Loading...
HomeMy WebLinkAbout2025-04-15; City Council; 02; Accepting Bids and Awarding a Contract to De La Fuente Construction, Inc. for the Beach Access Repair and Upgrades from Pine Avenue to Tamarack Avenue ProjectCA Review CKM Meeting Date: April 15, 2025 To: Mayor and City Council From: Geoff Patnoe, City Manager Staff Contact: Hossein Ajideh, Engineering Manager hossein.ajideh@carlsbadca.gov, 442-339-2756 Brandon Miles, Acting Senior Engineer brandon.miles@carlsbadca.gov, 442-339-2745 Subject: Accepting Bids and Awarding a Contract to De La Fuente Construction, Inc. for the Beach Access Repair and Upgrades from Pine Avenue to Tamarack Avenue Project District: 1 Recommended Actions Adopt a resolution accepting bids and awarding a contract to De La Fuente Construction, Inc. for the Beach Access Repair and Upgrades from Pine Avenue to Tamarack Avenue Project for an amount not to exceed $8,406,387.16. Executive Summary This project will replace the four upper seawall staircases along Carlsbad Boulevard and widen the sidewalk on the west side of Carlsbad Boulevard between Pine Avenue and Cherry Avenue. The sidewalks and stairways from the upper seawall to the lower seawall were built in the 1980s and are in urgent need of repair. In some places, concrete steps are crumbling, rusted rebar is exposed, the steel railings are corroded and the pillars holding up the upper sidewalk are deteriorating, with erosion along some of the foundations. Staff request that the City Council accept the bids and award the construction contract for the Beach Access Repair and Upgrades from Pine Avenue to Tamarack Avenue Project, Capital Improvement Program Project No. 3896, to De La Fuente Construction, Inc., the lowest responsive and responsible bidder, in an amount not to exceed $8,406,387.16. Carlsbad Municipal Code Sections 3.28.080(C) and 3.28.080(I)(6), which cover purchasing in construction contracts, require the City Council’s approval for all formally bid contracts when the value exceeds $220,000, as this project does. Explanation & Analysis The City Council approved the project’s plans, specifications and contract documents; and authorized advertising the project for construction bids on Nov. 19, 2024, with the adoption of April 15, 2025 Item #2 Page 1 of 6 Docusign Envelope ID: 52F3AFBC-B687-4BBB-BCE2-32E7B242EA13 Resolution No. 2024-254. The project was then advertised using the city’s formal bidding procedures. Staff received eight bids for construction of the project on Feb. 20, 2025. Staff reviewed the contract documents and found that De La Fuente Construction, Inc. was a responsible bidder, with the lowest responsive bid in an amount of $8,406,387.16. De La Fuente Construction, Inc. was found to be responsive because its bid met the requirements of the bidding documents and responsible because it submitted a list of similar projects to show its capability and qualification to perform the specified work. The construction contract contains general performance standards and references technical specifications, which if not met, allow the city to withhold payment. The contract also includes a one-year warranty period from notice of completion. Fiscal Analysis Sufficient funds have already been appropriated for the project in prior years from the Infrastructure Replacement and General Capital Construction funds. The available funds and estimated costs for the project are shown in the following table: Carlsbad Municipal Code sections 3.28.040(C)(5) and 3.28.090(B) authorize the City Manager or designee to approve change orders in an amount equal to the contingency set at the time of project award, which for this project is $1,681,300. Environmental Evaluation In keeping with the California Environmental Quality Act and the CEQA Guidelines, the Planning Commission approved a mitigated negative declaration (State Clearinghouse No. 2023050505), coastal development permit (CDP 2021-0011) and habitat management plan permit (HMP 2021-0003) for this project on July 19, 2023. Beach Access Repair and Upgrades from Pine Avenue to Tamarack Avenue Project Capital Improvement Program Project No. 3896 Total appropriation to date $13,511,750 Total expenditures and encumbrances to date -$1,966,959 Total available funding $11,544,791 Construction contract – De La Fuente Construction, Inc. (rounded) -$8,406,387 Construction contingency -$1,681,300 Construction management, inspection, material testing and support services (estimated) -$1,000,000 Total estimated construction costs -$11,087,687 Remaining balance $457,104 Additional appropriation needed $0 April 15, 2025 Item #2 Page 2 of 6 Docusign Envelope ID: 52F3AFBC-B687-4BBB-BCE2-32E7B242EA13 Next Steps Once the City Council accepts bids and awards the construction contract to De La Fuente Construction, Inc., staff will issue a purchase order, schedule a pre-construction meeting with De La Fuente Construction, Inc. and issue a notice to proceed for construction of the project. The construction contract for the project provides for 20 months, excluding the summer months between Memorial Day weekend and Labor Day weekend during which construction would be paused, to complete the project improvements. Construction is expected to begin in fall 2025 and be completed by late 2027. Exhibits 1. City Council resolution 2. Location map April 15, 2025 Item #2 Page 3 of 6 Docusign Envelope ID: 52F3AFBC-B687-4BBB-BCE2-32E7B242EA13 Exhibit 1 RESOLUTION NO. 2025-079 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ACCEPTING BIDS AND AWARDING A CONTRACT TO DE LA FUENTE CONSTRUCTION, INC. FOR THE BEACH ACCESS REPAIR AND UPGRADES FROM PINE AVENUE TO TAMARACK AVENUE PROJECT FOR AN AMOUNT NOT TO EXCEED $8,406,387.16 WHEREAS, the City Council of the City of Carlsbad, California, has determined it necessary, desirable and in the public interest to construct the Beach Access Repair and Upgrades from Pine Avenue to Tamarack Avenue Project, Capital Improvement Program, or CIP, Project No. 3896, or Project; and WHEREAS, Carlsbad Municipal Code, or CMC, Sections 3.28.080(C) and 3.28.080(I)(6), which govern purchasing in construction contracts, require the City Council to award all formally bid contracts when the value exceeds $220,000; therefore, the Project is subject to this requirement; and WHEREAS, on Nov. 19, 2024, the City Council adopted Resolution No. 2024-254, approving the plans, specifications and contract documents and authorizing advertisement for construction bids for the Project; and WHEREAS, on Feb. 20, 2025, staff received eight bids for construction of the Project; and WHEREAS, De La Fuente Construction, Inc. submitted the lowest responsive bid to construct the Project, in an amount not to exceed $8,406,387.16, and is a responsible bidder; and WHEREAS, CMC Sections 3.28.040(C)(5) and 3.28.090(B) authorize the City Manager or designee to approve change orders in an amount equal to the contingency set at the time of project award, which is $1,681,300 for the Project; and WHEREAS, the Project funding sources include the Infrastructure Replacement and General Capital Construction funds, and sufficient funding is available in the account for the CIP Project No. 3896, to complete the Project. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1.That the above recitations are true and correct. 2.That in accordance with the California Environmental Quality Act, or CEQA, and the CEQA Guidelines, the Planning Commission approved a mitigated negative declaration April 15, 2025 Item #2 Page 4 of 6 Docusign Envelope ID: 52F3AFBC-B687-4BBB-BCE2-32E7B242EA13 (State Clearinghouse No. 2023050505), Coastal Development Permit (CDP 2021-0011) and Habitat Management Plan Permit (HMP 2021-0003) for this project on July 19, 2023. 3.That the lowest responsive bid of $8,406,387.16 submitted by De La Fuente Construction, Inc., a responsible bidder, for construction of the Beach Access Repair and Upgrades from Pine Avenue to Tamarack Avenue Project, CIP Project No. 3896, is accepted, and the Mayor is authorized to execute the contract for the Project. 4.That the City Manager or designee is authorized to approve construction change orders up to $1,681,300 for the Project. 5.That the City Manager or designee is authorized to sign all other documents necessary for regulatory compliance, to extend funding opportunities, or to otherwise implement and finalize the Project, all of which are subject to review and approval as to form by the City Attorney’s office. 6.That the award of this contract is contingent upon De La Fuente Construction, Inc. executing the required contract and submitting the required bonds and insurance policies, as described in the contract, within 20 calendar days after adoption of this Resolution. The City Manager may grant reasonable extensions of time to execute the contract and assemble the required bonds and insurance policies. PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 15th day of April, 2025, by the following vote, to wit: AYES: Blackburn, Bhat-Patel, Acosta, Burkholder, Shin. NAYS: None. ABSTAIN: None. ABSENT: None. ______________________________________ KEITH BLACKBURN, Mayor ______________________________________ SHERRY FREISINGER, City Clerk (SEAL) April 15, 2025 Item #2 Page 5 of 6 Docusign Envelope ID: 52F3AFBC-B687-4BBB-BCE2-32E7B242EA13 PINE AV G A R F I E L D S T MAGNOLIA A V TAMARACK A V M A D I S O N S T CHESTNUT A V WALNUT AV PALM AV H I B I S C U S C R L I N C O L N S T OAK AV C A R L S B A D B L SHERI D A N P L CAMELLIAPL WALNUT AV PINE AV R O O S E V E L T S T AVOCADO LN O C E A N S T LO N G P L T Y L E R S T H A R D I N G S T SYCAMORE A V W A S H I N G T O N S T H A R B O R D R MAPLE AV J E F F E R S O N S T ACACIA AV CHERRY AV JUNIPER AV HEMLOCK A V L I N M A R L N REDWOOD A V SEQUOIA AV CHINQUAPI N A V A N C H O R W Y PROJECT NAME PROJECTNUMBER3896 EXHIBIT2BEACH ACCESS REPAIR AND UPGRADES FROMPINE AVENUE TO TAMARACK AVENUE PROJECT $!Å VISTA ENCINITAS S.D. COUNTY OCEANSIDE PACIFICOCEAN T A M A R A C K AV MELR O S E D R L A COSTAAV C A R L S B A D B L AV I A R A PY C A R L S B A D VILLAGEDR RANCHOSANTAFE R D A L G A R D C O L L E G E B L P A L O M A R A IRPORT RD FARADAY AV P O IN S E T TI A L N CANN O N R D C A R L S B A D B L ELCAMINOREAL $!Å NOT TOSCALE LOCATION PROJECT VICINITY MAP LOCATION MAP LOCATION PROJECT Author: Andy Chang Date: 3/3/2025 Document Path: T:\Hossein_Ajideh\Location_Map\CIP_3896\LocationMap_CIP_3896.mxd Exhibit 2 April 15, 2025 Item #2 Page 6 of 6 Docusign Envelope ID: 52F3AFBC-B687-4BBB-BCE2-32E7B242EA13