:
B. 0 Nonresidential new construction
Please refer to Carlsbad Ordinance CS-347 when completing this section.
□ Water heating system derives at least 40% of its energy from one of the following (attach documentation):
D Solar-thermal □ Photovoltaics □ Recovered energy
□ Water heating system is (choose one):
□ Heat pump water heater
□ Electric resistance water heater(s)
D Solar water heating system with .40 solar savings fraction
□ Exception:
A. 0 Residential New construction and major alterations•
Please refer to Carlsbad Ordinance CS-349 when completing this section.
D One and two-family residential dwelling or townhouse with attached garage:
□ One EVSE ready parking space required □ Exception :
□ Multi-family residential: □ Exception •
Total Parking Spaces EVSE Spaces
Proposed Capable I Ready I
I I
Calculations: Total EVSE spaces= .10 x Total parking (rounded up to nearest whole number)
EVSE Installed= Total EVSE Spaces x .SO (rounded up to nearest whole number)
EVSE other= Total EVSE spaces-EVSE Installed
(EVSE other may be "Capable," "Ready" or "Installed.")
Installed I
I
Total
P-30 Page 6 of 7 Revised 06/22
City of Carlsbad Climate Action Plan Consistency Checklist
•Major alterations are: (1) for one and two-family dwellings and townhouses with attached garages, alterations have a building permit valuation 2: $60,000 or
include an electrical service panel upgrade; (2) for multifamily dwellings (three units or more without attached garages!, alterations have a building permit
valuation 2: $200,000, interior finishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems
are proposed.
B O Nonresidential new construction (includes hotels/motels) □ Exception •
Total Parking Spaces EVSE Spaces
Proposed Capable Ready
Calculation: Refer to the table below:
Total Number of Parking Spaces provided Number of required EV Spaces
□ 0-9
□ 10-25
□ 26-50
□ 51-75
□ 76-100
□ 101-150
□ 151-200
□ 201 and over
Use
1
2
4
6
9
12
17
10 percent of total
and gross floor area (GFA) allocated to each use.
elected from the City of Carlsbad Employee ADTTable.
GFA Employee ADT /1,000 S.F.
If total employee ADT is greater than or equal to 110 employee ADT, a TOM plan is requI
Installed Total
Number of required EVSE Installed Spaces
1
1
2
3
5
6
9
50 percent of Required EV Spaces
Total Employee ADT
Total L_----======-
•NOTE: Notwithstanding the 110 employee AOT threshold above, General Plan Mobility Element Policy 3-P.11 requ ew development that adds vehicle traffic
to vehicle LOS-exempt street facilities to implement TOM and transportation system management strategies. Please consult wI • of Carlsbad Land Development
Engineering (LOE) staff to determine whether this policy applies to your project.
TOM plan required: Yes □ No □
LOE Staff Verification : □ _____ (staff initials)
Transportation Demand Management (TOM) was approved with overall Master Plan for campus.
No changes proposed, TOM n/a to permit application.
P-30 Page 7 of 7 Revised 06/22
{ Cicyof
Carlsbad
PURPOSE
CLIMATE ACTION PLAN
CONSISTENCY CHECKLIST
B-50
Development Services
Building Division
1635 Faraday Avenue
442-339-2719
www.carlsbadca.gov
This checklist is intended to help building permit applicants identify which Climate Action Plan (CAP) ordinance requirements
apply to their project. This completed checklist (B-50) and summary (B-55) must be included with the building permit
application. The Carlsbad Municipal Code (CMC) can be referenced during completion of this document by clicking on
the provided links to each municipal code section.
NOTE: The following type of pennits are not required to fill out this form
❖ Patio I ❖ Decks I ❖ PME (w/o panel upgrade) I ❖ Pool
Consultation with a certified Energy Consultant is encouraged to assist in filling out this document. Appropriate
certification includes, but is not limited to: Licensed, practicing Architect, Engineer, or Contractor familiar with Energy
compliance, IECC/HERS Compliance Specialist, ICC G8 Energy Code Specialist, RESNET HERS rater certified, certified
ICC Residential Energy Inspector/Plans Examiner, ICC Commercial Energy Inspector and/or Plans Examiner, ICC CALgreen
Inspector/Plans Examiner, or Green Building Residential Plan Examiner.
If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance,
check N/A and provide an explanation or code section describing the exception.
Details on CAP ordinance requirements are available at each section by clicking on the municipal code link provided. The
project plans must show all details as stated in the applicable Carlsbad Municipal Code (CMC) and/or Energy Code and
Green Code sections.
Project Name/Building
Permit No.:
Property Address/APN :
Applicant Name/Co.:
Applicant Address:
Contact Phone:
Tl Hilton Grand Vacation Club 5d BP No.: CBC2022-0277
1594 Marbrisa Circle, Carlsbad, CA 92008
Dan Talant / NOAA Group
4990 N Harbor Dr. Unit 201, San Diego, CA 92106
619-297-8066 Contact Email: dant@noaainc.com
Contact information of person completing this checklist (if different than above):
Name:
Company
name/address:
Contact Phone: 619-297-8066
Contact Email:
nt C/;;f.;t Applicant Signature: _______________ Date: 9.27.22
B-50 Page 1 of 7 Revised 04/21
Use the table below to determine which sections of the Ordinance checklist are applicable to your project. For
alterations and additions to existing buildings, attach a Permit Valuation breakdown on a separate sheet.
Building Permit Valuation (BPV) $ breakdown _2_2_5,._0_0_0 ____ _
0 Residential
D New construction
D Additions and alterations:
D BPV < $60,000
D BPV.:: $60,000
D Electrical service panel upgrade only
D BPV.:: $200,000
[i] Nonresidential
D New construction
D Alterations:
~ BPV.:: $200,000 or additions .::: 1,000
square feet
D BPV.:: $1,000,000
D .:: 2,000 sq. ft. new roof addition
1. Energy Efficiency
A high-rise residential building is 4 or more stories, including a
Low-rise High-rise mixed-use building in which at least 20% of its conditioned floor
area is residential use
2A*, 3A*, 1B, 2B, *Includes detached, newly constructed ADU 4A*, 3B, 4A
N/A N/A All residential additions and alterations
1A, 4A 4A 1-2 family dwellings and townhouses with attached garages
only.
*Multi-family dwellings only where interior finishes are removed
1A, 4A* 1B, 4A* and significant site work and upgrades to structural and
mechanical, electrical, and/or plumbing systems are proposed
1 B, 2B, 3B, 4B and 5
1B, 5
1B, 2B, 5 Building alterations of.:: 75% existing gross floor area
2B, 5 1 B also applies if BPV.::: $200,000
Please refer to Cartsbad Municipal Code (CMC) 18.21 .155 and 18.30.190,and the California Green Building Standards Code (CAL Green) for more
information. Appropriate details and notes must be placed on the plans according to selections chosen in the design.
A O Residentialadditionoralteration:l:$60,000buildingpennitvaluation. D N/A _________ _
Details of selection chosen below must be placed on the plans referencing CMC □ Exception: Home energy score .:: 7
18.30.190. (attach certification)
Year Built Single-family Requirements Multi-family Requirements
D Before 1978 Select one option:
D Ductsealing D Attic insulation □ Cool roof D Attic insulation
D 1978 and later Select one option:
D Lighting package D Water heating Package
D Between1978and1991 Select one option:
D Ductsealing □ Attic insulation □Cool roof
D 1992 and later Select one option:
D Lighting package D Water heating package
Updated 4/ I 6/2021 3
8. [j] Nonresidential* new construction or alterations 2: $200,000 building pennit valuation,
or additions 2: 1,000 square feet. See CMC 18.21.155 and CAL Green Appendix AS □ N/A
AS.203.1.1 Choose one: D .1 Outdoor lighting D .2 Restaurant service water heating ( CE C 140. 5)
□ .3Warehousedocksealdoors. D .4DaylightdesignPAFs D .5Exhaustairheatrecovery II N/A
AS.203.1.2.1 Choose one: D .95 Energy budget (Projects with indoor lighting OR mechanical)
II .90 Energybudget (ProjectswithindoorlightingANDmechanical) □ N/A
AS.211 .1 .. D On-site renewable energy:
□ N/A
AS.211.3** □Green power: (If offered by local utility provider, 50% minimum renewable sources)
□ N/A
AS.212.1 D Elevators and escalators: (Project with more than one elevator or two escalators)
□ N/A
AS.213.1 D Steel framing: (Provide details on plans for options 1-4 chosen)
D N/A _______ _
* Includes hotels/motels and high-rise residential buildings
** Foralterations~ $1 ,000,000 BPV and affecting> 75% existing grossfloorarea, OR alterationsthatadd 2,000 square feet of newroofaddition: comply
with CMC 18.30.130 (section 2B below) instead.
2. Photovoltaic Systems
A. D Residential new construction (for low-rise residential building permit applications submitted after 1/1/20). Refer to 2019 California
Energy Code section 150.1 (c)14 for requirements. If project includes installation of an electric heat pump water heater pursuant to
CAP section 38 below (low-rise residential Water Heating), increase system size by .3kWdc if PV offset option is selected.
Floor Plan ID (use additional CFA #d.u. Calculated kWdc*
sheets if necessary)
Total System Size:
kWdc = (CFAx.572) / 1,000 + (1 .15 x #d.u.)
*Formula calculation where CFA = conditional floor area, #du= number of dwellings per plan type
If proposed system size is less than calculated size, please explain.
kWdc
Exception
D
□
□
□
8. D Nonresidential new construction or alterations 2:$1,000,000 8PV AND affecting 2:75% existing floor area, OR addition that increases
roof area by ~.ooo square feel Please refer to CMC 18.30.130 when completing this section. *Note: This section also applies to
high-rise residential and hotel/motel buildings.
Choose one of the following methods:
D Gross Floor Area (GFA)Method
GFA:
D If< 10,000s.f. Enter: 5 kWdc
Min. System Size:
D If~ 1 O,OOOs.f. calculate: 15 kWdc x (GFN10,000) **
kWdc
**Round building size factor to nearest tenth, and round system size to nearest whole number.
Updated 4/16/2021 4
D Time-Dependent Valuation Method
Annual TDVEnergyuse:*** ______ x .80= Min. system size: ______ kWdc
***Attach calculation documentation using modeling software approved by the California Energy Commission.
3. Water Heating
A. D Residential and hotel/motel new construction. Refer to CMC 18.30.170 when completing this section.
Provide complete details on the plans.
□ For systems serving individual dwelling units choose one system :
□ Heat pump water heater AND Compact hot water distribution AND Drain water heat recovery (low-rise
residential only)
□ Heat pump water heater AND PV system .3 kWdc larger than required in CMC 18.30.130 (high rise
residential hotel/motel) or CA Energy Code section 150.1 (c) 14 (low-rise residential)
□ Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher
□ Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors
□ Exception:
□ For systems serving multiple dwelling units, install a central water-heating system with ALL of the following:
□ Gas or propane water heating system
□ Recirculation system per CMC 18.30.150(8) (high-rise residential, hotel/motel) or CMC 18.30.170(8) (low-
rise residential)
□ Solar water heating system that is either:
□ .20 solar savings fraction
□ .15 solar savings fraction, plus drain water heat recovery
□ Exception:
B. D Nonresidential new construction. Refer to CMC 18.30.150 when completing this section. Provide
complete details on the plans.
□ Water heating system derives at least 40% of its energy from one of the following (attach documentation):
□ Solar-thermal □ Photovoltaics □ Recovered energy
□ Water heating system is (choose one):
□ Heat pump water heater
□ Electric resistance water heater(s)
□Solar water heating system with .40 solar savings fraction
□ Exception:
It may be necessary to supplement the completed checklist with supporting materials, calculations or certifications, to
demonstrate full compliance with CAP ordinance requirements. For example, projects that propose or require a
performance approach to comply with energy-related measures will need to attach to this checklist separate calculations
and documentation as specified by the ordinances.
Updated 4/16/21 5
4. Electric Vehicle Charging
A. D Residential New construction and major alterations*
Please refer to CMC 18.21.140 when completing this section.
□ One and two-family residential dwelling or townhouse with attached garage:
□ One EVSE Ready parking space required □ Exception : _____________ _
□ Multi-familyresidential· □ Exception •
Total Parking Spaces EVSE Spaces
Proposed EVSE (10% of total) Installed (50% of EVSE) Other "Ready" Other "Capable"
Calculations: Total EVSE spaces= .10 x Total parking spaces proposed (rounded up to nearest whole number) EVSE Installed = Total EVSE
Spaces x .50 (rounded up to nearest whole number) EVSE other may be "Ready" or "Capable"
*Majoralterations are: ( 1 )for one and two-family dwellings and townhouses with attached garages, alterations have a building permit
valuation~ $60,000 or include an electrical service panel upgrade; (2) for multifamily dwellings (three units or more without attached
garages), alterations have a building permit valuation~ $200,000, interiorfinishes are removed and significant site work and upgrades to
structural and mechanical, electrical, and/or plumbing systems are proposed.
*ADU exceptions for EV Ready space (no EV ready space required when):
(1) The accessory dwelling unit is located within one-half mile of public transit.
(2) The accessory dwelling unit is located within an architecturally and historically significant historic district.
(3) The accessory dwelling unit is part of the proposed or existing primary residence or an accessory structure.
(4) When on-street parking permits are required but not offered to the occupant of the accessory dwelling unit.
(5) When there is a car share vehicle located within one block of the accessory dwelling unit.
B. D Nonresidential new construction (includes hotels/motels) D Exception : ____________ _
Please refer to CMC 18.21.150 when completing this section
Total Parking Spaces
Proposed EVSE (10% of total) I Installed (50% of EVSE) I Other "Ready" I Other "Capable"
I I I
Calculation: Refer to the table below:
Total Number of Parking Spaces provided Number of required EV Spaces Number of required EVSE Installed Spaces
D 0-9 1 1
□ 10-25 2 1
D 26-50 4 2
□ 51-75 6 3
□ 76-100 9 5
D 101-150 12 6
D 151-200 17 9
□ 201 andover 1 0 percent of total 50 percent of Required EV Spaces
Calculations: Total EVSE spaces= .10 x Total parking spaces proposed (rounded up to nearestwholenumber) EVSE Installed = Total EVSE
Spaces x .50 (rounded up to nearest whole number) EVSE other may be "Ready" or "Capable"
Updated 4/1 6/2021 6
5. Ii] Transportation Demand Management (TOM): Nonresidential ONLY
An approved Transportation Demand Management (TOM) Plan is required for all nonresidential projects that meet a threshold of employee-generated ADT.
City staff will use the table below based on your submitted plans to determinewhetherornoryourpermit requires a TOM plan. lfTOM is applicable to your
permit, staff will contact the applicant to develop a site-specific TOM plan based on the permit details.
Acknowledgment:
Employee ADT Estimation for Various Commercial Uses
Use
EmpADTfor
first 1,000 s.f.
EmpADTI
1000 s.f.1
Office (all)2 20
Restaurant 11
Retaih 8
Industrial 4
Manufacturing 4
Warehousing 4
1 Unless otherwise noted, rates estimated from /TE Trip
Generation Manual, 1 ()lh Edition
13
11
4.5
3.5
3
1
2 For all office uses, use SANDAG rate of 20 ADT/1,000 sf to
calculate employee ADT
3 Retail uses include shopping center, variety store, supermarket,
gyms, pharmacy, etc.
Other commercial uses may be subject to special
consideration
sample c1IGYl1tl0os;
Office: 20,450 sf
1. 20,450 sf/ 1000 x 20 = 409 Employee ADT
Retail: 9,334 sf
1. First 1,000 sf= 8 ADT
2. 9,334 sf -1,000 sf= 8,334 sf
3. (8 ,334 sf/ 1,000 x 4.5) + 8 = 46 Employee ADT
I acknowledge that the plans submitted may be subject to the City of Carlsbad's Transportation Demand Management Ordinance. I agree to be contacted should
my permit require a TOM plan and understand that an approved TOM plan is a condition of permit issuance.
ApplicantSignature: _____ ~ ___ C_~----------Date: 9.27.22
Person other than Applicant to be contacted for TDM compliance (if applicable):
Name(Pnnted):_o_a_n_T_a_la_n_t _______________ _ 619-297 -B'066 Phone Number: _____ _
E .1 Add dant@noaainc.com ma1 ress: ___________________ _
Updated 4/16/2021 7
( City of
Carlsbad
CLIMATE ACTION PLAN (CAP) COMPLIANCE
CAP Building Plan
Template
B-55
Development Services
Building Division
1635 Faraday Avenue
442-339-2719
www.carlsbadca.gov
The following summarizes project compliance with the applicable Climate Action Plan ordinances of the Carlsbad Municipal Code and
California Green Building Standards Code (CALGreen), current version. Use this form to summarize all applicable CAP measures for your iiiiliia IF CAP MEASURES ARE APPLICABLE, IMPRINT THIS COMPLETED FORM ONTO PROJECT PLANS.
1. ENERGY EFFICIENCY APPLICABLE: □YES □ NO
Complies with CMC 18.30.190
& 18.21.155 0Yes ON/A
Existing Structure, year built: ____ _
Prepared Energy Audit? 0Yes D No
Energy Score: _____ _
Efficiency Measures included in scope:
2. PHOTOVOLTAIC SYSTEM APPLICABLE: DYES D NO
Complies with CMC section 18.30.130 and 2019 California Energy
Code section 150.l(c}l4 D Yes D N/A
Required Provided
Size of PV system (kWdc):
Sizing PV by load calculations D Yes D No
If by Load Calculations:
Total calculated electrical load:
80% of load:
Hardship Requested
Hardship Approved
0Yes 0No
□Yes ONo
3. ALTERNATIVE WATER HEATING SYSTEM APPLICABLE: □ YES □NO
4.
Complies with CMC sections 18.30.150
and 18.30.1707
Alternative Source:
□ Electric
□ Passive Solar
Hardship Requested
Hardship Approved
Oves ON/A
OYes
□Yes
□No
□No
ELECTRIC VEHICLE {EV) CHARGING APPLICABLE: □ YES □NO
Complies with CMC
section 18.21.140?
Panel Upgrade?
Total EV Parking Spaces:
No. of EV Capable Spaces:
No. of EV Ready Spaces:
No. of EV Installed Spaces:
Hardship Requested
Hardship Approved
Oves ON/A
0Yes 0No
Required Provided
5. TRAFFIC DEMAND MANAGEMENT APPLICABLE: □ YES □ NO
Compliant? 0Yes ONo
TDM Report on file with city? D Yes D No