Loading...
HomeMy WebLinkAbout1208 OAK AVE; ; PC2023-0037; RecycleC City of Carlsbad CONSTRUCTION WASTE MANAGEMENT PLAN B-59 Development Services Building Division 1635 Faraday Avenue www.carlsbadca.gov This form shall be completed for all demolitions and new construction, additions, and alterations. The California's Green Building Standards Code (CALGreen) req uires that at least 65% of construction site debris generated during demolition projects, most new construction, as well as the majority of building additions or alterations be recycled, reused, or otherwise diverted from landfill disposal. STEP 1: The Applicant must submit PART 1 of this form before a building permit application is approved. STEP 2: The permit holder shall utilize a waste management company that can provide verifiable documentation that meets 65% waste diversion. Republic Services is the exclusive franchised waste hauler in the City of Carlsbad. • Option A-Roll-Off Bins: Call Customer Service (760) 332-6464 and ask for a C&D account for waste diversion. Republic Services will provide roll-off bins for construction waste. • Option B -Self Haul to Republic Services or other dump site that can provide verifiable documentation. It must be a Certified Source Separated Recycling Facility. When you enter the site, explain to gate operator that this is C&D material. When you exit the site, request a receipt and certificate from gate operator for waste diversion. STEP 3: Prior to permit close-out (permit final), the permit holder sha ll complete PART 2 of this form and submit all trash and recycling weight receipts to the bu ilding inspector. Waste log, acknowledgement, and tickets must be submitted to release your certificate of occupancy. C&D CERTIFICATION: ~ I certify under penalty of perjury under the laws of the State of California that the information provided in and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is t rue and correct to the best of my knowledge and belief. I understand the waste diversion requirements of the State of California and submit this Construction Waste Management Plan pursuant to California Green Building Standards Code 4.408.2 or 5.408.1.1. Failure to provide documentation of C&D reporting, reporting of waste diversion less than 65%, and failure to provide adequate we ight rece ipts, may result in enforcement action against me or other responsible parties, including a notice of violation, citations, and any other remedies provided in Chapters 1.08 and 1.10 of the Carlsbad Municipal Code. Projects are required to submit their Waste Log, Acknowledgement Form, and Weight Receipts prior to Certificate of Occupancy (CO) issuance. This project does not involve disposal of unive rsa l or hazardous waste OR this project includes disposal of universal or hazardous waste in a responsible, safe and verifiable manner. Disposal of asbestos- containing materials, batteries, electronic waste, fluorescent bulbs, lead based paints, mercury containing equipment and refrigerants, require specia l processing prior to commencement of 01· • n activities. 5/31/2024 Date: __________ _ Page 1 of 4 rev 4/24 .. PART 1 Complete and submit this form when applying for a building permit. Permits will not be issued without a completed Construction Waste Management Plan. SECTION A Permit No. _P_c_20_2_3_-_oo_3_7 ______ Project Title 1208/1210 Oak Ave. ADU Remodel Project Address 1208 / 1210 Oak Avenue Carlsbad APN 156-180-49 Applicant Name_D_a_v_i_s _____________ D_i_a_n_a ______ Phone 760-521-9224 Last First SECTION B Complete the following table with estimated waste tonnage to be generated by your project. Material Type Complete this line af the table only if only using WASTE MANAGEMENT roll-off bins. Mixed C&D Debris Asphalt & Concrete Brick/ Masonry/ Tile M ixed Inert Debris Cabinets, Doors, Fixtures, Windows (circle all that apply) Carpet Carpet Padding/ Foam Cardboard Ceiling Tile (acoust ic) Drywall (used, new, scrap) Landscape Debris (brush, trees, stumps, etc.) No dirt. Unpainted Wood & Pallets Roofing Materials Scrap Metal Stucco Other: Trash/ Debri TOTAL SECTION C To meet 65% Diversio Page 2 of 4 Estimated Waste Quantity {tons) A B C Place a { ✓) check next to items to be reused or salvaged 400 300 700 Place a {✓)check next to items to be recycled 350 350 Place a {✓) check next to items to be disposed at landfill 150 200 200 550 1050 550 _________ x 0.65 = ____________ tons Total Estimated Waste f rom above Minimum Required Diversion rev 4/24 PART 2 Complete before final inspection, obtain City Approved hauler receipts and return prior to final building approval. DEBRIS RECYCLING REPORT (ACTUAL): Acknowledgement I certify under penalty of perjury under the laws of the State of Cal ifornia that t he information provided in and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge and belief. Permit No. ~eg ~ OJ,. 3 --a 11 6 Print Name Address /20# Of}K. /JV[ 4AAL$~ t'A ?,2t;o$ Date Use this Final Log below to track loads of materials as they leave the job site. @@SAVE RECEIPTS@@ Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken. Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons. A B C Date Material Type Actual Amt Actual Amt Actual Amt Destination Facility Reused or Recycled Disposed in (Name, Address, Phone) Salvaged Landfill Example: 01/01/2020 Palomar Transfer Station, 5960 El Concrete (broken) 5 tons I IS-30 ,5D ,So ,Y I j{) @TOTAL 1-3 Diversion Rate Achieved Total of columns A+ B Total of columns A + B + C DIVERSION Camino Real -760 603-0153 ;,: 65% ~ 65% Contractor /Owner Signature C::::::::/tJ 2 Date O 7/! I ../4 y - Attach the following documentation to this Report: Return completed form and documentation to: • Original recycling weight tickets, landfill weight tickets • Original donation receipts with photos and/or itemized descriptions • Any other relevant information to support Recycling Report City of Carlsbad Building Division (1st Floor) 1635 Faraday Avenue Carlsbad, CA 92008 Page 3 of 4 Rev. 04122 {"_city of Carlsbad CONSTRUCTION WASTE MANAGEMENT PLAN B-59 part 2 Development Services Building Division 1635 Faraday Avenue 422-339-2719 www.carlsbadca.gov Your project qualifies for the City of Carlsbad Construction Waste Management Plan (CWMP): Section 4.408.1 and Section 5.408.1 of the California Green Building Standards Code requires at least 65% of non-hazardous construction debris is recycled and/ or salvaged for reuse. NEXT STEPS: STEP 1. Before the project - a. Review your CWMP completed prior to permit issuance. (copy is attached to your job card) This plan demonstrates how you will recycle a minimum of 65% of the construction waste generat ed from your project by choosing: Republic Services or Self Haul. STEP 2 -During the Project a. Save all receipts and/or documents from reuse facilities, recycling centers, processing facilities, and landfills where materials were taken. b. Complete the Debris Recycling Report (ORR) on the next page as your project progresses. Recycling/diversion goals are (at a minimum) 65% of the waste generated by your project STEP 3 -After the Project a. Prior to receiving inspection for final sign off the Building Permit or Certificate of Occupancy, Applicant must submit t he fu lly completed and approved (ORR) of the Construction Waste Management Plan (CWMP) Table. b. Provide the ORR and receipts to your building inspector. FOR MORE INFORMATION: NOTICE: Applicant (contractor and subcontractors) shall comply with the project's CWMP. It is the Applicant's responsibility to collect all receipts from the facilities that recycle their materials AND all project waste/landfill disposal receipts. When working with the City's franchised hauler, Republic Services, one cumulative project receipt is acceptable. However, it is the Applicant's responsibility to confirm that the bins are collected for C&D Recycling. 1. This project shall generate t he least amount of waste possible by planning and ordering carefully, following all proper storage and handling procedures to reduce broken and damaged materials, and reusing materials whenever possible. 2. Republic Services can provide 2 roll-off bins, one for commingled construction debris and one for trash. The commingled construction roll-off bin will be taken to a Certified Mixed C&D Processing Facility to sort the material and create receipt(s), to demonstrate the project has met a 65% diversion rate or greater. 3. Applicants with a goal of recycling greater than 65% of the project's total waste should work with the City's exclusive franchised waste hauler to develop a more specific CWMP. This plan may include using additional roll-off bins for particular phases of construction (e.g., concret e and wood waste) to ensure the highest waste diversion rate possible. 4. Contractors/subcontractors hauling t heir own waste as part of their scope of work (e.g., construction clean up companies, etc.) SHALL NOT be excluded from complying with the CWMP and shall provide weight and waste diversion receipts from a Certified Source Separated Recycling Facility. For a current list of Certified Recycling Facilities go to http://www.sandiego.gov/envi ron menta I-services/recycling/cd/i ndex.shtm I. 5. If contractors/subcontractors furnish their own debris boxes as part of their scope of work, they SHALL NOT be excluded from complying with the CWMP and shall provide weight and waste diversion receipt s from a Certified Source Separated Recycling Facility. Rev. 05122 PALOMAR TRANSFER 5960 EL CAMINO REAL CARLSBAD, CA 92008 (760)603-0153 018415 -MUTUAL PARTNERS , INC . 1640 OCEANSIDE BLVD OCEANSIDE , CA 92054 Contract: COMM-GATE Yr . 200 GROSS 11 ,960 TARE 10 ,000 NET 1 ,960 Tracking Qty: 0 .00 Qty 0.98 Unit Description TN MSW Origin: OCEANSIDE Signature: 54 Ticket #: 2718009 Weighmaster: marticy Scale In Tare Out 100% In: July 09, 2024 Out: July 09 , 2024 Vehicle : a61926 Ref: BOL: INBOUND INVOICE Rate Extension $101. 2] $99.19 Tax $0 .00 Total Paid Change 9 :29 am 9 :29 am Total $99 .19 $99.19 $0 .00 $0.00 PALOMAR TRANSFER 5960 EL CAMI,NO REAL CARLSBAD, CA 92008 (760)603-0153 ( 018415 -MUTUAL PARTNERS , INC . 1640 OCEANSIDE BLVD OCEANSIDE , CA 92054 Contract : COMM-GATE Yr. 200 GROSS 12 ,020 TARE 9,840 NET Tracking Qty: 2 ,180 0.00 Qty Unit Description 1 .09 TN MSW Origin: OCEANSIDE Signature: 54 Ticket ( 2711807 Weighmaster: marticy Scale In Tare Out 100% In : Out : Vehicle : Ref : 801 : INBOUND INVOICE June 24 , 2024 June 24 , 2024 al06151 Rate Extension $101.2] $110 .32 Tax $0.00 I 5D Total Paid Change 9:08 am 9 :08 am Total $110 .32 $110 .32 $0 .00 $0 .00 /{-tv.f( p 4tJ1tr5 r/L.prt O r)lf/l. ~/lt)'J(C'f_f (o>W dAJ011..5 ). PALOMAR TRANSFER 5960 EL CAMI NO REAL CARLSBAD, CA 92008 (760)603-01 53 018 415 -MUT UAL PARTNERS , INC. 1640 OCEANSI DE BLVD OCEANSIDE, CA 92054 Contract : COMM-GATE Yr. 200 GROSS 1 1 ,800 TARE NET Tracking Qty: 9 ,840 1 ,960 0 .00 Qty Unit Description 0 .98 TN MSW Origin: OCEANSIDE Signature : 54 Ti cke[ ~: 2705965 We i ghmaster: marticy Scale In Tare Out 100% ----- crt:-~-.:i:+-~1 0 , 2024 Vehicle : Ref: BOL : INBOUND INVOICE a l06151 Rate Extension $101.2] $99.19 Tax $0 .00 Total Paid Change 8 :59 am 8 :59 am Total $99 .19 $99 .19 $0 .00 $0 .00