HomeMy WebLinkAbout1078 BUENA VISTA WAY; ; CBR2022-2155; Recycle{city of
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
8-59
Deve/01?_ment Ser_vices
Building Division
1635 Faraday Avenue
442-339-2719
www.carlsbadca.gov
APPLICABLE TO NEW CONSTRUCTION, ALL RESIDENTIAL ADDITIONS AND ALTERATIONS AND
COMMERCIAL ADDITIONS AND ALTERATIONS OVER $200K. If you have questions about the recycling
requirement or completing this form, please contact Republic Services at (760) 332-6464 a certified C&D
recycler, or the Carlsbad Building Division at (442) 339-2700. Please note: Unless you are self-hauling, Republic
Services or approved haulers must be used for all construction projects within the City of Carlsbad.
PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued
without a completed Construction Waste Management Plan.
Applicant Information
Permit No. ____________ _
ProjectAddress_._/~o~]_,_G_~.....,_~~~~~~-~---------~ J;~;:TiVl APN
Owner Contractor Architect Other
Applicant Name _________________ _ □ □ □ □
Last First
Applicant Address ------------------------------------
Phone _._ __ ,__ _________ E-mail Address
Applicant Mailing Address
(if different than project address)
Project Type
(check all that apply):
Brief Description
Residential
~ Avu..
Commercial
□
Public Building □
Project Size ___ $:J~'--,1'2~------Estimated Cost of Project $_1_1._S--+-_(J:JQ ____________ _
(square footage)
Please check the appropriate box:
I plan on using REPUBLIC SERVICES roll-off bin(s) for all materials and will provide all receipts after construction.
I plan on self-hauling to a certified recycling facility and will provide all receipts after construction.
This is a proposed LEED certified project and I plan on separating materials on site in conjunction with REPUBLIC
SERVCES.
Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information
provided in and with this form pertains to construction and demolition debris generated only from the project listed
in PART 1, that I have reviewed the accuracy of the informat~ion, d that the information is true and correct to the
best of my knowledge and belief.
Print Name ~ ~} /I Signature_--,£--'"'----"------Date ~-(I -L-,}L-l--
Page 1 of 3 Rev. 05122
CBR2022-2155
/8 ADU
WAY
PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will
(cont'd) not be issued without a completed Construction Waste Management Plan.
DEBRIS RECYCLING ESTIMATE:
... ,,..11,1.,., Permit No . f{,Project Title
Project Address l 0 1 b Bu~£. \J r5i~ APN
Applicant Name ~t= ~ Phone ( 7 fu ) 53~-097>1
Last First
.11,1,,■: Complete the following table with estimated waste tonnage to be generated by your project.
This is your plan for construction waste management. Changes can be made on the final recycle report.
Goal: the diversion rate shall be 65% by weights of debris.
A B C
Material Type Estimated Place a (0) check Place a (0) check next Place a (0) check next
Waste Quantity next to item s t o be to items to be to items to be
(tons) reused or salvaged recycled disposed at landfill
Complete this line of the table only if
only using WASTE MANAGEMENT
roll-off bins. I igp □ Mixed C&D Debris □
Asphalt & Concrete \ □ B □
Brick / Masonry / Tile I □ g □
Mixed Inert Debris □ □ l5a>
Cabinets, Doors, Fixtures, □ □ □ Windows (circle all that apply)
Carpet □ □ □
Carpet Padding / Foam □ [l n
Cardboard \ □ &er □
Ceiling Tile (acoustic) □ □ □
Drywall (used, new, scrap) □ n □
Landscape Debris (brush, trees, □ □ □ stumps, etc.) No dirt.
Unpainted Wood & Pallets I □ 8=' □
Roofing Materials I □ ';IQ □
Scrap Met al ' □ @ □
Stucco I n n IS(I)
Other: □ □ □
TOTAL --
•
To meet 65% Diversion Requiremm~nt (e • te) fl-x 0.65 = s ~ tons .
1/,:::t IE t mated Waste from above Minimum Required Diversion
Contractor/Owner Signature Date i✓ !1 ~ i~ 7.,V ,
Page 2 of 4 Rev. 05122
Conversion Table for Common Construction Waste
This document is informational onlv. It is here to helo vou convert truckload auantities to tons, if necessary.
Column A Column B Column C
Category Material Volume TonsLUnit Tons
Mixed Debris Construction cy X 0.18 =
Demolition cy X 1.19 =
Asphalt/Concrete Asphalt (broken) cy X 0.70 =
Concrete (broken) cy X 1.20 =
Concrete (solid slab) cy X 1.30 =
Brick/Masonry/Tile Brick (broken) cy X 0.70 =
Brick (whole, palletized) cy X 1.51 =
Masonry brick (broken) cy X 0.60 =
Tile sq ft X 0.00175 =
Building Materials (cabinets, doors, windows, etc.) cy X 0.15 =
Cardboard (flat) cy X 0.05 =
Carpet By square foot sq ft X 0.0005 =
By cubic yard cy X 0.30 =
Carpet Padding/Foam sq ft X 0.000125 =
Ceiling Tiles Whole (palletized) cy X 0.0003 =
Loose cy X 0.09 =
Drywall (new or used) 1/2" (by square foot) sq ft X 0.0008 =
5/8" (by square foot) sq ft X 0.00105 =
Demo/used (by cu. yd.) cy X 0.25 =
Landscape Debris (brush, trees, etc.) cy X 0.15 =
Asphalt Composition
Shingles, asphalt Shingle cy X 0.22 =
Unpainted Wood/Pallets By board foot bd ft X 0.001375 =
By cubic yard cy X 0.15 =
Trash/Garbage cy X 0.18 =
Other (estimated weight) cy X estimate =
cy X estimate =
cy X estimate =
cy X estimate =
Total all =
Page 3 of 3
Rev .. 05122