HomeMy WebLinkAboutPRE 2025-0024; 4380 HIGHLAND DRIVE; Admin Decision LetterMay 19, 2025
FEDERICO TELLO
2434 FENTON STREET, SUITE 300
CHULA VISTA, CA 91914
federico@wsiadb.com
SUBJECT:
Dear Applicant,
PRE 2025-0024 (DEV2025-0027) -4380 HIGHLAND DRIVE
APN: 206-192-15-00
{city of .
Carlsbad
VIA EMAIL AND MAIL
Thank you for submitting a preliminary review application for a development proposal to consider a new
licensed 15-bed Residential Care Facility for the Elderly (RCFE) on property located at 4380 Highland
Drive. The project site, an approximately 47,825 square foot lot, currently is developed with an existing
one-story residential structure with a licensed 15-bed RCFE named The Gardens by the Sea. The
application is proposing to subdivide the 47,825 square foot lot into two separate lots. Resultant Parcel
1 would equal approximately 26,279 square feet and would accommodate the existing residence and
15-bed RCFE . Resultant Parcel 2 would equal approximately 21,546 square feet and would include the
construction of a new 7,000 square foot single-family residence for another 15-bed RCFE. In total, Parcel
1 and Parcel 2 would each have an individual licensed 15-bed RCFE operating separately of each other.
In response to your application, the Planning Division has prepared this comment letter. Please note
that the purpose of a preliminary review is to provide you with directions and comments on the overall
concept of your project. This preliminary review does not represent an in-depth analysis of your
project. It is intended to give you feedback on critical issues based upon the information provided in
your submittal. This review is based upon the plans, policies, and standards in effect as of the date of
this review. Please be aware that at the time of a formal application submittal, new plans, policies,
and standards may be in effect and additional issues of concern may be raised through a more specific
and detailed review.
Planning:
General
1. General Plan and zoning designations for the property are as follows:
a. General Plan: R-4, Residential, 0-4 dwelling units per acre.
b. Zoning: One-family Residential with 15,000 square-foot minimum lot size (R-1-15,000)
Community Development Department
Planning Division I 1635 Faraday Avenue I Ca rlsbad, CA 92008-7314 I 442-339-2600
PRE 2025-0024 (DEV2025-0027) -4380 HIGHLAND DRIVE
May 19, 2025
Pa e 2
c. The property is located within the Coastal Zone, more specifically, the Mello II Segment of
the Local Coastal Program . The Coastal land use designation and zone are the same as the
general plan and zoning above. The California Coastal Commission does not have appeal
authority as it relates to the location of this property.
2. The project requires the following permits:
a. Conditional Use Permit (CUP)
b. Coastal Development Permit (CDP)
c. Hillside Development Permit (HDP)
d. Minor Subdivision (MS)
e. Minor Habitat Management Plan Permit (HMP)
Because the CUP, CDP, and HDP all require decisions by the Planning Commission, all the above-
noted permits also require a decision by the Planning Commission (CMC § 21.54.040) with any
appeals going to the City Council.
3. Technical Studies/Exhibits. A formal submittal of this project will need to include two (2) hard
copies of each of the following technical studies/exhibits:
a. Biological Study. A formal submittal of this project will need to include a biological study of the
site demonstrating compliance with the City of Carlsbad's Habitat Management Plan (HMP) and
Guidelines for Biological Studies. With the property located in the Coastal Zone and including
steep slopes along its eastern boundary, if the site contains any potentially or known occupied
Coastal Sage Scrub (CSS), protocol surveys shall be conducted in the appropriate time period to
adequately survey for the presence of nesting gnatcatchers. Surveys conducted outside of this
nesting period may only observe presence/absence of gnatcatchers and would not be accepted
as adequate for purposes of CEQA and Local Coastal Program compliance.
Also, where the proposed development is located adjacent to steep slopes containing natural
habitat, the project site will be subject to the adjacency standards of the HMP (see HMP
sections F-16 through F-24). The biological study and proposed exhibits will all need to
demonstrate how the project complies with these standards. Any buffers, or open space
easements, that are required will need to be devoid of any development.
The city's HMP may be reviewed online at:
https://www.carlsbadca.gov/home/showpublisheddocument/224/637446616709600000
The Guidelines for Biological Studies may be reviewed on line at:
https://www.carlsbadca.gov/home/showpublisheddocument/1604/637819050500430000
Community Development Department
Planning Division I 1635 Faraday Avenue I Carlsbad, CA 92008-7314 I 442-339-2600
PRE 2025-0024 (DEV2025-0027) -4380 HIGHLAND DRIVE
May 19, 2025
Pa e 3
b. Cultural Resources/Paleontological Studies. The development of the proposed project will
require excavation in an area of the city known to have a high sensitivity as it relates to
archeological and paleontological resources. Please direct your consultant(s) to the city's Tribal,
Cultural and Paleontological Resources Guidelines. Please note that any archeological pedestrian
survey of the site for the cultural resources study shall include a Native American monitor during
the survey. The guidelines may be reviewed at the Planning Division front counter or found
online at:
https://www.carlsbadca.gov/home/showpublisheddocument/254/637425976516870000
Additional technical reports may be required for city staff to make a determination in accordance
with the California Environmental Quality Act.
4. Conditional Use Permit. Residential Care Facilities (serving seven or more people)(defined CMC
21.04.480) require a Planning Commission level conditional use permit. In addition to the newly
proposed RCFE, we did not find an approved conditional use permit for the existing RCFE. While this
preliminary review application and the existing businesses (The Gardens by the Sea) website (see
attached) describes a RCFE serving up to 15 people, the most current business license application on
file describes the existing RCFE as only serving 6 people. This noted inconsistency will need to be
addressed with a formal application submittal.
5. Hillside Development. The property contains slopes over 15 percent and an elevation differential
greater than 15 feet in height. Formal submittal of an application to the City's Planning Division for
discretionary review will need to demonstrate compliance with the city's Hillside Development
Regulations and Hillside Development & Design Guidelines. As part of a formal submittal, please be
sure that proposed project exhibits address all requirements listed under CMC § 21.95.130 -Hillside
Mapping Procedures and CMC § 21.95.140 -Hillside Development and Design Standards.
A development standard that may have an impact on the proposed site design is the Slope Edge
Building Setback. Please review CMC § 21.95.140 as it relates and adjust the site plan and future
elevations accordingly.
6. Conceptual Landscape Plans. Formal submittal of an application to the City's Planning Division for
discretionary review will need to include conceptual landscape plans. Landscape plans shall be
designed in accordance with the City of Carlsbad's Landscape Manual Policies and Requirements.
The City of Carlsbad's Landscape Manual can be found on the Planning Division's web page at the
following address:
http://www.carlsbadca .gov/civicax/filebank/blobdload.aspx?Blob1D=24086
As part of this submittal, please be sure to include a Fire Protection Plan and address all applicable
Fire Protection Policies.
Community Development Department
Planning Division / 1635 Faraday Avenue I Carlsbad, CA 92008-7314 I 442-339-2600
PRE 2025-0024 (DEV2025-0027) -4380 HIGHLAND DRIVE
May 19, 2025
Pa e 4
7. No conceptual landscape exhibits were included with this preliminary review submittal; therefore,
no comments regarding compliance with the City of Carlsbad's Landscape Manual Policies and
Requirements have been provided.
8. No architectural exhibits were included with this preliminary review submittal; therefore, no
comments regarding compliance with zoning standards has been provided.
9. When preparing architectural exhibits for a discretionary application submittal, please refer to the
city's Guide for Measuring Building Height:
https://www.carlsbadca.gov/home/showpublisheddocument/268/637425976538130000
10. The shape of the new lot (Lot 2) being created by the proposed subdivision is considered a
panhandle or flag-shaped lot, which is subject to the provisions outlined in CMC Chapter 21.10. In
approving a panhandle lot, a determination shall be made as to what portion of such lot shall be the
buildable lot. Pursuant to this chapter, the buildable portion shall be the entire lot exclusive of any
portion of the lot less than thirty-five feet in width that is used for access to the lot. Additionally, a
determination shall be made on which property lines of the buildable lots are the front, sides and
rear for purposes of providing required yards.
Any panhandle lot approved pursuant to CMC Chapter 21.10 shall meet the following requirements:
a. The area of the buildable portion of the lot shall be a minimum 15,000 square feet.
While the proposed site plan does not identify the buildable portion of the proposed lot, a
rough calculation appears to show it meeting the minimum 15,000 square foot threshold.
With a formal application submittal for discretionary review, please be sure to clarify the
area of the buildable portion of the lot, separate from the total lot area .
b. The width requirements for the buildable portion of the lot shall be met as required for lots in the
zone district.
In this case, pursuant to the R-1 zone (CMC § 21.10.100 .A.2), lots required to have an area
of at least 10,000 square feet and up to 20,000 square feet, shall have a minimum width of
75 feet. The buildable portion of the proposed Lot 2, measuring approximately 110 feet in
width, meets the minimum 75-foot lot-width requirement.
c. The yard requirements of the zone district shall be met as required for interior lots.
In this case, pursuant to the R-1 zone, the buildable portion of proposed Lot 2 shall be
required to have a 20-foot front yard setback, 20-foot rear yard setback, and 10-foot side
yard setbacks. The front and side yard setbacks depicted on the proposed site plan are
correctly identified; however, the rear yard setback shall be 2x the side yard, or in this case a
minimum 20 feet. Please be aware that Hillside Development Slope Edge Building Setback,
as discussed above, may propose a more restrictive building setback that will need to be
accommodated.
Community Development Department
Planning Division I 1635 Faraday Avenue I Carlsbad, CA 92008-7314 I 442-339-2600
PRE 2025-0024 (DEV2025-0027) -4380 HIGHLAND DRIVE
May 19, 2025
Pa e 5
d. The length of the portion of the lot fronting on a public street or publicly dedicated easement
afforded access to the buildable lot shall not be greater than one hundred fifty feet for a single
lot. The minimum width for such access portion shall be twenty feet.
The panhandle portion of proposed Lot 2 is appropriate, measuring approximately 24 feet in
width and approximately 108 feet in length, as depicted on the proposed site plan.
e. An improved driveway shall be provided within the access portion of the lot from the street or
public easement to the parking area on the buildable lot at least fourteen feet wide for single
lots and twenty feet wide when serving more than one lot. The minimum overhead clearance
shall be ten feet. The driveway shall be constructed to accommodate public service vehicles with
a minimum of two-inch thick asphalt concrete paving on proper base with rolled edges.
Compliance with the above would need to be clarified as part of formal application
submittal for discretionary review.
f Drainage from the lot shall be channeled down the private access to a public street or special
drainage means must be provided to the satisfaction of the City Engineer.
Compliance with the above would need to be clarified as part of formal application
submittal for discretionary review.
g. Each lot shall have three non-tandem parking spaces with an approach not less than twenty-four
feet in length with proper turnaround space to permit complete turnaround for forward access
to the street. The parking and access arrangement shall be designed to the satisfaction of the
City Engineer.
Compliance with the above would need to be clarified as part of formal application
submittal for discretionary review.
h. Structures permitted in the access portion of the lot shall be limited to mailboxes, fences, trash
enclosures, landscape containers and nameplates. Except for mailboxes, the structures shall not
be greater than forty-two inches in height if located within twenty feet of the street property line
or greater than six feet in height beyond this point.
Compliance with the above would need to be clarified as part of formal application
submittal for discretionary review.
i. The property owner of such a lot shall agree to hold the city or any other public service agency
harmless from liability for any damage to the driveway when being used to perform a public
service.
j. Any other condition the official or decision-making body with the authority to otherwise approve
the subdivision may determine to be necessary to properly develop such property.
Community Development Department
Planning Division I 1635 Faraday Avenue I Carlsbad, CA 92008-7314 I 442-339-2600
PRE 2025-0024 (DEV2025-0027) -4380 HIGHLAND DRIVE
May 19, 2025
Pa e 6
11. Proposed Lot 1 with the existing residential structure will need to demonstrate compliance with the
R-1 zone development requirements as part of any formal application submittal for a minor
subdivision. All setbacks for the existing structure will need to be identified and determined
compliant.
12. Pursuant to CMC § 21.44.020.B.Table-A the number of required off-street parking spaces for a
residential care facility serving seven or more people shall be determined by the city planner and
shall be based on the operating characteristics of a specific proposal, including, but not limited to,
number of (1) employees, (2) beds, and (3) service deliveries. As part of a formal application
submittal, please submit a parking study prepared by a registered Traffic Engineer or other qualified
parking consultant, or other evidence satisfactory to the City Planner covering both sites. Parking for
each lot shall be independent of the other.
13. New requirements related to the city's goals to reduce greenhouse gas (GHG) emissions will likely
impact development requirements of this project. A formal application submittal will need to
include a completed Climate Action Plan Checklist (Form P-30) to determine what requirements will
apply to the project. New GHG reduction requirements are related to energy efficiency,
photovoltaic, electric vehicle charging, water heating and traffic demand management
requirements, as set forth in the California Green Building Standards Code and in Carlsbad Municipal
Code Chapters 18.21, 18.30 and 18.51 which is available on the city's website at the following
address:
http://www.qcode.us/codes/carlsbad/view.php?topic=18&frames=on
To the extent that new GHG reduction requirements are in effect at the time of application for
grading or building permits, the project will be required to comply with the effective requirements
even if different than what is proposed in the project's planning approvals. GHG reduction
requirements may impact, but are not limited to, site design and local building code requirements. If
incorporating new GHG reduction requirements results in substantial modifications to the project
after planning approvals are obtained, then prior to issuance of grading or building permits, the
applicant may be required to submit and receive approval of a Consistency Determination or an
Amendment application for the project through the Planning Division.
14. Applicant Questions/Staff Responses:
a. Does the existing lot currently have a Conditional Use Permit {CUP) that enables operation of the
existing 15-bed RCFE?
Staff Response: We cannot find any records that the existing 15-bed RCFE has a conditional use
permit.
b. After the lot split, will a new CUP be required for the second RCFE on the new parcel, or can the
entitlement structure from the existing lot be extended or duplicated?
Staff Response: CUPs run with the land; therefore, each property would need its own CUP. The
lot split (MS) and conditional use permit {CUP) would be considered simultaneously.
Community Development Department
Planning Division I 1635 Faraday Avenue I Carlsbad, CA 92008-7314 I 442-339-2600
PRE 2025-0024 (DEV2025-0027) -4380 HIGHLAND DRIVE
May 19, 2025
Pa e 7
c. Will the City permit the operation of two licensed RCFEs, each with 15 beds, on adjacent lots
under current zoning and land use regulations?
Staff Response: It is conceivable with separate CUPs. However, these uses are identified as
conditional for a reason, and they are subject to public hearings for a decision by the Planning
Commission and the City Council on appeal.
d. Can the permit application for the new construction proceed concurrently with the lot split
review to reduce development time line?
Staff Response: What you are describing is known as concurrent processing. The following link
will take you to the City's Informational Bulletin No. 113 regarding this topic:
https://www.carlsbadca .gov/home/showpublisheddocument/8164/637704327248070000
e. What is the expected review and approval timeline for a new or modified CUP for a 15-bed RCFE?
Staff Response: Timing is difficult to predict, especially given this site is located in the Coastal
Zone and appears to be constrained with steep slopes and natural habitat that might contain
occupied coastal sage scrub. The following link will take you to City of Carlsbad Informational
Bulletin No. 110 discussing the Community Development Department's commitment to a timely
review of your application:
https://www.carlsbadca.gov/home/showpublisheddocument/17840/638555998639630000
f. Will the proposed project require a neighborhood compatibility review or community outreach
component?
Staff Response: Yes. The following link will take you to the City of Carlsbad's City Council Policy
Statement No. 84:
https://www.carlsbadca .gov/home/showpublisheddocument/19411/638693435056900000
Such project, as described in this preliminary review application, would be subject to both
Category-A (Early Public Notification) and Category-B (Enhanced Public Engagement) as
described. The applicability of Category-B is due to the requirement to process a Planning
Commission level CUP for a 15-Bed RCFE. You will find this discussed on page 3 of the policy.
g. Are there any additional zoning, density, environmental, or access requirements we should be
aware of based on the intended use as licensed RCFEs?
Staff Response: Response to this question is answered in both the Planning Division responses
above and the Land Development Engineering responses below.
Community Development Department
Planning Division I 1635 Faraday Avenue I Carlsbad, CA 92008-7314 I 442-339-2600
PRE 2025-0024 (DEV2025-0027) -4380 HIGHLAND DRIVE
May 19, 2025
Pa e 8
All necessary application forms, submittal requirements, and fee information are available at the
Planning Division's counter located in the Faraday Building at 1635 Faraday Avenue or online at:
https://www.carlsbadca.gov/departments/community-development/planning.
You may also access the General Plan Land Use Element and the Zoning Ordinance online at the website
address shown. Please review all information carefully before submitting.
Land Development Engineering:
1. Please contact Nick Gorman in the Transportation Division at Nick.Gorman@carlsbadca.gov, a
division of the Public Works Department, to determine if a Scoping Agreement is required. Scoping
Agreements are used to determine if a Local Mobility Analysis (LMA) is required and the scope of
analysis. If an LMA is deemed necessary, first, work with Transportation Division staff to obtain an
approved scoping agreement. After the scoping agreement has been approved, please submit the
approved Scoping Agreement as an appendix within the LMA that is to be prepared per the most
recent Transportation Impact Analysis Guidelines.
2. After the scoping agreement has been approved or deemed not necessary by the Transportation
Division, please submit a completed Transportation Analysis Need Statement Form P-42 to Land
Development Engineering at LandDev@carlsbadca.gov prior to discretionary application submittal. If
an LMA has been deemed not necessary by the Transportation Division, please provide
correspondence from the Transportation Division indicating one is not required.
3. A Transportation Demand Management (TDM) plan may be required depending on the number of
employee vehicle trips the project will generate. Please calculate the gross employee ADT using the
generation rates from Table 2-2 of the TDM Handbook. The TDM Handbook is available on the city's
website at the following address:
https://www.carlsbadca.gov/home/showpublisheddocument/310/637425981338370000
Show calculations on the Climate Action Plan checklist, Form P-30. If applicable, submit a TDM plan
with your application for discretionary permits.
4. Depending on the CEQA determination, which is determined after the application for discretionary
permits is submitted, a Vehicle Miles Traveled (VMT) analysis may be required per the Vehicles
Miles Traveled Analysis Guidelines. These guidelines are available on the city's website at the
following address:
https://www .ca rlsbadca .gov /home/showdocument?id=312
5. Please complete a Stormwater Standards Questionnaire, Form E-34. This questionnaire will guide
you and the city in determining what type of reports and storm water mitigation must be completed
to satisfy state and City stormwater quality requirements. The questionnaire is located on the City of
Carlsbad website.
Community Development Department
Planning Division I 1635 Faraday Avenue I Carlsbad, CA 92008-7314 I 442-339-2600
PRE 2025-0024 (DEV2025-0027) -4380 HIGHLAND DRIVE
May 19, 2025
Pa e 9
6. Based on a preliminary analysis it appears that this project is a Priority Development Project (PDP). A
tally of the existing and proposed impervious area on site is needed to confirm whether any of the
questions in step 3 of the questionnaire will be answered 'yes', thus defining the project as a PDP.
All impervious surfaces being created or replaced (onsite and offsite) shall be included for
treatment. Submit a Storm Water Quality Management Plan. Review the Hydromodification
Exemption Map and Potential Critical Coarse Sediment Yield Area Map on the City website to see if
this criterion applies to your project. The post construction stormwater treatment BMPs shall be
shown on a conceptual grading plan and drainage plan with the discretionary application.
7. Please provide a Preliminary Title Report (current within the last six (6) months).
8. Please annotate and delineate all existing easements and encumbrances listed in the Preliminary
Title Report on the site plan. If any vacations or quitclaims are planned with this development
annotate on the site plan.
9. A Preliminary Hydrology Study including map and calculations is required to demonstrate
capacity/sizing of proposed and existing storm drain infrastructure. Show 100-year storm hydrologic
calculations before and after development for each drainage basin.
Also, if any drainage crosses from one new parcel to another new parcel, then a proposed covenant
of easement may be necessary. A covenant of easement may be recorded on the required parcel
map.
10. A preliminary geotechnical report is required to evaluate the feasibility of the project. Guidelines for
preliminary geotechnical studies are available on the City of Carlsbad Engineering website.
11. Per CMC § 15.16.060 this project will require a grading permit and grading plan.
12. This project shall utilize City of Carlsbad Survey Control Network established on Record of Survey
Map 17271, NAD83, Zone VI, 1991.35 Epoch for horizontal control and NGVD 29 datum for vertical
control per City of Carlsbad Engineering Standards.
13. Please delineate and annotate the limits of grading. Include remedial grading quantities on the plan.
14. Please delineate and annotate approximate topographic contours for existing and proposed
condition. Provide 1-foot contours for slopes less than 5%; 2-foot intervals for slopes between 5%
and 10%, and 5-foot intervals for slopes over 10%. Extend contours a minimum 25 feet beyond the
project boundary.
15. On the site plan, please show and identify all existing surface improvements screened back at the
project site, project frontage and within 25 feet of the boundary.
16. Please indicate the earthwork quantities (cut, fill, import, export, remedial) proposed for the project
in cubic yards.
Community Development Department
Planning Division I 1635 Faraday Avenue I Carlsbad, CA 92008-7314 I 442-339-2600
PRE 2025-0024 (DEV2025-0027) -4380 HIGHLAND DRIVE
May 19, 2025
Page 10
17. Please provide spot elevations at the corners of each pad in the proposed condition. Include finish
pad and floor elevations.
18. Please provide the method of draining each lot. Unless otherwise specified by a geotechnical
engineer, method of drainage shall comply with California Building Code (latest version) section
1804.4.
19. Please delineate location of all existing and proposed buildings, walls, fences and permanent
structures onsite and within 25 feet of the site .
20. The project frontage has been identified in the city's inventory as a vacant planting site. Please
coordinate with the city's Parks and Recreation Department for planting requirements per CMC §
11.12 (Trees and Shrubs) for additional information.
21. This project is proposing a subdivision to create two (2) parcels. A Tentative Parcel Map is required.
22. Please provide typical street cross sections for existing frontage streets. Plot existing right-of-way
width and existing improvements.
23. Per CMC § 20.28.020, panhandle lots may not serve as access to any lot except the lot of which the
panhandle is a part. The driveway between the two (2) lots will need to be segregated to prevent
dual access on the panhandle.
24. Driveways that exceed more than 150 feet in length shall have a turnaround designed for a 3-point
turn of a passenger vehicle. Additionally, the applicant shall coordinate with the fire department to
ensure width and grade of driveway meets all Fire Department requirements.
25. Per CMC § 20.16.0l0(H), the proposed lot to depth ratio cannot be more than 3 times the average
lot width. The depth exceeds the width ratio by a small margin of 3.04. The average width was
calculated to be 92.65 feet. (282 FEET DEEP/92.65 FEET WIDE= 3.04). Adjust subdivision boundary
accordingly.
26. Show all existing utilities and callout size for: water, sewer, storm drain, underground dry utilities,
overhead lines, traffic signals, streetlights in Highland Drive and laterals affecting the property. See
DWG 149-8 for existing 8-inch sewer and DWG 937-4 for existing 8-inch water pipe.
27. All transformers and electrical facilities solely serving this project site shall be located onsite and
outside of the public right-of-way.
28. Please obtain a letter from SDG&E confirming their approval of the proposed transformer location
and stating that no additional off-site facilities will be necessary for this project. Please also include
all existing and proposed dry utilities and the services that will supply power to the proposed
transformer.
29. Please be aware this project shall be required to underground overhead utility lines servicing the
existing building on Lot 2 once the new building is constructed . The main overhead utility lines
Community Development Department
Planning Division I 1635 Faraday Avenue I Carlsbad, CA 92008-7314 I 442-339-2600
PRE 2025-0024 (DEV2025-0027) -4380 HIGHLAND DRIVE
May 19, 2025
Page 11
paralleling Highland Drive will not be required to be placed underground. The property owner,
however, will be required to enter into a Local Improvement District Agreement to agree to
underground the utilities in the future if an assessment district to underground the utilities is ever
formed.
30. Please locate existing and proposed fire service, backflows, potable and recycled water services,
meters, landscape irrigation services, and sewer laterals for the new development in compliance
with City of Carlsbad Engineering Standards requirements.
31. Please provide multiple cross-sections of the site to demonstrate differences in grade from adjacent
properties, existing and proposed grades on-site, fences and location of structures on-site and on
adjacent properties.
32. Highland Drive is designated as an alternative design street. Therefore, this development is not
subject to installing street frontage improvements at this time. The property owner will be required
to enter into a Neighborhood Improvement Agreement (NIA) with the city. The Agreement will be
recorded with San Diego County Recorder's Office.
33. Per CMC § 21.10.100 (C), the buildable portion shall be the entire lot exclusive of any portion of the
lot less than 35-feet in width that is used for access to the lot.
34. Meet with the Fire Department to identify the necessary fire protection measures required for this
project (access, fire hydrants, sprinkler system, on-site circulation, emergency access, etc.)
35. Please see the attached red lined plan and address all comments prior to making a formal
discretionary permit application submittal.
36. Please be advised that a more in-depth review of the proposed development will occur with the
discretionary permit application when a more complete design of the project is provided.
Fire & Life Safety:
1. The property is located adjacent to flammable vegetation, including native vegetation, to the east.
Fuel Modification in accordance with the City's Landscape Manual will be required. Typically fuel
modification of 60 feet to structures is required.
2. Due to potential native habitat, please coordinate with Habitat Management Program Manager,
Roseanne Humphrey.
3. Hose-pull distance around proposed structure is greater than 150-feet. As such, the "private access
road" shall meet requirements for a fire department access road.
4. Fire Department access roadways shall be designed, constructed, and maintained to support the
imposed loads of fire apparatus with a total weight of 75,000 pounds. The surface shall be designed,
constructed, and maintained to provide all-weather driving capabilities. A letter or statement, wet-
stamped and signed by a registered engineer, shall be provided on any future plans certifying that
Community Development Department
Planning Division I 1635 Faraday Avenue I Carlsbad, CA 92008-7314 I 442-339-2600
PRE 2025-0024 (DEV2025-0027) -4380 HIGHLAND DRIVE
May 19, 2025
Page 12
any new roadways meet this 75,000-pound, all-weather requirement. Road base without an
appropriate topping or binding material does not satisfy the all-weather requirement.
5. Private driveways used as required fire apparatus access roads serving no more than two dwellings
shall have a minimum width of 16 feet.
Building:
1. No comments.
If you would like to schedule a meeting to discuss this letter with the commenting departments, please
contact Jason Goff at the number below. You may also contact each department individually as follows:
• Planning: Jason Goff, Senior Planner, at (442) 339-2643
• Land Development Engineering: David Rick, Project Engineer, at (442) 339-2781
• Fire & Life Safety: Darcy Davidson, Fire Division Chief, at (442) 339-2662
• Building: Shawn Huff, Building Official, at (442)-339-5338
Sincerely,
ERIC LARDY, AICP
City Planner
EL:JG:cf
Attachments:
1. The Gardens by the Sea, website excerpt information.
2. Redlined Site Plan from Land Development Engineering
c: david@thegardenscarlsbad .com; David Cooper, 4380 Highland Drive, Carlsbad, CA 92008
David Rick, Project Engineer
Fire & Life Safety
Laserfiche/File Copy
Data Entry
Community Development Department
Planning Division I 1635 Faraday Avenue I Carlsbad, CA 92008-7314 I 442-339-2600
ATTACHMENT
PRE 2024-0024 -4380 Highland Drive
Home About Usv Services Activities Tour Contact Us
Welcome Home to The Gardens
There are seven spacious bedrooms in this large home, which sits on an acre and a half
of land that was formally an avocado grove. Yes, we often include our own avocados in
the tasty meals the Staff prepares according to the Resident's individual preferences.
In addition to our own homemade soups and meals, there are days we will enjoy the
simple pleasures of a takeoutburger or a complete turkey dinner with all the fixings
from a local restaurant. Reading, watching TV or videos, working on puzzles, crafts, and
walks around the grounds are always available to each Resident. A highlight is when
We encourage inquiries and hope you will visit us. You will be wa rmly welcomed!
Tour the Facility
The Garclens
by t he Sen,
Home About Usv Services Activities Tour Contnct Us
''l k' I -
Email: info@thegardenscarlsbad.com
You may use the form below to
request information or to
arrange a tour.
Name"
Email'
• ~ I
¥
6 ~ ~ 6 t a I ,; ~ ~ ~ ~ ~ ~ ~ b I ¥ t
3 i ~ I f ~ I
(~ Je.;1?1l-
'if '• iVC.. LD""',; l'1
~ ~ " ~ i 1 ~ I : ,
1 PROPOSED SITE PLAN SCENARIO 1
·8)
UNIT 1
MAIN RESIDENCE
7.000 SF t-STORY
"/."iJ2.' -, 'f7 .• 6 f
( -:-J7. 17
CITY COMMENTS
Tl-IE TWO PARCELS ARE IN THE R-1-15000 CHE-FAMILY RESIDENTIAL ZONE, Win-I A
GENERAL PLAN LANO USE OF R ....
THE MINIMUM LOT SIZE IN THIS ZONE IS 15,000 SQ FT.
eon, PROPERTIES ARE IN THE COASTAL ZONE:
A MINOR COASTAL DEVELOPMENT PERMIT (CDP) IS AEQUIREO FOR SMALL
PROJECTS (E.G., ADUS).
A MAJOR COP (HANDLED BY THE CALIFORNIA COASTAL COMMISSION) IS
NEEDED FOR LARGER PROJECTS (E.G., A NE\'i' SINGLE-FAMILY HOME}.
A PRELIMIHARY REVIEW IS RECOMMENDED TO ASSESS PROJECT FEASIBILITY AND
REQUIRED ENTITLEMENTS, INCLUDING A CDP.
IF A MAJOR COP IS REQUIRED, THE PROCESS TYPICALLY TAKES AROUND A YEAR.
RESIOEtffiAL CARE FACILITIES 1r~ R-1 ZONES HAVE A CODIFIED LIMIT ON THE
NUMBER OF PATIENTS (6 PATIENTS)AllOWEO,
IF THE PROPOSED FACILITY EXCEEDS 8 PATIENTS. PERMISSIBILITY WOULD NEED
FURTHER ASSESSMENT THROUGH A PRELIMINARY REVIEW,
4380 HIGHLAND DR CARLSBAD, CA 92009
LOT2
AREA 21,546SF
COVERAGE
AREA(4DY,) 8,018 SF
PROPOSED
COVERAGE 7,000SF AREA
PROPOSED
UHITS 1
Jf.1/H ,_, I? ~~ P>•~"'"' v,,,'< o/ COi
q 2,.., ,,,7'-J ~ 2 ?'if ' "V-\1"•,-v,'1 4+".;-i-J..f. __ ..,
ESC:IJlli"•l'·O·
ene-te studio >-~n!.,IIH"l'l'OOHl~T-,
Dtt,l«,.V~,..rs
n5 fl 5TKf..CT 5l.flC 300 ,-NI Dl:!GO, c:..32101
CcL·C.l,.7C.O.,f◄22 ,,,.~.7502 C,.UJ,cne:n:,r,:l,o@'J"',ll.<""'
□
"' C, C, N "' <( (.)
~ z [ll cn :3 ..J 0:: 0. <(
w (.)
!:: 0:: 0 0 en 0 iS (.) 5 :::i ~ I-
I en
~ :::;; (!) w w :E .. I-
~ :r i C, ~LIJ (.) co u z "' ~w r en "<t
( ... ~"' )
D
'J:\151t."l'I~:
mttr>-GC,
SITf:l'lAN
lMU,
SCAJ.r, CATr,
I/IC'• /".O -4/11/ZOZS
SttttT»o,
SP1
j).,,, V,, /!I<,
l (/1.i.,/").)