Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2730 ARGONAUTA ST; ; CBR2024-1326; Recycle
{"Cityof Carlsbad CONSTRUCTION WASTE MANAGEMENT PLAN B-59 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov APPLICABLE TO NEW CONS RUCTION, RESIDENTIAL ADDITIONS AND ALTERATIONS OVER $6OK VALUATION AND COMMERCIAL ADDITIONS AND ALTERATIONS OVER $200K. You are required to list materials that will be reused, recycled or disposed from your project. If you have questions about the recycling requirement or completing this form, please contact Republic Services at (760) 332-6464, a certified C&D recycler, or the Carlsbad Building Division at (442) 339-2719 Please note: Unless ou are self-haulin Re ublic Services or a roved haulers must be used for all construction ro·ects within the Cit of Carlsbad . PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued Applicant Information Permit No. __ C_B_R_2_0_24_-1_3_2_6 ___ Project Title· PADILLA'S BATHROOM REMODEL Project Address __ 2_7_3_0_A_R_G_O_N_A_U_T_A_S_T_. __________ APN 215-400-17 -00 Applicant Name _P_A_D_I_L_LA ____ R_U_D_Y ____ _ Owner ~ Other □ last First ApplicantAddress _2_73_0_A_R_G_O_N_A_U_T_A_S_T_._C_A_R_L_S_B_A_D_,_C_A_._9_2_0_0_9 _______ _ Phone 858 688-8013 E-mailAddress RUDY@LAVAPROPANE.COM Applicant Mailing Address (if different than project address) Project Type (check all that apply): Residential ~ Commercial □ Public Building □ Brief Description TO CONVERT A MASTER BATHROOM TO 2 BATHROOMS Project Size ___ 1 _S_2 ______ Estimated Cost of Project$ 20,000 · 00 (square footage) Please check the appropriate box: D I plan on using REPUBLIC SERVICES roll-off bin(s) for all materials and will provide all receipts after construction. D I plan on using a City Approved hauler and will provide all receipts at the final occupancy inspection. D This is a proposed LEED certified project. I plan on separating materials on site in conjunction with Republic. Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information provided in and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge and belief. RUDY PADILLA "'2:Jd~~. ~-,.l_,,1,1_ Print Name. _____________ Signature 1'~ r-"4UC4 Date 07/09/2024 Page 1 of 4 Rev. 2.10.21 PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will not be issued without a completed Construction Waste Management Plan. DEBRIS RECYCLING ESTIMATE: • ' Permit No . Project Title Project Address APN Applicant Name Phone Last First • . Complete the following table with estimated waste tonnage to be generated by your project . . This is your plan for construction waste management. Changes can be made on the final recycle report. Goal: the diversion rate shall be 65% by weights of debris. A B C Material Type Estimated Place a ( ✓) check Place a(✓) check next Place a ( ✓) check next Waste Quantity next to items to be to items to be to items to be (tons) reused or salvaged recycled disposed at landfill Complete this line of the table only if } ~ only using WASTE MANAGEMENT \ ~ roll-off bins. v Mixed C&D Debris \ Parking lot Asphalt & Concrete l"" \ I ~ ,,,--I'"' \ Brick/ Masonry/ Tile I "'\ I I ' I re)/;, Mixed Inert Debris \ " I I \ l _/ Cabinets, Doors, Fixtures, \ I /' Windows (circle all that apply) .-----\ , ((/ \i Carpet Carpet Padding/ Foam -c____,~ Cardboard ~ _) v Ceiling Tile (acoustic) " A, ( /~ Drywall (used, new, scrap) n~ Landscape Debris (brush, trees, ~ stumps, etc.) No dirt. Unpainted Wood & Pallets Concrete Roofing Materials Scrap Metal Stucco Other: TOTAL • To meet 65% Diversion Requirement (estimate) X 0.65 = tons Total Estimated Waste from above Minimum Required Diversion Contractor/Owner Signature ~"4 'i)adifta Date 07/09/2024 Page 2 of 4 Rev. 711120 C cityof Carlsbad CONSTRUCTION WASTE MANAGEMENT PLAN . B-59 part 2 City of Carlsbad MAR 1 7 2025 Development Services Building Division 1635 Faraday Avenue 422-339-2719 www.carlsbadca.gov Your project qualifies for the City of Carlsbad Construction Waste Management Plan (CWMP): Section 4.408.1 and Section 5.408.1 of the California Green Buildini3sJi~~~~Wd8ii\®N at least 65% of non-hazardous construction debris is recycled and/ or salvaged for reuse. NEXT STEPS: REcor~o STEP 1. Before the project -OPY a. Review your CWMP completed prior to permit issuance. (copy is attached to your job card) This plan demonstrates how you will recycle a minimum of 65% of the construction waste generated from your project by choosing: Republic Services or Self Haul. STEP 2 -During the Project a. Save all receipts and/or documents from reuse facilities, recycling centers, processing facilities, and landfills where materials were taken. b. Complete the Debris Recycling Report (ORR) on the next page as your project progresses. Recycling/d iversion goals are (at a minimum) 65% of the waste generated by your project STEP 3 -After the Project a. Prior to receiving inspection for final sign off the Building Permit or Certificate of Occupancy, Applicant must submit the fully completed and approved (ORR) of the Construction Waste Management Plan (CWMP) Table. b. Provide the ORR and receipts to your building inspector. FOR MORE INFORMATION: NOTICE: Applicant (contractor and subcontractors) shall comply with the project's CWMP. It is the Applicant's responsibility to collect all receipts from the facilities that recycle their materials AND all project waste/landfill disposal receipts. When working with the City's franchised hauler, Republic Services, one cumulative project receipt is acceptable. However, it is the Applicant's responsibility to confirm that the bins are collected for C&D Recycling. 1. This project shall generate the least amount of waste possible by planning and ordering carefully, following all proper storage and handling procedures to reduce broken and damaged materials, and reusing materials whenever possible. 2. Republic Services can provide 2 roll-off bins, one for commingled construction debris and one for trash. The commingled construction roll-off bin will be taken to a Certified Mixed C&D Processing Facility to sort the material and create receipt(s), to demonstrate the project has met a 65% diversion rate or greater. 3. Applicants with a goal of recycling greater than 65% of the project's total waste should work with the City's exclusive franchised waste hauler to develop a more specific CWMP. This plan may include using additional roll-off bins for particular phases of construction (e.g., concrete and wood waste) to ensure the highest waste diversion rate possible. 4. Contractors/subcontractors hauling their own waste as part of their scope of work (e.g., construction clean up companies, etc.) SHALL NOT be excluded from complying with the CWMP and shall provide weight and waste diversion receipts from a Certified Source Separated Recycling Facility. For a current list of Certified Recycling Facilities go to http://www.sa n di ego.gov/ environ me nta I-se rvi ces/ re eye Ii ng/ cd/i n dex. s htm I. 5. If contractors/subcontractors furnish their own debris boxes as part of their scope of work, they SHALL NOT be excluded from complying w ith the CWMP and shall provide weight and waste diversion receipts from a Certified Source Separated Recycling Facility. Rev. 05122 PART 2 Complete before final inspection, obtain City Approved hauler receipts and return prior to final building approval. DEBRIS RECYCLING REPORT (ACTUAL): -..,:::1-■11n., •. 1 Acknowledgement I certify under penalty of perjury under the laws of the State of California that the information provided in and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge and belief. Permit No. \ ~ 1..<o Print Name '\Z \.ib', t>~l)l\iv!L d-iio Mku~~,p .... :<-I D--U--Address ~.-Date l:r•lrlh'■:-Use this Final Log below to track loads of materials as they leave the job site. @©SAVE RECEIPTS ©© Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken. Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons. A B C Date Material Type Actual Amt Actual Amt Actual Amt Destination Facility Reused or Recycled Disposed in (Name, Address, Phone I Salvaged Landfill Examele: Palomar Transfer Station, 5960 El 01/01/2020 Concrete (broken) 5 tons Camino Real -/760) 603-0153 I . -J,b /?S Lu O t> -) / D Q1,v A '-'L. -z ... 1? 2.11-¢ \ 'OC/ , ®TOTAL I Diversion Rate Achieved c...,. 1.~ 10.,..l / '-1 .1..~ = ;?; 65% /Oo % :.65%□ Total of columns A + B Total of columns A+ B + C DIVERSION Contractor/Owner Signature'\2"P~ ~ Date ~ -}3 -J.r° - Attach the following documentation to this Report: Return completed form and documentation to: . Original recycling weight tickets, landfill weight tickets City of Carlsbad . Original donation receipts with photos and/or itemized descriptions Building Division (1st Floor) . Any other relevant information to support Recycling Report 1635 Faraday Avenue Carlsbad, CA 92008 Page 3 of 4 Rev. 04122 54 Ticket #: 2813682 PALOMAR TRANSFER 5960 EL CAMINO REAL CARLSBAD , CA 92008 (760)603-0153 RECORDC! March 03 , 2025 2 :09 pm 000999 -CASH AND CHECK CUSTOMER ADDRESS carlsbad, CA 92008 Contract : RESI -GATE Yr . 2 GROSS 16,840 Scale In TARE 12 ,600 Tare Out NET 4 ,240 Tracking Qty : 0 .00 Qty 2 .12 Unit Description TN MSW Origin: CARLSBAD 100% Signature : PALOMAR 1AA1 fER 51 A1l 5960 cl CAM11~O REAL e,r..RLSBAD. CA 92008 14'1019 CREDIT CARD Ca1d ;; OW Ca1d AID: SEQ ~: Batch ;;. lNV01CE 11pprn~al Code: Entr~ Method· Mode: VISA SALE XXXXXX't/.XXXX1976 CHASE VISA A0000000031010 59 61 60 CU51OMER COP~ 00~621 Contactle5S lssue1 Out : Vehicle: Ref : BOL : INBOUND CASH March 03 2025 2 :09 pm A119954 City of Carlsbad MAR 1 7 i:U25 BUILDING DIVISION Rate Extension $101.2] $214 .57 Tax $0 .00 Total $214.57 Total Paid Change .EDIT CARD-SCALE $214 .57 $214 .57 $0.00 V