HomeMy WebLinkAbout1 LEGOLAND DR; ; CBC2023-0090; Recycle{city of
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59
Develo12_mefJ_t Services
Building Division
1635 Faraday Avenue
442-339-2719
www.carlsbadca.gov
Many of the materials generated from your project can be recycled. You are required to list materials that will be
reused, recycled or disposed from your project. If you have questions about the recycling requirement or completing
this form, please contact Waste Management at 442-339-9400, a certified C&D recycler, or the Carlsbad Building
Division at 442-339-2700. Please note: Unless ou are self-haulin Waste Mana ement or a roved haulers must be
used for all construction ro·ects within the Cit of Carlsbad.
PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued
without a completed Construction Waste Management Plan.
Applicant Information
Permit No. _____________ Project Title LEGOLAND Fun Town Stage Renovation
Project Address 1 LEGOLAND Drive, Carlsbad, CA 92008
Applicant Name Jones, Megan
Last First
Owner
0
APN
Contractor Architect
0 ®
Applicant Address 3111 Camino Del Rio N, Suite 500, San Diego, CA 92108
Phone 619) 97-0131 E-mailAddress mjones@sgpa.com
211-1 00-09-00
Other
0 --
---------------------
Applicant Mailing Address
(if different than project address)
Project Type
( check all that apply):
Residential Commercial □ [Z]
Brief Description Renovation of an existing outdoor amphitheater
Public Building □ Industrial □
Project Size 1 O?O Estimated Cost of Project $_2_,_0_0_0_,0_0_0 ___________ _
(square footage)
Please check the appropriate box:
D I plan on using REPUBLIC SERVICES roll-off bin(s) for all materials and will provide all receipts after construction.
I ✓ I I plan on using a City Approved Hauler and will provide all receipts after construction.
D This is a proposed LEED certified project and I plan on separating materials on site in conjunction with
REPUBLIC
Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information
provided in and with this form pertains to construction and demolition debris generated only from the project listed
in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the
best of my knowledge and belief.
Print Name Owenn Geis Signature ___ ~---~_'lf_~..___i' ____ Date 03/10/23
Page 1 of 4 Rev. 041'22
PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will
not be issued without a completed Construction Waste Management Plan.
DEBRIS RECYCLING ESTIMATE:
SECTION A Permit No. __________ Project Title LEGOLAND Fun Town Stage Rene
Project Address 1 LEGOLAND Drive, Carlsbad CA 92008 APN 211-100-09-00
Applicant Name Jones, Megan Phone 619-297-0131 ------------------------------------
Last First
SECTION B Complete the following table with estimated waste tonnage to be generated by your project.
This is your plan for construction waste management. Changes can be made on the final recycle report.
Goal: the diversion rate shall be 65" by weights of debris.
Material Type
Complete this line of the table only if
only using WASTE MANAGEMENT
roll-off bins.
Mixed C&D Debris
Parking lot Asphalt & Concrete
Brick/ Masonry/ Tile
Mixed Inert Debris
Cabinets, Doors, Fixtures,
Windows (circle all that apply)
Car et
Carpet Padding/ Foam
Cardboard
Ceiling Tile (acoustic)
Drywall (used, new, scrap)
Landscape Debris (brush, trees,
stumps, etc.) No dirt.
Unpainted Wood & Pallets
Concrete Roofing Materials
Sera Metal
Stucco
Other:
TOTAL
SECTION C
Estimated
Waste Quantity
(tons)
To meet 65% Diversion Requirement (estimate)
A
Place a(✓) check
next to items to be
reused or salvaged
14.45
B
Place a ( ✓) check next
to items to be
recycled
9.6
2
11 .6
C
Place a ( ✓) check next
to items to be
disposed at landfill
2.85
2.85
x 0.65 = 9.39 tons ---------------------
Total Estimated Waste from above Minimum Required Diversion
Contractor/Owner Signature _____ a_~ __ 'II_~,____• ________ Date 03/10/23 --------------
Page 2 of4 Rev. 711120
Conversion Table for Common Construction Waste
This document is informational only. It is here to help you convert truckload quantities to tons if necessary.
Column A Column B Column C
Category Material Volume Tons/Unit Tons
Mixed Debris Construction cy X 0.18 =
Demolition cy X 1.19 =
Asphalt/Concrete Asphalt (broken) 6.3 cy X 0.70 =
Concrete (broken) 4.29 cy X 1.20 =
Concrete (solid slab) cy X 1.30 =
Brick/Masonry/Tile Brick (broken) cy X 0.70 =
Brick (whole, palletized) cy X 1.51 =
Masonry brick (broken) cy X 0.60 =
Tile sq ft X 0.00175 =
Building Materials (cabinets, doors, windows, etc.) cy X 0.15 =
Cardboard (flat) cy X 0.05 =
Carpet By square foot sq ft X 0.0005 =
By cubic yard cy X 0.30 =
Carpet Padding/Foam sq ft X 0.000125 =
Ceiling Tiles Whole (palletized) cy X 0.0003 =
Loose cy X 0.09 =
Drywall (new or used) 1/2" (by square foot) sq ft X 0.0008 =
5/8" (by square foot) sq ft X 0.00105 =
Demo/used (by cu. yd.) cy X 0.25 =
Landscape Debris (brush, trees, etc.) 19 cy X 0.1 5 =
Asphalt Composition
Shingles, asphalt Shingle cy X 0.22 =
Unpainted Wood/Pallets By board foot bd ft X 0.001375 =
By cubic yard cy X 0.15 =
Trash/Garbage cy X 0.18 =
Other (estimated weight} cy X estimate =
cy X estimate =
cy X estimate =
cy X estimate =
Total all =
Page 4 of 4
Rev. 04122
C cityof
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59 part 2
Development Services
Building Division
1635 Faraday Avenue
442-339-2719
www.carlsbadca.gov
Your project qualifies for the City of Carlsbad Construction Waste Management Plan (CWMP): Section 4.408.1 and Section 5.408.1
of the 2019 California Green Building Standards requires at least 65% of non-hazardous construction debris is recycled and/or
salvaged for reuse.
NEXT STEPS:
STEP 1. Before the project -
a. Review your CWMP completed prior to permit issuance. (copy is attached to your job card) This plan demonstrates how
you will recycle a minimum of 65% of the construction waste generated from your project by choosing: Waste
Management or Self Haul.
STEP 2 -During the Project
a. Save all receipts and/or documents from reuse facilities, recycling centers, processing facilities, and landfills where
materials were taken.
b. Complete the Debris Recycling Report (ORR) on the next page as your project progresses. Recycling/diversion goals are
(at a minimum) 65% of the waste generated by your project
STEP 3 -After the Project
a. Prior to receiving inspection for final sign off the Building Permit or Certificate of Occupancy, Applicant must submit the
fully completed and approved (ORR) of the Construction Waste Management Plan (CWMP) Table.
b. Provide the ORR and receipts to your building inspector.
FOR MORE INFORMATION:
NOTICE: Applicant (contractor and subcontractors) shall comply with the project's CWMP. It is the Applicant's responsibility to
collect all receipts from the facilities that recycle their materials AND all project waste/landfill disposal receipts. When working
with the City's franchised hauler, Republic Services, one cumulative project receipt is acceptable. However, it is the Applicant's
responsibility to confirm that the bins are co llected for C&D Recycling.
1. This project shall generate the least amount of waste possible by planning and ordering carefully, following all proper
storage and handling procedures to reduce broken and damaged materials, and reusing materials whenever possible.
2. Republic Services can provide 2 roll-off bins, one for commingled construction debris and one for trash. The
commingled construction roll-off bin will be taken to a Certified Mixed C&D Processing Facility to sort the material and
create receipt(s), to demonstrate the project has met a 65% diversion rate or greater.
3. Applicants with a goal of recycling greater than 65% of the project's total waste should work with, the City's exclusive
franchised waste hauler, to develop a more specific CWMP. This plan may include using additional roll-off bins for
particular phases of construction (e.g., concrete and wood waste) to ensure the highest waste diversion rate possible.
4. Contractors/subcontractors hauling their own waste as part of their scope of work (e.g., construction clean up companies,
etc.) SHALL NOT be excluded from complying with the CWMP and shall provide weight and waste diversion receipts from
a Certified Source Separated Recycling Facility. For a current list of Certified Recycling Facilities go to
http://www.sandiego.gov/environmental-services/recycling/cd/index.shtml.
5. If contractors/subcontractors furnish their own debris boxes as part of their scope of work, they SHALL NOT be excluded
from complying with the CWMP and shall provide weight and waste diversion receipts from a Certified Source Separated
Recycling Facility.
Rev. 51612022
PART 2 Complete before final inspection, obtain WASTE MANAGEMENT signature, and return with receipts prior to final
building approval.
DEBRIS RECYCLING REPORT (ACTUAL):
Acknowledgement
I certify under penalty of perjury under the laws of the State of California that the information provided in and with this
form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have
reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge
and belief.
Use this Final Log below to track loads of materials as they leave the job site.
□□SAVE RECEIPTS□□
Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken.
Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons.
Date Material Type
A B C
Actual Amt
Reused or
Salvaged
Actual Amt Actual Amt
Recycled Disposed in
Landfill
Destination Facility
(Name, Address, Phone)
Example:
01/05/2018 Concrete (broken) 5 tons
Palomar Transfer Station, 5960 El
Camino Real
603-0153
□TOTAL
Diversion Rate Achieved ~I S_w 0_'1 _~/ _ _,__,j l,....._._._._0....._5 __ = q 3 %
Total of columns A+ B Total of columns A + B + C DIVERSION
Date I l / L <;.. Ii_ 3 Contractor/Owner Signature ~ ---------
Attach the following documentation to this Report: Return completed form and documentation to:
• Original recycling weight tickets, landfill weight tickets
• Original donation receipts with photos and/or itemized descriptions
• Any other relevant information to support Recycling Report
City of Carlsbad
Building Division (1st Floor)
1635 Faraday Avenue
Carlsbad, CA 92008
Rev. 5/612022
_ _,...;o Station
8184 Commercial St.
La Mesa, CA 91942
(619) 466-3355
customer: ·0313
ROSENBACH COMPANY
1870 CROSSON DR. #200
EL CAJON, CA. 92020
Ticket: 11685
Date: 09/30/23
Commodity Units Rate
20 Commercial Refuse 1.98
In: 13:17
out: 13:11
Truck:
Container:
Route:
Origin:
0011/0011
02020
020 SAN DIEGO
[Gross(In): 7.70 tons Man Wt Tare 5.72 tons Stored Net:
Extended
Charge
227.70
l. 98 tons] -
TOTAL DUE 227.70
Miguel E. Driver