Loading...
HomeMy WebLinkAboutCT 2022-0003; CARLSBAD BY THE SEA SUMMERHOUSE; SCOPING AGREEMENT FOR TRANSPORTATION IMPACT STUDY; 2022-10-17(Cityot __ T_RA_N_S_P_O_R_TA_T_IO_N_IM_P_A_CT_A_N_A_LY_S_IS_G_U_I_D_EL_IN_E_S ______________ Carlsbad Apri/2018 ATTACHMENT A SCOPING AGREEMENT FOR TRANSPORTATION IMPACT STUDY This letter acknowledges the City of Carlsbad Traffic Engineering Division requirements for the transportation impact analysis of the following project. The analysis must follow the latest City of Carlsbad Transportaion Impact Study Guidelines dated September 2017. Case No. Project Name: Project Location: Project Description: ______________________________ _ Related Cases - SP No. EIR No. GPA No. CZ No. Name: Address: Consultant Telephone: ______________ _ Developer A. Trip Generation Source: ___________________________ _ Extended Land Use ----------Proposed Land Use ____________ _ Extended Zoning Proposed Zoning Total Da ily Trips Forcast Daily Trips ____________ _ (Attach a trip generation table. Describe Trip Reduction Factors proposed and included in the trip generation table.} B. Trip Distribution: D Select Zone (Model Series __ ) (Provide exhibit for detailed trip distribution and assignment.} C. Background Traffic Phased Project D No D Yes Phases: ------------------ Please contact the Engineering Devision or use the mast recently provided data Model/Forcast Methodology: ___________________________ _ Ca li for ni a 35 I Page {city of __ T_RA_N_S_P_O_R_TA_T_IO_N_IM_P_A_C_T_A_N_A_LY_S_IS_G_U_I_D_EL_IN_E_S ______________ Carlsbad April 2018 D. Study Intersections: (NOTE: Subject to revision after other projects, trip generation and distribution are determined, or comments) 1. 2. 3. 4. 5. 6. 7. 8. ------------------ ------------------ ------------------ E. Study Roadway Segments: (NOTE: Subject to revision after other projects, trip generation and distribution are determined, or comments) 1. 2. 3. 4. F. Other Jurisdictional Impacts 5. ------------------ 6. ------------------ 7. ------------------ 8. ------------------ Is this project within any other Agency's Sphere of Influence or one-mile radius of boundaries? D Yes D No If so, name of Jurisdiction: ----------------------------- G. Site Plan (Attach a legible 11'X17' copy) H. Specific issues to be adressed in the Study (in addition to the standard analysis described in the Guidelines) (To be filled out by Engineering Devision) Recommended by: Consultant's Representative Date Scoping Agreement Submitted on Date Scoping Agreement Resubmitted on Date Approved Scoping Agreement: ~. City of Carlsbad Date Traffic Engineering Division Ca l ifotnia 36 I Page Floor Configuration / Use Beds DU [c] Basement Parking 0 0 Level 1 19 Memory Care Beds in 19 Units 19 19 Level 2 16 Professional Care Beds in 10 Units 16 10 Level 3 7 Professional Care Beds in 5 Units 7 5 42 34 In Out Rate [a] In Out Rate [b] SANDAG [a]Convalescent / Nursing Beds 3.00 60% 40% 0.07 40%60% 0.07 In Out Total In Out Total 1 Convalescent / Nursing 19 57 2 2 4 2 2 4 2 Convalescent / Nursing 16 48 2 1 3 1 2 3 3 Convalescent / Nursing 7 21 1 0 1 0 1 1 42 126 5 3 8 3 5 8 City of Carlsbad TIA Guidelines (2020) Notes: Total Site Trips [a] SANDAG - (Not So) Brief Guide of vehicular Traffic Generation Rates for the San Diego Region (2002) [b] Rate as a percent of daily traffic [c] DU - Dwelling Units (Rooms). Level Land Use Beds Daily AM Peak Hour PM Peak Hour Trip Generation Estimates Site Summary Total Units Trip Generation Rates Source Land Use Unit Daily Rate AM Peak Hour PM Peak Hour--------- Table 1: Types of Transportation Impact Analysts Report Required & Elements to be Included Land Use Conforms to Approv...J Spe<lfk Plan or Master Plan Conforms to General Pt.an or Zoning Does not Conform to G•n.-ral Plan or Zoning Forecast Prcject Generated Auto Trips < 110 AOT 111 lo 4519 AOT or er < l 1 peak hour trips 12 to 49 peak hour trip• TIA Not Required level I Level II 500 to 1,000 ACT or SO to 100 peak hour trip, 1,000 to Z,400 ACT or 100 to 200 peak hour trips Levell Level 111 level V l"vel IV Level VI >Z,400ADT or >200 pe.a k hour trips level VII level VIII LANGAN ENGJIIE!RJNG & EJM'IONMENTAl SllMClS SITE LOCATION SITE STUDY AREA LEGEND Study Segment PROJECT TRIP ASSIGNMENT 60% To & From South 5 / 5 / 76 AM / PM / Daily 40% To & From North 3 / 3 / 50 AM / PM / Daily TDM / TSM Strategies Requirement The Project would be subject to implementing TDM and TSM strategies per Policy 3-P.11 if it adds more than 110 ADT or 11 peak-hour trips in a single direction of travel to an exempt segment. The nearest exempt segments in the vicinity of the project is El Camino Real (north of Marron Road). Based on the projected trip assignment, the amount of traffic in both directions would be less than the 110 ADT and 11 peak-hour trips. As a result, it can be determined that the amount of traffic in a single direction would be less than the established thresholds. As a result, the Project is not subject to implementing TDM and TSM strategies. OH --0 w (A w m (A I ~ 'i' + ~ --I -l---------~ ----* ------q:_~ -----+,----------------- ASPH 8" R.C.P. WATER MAIN ASPH -----It----- ASPH t--------c,..-:eJ-----+-'"'-----t---+--~--,--s,---_____ '----r-----w-----w-r-----w-----w-----w-----w-----c>"'--W'-----w-----w-----w-----w-----w'~~------, • 50 • 0 0 0 + --t GARFIELD STREET + + + + CONG CONG CONC \ ~== ~--~'"" -R/Wx-=::::=:=~='====°§;,,=--1>e~=Jj ~XF -=~---=--=~==--, ~~~~=--',~==-~~'='-==-'fs,C::C...=--=---=----=='iA= =c-,--e=-R/W---=~===,,===r--,--~==-'""----,-----,,,...----'-j_._-_+----l--+------j ,-, }--, C) -l ,'a\_ ~ ' ,'i·+ 1'' "( lO -~~-, I I I -----~~-~ p---= -------,-----------,--------- ---------------1 I ~ I /+I I l----------50 I I CD ________ , ---+-----------1~ ~~ I I ~ I -50 I I I I I I ---------------r-------... I I I ' ,"'+ 5 0 I 0 --SD~ SD --SD ~~~--~---iiiiiiiiiiiiiii--1 -SCALE, I "~10• w W-----W'-----W-- ASP A t:)7J s • Cl) :z 0 tu b en ~ ffi () a: CJ CJ :z 0 -a: b5 a.. ti)