HomeMy WebLinkAbout2511 GATEWAY RD; ; CBC2024-0335; Recycle( City of
Carlsbad
CONSTRUCTION WASTE
City of Ca~GEMENT PLAN
JAN 1 7 2G25
BUILDING DIVIS/O
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Applicable to ALL NEW CONSRUCTION, ADDITIONS AND ALTERATIONS. You are required to list
materials that will be reused, recycled or disposed from your project. If you have questions about the recycling
requirement or completing this form, please contact Waste Management at (760) 929-9400, a certified C&D
recycler, or the Carlsbad Building Division at (760) 602-2700. Please note: Unless you are self-hauling, Waste
Management or approved haulers must be used for all construction projects within the City of Carlsbad.
PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued
without a completed Construction Waste Management Plan.
Applicant Information
Permit No. CBC2024-0335 Project Title VIASAT BUILDING E4-TENANT IMPROVEMENT
ProjectAddress2511 GATEWAY RD. CARLSBAD, CA 92009 APN 213-260-11
Applicant Name Destination West Builders, LLC. Contractor
0 Last First
Applicant Address 5140 Birch St Suite 200 Newport Beach, CA 93660
Phone ( 949 ) 781-6620 E-mail Address Caroline@destinationwestbuilders.com
Applicant MailingAddress 5140 BIRCH ST. SUITE 200 NEWPORT BEACH,CA 92660
(if different than project address)
Project Type
(check all that apply):
Residential □ Commercial 0 Public Building □
Brief Description T_en_a_n_t _lm_p_ro_v_em_en_t __________________________ _
Project Size_2_9_6_?_0 ________ Estimated Cost of Project $ _______________ _
(square footage)
Please check the appropriate box:
DI plan on using WASTE MANAGEMENT roll-off bin(s) for all materials and will provide all receipts after construction.
DI plan on self-hauling to a certified recycling facility and will provide all receipts after construction.
D This is a proposed LEED certified project and I plan on separating materials on site in conjunction with WASTE
MANAGEMENT.
Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information
provided in and with this form pertains to construction and demolition debris generated only from the project listed
in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the
best of my knowledge and belief.
Print Name Caroline Carranza Signature Caroline Carranza Date 1 /14/25
Page 1 of 4 Rev. 2.10.21
PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will
(cont'd) not be issued without a completed Construction Waste Management Plan.
DEBRIS RECYCLING ESTIMATE:
SECTION A Permit No. CBC2024-0335 Project Title VIASAT BUILDING E4 -TENANT [!
Project Address 2511 GATEWAY RD. CARLSBAD, CA 92009
Applicant Name Destination West Builders, LLC. Phone
APN 213-260-11
Last First
SECTION B Complete the following table with estimated waste tonnage to be generated by your project.
This is your plan for construction waste management. Changes can be made on the final recycle report.
Goal: the diversion rate shall be 65% by weights of debris.
Material Type
Complete this line of the toble·only if
only using WASTE MANAGEMENT
roll-off bins.
Mixed C&D Debris
Parking lot Asphalt & Concrete
Brick/ Masonry/ Tile
Mixed Inert Debris
Cabinets, Doors, Fixtures,
Windows (circle all that apply)
Car et
Carpet Padding/ Foam
Cardboard
Ceiling Tile (acoustic)
Drywall (used, new, scrap)
Landscape Debris (brush, trees,
stumps, etc.) No dirt.
Unpainted Wood & Pallets
Concrete Roofing Materials
Sera Metal
Stucco
Other:
TOTAL
SECTION C
Estimated
Waste Quantity
(tons)
.1 TON
.1 TON
.1 TON
.1 TON
.1 TON
To meet 65% Diversion Requirement (estimate)
A B C
Place a ( ✓) check
next to items to be
reused or salvaged
.5TON
Place a ( ✓) check next
to items to be
recycled
V
V
V
V
Place a ( ✓) check next
to items to be
disposed at landfill
x 0.65 = 0-325 tons -------------------Total Estimated Waste from above Minimum Required Diversion
Contractor /Owner Signature_C_a_ro_li_n_e_c_a_rr_an_z_a __________ Date 1 /14/25
Page 2 of 4 Rev. 7/1/20
DEBRIS RECYCLING REPORT (ACTUAL):
SECTION A I Acknowledgement
I certify under penalty of perjury under the laws of the State of California that the ipformation provided in and with
this form pertains to construction and demolition debris generated only from the-project listed in PART 1, that I have
reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge
and belief.
Permit No. csc2024-0335 Print Name Caroline Carranza ------------------Address 2511 GATEWAY RD. CARLSBAD, CA 92009 Date 1/14/25
-----------!
SECTION B Use this Final Log below to track loads of materials as they leave the job site.
@@SAVE RECEIPTS@@
Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where matE!rial is taken.
Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons.
A B C
Date Material Type Actual Amt Actual Amt Actual Amt Destination Facility
Reused or Recycled Disposed in (Name, Address, Phone)
Salvaged Landfill
Example:
01/01/2020
Palomar Transfer Station, 5960 El
Concrete {broken) 5 tons Camino Real
-760 603-0153
12/6/24 Mixed C&D 1.07 0.57 EDCO
12/7/24 Mixed C&D 2.77 1.49 EDCO
@TOTAL
SECTION C
Diversion Rate Achieved 3.84 / 5.91 = 0.65 % ~ 65% l ✓I
Total of columns A + B Total of columns A + B + C DIVERSION
Contractor/Owner Signature_C_a_ro_li_n_e_c_a_rr_an_z_a ________ Date 1/14/25
Attach the following documenta"tion to this Report: Return completed form and documentation to:
• Original recycling weight tickets, landfill weight tickets
• Original donation receipts with photos and/or itemized descriptions
• Any other relevant information to support Recycling Report
City of Carlsbad
Building Division (1st Floor)
1635 Faraday Avenue
Carlsbad, CA 92008
Page 3 of 4 Rev. 2/10/21
3825 Bancroft Drive. Spring Valley, CA 91977
P -619-589-6001 F -619-589-71 58
CONSTRUCTION AND DEMOLITION DEBRIS RECYCLING LOG
Daily Log of Construction and Demolition (C&D) Materials Removed or Reused on Job Site
Date: 1/10/2025
Project: ViaSat E4 3rd Floor
Address: 2501 Gateway Rd., Carlsbad, CA
DATE TICKET NO. DESTINATION LOCATION
12/6/24 71290 Edco La Mesa CA
12/7/24 71662 Edco La Mesa CA
• 1 O wheeler holds 20,250 lbs of concrete with allowable air space
TOTAL RECYCLED:
65%
Job No: 24021-257
Customer: Destination West Builders
(TONS) (TONS)
RECYCLED TRASH 'Y, RECYCLABLE MATERIAL TYPE
1.07 0.57 65% Mixed C&D
2.77 1.49 65% Mixed C&D
3.84 2.07
Name of Person Verifying Accuracy:
Signature: ___ L__.,_ G)____..~ 1 _________ _
~rton
EDCO Station ~
8184 Commercial St.
La Mesa, CA 91942
(619) 466-3355
J--l¥~~'
Customer: 0171 Ticket: 71662
Date: 12/07/24
In:
Out:
CASPER CO (' () fl
s875 BAN€R:OFT DF . ' -«ASl)\ LJi:\,+ett\ P,.,vi,' ~ SPRING 1TALLli¥ CA 91999-'----J
Commodity Units Rate
55 C&D Certified 4.26
5:38
5:54
INVOICE
Truck: 1101/1101
Container:
Route: 02055
Origin: 020 SAN DIEGO
[Gross(In): 13.29 tons Scl#l Tare 9.03 tons Scl#l Net:
Extended
Charge
545.28
4.26 tons]
TOTAL DUE 545.28
Miguel E.
EDCO Station
8184 Commercial St.
La Mesa, CA 91942
(619) 466-3355 •
Customer: 0171
CASPER CO
~~--~~~~~~ SP~L~Y CA 91977
Ticket: 71290
Date: 12/06/24
Commodity Units Rate
55.C&D Certified 1.64
In: 7: 44
Out: 8:00
Truck:
Container:
Route:
Origin:
INVOICE
0036/0036
02055
020 SAN DIEGO
[Gross(In): 6.83 tons Scl#3 Tare 5.19 tons Man Wt Net:
Extended
Charge
209.92
1. 64 tons]
TOTAL DUE 209.92
Construction & Demolition Diversion Certificate --Diversion Percentage 65%
This certifies that the pompany listed above has utilized an EDCO facility to divertponstruction delJ)olition materia\s in accordance
with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility.
OSIRIS Driver
{'city of
Carlsbad
■
V v v
v
✓
l!]