Loading...
HomeMy WebLinkAbout2511 GATEWAY RD; ; CBC2024-0335; Recycle( City of Carlsbad CONSTRUCTION WASTE City of Ca~GEMENT PLAN JAN 1 7 2G25 BUILDING DIVIS/O Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Applicable to ALL NEW CONSRUCTION, ADDITIONS AND ALTERATIONS. You are required to list materials that will be reused, recycled or disposed from your project. If you have questions about the recycling requirement or completing this form, please contact Waste Management at (760) 929-9400, a certified C&D recycler, or the Carlsbad Building Division at (760) 602-2700. Please note: Unless you are self-hauling, Waste Management or approved haulers must be used for all construction projects within the City of Carlsbad. PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued without a completed Construction Waste Management Plan. Applicant Information Permit No. CBC2024-0335 Project Title VIASAT BUILDING E4-TENANT IMPROVEMENT ProjectAddress2511 GATEWAY RD. CARLSBAD, CA 92009 APN 213-260-11 Applicant Name Destination West Builders, LLC. Contractor 0 Last First Applicant Address 5140 Birch St Suite 200 Newport Beach, CA 93660 Phone ( 949 ) 781-6620 E-mail Address Caroline@destinationwestbuilders.com Applicant MailingAddress 5140 BIRCH ST. SUITE 200 NEWPORT BEACH,CA 92660 (if different than project address) Project Type (check all that apply): Residential □ Commercial 0 Public Building □ Brief Description T_en_a_n_t _lm_p_ro_v_em_en_t __________________________ _ Project Size_2_9_6_?_0 ________ Estimated Cost of Project $ _______________ _ (square footage) Please check the appropriate box: DI plan on using WASTE MANAGEMENT roll-off bin(s) for all materials and will provide all receipts after construction. DI plan on self-hauling to a certified recycling facility and will provide all receipts after construction. D This is a proposed LEED certified project and I plan on separating materials on site in conjunction with WASTE MANAGEMENT. Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information provided in and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge and belief. Print Name Caroline Carranza Signature Caroline Carranza Date 1 /14/25 Page 1 of 4 Rev. 2.10.21 PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will (cont'd) not be issued without a completed Construction Waste Management Plan. DEBRIS RECYCLING ESTIMATE: SECTION A Permit No. CBC2024-0335 Project Title VIASAT BUILDING E4 -TENANT [! Project Address 2511 GATEWAY RD. CARLSBAD, CA 92009 Applicant Name Destination West Builders, LLC. Phone APN 213-260-11 Last First SECTION B Complete the following table with estimated waste tonnage to be generated by your project. This is your plan for construction waste management. Changes can be made on the final recycle report. Goal: the diversion rate shall be 65% by weights of debris. Material Type Complete this line of the toble·only if only using WASTE MANAGEMENT roll-off bins. Mixed C&D Debris Parking lot Asphalt & Concrete Brick/ Masonry/ Tile Mixed Inert Debris Cabinets, Doors, Fixtures, Windows (circle all that apply) Car et Carpet Padding/ Foam Cardboard Ceiling Tile (acoustic) Drywall (used, new, scrap) Landscape Debris (brush, trees, stumps, etc.) No dirt. Unpainted Wood & Pallets Concrete Roofing Materials Sera Metal Stucco Other: TOTAL SECTION C Estimated Waste Quantity (tons) .1 TON .1 TON .1 TON .1 TON .1 TON To meet 65% Diversion Requirement (estimate) A B C Place a ( ✓) check next to items to be reused or salvaged .5TON Place a ( ✓) check next to items to be recycled V V V V Place a ( ✓) check next to items to be disposed at landfill x 0.65 = 0-325 tons -------------------Total Estimated Waste from above Minimum Required Diversion Contractor /Owner Signature_C_a_ro_li_n_e_c_a_rr_an_z_a __________ Date 1 /14/25 Page 2 of 4 Rev. 7/1/20 DEBRIS RECYCLING REPORT (ACTUAL): SECTION A I Acknowledgement I certify under penalty of perjury under the laws of the State of California that the ipformation provided in and with this form pertains to construction and demolition debris generated only from the-project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge and belief. Permit No. csc2024-0335 Print Name Caroline Carranza ------------------Address 2511 GATEWAY RD. CARLSBAD, CA 92009 Date 1/14/25 -----------! SECTION B Use this Final Log below to track loads of materials as they leave the job site. @@SAVE RECEIPTS@@ Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where matE!rial is taken. Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons. A B C Date Material Type Actual Amt Actual Amt Actual Amt Destination Facility Reused or Recycled Disposed in (Name, Address, Phone) Salvaged Landfill Example: 01/01/2020 Palomar Transfer Station, 5960 El Concrete {broken) 5 tons Camino Real -760 603-0153 12/6/24 Mixed C&D 1.07 0.57 EDCO 12/7/24 Mixed C&D 2.77 1.49 EDCO @TOTAL SECTION C Diversion Rate Achieved 3.84 / 5.91 = 0.65 % ~ 65% l ✓I Total of columns A + B Total of columns A + B + C DIVERSION Contractor/Owner Signature_C_a_ro_li_n_e_c_a_rr_an_z_a ________ Date 1/14/25 Attach the following documenta"tion to this Report: Return completed form and documentation to: • Original recycling weight tickets, landfill weight tickets • Original donation receipts with photos and/or itemized descriptions • Any other relevant information to support Recycling Report City of Carlsbad Building Division (1st Floor) 1635 Faraday Avenue Carlsbad, CA 92008 Page 3 of 4 Rev. 2/10/21 3825 Bancroft Drive. Spring Valley, CA 91977 P -619-589-6001 F -619-589-71 58 CONSTRUCTION AND DEMOLITION DEBRIS RECYCLING LOG Daily Log of Construction and Demolition (C&D) Materials Removed or Reused on Job Site Date: 1/10/2025 Project: ViaSat E4 3rd Floor Address: 2501 Gateway Rd., Carlsbad, CA DATE TICKET NO. DESTINATION LOCATION 12/6/24 71290 Edco La Mesa CA 12/7/24 71662 Edco La Mesa CA • 1 O wheeler holds 20,250 lbs of concrete with allowable air space TOTAL RECYCLED: 65% Job No: 24021-257 Customer: Destination West Builders (TONS) (TONS) RECYCLED TRASH 'Y, RECYCLABLE MATERIAL TYPE 1.07 0.57 65% Mixed C&D 2.77 1.49 65% Mixed C&D 3.84 2.07 Name of Person Verifying Accuracy: Signature: ___ L__.,_ G)____..~ 1 _________ _ ~rton EDCO Station ~ 8184 Commercial St. La Mesa, CA 91942 (619) 466-3355 J--l¥~~' Customer: 0171 Ticket: 71662 Date: 12/07/24 In: Out: CASPER CO (' () fl s875 BAN€R:OFT DF . ' -«ASl)\ LJi:\,+ett\ P,.,vi,' ~ SPRING 1TALLli¥ CA 91999-'----J Commodity Units Rate 55 C&D Certified 4.26 5:38 5:54 INVOICE Truck: 1101/1101 Container: Route: 02055 Origin: 020 SAN DIEGO [Gross(In): 13.29 tons Scl#l Tare 9.03 tons Scl#l Net: Extended Charge 545.28 4.26 tons] TOTAL DUE 545.28 Miguel E. EDCO Station 8184 Commercial St. La Mesa, CA 91942 (619) 466-3355 • Customer: 0171 CASPER CO ~~--~~~~~~ SP~L~Y CA 91977 Ticket: 71290 Date: 12/06/24 Commodity Units Rate 55.C&D Certified 1.64 In: 7: 44 Out: 8:00 Truck: Container: Route: Origin: INVOICE 0036/0036 02055 020 SAN DIEGO [Gross(In): 6.83 tons Scl#3 Tare 5.19 tons Man Wt Net: Extended Charge 209.92 1. 64 tons] TOTAL DUE 209.92 Construction & Demolition Diversion Certificate --Diversion Percentage 65% This certifies that the pompany listed above has utilized an EDCO facility to divertponstruction delJ)olition materia\s in accordance with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility. OSIRIS Driver {'city of Carlsbad ■ V v v v ✓ l!]