HomeMy WebLinkAboutCDP 2022-0013; URBINO MINOR SUBDIVISION - 1ST EXTENSION; Admin Decision LetterApril 21, 2025
Doug Logan
Rancho Coastal Engineering
310 Via Vera Cruz, Unit 205
San Marcos, CA 92078
{'Cityof
Carlsbad
SUBJECT: CDP 2022-0013/MS 2022-0001 (DEV2020-0263}-URBINO MINOR SUBDIVISION -
1ST EXTENSION
The Planning Division has completed its review of your application for the first extension of Minor Coastal
Development Permit CDP 2022-0013 and Tentative Parcel Map MS 2022-0001, submitted on March 20,
2025. The project site, located at 3997 Park Drive and in the Mello II Segment of Coastal Zone, was
approved to be subdivided into two lots on April 3, 2023. The project was set to expire on April 3, 2025.
The time extension application was filed on March 20, 2025, prior to the expiration date. After careful
consideration of the circumstances surrounding this request, it has been determined that (1) there has
been no change of circumstances in relation to coastal resources per Section 13169 of the California Code
of Regulations, (2) the project is still in compliance with the Minor Coastal Development Permit and
Tentative Parcel Map regulations, and (3) that the findings required for granting a Minor Coastal
Development Permit and Tentative Parcel Map extension can be made; therefore, the City Planner
APPROVES the first extension of Minor Coastal Development Permit CDP 2022-0013 and Tentative
Parcel Map MS 2022-0001 for two (2) years from April 3, 2025 to April 3, 2027, based on the following
findings and conditions.
Findings:
1. All of the findings contained in the administrative approval letter dated April 3, 2023 for Coastal
Development Permit CDP 2022-0013 and Tentative Parcel Map MS 2022-0001, apply to this
extension and are incorporated herein by reference and remain in effect.
2. That the first two-year extension from April 3, 2025 to April 3, 2027 is appropriate because the
project is still consistent with the Coastal Development Permit and Tentative Parcel Map regulations,
and the extension would allow the owner/applicant to preserve existing property entitlements while
satisfying the conditions for the two-lot subdivision.
3. That such permits and approvals as extended are consistent with the requirements of Titles 20 and
21 of this code at the time of their extension.
4. That the City Planner has determined that the project is exempt from the requirements of the
California Environmental Quality Act (CEQA) per Sections 15315 -Minor Land Divisions of the State
CEQA Guidelines and will not have any adverse significant impact on the environment.
Community Development Department
Planning Division J 1635 Faraday Avenue Carlsbad, CA 92008-7314 J 442-339-2600 www.carlsbadca.gov
CDP 2022-0013/MS 2022-0001 (DEV2020-0263)-URBINO MINOR SUBDIVISION -lST EXTENSION
April 21, 2025
Pa e 2
Conditions:
1. This first extension of Coastal Development Permit CDP 2022-0013 and Tentative Parcel Map MS
2022-0001 is granted from April 3, 2025 to April 3, 2027. If building or grading permits for this project
are not obtained within this time, the Coastal Development Permit and Tentative Parcel Map
extension will expire on April 3, 2027, unless extended pursuant to Section 21.201.210 of the Carlsbad
Municipal Code.
2. All of the conditions contained in contained in the administrative approval letter dated April 3, 2023
for Coastal Development Permit CDP 2022-0013 and Tentative Parcel Map MS 2022-0001 apply to
this extension and are incorporated herein by reference and remain in effect.
NOTICE
Please take NOTICE that approval of your project includes the "imposition" of fees, dedications,
reservations, or other exactions hereafter collectively referred to for convenience as "fees/exactions."
You have 90 days from the date of final approval to protest imposition of these fees/exactions. If you
protest them, you must follow the protest procedure set forth in Government Code Section 66020(a), and
file the protest and any other required information with the City Manager for processing in accordance
with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any
subsequent legal action to attack, review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT
APPLY to water and sewer connection fees and capacity charges, nor planning, zoning, grading or other
similar application processing or service fees in connection with this project; NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute
of limitations has previously otherwise expired.
This decision may be appealed by you or any other member of the public to the Planning Commission
within ten days of the date of this letter. Appeals must be submitted in writing to the Planning Division at
1635 Faraday Avenue in Carlsbad, along with a payment of $930. The filing of such appeal within such
time limit shall stay the effective date of the order of the City Planner until such time as a final decision
on the appeal is reached. If you have any questions regarding this matter, please feel to contact Shannon
Harker at (442) 339-2621.
CITY OF CARLSBAD
ERIC LARDY, AICP
City Planner
EL:SH:cf
c: Arthur Urbino, 3997 Park Drive, Carlsbad, CA 92008
Tim Carroll, Project Engineer
Eric Lardy, City Planner
Data Entry
Laserfiche/File Copy