HomeMy WebLinkAboutCD 2025-0003; CARLSBAD BY THE SEA SUMMERHOUSE; Consistency Determination (CD)CITY OF CARLSBAD APPLICATION FORM FOR CONSISTENCY DETERMINATION APPLICATION
CITYUSE'ONLY <-_-···_ --._ :.:_-,-----_-_-_-_... --__ •-__ --__ -' ---_ Dev~i~pmenfNuml>@r: DE:'0~o),):_Ctj(5'8-_•---•_-··'· ,---------'·:,;:_
Ori9in~I ~~oject Numl),er: _ ~/ ')o .'r),., ~ ff OCtJ • __ ' ' Co_ nsi_st_ erfoy Determination Numl>ei'_: CQU> l:S .'"'.o Oo3 -_ -.... _,--· - . . . . . . ·. .
PROJECT NAME: CARLSBAD BY THE SEA, SUMMER HOUSE ~l"i""""\./ r--,1 • ,-·, _, ,-·,, r·
Assessor's Parcel Number(s) and -··ii ._, I V/~\l ,L.,_1_ , --
Address: 2710; 2720, 2730, 2740 OCEAN STREET,
Description of proposal (add attachment if necessary): j~N J O 2025
See attached narrative 10! /\:\J~\'./l\1/.! [''I' t!--.:. t..,._. • 4 'JI I l, ,' '_., L~ • , , ,
Would you like to orally present your proposal to your assigned staff planner/engineer? I Yes I □ No
□
Please list the staff members you have previously spoken to regarding this project. If none, please so state.
Jason Goff-Planning, David Rick-Engineering, Darcy Davidson-Fire
OWNER NAME (Print): Front Porch Communities and Services APPLICANT NAME (Print): Fron! Porch Commumt1es and
Serv1eos
MAILING ADDRESS: 2855 Carlsbad Blvd MAILING ADDRESS: 2855 Carlsbad Blvd
CITY, STATE, ZIP: Carlsbad, CA, 92008 CITY, STATE, ZIP: Carlsbad, CA, 92008
TELEPHONE: 7p0-720-4580 TELEPHONE: 760-720-4580
EMAIL ADDRESS: EMAIL ADDRESS: w
*Owner's signature indi~es permission to conduct a preliminary
review for a development proposal
IN THE PROCESS OF REVIEWING THIS APPLICATION IT MAY BE I CERTIFY THAT I AM THE LEGAL REPRESENTATIVE OF THE I NECESSARY FOR MEMBERS OF CITY STAFF TO INSPECT AND OWNER AND THAT ALL THE ABOVE INFORMATION IS TRUE
ENTER THE PROPERTY THAT IS THE SUBJECT OF THIS AND CORRECT TO THE BEST OF MY KNOWLEDGE.
APPLICATION. I/WE CONSENT TO ENTRY FOR THIS PURPOSE. I ~ CERTIFY THAT I AM THE LEGAL OWNER AND THAT ALL THE ABOVE
INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY
KNOWLEDGE.
SIG~~
1/lfr-~I Vvv: 1.29.2025 1.29.2025
DATE
,
DATE SIG--:-ruRE
APPLICANT'S REPRESENTATIVE (Print): Jason Erdahl, Ankrom Moisan Architects
MAILING ADDRESS: 38 NW Davis, Suite 300
CITY, STATE, ZIP: Portland, OR 97209
TELEPHONE: 503-977-5235
EMAIL ADDRESS: jasone@ankrommoisan.com
I CERTIFY THAT I AM THE LEGAL REPRESENTATIVE OF THE APPLICANT AND THAT ALL THE ABOVE INFORMATION IS TRUE AND
CORRECT TO THE BEST OF MY KNOWLEDGE. -,! f~_i1n1.f.l i j • • ' t.~ f .,.,~, 01/24/25
SIGNATURE DATE
FEE REQUIRED/DATE FEE PAID: $1008
RECEIVED BY: ~ (,t s1}__fV C ~ .
P-16 Page 2of2 Revised 3/22
•. ···-'-::·,:· .• ,-.-~ . •• ... •. : ·,,
.. ,
•, '
:}
CARLSBAD BY THE SEA
Retirement Community
a front porch community JAN 3 0 2025
January 29, 2025
To City of Carlsbad Planning Department,
Please find attached narrative and drawings from our architect, Ankrom Moisan, noting the
updated drawings for Consistency Determination review.
Ankrom Moisan has provided detailed reasons for the requested changes to the originally .
approved plans. Front Porch/ Carlsbad by the Sea have worked closely with the design and
engineering team to ensure we stay within the confines of the original intent of the project,
while ensuring the actual construction can be accomplished, per plan.
Carlsbad by the Sea appreciates the continued support from the City of Carlsbad in reviewing
this project that will provide needed care for the aging community.
Best regards,
~~J.;~A-<L/
Paula Digernessd' • --
Executive Director
2855 Carlsbad Boulevard • Carlsbad, CA 92008
(760) 720-4580 • FAX (760) 729-0938
www.carlsbadbythesea.org
CARLSBAD BY THE SEA -SUMMER HOUSE
Application for Consistency Determination
January 30, 2025
PROJECT INFORMATION-APPROVED VS PROPOSED
PROJECT AREA -ABOVE GRADE
Approved = 35,721 SF
Proposed = 36,271 SF
PROJECT AREA -BELOW GRADE
Approved = 16,703 SF
Proposed = 15,276 SF
MEMORY CARE BEDS
Approved= 19
Proposed =18
PROJECT NARRATIVE
PROFESSIONAL CARE BEDS
Approved = 23
Proposed = 22
PARKING SPACES
Approved = 30
Proposed =29
LOT COVERAGE (60% max)
Approved = 57.9%
Proposed = 58.2%
(♦/\
Ankrom Moisan
Carlsbad by the Sea is submitting this narrative along with the discretionary planning application/drawings to describe the
proposed changes for this project.
Building Floor Elevations / Maximum Height
The building as approved did not have sufficient floor to floor elevations for the intended use. The increase is needed to allow for
HVAC, Structure, and height in the garage for the accessible van. The building has been lowered into the ground 1'-8" and raised
1'-4" to the maximum height limit of 30 feet. The building structure has also been changed from wood framed to concrete/metal
framed to reduce the thickness of the floor systems. Please see the diagram below with approved and proposed elevations.
E.G. ll1 HEIGHT -PROJECTION LINE "'-_ _:1::r•;:;•·,i..__..-~""'---":--'--SLOPED ROOFS
-
- ------ - -~ ---'J ------~76'~0"--
}" ·~-------===--~ -~--J•112-EG.2•·HEIGKT ~ PROJECTION LINE
FLATAOOFS --------------
..__.,.,,,_ --~ ---------------------------------------
---70'·1"
: :_:' • :_: :_6_9'.:.'_"0 .-0,
PROPOSED ELEVATIONS (BLUEi------,. .
r--...~.zy-~
LEVEL 3 b g
!l!!ll!!l!l!!!IJl .... l!!ll!l!~!!l!llll!llllllil!lllllllllllll!l!!ll!!l!l!!!IJl .... lllllllllll!l--.1111111111111!1!!11!! .... l!llllllllllll ... ll!lll ....... • • 0 -·· • e,· O" -rr -r ,_-_--______ -_-➔---r~--,-..... ----------··r --·--·-----'"0 l
LEVEL2
II I
LEVEL 1
-----· ------------·---
BASEMENT
Architecture Interiors Planning Brand
ankrommoisan.com 1 I 3
Portland Seattle San Francisco
Ankrom Moisan Architects, Inc.
' I
The lowering of the building caused the following changes to the project in the Garage Level and Level 1.
1. Increased the ramp slope to the parking garage. See details below under Civil Engineering design.
2. Lowered Floor Level 1 and several landscape and hardscape areas. This resulted in the following revisions.
a. Reconfigured the common areas to front the outdoor gardens to improve light and air into the building.
b. Relocated a unit to the plan north and enlarged a window well. Also added a window well to the NE corner.
c. The memory care gardens and drop off were lowered to align with the new interior floor elevation.
3. The storm drainage design was lowered to match proposed floor levels. See the Civil Engineering section below.
Building Square Footage
The building area above grade has increased 550 sf. This is due mainly to decreasing the size of two exterior patios on Level 2
which enlarged the building floor area, and calculation methodologies causing discrepancies from the original calculations.
Modifications to Independent Living Apartments
1. The number of units was reduced to create larger apartments.
2. Several windows were added or enlarged to improve the apartment assess to light and air.
3. An additional roof dormer was added and others adjusted to match the apartment floor plans.
Roof Terrace
1. The common use area has been removed.
2. The IL terraces have been modified to match the apartment plans.
Utility and Building Infrastructure
1. It was determined that the building needed an emergency generator to ensure operations for the health and safety of
the residents. The generator was added below grade at the bottom of the garage ramp. A chimney was added to the
plan east facade for the exhaust systems.
2. The parapet walls, mechanical screen "architectural feature" on the north facade (Garfield St) where raised from
approximately 24" to 36" to shield mechanical equipment.
Landscape Design
The floor level design change results in the front gardens being set slightly lower-approximately one foot-relative to the public
sidewalk. To address privacy for these sunken patios, a horizontal fence atop a low retaining wall has been incorporated. This
design balances the need for resident privacy with visual appeal from the street. Access to the building is provided through a
pedestrian gate with a callbox, allowing secure entry for visitors on foot. Additionally, a retractable gate accommodates vehicular
access to the single parking/loading space located at the Ocean Street entrance. The memory care courtyard has been
thoughtfully designed as a tranquil, therapeutic environment. Garden elements suitable for memory care residents-such as
fountains with no standing water and clear pathways-have been integrated into the space. Trees positioned outside the courtyard
fence beautify the streetscape while providing filtered shade within the courtyard. The planting design continues to prioritize low-
water-use plant material in alignment with sustainable practices. However, a more textural selection of plantings has been
introduced to enrich the visual experience and sensory engagement for residents. This approach integrates a variety of foliage
textures and forms, where the updated plant palette maintains drought tolerance while offering year-round interest and
contributing to the calming atmosphere essential for the senior living environment. These changes reflect a commitment to
creating a functional, sustainable, and inviting environment for residents, visitors, and the surrounding community.
Portland Seattle San Francisco
213 Ankrom Moisan
Civil Engineering Design
The civil-related changes from the approved Conditional Use Permit (CUP) are listed below.
1. Finished Floor elevations were lowered at architect's request to allow more clear space between slabs. CUP Basement FF
was 33.0 and was lowered to 31.33. CUP 1st floor (fronting Ocean St) was 4250 and it was lowered to 41.33. CUP 2nc1 floor
(fronting Garfield St) was 51.75 and was lowered to 51.67.
2. The outdoor patios (memory care) fronting Ocean St. were lowered. The drop off area was lowered and a ramp with
handrails to access the sidewalk on Ocean St was added.
3. The above ground Modular Wetland System (MWS) were moved outside of the memory care patios to provide more
space in the patios.
4. The vehicle drive aisle to the basement was adjusted but the slope will be less than 20% and will still be paved with
concrete.
5. Some of the lowered patios will have to piped to the basement storm drain wet-well in the basement. The wet-well was
already taking the drive aisle ramp runoff via the trench drain and some of the patios and the additional area will be
pumped to the MWS BMP #1. Once plumbing designs the routing in the Construction Documents phase the SWQMP and
drainage study will be updated.
6. Minor patio and hardscape updates. Points of connections for utilities remained the same, driveway locations remained
the same.