HomeMy WebLinkAbout2598 STATE ST; ; CBC2022-0188; Recyclel_ City of
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59
Development Services
Building Division
1635 Faraday Avenue
www .ca rlsbadca .gov
This form shall be completed for all demolitions and new construction, additions, and alterations.
The California's Green Building Standards Code (CALGreen) requires that at least 65% of construction site
debris generated during demolition projects, most new construction, as well as the majority of building
additions or alterations be recycled, reused, or otherwise diverted from landfill disposal.
STEP 1: The Applicant must submit PART 1 of this form before a building permit application is approved.
STEP 2: The permit holder shall utilize a waste management company that can provide verifiable
document ation that meets 65% waste diversion. Republic Services is the exclusive franchised waste hauler in
the City of Carlsbad.
• Option A-Roll-Off Bins: Call Customer Service (760) 332-6464 and ask for a C&D account for waste
diversion. Republic Services will provide roll-off bins for construction waste.
• Option B -Self Haul to Republic Services or other dump site that can provide verifiable
documentation. It must be a Certified Source Separated Recycling Facility. When you enter the site,
explain to gate operator that this is C&D material. When you exit the site, request a receipt and
certificate from gate operator for waste diversion.
STEP 3: Prior to permit close-out (permit final), the permit holder shall complete PART 2 of this form and
submit all trash and recycling weight receipts to the building inspector. Waste log, acknowledgement, and
tickets must be submitted to release your certificate of occupancy.
APPLICANT CERTIFICATIONS:
CHECK EACH~
[2( I certify under penalty of perjury under the laws of the State of California that the information
provided in and with this form pertains to construction and demolition debris generated only from the
roject listed in PART 1, that I have reviewed the accuracy of the information, and that the
nformation is true and correct to the best of my knowledge and belief.
understand the waste diversion requirements of the State of California and submit this Construction
Waste Management Plan pursuant to California Green Building Standards Code 4.408.2 or 5.408.1.1.
Failure to provide documentation of C&D reporting, reporting of waste diversion less than 65%, and
failure to provide adequate weight receipts, may result in enforcement action against me or other
responsible parties, including a notice of violation, citations, and any other remedies provided in
Chapters 1.08 and 1.10 of the Carlsbad Municipal Code. Projects are required to submit their Waste
/ Log, Acknowledgement Form, and Weight Receipts prior to Certificate of Occupancy (CO) issuance.
~ This project does not involve disposal of universal or hazardous waste OR this project includes disposal
of universal or hazardous waste in a responsible, safe and verifiable manner. Disposal of asbestos-
containing materials, batteries, electronic waste, fluorescent bulbs, lead based paints, mercury
containing equii;i ent and refrigerants, require special processing prior to commencement of
consttucfon or demoliti ivi:~L
Date:~f? )2S;; I
Page 1 of 4 rev4/24
PART 1 Complete and submit this form when applying for a building permit. Permits will not be issued without a
completed Construction Waste Management Plan.
Last First
Complete the following table with estimated waste tonnage to be generated by your project.
Material Type
Complete this line of the table only if
only using WASTE MANAGEMENT
roll-off bins.
Mixed C&D Debris
Asphalt & Concrete
Brick/ Masonry/ Tile
Mixed Inert Debris
Cabinets, Doors, Fixtures,
Windows (circle all that apply)
Carpet
Carpet Padding/ Foam
Cardboard
Ceiling Tile (acoustic)
Drywall (used, new, scrap)
Landscape Debris (brush, trees,
stumps, etc.) No dirt.
Unpainted Wood & Pallets
Roofing Materials
Scrap Metal
Stucco
Other:
TOTAL
Estimated
Waste Quantity
(tons)
0
A
Place a(✓) check
next to items to be
reused or salvaged
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
B C
Place a (✓) check next Place a(✓) check next
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
to items to be
disposed at landfill
□
□
□
□
□
□
□
□
□
□
□
□
□
tons
Waste from above Minimum Required Diversion
~~=-----1'.::'.:~===-------Date _4-+---'-/ \ 7_/ ~--/ l
Page 2 of4 rev 4/24
PART 2. Complete and submit this form before final inspection. Projects are required to submit their Waste Log,
Acknowledgement Form, and Weight Receipts prior to Certificate of Occupancy (CO) issuance. Failure to provide
documentation, reporting of waste diversion less than 65%, and failure to provide adequate weight receipts, may
render the Project non-compliant and the responsible parties subject to code enforcement.
SECTION A
Project Address,_:=::~~:_::~:!.LL-""::::::~=::;;~~::;:~~Y..f;dl::...21::.. ____ --;~r
Applicant Name ~-=--=--=-:l...ll..::......;:Uc::~~.ldl...u:.:--=
Last First
Use this Final Log below to track loads of materials as they leave the job site.
@@SAVE RECEIPTS@®
Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken.
Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons.
A B C
Date
Example:
01/01/2020
Material Type
Concrete (broken}
@TOTAL
Diversion Rate Achieved
Actual Amt
Reused or
Salvaged
0
Total of columns A + B
Attach the following documentation to this Report:
• Original recycling weight tickets, landfill weight tickets
Actual Amt Actual Amt
Recycled Disposed in
Landfill
5 tons
0 0
Total of columns A + B + C
Destination Facility
(Name, Address, Phone)
Palomar Transfer Station, 5960 El
Camino Real
3
2: 65%
DIVERSION
Return completed form and documentation to:
City of Carlsbad
• Original donation receipts with photos and/or itemized descriptions Building Division (1st Floor)
1635 Faraday Avenue
Carlsbad, CA 92008
• Any other relevant information to support Recycling Report
Page 3 of4 rev 4/24
{'city of
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
8-59
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
APPLICABLE TO NEW CONS RUCTION, RESIDENTIAL ADDITIONS AND ALTERATIONS OVER $6OK
VALUATION AND COMMERCIAL ADDITIONS AND ALTERATIONS OVER $200K . You are required to list
materials that will be reused, recycled or disposed from your project. If you have questions about the recycling
requirement or completing this form, please contact Republic Services at (760) 332-6464, a certified C&D recycler, or
the Carlsbad Building Division at (442) 339-2719 Please note: Unless you are self-hauling, Republic Services or approved
haulers must be used for all construction projects within the City of Carlsbad.
PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued
Applicant Information
Permit No. ____________ Project Title _W_il_d_la_n_d_s _____________ _
Project Address2598 State Street, Carlsbad Ca. 92008 APN
ApplicantName Resnick John Pi Coor 'E~r □ ------
last First
Applicant Address 2598 State Street, Carlsbad Ca. 92008
Phone 619 850-6590 E-mail Address john@jeune-jolie.com
Applicant Mailing Address
(if different than project address)
Project Type
(check all that apply):
Residential Commercial
□ 0
Brief Description T_I _R_e_s_t_a_u_ra_n_t _____________________________ _
Project Size. ___________ Estimated Cost of Project$ ________________ _
(square footage)
Please check the appropriate box:
lv'I I plan on using REPUBLIC SERVICES roll-off bin(s) for all materials and will provide all receipts after construction.
D I plan on using a City Approved hauler and will provide all receipts at the final occupancy inspection.
D This is a proposed LEED certified project. I plan on separating materials on site in conjunction with Republic.
Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information
provided in and with this form pertains to construction and demolition debris generated only from the project listed
in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the
best of my kno4•~•• and~
Print Name~\/\ _Jt{6\J\\C..,L Signatur"'(._ __ ~=--~-=---~---Date 4/12/23
Page 1 of4 Rev. 2. 10.21
PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will
not be issued without a completed Construction Waste Management Plan.
DEBRIS RECYCLING ESTIMATE:
SECTION A Permit No. __________ Project Title Wildlands -----------------
Project Address2598 State St. Carlsbad, Ca. 92008 APN
Applicant Name Resnick John Phone 619-850-6590
Last First
SECTION B Complete the following table with estimated waste tonnage to be generated by your project.
This is your plan for construction waste management. Changes can be made on the final recycle report.
Goal: the diversion rate shall be 65% by weights of debris.
Material Type
Complete this line of the table only if
only using WASTE IMNAGBIIIENT
roll-off bins.
Mixed c&D Debris
Parking lot Asphalt & Concrete
Brick/ Masonry/ Tile
Mixed Inert Debris
Cabinets, Doors, Fixtures,
Windows (circle all that apply)
Car et
Carpet Padding/ Foam
Cardboard
Ceiling Tile (acoustic)
Drywall (used, new, scrap)
Landscape Debris (brush, trees,
stumps, etc.) No dirt.
Unpainted Wood & Pallets
Concrete Roofing Materials
Sera Metal
Stucco
Other:
TOTAL
SECTION C
Estimated
Waste Quantity
(tons)
8.5
4.3
30.0
.6
1.2
10.0
To meet 65% Diversion Requirement (estimate
A B C
Place a ( ✓) check
next to items to be
reused or salvaged
6.0
Page 2 of 4
Place a(✓) check next
to items to be
recycled
8.5
4.3
8.0
10.0
Place a ( ✓) check next
to items to be
disposed at landfill
Rockridge
Rockridge
Sanco
Sanco
Miller Metal
l\llinimum Required Diversion
4/12/23
Rev. 711120
PART 2 Complete before final inspection, obtain City Approved hauler receipts and return prior to final
building approval.
DEBRIS RECYCLING REPORT (ACTUAL):
I
SECTION A Acknowledgement
I certify under penalty of perjury under the laws of the State of California that the information provided in and with
this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have
reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge
and belief.
Permit No .. _______________ Print Name Wildlands __________________ __,
Address _2_5_98_S_ta_t_e_S_t_re_e_t _C_a_rl_sb_a_d---'-,_C_a_._9_2_0_0_8 ______ Date 4/12/23
SECTION B Use this Final Log below to track loads of materials as they leave the Job site.
(Q)(O)SAVE RECEIPTS(O)(O)
Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken.
Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons.
Date Material Type
A B C
Actual Amt
Reused or
Salvaged
Actual Amt Actual Amt
Recycled Disposed in
Landfill
Destination Facility
(Name, Address, Phone)
Example:
01/01/2020 Concrete (broken) Stans
Palomar Transfer Station, 5960 El
Camino Real
-760 603-0153
<lbTOTAL
SECTION C
Diversion Rate Achieved -------~"" ___________ = _____ %
A + B + C DIVERSION
4/12/23
Return completed form and documentation to:
• Original recycling weight tickets, Ian fill weight tickets
• Original donation receipts with photos and/or itemized descriptions
• Any other relevant information to support Recycling Report
City of Carlsbad
Building Division (1st Floor)
1635 Faraday Avenue
Carlsbad, CA 92008
Page 3 of 4 Rev. 04122
SANCO Resource Recovery
6750 Federal Blvd.
Lemon Grove , CA 91 945
(619) 287 -7555
customer: 0583 Ticket: 18928
Date: 08/01/22
BTS EQUIP . UNL., INC.
13465 CMNO CANADA #106-5 01
EL CAJON, CA. 92021
Rate
In: 11:55
Out: 12:09
83.00 per TON
INVOICE
Truck: 0307
Container:
Route: 02034
Origin: 020 SAN DIEGO
Commodity Units
34 CONSTRUCTION/ DEMOL .77
[Gross(In): 1 3,360 . lbs Scl#2 Tare 11,820 . lbs Scl#2
Extended
Charge
63.91
Net: 1 ,540 . lbs)
TOTAL DUE 63.91 Construction & Demolition Diversion Certificate --Diversion Percentage 69%
This certifies that the company listed above has utilized an EDCO facility to divert construction demolition materials in accordance
with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility.
Brayan Tapia Driver
...
SANCO Resource Recovery
6750 Federal Blvd.
Lemon Grove, CA 91945
(619} 287-7555
Customer: 0583 Ticket: 18909
Date: 08/01/22
BTS EQUIP. UNL., INC.
13465 CMNO CANADA #106-501
EL CAJON, CA. 92021
Rate
In: 10:49
Out: 11:05
83.00 per TON
INVOICE
Truck: 0307
Container:
Route: 02034
Origin: 020 SAN DIEGO
Commodity Units
34 CONSTRUCTION/ DEMOL 2.94
[Gross(In}: 17,780. lbs Scl#l Tare 11,900. lbs Scl#l
Extended
Charge
244.02
Net: 5 ,880. lbs]
TOTAL DUE 244.02
Construction & Demolition Diversion Certificate -· Diversion Percentage 69%
This certifies that the company listed above has utilized an EDCO facility to divert construction demolition materials in accordance
with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility.
Brayan Tapia Driver
SYCAMORE LANDFILL
8514 MAST BLVD
SANTEE , CA 92071
() -
333428 -BTS EQUIPMENT UNLIMITED, I NC.
13465 CAMINO CANADA 106-501
EL CAJON, CA 92021
Contract: BTS EQUIPMENT UNL
GROSS 41, 720 Scale In
TARE 34,100 Tare Out
NET 7,620
Tracki ng Qty: 0 .00
Qty
3 .81
Origin:
1.00
Signat ure:
Unit Description
TN C&D
CARLSBAD
ENVIRONMENTAL FEE 1
100%
, • Ticket #: 2074514
Weighmaster: torrestl
In: August 01, 2022
Out: August 01, 2022
Vehicle: 4245/A61610
Ref: 22-50
BOL :
INBOUND
INVOICE
Rate Extension
$78.00 $297.18
$18.00 $18.00
Tax
$0.00
$0.00
Total
Paid
Change
4 :05 pm
4:05 pm
Tota l
$297.18
$18 .00
$315.18
$0.00
$0 .00
PALOMAR TRANSFER $·"; ,.,17::
5960 EL CAMINO REAL
CARLSBAD , CA 92008
(760)603-0153
333419 -BTS EQUIPMENT UNLIMITED, INC .
13465 CAMI NO CANADA 106-501
EL CAJ ON , CA 92021
Contract: COMM-GATE Yr. 200
GROSS 42 ,220
TARE 34 ,020
NET
Tracki ng Qty:
8 ,200
0 .00
Qty
4 .10
Unit Description
TN MSW
Origin: CAMP PENDLETON
Signatu re:
Scale In
Tare Out
100%
s• Ticket #: 2435039
Weighmaster: rivernol
In: July 29, 2 022
Out: J uly 29, 2022
Vehi cle: A61903
Ref: C+D
BOL :
I NBOUND
INVO I CE
Rate Extension
$87 .54 $358 .91
Tax
$0.00
Total
Paid
Ch ange
8:27 am
8 :27 am
Total
$358.91
$358 .91
$0 .00
$0 .00
PALOMAR TRANSFER
5960 EL CAMINO REAL CARLSBAD, CA 92008
(760)603-0153
333419 -BTS EQUIPMENT UNLIMITED, INC . 134 65 CAMINO CANADA 106-501
EL CAJON , CA 92021
Contract: COMM-GATE Yr. 200
GROSS 46,100 Scale In
TARE 34,020 Tare Out
NET 12,080
Tracki ng Qty: 0 .00
Qty Un it Descri ption
6 . 04 TN MSW
Or igin: CAMP PENDLETON 1 00%
Signa ture:
Welghmaster: rivernol
In: Jul y 28 , 2022
Out : July 28, 2022
Vehicle : A61 903
Ref: 22~JS-o eti.dl.g_t~n
BOL:
INBOUND
INVOICE
Rate Extensi on
$87.54 $528 .74
Tax
$0 .00
Total
Paid
Change
8:30 am
8 :30 am
Total
$528.74
$528.74
$0 .00
$0.00
SYCAMORE LA~DflLL
8514 MAST BLVD
SANTEE , CA 92071
() -
w ,i l' (~~ Ticket #, 218 964 2 s . '29 Weiqhmaster: perezJ
l-i9J In : June 16, 2023
333428 BTS EQUIPMENT UNL IMITED, I NC.
13465 CAMINO CANADA 106-501 Ou'.:.: Jt:.ne l6, 2023
EL 2AJON , CA 92021
Conlract: BTS
GROSS
TARE
NET
EQUTPMENT UNI
40,120
32,960
7 ,160
':'racking Qty : 0 .00
Qty Lnit Desc::-i.p".:.ion
3.58 TN C&D
Origin : CARLSBAD
l.OC ENVIRONMENTAL
Signa~ure:
Scale In
Ta:::e OuL
1 00%
FEE , -
Vehicle: 4240/4 7401
Ref : wildiife
BOL:
I NBOUND
INVOICE
Rate Extens ion
$81. 90 $293 .20
$19 .71 $19.71
'!'ax
S0.00
$0 .00
Total
Paid
Change
8 : 42 am
8 : 42 am
Total
S293 .20
$19.71
$312.91
$0 .00
$0 .00
SYCAMORE ~A~or:LL
8:i:4 MAS7 B!.VD
SANTC:E , Ci\ 92071
{) -
333428 8'1'S I::QU1PMENT UN1,lMI'I'ED, INC.
~J465 CAMI NO CANADA 106-501
EL CAJON , CA 92021
Cont r uct : BTS
GROSS
TARI::
NtT
EQU:?MENT UNL
41 ,540
34,080
7 ,460
'l'r:ack:..ng Qty: 0 .00
Qty
: . ·, 3
Unit Dcscript'on
TN C&D
Griqir.: SAN DIEGO
Scale In
Scale Ci;~
100%
1.00 tNVIRO~~ENTAL FEE 1
Oul :
'124G/30
Ref: dcl ! o S'.l~:::.r
BOL:
nrno:.JND
IN\/Ol CI•;
Ra te Ex•~•-P.s~ >:-
sa:. 98 ~3·;~ .. ~e:
$19.·1: S 1 . cc .$ J g .
Tot< '
Pai :
Change $C .0C
SYCAMORE LANDF:LL
851'1 MAST BLVD
SAN'.:'1::E, CA 92071
,/}fl /J;::-Tic ket J , 2189848
;J,, Wei ghmaster: calixch
() -
3334d8 -BTS EQUIPMtNT UNLIMITED, INC.
1 34 6~ CAMI NO CANADA 106-501
EL CAJO~, CA 9202 -
Cont=act : BTS EQUIPMRNT UNl
GROSS 58 ,880 Scale In
1'ARE 33 ,920 Tar e Out
NET 2 4,960
Tracklng Qty: 0 .00
Qty Unit Descri pt.ion
12.48 TN C&D
Origin: ZL CAJON 100 %
i.. 00 ENVIRONMENTAL FEE l
Signature :
In : June 16, 2023
Out : June 16, 2023
Vehicle: 1240/c:t64496
Ref: 2ND ST ARBY'S
BOL :
INBOUND
I NVOICE
Rate Extension
$81.90 $1,022 .11
$19.71 $19.71
Tax
$0.00
$0.00
Total
?a::.d
Cha?;ge
'.!.2: 4 0 pm
12 :40 pm
Total
$1.022 .11
$19.7 1
$1,04 1 .82
$0 .00
so .co
Non-Negotiable Bill-of-Lading
and Transportation Agreement
PH: 619-324-706!
FX: 619-443-0441
BTS EQUIPMENT UNLIMITED, INC. 5472
DAILY TRIP REPORT
BILLED TO: as: DATE: l, -JS· ..2,J INSPECTED:
TRUCKJNG CO:
VEHICLE#: ST ART TIME: C
PLANT: JOB#: STOPTlME: V
LO QTY-PLANT LEAVE
NO. TICKET NUMBER MATERIAL YD/TN LOCATION AT PLANT PLANT JOBSITE/ DESTINATION ARR. JOB LEAVE JOB
1 ~~ C ~-,../ .. H.•/7
2 .,<1,,t.~ ~,J,i; I-7"1 ,,~ C, I .;l-JJ/7 7 7~
}),~ -dkM° -. 9,2.o 3 ~
J1CJ' ';>,)'D /J1.-11A. ~ Id.I<. ~31> -4 J ~<LrLS 2J , • ;J
5 ' ., f <"~" ,( :fl?~ l I' ") JO
6 '1 Jh /'YJ J 1. tt-L '1i ~ I /) 'JA)
7 '1.10 1'1-'J J 'Y -~ . /:z_3:J!--I
8 ,J,i(l /)£Mb & f /:J.,,/15
9 1. )1) Ml~ I-, ~ I I'> ,$1 1.0.;I
10 210 ,,,,,, ')t /., ~ "l ' ,,.J_ 2~
11 ;fl) f) ,n ,'is~~ :,_-I'> I .Jfe J ;If
12 RX/~ 1. IL •" (l~.._J t1.! J.,/)1 '-I I ,
13
14
15
COMMENTS (NOTE ANY DELAYS):
CHECK#'S:
TOTAL TONS: TOTAL HRS: /P
TOT AL LOADS: HRRATI TOTAL CHG:$
CUSTOMER SIGNATURE BltllfAI DRIVER SIGNATURE
WHITE: BTS Copy YELLOW: Carrier/Trucking CO. PINK: Customer
Non-Negotiable Bill-of-Lading
and Transportation Agreement
B~EOU~MENTUNLIMITED,INC
DAILY TRIP REPORT
PH: 619-324-7065
FX: 619-443-0448
5473
BILLED TO: DATE: ( ,.. J L . .2-] INSPECTED: .
TRUCKJNG CO:
VEHICLE #: TRUC~: t/JP
DRIVER NAME:~
/Jj START TIMI!: ~
PLANT:
LO QTY-PIANT LEAVE
NO. TICKET NUMBER MATERIAL YD/TN LOCATION AT PIANT PIANT JOBSITE/ DESTINATION ARR. JOB LEAVE JOB
15
COMMENTS C\'OTE ANY DELAYS):
CRECK#'S:
TOTAL TONS: TOTAL HRS: /0
TOTAL LOADS: HR RATE TOTALCHC:S
CUSTOMER SIGNATURE Bl■fHi DRIVER SIGNATURE
WHITE: BTS Copy YELLOW: Carrier/Trucking CO. PINK: Customer
~i, Ticket #: 2526422
PALOMAR TRANSFER
5960 EL CAMINO REAL
CARLSBAD, CA 92008 Weighrnaster: IN -venegern OUT -rnarticy
(760) 603-0153
333419 -BTS EQUIPMENT UNLIMITED, INC.
13465 CAMINO CANADA 106-501
EL CAJON, CA 92021
Contract: COMM-GATE Yr . 200
GROSS 46,960 Scale In
TARE 35,220 Scale Out
NET 11,740
Tracking Qty: 0.00
Qty
5.87
Unit Description
TN MSW
Origin: CARLSBAD
Signature:
100%
In: March 23, 2023
Out: Ma r ch 23, 2023
Vehicle: CD
Ref : 22-050 -BTS
BOL:
INBOUND
INVOICE
Rate Extension
S87 .54 S513 .86
Tax
$0.00
Total
Paid
Change
11: 57 am
12 :12 pm
Total
$513.86
$513.86
$0.00
$0.00