Loading...
HomeMy WebLinkAbout1594 MARBRISA CIR; ; CBC2022-0277; PermitBuilding Permit Finaled Commercial Permit Print Date: 03/12/2025 Job Address: 1594 MARBRISA CIR, CARLSBAD, CA 92008 Permit Type: BLDG-Commercial Work Class: nant Improvement Parcel#: 2111312300 Track#: Valuation: $225,775.88 Lot#: Occupancy Group: A-3 / B Project#: #of Dwelling Units: Plan#: Bedrooms: Bathrooms: Construction Type:VA Orig. Plan Check#: Occupant Load : 628 Plan Check#: Code Edition: 2019 Sprinkled: Yes Project Title: Permit No: Status: ('cityof Carlsbad CBC_202Z-0Z77 Close -Flaale.d Applied: 08/05/2022 Issued: 02/06/2023 Finaled Close Out: 03/12/2025 Final Inspection: 11/27/2024 INSPECTOR: Dreibelbis, Peter Alvarado, Tony Description: HILTON GRAND VACATIONS CLUB: COM-Tl (3,917 SF ) 1ST, 2ND AND THIRD FLOOR OFFICES Applicant: NOAA GROUP ARCHITECTS DAN TALANT 4990 N HARBOR DR, # 201 SAN DIEGO, CA 92106-2371 (858) 736-1508 FEE BUILDING PLAN CHECK Property Owner: GRAND PACIFIC PALISADES OWNERS ASSOCIATION INC 5900 PASTEUR CT, # STE 200 CARLSBAD, CA 92008-7336 (760) 827-3200 BU ILDING PLAN REVIEW -MINOR PROJECTS (LOE) BUILDING PLAN REVIEW -MINOR PROJECTS (PLN) CERTIFICATE OF OCCUPANCY COMM/IND Tl -STRUCTURAL FIRE A-2 & A-3 Occupancies -Tl SB1473 -GREEN BUILDING STATE STANDARDS FEE STRONG MOTION -COMMERCIAL (SMIP) Total Fees : $3,506.22 Total Payments To Date: $3,506.22 Balance Due: AMOUNT $910.26 $194.00 $98.00 $16.00 $1,523.74 $691.00 $10.00 $63.22 $0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32 .030. Fa ilure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. Building Division Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov ( City of Carlsbad PLAN CHECK REVISION OR DEFERRED SUBMITTAL APPLICATION Development Services Building Division 1635 FaradayAvenue 442-339-2719 www.carlsbadca .gov B-15 Original Plan Check Number (;.i:.c. '1d1n,..-o"l,.11 Project Address I i;i~ >\t1~g&'1t.-\SA c> \'2.<.,V<., Plan Revision Number ~"' '2.cn-">' <X>S:I General Scope of Revision/Deferred Submittal: tbtV\$t Ml:;,0-\A~ l Svb~Y ~$,f;I{ A:tJ!> S~)f:t WALL 1D A.Gt:.o""....,00@:tE. -pve,::r Q-l.q% CONTACT INFORMATION: Address ~710 N, Jtq,,ul.t,(L.., Qi.we, ~Th 20\ Email Address dun+@ 1--\o¾; hC,, U:> 'I\'\, Fax ~--------- Zip j0l6(, Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person. 1 . Elements revised: ,RI Plans O Calculations O Soils D Energy O Other 2. Describe revisions in detail 4. Does this revision, in any way, alter the exterior of the project? D Yes 5. Does this revision add ANY new floor area(s),? D Yes ~ No 6. Does this revision affect any fire related issues? D Yes ~ No 7. Is this a complete set? g Yes 181 No ~Signature ~a-Lcf/i.l Date 3. List page/s) where each revision is shown ,,gj No 1635 Faraday Avenue, Carlsbad, CA 92008 Ph: 442-339-2719 Email: building@carlsbadca.gov www.carfsbadca.gov , ( City of Carlsbad COMMERCIAL BUILDING PERMIT APPLICATION 8-2 Plan Check CW,.2.Q'l-'2.-O'i{l Est. Value • ?-?:f', ,7~'t e,g PC Deposit A, ,\(), • .2.(o Date '« • S::•:Zo2:z_ Job Address 1594 Marbrisa Circle Suite: APN: 211-130-os ----- Tenant Name#: Hilton Grand Vacations Club Lot #: ____ Year Built: _________ _ Year Built:_2_01_3 __ Occupancy: A-3 t 8 Construction Type:_v_A__ Fire sprinklers@'ESQNO A/C:QYES@No BRIEF DESCRIPTION OF WORK: Tenant Improvement to portions of 1st. 2nd & 3rd floors of existing office spaces and sales support spaces. D Addition/New: ____________ New SF and Use, __________ New SF and Use _______ SF Deck, SF Patio Cover, SF Other (Specify) ___ _ [{]Tenant Improvement: _3_,9_17 ____ SF, Existing Use: SALES / ADMIN Proposed Use: SALES / ADMIN _____ SF, Existing Use: _______ Proposed Use : ______ _ □ Pool/Spa: _____ SF Additional Gas or Electrical Features? ____________ _ □solar: __ _ _ __ Modules, Mounted:0Roof 0Ground D Reroof:.+-.....a.~;...;;. _________________________________ _ D Plumbing/Me cal □ Other: ----=-.....-,--~.,a..,...".,...,...,.· __._1 ___________________________ _ TY OF C f\r<,L ._,, ,_ I\ ( I \ PRIMARY APPLICANT PROPERTY OWNER Name: Dan Talant. NOAA Group Inc Name: Grand Pacific Resorts LP Address: 4990 N. Harbor Dr. Address: 5900 Pasteur Court, Suite 200 . • City: San Diego State: CA Zip:_s_21_0_6 ___ City: Carlsbad State:~Zip:_9_2o_o_s __ _ Phone: (858) 736-1508 Phone: 760-431-8500 Email: off;c.~{i? Qt>GlCA 1 "I c.,., (_ph'\ Email: harnold@gpresorts.com DESIGN PROFESSIONAL CONTRACTOR OF RECORD Name: Dan Talant. NOAA Group Inc Business Name: Grand Pacific Resorts. Inc. Address: 4990 N. Harbor Dr. Address: 5900 Pasteur Court, Suite 200 City: San Diego State: CA Zip:_s_21_os ___ City: Carlsbad State: CA Zip:_s_2o_o_s ____ _ Phone: (85B)_736~1_508 ·-~-----------Phone: 760-431-8500 Email: of.fit e('o3 Y)p C\fi. j (\y • £ pN\ Email: harnold@gpresorts.com Architect State License: c3s94s CSLB License#: 1018716 Class: 8 -------------------- Car Is bad Business License# (Required): _______ _ APPLICANT CERTIFICATION: I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. ---7'; / · 0-Z/-r NAME {PRINT): Dan Talant SIGN:_ ~ C ~ ~ DATE: 0BI0312022 1635 Faraday Ave Carlsbad, CA 92008 Ph : 760-602-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov REV. 07121 THIS PAGE REQUIRED AT PERMIT ISSUANCE PLAN CHECK NUMBER: ______ _ A BUILDING PERMIT CAN BE ISSUED TO EITHER A STATE LICENSED CONTRACTOR OR A PROPERTY OWNER. IF THE PERSON SIGNING THIS FORM IS AN AGENT FOR EITHER ENTITY AN AUTHORIZATION FORM OR LETTER IS REQUIRED PRIOR TO ,...ef,RMIT ISSUANCE. (OPTION A): LICENSED CONTRACTOR DECLARATION: I herebyaf firm under penal tyof perjurythat I am licensed under provisions of Chapter 9 ( commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is in full force and effect. I alsoaf firm under penalty of perjury one of the following declarations (CHOOSE ONE): 0 1 have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the work which this permit is issued. Policy No. ______________________________________ _ -OR- ,x;il have and will maintain worker's compensation, as required by Section 3700 of the Labor Code,~ performjlnCe of th~ork for which Uiis P.ermit is issued. f-1lv workers' co'T'peQsation ·ns ance carrier and policy number are : Insurance Company Name: I l!c!t.uf!!Z.fef!i5 l.bttt.,<> e:.+ • ~,,..pico Policy No. It:' "-l.-Expiration Date: Nev, 1 ·-2"2 3 -OR- O certificate of Exemption: I certify that in the performance of the work for which this perm it is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage is unlawful and shall subject an employer to criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for in Section 3706 of the Labor Code, interest and attorney's fees. CONSTRUCTION LENDING AGENCY, IF ANY: I hereby affirm that there is a construction lending agency for the performance of the work this permit IS issued (Sec. 3097 (i) Civil Code). Lender's Name: _____________________ Lender's Address: ____________________ _ CONTRACTOR CERT/FICA TION: I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all City ordinance__s and State laws relating to building construction. NAME {PRINT): A/1 i heel fh,d{ e> s1GNATURE: ' ;;?-b-2.:3 Note: If the person signing above is an authorized agent for the contractor provid etter of authorization o -OR - (OPTION B): OWNER-BUILDER DECLARATION: I hereby affirm that I am exempt from Contractor's License Law for the following reason: n I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. '-ro44, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). -OR-D 1. as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s] licensed pursuant to the Contractor's License Law). -OR- D I am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason: AND, D FORM B-61 "Owner Builder Acknowledgement and Verification Form" is required for any permit issued to a property owner. By my signature below I acknowledge that, except for my personal residence in which I must have resided for at least one year prior to completion of the Improvements covered by this permit, I cannot legally sell a structure that I have bui It as an owner-builder if it has not been constructed In its entirety by licensed contractors. I understand thatacopyof the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application is submitted orat the following Web site: http:/ l www.leginfo.ca.gov/co/aw.html. OWNER CERTIFICATION: I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with al I City ordinances and State laws relating to building construction. NAME (PRINT): SIGN: __________ DATE: ______ _ Note: If the person signing above is an authorized agent for the property owner include form B-62 signed by property owner. 1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov 2 REV. 07121 PERMIT INSPECTION HISTORY for (CBC2022-0277) Permit Type: BLDG-Commercial Application Date: 08/05/2022 Owner: GRAND PACIFIC PALISADES OWNERS ASSOCIATION INC Work Class: Tenant Improvement Issue Date: 02/06/2023 Subdivision: CITY OF CARLSBAD TRACT NO 15-08 Status: Closed -Finaled Expiration Date: 03/25/2024 Address: 1594 MARBRISA CIR CARLSBAD, CA 92008 IVR Number: 42439 Scheduled Actual Inspection Type Inspection No. Date Start Date Wednesday, March 12, 2025 Checklist Item Are erosion control BMPs functioning properly? Are perimeter control BMPs maintained? Is the entrance stabilized to prevent tracking? Have sediments been tracked on to the street? Has trash/debris accumulated throughout the site? Are portable restrooms properly positioned? Do portable restrooms have secondary containment? COMMENTS Inspection Primary Inspector Status Reinspection Inspection Passed Yes Yes Yes Yes Yes Yes Yes Page 6 of 6 PERMIT INSPECTION HISTORY for (CBC2022-0277) Permit Type: BLDG-Commercial Application Date: 08/05/2022 Owner: GRAND PACIFIC PALISADES OWNERS ASSOCIATION INC Work Class: Tenant Improvement Issue Date: 02/06/2023 Subdivision: CITY OF CARLSBAD TRACT NO Status: Scheduled Date 10/06/2023 11/27/2024 15-08 Closed -Finaled Expiration Date: 03/25/2024 IVR Number: 42439 Address: 1594 MARBRISA CIR CARLSBAD, CA 92008 Actual Inspection Type Start Date Inspection No. Inspection Primary Inspector Checklist Item BLDG-Plumbing Final BLDG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final NOTES Created By Angie Teanio Status COMMENTS April 20, 2023:. Temporary certificate of occupancy-(approved), for showcase timeshare presentation rooms and admin offices, located at second floor locations (only) -approved. TEXT 206-930-1644 Michael// Check Fire is Final 10/06/2023 BLDG-SW-Pre-Con Checklist Item 226352-2023 COMMENTS Partial Pass Tony Alvarado BLDG-Building Deficiency October 6, 2023: (progress inspection). 1. Marbrisa Project: phase-2 sales pods on third floor, interior tenant improvement - progress inspection-approved. 11/27/2024 BLDG-Final Inspection 269508-2024 Passed Tony Alvarado Checklist Item BLDG-Building Deficiency BLDG-Plumbing Final BLDG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final NOTES Created By Ang ie Teanio COMMENTS Additional construction phases to be completed at later date per Contractor representative. Scope of office building tentative improvement/remodel per plan - OK. TEXT 206-930-1644 Michael // Check Fire is Final BLDG-SW-Inspection 269507-2024 Passed Tony Alvarado Reinspection Inspection Passed Yes Yes Yes Yes Created Date 04/19/2023 Reinspection Incomplete Passed Yes Passed Yes Yes Yes Yes Yes Created Date 04/19/2023 Complete Complete Wednesday, March 12, 2025 Page 5 of 6 PERMIT INSPECTION HISTORY for (CBC2022-0277) Permit Type: BLDG-Commercial Application Date: 08/05/2022 Owner: GRAND PACIFIC PALISADES OWNERS ASSOCIATION INC Work Class: Tenant Improvement Issue Date: 02/06/2023 Subdivision: CITY OF CARLSBAD TRACT NO 15-08 Status: Closed -Finaled Expiration Date: 03/25/2024 Address: 1594 MARBRISA CIR IVR Number: 42439 CARLSBAD, CA 92008 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Status Checklist Item COMMENTS Passed Are inactives slopes properly Yes stabilized? Are areas flatter than 3: 1 Yes covered or protected? Are sediment controls properly Yes maintained? Are erosion control BMPs Yes functioning properly? Are natural areas protected Yes from erosion? Do basins appear to be Yes maintained as required? Are perimeter control BMPs Yes maintained? Is the entrance stabilized to Yes prevent tracking? Have sediments been tracked Yes on to the street? Are storm drain inlets Yes protected and maintained? Has sediment accumulated on Yes impeNious surfaces? Are dumpsters and trash Yes receptacles covered? Has trash/debris accumulated Yes throughout the site? Are stockpiles and spoils Yes protected from runoff? Are all storage areas clean Yes and maintained? Are spill kits provided onsite? Yes Are washout areas maintained Yes and protected? Were spills/leaks obseNed Yes during the inspection? Were there any discharges Yes during the inspection? Are portable restrooms Yes properly positioned? Do portable restrooms have Yes secondary containment? Are BMPs stockpiled for Yes emergency deployment? 04/20/2023 04/20/2023 BLDG-Final Inspection 208578-2023 Partial Pass Tony Alvarado Reinspection Incomplete Wednesday, March 12, .2025 Page 4 of 6 PERMIT INSPECTION HISTORY for (CBC2022-0277) Permit Type: BLDG-Commercial Application Date: 08/05/2022 Owner: GRAND PACIFIC PALISADES OWNERS ASSOCIATION INC Work Class: Tenant Improvement Issue Date: 02/06/2023 Subdivision: CITY OF CARLSBAD TRACT NO Status: Closed -Finaled Expiration Date: 03/25/2024 IVR Number: 42439 15-08 Address: 1594 MARBRISA CIR CARLSBAD, CA 92008 Scheduled Date Actual Inspection Type Start Date Inspection No. Inspection Primary Inspector Reinspection Inspection 03/28/2023 Checklist Item BLDG-Building Deficiency NOTES Created By Angie Teanio Status COMMENTS TEXT 206-930-1644 Mike 03/28/2023 BLDG-84 Rough Combo(14,24,34,44) 206385-2023 Passed Tony Alvarado Checklist Item BLDG-14 Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout BLDG-34 Rough Electrical BLDG-44 Rough-Ducts-Dampers NOTES Created By Angie Teanio Angie Teanio COMMENTS 1. Non-load bearing partition walls, and T-bar grid ceiling MEPS, scope of work per engineered plans and deta il specifications-approved. TEXT 206-930-1644 Michael 206-930-1644 Michael BLDG-85 T-Bar, Ceiling 206604-2023 Passed Tony Alvarado Grids, Overhead Checklist Item BLDG-14 Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout BLDG-34 Rough Electrical BLDG-44 Rough-Ducts-Dampers COMMENTS 1. Non-load bearing partition walls, and T-bar grid ceiling MEPS, scope of work per engineered plans and detail specifications-approved. BLDG-SW-Inspection 206625-2023 Passed Tony Alvarado Wednesday, March 12, 2025 Passed No Created Date 03/02/2023 Passed Yes Yes Yes Yes Created Date 02/28/2023 03/27/2023 Passed Yes Yes Yes Yes Complete Complete Complete Page 3 of6 PERMIT INSPECTION HISTORY for (CBC2022-0277) Permit Type: BLDG-Commercial Application Date: 08/05/2022 Owner: GRAND PACIFIC PALISADES OWNERS ASSOCIATION INC Work Class: Tenant Improvement Issue Date: 02/06/2023 Subdivision: CITY OF CARLSBAD TRACT NO 15-08 Status: Closed -Finaled Expiration Date: 03/25/2024 IVR Number: 42439 Address: 1594 MARBRISA CIR CARLSBAD, CA 92008 Scheduled Date Actual Inspection Type Start Date Inspection No. Inspection Status Primary Inspector Reinspection Inspection 03/02/2023 03/03/2023 Checklist Item BLDG-14 Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout BLDG-34 Rough Electrical BLDG-44 Rough-Ducts-Dampers NOTES Created By Angie Teanio COMMENTS March 1, 2023: 1. Phase 1, Hilton grand vacations MarBrisa hotel. 2. Second level, second floor, interior commercial tenant space improvement. 3. Construct and remodel enter nonload bearing partition walls (typical), and relocate existing electrical outlets, switches, and light fixtures, mechanical ducting, minimal plumbing pipe lines. 4. Interior remodel per approve stamped signed plans. 5. Contractor representative required to update any As-built and field floor plan revisions, update city approved plans To reflect interior remodel as built site conditions., before final inspection certificate of occupancy is completed. 6. Rest of work-OK. 7. Fire prevention inspection and approval required prior to above T bar/Gypsum board, ceiling hard-lid rough inspection completed. TEXT 206-930-1644 Michael 03/02/2023 BLDG-16 Insulation Checklist Item 204595-2023 COMMENTS Partial Pass Tony Alvarado BLDG-Building Deficiency BLDG-17 Interior Lath/Drywall 204596-2023 Partial Pass Tony Alvarado BLDG-16 Insulation Checklist Item 204690-2023 COMMENTS Cancelled BLDG-Building Deficiency NOTES Created By Angie Teanio BLDG-17 Interior Lath/Drywall 204689-2023 TEXT 206-930-1644 Mike Cancelled Peter Dreibelbis Peter Dreibelbis Wednesday, March 12, 2025 Passed Yes Yes Yes Yes Created Date 02/28/2023 Re inspection Incomplete Passed Yes Relnspectlon Incomplete Reinspection Incomplete Passed Yes Created Date 03/02/2023 Re Inspection Incomplete Page 2 of 6 Building Permit Inspection History Finaled {cityof Carlsbad PERMIT INSPECTION HISTORY for (CBC2022-0277) Permit Type: BLDG-Commercial Work Class: Tenant Improvement Status: Scheduled Date 03/01/2023 Closed -Finaled Actual Inspection Type Start Date 03/01/2023 BLDG-17 Interior Lath/Drywall Checklist Item Application Date: 08/05/2022 Owner: GRAND PACIFIC PALISADES OWNERS ASSOCIATION INC Issue Date: 02/06/2023 Subdivision: CITY OF CARLSBAD TRACT NO 15-08 Expiration Date: 03/25/2024 Address: 1594 MARBRISA CIR CARLSBAD, CA 92008 IVR Number: 42439 Inspection No. Inspection Primary Inspector Reinspection Inspection Status 204525-2023 Partial Pass Tony Alvarado Reinspection Incomplete COMMENTS Passed BLDG-Building Deficiency March 1, 2023: Yes Wednesday, March 12, 2025 BLDG-84 Rough Combo(14,24,34,44) 1 . Phase 1, Hilton grand vacations MarBrisa hotel. 2. Second level, second floor, interior commercial tenant space improvement. 3. Construct and remodel enter nonload bearing partition walls (typical), and relocate existing electrical outlets, switches, and light fixtures, mechanical ducting, minimal plumbing pipe lines. 4. Interior remodel per approve stamped signed plans. 5. Contractor representative requ ired to update any As-built and field floor plan revisions, update city approved plans To reflect interior remodel as built site conditions., before final inspection certificate of occupancy is completed. 6. Rest of work-OK. 7. Fire prevention inspection and approval requ ired prior to above T bar/Gypsum board, ceiling hard-lid rough inspection completed. 204422-2023 Partial Pass Tony Alvarado Relnspectlon Incomplete Page 1 of 6 ~lrue Nor h COMPllA N C S RVIC S October 14, 2022 City of Carlsbad Community Development Department -Building Division 1635 Faraday Ave. City of Carlsbad -FINAL REVIEW City Penn it No: CBC2022-0277 True North No.: 22-018-158 Carlsbad, CA 92008 Plan Review: Tl Hilton Grand Vacation Club Sales Address: 1594 Marbisa Cricle, Carlsbad, CA Applicant Name: Dan Talent Applicant Email: office@noaainc.com OCCUPANCY AND BUILDING SUMMARY: Occupancy Groups: A-3/B Occupant Load: 628 Type of Construction: V-A Sprinklers: Yes Stories: 3 AreaofWork(sq. ft.): 3,917 sq. ft. The plans have been reviewed for coordination with the permit application. Valuation: Confirmed Scope of Work: Confirmed Floor Area: Confirmed Attn: Building & Safety Department, True North Compliance Services, Inc. has completed the final review of the following documents for the project referenced above on behalf of the City of Carlsbad: 1. 2. Drawings: One(]) copy dated September 16, 2022, by NOAA Group. Structural Calculations: One (I) copy dated August 5, 2022, by BWE. The 2019 California Building, Mechanical, Plumbing, and Electrical Codes (i.e., 2018 IBC, UMC, UPC, and 2017 NEC, as amended by the State of California), 2019 California Green Building Standards Code, 2019 California Existing Building Code, and 2019 California Energy Code, as applicable, were used as the basis of our review. Please note that our review bas been completed and we have no further comments however, we bring the following to your attention: I. ln order to expedite the pennitting process, we have made annotations (in red ink) to Sheets A-2 & A-7. We have enclosed the above noted documents bearing our review stamps for your use. Please call if you have any questions or if we can be of further assistance. Sincerely, True North Compliance Services Review By: Alaa Atassi -Plan Review Engineer True North Compliance Services, Inc. 3939 Atlantic Avenue Suite 116, Long Beach, CA 90807 T / 562.733.8030 Transmittal Letter August 24, 2022 City of Carlsbad Community Development Department -Building Division 1635 Faraday Ave. Carlsbad, CA 92008 Plan Review: TI Hilton Grand Vacation Club Sales Address: 1594 Marbisa Cricle, Carlsbad CA Applicant Name: Dan Talent Applicant Email: office@noaainc.com Trl1 e orth COMPI IANCJ! .RVICES FIRST REVIEW City Penn.it No: CBC2022-0277 True North No.: 22-018-158 True North Compliance Services, Inc. has completed the first review of the following documents for the project referenced above on behalf of the City of Carlsbad: 1. 2. Drawings: Electronic copy not dated, by NOAA Group. Structural Calculations: Electronic copy dated March 26, 2020, by BWE. Attn: Permit Technician, the plans have been reviewed for coordination with the permit application. See below for additional information: Valuation: Scope of Work: Floor Area: Confirmed Confirmed Confirmed Our comments follow on the attached list. Please call if you have any questions or if we can be of further assistance. Sincerely, True North Compliance Services Review By: Alaa Atassi -Plan Review Engineer True North Compliance Services, Inc. 3939 Atlantic Avenue Suite 116, Long Beach, CA 90807 T / 562. 733.8030 TI Hilton Grand Vacation Club Sales 1594 Marbisa Cir August 24, 2022 Plan Review Comments RESUBMITTAL INSTRUCTIONS: City of Carlsbad-FIRST REVIEW City Pem1it No.: CBC2022-0277 True North No .: 22-018-158 Page 2 Deliver THREE corrected sets of plans and TWO corrected calculations/reports directly to the City of Carlsbad Building Division, 1635 Faraday Ave., Carlsbad, CA 92008, (442) 339-2719. The City will route the plans to True North, Planning and Land Development Engineering Departments (if applicable) for continued review. Note: If this project requires FIRE PREVENTION review, ensure that you follow their specific instructions for resubmittal review. The City will not route plans back to Dennis Grubb & Associates for continued Fire Prevention review. GENERAL INFORMATION: A. The following comments are referred to the 2019 California Building Mechanical, Plumbing, Electrical Codes, California Green Building Standards Code, and Energy Code (i .e., 2018 IBC, UMC, UPC, and 2017 NEC, as amended by the State of California). B. There may be other comments generated by the Building Division and/or other City departments that will also require your attention and response. This attached list of comments, then, is only a portion of the plan review . Contact the City for other items . C. Respond in writing to each comment by marking the attached comment list or creating a response letter. Indicate which details, specification, or calculation shows the required information. Your complete and clear responses will expedite the re-check. D. Please be sure to include the architect and engineer's stamp and signature on all sheets of the drawings and on the coversheets of specifications and calculations per CBPC 5536.1 and CBPC 6735. This item will be verified prior to plan approval . OCCUPANCY & BUILDING SUMMARY: Occupancy Groups : Occupant Load: Type of Construction: Sprinklers: Stories: Area of Work (sq. ft.): A-3/B 628 V-A Yes 3 3917 sq. ft. ARCHITECTURAL COMMENTS: Al. A large portion of the second floor was converted from B occupancy to A-3 occupancy. Provide updated allowable area analysis of the building in accordance with CBC 506 and 508.3 . A2 . Sheet A-3.1 , address the following comments: a) Specify the total occupant load of building. CBC 1004.5. b) At plan 2, the total occupant load from the Patio and Showcase 1 is 50 occupants which requires to have two exits. Please revise to show compliance with CBC 1006.2.1. TI Hilton Grand Vacation Club Sales 1594 Marbisa Cir August 24, 2022 City of Carlsbad-FIRST REVIEW City Pennit No .: CBC2022-0277 True North No.: 22-018-158 Page 3 i) Assembly spaces with 50 or more occupants require panic hardware at doors per CBC 1010.1.10. ii) Provide required exit signs per CBC 1013. iii) Ensure exits are separated by more than one-third the diagonal distance from the space per CBC 1007.1 .1 c) At plan 3, the patio north of plan has more than 10 occupants, which requires the doors to be side- hinged swinging doors per CBC 1010.1.2 . Please revise. A3 . Sheet A-4, plans have door tags but a door schedule was not provided. Please provide. A4. Project information indicates the structure is Type V-A construction. Type V-A construction requires the primary structure, bearing walls, roof, floor, and secondary members to be one hour fire resistive construction. A structural beam is being replaced. Provide details of individual encasement primary structural framing members per CBC 704 .2 and 704.3. A5. Note on plans: Roof mounted equipment must be screened and roof penetrations should be minimized. City Policy 80-6 ACCESSIBILITY COMMENTS: D 1. CBC l lB-202.3 requires that accessibility be provided to the altered spaces. This accessibility shall include the requirements of CBC l lB-202.4, which entails : a primary entrance, a primary path of travel, sanitary facilities serving the area, a drinking fountain, and signs. Please address the following: a) Show the accessible path of travel from the public way to the area of alteration. b) On the site plan, specify the accessible route to be 5% maximum running slope with 2% maximum cross slope per CBC 1 lB-403.3. c) Provide detectable warning where the accessible route crosses or adjoins the vehicular path of travel per CBC llB-247.1.2.5. Provide details in accordance with CBC llB-705. l. d) Sho\v location and provide details for curb ramps in accordance with CBC l lB-406. TI Hilton Grand Vacation Club Sales 1594 Marbisa Cir August 24, 2022 City of Carlsbad-FIRST REVIEW City Pennit No.: CBC2022-0277 True North No.: 22-018-158 Page 4 e) Show location and provide site specific plans and details for the restrooms serving the area to verify that it meets the requirements of CBC l lB Division 6. f) Show the location and provide details for the drinking fountain serving this area (if provided) to verify that it meets the requirements of CBC l lB-211.1 and CBC l lB-602. g) Provide site specific details and dimensions of accessible parking, accessible aisles, markings signage, etc., to verify it meets the requirements of CBC l lB Division 5. D2. Provide infonnation for the existing and proposed doors that are within the area of work. a) Confinn the clear width of the doorways are 32" minimum per CBC 118-404.2.3. b) Door hardware are operable ·with one hand and do not require tight grasping, pinching, or twisting of the hand. CBC 1 lB-404.2 . 7 and 1 lB-309.4. c) Door thresholds comply with CBC l lB-404.2.5. d) Door opening force is 5-pounds ma-ximum for interior doors per CBC l IB-404.2 .9. e) Door opening hardware is mounted 34" to 44" above the finish floor per CBC l lB-404.2.7 . f) Lower 10 inch of the door surface is provided with a smooth surface for the full width of the door, at the push side of the door per CBC 1 lB-404.2.10. MECHANICAL COMMENTS: No Comments. ELECTRICAL COMMENTS: E 1. Note on plans: Per city policy wiring is not permitted on the roof of a building and ,vi ring on the exterior of a building requires approval by the Building Official. E2. Sheet E201 : Revise plans to provide infonnation on lighting for the Showcase 1 space. Provide emergency lighting in area of work. Emergency lighting shall illuminate the means of egress at all times the building space is occupied. Emergency lighting shall have power for duration of not less than 90 minutes. CBC 1008 PLUMBING COMMENTS: Pl. Clarify plumbing scope of work on plans. TI Hilton Grand Vacation Club Sales 1594 Marbisa Cir August 24, 2022 GREEN BUILDING COMMENTS: City of Carlsbad-FIRST REVIEW City Pennit No.: CBC2022-0277 True North No.: 22-018-158 Page5 G 1. Climate Action Plan requirements apply to all new structures, residential additions/remodels equal to or exceeding $60,000 in valuation, and commercial City of Carlsbad requires that all projects that qualify for CAP compliance will require a completed Climate Action Plan (CAP) Consistency Checklist (city fonn B- 50) to be completed by the APPLICANT. a) For plans submitted to the City the following Climate Action Plan requirements apply, per Carlsbad ordinance: b) The submitted document is P-30 fonn . The applicant is to fill out the B-50 CAP Consistency Checklist. The scope of work and project valuation will determine ·which sections of the CAP are required. c) Plan examiners review the B-50 CAP Consistency Checklist for completion. G2 . Proposed tenant improvement pennit valuation is $200,000 or more. As such, the mandatory measures of the 2019 California Green Building Code apply. CGBSC 301.3. Please address the following: a) Reproduce the nonresidential occupancies application checklist onto the plan sheets. b) Add an additional column to the checklist to indicate where the appropriate requirements are noted within the set of plans. c) The Code sections relevant to the additions and alterations shall only apply to the portions of the building being added or altered with the scope of the pennit work. ENERGY COMPLIANCE COMMENTS: Tl. The specified address on the Indoor Lighting title 24 energy fonns is for a different building. Please revise and provide updated title 24 energy forms . Sf.t' lo, CAllf<Jtt~I-' Indoor lighting N'CCIII I CERTIFl(.41( OF (OMPUAHCC 1h11 documtnt if used to d,monrlrot• comp/lone. with rl.'(luirements ,n ~I.~ flJl,.li, aJJlj, .tl.til.4 ond j ooth PfOt-(1 NanMt: 111\i:16N .. ..-DvAO<!IOft1upot1 Pa1•· Prof0<t Addrtn: I ,, fi.15() C~LSIIAD 8LVO.J~t• Prtp,tf/d: j .I A. GENERAi. INFORMATION - 01 Profec1 Locat>0<1 1<11';) (CARLSB.tD (14 Iota! Cond,tlontd fl 02 lc1111u11t lone 11 0~ lot.II uncondll•Ol\4!( 03 O<eupancv 1vpe, W,thln P~N:• (l(llect •II that apptyJ 06 • of Storl~s (Habltal 1181 Office l □(Ret.111 I t8J (War<housc 0 Ho1el/Mo1el 0 P,r~ln1 Gor•B• I D )Hlah R"• Re,idenll•I I D JR•locmbl• 0 Hee1hht.1,• STRUCTURAL COMMENTS: S l . The structural calculations specify work on the gridline 14 of third floor, while plans do not show any information on gridline 14. a) Revise plans to show consistency with structural calculations. b) Show location of proposed WIO beam . Specify size of beam on plans. c) Provide and cross reference connection details for the proposed work. TI Hilton Grand Vacation Club Sales 1594 Marbisa Cir August 24, 2022 City of Carlsbad-FIRST REVIEW City Pennit No.: CBC2022-0277 True North No.: 22-018-158 Page 6 S2. Sheet Sl: Revise the items requiring special inspections to include the steel beam welding. S3 . Sheet S3 shows shear wall schedule. Show location on plans for the proposed shear walls, and provide supporting calculations. If you have any questions regarding the above comments, please contact Alaa Atassi via email alaa@tncservices.com, or telephone (562) 733-8030. [END] B\VE STRUCTURAL • CIVIL •SURVEY• LAND PLANNING 9449 Balboa Avenue, Suite 270 • San Diego, CA 92123 Phone (619) 299-5550 ■ Fax (619) 299-9934 www.bwesd.com ENGINEER: Charles Colvin DATE: August 5, 2022 PROJECT NUMBER: 11132A.1.01 STRUCTURAL CALCULATIONS FOR Marbrisa Sales Building Tl for Hilton Click here to enter text. Grand Pacific Drive CARLSBAD, CALIFORNIA 92008 Prepared for GRAND PACIFIC RESORTS, INC. 5900 PASTEUR CT, #200 CARLSBAD, CALIFORNIA >-1--cJ ON t-o N .....__ (") 0 ·-N N --..1 ~-..... (") :st 0 ~o ..-..-I ~ N N N 0 N 0 al 0 B\VE Sales Tl Scope: STRUCTURAL ■ CIVIL ■ SURVEY ■ LAND PLANNING 9449 Balboa Avenue, Suite 270 ■ San Diego, CA 92123 Phone {619) 299-5550 ■ Fax (619} 299-9934 www.bwesd.com The majority of the scope of the Tl is an interior remodel; mostly effecting non-structural interior walls. BWE originally designed this structure in 2013/2014 conforming to the 2010 CBC to be flexible, knowing that it would be a sales use while there are units to sell, and then converted to living spaces once we enter the end of the sales cycle. The structure is a combination timber bearing wall and steel beam supported vertical gravity system with engineered I-joist and plywood floors and wood truss supported plywood roof. The lateral system is plywood shearwalls. There is a door that is being relocated at level 2 along the "front" of the units near ~G and 14. We have provided continuity strapping and hold downs around it to maintain force transfer. The wall is lightly loaded, originally ~350 plf, now ~4so plf with the reduced length; constructed as a "3E" wall, with a capacity of 550#/ft. Typical Loads: Guestrooms DL=26 psf LL=S0 psf DATE __ 20_2_2-_0_8-_05 __ INCJ■lUfO 10 uura Hrl.C1Ai110N.t Prc..V\·~._., (o. ... ~-</t3 .~-:-3-,'t.l~/~ ~ ~ <::"/to-1.,~ etst~,~- ~ ) ~ <r. 'rP-v-u-Q -=-~-l) ~ I f..r.. H f) IC) OFFICE USE ONLY SAN DIEGO REGIONAL HAZARDOUS MATERIALS QUESTIONNAIRE RECORD ID# __________________ _ PLAN CHECK# ________________ _ Business Name Hilton Grand Vacation Club Project Address Business Contact Houston Arnold Telephone# 760-431-8500 BP DATE APN# 1594 Marbrisa Circle City Carlsbad State CA Zip Code 92008 211 -130-02, 211-130-05 Mailing Address City 4990 N Harbor Dr, Unit 201 San Diego State CA Zip Code 92106 Plan File# CBC2022-0277 Project Contact Dan Talant Applicant E-mail dant noaainc.com Telephone# 619-297-8066 The following questions represent the facility's activities, NOT the specific project description. PART I: FIRE DEPARTMENT-HAZARDOUS MATERIALS DIVISION: OCCUPANCY CLASSIFICATION: (not required for projects within the City of San Diego): Indicate by circling the item, whether your business will use, process. or store any of the following hazardous materials. If any of the items are circled, applicant must contact the Fire Protection Agency with jurisdiction prior to plan submittal. Occupancy Rating: Facility's Square Footage (including proposed project): 1. Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives 13. Corrosives 2. Compressed Gases 6. Oxidizers 10. Cryogenics 14. Other Health Hazards 3. Flammable/Combustible Liquids 7. Pyrophorics 11 . Highly Toxic or Toxic Materials 15. None of These. 4. Flammable Solids 8. Unstable Reactives 12. Radioactives PART II: SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEAL TH -HAZARDOUS MATERIALS DIVISION IHMDI: If the answer to any of the questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 5500 Overland Avenue, Suite 110, San Diego, CA 92123. Call (858) 505-6700 prior to the issuance of a building permit. FEES ARE REQUIRED Project Completion Date: Expected Date of Occupancy: 1. 2. 3. 4. 5. 6. 7. 8. YES NO (for new construction or remodeling projects) Is your business listed on the reverse side of this form? (check all that apply). D IXI D IXI Will your business dispose of Hazardous Substances or Medical Waste in any amount? □ IX) Will your business store or handle Hazardous Substances in quantities greater than or equal to 55 gallons, 500 pounds and/or 200 cubic feet? □ □ D D D IX) Will your business store or handle carcinogens/reproductive toxins in any quantity? IX) Will your business use an existing or install an underground storage tank? IX) Will your business store or handle Regulated Substances (CalARP)? IX) Will your business use or install a Hazardous Waste Tank System (Tille 22, Article 10)? IX) Will your business store petroleum in tanks or containers at your facility with a total facility storage capacity equal to or realer than 1,320 allons? California's Above round Petroleum Stora e Act . 0 CalARP Exempt I Date Initials 0 CalARP Required I Date Initials 0 CalARP Complete I Date Initials PART Ill: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT IAPCDI: Any YES* answer requires a stamp from APCD 10124 Old Grove Road, San Diego, CA 92131 apcdcomp@sdcounty.ca.gov (858) 586-2650). [*No stamp required if Q1 Yes aDQ Q3 Yes and Q4-Q6 No]. The following questions are intended to identify the majority of air pollution issues at the planning stage. Projects may require additional measures not identified by these questions. For comprehensive requirements contact APCD. Residences are typically exempt, except -those with more than one building• on the property; single buildings with more than four dwelling units; townhomes; condos; mixed-commercial use; deliberate burns; residences forming part of a larger project. rExcludes garages & small outbuildings.] YES NO 1. IX) D Will the project disturb 160 square feet or more of existing building materials? 2. 0 IX) Will any load supporting structural members be removed? Notification may be required 10 working days prior to commencing demolition. 3. IX) D (ANSWER ONLY IF QUESTION 1 or 2 IS YES) Has an asbestos survey been performed by a Certified Asbestos Consultant or Site Surveillance Technician? 4. D IX) (ANSWER ONLY IF QUESTION 3 IS YES) Based on the survey results, will the project disturb any asbestos containing material? Notification may be required 1 O working days prior to commencing asbestos removal. 5. D IX) Will the project or associated construction equipment emit air contaminants? See the reverse side of this form or APCD factsheet (www.sdapcd.org/info/facts/permits.pdf) for typical equipment requiring an APCD permit. 6. D D (ANSWER ONLY IF QUESTION 5 IS YES) Will the project or associated construction equipment be located within 1,000 feet of a school bounda Briefly describe business activities: Sales Building / Administration Briefly describe proposed project: Dan Talant 10 / 20 / 2022 Name of Owner or Authorized Agent Signature of Owner or Authorized Agent Date I decriw~sii,{'f~?~~~f~8~ii!,t}..¾Ll\,l~J..~Mf13'X-Pl?JN':ledge and t100R fa~fr&Q~~'flt'!rein are true and correct. BY· DATE· / / EXEMPT OR NO FURTHER INFORMATION REQUIRED RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY COUNTY-HMO* COUNTY-HMO APCD COUNTY-HMO APCD ·--- ~~n Co11c-, q,~ ~ 1i R.ev1eweo <2 10/20/2022 MA :!! Ollte/lnihl>IS ~,, t ~ Diego co .. *A stamp in this box only exempts businesses from completing or updating a Hazardous Materials Business Plan. other permI1tIng requirements may still apply. HM-9171 (08/15) County of San Diego -DEH -Hazardous Materials Division LIST OF BUSINESSES WHICH REQUIRE REVIEW AND APPROVAL FROM THE COUNTY OF SAN DIEGO DEPARTMENT OF ENVIRONMENTAL HEALTH-HAZARDOUS MATERIALS DIVISION Check all that apply: AUTOMOTIVE D Battery Manufacturing/Recycling D Boat Yard D Car Wash D Dealership Maintenance/Painting D Machine Shop D Painting D Radiator Shop D Rental Yard Equipment D Repair/Preventive Maintenance D Spray Booth D Transportation Services D Wrecking/Recycling CHEMICAL HANDLING D Agricultural supplier/distributor D Chemical Manufacturer D Chemical Supplier/Distributor D Coatings/Adhesive D Compressed Gas Supplier/Distributor D Dry Cleaning D Fiberglass/Resin Application D Gas Station D Industrial Laundry D Laboratory D Laboratory Supplier/Distributor 0 Oil and Fuel Bulk Supply D Pesticide Operator/Distributor CHEMICAL HANDLING D Photographic Processing D Pool Supplies/Maintenance D Printing/Blue Printing D Road Coatings D Swimming Pool D Toxic Gas Handler D Toxic Gas Manufacturer METAL WORKING D Anodizing D Chemical Milling/Etching D Finish-Coating/Painting D Flame Spraying D Foundry D Machine Shop-Drilling/Lathes/Mills D Metal Plating D Metal Prepping/Chemical Coating D Precious Metal Recovery D Sand Blasting/Grinding D Steel Fabricator D Wrought Iron Manufacturing AEROSPACE D Aerospace Industry D Aircraft Maintenance D Aircraft Manufacturing OTHERS AND MISCELLANEOUS 0 Asphalt Plant D Biotechnology/Research D Chiropractic Office D Co-Generation Plant D Dental Clinic/Office D Dialysis Center D Emergency Generator D Frozen Food Processing Facility D Hazardous Waste Hauler D Hospital/Convalescent Home D Laboratory/Biological Lab D Medical Clinic/Office D Nitrous Oxide (NO,) Control System D Pharmaceuticals 0 Public Utility D Refrigeration System D Rock Quarry D Ship Repair/Construction D Telecommunications Cell Site D Veterinary Clinic/Hospital D Wood/Furniture Manufacturing/Refinishing ELECTRONICS D Electronic Assembly/Sub-Assembly D Electronic Components Manufacturing D Printed Circuit Board Manufacturing NOTE: THE ABOVE LIST INCLUDES BUSINESSES, WHICH TYPICALLY USE, STORE, HANDLE, AND DISPOSE OF HAZARDOUS SUBSTANCES. ANY BUSINESS NOT INCLUDED ON THIS LIST, WHICH HANDLES, USES OR DISPOSES OF HAZARDOUS SUBSTANCES MAY STILL REQUIRE HAZARDOUS MATERIALS DIVISION (HMO) REVIEW OF BUSINESS PLANS. FOR MORE INFORMATION CALL (858) 505-6880. LIST OF AIR POLLUTION CONTROL DISTRICT PERMIT CATEGORIES Businesses, which include any of the following operations or equipment, will require clearance from the Air Pollution Control District. CHEMICAL 47 -Organic Gas Sterilizers 32 -Acid Chemical Milling 33 -Can & Coil Manufacturing 44 -Evaporators, Dryers & Stills Processing Organic Materials 24 -Dry Chemical Mixing & Detergent Spray Towers 35 -Bulk Dry Chemicals Storage 55 -Chrome Electroplating Tanks COATINGS & ORGANIC SOLVENTS 27 -Coating & Painting 37 -Plasma Arc & Ceramic Deposition Spray Booths 38 -Paint, Stain & Ink Mfg 27 -Printing 27 -Polyester Resin/Fiberglass Operations METALS 18 -Metal Melting Devices 19 -Oil Quenching & Salt Baths 32 -Hot Dip Galvanizing 39 -Precious Metals Refining ORGANIC COMPOUND MARKETING (GASOLINE, ETC) 25 -Gasoline & Alcohol Bulk Plants & Terminals 25 -Intermediate Refuelers 26 -Gasoline & Alcohol Fuel Dispensing COMBUSTION 34 -Piston Internal -Combustion Engines 13 -Boilers & Heaters (1 million BTU/hr or larger) 14-Incinerators & Crematories 15 -Burn Out Ovens 16 -Core Ovens 20 -Gas Turbines, and Turbine Test Cells & Stands 48 -Landfill and/or Digester Gas Flares ELECTRONICS 29 -Automated Soldering 42 -Electronic Component Mfg FOOD 12 -Fish Canneries 12 -Smoke Houses 50 -Coffee Roasters 35 -Bulk Flour & Powered Sugar Storage SOLVENT USE 28 -Vapor & Cold Degreasing 30 -Solvent & Extract Driers 31 -Dry Cleaning ROCK AND MINERAL 04 -Hot Asphalt Batch Plants 05 -Rock Drills 06 -Screening Operations 07 -Sand Rock & Aggregate Plants 08 -Concrete Batch, CTB, Concrete Mixers, Mixers & Silos 1 0 -Brick Manufacturing OTHER 01 -Abrasive Blasting Equipment 03 -Asphalt Roofing Kettles & Tankers 46 -Reverse Osmosis Membrane Mfg 51 -Aqueous Waste Neutralization 11 -Tire Buffers 17 -Brake Debonders 23 -Bulk Grain & Dry Chemical Transfer & Storage 45 -Rubber Mixers 21 -Waste Disposal & Reclamation Units 36 -Grinding Booths & Rooms 40 -Asphalt Pavement Heaters 43 -Ceramic Slip Casting 41 -Perlite Processing 40 -Cooling Towers -Registration Only 91 -Fumigation Operations 56 -WWTP (1 million gal/day or larger) & Pump Station NOTE: OTHER EQUIPMENT NOT LISTED HERE THAT IS CAPABLE OF EMITTING AIR CONTAMINANTS MAY REQUIRE AN AIR POLLUTION CONTROL DISTRICT PERMIT. IF THERE ARE ANY QUESTIONS, CONTACT THE AIR POLLUTION CONTROL DISTRICT AT (858) 586-2600. HM-9171 (08/15) County of San Diego -DEH -Hazardous Materials Division Development Services Planning Division 1635 Faraday Avenue (442) 339-2610 www.carlsbadca.gov PURPOSE CLIMATE ACTION PLAN CONSISTENCY CHECKLIST P-30 REC {l.UG O 5 ?.022 (City of Carlsbad I kl.SBAD In September 2015, the Ct C s?a.d a1q11>te'sila tlimate Action Plan (CAP) that outlines actions that the city will undertake to • dfuiev ft ' J51oportional share of state greenhouse gas (GHG) em issions reductions. This checklist contains measures that are required to be implemented on a project-by-project basis to ensure that the specified emissions targets identified in the Climate Action Plan {CAP) are achieved. Implementation of these measures will ensure that new development is consistent with the CAP's assumption for relevant CAP strategies toward achieving the identified greenhouse gas (GHG) reduction targets. In this manner, a project's incremental contribution to a cumulative GHG emissions effect may be determined not to be cumulatively considerable if it complies with the requirements of the CAP, in accordance with CEQA Guidelines Sections 15064(h)(3), 15130{d), and 15183(b).* *City staff are currently not assessing the greenhouse gas impacts of California Environmental Quality Act projects by using the Climate Action Plan as a qualified GHG reduction plan under CEQA sect ... n 15183.S(b). Please consult with the Planning Department for further guidance. Additional informatio may be found on the Climate Action Plan Update and Vehicle Miles Traveled calculations staff report. This checklist is intended to assist project applicants in identifying CAP ordinance requirements air- demonstrate how their project fulfills those requirements. This checklist is to be completed and includ ..... in applications for new development projects that require discretionary review. The specific applica o requirements outlined in the checklist shall be required as conditions of project approval for C compliant projects with streamlined GHG emissions assessments. This checklist (i.e. Form P-30) is complementary to the checklist provided in Form B-50, which is specific to building permits and required for building permit applications. APPLICATION SUBMITTAL REQUIREMENTS • The completed check list must be included in the project submittal package or building permit application. Application submittal procedures can be found on the City of Carlsbad website. This checklist is designed to assist the applicant in identifying the minimum CAP-related requ irements specific to their project. However, it may be necessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate full compliance with CAP requirements. For example, projects that propose or require a performance approach to comply with energy-related measures will need to attach to this checklist separate calculations and documentation as specified by the ordinances. • If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance, an explanation must be provided to the satisfaction of the Planning Division or building official. • The requirements in the checklist will be included in the project's conditions of approval or issuance of building permit. • Details on CAP ordinance requirements are available on the city's website. Revised 6/22 City of Carlsbad Climate Action Plan Consistency Checklist STEP 1: LAND USE CONSISTENCY The first step in determining CAP consistency for discretionary development is to assess the project's consistency with the growth projections used in the development of the CAP. This section allows the city to determine a project's consistency with the land use assumptions used in the CAP . Projects found not to be consistent with the CAP's land use assumptions and that are projected to emit at or above the CAP screening threshold of 900 metric tons of CO2 equivalent (MTCO2e) GHG will be subject to a project-specific analysis of GHG emissions' impact on the environment in accordance with the requirements of the California Environmental Quality Act (CEQA). This may result in GHG-reducing mitigation measures applied as a condition of project approval in addition to compliance with the CAP ordinance requirements identified in Step 2 of this checklist. (Check the appropriate box and provide an explanation and supporting documentation for your answer) A. Is the proposed project consistent with the existing General Plan land use and specific/master plan or zoning designations? OR, If the proposed project is not consistent with the existing land use plan and zoning designations, does the project include a land use plan and/or specific plan, master plan or zoning designation amendment that would result in an equivalent or less GHG-intensive project when compared to the existing designations? Yes No □ If "Yes", proceed to Step 2 of the checklist. For the second option under Question A above, provide estimated project-related GHG emissions under both existing and proposed designation(s) for comparison. GHG emissions must be estimated in accordance with the City of carlsbad Guidance to Demonstrating Consistency with the Climate Action Plan. If "No", proceed to Question B. B. The CAP established a screening threshold of 900 MTC02e/year for new development projects to assist in determining consistency with the CAP. The types and sizes of typical projects listed below have been determined to correspond to the CAP screening threshold. Will the proposed land use change result in the construction of less than any one of the following? • Single-Family Housing: SO dwelling units • Multi-Family Housing: 70 dwelling units • Office: 35,000 square feet • Retail Store: 11,000 square feet • Grocery Store: 6,300 square feet • Other: If the proposed project is not one of the above types, provide a project-specific GHG emissions analysis to determine whether it is below the 900 MTC02e/year screening threshold. If "Yes", proceed to Step 2 of the checklist. □ □ If "No", the project's GHG impact is potentially significant and must be analyzed in accordance with CEOA. Applicant must prepare a Self-developed GHG emissions reduction program in accordance with the City of carlsbad Guidance to Demonstrating Consistency with the Climate Action Plan to demonstrate how it would offset the increase in emissions over the existing designations. The project must incorporate each of the applicable measures identified in Step 2 to mitigate cumulative GHG emissions impacts unless the decision maker finds that a measure is infeasible in accordance with california Environmental Quality Act Guidelines Section 15091. Mitigation in lieu of or in addition to the measures in Step 2 may be required, depending on the results of the project-specific GHG impact analysis. Proceed and complete a project-specific Self-developed GHG emissions reduction program and Step 2 of the Checklist. P-30 Page 2 of 7 Revised 06/22 City of Carlsbad Climate Action Plan Consistency Checklist STEP 2: CAP ORDINANCE COMPLIANCE REQUIREMENTS Completion of this checklist will document a project's compliance with CAP ordinances, and in turn, demonstrate consistency with the applicable measures and actions of the CAP. The compliance requirements in this Step 2 apply to development projects that require a building permit. All other development projects shall implement all emissions-related mitigation measures from the General Pl an Update EIR. Project No./Name: Marbrisa -Hilton Sales Building Tl Property Address/APN: 1594 Marbrisa Circle, Carlsbad, CA 92008. APN: 211 -1 30-02 / 211-130-05 Applicant Name/Co.: Grand Pacific Carlsbad, LP Applicant Address: 5900 Pacific Court, Suite 200, Carlsbad, CA 92008 Contact Phone : 760-431-8500 Contact Email: HArnold@gpresorts.com Contact information of person completing this checklist (if different than above): Name: Dan Talant Contact Phone: 858 -736-1508 Company name/address: NOAA Group Architects 4990 North Harbor Drive, Suite 201 Contact Email: office@noaainc.com San Diego, CA 92106 Use the table below to determine which sections of the Ordinance Compliance checklist are applicable to your project. If your project includes alterations or additions to an existing building, please contact the Carlsbad Building Division for assistance in estimating building permit valuation, by phone at 760-602-2719 or by email at building@carlsbadca.gov. □ Alterations: □ BPV < $60,000 □ BPV 2: $60,000 □ Electrical service panel upgrade □ BPV 2: $200,000 D New construction IX! Alterations: P-30 N/A lA and 4A 4A lA and 4A Page 3 of 7 All residential alterations 1-2 family dwellings and townhouses with attached garages only Multi-family dwellings only where interior finishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed Revised 06/22 City of Carlsbad Climate Action Plan Consistency Checklist IX! BPV::?: $200,000 or additions::?: 18,5 1,000 square feet D BPV::?: $1,000,000 1B, 2B and 5 Building alterations of::?: 75% existing gross floor area D ::?: 2,000 sq. ft. new roof addition 2B and 5 1B also applies if BPV::?: $200,000 Please refer to Carlsbad Ordinance No. CS-347 and the california Green Building Standards Code (CALGreen) for more information when completing this section. A. D Residential addition or alteration.!: $60,000 building permit valuation. See Ord. CS-347, Section 8. Year Built Single-family Requirements □ Before 1978 Select one: □ Duct sealing □ Attic insulation □ Cool roof □ 1978 and later Select one: D Lighting package □ Water heating package □ Between 1978 and 1990 □ 1991 and later B. [RI Nonresidential* new construction or alterations.!: $200,000 building permit valuation, or additions .!: 1,000 square feet. See CALGreen Appendix AS, Discussion AS.2, as amended in CS-347, Section 3. AS.203.1.1.1 □ Outdoor lighting: .90 Allowed Outdoor Lighting Power AS.203.1.1.2 □ Restaurant service water heating (comply with california Energy Code Section 140.5, as amended) AS.203.1.2.1 Choose one as applicable: D .95 Energy budget ll!l .90 Energy budget AS.211.1.** □ On-site renewable energy AS.211.3** D Green power (if offered by local utility provider, 50% minimum renewable sources) AS.212.1 □ Elevators and escalators AS.213.1 □ Steel framing P-30 Page 4 of 7 □ N/A _________ _ □ Exception: Home energy score .!: 7 (attach certification) Multi-family Requirements □ Attic insulation Select one: □ Attic insulation □ Duct Sealing □ Cool roof Select one: □ Lighting package D Water heating package 0 N/A ________ _ No new Outdoor Lighting ll!l N/A proposed in application. No Restaurant proposed in !RI N/A application. □ N/A BPV < $1 ,000,000 and affecting ll!l N/A < 75% existing gross floor are~. BPV < $1 ,000,000 and affecting ll!l N/A <75% existing gross floor area. No work proposed to existing ll!l N/A Elevators in application. Revised 06/22 City of Carlsbad Climate Action Plan Cons istency Checklist • Includes hotels/motels and high-rise residential buildings ~ N/A No work proposed to existing Steel framing in application. •• For alterations~ $1,000,000 BPV and affecting> 75% existing gross floor area, or alterations that add 2,000 square feet of new roof addition: comply with California Energy Code section 120.10 instead. A., D Residential new construction (for building permit applications submitted after 1/1/20). Refer to 2019 California Energy Code section 150.l(c) 14 for requirements. Note: if project includes installation of an electric heat pump water heater pursuant to Carlsbad ordinance CS-348, increase system size by .3kWdc if PV offset option is selected. Floor Plan ID (use additional CFA #d.u. Calculated kWdc* sheets if necessary) Total System Size: kWdc = (CFAx.572) / 1,000 t (1.15 x #d.u.) *Formula calculation where CFA = conditional floor area, #du = number of dwellings per plan type If proposed system size is less than calculated size, please explain. Exception □ □ □ □ kWdc B. D Nonresidential new construction or alterations ~$1,000,000 BPV and affecting ~75% existing floor area, or addition that increases roof area by ~2,000 square feet. Please refer to Carlsbad Ordinance CS-347, Section 6 when completing this section. Choose on e of the following methods: □ Gross Floor Area (GFA) Method GFA: □ If< 10,000s.f. Enter: 5 kWdc Min. System Size: ___ kWdc □ If~ 10,000s.f. calculate: 15 kW de x (GFA/10,000) ** **Round building size factor to nearest tenth, and round system size to nearest whole number. □ Time-Dependent Valuation Method Annual TDV Energy use:*** x .80= Min. system size: ____ kWdc ***Attach calculation documentation using modeling software approved by the Californ ia Energy Commission. P-30 Page 5 of 7 Revised 06/22 City of Carlsbad Climate Action Plan Consistency Checklist A. 0 Residential and hotel/motel new construction Please refer to Carlsbad Ordinance CS-347 and CS-348 when completing this section. □ For systems serving individual dwelling units choose one: □ Heat pump water heater AND compact hot water distribution AND drain water heat recovery (low-rise residential only) D Heat pump water heater AND PV system .3 kWdc larger than required in CA Energy Code Section 120.10 (for high rise residential hotel/motel) or 150.l(c) 14 (for low-rise residential) □ Heat pump water heater meeting Tier 3 or higher NEEA Advanced Water Heating Specification □ Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors □ Exception: □ For systems serving multiple dwelling units, install a central water-heating system with all of the following: □ Gas or propane water heating system □ Recirculation system per CS-347 (high-rise residential, hotel/motel) or CS-348 (low-rise residential) □ Solar water heating system that is either: □ .20 solar savings fraction D .15 solar savings fraction, plus drain water heat recovery □ Exception: B. 0 Nonresidential new construction Please refer to Carlsbad Ordinance CS-347 when completing this section. □ Water heating system derives at least 40% of its energy from one of the following (attach documentation): D Solar-thermal □ Photovoltaics □ Recovered energy □ Water heating system is (choose one): □ Heat pump water heater □ Electric resistance water heater(s) D Solar water heating system with .40 solar savings fraction □ Exception: A. 0 Residential New construction and major alterations• Please refer to Carlsbad Ordinance CS-349 when completing this section. D One and two-family residential dwelling or townhouse with attached garage: □ One EVSE ready parking space required □ Exception : □ Multi-family residential: □ Exception • Total Parking Spaces EVSE Spaces Proposed Capable I Ready I I I Calculations: Total EVSE spaces= .10 x Total parking (rounded up to nearest whole number) EVSE Installed= Total EVSE Spaces x .SO (rounded up to nearest whole number) EVSE other= Total EVSE spaces-EVSE Installed (EVSE other may be "Capable," "Ready" or "Installed.") Installed I I Total P-30 Page 6 of 7 Revised 06/22 City of Carlsbad Climate Action Plan Consistency Checklist •Major alterations are: (1) for one and two-family dwellings and townhouses with attached garages, alterations have a building permit valuation 2: $60,000 or include an electrical service panel upgrade; (2) for multifamily dwellings (three units or more without attached garages!, alterations have a building permit valuation 2: $200,000, interior finishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed. B O Nonresidential new construction (includes hotels/motels) □ Exception • Total Parking Spaces EVSE Spaces Proposed Capable Ready Calculation: Refer to the table below: Total Number of Parking Spaces provided Number of required EV Spaces □ 0-9 □ 10-25 □ 26-50 □ 51-75 □ 76-100 □ 101-150 □ 151-200 □ 201 and over Use 1 2 4 6 9 12 17 10 percent of total and gross floor area (GFA) allocated to each use. elected from the City of Carlsbad Employee ADTTable. GFA Employee ADT /1,000 S.F. If total employee ADT is greater than or equal to 110 employee ADT, a TOM plan is requI Installed Total Number of required EVSE Installed Spaces 1 1 2 3 5 6 9 50 percent of Required EV Spaces Total Employee ADT Total L_----======- •NOTE: Notwithstanding the 110 employee AOT threshold above, General Plan Mobility Element Policy 3-P.11 requ ew development that adds vehicle traffic to vehicle LOS-exempt street facilities to implement TOM and transportation system management strategies. Please consult wI • of Carlsbad Land Development Engineering (LOE) staff to determine whether this policy applies to your project. TOM plan required: Yes □ No □ LOE Staff Verification : □ _____ (staff initials) Transportation Demand Management (TOM) was approved with overall Master Plan for campus. No changes proposed, TOM n/a to permit application. P-30 Page 7 of 7 Revised 06/22 { Cicyof Carlsbad PURPOSE CLIMATE ACTION PLAN CONSISTENCY CHECKLIST B-50 Development Services Building Division 1635 Faraday Avenue 442-339-2719 www.carlsbadca.gov This checklist is intended to help building permit applicants identify which Climate Action Plan (CAP) ordinance requirements apply to their project. This completed checklist (B-50) and summary (B-55) must be included with the building permit application. The Carlsbad Municipal Code (CMC) can be referenced during completion of this document by clicking on the provided links to each municipal code section. NOTE: The following type of pennits are not required to fill out this form ❖ Patio I ❖ Decks I ❖ PME (w/o panel upgrade) I ❖ Pool Consultation with a certified Energy Consultant is encouraged to assist in filling out this document. Appropriate certification includes, but is not limited to: Licensed, practicing Architect, Engineer, or Contractor familiar with Energy compliance, IECC/HERS Compliance Specialist, ICC G8 Energy Code Specialist, RESNET HERS rater certified, certified ICC Residential Energy Inspector/Plans Examiner, ICC Commercial Energy Inspector and/or Plans Examiner, ICC CALgreen Inspector/Plans Examiner, or Green Building Residential Plan Examiner. If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance, check N/A and provide an explanation or code section describing the exception. Details on CAP ordinance requirements are available at each section by clicking on the municipal code link provided. The project plans must show all details as stated in the applicable Carlsbad Municipal Code (CMC) and/or Energy Code and Green Code sections. Project Name/Building Permit No.: Property Address/APN : Applicant Name/Co.: Applicant Address: Contact Phone: Tl Hilton Grand Vacation Club 5d BP No.: CBC2022-0277 1594 Marbrisa Circle, Carlsbad, CA 92008 Dan Talant / NOAA Group 4990 N Harbor Dr. Unit 201, San Diego, CA 92106 619-297-8066 Contact Email: dant@noaainc.com Contact information of person completing this checklist (if different than above): Name: Company name/address: Contact Phone: 619-297-8066 Contact Email: nt C/;;f.;t Applicant Signature: _______________ Date: 9.27.22 B-50 Page 1 of 7 Revised 04/21 Use the table below to determine which sections of the Ordinance checklist are applicable to your project. For alterations and additions to existing buildings, attach a Permit Valuation breakdown on a separate sheet. Building Permit Valuation (BPV) $ breakdown _2_2_5,._0_0_0 ____ _ 0 Residential D New construction D Additions and alterations: D BPV < $60,000 D BPV.:: $60,000 D Electrical service panel upgrade only D BPV.:: $200,000 [i] Nonresidential D New construction D Alterations: ~ BPV.:: $200,000 or additions .::: 1,000 square feet D BPV.:: $1,000,000 D .:: 2,000 sq. ft. new roof addition 1. Energy Efficiency A high-rise residential building is 4 or more stories, including a Low-rise High-rise mixed-use building in which at least 20% of its conditioned floor area is residential use 2A*, 3A*, 1B, 2B, *Includes detached, newly constructed ADU 4A*, 3B, 4A N/A N/A All residential additions and alterations 1A, 4A 4A 1-2 family dwellings and townhouses with attached garages only. *Multi-family dwellings only where interior finishes are removed 1A, 4A* 1B, 4A* and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed 1 B, 2B, 3B, 4B and 5 1B, 5 1B, 2B, 5 Building alterations of.:: 75% existing gross floor area 2B, 5 1 B also applies if BPV.::: $200,000 Please refer to Cartsbad Municipal Code (CMC) 18.21 .155 and 18.30.190,and the California Green Building Standards Code (CAL Green) for more information. Appropriate details and notes must be placed on the plans according to selections chosen in the design. A O Residentialadditionoralteration:l:$60,000buildingpennitvaluation. D N/A _________ _ Details of selection chosen below must be placed on the plans referencing CMC □ Exception: Home energy score .:: 7 18.30.190. (attach certification) Year Built Single-family Requirements Multi-family Requirements D Before 1978 Select one option: D Ductsealing D Attic insulation □ Cool roof D Attic insulation D 1978 and later Select one option: D Lighting package D Water heating Package D Between1978and1991 Select one option: D Ductsealing □ Attic insulation □Cool roof D 1992 and later Select one option: D Lighting package D Water heating package Updated 4/ I 6/2021 3 8. [j] Nonresidential* new construction or alterations 2: $200,000 building pennit valuation, or additions 2: 1,000 square feet. See CMC 18.21.155 and CAL Green Appendix AS □ N/A AS.203.1.1 Choose one: D .1 Outdoor lighting D .2 Restaurant service water heating ( CE C 140. 5) □ .3Warehousedocksealdoors. D .4DaylightdesignPAFs D .5Exhaustairheatrecovery II N/A AS.203.1.2.1 Choose one: D .95 Energy budget (Projects with indoor lighting OR mechanical) II .90 Energybudget (ProjectswithindoorlightingANDmechanical) □ N/A AS.211 .1 .. D On-site renewable energy: □ N/A AS.211.3** □Green power: (If offered by local utility provider, 50% minimum renewable sources) □ N/A AS.212.1 D Elevators and escalators: (Project with more than one elevator or two escalators) □ N/A AS.213.1 D Steel framing: (Provide details on plans for options 1-4 chosen) D N/A _______ _ * Includes hotels/motels and high-rise residential buildings ** Foralterations~ $1 ,000,000 BPV and affecting> 75% existing grossfloorarea, OR alterationsthatadd 2,000 square feet of newroofaddition: comply with CMC 18.30.130 (section 2B below) instead. 2. Photovoltaic Systems A. D Residential new construction (for low-rise residential building permit applications submitted after 1/1/20). Refer to 2019 California Energy Code section 150.1 (c)14 for requirements. If project includes installation of an electric heat pump water heater pursuant to CAP section 38 below (low-rise residential Water Heating), increase system size by .3kWdc if PV offset option is selected. Floor Plan ID (use additional CFA #d.u. Calculated kWdc* sheets if necessary) Total System Size: kWdc = (CFAx.572) / 1,000 + (1 .15 x #d.u.) *Formula calculation where CFA = conditional floor area, #du= number of dwellings per plan type If proposed system size is less than calculated size, please explain. kWdc Exception D □ □ □ 8. D Nonresidential new construction or alterations 2:$1,000,000 8PV AND affecting 2:75% existing floor area, OR addition that increases roof area by ~.ooo square feel Please refer to CMC 18.30.130 when completing this section. *Note: This section also applies to high-rise residential and hotel/motel buildings. Choose one of the following methods: D Gross Floor Area (GFA)Method GFA: D If< 10,000s.f. Enter: 5 kWdc Min. System Size: D If~ 1 O,OOOs.f. calculate: 15 kWdc x (GFN10,000) ** kWdc **Round building size factor to nearest tenth, and round system size to nearest whole number. Updated 4/16/2021 4 D Time-Dependent Valuation Method Annual TDVEnergyuse:*** ______ x .80= Min. system size: ______ kWdc ***Attach calculation documentation using modeling software approved by the California Energy Commission. 3. Water Heating A. D Residential and hotel/motel new construction. Refer to CMC 18.30.170 when completing this section. Provide complete details on the plans. □ For systems serving individual dwelling units choose one system : □ Heat pump water heater AND Compact hot water distribution AND Drain water heat recovery (low-rise residential only) □ Heat pump water heater AND PV system .3 kWdc larger than required in CMC 18.30.130 (high rise residential hotel/motel) or CA Energy Code section 150.1 (c) 14 (low-rise residential) □ Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher □ Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors □ Exception: □ For systems serving multiple dwelling units, install a central water-heating system with ALL of the following: □ Gas or propane water heating system □ Recirculation system per CMC 18.30.150(8) (high-rise residential, hotel/motel) or CMC 18.30.170(8) (low- rise residential) □ Solar water heating system that is either: □ .20 solar savings fraction □ .15 solar savings fraction, plus drain water heat recovery □ Exception: B. D Nonresidential new construction. Refer to CMC 18.30.150 when completing this section. Provide complete details on the plans. □ Water heating system derives at least 40% of its energy from one of the following (attach documentation): □ Solar-thermal □ Photovoltaics □ Recovered energy □ Water heating system is (choose one): □ Heat pump water heater □ Electric resistance water heater(s) □Solar water heating system with .40 solar savings fraction □ Exception: It may be necessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate full compliance with CAP ordinance requirements. For example, projects that propose or require a performance approach to comply with energy-related measures will need to attach to this checklist separate calculations and documentation as specified by the ordinances. Updated 4/16/21 5 4. Electric Vehicle Charging A. D Residential New construction and major alterations* Please refer to CMC 18.21.140 when completing this section. □ One and two-family residential dwelling or townhouse with attached garage: □ One EVSE Ready parking space required □ Exception : _____________ _ □ Multi-familyresidential· □ Exception • Total Parking Spaces EVSE Spaces Proposed EVSE (10% of total) Installed (50% of EVSE) Other "Ready" Other "Capable" Calculations: Total EVSE spaces= .10 x Total parking spaces proposed (rounded up to nearest whole number) EVSE Installed = Total EVSE Spaces x .50 (rounded up to nearest whole number) EVSE other may be "Ready" or "Capable" *Majoralterations are: ( 1 )for one and two-family dwellings and townhouses with attached garages, alterations have a building permit valuation~ $60,000 or include an electrical service panel upgrade; (2) for multifamily dwellings (three units or more without attached garages), alterations have a building permit valuation~ $200,000, interiorfinishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed. *ADU exceptions for EV Ready space (no EV ready space required when): (1) The accessory dwelling unit is located within one-half mile of public transit. (2) The accessory dwelling unit is located within an architecturally and historically significant historic district. (3) The accessory dwelling unit is part of the proposed or existing primary residence or an accessory structure. (4) When on-street parking permits are required but not offered to the occupant of the accessory dwelling unit. (5) When there is a car share vehicle located within one block of the accessory dwelling unit. B. D Nonresidential new construction (includes hotels/motels) D Exception : ____________ _ Please refer to CMC 18.21.150 when completing this section Total Parking Spaces Proposed EVSE (10% of total) I Installed (50% of EVSE) I Other "Ready" I Other "Capable" I I I Calculation: Refer to the table below: Total Number of Parking Spaces provided Number of required EV Spaces Number of required EVSE Installed Spaces D 0-9 1 1 □ 10-25 2 1 D 26-50 4 2 □ 51-75 6 3 □ 76-100 9 5 D 101-150 12 6 D 151-200 17 9 □ 201 andover 1 0 percent of total 50 percent of Required EV Spaces Calculations: Total EVSE spaces= .10 x Total parking spaces proposed (rounded up to nearestwholenumber) EVSE Installed = Total EVSE Spaces x .50 (rounded up to nearest whole number) EVSE other may be "Ready" or "Capable" Updated 4/1 6/2021 6 5. Ii] Transportation Demand Management (TOM): Nonresidential ONLY An approved Transportation Demand Management (TOM) Plan is required for all nonresidential projects that meet a threshold of employee-generated ADT. City staff will use the table below based on your submitted plans to determinewhetherornoryourpermit requires a TOM plan. lfTOM is applicable to your permit, staff will contact the applicant to develop a site-specific TOM plan based on the permit details. Acknowledgment: Employee ADT Estimation for Various Commercial Uses Use EmpADTfor first 1,000 s.f. EmpADTI 1000 s.f.1 Office (all)2 20 Restaurant 11 Retaih 8 Industrial 4 Manufacturing 4 Warehousing 4 1 Unless otherwise noted, rates estimated from /TE Trip Generation Manual, 1 ()lh Edition 13 11 4.5 3.5 3 1 2 For all office uses, use SANDAG rate of 20 ADT/1,000 sf to calculate employee ADT 3 Retail uses include shopping center, variety store, supermarket, gyms, pharmacy, etc. Other commercial uses may be subject to special consideration sample c1IGYl1tl0os; Office: 20,450 sf 1. 20,450 sf/ 1000 x 20 = 409 Employee ADT Retail: 9,334 sf 1. First 1,000 sf= 8 ADT 2. 9,334 sf -1,000 sf= 8,334 sf 3. (8 ,334 sf/ 1,000 x 4.5) + 8 = 46 Employee ADT I acknowledge that the plans submitted may be subject to the City of Carlsbad's Transportation Demand Management Ordinance. I agree to be contacted should my permit require a TOM plan and understand that an approved TOM plan is a condition of permit issuance. ApplicantSignature: _____ ~ ___ C_~----------Date: 9.27.22 Person other than Applicant to be contacted for TDM compliance (if applicable): Name(Pnnted):_o_a_n_T_a_la_n_t _______________ _ 619-297 -B'066 Phone Number: _____ _ E .1 Add dant@noaainc.com ma1 ress: ___________________ _ Updated 4/16/2021 7 ( City of Carlsbad CLIMATE ACTION PLAN (CAP) COMPLIANCE CAP Building Plan Template B-55 Development Services Building Division 1635 Faraday Avenue 442-339-2719 www.carlsbadca.gov The following summarizes project compliance with the applicable Climate Action Plan ordinances of the Carlsbad Municipal Code and California Green Building Standards Code (CALGreen), current version. Use this form to summarize all applicable CAP measures for your iiiiliia IF CAP MEASURES ARE APPLICABLE, IMPRINT THIS COMPLETED FORM ONTO PROJECT PLANS. 1. ENERGY EFFICIENCY APPLICABLE: □YES □ NO Complies with CMC 18.30.190 & 18.21.155 0Yes ON/A Existing Structure, year built: ____ _ Prepared Energy Audit? 0Yes D No Energy Score: _____ _ Efficiency Measures included in scope: 2. PHOTOVOLTAIC SYSTEM APPLICABLE: DYES D NO Complies with CMC section 18.30.130 and 2019 California Energy Code section 150.l(c}l4 D Yes D N/A Required Provided Size of PV system (kWdc): Sizing PV by load calculations D Yes D No If by Load Calculations: Total calculated electrical load: 80% of load: Hardship Requested Hardship Approved 0Yes 0No □Yes ONo 3. ALTERNATIVE WATER HEATING SYSTEM APPLICABLE: □ YES □NO 4. Complies with CMC sections 18.30.150 and 18.30.1707 Alternative Source: □ Electric □ Passive Solar Hardship Requested Hardship Approved Oves ON/A OYes □Yes □No □No ELECTRIC VEHICLE {EV) CHARGING APPLICABLE: □ YES □NO Complies with CMC section 18.21.140? Panel Upgrade? Total EV Parking Spaces: No. of EV Capable Spaces: No. of EV Ready Spaces: No. of EV Installed Spaces: Hardship Requested Hardship Approved Oves ON/A 0Yes 0No Required Provided 5. TRAFFIC DEMAND MANAGEMENT APPLICABLE: □ YES □ NO Compliant? 0Yes ONo TDM Report on file with city? D Yes D No