HomeMy WebLinkAbout2590 CALENDULA LN; ; CBRA2023-0210; PermitBuilding Permit Finaled
(Cityof
Carlsbad
Residential Associated Permit
Print Date: 04/02/2025
Job Address: 2590 CALENDULA LN, CARLSBAD, CA 92008-3748
Permit Type: BLDG-Associated Permit Residential Work Class: Condo
Parcel#: 2071013500 Track#: CT 16-07
Valuation: $348,390.90 Lot#:
Occupancy Group: R3/U Project#: DEV16038
#of Dwelling Units: 1 Plan #:
Bedrooms: 3 Construction Type:V-B
Bathrooms: Orig. Plan Check#: PC2022-0005
Occupant Load: O Plan Check#: PC2023-0043
Code Edition: 2019
Sprinkled: Yes
Project Title: MARJA ACRES
Permit No:
Status:
CBRA2023-0210
Closed -Finaled
Applied: 12/12/2023
Issued: 05/10/2024
Finaled Close Out: 04/02/2025
Final Inspection: 11/14/2024
INSPECTOR: Renfro, Chris
Consultant, Landscape
Alvarado, Tony
Description: MARJA ACRES: (CORAL RIDGE) PHASE F4 // BLDG F15 // UNIT 735 // 1730 SF LIV// 480 SF GARAGE
Applicant:
KB HOME COASTAL INC
ELIZABETH SHOEMAKER
9915 MIRA MESA BLVD, # 100
SAN DIEGO, CA 92131-7001
FEE
ATTACHED ACCESSORY & UTILITY USES
DUP FLRPLN SFD & DUPLEXES
PARK IN-LIEU ATTACHED(> 4 UNITS) NW
PUBLIC FACILITIES FEES -outside CFD
SB1473 -GREEN BUILDING STATE STANDARDS FEE
STRONG MOTION -RESIDENTIAL (SMIP)
Total Fees: $20,691.17 Total Payments To Date:
Building Division
$20,691.17
Contractor:
KB HOME COASTAL INC
9915 MIRA MESA BLVD, # STE 100
SAN DIEGO, CA 92131-7001
(951) 691-5300
Balance Due:
AMOUNT
$933.80
$1,314.40
$6,190.00
$12,193.68
$14.00
$45.29
$0.00
Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
PERMIT INSPECTION HISTORY for (CBRA2023-0210)
Permit Type: BLDG-Associated Permit Residenti: Application Date: 12/12/2023 Owner:
Work Class: Condo Issue Date: 05/10/2024 Subdivision: RANCHO AGUA HEDIONDA POR
OF
Status: Closed -Finaled Expiration Date: 04/07/2025 Address: 2590 CALENDULA LN
IVR Number: 53775 CARLSBAD, CA 92008-3748
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
BLDG-SW-Inspection 263727-2024 Partial Pass Chris Renfro Reinspection Incomplete
Checklist Item COMMENTS Passed
Are erosion control BMPs Yes
functioning properly?
Are perimeter control BMPs Yes
maintained?
Is the entrance stabilized to Yes
prevent tracking?
Have sediments been tracked Yes
on to the street?
Has trash/debris accumulated Yes
throughout the site?
Are portable restrooms Yes
properly positioned?
Do portable restrooms have Yes
secondary containment?
11/14/2024 11/14/2024 BLDG-Final Inspection 267708-2024 Passed Tony Alvarado Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-Plumbing Final Yes
BLDG-Mechanical Final Yes
BLDG-Structural Final Yes
BLDG-Electrical Final Yes
BLDG-SW-Inspection 268133-2024 Passed Tony Alvarado Complete
Checklist Item COMMENTS Passed
Are erosion control BMPs Yes
functioning properly?
Are perimeter control BMPs Yes
maintained?
Is the entrance stabilized to Yes
prevent tracking?
Have sediments been tracked Yes
on to the street?
Has trash/debris accumulated Yes
throughout the site?
Are portable restrooms Yes
properly positioned?
Do portable restrooms have Yes
secondary containment?
Wednesday, April 2, 2025 Page 6 of 6
PERMIT INSPECTION HISTORY for (CBRA2023-0210)
Permit Type: BLDG-Associated Permit Residenti; Application Date: 12/12/2023 Owner:
Work Class: Condo Issue Date: 05/10/2024 Subdivision: RANCHO AGUA HEDIONDA POR
OF
Status: Closed -Finaled Expiration Date: 04/07/2025 Address: 2590 CALENDULA LN
IVR Number: 53775 CARLSBAD, CA 92008-3748
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
Checklist Item COMMENTS Passed
Are erosion control BMPs Yes
functioning properly?
Are perimeter control BMPs Yes
maintained?
Is the entrance stabilized to Yes
prevent tracking?
Have sediments been tracked Yes
on to the street?
Has trash/debris accumulated Yes
throughout the site?
Are portable restrooms Yes
properly positioned?
Do portable restrooms have Yes
secondary containment?
09/12/2024 09/12/2024 BLDG-16 Insulation 260688-2024 Passed Tony Alvarado Complete
9hecklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-17 Interior 260735-2024 Passed Tony Alvarado Complete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-SW-Inspection 260987-2024 Partial Pass Tony Alvarado Reinspectlon Incomplete
Checklist Item COMMENTS Passed
Are erosion control BMPs Yes
functioning properly?
Are perimeter control BMPs Yes
maintained?
Is the entrance stabilized to Yes
prevent tracking?
Have sediments been tracked Yes
on to the street?
Has trash/debris accumulated Yes
throughout the site?
Are portable restrooms Yes
properly positioned?
Do portable restrooms have Yes
secondary containment?
10/09/2024 10/09/2024 BLDG-33 Service 263554-2024 Partial Pass Chris Renfro Relnspectlon Incomplete
Change/Upgrade
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
Wednesday, April 2, 2025 Page 5 of6
PERMIT INSPECTION HISTORY for (CBRA2023-0210)
Permit Type: BLDG-Associated Permit Residenti; Application Date: 12/12/2023 Owner:
Work Class: Condo Issue Date: 05/10/2024 Subdivision: RANCHO AGUA HEDIONDA POR
OF
Status: Closed -Finaled Expiration Date: 04/07/2025 Address: 2590 CALENDULA LN
IVR Number: 53775 CARLSBAD, CA 92008-3748
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Re inspection Inspection
Date Start Date Status
BLDG-SW-Inspection 256484-2024 Partial Pass Chris Renfro Re inspection Incomplete
Checklist Item COMMENTS Passed
Are erosion control BMPs Yes
functioning properly?
Are perimeter control BMPs Yes
maintained?
Is the entrance stabilized to Yes
prevent tracking?
Have sediments been tracked Yes
on to the street?
Has trash/debris accumulated Yes
throughout the site?
Are portable restrooms Yes
properly positioned?
Do portable restrooms have Yes
secondary containment?
08/27/2024 08/27/2024 BLDG-13 Shear 259129-2024 Passed Tony Alvarado Complete
Panels/HD (ok to wrap)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
08/29/2024 08/29/2024 BLDG-84 Rough 259474-2024 Passed Tony Alvarado Complete
Combo(14,24,34,44)
Checklist Item COMMENTS Passed
BLDG-14 Yes
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44 Yes
Rough-Ducts-Dampers
BLDG-SW-Inspection 259616-2024 Partial Pass Tony Alvarado Re inspection Incomplete
Wednesday, April 2, 2025 Page 4 of 6
PERMIT INSPECTION HISTORY for {CBRA2023-0210)
Permit Type: BLDG-Associated Permit Residenti, Application Date: 12/12/2023 Owner:
Work Class: Condo Issue Date: 05/10/2024 Subdivision: RANCHO AGUA HEDIONDA POR
OF
Status: Closed -Finaled Expiration Date: 04/07/2025 Address: 2590 CALENDULA LN
IVR Number: 53775 CARLSBAD, CA 92008-3748
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
Checklist Item COMMENTS Passed
BLDG-Building Deficiency 2nd story deck nailing Yes
BLDG-SW-Inspection 253558-2024 Partial Pass Chris Renfro Reinspection Incomplete
Checklist Item COMMENTS Passed
Are erosion control BMPs Yes
functioning properly?
Are perimeter control BMPs Yes
maintained?
Is the entrance stabilized to Yes
prevent tracking?
Have sediments been tracked Yes
on to the street?
Has trash/debris accumulated Yes
throughout the site?
Are portable restrooms Yes
properly positioned?
Do portable restrooms have Yes
secondary containment?
07/15/2024 07/15/2024 BLDG-14 254755-2024 Partial Pass Chris Renfro Relnspectlon Incomplete
Frame/Steel/Bolting/We
ldlng (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency 3rd story deck nailing Yes
BLDG-SW-Inspection 254819-2024 Partial Pass Chris Renfro Re inspection Incomplete
Checklist Item COMMENTS Passed
Are erosion control BMPs Yes
functioning properly?
Are perimeter control BMPs Yes
maintained?
Is the entrance stabilized to Yes
prevent tracking?
Have sediments been tracked Yes
on to the street?
Has trash/debris accumulated Yes
throughout the site?
Are portable restrooms Yes
properly positioned?
Do portable restrooms have Yes
secondary containment?
07/30/2024 07/30/2024 BLDG-15 Roof/ReRoof 256258-2024 Passed Chris Renfro Complete
(Patio)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
Wednesday, April 2, 2025 Page 3 of6
PERMIT INSPECTION HISTORY for (CBRA2023-0210)
Permit Type: BLDG-Associated Permit Residenti; Application Date: 12/12/2023 Owner:
Work Class: Condo Issue Date: 05/10/2024 Subdivision: RANCHO AGUA HEDIONDA POR
OF
Status: Closed -Finaled Expiration Date: 04/07/2025 Address: 2590 CALENDULA LN
IVR Number: 53775 CARLSBAD, CA 92008-3748
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
Checklist Item COMMENTS Passed
Are erosion control BMPs Yes
functioning properly?
Are perimeter control BMPs Yes
maintained?
Is the entrance stabilized to Yes
prevent tracking?
Have sediments been tracked Yes
on to the street?
Has trash/debris accumulated Yes
throughout the site?
Are portable restrooms Yes
properly positioned?
Do portable restrooms have Yes
secondary containment?
06/13/2024 06/13/2024 BLDG-11 251693-2024 Passed Chris Renfro Complete
Foundation/Ftg/Piers
(Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-31 251692-2024 Passed Chris Renfro Complete
Underground/Conduit -
Wiring
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-SW-Inspection 251830-2024 Partial Pass Chris Renfro Reinspection Incomplete
Checklist Item COMMENTS Passed
Are erosion control BMPs Yes
functioning properly?
Are perimeter control BMPs Yes
maintained?
Is the entrance stabilized to Yes
prevent tracking?
Have sediments been tracked Yes
on to the street?
Has trash/debris accumulated Yes
throughout the site?
Are portable restrooms Yes
properly positioned?
Do portable restrooms have Yes
secondary containment?
07/01/2024 07/01/2024 BLDG-14 253445-2024 Partial Pass Chris Renfro Relnspectlon Incomplete
Frame/Steel/Bolting/We
lding (Decks)
Wednesday, April 2, 2025 Page 2 of 6
Building Permit Inspection History Finaled
(cityof
Carlsbad
PERMIT INSPECTION HISTORY for (CBRA2023-0210)
Application Date: 12/12/2023 Owner: Permit Type: BLDG-Associated Permit Residenti;
Work Class: Condo Issue Date: 05/10/2024 Subdivision: RANCHO AGUA HEDIONDA POR
OF
Status: Closed -Finaled Expiration Date: 04/07/2025
IVR Number: 53775
Address: 2590 CALENDULA LN
CARLSBAD, CA 92008-3748
Scheduled
Date
Actual Inspection Type
Start Date
12/09/2024 BLDG-Planning Final
Inspection No.
270549-2024
Inspection Primary Inspector
Status
Passed Landscape
Consultant
Checklist Item COMMENTS
BLDG-Building Deficiency
NOTES Created By
Paula Cross
05/30/2024 05/30/2024 BLDG-21
Underground/Underflo
or Plumbing
250084-2024
TEXT
The following Units for Bldg. F15 have
satisfactorily completed the associated
landscape installation and may be released
for Permanent Occupancy. The Permit Card
for each Unit was signed on November 19,
2024
Coral Ridge -Bldg. F15 -Unit 68S -
2470 Calendula Lane -CBRA2023-0215
Coral Ridge -Bldg. F15 -Unit 69S -
2480 Calendula Lane -CBRA2023-0214
Coral Ridge -Bldg. F15 -Unit 70S -
2490 Calendula Lane -CBRA2023-0213
Coral Ridge -Bldg. F15 -Unit 71 S -
2530 Calendula Lane -CBRA2023-0212
Coral Ridge -Bldg. F15 -Unit 72S -
2560 Calendula Lane -CBRA2023-0211
Coral Ridge -Bldg. F15 -Unit 73S -
2590 Calendula Lane -CBRA2023-0210
Coral Ridge Building M2, Phase 24 has been
designated as the final Building and Units for
the Coral Ridge half of the project. No Units
from this Building (M2) will be released until all
landscape punch list items and close out
documents have been completed and
approved for all phases of Coral Ridge.
Passed Chris Renfro
Checklist Item COMMENTS
BLDG-Building Deficiency
BLDG-SW-Inspection 250296-2024 Partial Pass Chris Renfro
Wednesday, April 2, 2025
Reinspection Inspection
Passed
No
Created Date
12/09/2024
Passed
Yes
Complete
Complete
Reinspection Incomplete
Page 1 of 6
Structural
City of Carlsbad
~L~R O 3 2025
BUILDING DIVISION
Page 1 of 6
KB Home -Coral Ridge at Maria Acres Townhomes
Structural Observation Report#l0
Job#: 10-11634
Date of Observation: 11 /22/2024
Date: l l /22/2024
Page: 1 of 6
Structural Observation Requested by: Structural Observation performed by: Area Observed:
Darnen Demuth
□ Foundation □
□ Footing & Slab □
□ Holdown, Anchor □
bolts & associated □
Rebar
181 Roof & Floor Trusses
181 Roof Sheathing
□ Roof Loaded
181 Second Floor wall
181 Third Floor Wall
□ Fourth Floor Wall
Shawn Afshar, PE Building Fl 7 (phase 8) Lots 23-28
Framin
Observ.ed Structural Elements and their connections
Floor Sheathing D Roof Sheathing 181 Exterior 181 Framing D Others
2nd Floor 181 1st Level 181 1st Level
3rd Floor 181 2nd Level 181 2nd Level
4th Floor 181 3rd Level 181 3rd Level
□ 4th Level □ 4th Level
Status of Construction
181 Stair Installed 181 Bathtub Installed
□ Window Installed 181 P,relirninary Drywall Installed
□ Flashing Installed 181 Drywall Stacked in Units
□ Building Wrapped □ Drywall on Wall
D Building Stuccoed □ Drywall on Ceiling
181 MEP installation on going 181 Sheathing one side Party Wall
Pursuant to your request, a visit to the project site was made on the above date to perfonn a structural observation in
confonnance with CBC 2016 section 1702 and 1704.6.
Please note, not all symmetric or repetitive areas were observed, therefore please have your field personnel verify the
correction items in all similar areas. Where repair recommendations are given, verify if additional coordination may be
necessary with other trades or design professionals.
The structural observations do not constitute an approval of the work nor do they relieve the contractor or inspection agencies
from complying with project and code requirements. All observations were conducted from the ground or floor level and no
testing or inspection was performed. Our observations do not include a review of the contractors means or methods of
construction, shoring, erection, bracing, nor any associated safety precautions.
\ \ T, (7'4) 97M780 I F, (71') 978·9788 I www.m"'""""l.com I 1845 W. 0,aog,wood A,e., '" 200 I O,aog,, CA 92868
Page 2 of 6
GENERAL ITEMS
01. At Exterior and Shear wall, sill plates should have minimum of (2) anchor bolts. One bolt within 12
inches but no less than 7 bolt diameters at the end of a sill plate.
02. Install MST A36 strap at the top plates at all shear walls or exterior walls wherever the plum bing
penetrates the top plates.
03. Install additional nailing where shiners are observed in the sheathing.
04. Notches and bored holes in structural members larger than allowed by the plans must be identified and
submitted to our office for review. Please submit RFI on all these structural members to show locations
and size of all holes and notches and we will provide our recommendations.
GS. At shear walls around openings, the sheathing shall be nailed to common studs at all panel joints
including above and below the opening. In some areas the sheathing was observed to be split onto
adjacent studs. Stitch nail adjacent studs at all panel joints with 16ds at the edge nailing spacing per the
shear wall schedule.
06. Ensure that all point loads such as from headers, beams have sufficient support beneath that matches the
width of the beam or girder truss.
07. Ensure that beam to beam connection hangers receive max. nailing.
08. All exterior non-shearwalls should have min. 1/2"¢anchor bolts @48 "o.c. shearwall schedule.
G9 . AC line sets that will penetrate shear walls must be brought to the attention of the engineer before
installation.
010. Ensure all floor diaphragm and shear wall sheathing is no less than 24" wide.
011. Install trimmers for beams and headers per structural plan.
012. Ensure that floor joists are installed per plan.
013. Headers must fully bear on trimmers, add hardwood shim in the gap or reinstall headers.
014. Fasteners for pressure preservative treated and fire retardant treated wood shall be of hot dipped zinc
coated galvanized or stainless steel. Exception: Provide a letter from the manufacturer of the treated wood
product stating that corrosion resistant fasteners are not required.
Carry all multiple studs, posts or trimmers from floor above down to floor below or beam below. Provide
solid blocking at floor level to transfer load from upper post/studs/trimmer to lower post/studs/trimmer.
T: (714) 978-9780 IF: (714) 978-9788 I www.vcastructural.com I 1845 W. Orangewood Ave., Ste. 200 I Orange, CA 92868
Floor Framing Page 3 of 6
The following circled items are observed omissions and deficiencies that must be corrected prior to completing the building. Refer to
attached figures for the location of observed items. Correct similar items in all locations
Sole Plate
SP Sole plate split or broken or has excessive notch.
SPI Sole plate size/thickness is not per plan.
SP2 Sole plate must be in full contact with floor
sheathing.
SP3 Sole plate nailing is not per plan.
Ho/down Hardware
HD Holdown is missing or damaged or mislocated or
HDI
HD2
HD3
size not per plan.
Holdown strap is not nailed.
Holdown post is not per plan. Replace post or add
post/stud per fix detail.
Holdown from above is not in line with the holdown
below, or beam below.
HD4 Provide solid wood filler under holdown post.
HDS Stitch nail 2x stud with B.N.to the holdown post
with 16d staggered, spacing should be per shear
wall schedule.
Column/Post
CC Column/Post base is missing or not per plan.
CCI Column/Post must be continuous thru floor space.
Install squash block to bridge upper column and
lower column.
Shear Wall
SW Shear panel missing or not per plan or SW
thickness not per SW schedule or nailing not per
SWI
SW2
SW3
SW4
sws
SW6
SW7
SW schedule or length not per plan.
Structural sheathing splices should be on common
member.
Shear panel or top plate is damaged.
3x stud is required behind adjoining panel edges.
Boundary nailing must be applied along Holdown
post.
Minimum sheathing dimension is 24".
Shear wall detail at party wall is not per plan.
Only one side at double shear wall is observed at
this time.
SW8 Shear wall detail is not per plan.
SW9 For double sided shear wall, structural sheathing
splices should be offset at opposing faces of wall so
that, joint do not land on one common stud.
Shear Transfer
A35 A35, shear transfer connector, 16d nailing at shear
wall to blocking is insufficient or installation is
unacceptable.
Al Blocking over/under shear wall is not installed per
plan or installation is unacceptable.
~ag strap is missing or installed incorrectly. ~ ;~ag Strap is not nailed.
Stud Wall
W Stud Number/Size/spacing is not per plan . Add
studs.
WI Stud is damaged or has excessive notch or hole at
utility penetration. Replace or add stud.
W2 Add stud under point load from beam or girder truss
per plan.
Framing
F Joist/Truss Joist, size/spacing is not per plan.
Fl Joist/Truss Joist has excessive notch or bored hole.
Repair per special instruction.
F2 Install full depth blocking at bearing wall.
F3 Joist/Truss Joist to beam hanger is missing, is not
the right size, is damaged or installation is
unacceptable.
F4 Provide support under beam.
FS Beam is damaged. Repair per special instruction.
F6 Beam size is not per plan. Replace or reinforce per
special instruction.
F7 Beam location is incorrect or beam is missing.
F8 Provide blocking under bearing wall.
F9 Brace interior wall per plan.
FlO Framing is not per plan.
FU Detail is not per plan.
Framing at Opening
HR Header size is not per plan or missing.
HRl King stud is missing or nailing from king stud to
end of header is not sufficient.
HR2 Provide sufficient trimmer per plan.
HR3 Header is not long enough. Replace or repair per
special instruction.
HR4 Horizontal straps and blocking at top and bottom of
opening are missing.
HRS Nail horizontal straps at top and bottom of
opening.
HR6 Install continuous rim at floor level.
HR7 Replace blocking with continuous rim at shear wall.
Diaphragm
D Diaphragm nailing is incorrect. Min. nailing is 12"
o.c. at field and 611 o.c. at edges and at boundaries.
D1 Plywood diaphragm is damaged. Replace.
D2 Block diaphragm edges and provide adequate
nailing.
D3 Horizontal sheathing is not extended to wall.
D4 Boundary nailing installation is not complete.
DS Mininmm sheathing dimension is 24".
Stair
Mc Stringer has excessive cuts.
Mel Stringer hanger is missing.
Miscellaneous
MC Hanger is missing or size is not per plan.
MCI All the hangers should receive maximum nailing.
MC2 Notched & bored holes should be per detail on plan.
MC3 All the connections should be fastened per
manufactw-er's specifications.
MC4 Remove furring strips prior to installing sheathing.
Page 4 of 6
S2-D41
6.4-PLEX -SECOND FLOOR FRAMING I
Page 5 of 6
S2-D41
6.4-PLEX -THIRD FLOOR FRAMING
Page 6 of 6
Ensure 2-CS16
vertical straps al type
"V" holdowns. TYP.
S2-042
6.4-PLEX -ROOF FRAMING
ORDC I ,'
(_ City of
Carlsbad
HEIGHT/
BOUNDARY
CERTIFICATION
City of CarlAA@Jtpment Services
AUG O 5 2024 Building Division
1635 Faraday Avenue
8-60 BUILDING DIVlS40N 760-602-2719
www.carlsbadca.gov
B-60
This form shall be completed to certify bui lding height and/or bounda ry when requested by the Building Division.
CBRA2023-0215,-0214,-0213,-0212,-0211,-0210 20 7
Permit #: ____________ Assessor's Parce l Number: __ _ 102 06
Site Address: 2470,2480,2490,2530,2560, 2590 Calendula Lane
Owner's Name: KB Marja Acres 248 LLC
This is to affirm t hat on_O_?_l2_3_f_2_0_2_4 ______ (date) the structure being constructed on the
site was surveyed by, or under the direction of, the undersigned.
HIEGHT CERTIFICATION:
~ The height from the lower of natural or finished grade to the highest finished point of the roof ridge
elevation, or any part of the structure immediately above, was found to be in conformance with the
approved plans. Surveyed height measurement (top of roof sheathing) at po int(s) identified in
approved plans as the highest point(s) of the structure above lower of natural or finished grade
elevation. (Attach 8 ½"x 11" sheets showing elevation(s) of structure where measurement(s) were
taken and location on site plan where they were taken) Total thickness of roofing materials (i.e. felt
and roofing) to be installed after sheathing inspection, not to exceed: N/A Total
Height: _3_4_.5_0_' ___ _
BOUNDARY CERTIFICATION:
l!i!iiil The boundary survey com pleted on the parcel establishes confirmation of setback compliance for
the new construction proposed with this permit. The proposed setback shown on the design
documents of 4o· feet from the property boundary to the inside edge of the
foundation forms is confirmed to be in compliance with the proposed design. Applicable easements
and/or encroachments discovered were brought to the attention of the property owner, project
applicant and/or designer for design consideration. Land records research and/or a field survey was
completed to determine this compliance.
Seal of Registration
Registered Civil Engineer, Structural Engineer,
or Licensed Land Surveyor
NOTE: Property owner or project app lica nt/developer may not certify building height.
Planni ng Division Acknowledgement: _______________ Date: _____ _
PROJECT PLANNER
Page 1 of 1 Rev. 10/21