Loading...
HomeMy WebLinkAbout2703 WATERBURY WAY; ; CBR2024-1578; Recycle( City of Carlsbad CONSTRUCTION WASTE MANAGEMENT PLAN B-59 Development_Services Building Division 1635 Faraday Avenue 442-339-2719 www.carlsbadca.gov APPLICABLE TO NEW CONSTRUCTION, ALL RESIDENTIAL ADDITIONS AND ALTERATIONS AND COMMERCIAL ADD ITIONS AND ALTERATIONS OVER $200K . If you have questions about the recycling requirement or completing this form, please contact Republic Services at (760) 332-6464 a certified C&D recycler, or the Ca rlsbad Building Division at (442) 339-2700. Please note: Unless you are se lf-hauling, Republic Services or approved haulers must be used for all construction projects within the City of Carlsbad. PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued without a completed Construction Waste Management Plan. Applicant Information Permit No. ____________ Project Title Neves Addition Project Address 2703 Waterbury Way Carlsbad CA 92010 APN 167-441-1300 Applicant Name _o_w_e_n_n_G_e_i_s ___________ _ Other I ✓ I Designer Last First Applicant Address 339 Durian St. Vista CA 92083 Phone ( 714 ) 402-6241 E-mail Address owenngeisdesigns@gmail.com Applicant Mailing Address (if different than project address) Project Type (check all that apply): Residential [Z] Commercial □ Public Building □ Brief Description A_dd_i_tio_n ________________________________ _ Project Size 2A08 SF Estimated Cost of Project $_$_8_7_,_0_0_0 ____________ _ (square f ootage) Please check the appropriate box: □ [{] I plan on using REPUBLIC SERVICES roll-off bin(s) for all materials and will provide all receipts after construction. I plan on using a City Approved Hauler and will provide all receipts after construction. □ This is a proposed LEED certified project and I plan on separating materials on site in conjunction w ith Republic Acknowledgement: I certify under penalty of perjury under the laws of the Stat e of California that the information provided in and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to t he best of my knowledge and belief. Print Name Owenn Geis Signature ___ O_WUIA'v ___ ~_e.t,y_· _____ Date 06/08/2024 Page 1 of 3 Rev. 05122 CBR2024-1578 f PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will (cont'd) not be issued without a completed Construction Waste Management Plan. DEBRIS RECYCLING ESTIMATE: SECTION A Permit No. ____________ Project Title Neves Addition P • t Add 2703 Waterbury Way Carlsbad CA 92010 APN roJec ress _________________________ __ 167 -441-1300 Applicant Name Geis Owenn Phone (714 )402 6241 Last First SECTION B Complete the following table with estimated waste tonnage to be generated by your project. This is your plan for construction waste management. Changes can be made on the final recycle report. Goal: the diversion rate shall be 65% by weights of debris. Material Type Complete this line of the table only if only using WASTE MANAGEMENT rail-off bins. Mixed C&D Debris Asp ha It & Concrete Brick/ Masonry/ Tile Mixed Inert Debris K:abinets, Doors, Fixtures. I Windows (circle all t hat apply) Carpet Carpet Padding/ Foam Cardboard Ceiling Tile (acoust ic) Drywall (used, new, scrap) Landscape Debris (brush, trees, stumps, etc.) No dirt. Unpainted Wood & Pallets Roofing Materials Scrap Metal Stucco Other: TOTAL SECTION C .1 .4 2 .5 Estimated Waste Quantity (tons) 3 To meet 65% Diversion Requirement (estimate) 3 A B C Place a (0) check next to items to be reused or salvaged □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ Place a (0) check next Place a (0) check next to items to be to items to be recycled disposed at landfill □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ 2.1 .9 x 0.65 = 1-95 tons ------------------- Total Estimated Waste f rom above Minimum Required Diversion Contractor/Owner Signature. ___ __,,O::;__..,.~..:...._;;;_ ____ q..=..a._Uy=--=-•.&....-Date 6/8/24 Page 2 of4 Rev. 05122